[2026] FCA 351
General information, not legal advice.
Federal Court of Australia
2026-03-27
Anderson J
Original judgment source is linked above.
2.1 The products: Alucobond PE and Alucobond Plus
On 10 Aug 2018, a "ban notice" was issued under s 9(1) of the Building Products (Safety) Act 2017 (NSW) (the product ban). The notice prohibits the use of ACPs with a core comprised of greater than 30% PE by mass in any external cladding / wall / insulation, façade or rendered finish in Class 2, 3, 5, 6, 7, 8 and 9 Buildings with Type A or Type B construction (as defined in the BCA).
The product ban was subject to two exceptions: (i) where the product is not deemed combustible in accordance with AS 1530.1-1994 testing; or (ii) the building product and proposed external wall assembly has successfully passed a test for both external wall fire spread and building-to-building fire spread classifications in accordance with AS 5113, where the test has been carried out by an accredited testing laboratory, and a statutory declaration is provided that the product will be installed in a manner identical to the tested prototype wall assembly or façade.
On 13 March 2018, a Minister's Guideline (MG-14) was issued pursuant to s 188(1)(c) of the Building Act 1993 (Vic).
The guideline provided that when considering to issue a building permit in relation to a Type A or B construction, the relevant building surveyor should not be satisfied that a proposed building work which includes the installation of a "Prescribed Combustible Product" as part of an external wall (or attachment) would comply with the Building Act (Vic) unless the application includes a determination of the Building Appeals Board that the installation of the product complies with the Building Act (Vic).
"Prescribed Combustible Products" were defined to mean a panel that comprised of a PE core bonded to one or more sheets of metal panels, including ACPs. PE core was defined to mean a core comprised of 30% or more PE by mass.
On 1 February 2021, MG-14 was revoked and replaced with a declaration under s 192B(1) of the Building Act (Vic) which prohibited ACPs with a core of less than 93% inert mineral filler by mass in external cladding as part of a wall system, in connection with Type A or Type B construction.
The Queensland government issued "Queensland Development Code, Mandatory Part 2.5 - Use of external cladding" which took effect from 18 October 2019. The Part provided that ACPs of greater than 30% PE core by mass were not permitted to be used on any building in any external cladding, external insulation or façade.
On 18 October 2019, the Queensland government further introduced Pt 4A of the Building Regulations 2006 (Qld). That Part required building owners of all buildings of Type A or Type B construction for which building development approval was given after 1 January 1994 but prior to 1 October 2018, to register their buildings, complete a "combustible cladding checklist", and obtain a statement from a building industry professional as to whether their building may be "an affected private building" (ie, has combustible cladding). If the building was suspected to have combustible cladding, then the building owners were required to engage a fire engineer to complete a fire safety assessment
In June 2018, the Western Australian government issued Guideline "GL-17: External Walls and Cladding". The guideline sets out the expectations of the Department of Fire and Emergency Services for any fire engineering brief or fire engineering report when addressing the performance requirements of the BCA.
Those expectations included that any use of potentially combustible wall systems be supported by large-scale façade test data. The guideline further provided that ACPs with a combustible core did not meet the DtS Provisions of the BCA for external walls of Type A and Type B construction and that a CodeMark "Certificate of Conformity" could only be relied upon if a fire engineer demonstrated its applicability to the subject building's design.
On 5 October 2018, the Western Australian government inserted reg 31HA into the Building Regulations 2012 (WA), which required any Performance Solution in respect of external walls to be non‑combustible by the BCA definition to be verified in accordance with C1V3 (unless used for exempt remedial work). C1V3, as defined in reg 3 of the Building Regulations (WA), means the Building Code Volume One Part C1 verification method.
On 12 March 2018, amendments to the Development Regulations 2008 (SA) came into operation which created new requirements for "designated building products" used on "designated buildings".
Around the same time, the Minister gazetted any metal plate or lining formed with aluminium, or similar metal sheet material, irrespective of core material, as a "designated building product" when used on a "designated building". As a result, the builder/designer was required to provide further details of the proposed product and complete any Performance Solution in the gazetted template. A statement of compliance was also required before any certificate of occupancy could be issued.
On 27 December 2017, the Director of Building Control issued a determination under ss 18 and 20(1)(d) of the Building Act 2016 (Tas). The determination, relevantly, provided that ACPs containing a PE core used as external building cladding were classified as "high risk building products" if they were used on (i) a class 2, 3 or 9 building of 2 or more storeys; or (ii) a class 5, 6, 7 or 8 building of 3 or more storeys.
This means that those products could not be used in Tasmanian buildings unless approved under the determination. Approval could only be obtained where there was evidence that the product was fit for the purpose for which it was intended, including, among other things, appraisable reports from suitably qualified persons and test reports being provided.
Southern elevation (screen capture from Professor Luke Bisby Report dated 26 April 2022)
Northern elevation (screen capture from Professor Luke Bisby Report dated 26 April 2022)
West elevation (screen capture from Professor Luke Bisby Report dated 26 April 2022)
East elevation (screen capture from Professor Luke Bisby Report dated 26 April 2022)
Reasons for the Order:
- Bayside Council is in receipt of documentation which indicates that the Aluminium Composite Panelling (ACP) installed on the subject premises is a product that contains a core material that is greater than 30% Polyethylene (PE) and is therefore a Banned Product pursuant to the [Building Products (Safety) Act 2017 (NSW)].
- Such products cause an unreasonable risk to the spread of fire around a building and therefore give rise to a risk of loss of life or damage to property from fire.
- The subject building is an 'affected building' under the [Building Products (Safety) Act 2017 (NSW)] (a building is an 'affected building' if a building product the subject of a building product use ban has been used in the building for a use that is prohibited by the building product use ban.
- Provisions for fire safety or fire safety awareness are not adequate to prevent the spread of fire or ensure or promote the safety of persons in the event of fire.
- To improve the current level of fire safety at the premises.
Inspection of Shore Building and combustible cladding risk assessment
Removal of old cladding and installation of new cladding
Eastern elevation (ie, back of building)
![]()
Western elevation (ie, front of building)
Please note: External cladding is out of the scope of this Fire Engineering Report. External cladding had been identified onsite by our office, however after requests to the builder to provide information confirming compliance to the PCA [sic] for assessment, to our knowledge no such information has been provided. Neither myself or our office take any responsibility for the type of cladding used if it deemed [sic] to be not in accordance with the BCA as this is out of the scope of our engagement and was mentioned numerous times during the design and construction phases of the project.
Hi mate,
This is non combustible right ?
Regards
While the panels have been identified as having a composition of less than 29% PE, the materials used in the entire assembly are what will ultimately determine how well the facade will perform in the event of a fire...
Furthermore, it is recommended to engage a fire engineer and a building certifier to assess the entire wall assembly to ascertain any risks associated with the areas clad in ACP considering the fire protection systems at the property.
Council has been made aware of the potential problems with the use of inappropriate and potentially dangerous cladding material to the façade of the buildings in our local area... [t]his review has identified the above-mentioned property as potentially containing the subject cladding.
Your proactive approach and potential engagement with Project Remediate assures confidence for a compliant cladding replacement proposal.
Considering the above, council will hold off on the order, however in the interim please provide an update within 30 days.
$476,622.30, offering an additional home owners warranty fee of $32,400.00.
(a) Firstly, the Applicants plead that when the Alucobond products were fitted as part of or as an attachment to the external wall or other building element, there was, and is, a material risk that the cladding will, in the event of a fire: cause or contribute to the spread and severity of the fire, cause or contribute to debris falling from the building, cause or contribute to fire and smoke overwhelming or compromising any fire safety measures in the building, and cause or contribute to the release of toxic products of combustion. As a result of all, any, or a combination of the above matters, the Applicants plead that the Alucobond products increase the risk of loss of life and damage to property, adversely impact the ability of occupants to evacuate, and/or adversely impact the ability of firefighting authorities to fight the fire. These are collectively referred to as the "Material Fire Risk Properties" of the Alucobond products. It is relevant to note that this part of the claim is pleaded in relation to all buildings (regardless of the class of building under the BCA).
(b) Secondly, the Applicants plead that the Alucobond products do not and did not comply with the BCA, or there was a material risk that they did not so comply. This is pleaded on the basis that the panels could not be used as part of a design that was compliant with the DtS Provisions of the BCA, and could not reasonably practicably form part of an alternative solution, other than where used in insubstantial quantities. These are referred to as the "BCA Non-compliance properties" and "BCA Non-compliance Risk Properties" of the Alucobond products. The Applicants stress that this aspect of their claim is separate and independent to the claim regarding the Material Fire Risk Properties.
(c) The third iteration of the consumer guarantee claim is effectively a consequence of the first two. The Applicants plead that by reason of the BCA Non-compliance Properties and/or the BCA Non-compliance Risk Properties of the panels, there was at all material times a risk that the Alucobond products could be the subject of a legally binding direction to be removed and/or replaced at the cost of the owner or leaseholder. These are referred to as the "Prohibition Risk Properties" and the "BCA-related Prohibition Risk Properties".
Part 1 - Whether the TPA and ACL apply to 3A's conduct
Whether 3A engaged in the impugned conduct in Australia.
If not, whether the TPA and ACL applied to conduct 3A engaged in outside Australia because it was carrying on business within Australia within the meaning of s 5(1) TPA and s 5(1)(g) of the CCA.
Part 2 - Consumer guarantee claims: threshold requirements
Whether 3A supplied Alucobond PE or Alucobond Plus to HVG in "trade or commerce": TPA, s 74D(1)(a) [TPA only].
Whether Alucobond PE or Alucobond Plus were "goods" for the purposes of s 74D, which turns on whether they were goods of a kind ordinarily acquired for personal, domestic or household use or consumption: TPA, s 74A(2)(a) [TPA only].
Whether a person "supplied" Alucobond PE or Alucobond Plus to a "consumer": TPA, s 74D(1)(b); ACL, s 54(1)(a).
5(a) - Whether each Applicant was "supplied" and "acquired" Alucobond PE or Alucobond Plus (as the case may be) as a "consumer" upon creation under the NSW strata legislation.
5(a)(i) - Whether each Applicant was "supplied" and "acquired" Alucobond PE or Alucobond Plus upon creation under the NSW strata legislation.
5(a)(ii) - Whether each Applicant is taken to have done so as a "consumer", which will only be so if, relevantly:
(A) the amount paid or payable by the Applicant for the Alucobond PE or Alucobond Plus did not exceed $40,000; or
(B) Alucobond PE or Alucobond Plus were goods of a kind ordinarily acquired for personal, domestic or household use or consumption: TPA, s 4B(1)(a)(i)-(ii); ACL, s 3(1)(a)-(b).
5(b) - Whether each developer of the Shore Building and Five Dock Building is taken to have been "supplied" and "acquired" Alucobond PE or Alucobond Plus as a "consumer", which will only be so if, relevantly:
5(b)(i) - the amount paid or payable by the developer for the goods did not exceed $40,0000; or
5(b)(ii) - the goods were of a kind ordinarily acquired for personal, domestic or household use or consumption; and
5(b)(iii) - the developer did not acquire or hold itself out as acquiring Alucobond PE or Alucobond Plus:
(A) for the purpose of re-supply in trade or commerce; or
(B) for the purpose of using it up or transforming it, in trade or commerce, in the course of a process or production or manufacture or in the course of repairing of treating other goods or fixtures on land: TPA, s 4B(1); ACL, s 3(2).
If 5(a) is not established, but 5(b) is established, whether each Applicant is a person who derived title to Alucobond PE or Alucobond Plus through or under the relevant developer: TPA, s 74D(1); ACL, s 271(1)-(2).
Whether the relevant goods affixed to the Shore Building and Five Dock Building are Alucobond PE or Alucobond Plus, or have been so used up or transformed as to be different "Third Party Products" manufactured by the Qualified Professional(s) who produced their façade systems: TPA, s 74D(1); ACL, s 54(1).
Part 3 - Consumer guarantee claims: merchantable and acceptable quality
Whether Alucobond PE or Alucobond Plus were not of merchantable or acceptable quality within the meaning of the relevant provisions: ACL, s 54(2)-(3); TPA, s 74D(2)-(3).
Whether, if Alucobond PE or Alucobond Plus are not of merchantable or acceptable quality, that is only because of an act or default or omission of, or any representation made by, any person other than the manufacturer or an employee or agent of the manufacturer, occurring after the goods have left the control of the manufacturer: ACL, s 271(2)(a).
[Positive misrepresentations] Whether, by distributing and/or publishing and/or authorising or approving HVG to distribute or publish certain brochures in Australia, 3A made, in trade or commerce, in connection with the supply, possible supply or promotion of Alucobond PE or Alucobond Plus, each of the: Suitability Representation, Plus Composition Representation, Fabrication and Affixation Representation, PE Fire Performance Representation, Plus Fire Performance Representation, and/or Compliance Representation, which depends on:
10(a) - Whether 3A distributed and/or published the brochures in Australia;
10(b) - Whether 3A authorised or approved HVG distributing and/or publishing the brochures in Australia;
10(c) - Whether, if 10(b) is established, that is sufficient to establish that 3A 'made' any representations conveyed by the brochures;
10(d) - Whether the brochures conveyed the alleged representations.
Whether the alleged representations were misleading for the reasons alleged in SOC [77]-[80].
[Warnings] Whether 3A or HVG were obliged to, and did not, publicly disclose, adequately or at all, the Suitability Warning, Limitation of Use Warning, Fabrication and Affixation Warning, Fire Risk Warning, Plus Composition Warning, and Non-compliance, Non-compliance Limitation or Fire Advice Limitation Warnings.
Part 6 - Causation and loss (Consumer Guarantee claims)
Whether each Applicant has suffered loss or damage because of Alucobond PE or Alucobond Plus not being of acceptable quality: ACL, s 272(1)(b).
Whether it was reasonably foreseeable that each Applicant would suffer such loss or damage as a result of the Alucobond PE or Alucobond Plus not being of acceptable quality: ACL, s 272(1)(b)
Part 7 - Causation and loss (Misleading Conduct claims)
Whether 3A made each of the Representations to, or directed the Misleading Conduct to, (a) Qualified Professionals engaged with respect to the Shore Building and Five Dock Building and/or (b) the developers.
Whether, had 3A not made the Representations or engaged in the Misleading Conduct: (a) the Qualified Professionals engaged with respect to the Shore Building and Five Dock Building would not have designed, specified, certified or used Alucobond PE or Alucobond Plus on the Shore Building and Five Dock Building and/or (b) the developers and the Applicants would not have acquired Alucobond PE or Alucobond Plus.
Whether, by reason of issues 18-19, the Applicants have suffered loss or damage because of the conduct of 3A in contravention of ss 29 or 33 of the ACL: ACL, s 236.
Whether the amendments made in the SOC are deemed to have taken effect on 3 March 2020, being the date certain significant amendments were made to the Applicants' claim, or on 14 February 2019, being the date on which the proceedings were commenced.
Whether 14 February 2019 or 3 March 2020 (whichever is applicable) is within 3 years after the day on which the Applicants first became aware, or ought reasonably to have become aware, that the acceptable quality guarantee had not been complied with: ACL, s 273.
Whether 14 February 2019 or 3 March 2020 (whichever is applicable) is within 6 years after the day on which Applicants' causes of action under s 236(1) accrued: ACL, s 236(2).
(a) whether 3A's production processes could appropriately ensure any particular Alucobond Plus panel had no more than 30% plastic binders. The Applicants contend that the acceptable tolerances within 3A's production process means that the proportion of material fed into the machine at any given time could be above or below the relevant proportion required, and therefore, some batches or panels would have more than 30% plastic binders. Dr Werner's evidence on this issue is dealt with in more detail in section 8.5.1 of these reasons;
(b) whether 3A engaged in impugned conduct in Australia or was otherwise carrying on business in Australia. Broadly speaking, this involved cross-examination regarding the nature of the Distributor Agreements between the Respondents, 3A's provision of warranties to Australian clients, and Dr Werner's visits to Australia. Additionally, Dr Werner was cross-examined about a senior sales manager from 3A in Germany, Susan Haas, who appears to have been largely responsible for the Australian market during the relevant period, and who also made numerous marketing trips to Australia. Again, Dr Werner's evidence on this issue is dealt with in more detail in section 6 of these reasons, below; and
(c) the nature of the fire performance tests conducted by 3A in relation to the Alucobond products, and the representations made by 3A regarding the results of those tests.
4.3.2 Mr Bill Filippopoulos (Five Dock Building)
Joint report of Dr Kirk and Mr Carrascal dated 3 March 2024 ("Group 1 Joint Report")
Joint Report of Professor Bisby, Mr Carrascal and Associate Professor Lange dated 28 March 2024 ("Group 2 Joint Report")
Joint Report of Professor Bisby, Professor Torero and Associate Professor Lange dated 3 April 2024 ("Group 3 Joint Report")
Joint Report of Mr Kip, Mr Davis and Mr Moore dated 3 April 2024 ("Group 4-5 Joint Report")
Joint Report of Mr Kip and Mr Halstead dated 13 Mar 2024 ("Group 6 Joint Report")
Joint Report of Mr Quigley, Mr Incoll and Mr Smithson dated 26 February 2024 ("Group 7 Joint Report")
Joint report of Dr Kirk and Mr Carrascal dated 3 March 2024 ("Group 1 Joint Report")
To identify the materials or substances... present in the core of the ACPs, different materials characterisation tests may be carried out on samples taken from the core of the ACPs... Combining results from a series of different tests provides more conclusive results, as, for instance, if different tests point towards the same result, there is more confidence in the finding.
(a) the average weight % of aluminium hydroxide was 68% for P1-A, and 68.6% for P2‑A;
(b) the estimated standard deviation of each value was calculated as +/- 0.5 for P1-A, and +/- 1 for P2-A;
(c) the total average for sample P1‑A across the test repeats was 68% of aluminium hydroxide, therefore reflecting an average 32 weight % of EVA, while the total average for sample P2-A was 68.6% of aluminium hydroxide and 31.4% of EVA.
(a) polyethylene vinyl acetate (EVA); and
(b) aluminium hydroxide (AI(OH)3),
and what were the results of those tests?
- Which of the tests, or combination of tests, provide the most accurate and reliable result?
5.2 Expert Group 2 - Fire behaviour experiments
Joint Report of Professor Bisby, Mr Carrascal and Associate Professor Lange dated 28 March 2024 ("Group 2 Joint Report")
There are, essentially, two types of tests in fire safety engineering. There are those tests which are developed and which are carried out in order to, essentially, assign some kind of a category or declare a pass/fail outcome of that test for a building product... The other types of testing that we might do in fire safety engineering are tests to the performance of building products or building materials. The reasons why we do those is to gather data that would be used to inform a fire safety engineering solution...
An important point to note with these two different types of test methods is that they're not intended to reproduce reality... They are designed in such a way... to gather data... as is relevant. They do not always represent reality because of that. If they were to represent reality, they would either be constrained to a very, very narrow band of application or they would be far too complex...
I consider the values which Mr Carrascal has determined and the observations that can be made on the basis of his testing, to be relevant as input to the fire engineering design process. I agree with Professor Bisby that the critical heat flux for ignition and for flame spread of the core of the material, the ignition temperate of the core and its burning behaviour cannot be characterised as reaction to fire properties of the composite product, as Professor Bisby has said. However, given the nature of the composite product... the response of the core, in my opinion, is a meaningful bound for the worse case of the product in terms of the relevant properties which have been discussed...
[Mr Carrascal's] test, as I mentioned before, is designed to deliver information which could be used by a fire safety engineer to inform the use of the fire safety engineering model or analysis to support the fire safety strategy or the design of a fire safety strategy of a building. The test that Mr Carrascal has done is not intended to represent reality.
5.3 Expert Group 3 - Fire engineers (academics)
Joint Report of Professor Bisby, Professor Torero and Associate Professor Lange dated 3 April 2024 ("Group 3 Joint Report")
Alucobond PE
What are the reaction-to-fire properties of Alucobond PE and do the aluminium coversheets of Alucobond PE protect the core?
What conclusions, if any, can be drawn from the fire performance tests conducted by Professor Bisby?
What, if any, are the risks to life and/or property presented by the use of Alucobond PE as part of or as an attachment to an external wall or building element?
To what extent can any risks to life and/or property identified in response to question (4) be mitigated by the design of the building as a whole?
Alucobond Plus
What are the reaction-to-fire properties of Alucobond Plus and to what extent do the aluminium coversheets protect the core of Alucobond Plus?
What conclusions, if any, can be drawn from the fire performance tests conducted by Professor Bisby and Mr Carrascal?
What conclusions, if any, can be drawn about the risks to life and/or property presented by the use of Alucobond Plus as part of or as an attachment to an external wall or building element?
To what extent can any risks to life and/or property identified in response to question 8 be mitigated by the design of the building as a whole?
Shore and Five Dock Buildings
- Did the use of Alucobond PE on the Shore Building as part of or as an attachment to an external wall or building element materially increase the risks to life and/or property in the event of a fire? If the answer is "yes", could Alucobond PE have been used in a way that did not present such risks and, if so, how?
- Did the use of Alucobond Plus on the Five Dock Building as part of or as an attachment to an external wall or building element materially increase the risks to life and/or property in the event of a fire? If the answer is "yes", could Alucobond Plus have been used in a way that did not present such risks and, if so, how?
[T]he process of development of cladding systems evolved at a certain speed that was much more significant than the speed at which competency was developed within the field creating a gap that resulted in many of these buildings being designed in a manner that... was not ideal.
...
[W]e have enabled systems to become too complex and the moment that they became too complex they became almost impossible to assess, rendering the professionals incompetent. Now, whether we can design simpler systems that we actually can assess, if we take back the control of the design process, is a completely different story. But in essence, what we have created is a system, which brought us to 2021, that had enabled the existence of a number of different buildings that had become too complex for the professionals to be able to assess.
Material and product manufacturers and suppliers have a responsibility to deliver accurate, relevant, credible, transparent, easily accessible, complete, unambiguous, and verifiable information on their products, to be used by competent professionals (i.e. specifiers, designers, approvers). This information has to be - and has to be presented in a form that is - consistent with careful and competent professional practise. If that information is not available to the satisfaction of the careful and competent professional, then it is incumbent on them to obtain it if possible, and therefore also incumbent on material and product manufacturers and suppliers to provide any and all information that is available to them.
5.3.2.1 What are the reaction-to-fire properties of Alucobond PE and do the aluminium cover sheets of Alucobond PE protect the core?
(a) the PE core may melt and ignite. In cases where some of the PE material remains in situ, areas of the panel remote from the area of direct influence of the pre-existing fire may be heated to a greater extent than would be the case had non-combustible cladding been used, thus potentially promoting upward external fire spread;
(b) the PE core material may flow out from the Alucobond PE panels and/or form burning droplets of molten PE, which would then mobilise in a downward direction due to gravity, likely whilst burning. This would increase the overall heat release rate of the fire and could promote external fire spread;
(c) the melted, burning PE can collect and pool on horizontal surfaces which may promote horizontal fire spread;
(d) the aluminium cover sheets may separate, particularly where mechanical fixings are not in place to explicitly prevent this; this would expose larger surface areas of PE within the cladding system, with consequent increases in the burning area and hence the fire size. This would promote upward, downward, and horizontal fire spread;
(e) mechanical deformation of the Alucobond PE panels - induced by differential thermal expansion alongside loss of mechanical properties of the PE core material, the polymer adhesive films bonding the PE core to the aluminium cover sheets, and the aluminium cover sheets themselves - may compromise the geometry of the cladding system, potentially opening up gaps and voids not intentionally designed into the Alucobond PE panels or the overall cladding system. This may also compromise the functionality of any fire cavity barriers or fire separation materials or products installed within the cladding system (intended to slow or prevent storey-to-storey vertical fire spread and/or fire spread horizontally around a building);
(f) mobilised, burning PE may flow or drip downward, over the surfaces of materials and products within the cladding system, thus increasing the surface area of burning PE and increasing the overall heat release rate, whilst also potentially igniting other combustible materials present within or adjacent to the cladding system, and potentially increasing the fire size and promoting further fire spread; and
(g) ongoing separation or burn-through of the aluminium cover sheets may further increase additional mobilisation of PE, with consequent further increases in heat release rate and fire spread; this may also lead to separation of cladding panels or components thereof (e.g. aluminium cover sheets) from the building, which could generate falling (potentially burning) debris hazards to bystanders, evacuating building occupants, emergency services personnel, and adjacent building properties.
The question to be asked when considering these [fires occurring in buildings with combustible cladding] in the context of these proceedings is not whether the performance of the external cladding on those buildings is adequate; but whether the performance of the external cladding is adequate having due consideration for, e.g., the function or use of the building, the fire load, the fire intensity, the evacuation time, etc.
(Original emphasis.)
5.3.2.2 What conclusions, if any, can be drawn from the fire performance tests conducted by Professor Bisby?
5.3.2.3 What, if any, are the risks to life and/or property presented by the use of Alucobond PE as part of or as an attachment to an external wall or building element?
[W]hether one uses one material or another that is simply one component that needs to be analysed. But it is impossible to generalise back and say, "If you use this material with this particular type of reaction to fire, then you will get this outcome", because the outcome is not the product of the material. It is the product of the ensemble of the fire safety strategy.
5.3.2.4 To what extent can any risks to life and/or property identified in response to question (4) be mitigated by the design of the building as a whole?
5.3.3.1 What are the reaction-to-fire properties of Alucobond Plus and to what extent do the aluminium cover sheets protect the core of Alucobond Plus?
(a) the mineral-filled EVA core material used in Alucobond Plus has less energy to release during a fire than Alucobond PE. Alucobond Plus had a heat of combustion of 13 MJ/kg compared to Alucobond PE's heat of combustion of 46 MJ/kg;
(b) on the basis of the experiments performed by Professor Bisby and Mr Carrascal, the mineral-filled EVA core material used in Alucobond Plus mobilises less readily upon heating compared to the PE core material used in Alucobond PE; and
(c) in the case of Alucobond Plus, the core material does not drip or flow like PE, but rather swells, softens, oozes and sloughs off.
(a) the mineral-filled EVA core will swell and is likely to ooze out from the edges of the Alucobond Plus. This may result in burning debris mobilising in a downward direction, possibly whilst flaming, and could result in downward external fire spread under certain conditions. However, given the relatively short-lived flaming observed for the Alucobond Plus core after it has fallen, these conditions may not occur in all cases;
(b) any exposed mineral-filled EVA core may ignite. In cases where some of the Alucobond Plus core material remains in situ, areas of Alucobond Plus remote from the area of direct influence of the pre-existing fire will be heated to a greater extent than would be the case had non-combustible cladding been used, thus making upward fire spread more likely;
(c) the aluminium cover sheets may separate locally where heated, particularly where mechanical fixings are not in place to explicitly prevent this. This will expose larger surface areas of mineral-filled EVA core material within the cladding system, with consequent increases in the burning area and hence the fire size. This could enable external vertical fire spread;
(d) mechanical deformation of the Alucobond Plus panels - induced by differential thermal expansion alongside loss of mechanical properties of the core material, the polymer adhesive films bonding the core material to the aluminium cover sheets, and the aluminium cover sheets themselves - may compromise the geometry of the cladding system. This may potentially open up gaps and voids not intentionally designed into the Alucobond Plus panels or the overall cladding system. This may also compromise the functionality of any fire cavity barriers or fire separation materials or products installed within the cladding system;
(e) mobilised and potentially burning mineral-filled EVA core material may ooze, dis‑bond, or slough downward, with consequent increases in the overall heat release rate, whilst also potentially igniting other combustible materials present within or adjacent to the cladding system. It is important to note that the likelihood and potential impact of mobilised, potentially burning mineral-filled EVA on downward ignition and increased heat release rate will be less than is the case for the PE core used in Alucobond PE panels; and
(f) ongoing separation or burn-through of the aluminium cover sheets may increase mobilisation of core material, with consequent increases in heat release rate and thus fire spread. This may also lead to separation of cladding panels or components thereof (eg, aluminium cover sheets) from the building, generating falling (potentially burning) debris hazards to bystanders, evacuating building occupants, emergency services personnel, and adjacent properties.
I think, in general, what is being described is a material that burns or a product that burns with fairly similar characteristics controlled by, fundamentally, the same parameters, same reaction to fire parameters as Alucobond PE will be controlled. I think there is - in some ways, I think the only difference is that there is some sense of better behaviour. You are diluting the combustible material by using an inert filler and you are adding some chemical products that reduce the flammability of the material. Nevertheless, the form of behaviour becomes quite complex. Significantly more complex than what you see with the PE, which, I think, from an engineering perspective, my only differentiation would be that, when treating the gain that the Alucobond Plus brings in terms of mobility, I would exercise quite a bit of caution and probably try to cover those uncertainties by accepting a very small fraction of that gain.
So I can accept, for example, the fact that, if I'm diluting the core with inert, I can reduce the heat of combustion by an equal proportion but, for example, I will not consider the gain of the chemical product because I think that creates a series of behaviours that probably compound it, doesn't make me gain that much. So, as a means of addressing this conservatively I will probably be very, very conservative in my judgment of what aspect of the gain I would take. But otherwise I think the mechanisms are the same.
5.3.3.2 What conclusions, if any, can be drawn from the fire performance tests conducted by Professor Bisby and Mr Carrascal?
[T]here is the debate of whether [the flame] will stop spreading. So Mr Carrascal mentions that there is a critical heat flux at which it will not continue to spread and Professor Bisby indicates that he is not comfortable with the universality of that statement - and because it depends on the conditions and the characteristics and so forth. The reality is they are both right...
[U]nder certain conditions the flame will become shorter than the area that is burning and then it cannot spread. Now, those conditions are complicated to calculate. But this is an advantage that we could envision the Alucobond Plus will potentially have, that it can lead to conditions, under certain conditions of design, where effectively we can say that it will not spread. Are those conditions going to be universal? No. Are those conditions going to be difficult to calculate and interpret? Yes... But are we capable of approximating those conditions in a conservative way? Yes. And we will actually take results, like the tests of Mr Carrascal, and try to see to what extent those can be extrapolated appropriately because the fact that we can condition the possibility of it not spreading is a great advantage.
5.3.3.3 To what extent can any risks to life and/or property identified in response to question 8 be mitigated by the design of the building as a whole?
[W]e are dealing with a material that has, in many ways, a better performance but in [some] ways is slightly more complicated to analyse. So while we can take some advantage in the design process of this better reaction-to-fire characteristics we have to exercise potentially a lot more caution in the way in which we take advantage of this and be quite conservative in our approach.
5.3.4.1 Did the use of Alucobond PE on the Shore Building as part of or as an attachment to an external wall or building element materially increase the risks to life and/or property in the event of a fire? If the answer is "yes", could Alucobond PE have been used in a way that did not present such risks and, if so, how?
Of course, in principle, Alucobond PE could have been used in a way that... minimises or makes acceptable such risks [to life and property]... In practice, justifying any substantial use would require employing, again, notably, with some cost in both time and money presumably, a careful and competent fire engineering designer to develop a suitably quantified and technically evidenced performance solution accounting for all of the relevant features in the building. Whether this is realistic within the Australian design context has already been discussed at some length.
Given the presence of the terraces, a fire starting on the third floor cannot progress vertically, thus fire spread will be limited by lateral fire spread over the ACP. A fire on the fourth floor cannot progress vertically, but the molten polyethylene will pool underneath the ACP intensifying the fire and potentially supporting lateral fire spread. This was a key mechanism of fire spread in the Grenfell Tower fire, nevertheless, lateral progression of the fire was very slow (several hours). The hazard condition for occupants will be the re-entry of the fire. If this was to occur, fire alarms will be activated and occupants will evacuate in approximately 2-3 minutes, if standard pre-movement and egress times are used.
In all of these scenarios, the fire cannot progress vertically, so the risk is clearly one of lateral fire spread... Using the fastest lateral fire spread rates from the Grenfell Tower fire it can be estimated that in 3 minutes a fire cannot spread laterally beyond a metre... Thus, the maximum possible fire dimensions will be one metre of panel. A fire of this size will be unlikely to ignite a fire on the fourth floor, if it was to start in the third floor. Therefore, the one-floor-fire scenario will not be compromised by the ACP and adjacent buildings will not be affected.
It is clear that for both scenarios, it is possible for polyethylene to drop and ignite combustible materials below the area of the fire. This will be of greater concern for a fire on the third floor. Nevertheless, there are no combustible materials present in significant quantities below the ACPs, therefore any fire event below will be very small and short lived. In a similar manner, the main risk of a fire fuelled by molten polyethylene on the fourth floor will be the ACPs themselves. The quantity of polyethylene is small therefore the pool created by the molten polyethylene will also be of a very small radius.
The potential contribution of the ACPs to the intensity and duration of internal fires will represent no challenge to the fire resistance of all the internal partitions, thus the protection of the internal means of egress will remained [sic] unchanged by the ACPs. The egress strategy will therefore be unaffected.
As the panels burn, they will deform and most likely fall off. This will only be a relevant issue if the fire starts on the third floor. In this case, the ignition of the panel would have been due to an internal event that would have had to attain very severe conditions before breaking out and igniting the panel. Typically, the characteristic time for an internal fire to attain those conditions would be of the order of 5 minutes. Fire alarms would have been activated and the fire authorities would have been informed.
(References omitted.)
5.3.4.2 Did the use of Alucobond Plus on the Five Dock Building as part of or as an attachment to an external wall or building element materially increase the risks to life and/or property in the event of a fire? If the answer is "yes", could Alucobond Plus have been used in a way that did not present such risks and, if so, how?
The fire engineering report establishes that the Five Dock Building is designed to allow for full evacuation of all occupants, including occupants with disabilities. The expected number of occupants is small (total of 157 occupants). The building utilises multiple levels of compartmentation protecting means of egress with a high level of redundancy. The approach towards detection and alarm is designed to deliver an optimized egress process. Thus, occupants will be expected to evacuate and the detection and compartmentation provisions are expected to enable evacuation to proceed safely. The Fire Engineering report does not provide any quantification. Therefore, it is not possible to establish the exact margin of safety, nevertheless, a simple analysis using commonly accepted approaches will show that the approach provides ample margin of safety, redundancy and robustness for the egress process.
The Five Dock Building provides a different type of example because it illustrates a scenario where the poor design and use of a product can introduce risks that cannot be mitigated even by the use of a product with the fire performance characteristics exhibited by Alucobond Plus. In this case, significant alterations to the fire safety strategy and building design are necessary to deliver a building that complies with the level of risk acceptable to the BCA.
The chosen fire safety strategy relies on containing the fire within one floor but nevertheless does not provide any assessment by which the design of the façade will support this to be the case...
Further, BCA Innovations could instead also have relied on the existing CodeMark for Alucobond Plus and have used the requirements for a façade as stated therein. Had Alucobond Plus been used in the façade of the Five Dock Building, in accordance with the requirements of the CodeMark certificate, then a Deemed-to-Satisfy solution may have been proposed for the Five Dock Building. This is provided a valid CodeMark certificate had been issued and the requirements on the CodeMark certificate had been adhered to. While, a BCA Professional would be entitled to rely on clause A2.2 of the BCA as evidence that the certified product could be used in compliance with the BCA, due diligence would have still been required. Due diligence is necessary to establish that all assumptions embedded in the Deemed-to-Satisfy solution would have still been met. This analysis would have demonstrated that a fire would have inevitably extended beyond the floor of origin. This would have then required a Performance Solution...
The detailed analysis of the Five Dock Building required to prepare a performance solution for the Building, would have to have regard to the presence and configuration of the Alucobond Plus, in the context of the overall fire performance of the building. As I have explained previously in this report, any analysis of the fire performance of a product, and the building as a whole, is complex and requires the consideration number of interrelated factors. In the context of the Five Dock Building, these considerations may include:
a) the fire safety strategy;
b) the properties and relative fire performance of Alucobond Plus (when compared to Alucobond PE);
c) the inclusion of any other fire safety features of the building;
d) the proximity of the Five Dock Building to other buildings;
e) the fire brigade response times and response protocols;
f) the nature of the occupants and egress patterns;
g) the overall fire safety system (eg. shelter in place, staggered evacuation, full evacuation); and
h) the design and construction of the façade system and the proposed method of installation.
This list is non-exhaustive, and it is not possible to provide an exhaustive list of factors which will be considered. However, it is important to note there are a number of factors unrelated to the façade, or the products used in the façade system, which will influence the fire performance of the building, and in turn, the ability of the building to comply with the BCA.
(References omitted.)
[I]n the case of the Five Dock Building, the use of Alucobond Plus across five floors on the Eastern elevation of the building, including around balconies and impinging into windows, would increase the risk of vertical and horizontal fire spread across floors, and a re-entry of the fire (through the balconies and windows) into further components.
5.3.4.3 Conclusions on the evidence of Expert Group 3
(a) evidence was given regarding the different levels of competency during the relevant period. In particular, Professor Torero and Associate Professor Lange spoke about how prior to the Grenfell Fire, there generally appeared to be a significant gap in the profession's ability to properly assess the fire risk posed by the more sophisticated façade systems;
(b) Professor Torero also spoke partly to the lack of available knowledge or understanding which led to the creation of the cladding library at the University of Queensland, and the development of CPD programs to assist skill development in the area;
(c) Professor Bisby, a number of times, referred to his understanding from Expert Group 4‑5 that at the relevant time in Australia, FSEs appeared to be rarely engaged in such projects, based on the industry's understanding that the panels were DtS compliant, such that no one would have had the sufficient competency to assess the fire risk at the time. Even if engaged, as noted above, Associate Professor Lange and Professor Torero noted the very wide degrees of variation in competency in the area; and
(d) Professor Torero noted his expectation that manufacturers and suppliers needed to ensure they were disclosing clear, accurate, and reliable information regarding the fire performance of their products. Professor Torero noted that this information was required for FSEs to be able to do their jobs properly. Professor Torero noted that a competent FSE would be expected to understand the limitations of any particular classification, and seek further information from manufacturers or suppliers and that classification and test data would need to be carefully reviewed to reasonably extrapolate to any real-life application since, in reality, reaction-to-fire behaviour would depend on so many different factors. An FSE would not expect to rely purely on information disclosed in a brochure since it would not be sufficient to properly consider the reaction-to-fire properties.
5.4 Expert Group 4-5 - Fire engineers (practising professionals)
Joint Report of Mr Kip, Mr Davis, Mr Moore, Professor Bisby and Professor Torero dated 3 April 2024 ("Group 4-5 Joint Report')
(a) Mr Stephen Kip: Mr Kip is the director of SKIP Consulting Pty Ltd, a fire safety engineering and building regulatory consultancy. Mr Kip was previously a building surveyor, and from 2000, was registered as an FSE in Victoria. Mr Kip has taught building regulations, building codes, and fire safety engineering at several TAFE colleges and universities since 1987. He is an adjunct Associate Professor at Victoria University, an honorary Fellow at the University of Melbourne School of Architecture, Building & Planning and one of the independently appointed building industry representatives on the ABCB. Mr Kip has been a member of the ABCB since 2015, and in that role, has been involved in reviewing and approving draft amendments to the BCC and NCC;
(b) Mr Rob Davis: Mr Davis was originally a part-time firefighter from 1979 until 1983. He completed his engineering qualifications in civil and structural engineering at the University of Witwatersrand in South Africa and was employed as a civil engineer in South Africa and Swaziland. In 2000, Mr Davis was registered as a Chartered Engineer through the Institution of Fire Engineers with the Engineering Council UK. Mr Davis migrated to Australia in 2003 and has provided fire safety engineering consultancy services on projects in Australia since then. Mr Davis is registered as a Fire, Civil, Structural and Building Services Engineer on the National Engineering Register, and has a Fire Safety Engineering registration in Queensland, NSW and Victoria. Since 2020, Mr Davis has held the position of Associate Director, Fire Engineering APAC at Total Essential Services Group; and
(c) Mr Ian Moore: Mr Moore is HVG's only witness. Mr Moore is a materials scientist by first degree, having qualified in 1985 and worked as a research metallurgist, senior materials engineer and forensic material scientist. Mr Moore became an FSE in 1995 and has over 30 years of fire safety and fire investigation experience. Mr Moore was part of the Fire Code Reform Centre research team that developed the first edition of the Centre's Fire Engineering Guidelines, for use in Australia. Mr Moore is a registered FSE in Victoria, and has held various fire safety engineering consultancy positions, including most recently from February 2021, Associate Fire Safety Team Leader at NJMdesign.
5.4.1 What "Performance Requirements" were applicable to the use of combustible ACPs as part of or as an attachment to an external wall or building element on Class 2 to 9 Buildings?
(1) CP1 deals with structural elements, and requires the elements of a building to, to the degree necessary, maintain structural stability during a fire appropriate to the building (including considerations such as the function and use of the building, the fire load and potential fire intensity, the height of the building, evacuation time, etc);
(2) CP2 deals with building elements which will, to the degree necessary, avoid the spread of fire to exits, to sole-occupancy units and public corridors, between buildings, and within a building. The avoidance of the spread of fire must be appropriate to the nature of the building, function or use of the building, the fire load, the potential fire intensity, the fire hazard, the number of storeys in the building, its proximity to other property, any active fire safety systems installed in the building, the size of any fire compartment, fire brigade intervention and other elements they support, and the evacuation time;
(3) CP3 requires a building to be protected from the spread of fire and smoke to allow sufficient time for the orderly evacuation of the building in an emergency;
(4) CP4 requires that linings, materials and assemblies in a Class 2 to 9 building, in order to maintain tenable conditions during evacuation, must, to the degree necessary, resist the spread of fire and limit the generation of smoke, heat, and any toxic gases likely to be produced. They must do so appropriate to the evacuation time, the number, mobility and other characteristics of occupants, the function or use of the building, and any active fire safety systems installed in the building;
(5) CP5 requires concrete external walls that could collapse as a complete panel to be designed so that in the event of fire within the building, the likelihood of outward collapse is avoided;
(6) CP6 requires a building to have elements which will, to the degree necessary, avoid the spread of fire from service equipment having a high fire hazard or potential for explosion;
(7) CP7 requires a building to have elements which will, to the degree necessary, avoid the spread of fire so that emergency equipment provided in a building will continue to operate for a period of time necessary to ensure the intended function of the equipment is maintained during a fire;
(8) CP8 requires that a building element provided to resist the spread of fire must be protected to the degree necessary so that an adequate level of performance is maintained where openings, constructions joints and the like occur, and where penetrations occur for building services; and
(9) CP9 requires access to be provided to and around a building to the degree necessary for fire brigade vehicles and personnel to facilitate intervention appropriate to the function or use of the building, the fire load, the potential fire intensity, the fire hazard, any active fire safety systems installed in the building, and the size of any fire compartment.
(a) A building must have elements which will, to the degree necessary, avoid the spread of fire-
(i) to exits; and
(ii) to sole-occupancy units and public corridors; and
(iii) between buildings; and
(iv) in a building.
(b) Avoidance of the spread of fire referred to in (a) must be appropriate to-
(i) the function or use of the building; and
(ii) the fire load; and
(iii) the potential fire intensity; and
(iv) the fire hazard; and
(v) the number of storeys in the building; and
(vi) its proximity to other property; and
(vii) any active fire safety systems installed in the building; and
(viii) the size of any fire compartment; and
(ix) fire brigade intervention; and
(x) other elements they support; and
(xi) the evacuation time.
(a) as CP1 deals with structural elements (and ACPs are usually not structural elements), CP1 can apply where ACPs are part of or attached to a structural element;
(b) where an ACP's location and/or method of construction enabled it to be ignited so that smoke or fire could spread into a building, or near evacuation routes, CP4 could also apply;
(c) CP8 could apply to an ACP where openings, construction joints, and the like occur; and
(d) CP9 would apply to a building that included ACP cladding if the ACP impacted exit locations, fire services locations, and fire brigade vehicular access.
[T]he stability of the actual panel itself is not what CP1 would be about. I would look at it more as the panels or the attachments are not to affect the structural stability of the wall, assuming it's a fire-rated wall, in terms of insulation load bearing capacity and integrity. So the method of fixing screws or whatever cannot affect the wall's performance, not the actual attachment element itself.
5.4.2 What was the role and involvement of FSEs in designing, constructing and certifying buildings in respect of combustible ACPs in Australia during the relevant period?
5.4.3 How did FSEs assess the proposed use of combustible ACPs as part of or as an attachment to an external wall or building element (and did this change during the relevant period)?
[The] process is set out in the International Fire Engineering Guidelines. It requires the fire safety engineer to [prepare] a FEB, as I described in the last question, and then provide that document to all relevant stakeholders for their review and agreement.
In my view, this step is the most important step for a fire safety engineer. The Building Code of Australia is performance based, it may or may not have been discussed yet, your Honour, so that means there are non-measurable qualitative requirements set out by government that describe what a building code needs to achieve with a set of incomplete deemed-to-satisfy provisions. So an owner or a builder can choose to follow the prescriptive deemed-to-satisfy provisions or use appropriately qualified consultants to design the building to those performance requirements.
There are often examples of fire safety matters that are either inappropriate or can be better served by different solutions. So, as I say, that step is really critical. So the fire safety engineer prepares a brief, which says, "This is what I intend to vary from the deemed-to-satisfy provisions and how I intend to satisfy the performance requirements", then the fire safety engineer has to find out who the relevant stakeholders are, and again, that could be people such as the owner, the architect, the insurer, particularly the fire brigade on fire safety matters, the builder, sometimes tenants in unusual circumstances, and their role is to make sure that what the fire safety engineer is proposing to do, frankly, passes a commonsense test for some of those practitioners but, for the fire brigade, doesn't adversely affect their firefighting operations. So the fire brigade are, again, perhaps the most relevant to the discussions we are having today.
Again, if any stakeholder does not agree to the proposed FEB then that disagreement has to be resolved before proceeding to the fire engineering report and, again, the legislation is, I would argue, necessarily complex but perhaps you might have a different view, your Honour. So the fire engineering report becomes the performance solution. They are the same thing if the process is followed correctly. But if the process isn't followed correctly, it doesn't exist. It's not a concluded performance solution, it's just a proposal.
So that fire engineering brief process of bringing the stakeholders into the discussion is really critical to make sure that public safety levels are maintained when we have a qualitative performance based code. Hopefully that makes some commonsense as well. From August 2018, the product ban, under section 91 of the Building Product Safety Act, effectively negated any reason for a fire safety engineer to be involved in those pr[o]scribed combustible ACPs that were banned. So that's fairly obvious that you wouldn't need to be involved in.
I agree with comments by Mr Kip in that that sets out the process of how the reports and the consultation stakeholders are involved. In terms of how you would go about the actual assessment, obviously, you would - I would start looking at where the panels are, the exposure of how those panels can become involved, such as barbecues, if they are on a balcony, car fires, bin fires, if they are down in ground level openings in the walls, such as windows or vent openings, and then look at - from that exposure, look at the conditions the panels would be exposed in terms of temperature and incident radiation, etcetera, and then go to the fire tests, both Australian and international, look at the results those panels got for those tests, look at what those tests exposed those panels to.
So, for example, a test exposed panel to 100 kilowatts per metre squared exposure and the actual building scenarios that you develop was only down at 50, you can have confidence that the panels would behave in a similar or better way than the test. If it's less, then the test becomes less reliant, or you can put less reliance on the test. So you go through that process and then you also look at risks in terms of other systems within the building, the evacuation routes, are there multiple routes, such as in a shopping centre, so if the fire is on one side, people evacuate to the other side. All of those aspects would still come into it, but the process, as Mr Kip explained, would be the same in terms of stakeholder review, brief, etcetera, etcetera.
The product has been tested to [Australian Standard] 1530.3-1999 and achieve [sic] an ignitability test, spread of flame index and heat evolved index of 0 (range of 0-20), and a smoked [sic] developed index of 1 (range of 1-10).
Despite these excellent test results the product does not meet the strict test requirements for non-combustibility and because of this the product was submitted to the Australian Building Codes Board CodemarkTM scheme for issue of a certificate of conformity. That certificate confirms the product meets performance requirements CP1 & CP2 of the BCA subject to;
...
- Buildings of Type A Construction are required to be protected throughout with a sprinkler system complying with Specification E1.5 of the BCA.
As this is a Type A building and is not sprinkler protected, the installation requires assessment as a BCA alternative Solution. ...
For tall buildings this is especially important as fire spread vertically is well known and understood and a flashover fire in a storey can explosively exit the space and spread up the façade. For relatively large predominantly low-rise buildings this is less well understood and height ceases to be accurate limiter (or indicator) of fire spread. For example a large fire within the proposed new area is at least 6m from the existing parts of the building and therefore is highly unlikely to rapidly spread to this part via the external building façade.
Additionally, the roof will often fail due to its lightweight construction... and vent the products of the fire through the roof. Whilst these fires can be very severe and provide fire-fighting challenges, they are not by themselves significantly worse than a fire in a BCA DtS compliant building of Type C construction, which in that case would allow external walls to be non-combustible, as those walls are > 18m from allotment boundaries. All of these matters have no substantial impact on life safety as building evacuation will have occurred before flashover due to alert, upright occupants and efficient egress out of the building.
The requirement for external walls to be non-combustible in this case is therefore unduly onerous in this circumstance, particularly given the proposed product, and does not significantly improve fire-resistance for the following reasons:
- The new external walls are predominantly two storey and have no combustible single storey and > 18m from the existing two storey part.
- The use of non-combustible external walls will not significantly improve life safety.
- The large amount of external glazing will dominate the fire growth and subsequent fire-fighting operations and these are not controlled by the BCA.
- The roof and supporting structure are not required to be fire-resisting in this case, and the roof covering will be non-combustible.
- The remaining external linings will all be non-combustible, with only the internal structural timber framing, and the areas of Alucobond cladding described in Appendix C being combustible.
- Conclusion
- Based on the analysis, the BCA provisions for non-combustible external walls are considered not appropriate in the circumstance.
- (References omitted.)
This is used at [sic] part of the awning structure at ground level and is potentially exposed to heating via a flashover/flaming fire within the adjacent space in the building or a local fire initiated directly below the awning. It is noted that the space below the awning is sprinkler protected via heads within the underside of the awning. In the unlikely event of sprinkler failure, this ACP could be ignited by such a fire. Since the awning is a horizontal structure, the effect of a fire below the awning will be to (a) melt the aluminium and (b) the [sic] cause the polyethylene to drip downward and potentially burn off any horizontal surface.
Flaming from [sic] directly from the ACP structure will be limited compared with if the structure was orientated vertically and while the awning structure remains in place, will provide shielding to the level above the canopy. In any case, the burning below the canopy as a result of the melting of the core is unlikely to result in spread between levels compared with the effect of a flashover fire in the adjacent ground level space if there was no awning. Furthermore, combustible cladding is not used for the exterior façade of the building above the awning level.
It is therefore considered that the use of ALUCOBOND®PE awnings as described in the [fire safety engineering report], does not present an undue risk with respect to fire spread. It is also considered that this construction will not present a risk with respect to egress from the adjacent parts of the building.
...
Subject to the description of materials and their usage and installation being as described in the [fire safety engineering report], we consider that the use of these materials will achieve compliance with BCA performance requirements CP2 and CP4.
This material is used for the roofs above level 6 but... is located above a 1mm thick layer of GALVABOND® steel sheeting and separated from the steel sheeting by 100mm of stone wool... This means that if heated continuously at 350°C, it will maintain its structure and thermal properties. The material is non-combustible but will tend to 'compress' when it reaches a higher temperature.
Combustibles within the kitchen/barbecue area on level 6 are the kitchen benches and combustible timber ceiling... This area is sprinkler protected so it can be reasonably assumed that a fire will be dealt with by the sprinklers or by extinguishers if the area is occupied at the time of the fire...
The other potentially significant fire scenario is a flaming/flashover fire in a space below the roof should the sprinklers fail to operate. The presence of the steel sheeting and stone wool will delay heating of the ACP. However, should it be ignited after a period of time, then flame spread will be on the outside of the roof with little contribution to the internal fire and will not spread the fire to other parts of the building. The risks associated with this scenario, in our assessment, are mostly associated with the effects of the unsprinklered internal flaming fire (for which the ACP is not responsible) and therefore it is considered that the presence of ALUCOBEST FR does not pose a significant risk to the building occupants
(Emphasis in original.)
The evidence summarised in Section 5 above [regarding various fire tests conducted on Alpolic/fr and Alucobond Plus] and in the [fire safety engineering report] is considered sufficient to demonstrate that the presence of ALUCOBOND® PLUS and ALPOLIC®/fr will have little effect on vertical fire spread and will be resistant to potential internal and external fire exposures. Notwithstanding the ability of ALUCOBOND® PLUS and ALPOLIC®/fr to limit fire spread as stated above, the risk assessment presented in the [fire safety engineering report] recognises other risk control measures including the presence of a sprinkler system. Other aspects that would further mitigate potential fire spread are now considered...:
(a) the ACP is generally limited to "strips" as opposed to large areas,
(b) the larger wall area shown in Figure 5.8 is at the top of the building and fire spread, should it occur, would have much less effect than if the area was at the bottom,
(c) the orientation of much of the ACP... is horizontal and discontinuous and this will greatly limit the burning rate and the likelihood of vertical spread. Horizontal spread would be very limited,
(d) the ACP materials are not readily accessible to the public and therefore are unlikely to be subjected to deliberate external fires, and
(e) for the 3 lowest levels, the ACP is attached to the outside of "balconies" which will reduce the impact on the ACP of a fire from the interior of the building in the event of sprinkler failure.
...
Subject to the description of materials and their usage and installation being as described in the [fire safety engineering report], we consider that the use of the materials will achieve compliance with the relevant BCA performance requirements.
(a) the extent of combustible cladding is less than 50% if the entire façade is included (whereas in the preliminary RAT assessment, the extent of the combustible cladding was determined as between 51-100% of the façade);
(b) the majority of the structure behind the cladding materials was fire-resisting or non‑combustible;
(c) the building has sprinklers throughout, reinforced concrete stairways, no combustible cladding near the exits and short exit travel distances;
(d) the building has sprinklers, smoke alarms, and a direct fire brigade connection. Mr Kip determined that the speed of evacuation would be as quick as possible for an apartment building, as a building-wide alarm would be activated once a sprinkler head operated; and
(e) the site, being on the corner of two major roads, whilst creating the potential for traffic management challenges, provided for excellent firefighter set-up and application. The other two boundaries were also set-back or fire resisting.
I think that would have to be caveated with, "it depends". You can put the appropriate provisions. Now, there are certain things that you will have to consider like the fire exposure from rubbish bins and, if I'm going to put a combustible material to the ground, I will probably include the potential for arson and there will be a number of different things and it is very unlikely that I will end up with 100 percent PE in the building. But, in essence, as a blank statement, I think it doesn't include all the necessary caveats that you should put in there that are part of the design process.
5.4.4 What information did FSEs rely upon and/or could they properly rely upon when assessing the suitability or compliance of ACPs for use on a building, including product information provided by manufacturers and/or suppliers of ACPs?
The information relied upon by FSEs when assessing the suitability or compliance of combustible ACPs for use on a building were in the relevant period and are now the results of fire tests carried out by NATA accredited bodies, or if such fire tests were not available, the results of overseas tests properly understood and contextualised, as well as any available and relevant scientific papers and fire engineering principles generally. The key relevant fire tests in the BCA Volume One were;
a) an Australian Standard ('AS') 1530.1-1994: Combustibility test for materials (AS 1530.1) test report for the determination of non-combustibility, to then assess compliance with BCA DtS clauses 3.1(b) and 4.1(b) of Specification C1.1 for external walls to be non-combustible,
b) an AS/NZS 1530.3 -1999: Simultaneous determination of ignitability, flame propagation, heat release and smoke release (AS1530.3) test report for the determination of the spread of flame index and smoke developed index of the test sample for assessment of attachments to a part of an external wall required to achieve a [Fire Resistance Level] (BCA DtS clause 2.4 of Specification C1.1),
c) an AS 1530.4-2005 (or 2014): Fire-resistance tests on elements of construction (AS 1530.4) for the determination of the ability of an attachment to a part of an external wall required to achieve a FRL to prevent ignition and to screen its core material from air for at least 10-minutes (BCA DtS clause 2.4 of Specification C1.1), and/or
d) an AS 5113-2016: Classification of external walls of buildings based on reaction-to-fire performance fire test report to assess one of the criteria to satisfy BCA verification method CV4 (for BCA 2016 Amendment no. 1, from March 2018 onwards).
Relevant international tests included NFPA 285, BS 8414, FM tests and smaller scale tests from the EU, UK and USA.
I consider this to be marketing fluff, not technical data. I agree with what Professor Bisby says, that it should be accurate, but I would not rely on it in that case. I agree that a product that's class B s 1 rated [when tested according to EN 13501-1] is inconsistent with "generates no harmful gases in case of fire". But, as I have said already, I would not be relying on this. I would be asking for test reports, test data... whether that is intended to be misleading or whether it is... marketing people who put this literature together without understanding the technical details, I don't know. But, as a result, I am very cynical of marketing products like this.
Small scale tests can provide misleading results for materials which are complex composites or assemblies. This is particularly the case where a combustible core material may be covered by a non-combustible or low-combustible material...
Full-scale façade tests are currently the only method available for absolutely determining the fire performance of complete assemblies which can be influenced by factors which may not be adequately tested in small scale tests.
These results only apply to the specimen mounted, as described in this report.
The results of this fire test may be used to directly assess fire hazard, but it should be recognized that a single test method will not provide a full assessment of fire hazard under all fire conditions.
Mr Moore noted that the comments were required to be included as part of the standard.
With regards to testing PE, I don't care how the ceiling panels are installed, the main thing is that they and the wall panel are installed in a manner that that [sic] will prolong the period prior to flashover for as long as possible.
I need to achieve group 3 rating, that is, flashover occurs between 120 - 600 seconds @ 100kw, not before.
...
Whatever protection you can provide to the ceiling panels to prolong the non flashover period, will be appreciated.
With regards to the wall panels, we are using cassettes with sealed panels joints. I am not sure if flat panels with exposed joints will assist in achieving the desired result.
As previously mentioned, anything that can be done to achieve a minimum of 120 seconds to flashover should be considered.
we passed the 120 sec.
as open joint system with a maximum of joints à 550mm ('worst case').
We build the ceiling like a submarine: rivets à 130 mm.
The flash over (=inferno) was at 9:07 minutes. They need more than the double time to extinguish the fire and will need more than 9 hours to clean up the test room.
Plus was tested on Tuesday: no flash-over within 20 min, as I told before.
PE had the flash-over after 120sec., i. e. group 3 rating as required.
Both tests were done as open joint/edge system with riveted fixing. The grid was about 550...600mm.
The only difference was the number of rivets in the ceiling. We put the double amount of rivets into the PE panels. We will see whether this will be mentioned in the report.
Probably we were lucky, that due to the first test the roof of the test room had a crack where a lot of smoke (and heat) escaped.
We have the classification.
When you have seen the fire in the 9th Minute, however, you think about what you are selling...
I would have already expected that performance... [W]hen you look at the way in which these materials burn, you know, like many other materials that we use in construction, the fire is a very, very significant fire... I mean, if you are asking me the question whether I expect these materials to produce a little fire that doesn't do anything, that's completely incorrect. What I'm expecting in a room of that nature, that is ISO test, I would expect flashover in two to three minutes... So, to be honest, the results I'm not surprised at all. I mean, the language is appalling but...
I mean, you know, clearly, the language is not the language that I would agree with, but whether this is honest and transparent, I mean, we require that to be the case and we want that to be the case but I believe that's to the judge to decide, not me...
I mean, the reality is that I would not request the internal communications. I would go straight to the data... When I look at the data I can figure out what the configuration was: a system that is riveted is a system that performs in a certain way, a system that is not riveted performs in a different way. I look at the heat release rate curve and I know exactly if it's riveted or not.
[I]f I can explain the process as it would happen in my period of practice, so if you came to me and said, "I want to put aluminium composite panels on my building", I wouldn't design it. I would say, "well, what are the products that we have got to choose here and what is the cost per square metre and what will the cost penalty be for the cheaper products?" And that analysis, which is not really engineering, it's just accounting, would be probably that would knock PE out on almost every project and I would argue actually every project because an engineer's responsibility is to make sure their clients have an economical building. That's a ten[et] of the code of ethics for engineers. It's not enough to say, "I can build you the most expensive building ever using the worst products as long as it's shiny". That's not what engineering is.
...
I'm making a point about practical engineering. It's an ethical obligation to make sure we don't waste a client's money, and this theoretical design you are proposing to me seems, without any analysis, a waste of money. Now, I don't disagree with, conceptually, that you can theoretically design anything.
I think that one of the things that we cannot confuse is that we have a functional requirement system and that functional requirement system enables the competent professional to be able to design things with the tools that are available.
...
You could actually even assume that the entire polyethylene was going to burn, you know, and you make that assumption and that is very restrictive, which basically means you are going to use it in very, very specific conditions that might be significant[ly] restricted. I think what we - if I may take Mr Kip's words and try to explain the reason for the confusion, is that, in reality, that didn't work, because not all the parties had the same level of competency... I think a reality of this problem of the approvals process cannot be confused with the possibility of getting things approved correctly.
...
You say if there was [sic] 100 storeys, and I would say that then we will decide, for example, that the restriction is that it will only be used in the top floor.
[A]s a professional fire engineer, you are asking me to make an assessment on a building that I don't know with all the provisions that it has that I'm not aware of and the reality is I cannot do that. I mean, you can argue that many of the features that are visible there are features that will create concern for me, that I will carefully analyse to make sure that they don't create a problem and, if they do, I would recommend not to do it. But the reality is that what you are asking me is just simply an impossibility.
5.4.5 Did the local and international fire tests used in the marketing material support the use of Alucobond PE or Alucobond Plus as part of a Performance Solution?
The tests listed in the material and the results there identified would not support the use of Alucobond PE or Alucobond Plus for DtS compliance as part of, or as an attachment to, an external wall or building element. Some of the tests could support the use of a performance-based solution depending upon the circumstances. A reasonable and competent FSE would not rely upon any test results stated in the marketing material but should ask to be provided with the relevant test report and results, including certificates.
5.4.6 How (if at all) could Alucobond PE have been used on the Shore Building, and how (if at all) could Alucobond Plus have been used on the Five Dock Building, as part of a Performance Solution such that the buildings complied with the BCA? In answering this question, please address Mr Davis' proposed Performance Solutions
(a) A combustible ACP to not be installed between windows three and four and windows nine and 10 on level two of the building's eastern elevation (being one of the sides of the building). Mr Davis identified that Alucobond PE was installed between windows of apartments such that the Alucobond PE could readily be involved in a fire. Mr Davis identified that this was a potential source of fire spread between apartments, although he noted that the consequences of a fire involving the ACPs are no greater than an equivalent building that complies with the DtS Provision; and
(b) The roof eaves to the apartments on level three of the building to not have continuous combustible ACPs between adjacent apartments. Mr Davis identified that a fire on level three could spread to the roof eaves and involve the Alucobond PE installed there. However, Mr Davis noted the roof is part of the apartment below and so, this does not represent an increased risk of fire spread between apartments. Mr Davis noted that the Alucobond PE was installed continuously between the apartments on level three and, therefore, required the ACPs to be fire separated to address the potential for lateral fire spread between apartments.
A building with ACPs may not be unsafe, and the risks may be considered acceptable, however risk perception is subjective, and often varies according to the experience and biases of interested parties. The only way to completely remove risk associated with ACPs is to replace them with a non-combustible alternative.
...
A Fire Engineering Brief (FEB) was not prepared as input to this example Fire Engineering Report (FER) as this FER is provided only for the purposes of advice in the Federal Court of Australia proceeding NSD215/2019.
(1) lining to external walls on levels three and four of the building;
(2) lining to the external side of the ground floor privacy fence and garden walls, offset from external walls;
(3) lining to an external wall at ground level around the fire exit door;
(4) lining to columns extending from the ground floor and then connected to Alucobond Plus on upper levels; and
(5) lining to external walls at the rear of balconies on levels one and two.
- No Fire Engineering Brief was prepared, or agreement from stakeholders sought/reached to proceed to the FER preparation stage.
- No input was provided from the relevant fire brigade on a critical firefighting issue for them (a combustible façade) and analysis of their needs beyond the expertise of a fire safety engineer.
- No holistic analysis of the overall building, including consideration of the previous alterative [sic] solutions that were required for the building.
- Dominant occupant characteristics and parameters for design occupant groups were not indicated (including no consideration of disabled egress).
- Hazards and preventative and protective measures were not described.
- Acceptance criteria and factors of safety for the analysis were not included.
- The engineering judgement that is applied is not justified.
- Fire scenarios and parameters for design fires are not included.
- Standards of construction, commissioning, management, use and maintenance are not specified.
- Sensitivity, redundancy and uncertainty studies are not included.
- The construction requirements that are needed to ensure that the fire safety system is properly realised are not discussed.
- There are no commissioning requirements discussed or specified.
- Procedures or processes that should be adhered to during management and use of the building (including façade alterations work) are not included.
- No maintenance requirements are specified, especially where 'nonstandard' components (those not fully complying with the prescriptive or deemed-to-satisfy requirements) are used in the fire safety system.
- The references to the BCA term "to the degree necessary" are misused. (performance requirements of the BCA must be satisfied entirely, but some 'heads of consideration' might not be relevant).
- A full (holistic) hazards analysis was not undertaken.
- The analysis does not consider other external ignition sources, including lightning strike, gas or other fuelled cooking devices (BBQ's) or hot-work on the building.
- The summary of findings in Section 1.2 confuses 'low-risk' with compliance with the BCA. Low-risk applies to a risk assessment process outcome, but compliance is satisfaction of the relevant performance requirements. 'Risk' is not a criteria or requirement in the BCA fire performance requirements.
- The summary of findings in Section 1.2 states; "The fire safety risk related to ACPs on a façade is primarily a life safety issue" but ignores the property protection requirements of the BCA for boundary separation of the façade.
- Incorrect application of the fire test reports for AS 1530.3 by not testing the ACP with the edges exposed for joints, perforations, recesses or the like for pipes, light switches or other fittings, which are proposed to be used as installed on the building.
[Mr Davis] does not generally disagree with [Mr Kip]'s comments on the Performance Solution process to develop the FE reports, however the submitted reports need to be considered in the context of why they were provided and the inherent limitations of preparing a FER report without the full input that the approval process would normally require as part of a complete building approval process.
A performance solution is developed using a stakeholder process as described in the International Fire Engineering Guidelines. The process includes a Fire Engineering Brief (called a Performance Based Design Brief since BCA 2019). The brief is prepared and developed in consultation with the relevant stakeholders, and includes the scope of the report, particularly the matters to be addressed through performance solutions, the relevant stakeholders, the principle [sic] building and occupant characteristics, fire hazards, the proposed assessment methodologies and the acceptance criteria to be applied for approval by stakeholders.
The Fire Engineering Reports were prepared in response to the questions from KWM, and as described in the letters of appointment to Mr Davis, which related to the potential to allow the use of Alucobond PE and Plus through a performance solution, and to prepare an example of Fire Engineering Reports for the performance solutions.
The Davis Fire Engineering Reports were not prepared to seek building approval, as this is not possible retrospectively, but were intended to demonstrate that a Performance Solution could demonstrate that a combustible ACP attached to an external wall could comply with the Performance Requirements. These reports are pro-forma examples of the type of fire engineering report that might have been developed through the approval process.
Joint Report of Mr Kip and Mr Halstead dated 13 Mar 2024 ("Group 6 Joint Report")
(a) as a "bonded laminate" pursuant to C1.12(f) (or, from 1 March 2018, C1.9(e)(vi)); or > > (b) as an "attachment" pursuant to clause 2.4 of Specification C1.1?
5.5.1 Could Alucobond PE or Alucobond Plus have been used on a Class 2 to 9 Building during the relevant period as a "bonded laminate" pursuant to C1.12(f) (or, from 1 March 2018, C1.9(e)(vi)); or as an "attachment" pursuant to cl 2.4 of Specification C1.1?
C1.12 Non-combustible materials
The following materials, though combustible or containing combustible fibres, may be used wherever a non-combustible material is required:
...
(f) Bonded laminated materials where-
(i) each laminate is non-combustible; and
(ii) each adhesive layer does not exceed 1 mm in thickness; and
(iii) the total thickness of the adhesive layers does not exceed 2 mm; and
(iv) the Spread-of-Flame Index and the Smoke-Developed Index of the laminated material as a whole does not exceed 0 and 3 respectively.
In cases where external walls were constructed wholly or in part from combustible ACPs, then this was permitted in some circumstances during some of the Relevant Period despite the prohibition... by clause C1.12 of BCA 2016 (prior to the introduction of amendment 1 in March 2018).
...
In my opinion, an ACP comprising two aluminium "laminates" glued to the core could fall within the exception in C1.12(f) if it met the requirements of that clause. Given the terms of C1.12(f), the question of what is a "laminate" would be one of interpretation.
2.4 Attachments not to impair fire-resistance
(a) A combustible material may be used as a finish or lining to a wall or roof, or in a sign, sunscreen or blind, awning, or other attachment to a building element which has the required FRL if-
(i) the material is exempted under C1.10 or complies with the fire hazard properties prescribed in Specification C1.10; and
(ii) it is not located near or directly above a required exit so as to make the exit unusable in a fire; and
(iii) it does not otherwise constitute an undue risk of fire spread via the façade of the building.
(b) The attachment of a facing or finish, or the installation of ducting or any other service, to a part of a building required to have an FRL must not impair the required FRL of that part.
(a) any material which does not comply with this Table is protected on all sides and edges from exposure to the air; and > > (b) the member or assembly, when tested in accordance with Specification A2.4, has a Spread-of-Flame Index and a Smoke-Developed Index not exceeding those prescribed in this Table; and > > (c) the member or assembly retains the protection in position so that it prevents ignition of the material and continues to screen it from access to free air for a period of not less than 10 minutes.
The BCA requires this of an AS 1530.3 fire test so that certain materials are tested in a way that exposes any combustible parts of that material or assembly, and the fire test report provided does not satisfy the requirements set out in the BCA Clause A2.4.
This is why the two fire test reports for Alucobond PE and Alucobond Plus both show the same results regardless of the combustibility of the cores. The aluminium face sheet of an ACP completely protects the combustible core from the radiant heat source in the fire test.
It is impossible to install Alucobond PE or Alucobond Plus on a building as a single sheet without joins.
In my opinion the criteria for undue risk of fire spread could not be satisfied for Alucobond PE in any circumstances, and would be extremely difficult or expensive to satisfy for Alucobond Plus, as shown in the subsequent CodeMark Certificate of Conformity issued on 6 July 2023 that now requires (amongst other matters and further fire testing); enhanced fire sprinklers throughout the building, cavity barriers at each floor level, non-combustible insulation throughout and treatment of all penetrations.
In my view... the use of Alucobond PE or Alucobond Plus will constitute an undue risk of fire spread via the façade of the building if used in anything other than insubstantial quantities and the concession in Clause 2.4(a)(iii) therefore cannot apply.
"Undue risk of fire spread" is not a concept that has a specific definition in the BCA. In my opinion, the use of the word "undue" indicates that the requirement is not directed towards preventing any and all risk of fire spread. Rather, the risk of fire spread is to be balanced against other factors, including for example: other fire safety systems incorporated into the building, the function and use of the building and the nature and mobility of its occupants, and the needs of the fire brigade in accessing the building;
It is agreed that the ground level awnings incorporating ALUCOBOND®PE and decorative timber laminates and timber battens can be considered as attachments in terms of clause 2.4(a) of Specification C1.1 of the Building Code of Australia (BCA)...
Section 6.1 [of the draft fire safety engineering report] correctly identifies the relevant conditions (i.e. (i) - (iii)) of clause 2.4(a) of Specification C1.1 of Volume 1 of BCA 2009) that must be met by a combustible attachment to meet the BCA requirements. The key issues with respect to the attachments (i.e. the awnings) is the potential effect on persons evacuating the building and whether the attachments will significantly increase the risk to occupants due to increased (or undue) fire spread compared with a building where the attachments are non-combustible.
Look, upon reflection, I think that's actually not an accurate statement. Again, I expressed yesterday that I was a co-author of this document, and I probably should have picked that up. It wasn't a critical part of the risk assessment and peer review process.
It is noted that the space below the awning is sprinkler protected via heads within the underside of the awning. In the unlikely event of sprinkler failure, this ACP could be ignited by such a fire. Since the awning is a horizontal structure, the effect of a fire below the awning will be to (a) melt the aluminium and (b) the [sic] cause the polyethylene to drip downward and potentially burn off any horizontal surface.
Flaming from directly from the ACP structure will be limited compared with if the structure was orientated vertically and while the awning structure remains in place, will provide shielding to the level above the canopy. In any case, the burning below the canopy as a result of the melting of the core is unlikely to result in spread between levels compared with the effect of a flashover fire in the adjacent ground level space if there was no awning. Furthermore, combustible cladding is not used for the exterior façade of the building above the awning level.
It is therefore considered that the use of ALUCOBOND®PE awnings as described in the [draft fire safety engineering report], does not present an undue risk with respect to fire spread. It is also considered that this construction will not present a risk with respect to egress from the adjacent parts of the building.
Sections 5.2 and 6.2 of the [draft fire safety engineering report] correctly identifies the relevant conditions (i.e. (i) - (iii)) of clause 2.4(a) of Specification C1.1 of Volume 1 of BCA 2006) that must be met by a combustible attachment to meet the BCA requirements. The key issues with respect to such attachments are the potential effect on persons evacuating the building and whether the attachments will significantly increase the risk to occupants during evacuation or due to increased (or undue) fire spread compared with a building where the attachments are non-combustible.
The evidence summarised in Section 5 [regarding the results of various fire tests] above and in the [draft fire safety engineering report] is considered sufficient to demonstrate that the presence of ALUCOBOND®PLUS and ALPOLIC®/fr will have little effect on vertical fire spread and will be resistant to potential internal and external fire exposures.
Notwithstanding the ability of ALUCOBOND®PLUS and ALPOLIC®/fr to limit fire spread as stated above, the risk assessment presented in the [fire safety engineering report] recognises other risk control measures including the presence of a sprinkler system. Other aspects that would further mitigate potential fire spread are now considered...:
(a) the ACP is generally limited to "strips" as opposed to large areas,
(b) the larger wall area shown in Figure 5.8 is at the top of the building and fire spread, should it occur, would have much less effect than if the area was at the bottom,
(c) the orientation of much of the ACP (Figure 5.7) is horizontal and discontinuous and this will greatly limit the burning rate and the likelihood of vertical spread. Horizontal spread would be very limited,
(d) the ACP materials are not readily accessible to the public and therefore are unlikely to be subjected to deliberate external fires, and
(e) for the 3 lowest levels, the ACP is attached to the outside of "balconies" which will reduce the impact on the ACP of a fire from the interior of the building in the event of sprinkler failure.
5.5.2 Could Alucobond PE or Alucobond Plus have been used in conformance with a CodeMark Certificate of Conformity during the relevant period (and if so, in what circumstances)?
(a) Subject to A2.3 and A2.4, evidence to support that the use of a material, form of construction or design meets a Performance Requirement or a Deemed-to-Satisfy Provision may be in the form of one or a combination of the following:
(i) A report issued by a Registered Testing Authority, showing that the material or form of construction has been submitted to the tests listed in the report, and setting out the results of those tests and any other relevant information that demonstrates its suitability for use in the building.
(ii) A current Certificate of Conformity or a current Certificate of Accreditation.
(iii) A certificate from a professional engineer or other appropriately qualified person which-
(A) certifies that a material, design, or form of construction complies with the requirements of the BCA; and
(B) sets out the basis on which it is given and the extent to which relevant specifications, rules, codes of practice or other publications have been relied upon.
(iv) A current certificate issued by a product certification body that has been accredited by the Joint Accreditation System of Australia and New Zealand (JAS-ANZ).
...
(vi) Any other form of documentary evidence that correctly describes the properties and performance of the material or form of construction and adequately demonstrates its suitability for use in the building.
(a) did not adequately address the performance requirements of the BCA in the application form;
(b) did not provide AS 1530.1 or AS 1530.4 test results;
(c) did not provide an AS 1530.3 test that was conducted in a manner compliant with the BCA;
(d) relied on a number of international tests of doubtful relevance, which were performed in ways that did not reflect the proposed installation of the product in the Australian market;
(e) did not involve large-scale testing; and
(f) did not analyse or consider the degree of concealment of the combustible core.
I take these statements to be criticisms of the Certifying Body for having issued the Alucobond PE and Alucobond Plus CodeMark Certificates. I do not understand the relevance of those criticisms. It is up to the Certifying Body to determine whether the information provided by the applicant is a sufficient basis to issue the certificate. What is important is that the CodeMark Certificates were in fact issued. This means that unless they were suspended or withdrawn, they constituted one form of evidence under clause A2.2 of the BCA that Alucobond PE and Alucobond Plus could be used conformably with the BCA, as long as the user was mindful of the limitations set out in the particular certificate.
"I also note below that many of the fire tests included with the material provided were performed on samples that do not reflect the use of the product as set out in the applicant's Australian installation manuals, and therefore do not support the proposed use. In my view, the certificates should never have been issued based on the material provided."
The issuing of these certificates promotes the incorrect use of these products under Deemed-to-Satisfy provisions, which is inappropriate.
(Citations omitted.)
109F Restriction on issue of construction certificates
...
(2) A certifying authority must not refuse to issue a construction certificate on the ground that any building product or system relating to the development does not comply with a requirement of the Building Code of Australia if the building product or system is accredited in respect of that requirement in accordance with the regulations made for the purposes of Part 4.
AED has been provided with a Codemark Certificate for the Alucobond Plus ACP's [sic], installed to the building.
The Alucobond Plus product is certified under a Codemark Certificate of Conformity (see attachment A) which is considered suitable to comply with Clause A2.2(a)(i) of the BCA.
Accordingly, based on the information provided that the installed product is "Alucobond Plus" and supported by a Codemark Certificate of conformity, no further works are considered necessary.
5.5.3 Could Alucobond PE or Alucobond Plus have been used on a low-rise building of Type C construction during the relevant period?
The building code deemed-to-satisfy provisions are not a complete set of requirements, and if you don't have a provision that you have to satisfy, it doesn't allow you to do anything you want. So you can't - you can't use the most combustible material you can imagine because the building code tells you it doesn't have to be non-combustible.
5.6 Expert Group 7 - Architects and building professionals
Joint Report of Mr Quigley, Mr Incoll, and Mr Smithson dated 26 February 2024 (Group 7 Joint Report)
5.6.1 Objections to evidence given by Mr Quigley and Mr Incoll
1. What advantages are offered by the use of ACPs?
2. What uses of ACPs did you observe during the relevant period?
- During the relevant period, what role would a reasonably prudent architect, developer, builder or contractor, or superintendent, (together, Building Professionals) have played in the selection of materials (including ACPs) for use on the façade of a building?
- In performing that role, would a reasonably prudent Building Professional have had regard to marketing material provided by manufacturers and/or suppliers of ACPs? If so, in what way(s)?
- During the relevant period, would a reasonably prudent Building Professional have considered Alucobond PE or Alucobond Plus safe and fit for purpose if it is assumed for the purposes of the question that both products:
a. were combustible;
were not capable of being used in a manner that met the deemed-to-satisfy provisions of the BCA; and
had the fire-risk properties identified in paragraph 14 of the Second Further Amended Statement of Claim?
Could a reasonably prudent Building Professional have adopted or approved the performance solutions proposed by Mr Davis for the Shore Building and the Five Dock Building?
5.6.2 What advantages are offered by the use of ACPs?
(a) provided a high-quality finish to the exposed external aluminium surface;
(b) involved less expensive material supply and fabrication costs when compared with the alternative post-finished solid aluminium sheet-based façade systems;
(c) provided the opportunity to achieve an in-place, flatter façade system less likely to exhibit out-of-plane distortion caused by thermal movement due to considerations of the product's response to changes in temperature and detailed design facilitating the accommodation of such movement;
(d) were relatively lightweight compared with the alternative post-finished solid aluminium sheet-based façade systems, allowing less robust (and sometimes less complex) fabrication of individual cladding components and face support structures;
(e) could be easily formed to create unique façades either in the factory or on-site, and where the current and folding required to achieve the required shapes was to be undertaken on site, the panels could be transported flat, reducing transportation costs; and
(f) were more thermally efficient than aluminium or steel panels.
5.6.3 What uses of ACPs did you observe during the relevant period
5.6.4 During the relevant period, what role would a reasonably prudent architect, developer, builder/contractor, or superintendent (together, the "Building Professionals") have played in the selection of materials (including ACPs) for use on the façade of a building?
5.6.5 In performing that role, would a reasonably prudent Building Professional have had regard to marketing material provided by manufacturers and/or suppliers of ACPs? If so, in what way(s)?
What was the extent to which architects and building professionals relied upon material provided by suppliers and/or manufacturers of ACPs?
Where the material was in common usage or where it had been previously used successfully on a project in which one of us was involved, architects and building professionals would rely upon supplier/manufacturer information, unless qualified or contradicted by any building specialist such as a building certifier, surveyor or fire engineer (the latter if engaged).
In addition to the above answer, we would say the following:
In practice, in the period up to 2017/2018 architects (and building specialists such as building surveyors, certifiers and fire engineers) used ACPs on the basis that they were appropriate and promoted as being appropriate by manufacturers and suppliers, there being a view held by some building professionals that the Lacrosse fire may well have been caused by substitution of an inferior product. The issue of combustibility did not arise with Alucobond products whether with architects, building surveyors, certifiers or fire engineers.
After the Grenfell fire, the Victorian Cladding Taskforce report and the 2018 NSW Fair Trading regulation banning the use of ACPs with a core of more than 30% polyethylene, opinion began to change amongst all building professionals. But architects (and other building professionals) continued to use Alucobond Plus on the basis that it complied with the exemption listed in the NSW Commissioner for Fair Trading ban.
[W]here an Architect is involved in a decision that goes beyond the scope of their expertise, in my experience, the Architect would raise this with the Project Manager (or the client where relevant) and request to retain an appropriate specialist (eg. a fire engineer). In my experience, an Architect would not (and should not, having regard to their relevant professional obligations set out above) make that decision without the advice of a specialist consultant.
Whether it was common to engage a fire safety engineer to assess the fire risks associated with the use of ACPs during the relevant period? Whether it was common to engage a fire safety engineer to assess the fire risks associated with the use of ACPs during the relevant period?
In the experience of [Mr Incoll] and [Mr Quigley] it was not common during the relevant period to engage a fire engineer for this purpose, though [Mr Quigley] knew of it having been done on one project in Albury around 2014. [Mr Smithson]'s experience was that it was common to engage a fire engineer covering every relevant aspect of a job, but he cannot say and cannot recall that they gave any specific advice on the use of ACPs and on any attendant fire risks associated with them.
What were the circumstances in which a fire safety engineer would be engaged to assess the fire risks associated with the use of ACPs during the relevant period?
In the experience of [Mr Incoll] and [Mr Quigley] a fire engineer was only engaged where a builder certifier had indicated a possible non-compliance and the building certifier considered that the development of a performance solution could justify certification. [Mr Quigley] does not recall ever engaging a fire engineer himself. [Mr Incoll] recalls in 2016 a developer engaged a fire engineer who formulated a performance solution which, when relevant work for it was done, led to certification.
In [Mr Smithson]'s experience the fire engineer was involved in the iterative process of building design in all aspects, but he cannot say and cannot recall that they gave specific advice on the use of ACPs, and any attendant fire risks associated with them.
5.6.6 During the relevant period, would a reasonably prudent Building Professional have considered Alucobond PE or Alucobond Plus safe and fit for purpose if it is assumed for the purposes of the question that both products: (a) were combustible; (b) were not capable of being used in a manner that met the deemed-to-satisfy provisions of the BCA; and (c) had the fire-risk properties identified in paragraph 14 of the Second Further Amended Statement of Claim?
[Mr Quigley and Mr Smithson]: If a fire engineer provided a performance solution for Alucobond [PE or Plus] the architect could consider its use if they considered that the fire engineer's recommended performance solution as to how to mitigate the risk, was satisfactory at least from a design perspective.
[Mr Incoll]: [F]rom a project manager's perspective, the project manager would require that the architect, in addition to any performance solution for Alucobond [PE or Plus], also proposed alternative non-Alucobond [PE or Plus] or equivalent solutions for consideration by the project team because of the implications of use of combustible products. These other alternatives together with the performance solution for Alucobond [PE or Plus] would be put before the client.
5.6.7 Could a reasonably prudent Building Professional have adopted or approved the Performance Solutions proposed by Mr Davis for the Shore Building and Five Dock Building?
Assuming the fire engineering suitability and satisfaction of building requirements of the performance solutions, the performance solutions of Davis could be adopted by an architect or other building professional on the basis of a series of related issues being satisfactorily addressed as are outlined in the report of Mr Quigley in reply at paragraph [62] to [69].
Also, in [the experts'] experience it was often the case that even a mere suggestion of the need for an alternative solution (or performance solution) would prompt a developer or designer to select an alternative cladding product that does not require such a performance solution so as to avoid time, cost and risk impacts...
My comment as a development management professional is that, during a project, it would take extra cost, time, and inconvenience to prepare a brief, tender services and engage a separate fire engineering professional to prepare an alternative solution (or performance solution) for a building... The process would generally involve... drafting a brief, identifying possible tenderers from a network of contacts, responding to queries from tenderers, assessing responses and engaging the preferred party. There is of course no guarantee that the fire engineering professional ultimately engaged will be able to successfully design an alternative solution that is approved. It is often the case that it would take several attempts by the fire engineering professional to design a proper alternative solution, if at all. Any alternative solution would need to accord with the Architect's design intent and vision for the building, and it would likely be necessary for further discussions to be had between the various stakeholders (including between the Architect, the Developer and the fire engineer who drafted the alternative solution) following the initial drafting of the alternative solution. In my capacity as a project manager on a few projects I have witnessed the outcome of the tender processes described above. The tender process alone can generally take up to two to three weeks to finalise, (with more time that will need to be allowed for, after the finalisation of the tender process, for the alternative solution to be designed and approved) which may result in a delay to the project.
(a) Abbott Report 1 - 8 Apr 2022;
(b) Abbott Report 2 - 13 Apr 2022;
(c) Abbott Report 3 - 19 Jan 2024; and
(d) Abbott Report 4 - 6 Aug 2024.
5.7.1 Were the rectification costs regarding the Shore Building reasonable?
Were the costs incurred by the [Shore OC] in replacing the cladding products on the Shore Building as at 14 February 2019, pursuant to the agreement between the [Shore OC] and Restorial Pty Ltd dated 27 November 2019, reasonable and appropriate having regard to the scope of work under the Contract...
5.7.2 How much would the complete Alucobond Plus cladding removal work at the Five Dock Building cost?
$476,622.50, offering an additional home owners warranty fee of $32,400.00.
5.7.3 Cost assessment of Mr Davis' remedial Performance Solutions
(a) removal of Alucobond Plus panels that connect vertically between apartment windows on the building's eastern elevation (ie, the back of the building), replacing them with a non-combustible cladding option if necessary. Additionally, mineral wool batting with a minimum density of 60 kg/m3 to be installed behind panels around all windows on the eastern elevation; or
(b) provide sprinklers to the entire building internally, including balconies, in accordance with AS 2118.1-2017.
A building with ACPs may not be unsafe, and the risks may be considered acceptable, however risk perception is subjective and often varies according to the experience and biases of interested parties. The only way to completely remove risk associated with ACPs is to replace them with a non-combustible alternative.
Fire safety risk related to ACPs on a façade is primarily a life safety issue, but could also affect the insurability of the property, and may influence tenant desirability, or the ability to lease, even if a building is compliant with the BCA 2019's Performance Requirements including one that complies with the DtS provisions or has been determined to be low risk.
[I]n my experience the retrofitting of a sprinkler system is a very complex process involving many parties and stakeholders and would require a significant amount of survey and investigation (possibly intrusive), before a design could even be commenced. Without a design solution and detailed scope of works I am unable to provide a costing for this option. Such a design solution is not in the Second Davis Report.
Illustration of Mr Davis' remedial Performance Solution regarding the Five Dock Building
(a) the potential for rapid fire spread making it difficult to locate the floor of origin of the fire, and the building areas at greatest risk;
(b) the significant additional resources that may be required including the use of specialist fire appliances, which may not always be available, where a fire cannot be readily contained and fire spread is likely to continue;
(c) the difficulties with access to fight fires across multiple floors, and the limitations of fire protection systems and water supply. This includes that:
(i) there are limited options for firefighters to access the floor of fire origin, to the extent it can be identified;
(ii) external attack via hose lines from street level is limited to the first five floors;
(iii) placing firefighters above a fire floor is extremely dangerous;
(iv) where firefighting requires fire-isolated doors to be left open on multiple floors, this can impact on the effectiveness of stair pressurisation systems and allow smoke to enter the stairs, creating hazards for evacuating occupants;
(v) sprinklers and in-building hydrants may require boosting with water from street level, and even so, may not achieve adequate water flow to meet the needs of all sprinklers in the building; and
(vi) there is a significant challenge in providing sufficient water from fire appliances to multiple floors of a building at once, due to the number of hose lines and amount of water required.
(d) the difficulties associated with rescue and evacuation operations, where fire has spread across multiple floors; and
(e) the risk of descending fire spread and falling debris which may impact the entry of firefighters to the building and the egress of evacuees.
6. WHETHER THE TPA AND ACL APPLY TO 3A'S CONDUCT
6.1 Issue 1 - Did 3A engage in the impugned conduct in Australia?
54 Guarantee as to acceptable quality
(1) If:
(a) a person supplies, in trade or commerce, goods to a consumer; and
(b) the supply does not occur by way of sale by auction;
there is a guarantee that the goods are of acceptable quality.
...
271 Action for damages against manufacturers of goods
(1) If:
(a) the guarantee under section 54 applies to a supply of goods to a consumer; and
an affected person in relation to the goods may, by action against the manufacturer of the goods, recover damages from the manufacturer.
...
[3124] The respondents submitted that, as the two Ethicon respondents are incorporated overseas and neither has a place of business in Australia, the statutory causes of action do not apply to them.
[3125] I reject the submission.
[3126] There is a general presumption that the TPA applies to "conduct within Australia or of Australian nationals". Section 5(1) extends the territorial operation but only to a limited extent: Bright v Femcare Ltd [2000] FCA 742; (2000) 175 ALR 50 (Lehane J) at [77]-[78]. Similarly, in Bray v F Hoffman-La Roche Ltd [2002] FCA 243; (2002) 118 FCR 1 at [50]-[51] Merkel J said that:
[Section] 5 of the TPA is to be accounted for only on the basis that the Act as a whole, including s 5 itself, has been framed on the assumption that when conduct is made a contravention of the Act it is only conduct in Australia that is meant unless the conditions set out in s 5 apply.
...
[U]nless expressly provided otherwise, the legislature intended that the Act is only to apply to extra-territorial conduct in the circumstances and subject to the conditions laid down in s 5.
(Emphasis added.)
[3127] In other words, "the conduct prescribed by Pt V of the TPA will be taken to be conduct within Australia unless s 5(1) applies": Worldplay Services Pty Ltd v Australian Competition and Consumer Commission [2005] FCAFC 70; (2005) 143 FCR 345 at [18] per Ryan and Kiefel JJ, Tamberlin J agreeing at [28]-[43]. In Bright at [78] Lehane J observed:
Conduct, then, gives rise to a liability under, for example, s 52, if two conditions are met: first, it is engaged in within Australia (by a corporation) or outside Australia (by a body referred to in s 5(1)); secondly, it is conduct in trade or commerce ([which includes] trade or commerce between Australia and a place outside Australia).
[3128] The same is true of all the relevant provisions of the TPA and the ACL.
[3129] In the present case each of those conditions was met. This case is not concerned with the extra-territorial operation of the Act. The statutory claims are concerned with conduct relating to the supply of goods. As to misleading or deceptive conduct, see Australian Competition and Consumer Commission v Valve Corporation (No 3) [2016] FCA 196; (2016) 337 ALR 647 (Edelman J) (ACCC v Valve Corporation (No 3)) at [177]. Supply of the Ethicon devices took place in Australia because the devices were received in Australia by JJM, an Australian company, delivered to Australian hospitals and doctors, and implanted in women in Australia. The allegedly misleading conduct occurred in Australia because it is based on the information provided to, and received by, Australian consumers in Australia: see Valve Corporation v Australian Competition and Consumer Commission [2017] FCAFC 224; (2017) 258 FCR 190 at [104]-[105], [116], [134]. Where the relevant conduct occurs in Australia, in Trade Practices Commission v Australia Meat Holdings Pty Ltd [1988] FCA 338; (1998) 83 ALR 299 at 356 Wilcox J described it as "a misuse of language" to speak of the statute being given an extra-territorial effect.
[64] Reading the Act as a whole, the relevant territorial connecting factor is in our view the supply of goods in New Zealand. Where goods have been supplied in New Zealand, the Act attaches certain consequences to that supply, both for the immediate supplier and for certain other businesses. It is not accurate to describe the availability of relief in respect of a supply of goods to a consumer in New Zealand against a person outside New Zealand as an "extraterritorial" application of the Act. Rather, the application of the Act turns on a relevant supply taking place in New Zealand.
[65] Put another way, supply to a consumer in New Zealand is the central focus or "hinge" of the Act, which provides the necessary territorial connection with New Zealand.
...
[70] The concept of extraterritoriality, as that term was used by the Supreme Court in Poynter, is not relevant in the present case. As already explained above, the supply of goods to a consumer in New Zealand provides the necessary link to this jurisdiction. The relevant conduct - the supply of goods to a consumer in New Zealand - takes place in New Zealand; the Act then prescribes the consequences of those goods being defective or unsafe.
[199] However, for Bertram to be liable under s 59, it is necessary that it is within the definition of "manufacturer" in s 7 of the ACL which provides:
(a) a person who grows, extracts, produces, processes or assembles goods;
(b) a person who holds himself or herself out to the public as the manufacturer of goods;
(c) a person who causes or permits the name of the person, a name by which the person carries on business or a brand or mark of the person to be applied to goods supplied by the person;
(d) a person (the first person) who causes or permits another person, in connection with:
(i) the supply or possible supply of goods by that other person; or
(ii) the promotion by that other person by any means of the supply or use of goods;
to hold out the first person to the public as the manufacturer of the goods;
(e) a person who imports goods into Australia if:
(i) the person is not the manufacturer of the goods; and
(ii) at the time of the importation, the manufacturer of the goods does not have a place of business in Australia.
[200] It does not appear to be in doubt that, prima facie, Bertram would fall within each of subparas (a)-(d) of subs (1). It produced and assembled the vessel and held itself out as manufacturing it. Its branding is upon the vessel and, through the dealership agreement, it caused Eagle Yachts to hold it out as the manufacturer of the vessel.
[201] However, here, the vessel was manufactured in the United States and sold there to Eagle Yachts. It was the latter which imported it to Australia. So the question which arises is whether Bertram is subject to the operation of the ACL and, in particular, the obligations imposed by s 59?
...
[205] Although there is nothing in s 131 or in s 59 (or in the definition of "manufacturer" in s 7) to suggest that the operation of the Act is confined to persons or corporations within Australia, or who have some connection with Australia, as a matter of statutory construction, it is generally accepted that an enactment will be presumed to apply only to the territory or nationals over which the Australian Government has jurisdiction. In Meyer Heine Pty Ltd v China Navigation Co Ltd [1966] HCA 11; (1966) 115 CLR 10 at 23; [1966] HCA 11; [1966] ALR 791 (Meyer Heine), Kitto J cited the relevant principle from the speech of Lord Russell of Killowen in Reg v Jameson [1896] 2 QB 425 at 430 as being:
if any construction otherwise be possible, an Act will not be construed as applying to foreigners in respect to acts done by them outside the dominions of the sovereign power enacting
[206] In Bray v F Hoffman-La Roche Ltd (2002) 118 FCR 1; 190 ALR 1; [2002] FCA 243 (Bray) at [47] Merkel J phrased that principle as, "a general canon of construction that an enactment will not be construed as applying to foreigners in respect of acts done by them outside the dominions of the sovereign power enacting" and identified it as being based on international comity whereby sovereign powers are bound to respect the subjects and the rights of all other sovereign powers outside its own territory. In both Bray and Meyer Heine it was recognised that the existence of a statutory provision extending the territorial operation of an enactment can usually only be accounted for on the basis that the Act, as a whole, has been framed upon the assumption that when conduct is made a contravention of the Act, such conduct is limited to that which occurs in Australia or to conduct to which the extraterritorial provisions apply.
[207] In respect of the ACL, s 5 of the CCA identifies the extent of its extraterritorial operation such that, for conduct outside of Australia to contravene any of its provisions, that conduct must be within the scope of that section. That section indicates that, generally, the provisions of the legislation apply only to conduct in Australia or to conduct outside of Australia where there is a sufficient nexus between the relevant actor and Australia. It provides:
5 Extended application of this Act to conduct outside Australia
(a) Part IV;
(b) Part XI;
(c) the Australian Consumer Law (other than Part 5-3);
...
(f) the remaining provisions of this Act (to the extent to which they relate to any of the provisions covered by paragraph (a), (b) or (c));
extends to the engaging in conduct outside Australia by:
(g) bodies corporate incorporated or carrying on business within Australia; or
(h) Australian citizens; or
(i) persons ordinarily resident within Australia.
[208] The necessary implication of s 5 is that the Act, as a whole, applies to conduct in Australia by, inter alia, the entities mentioned in subparas (g) to (i). If the Act expressly extends its scope to the conduct of those entities engaged in beyond Australian territorial limits, it is axiomatic that their conduct within Australia is also within the Act's operational scope. It follows that if an entity is carrying on business within Australia its conduct, either within or outside of Australia, is subject to the liabilities imposed by the Act.
[209] For the purposes of this matter the issue resolves to one of the application of the ACL to the conduct of Bertram in the manufacture of the vessel in the United States and as well as, or in the alternative, its provision of a warranty to Mr Vautin in respect of Revive. Bertram will be subject to the operation of the ACL if relevant conduct occurred in Australia or if, at the relevant time, it carried on business in Australia. Here Mr Vautin contends that both connections existed in 2011 and 2012 when the vessel was supplied to Mr Vautin.
Conduct in Australia
[210] With respect to the submission that Bertram engaged in relevant "conduct" in Australia, Mr Vautin relies upon the terms of ss 59 and 271(5), the latter of which gives an affected person a cause of action where a guarantee is not complied with...
[211] Mr Vautin's first submission is that all that is required for Bertram to be subject to the operation of the ACL is that there has been a supply of goods to the consumer and that such a supply does not need to be a supply directly by the manufacturer... He submits that, here, that requirement has been satisfied by the supply of the vessel by Eagle Yachts to Mr Vautin.
[212] That submission should not be accepted. The question is one of the liability of an overseas manufacturer who has sold goods in the USA to Eagle Yachts and the latter has imported them to Australia and supplied them to Mr Vautin. On a proper construction of the ACL the liability imposed on the manufacturer under s 271(5) does not arise merely by reason of the supply of the goods to a consumer by some third party (such as a retailer). That alone is insufficient and, as was identified in Bray, the nexus with Australia must be, at least, conduct by the manufacturer. Moreover, that relevant conduct must be conduct in relation to the relevant contravention and, indeed, it is probably necessary that it relate to the gravamen of the statutory cause of action being pursued ...
...
[214] Under s 271(5) the liability of a manufacturer of goods arises where the guarantee imposed by s 59 is not complied with. It might be said, however, that a necessary precondition to that is that the express guarantee had been given by the manufacturer to the consumer as so to enliven the operation of s 59.
We are conscious that on this reading of the Consumer Guarantees Act, an overseas manufacturer might be exposed to liability even if it did not know its products were being sold in this country, for example because a distributor in another country was on-selling some of the product it had purchased into New Zealand. Indeed a manufacturer might find itself liable to a New Zealand consumer under the Act even if it had consciously chosen not to sell its product in this country, but the product found its way here indirectly. However it was not suggested to us that these concerns arise in the present case. We therefore need not consider whether such a result would go beyond the purpose of the Act, or whether private international law principles provide a solution to any apparent injustice in such a case.
7 Meaning of manufacturer
(1) A manufacturer includes the following:
(a) a person who grows, extracts, produces, processes or assembles goods;
(b) a person who holds himself or herself out to the public as the manufacturer of goods;
(c) a person who causes or permits the name of the person, a name by which the person carries on business or a brand or mark of the person to be applied to goods supplied by the person;
(d) a person (the first person) who causes or permits another person, in connection with:
(i) the supply or possible supply of goods by that other person; or
(ii) the promotion by that other person by any means of the supply or use of goods;
to hold out the first person to the public as the manufacturer of the goods;
(e) a person who imports goods into Australia if:
(i) the person is not the manufacturer of the goods; and
(ii) at the time of the importation, the manufacturer of the goods does not have a place of business in Australia.
(1) held itself out to the public as the manufacturer of the products;
(2) caused or permitted its brand or mark (being its "Alucobond" trademarks) to be applied to the products; and
(3) caused or permitted HVG to hold it out to the public as the manufacturer of the Alucobond products in connection with the supply or possible supply of the products, or the promotion by HVG of the supply or use of the products.
6.1.1.2 Did 3A supply the Alucobond products to HVG in Australia?
Unless another form of shipment has been agreed, 3A Composites supplies "ex works" (INCOTERMS 2011). The time that the goods are ready for shipment in the supplying works shall prevail for observance of the agreed delivery periods and dates. Unless otherwise agreed in writing, the risk shall pass to the customer upon dispatch "ex works".
Valve submits that: its supply of computer software subscriptions, including games, to consumers was made in accordance with the [Steam Subscriber Agreement]; this supply was effected in Washington State, on the basis that a reference to the "supply" of goods includes a reference to agreeing to supply goods (see s 11(b) of the Australian Consumer Law); and, applying this, Valve's supply of goods took place where Valve agreed to supply consumers with computer software, including games (namely, in Washington State). In our view, this submission should be rejected. Although the definition of supply includes an agreement to supply, it does not follow that the supply in this case is to be located where the agreement was made. In the present case, the supply of computer games by Valve to customers in Australia took place where the customer downloaded the computer game on his or her computer. ...
6. Reservation of Title
6.1 3A Composites reserves title to the goods delivered by 3A Composites as security for all claims accruing to 3A Composites against the customer from this and future business relations.
6.2 The title of 3A Composites shall extend to the new products created by the processing of the reserved goods. In the event of processing, union or mixing with items not belonging to 3A Composites, 3A Composites shall acquire joint title in the proportion of the invoice value of our reserved goods to that of the other materials.
As to misleading or deceptive conduct, see Australian Competition and Consumer Commission v Valve Corporation (No 3) [2016] FCA 196; (2016) 337 ALR 647 (Edelman J) ... at [177] ... The allegedly misleading conduct occurred in Australia because it is based on the information provided to, and received by, Australian consumers in Australia: see Valve Corporation v Australian Competition and Consumer Commission [2017] FCAFC 224; (2017) 258 FCR 190 at [104]-[105], [116], [134]. Where the relevant conduct occurs in Australia, in Trade Practices Commission v Australia Meat Holdings Pty Ltd [1988] FCA 338; (1998) 83 ALR 299 at 356 Wilcox J described it as "a misuse of language" to speak of the statute being given an extra-territorial effect.
[W]here it is alleged that a respondent has, by making representations on the internet, engaged in conduct that is misleading or deceptive... and an issue arises as to the place of the representations, it is necessary to ask where in substance the representations were made. If the respondent is based overseas and has a relationship with customers in Australia, it is likely that representations addressed to those customers will be taken to have been made in Australia, being the place where the customer accesses and reads the representations on his or her computer. This is likely to be the case even if the representations are available to be accessed by consumers in other countries around the world...
(a) cl 1: 3A granted HVG the exclusive right to sell and use Alucobond within Australia, and to use 3A's Alucobond trademark "in connection with the sale" of the Alucobond products. HVG was to import the products "on [its] own account" and purchase the products exclusively from 3A. Under cl 17 (or 16, depending on the particular Distributor Agreement), HVG was not to purchase or sell any products competing with Alucobond.
(b) cl 3: 3A was to sell and deliver to HVG such quantities of the Alucobond products as may be ordered by HVG, with all contracts for the sale to be based on the General Terms of Delivery and Payment;
(c) cl 4: HVG was required to buy and import from 3A minimum quantities of Alucobond which were described in schedules to the Distributor Agreements as HVG's sales target. For the purposes of illustration, the 2015 Distributor Agreement noted sales targets for Alucobond of 460.000 m2 for 2015, and 475.000 m2 for 2016. The 2018 Distributor Agreement noted that sales targets for each year would be defined mutually by 30 September of the preceding year, however required under cl 4 that in the case of underperformance below 90%, for HVG to submit a detailed business and market report.
(d) cll 5-6: up to 1 January 2018, HVG was permitted to use 3A's Alucobond trademark for the purposes of the Distributor Agreement. However, where HVG used the trademark, it was required to indicate 3A's interest in it by displaying 3A's logo and the address of 3A's head office. Under cl 6 (again, up to 1 January 2018), HVG was required to secure 3A's approval of any publication or other material prepared by HVG in connection with the sale of Alucobond prior to its use. HVG was restrained from doing anything which would impair the trademark.
(e) cll 7-8 (cll 6-7 for the 2018 agreement): HVG was required to maintain a place of business in Australia with adequate facilities, staff, and quantities of Alucobond to properly service the needs of customers in Australia, and to meet certain standards of operation and services. This included an obligation on HVG to generally carry on its business so as to maximise the Alucobond trademark, and to encourage the sale of Alucobond products. The Distributor Agreements also restrained HVG from giving any warranty or representation on behalf of 3A.
(f) cl 12 (cl 11 for the 2018 agreement): HVG was to present 3A with a marketing plan each year, which was to be approved by 3A prior to its implementation. This was to include activities such as advertisements, participation in exhibitions, product seminars, and other promotional activities. 3A would determine on a case-by-case basis a cost contribution to the expenditure for such marketing and promotional activities by HVG. Additionally, 3A was to provide HVG with such quantities of promotional material and literature about the Alucobond products published from time to time by 3A as was necessary for the purposes of the Distributor Agreements. 3A was also to give to HVG technical details and assistance as may be required from time-to-time. Such promotional material and literature and technical details were to be provided free of charge by 3A.
(g) cl 15 (cl 14 for the 2018 agreement): "[HVG], being an independent contractor engaged in its own and entirely separate business, shall in no way be construed to constitute itself an agent or employee of [3A] for any purpose whatsoever... Nothing in this agreement constitutes a partnership between the parties".
(h) cl 16 (cl 15 for the 2018 agreement): As part of the termination rights of each party, if HVG failed to reach a minimum of 75% of its sales target, 3A had the option to terminate the agreement at the end of the relevant calendar year in which HVG failed to meet its commitment. Additionally, in the event of termination, 3A was not liable to repurchase any of the Alucobond products from HVG, and HVG would not be entitled to any compensation from 3A for a loss of customers resulting from the termination of the agreement; and
(i) cl 23 (cl 22 for the 2007 and 2018 agreements): the applicable law of the Distributor Agreements was the law of Germany.
[W]here it is alleged that a respondent has, by making representations on the internet, engaged in conduct that is misleading or deceptive or likely to mislead or deceive in contravention of s 18 of the Australian Consumer Law, or made false or misleading representations in contravention of s 29 of the Australian Consumer Law, and an issue arises as to the place of the representations, it is necessary to ask where in substance the representations were made. If the respondent is based overseas and has a relationship with customers in Australia, it is likely that representations addressed to those customers will be taken to have been made in Australia, being the place where the customer accesses and reads the representations on his or her computer. This is likely to be the case even if the representations are available to be accessed by consumers in other countries around the world. A distinction is to be drawn between the conduct proscribed by ss 18 and 29 and the causation of loss or damage. It is not necessary, for the purposes of these provisions, to establish loss or damage. It follows that, for the purposes of determining the place where the representations were made, it is not necessary to determine whether any loss or damage was suffered and, if so, the place of that loss or damage.
In circumstances where Valve had a direct relationship with a large number of Australian consumers, and Valve required consumers to agree to the SSA before they could open an account and purchase a game, the... representations were made in Australia when consumers in Australia accessed and read the SSA on their computers. This is where, in substance, for the purposes of ss 18 and 29(1)(m) [of the ACL], the representations were made.
6.2 Issue 2 - Was 3A carrying on business within Australia?
5 Extended application of this Act to conduct outside Australia
(1) Each of the following provisions:
...
(c) the Australian Consumer Law (other than Part 5-3);
...
extends to the engaging in conduct outside Australia by:
(g) bodies corporate incorporated or carrying on business within Australia; or
At general law, carrying on a business generally involves conducting some form of commercial enterprise, systematically and regularly with a view to profit: [Gebo Investments (Labuan) Ltd v Signatory Investments Pty Ltd [2005] NSWSC 544; (2005) 54 ACSR 111] at [38]. It is unnecessary to restate the "usual elements" of a finding of carrying on business in Australia. It is, however, necessary to point out that a company may be found to carry on business in Australia even though the bulk of its activities are conducted elsewhere (Gebo Investments at [38]-[41]) and that it conducts its activities in Australia by reason of its control over or connection with an Australian company: Adams v Cape Industries plc [1990] Ch 433 at 530 and Bray v F Hoffman-La Roche Ltd [2002] FCA 243; (2002) 118 FCR 1 at [60]- [63].
For instance, in [Bray v F Hoffman-La Roche Ltd [2002] FCA 243; (2002) 118 FCR 1] at 17-18 [59]‑[60], Merkel J referred to the parties' acceptance that [sic] expression "carrying on business in Australia" should be broadly interpreted in light of its purposes of consumer protection to enable the Trade Practices Act to apply to conduct that is intended to have, and has, an adverse effect on competition in Australia. His Honour continued, saying that:
The expression "carrying on business" is not defined although s 4(1) defines "business" as including a business not carried on for profit. As was pointed out by Gibbs J in Luckins v Highway Motel (Carnarvon) Pty Ltd [1975] HCA 50; (1975) 133 CLR 164 at 178; [1975] HCA 50; 7 ALR 413 at 422 (Luckins) the expression "may have different meanings in different contexts". The present context is s 5(1), which gives effect to the legislature's view that comity, for the purposes of the TPA, requires that a particular nexus with Australia exist (ie citizenship or residence by a person or incorporation or the carrying on of business in the case of a body corporate) if certain Parts of the TPA are to apply to conduct engaged in outside of Australia by those persons or bodies corporate. As is clear from the judgments in Meyer Heine it was open to the legislature, as a matter of power and comity, to impose a lesser nexus requirement (eg intended and actual anti-competitive consequences in Australia) but it chose not to do so. In that context the expression should be given its ordinary or usual meaning.
As his Honour concluded, the ordinary meaning of "carrying on business" usually involves (by the words "carrying on") a series or repetition of acts. Those acts will commonly involve "activities undertaken as a commercial enterprise in the nature of a going concern, that is, activities engaged in for the purpose of profit on a continuous and repetitive basis": see Thiel v Federal Commissioner of Taxation [1990] HCA 37; (1990) 171 CLR 338 at 350; [1990] HCA 37; 94 ALR 647 at 654 (Dawson J); Pioneer Concrete Services Ltd v Galli [1985] VicRp 68; [1985] VR 675 at 705; [1985] VicRp 68; (1985) 4 IPR 227 at 235 (the Court); Hope v Bathurst City Council (1980) 144 CLR 1 at 8-9; 29 ALR 577 at 582 (Mason J; Gibbs, Stephen and Aickin JJ agreeing).
I return to the general law concept of carrying on business. According to those concepts, carrying on of business generally involves conducting some form of commercial enterprise, systematically and regularly with a view to profit... although, as a number of cases emphasise, there may be a finding that business is carried on even where some of the usual elements are missing. The following passage in the judgment of Gibbs J in Smith v Capewell [1979] HCA 48; (1979) 142 CLR 509 is instructive:
The expression "carry on business" in its ordinary meaning, signifies a course of conduct involving the performance of a succession of acts, and not simply the effecting of one solitary transaction. In Smith v Anderson (1880) 15 Ch D 247 ; [1874-80] All ER Rep 1121, where the Court of Appeal considered the effect of s 4 of the Companies Act 1862 (UK) which spoke of an "association ... formed ... for the purpose of carrying on any ... business", Brett LJ said, Ch D at 277-8; All ER Rep at 1130: "The expression 'carrying on' implies a repetition of acts, and excludes the case of an association formed for doing one particular act which is never to be repeated."
In Kirkwood v Gadd [1910] AC 422; [1908-10] All ER Rep 768 Lord Loreburn LC said (AC at 423): "What is carrying on business? It imports a series or repetition of acts." In the same case Lord Atkinson (at 431) referred with apparent approval to the statement of Brett LJ in Smith v Anderson. Similarly, in Premier Automatic Tickets Issuers Ltd FC of T [1933] HCA 51; (1933) 50 CLR 268 at 298, Dixon J, in a passage frequently quoted, said that "the carrying on or carrying out of any profit-making undertaking or scheme" in a taxation statute, "appears to cover, on the one hand, the habitual pursuit of a course of conduct, and, on the other, the carrying into execution of a plan or venture which does not involve repetition or system ...".
[92] [Facebook Inc] submitted that the fact that the installation of the cookies and the management of the Facebook login (through the Graph API) took place in Australia did not entail that the business which included them was located in Australia. Whilst it was true that these services were being provided by Facebook Inc to Facebook Ireland as part of its business of providing data processing services, this was not the business which was being conducted in Australia. The only business being conducted in Australia was that of Facebook Ireland. The users and developers in Australia had contractual relations with Facebook Ireland and the revenue which was derived from them was earned by Facebook Ireland. Facebook Inc's role in this picture was merely to provide services to Facebook Ireland in the conduct of that quite different business.
[93] The essence of this submission is that Facebook Inc's activities in Australia themselves lack a commercial quality because Facebook Inc is not engaged in any commerce in Australia...
...
[95] ... Facebook Inc's business of providing data processing services to Facebook Ireland is conducted from its data centres which are not in Australia. But an aspect of that business - the installation and removal of cookies and the management of the Facebook login through the Graph API - are activities which do take place in Australia... [T]hose activities do not themselves comprise the commercial dealings which are the business.
[96] ... This question [now posed for determination] emerges from the description given by Mason J in Hope [v Bathurst City Council (1980) 144 CLR 1 at 8-9] of the nature of the carrying on of a business as a collection of "activities undertaken as a commercial enterprise in the nature of a going concern, that is, activities engaged in for the purpose of profit on a continuous and repetitive basis". The concept has therefore two elements: (a) activities undertaken as a commercial enterprise as a going concern with a view to a profit; and (b) carried on in a continuous and repetitive basis. Where a company undoubtedly conducts business in one place, this two limbed definition can give rise to two distinct problems when the company then does an act or acts in another place which, however, satisfy only one of the limbs in Hope. The two problems are these:
(1) the company engages in a single commercial transaction in a place where it otherwise does not conduct business. Does the company conduct business in this place? The single transaction means that the repetition requirement in Hope is not satisfied in that place but the commerciality limb is satisfied; and
(2) the company engages in repetitive acts in the performance of its business in a place where it otherwise does not conduct business but in doing so it engages in no commercial activity. Does the company conduct business in this place? The repetition requirement in Hope is satisfied but the commerciality limb is not.
[97] Question (2) is... the question in this case...
...
[103] It is difficult to see that a different approach should be taken to the second situation, ie where there is continuous business activity in the jurisdiction but where that activity does not result in any transactions in the jurisdiction. Just as one asks whether the single act in one jurisdiction took place in the course of the business conducted in another jurisdiction one should ask, in a case such as the present, whether the repetitive but non-commercial activity occurring in one jurisdiction took place in the course of the business conducted in the other. ... To put the problem in more general terms, if a company conducts business in a foreign jurisdiction and it does acts within Australia as part of that business which fall within either limb in Hope then, subject to any contrary implication arising from the statutory context, it will conduct business in Australia.
For reasons explained during my visit please ensure that in future, and what was common practise in the past, always forward draft copies of any potential print document to me for final approval. Please understand that this is not meant to make your life difficult, but this is common practise with all our other partners too and acknowledging the fact that 3A is producer and holder of the brand Alucobond and we need to ensure it's used in the right way.
In addition we agreed on the following topics to support our joint business model:
...
- Instead we will give you full support, especially through Susan, to roll out these surfaces in the Australian market to have more differentiation against competitors.
As in previous trips, the purpose of the visit was in response to an invitation by AAPL to assist in the promotion of Alucobond by meeting their most influential customers, architects and fabricators, to grow their awareness and the profile of ALCAN and assess the current market conditions in Australia. Furthermore, to assist in the creation of new business relationships and to reinforce and enhance those that are existing.
This was to be achieved through visits to project sites and discussions with their important clients in order to assess current and potential future demands for Alucobond and the competition we face.
This exhibition attracts Australia's best architects and interior designers and has proven to be an ideal showcase for Alucobond. Approx. 248 contacts were made during the three days the exhibition was on and it can therefore be considered as being most valuable for our business. A number of important new contacts were made for upcoming projects with clients who were not aware of Alucobond before or who had not considered Alucobond prior to the exhibition.
...
This exhibition was also successfully used to further strengthen our relationship with Alucobond Architectural [ie HVG] and Australia's most important clients which included various architects, designers, fabricators from all states of Australia. My attendance was greatly appreciated in this respect.
7. CONSUMER GUARANTEE CLAIM: THRESHOLD REQUIREMENTS
(a) that 3A supplied Alucobond PE or Alucobond Plus "in trade or commerce": TPA, s 74D(1)(a) (issue 3);
(b) that Alucobond PE and Alucobond Plus were "goods" for the purposes of s 74D, which turns on whether they were goods of a kind ordinarily acquired for personal, domestic or household use or consumption: TPA, s 74A(2)(a); ACL, s 3(1)(b) (issue 4);
(c) that a person "supplied" Alucobond PE or Alucobond Plus to a "consumer": TPA, s 74D(1)(b); ACL, s 54(1)(a) (issue 5(a));
(d) that each developer of the Shore Building and Five Dock Building is taken to have been "supplied" and "acquired" Alucobond PE or Alucobond Plus as a "consumer" (issue 5(b));
(e) if issue 5(a) is not established but issue 5(b) is established, that each of the Shore OC and Five Dock OC is a person who derived title to Alucobond PE or Alucobond Plus through or under the relevant developer: TPA, s 74D(1); ACL, s 271(1)-(2) (issue 6); and
(f) whether the relevant goods affixed to the Shore Building and Five Dock Building are Alucobond PE or Alucobond Plus, or have been so used up or transformed so as to be different "Third Party Products" manufactured by the "Qualified Professional(s)" who produced their façade systems: TPA, s 74D(1); ACL, s 54(1) (issue 7).
The Committee considers that the [Manufacturers Warranties Act 1974 (SA) and the Manufacturers Warranties Ordinance 1975 (ACT)] mentioned above is based upon a sound principle - that it is the manufacturer placing goods on to the market in the first place who is largely responsible for the quality of goods and that the law should require manufacturers to be directly responsible for statutorily-imposed standards in respect of the quality of those goods... We do not accept that it is appropriate for liability for a breach of that statutory standard to rest upon persons other than the manufacturer simply because the consumer has no contractual nexus with the manufacturer. Of all the persons in the distributive chain, the manufacturer is the person best placed to effect appropriate insurance against such liability and obviously is the only person who can adjust the manufacturing process to take account of any persistent defects.
[The Minister's observations] also invite attention to the principle of statutory interpretation that although beneficial legislation (which customs rebate provisions are accepted to be...) is generally to be construed broadly in favour of its beneficiaries, excepting provisions within beneficial legislation need not for that reason be given a liberal interpretation (see Rose v Secretary, Department of Social Security [1990] FCA 59; (1990) 21 FCR 241 at 244). As Pearce and Geddes observe in Statutory Interpretation in Australia (5th ed 2001) at [9.5]:
Exceptions may be included in the legislation to provide the practical balance between competing public interests. As such they should be interpreted carefully in order not to destroy that balance.
7.1 Issue 3 - Whether 3A supplied the Alucobond products to HVG "in trade or commerce": TPA, s 74D(1)(a)
74D Actions in respect of goods of unmerchantable quality
(1) Where:
(a) a corporation, in trade or commerce, supplies goods manufactured by the corporation to another person who acquires the goods for re‑supply;
(b) a person (whether or not the person who acquired the goods from the corporation) supplies the goods (otherwise than by way of sale by auction) to a consumer;
(c) the goods are not of merchantable quality; and
(d) the consumer or a person who acquires the goods from, or derives title to the goods through or under, the consumer suffers loss or damage by reason that the goods are not of merchantable quality;
the corporation is liable to compensate the consumer or that other person for the loss or damage and the consumer or that other person may recover the amount of the compensation by action against the corporation in a court of competent jurisdiction.
trade or commerce means trade or commerce within Australia or between Australia and places outside of Australia.
It is well established that the words "trade" and "commerce", when used in the context of s. 51(i) of the Constitution, are not terms of art but are terms of common knowledge of the widest import. The same may be said of those words as used in s. 52(1) of the Act. Indeed, in the light of the provisions of s. 6(2) of the Act which give an extended operation to s. 52 and which clearly use the words "trade" and "commerce" in the sense which the words bear in s. 51(i) of the Constitution, it would be difficult to maintain that those words were used in s. 52 with some different meaning. The real problem involved in the construction of s. 52 of the Act does not, however, spring from the use of the words "trade or commerce". It arises from the requirement that the conduct to which the section refers be "in" trade or commerce...
As a matter of language, a prohibition against engaging in conduct "in trade or commerce" can be construed as encompassing conduct in the course of the myriad of activities which are not, of their nature, of a trading or commercial character but which are undertaken in the course of, or as incidental to, the carrying on of an overall trading or commercial business... Alternatively, the reference to conduct "in trade or commerce" in s. 52 can be construed as referring only to conduct which is itself an aspect or element of activities or transactions which, of their nature, bear a trading or commercial character...
Nonetheless, when the section is read in the context provided by other features of the Act, which is "An Act relating to certain Trade Practices", the narrower (i.e. the second) of the alternative constructions of the requirement "in trade or commerce" is the preferable one. Indeed, in the context of Pt V of the Act with its heading "Consumer Protection", it is plain that s. 52 was not intended to extend to all conduct, regardless of its nature, in which a corporation might engage in the course of, or for the purposes of, its overall trading or commercial business. Put differently, the section was not intended to impose, by a side-wind, an overlay of Commonwealth law upon every field of legislative control into which a corporation might stray for the purposes of, or in connection with, carrying on its trading or commercial activities. What the section is concerned with is the conduct of a corporation towards persons, be they consumers or not, with whom it (or those whose interests it represents or is seeking to promote) has or may have dealings in the course of those activities or transactions which, of their nature, bear a trading or commercial character. Such conduct includes, of course, promotional activities in relation to, or for the purposes of, the supply of goods or services to actual or potential consumers, be they identified persons or merely an unidentifiable section of the public. In some areas, the dividing line between what is and what is not conduct "in trade or commerce" may be less clear and may require the identification of what imports a trading or commercial character to an activity which is not, without more, of that character.
(Original emphasis.)
The terms "trade, commerce, and intercourse" are not terms of art. They are expressions of fact, they are terms of common knowledge, as well known to laymen as to lawyers, and better understood in detail by traders and commercial men than by Judges. But as Judges we are taken to know and do in fact in this instance know the general import of the words. The particular instances that may fall within the ambit of the expression depend upon the varying phases and development of trade, commerce and intercourse itself. Aviation and wireless telephony have lately added to the list of instances, but the essential character of the class remains the same. _"Trade and commerce" between different countries - _we leave out for the present the word "intercourse" - has never been confined to the mere act of transportation of merchandise over the frontier. That the words include that act is, of course, a truism. But that they go far beyond it is a fact quite as undoubted. All the commercial arrangements of which transportation is the direct and necessary result form part of "trade and commerce." The mutual communings, the negotiations, verbal and by correspondence, the bargain, the transport and the delivery are all, but not exclusively, parts of that class of relations between mankind which the world calls "trade and commerce."
(Emphasis added.)
7.2 Issue 4 - Whether the Alucobond products were goods of a kind ordinarily acquired for personal, domestic or household use or consumption: TPA, s 74A(2)(a); ACL, s 3(1)(b)
a reference to goods shall, unless the contrary intention appears, be read as a reference to goods of a kind ordinarily acquired for personal, domestic or household use or consumption;
(a) reflective foil insultations products, citing Bunnings Group Ltd v Laminex Group Ltd (2006) 153 FCR 479; [2006] FCA 682 at [112]- [114];
(b) carpets, including carpets with a commercial rating or some other quality which makes the carpet last longer than other carpets normally supplied for use in a domestic setting, citing Carpet Call Pty Ltd v Chan (1987) ASC 55-553 (and Rasell v Cavalier Marketing (Australia) Pty Ltd [1991] 2 Qd R 323); and
(c) pre-fabricated formwork wall panels made up of fibre cement, citing Actol Pty Ltd v Rise Products [2022] NSWCATCD 150 at [37], [239]-[240].
But there are some transactions which will inevitably be above the monetary limit, which could be encompassed by the present definition and should continue to be encompassed - in the interests of the non-commercial consumer. A contract for the construction of a family home is one example.
(Emphasis added.)
For the purposes of this Division, goods shall be taken to be supplied to a consumer notwithstanding that, at the time of the supply, they are affixed to land or premises.
(a) the statutory phrase "goods of a kind ordinarily acquired for personal, domestic or household use or consumption" should be construed broadly, wherever it appears in the TPA, so as to give the fullest relief which the fair meaning of its language will allow: at [76];
(b) the word "ordinarily" means "commonly" or "regularly", not "principally", "exclusively" or "predominantly": at [81];
(c) it is preferable to pose the statutory question, of whether the goods in issue are goods of a kind ordinarily acquired for personal, domestic or household use or consumption, as a single composite question. This can be contrasted with a two-stage inquiry as to, first, the genus of goods in question, and secondly, whether that kind of good is ordinarily acquired for personal, domestic or household use or consumption. Posing the genus question separately as a threshold one runs the risk of prejudging the answer to the statutory question: at [82];
(d) depending on the precise statutory question and the circumstances of the particular case, it will be relevant to inquire as to the essential character of the goods in question. However, while the essential character test is relevant, the statutory question cannot be answered without a broader inquiry into the evidence concerning the design, marketing, pricing and potential uses of the type of goods in question: at [83], [86]; and
(e) the question posed by s 74A(2)(a) is ultimately a question of fact and degree: at [87].
(a) acquires from a supplier goods or services of a kind ordinarily acquired for personal, domestic, or household use or consumption; and
(b) does not acquire the goods or services, or hold himself or herself out as acquiring the goods or services, for the purpose of -
(i) resupplying them in trade; or
(ii) consuming them in the course of a process of production or manufacture; or
(iii) in the case of goods, repairing or treating in trade other goods or fixtures on land.
A "consumer" under the CGA is a person who acquires from a supplier "goods or services of a kind ordinarily acquired for personal, domestic, or household use or consumption", and who does not acquire the goods or services for the purpose of resupplying them in trade, or consuming them in the course of a manufacturing process. The consumer is therefore, a person who is the "end user" of the goods, and the provisions of the Act imposing the statutory guarantees are directed at the kind of goods and services "ordinarily acquired for personal, domestic, or household use or consumption".
While the Alucobond cladding is a product that is used in the construction of residential premises used by householders, it is not a product that householders themselves ordinarily acquire for their personal use or consumption. It is a product that is ordinarily acquired by construction contractors or building companies for use and incorporation in the residential and commercial buildings that they construct, and which in the case of residential premises will be used by householders to live in. The plaintiffs' own evidence shows this to be the case as regards the Alucobond purchased by building and construction companies in New Zealand. This interpretation is also consistent with paragraph (c) of the definition of "goods" which excludes whole buildings or parts of whole buildings unless they are easily removeable structures not designed for residential accommodation.
Even if the Alucobond panels came within the definition of "goods" for the purpose of the Consumer Guarantees Act, it is we think clear that those panels are not goods of a kind ordinarily acquired for personal, domestic, or household use or consumption. There was no evidence before the High Court of sales of Alucobond panels to end‑users in their original manufactured form as flat panels. It was not suggested in evidence that Alucobond panels are sold at retail for use by consumers in building or repairing their own homes. All the evidence before us ... related to the use of Alucobond panels by building professionals ... to carry out work on a building by fabricating and installing the panels on that building. In the process of supply, the panels are modified and lose their separate identity. They become part of the building. That is, the panels are acquired by a building professional to be used to construct, or repair, fixtures on land. The owner of the building does not acquire the panels as such; rather, the owner of the building acquires a building or part of a building as a result of the materials consumed and work performed by the building professional.
(a) in an email chain from March 2012, Mr Wade Martin of HVG discussed the sale of Alucobond panels with an individual regarding his house in Hazelwood, Victoria. Mr Martin stated that anyone could purchase Alucobond from HVG directly with upfront payment, but recommended "getting the right price through the installer/contractor".
(b) In an email chain from August 2012, Mr Steve Kelly of HVG responded to an inquiry from an individual who was seeking to use Alucobond on his "2 floor 5 bedroom residential freestanding house". Mr Kelly responded by providing a guide around the costs of supply and installation, and providing fixing details, and said he would be "happy to recommend approved fabricator/ installers to quote you supply and install";
(c) in another email chain from August 2012, Mr Martin sold two panels to an individual, for which she paid via VISA card;
(d) in an email chain in September 2012, a builder inquired about the use of Alucobond panels on an extension to her house. Mr Martin responded to the inquiry, including by providing an estimated cost for supply and installation and stated: "I can help you tender the package out to a few contractors to get the right price";
(e) in three situations (in July 2015, November 2015, and July 2017), individuals inquired with HVG in relation to the supply and/or installation of Alucobond panels on their homes. HVG in each circumstance provided the individuals with fixing details for the panels and provided the details of approved installers in order for the individuals to obtain quotes; and
(f) in two other situations, by emails in October 2014 and March 2017, HVG provided information regarding the fire properties of Alucobond panels directly to individual homeowners who were considering the use of the products. This included the provision of a CodeMark Certificate (in October 2014), and information regarding the Bushfire Attack Level rating of Alucobond Plus (in March 2017).
[73] In Project Blue Sky Inc v Australian Broadcasting Authority (1998) 194 CLR 355 at [69]-[70], McHugh, Gummow, Kirby and Hayne JJ said:
The primary object of statutory construction is to construe the relevant provision so that it is consistent with the language and purpose of all the provisions of the statute. The meaning of the provision must be determined "by reference to the language of the instrument viewed as a whole". In Commissioner for Railways (NSW) v Agalianos [(1955) [1955] HCA 27; 92 CLR 390], Dixon CJ pointed out that "the context, the general purpose and policy of a provision and its consistency and fairness are surer guides to its meaning than the logic with which it is constructed". Thus, the process of construction must always begin by examining the context of the provision that is being construed.
A legislative instrument must be construed on the prima facie basis that its provisions are intended to give effect to harmonious goals.
[74] The policy and purposes underpinning the TPA were examined by Lockhart and Gummow JJ in Accounting Systems 2000 (Developments) Pty Ltd v CCH Australia Ltd (1993) 42 FCR 470 (at 503-504):
As is the case with Pt IV of the [TPA], the evident purpose and policy underlying Pt V, which includes s 52, recommends a broad construction of its constituent provisions, the legislation being of a remedial character so that it should be construed so as to give the fullest relief which the fair meaning of its language will allow: see the discussion of the authorities by Mason CJ in Devenish v Jewel Food Stores Pty Ltd [1991] HCA 7; (1991) 172 CLR 32 at 44. The precise boundaries of the territory within which s 52 operates remain undetermined: Concrete Constructions (NSW) Pty Ltd v Nelson [1990] HCA 17; (1990) 169 CLR 594 at 601.
In Webb Distributors (Aust) Pty Ltd v Victoria [1993] HCA 61; (1993) 179 CLR 15 at 41, McHugh J said:
The Trade Practices Act is a fundamental piece of remedial and protectionist legislation. Such legislation should be construed broadly so as "to give the fullest relief which the fair meaning of its language will allow".
Mason CJ expressed similar views concerning the provisions of Part IV of the TPA in Devenish v Jewel Food Stores Pty Ltd [1991] HCA 7; (1991) 172 CLR 32 at 44.
[75] In Zaravinos v Dairy Farmers Co-Operative Ltd and Pure-Pak Australia [1985] FCA 77; (1985) 7 FCR 195 at 198, Lockhart J explained the particular statutory purposes of Div 2A somewhat more narrowly:
The rationale behind Div 2A is that liability for defects in goods should be borne by the manufacturer rather than the retailer because of modern methods of packaging, labelling, distribution and promotion of goods. Division 2A does not apply where there is a contract between the manufacturer and the consumer. It applies where the manufacturer supplies goods to another person, usually a distributor or retailer, who acquires the goods for the purposes of resupply. The Division applies to the supply of goods which are of a kind ordinarily acquired for personal, domestic or household use or consumption that is, consumer goods.
[76] Notwithstanding the more particular statutory purposes which underpin Div 2A, I consider that a uniform approach should be adopted when construing the definitional phrase found in s 74A(2)(a) and in other provisions of the TPA. Moreover, in my opinion, the statutory phrase should be construed broadly, wherever it appears in the TPA, so as to give the fullest relief which the fair meaning of its language will allow.
The meaning of 'consumer'
...
The definition establishes when a person is a consumer, which is determined by reference to the nature of the goods or services acquired or to be acquired...
A person is taken to have acquired goods as a consumer if:
- the goods were of a kind ordinarily acquired for personal, domestic or household use or consumption... This is an objective assessment based on the nature and usual purpose of the goods; ...
It is correct, as the respondent argues, that white-faced foil laminates have special attributes and applications. They are, and were at all relevant times, significantly more expensive than uncoated reflective foil laminates, and are in fact used almost exclusively in commercial and industrial applications. However, as the applicant's experts said, there is nothing other than price that would make them unsuitable for use in residential applications. The respondent contends that the special attributes, special applications and greater cost of white-faced and other decorative foil laminates render them so distinctive that they must be regarded as goods of a different kind from reflective foil laminates. I do not accept this contention.
Having regard to the whole of the evidence, I am satisfied that the products are goods of a kind ordinarily acquired for personal, domestic or household use or consumption within the meaning of s 74A(2)(a). In reaching this conclusion, I have taken into account the differences in marketing, price, attributes and ordinary use of the products by end users upon which the respondent relies. I have also taken into account the common features and applications of reflective foil laminates and white-faced foil laminates. In my opinion, the proper characterisation of the products must give due weight to the three essential properties of the products. They are and were acquired and used in building constructions because they possess those essential properties...
The evidence, as far as it goes, suggests that the product is intended for the construction of residential housing as much as for commercial buildings. Although it is not a product likely to be used by the ordinary homeowner, it is ordinarily used by licensed builders in the construction of residential buildings for ordinary homeowners. It is implicit in the distinction sought to be drawn in Bunnings Group between reflective foil laminates and the "white faced foil laminates" under consideration in that case that a product ordinarily used in the construction of residential housing is "goods of a kind ordinarily used for personal, domestic or household use or consumption".
I further note the provisions of s 3(10) of the ACL. The onus of establishing that the product is not such a good lay upon Rise Products. I do not consider that Rise Products has led evidence to enable me to conclude that the RiseWall product is not goods of the kind ordinarily acquired for personal, domestic or household use or consumption.
[89] ... There was no evidence before the High Court of sales of Alucobond panels to end-users in their original manufactured form as flat panels. It was not suggested in evidence that Alucobond panels are sold at retail for use by consumers in building or repairing their own homes. All the evidence before us, including the evidence of Mr Gouws of Kaneba, related to the use of Alucobond panels by building professionals (including Kaneba) to carry out work on a building by fabricating and installing the panels on that building. In the process of supply, the panels are modified and lose their separate identity. They become part of the building. That is, the panels are acquired by a building professional to be used to construct, or repair, fixtures on land. The owner of the building does not acquire the panels as such; rather, the owner of the building acquires a building or part of a building as a result of the materials consumed and work performed by the building professional.
...
[91] ...[I]n the present case, there is uncontroverted evidence that Alucobond panels are not ordinarily acquired for personal, domestic, or household use or consumption. It is not sufficient that the panels are used for residential purposes, in the sense that they are incorporated into dwellings. The question is whether individuals or households ordinarily purchase those goods. In the present case, the evidence is sufficient to show that Alucobond panels are not ordinarily acquired by individuals or households; rather, individuals and households contract for houses to be built, or work to be done on their houses, in a manner that consumes Alucobond panels in order to construct or repair the dwelling.
[92] Mr Farmer submits that a homeowner who reclads their house acquires the cladding product. They are entitled to expect that product will meet the standards prescribed by the legislation, in the same way as they would expect a domestic fridge or stove to do regardless of whether they buy it from the contractor or from the importer. He says the Consumer Guarantees Act protects the domestic end-user regardless of the chain of supply. They are entitled to seek a remedy against a supplier (which, in the circumstances, may include the tradesperson who acquires the goods on their behalf, or the distributor, where the sale contract provides for property to pass directly to the consumer) or the manufacturer.
[93] The flaw in this argument is that a homeowner who contracts with a building professional for their house to be reclad will not normally enter into a contract to purchase goods in the form of cladding panels. Rather, the homeowner will usually contract for the recladding service to be provided. In the course of providing that service, the relevant building professional purchases and uses/consumes cladding panels to (re)construct the house. The homeowner ends up with a reclad house, with cladding panels incorporated in it: the panels lose their separate identity as goods. This is quite different from direct or indirect purchase of a fridge or stove; an item distinct from the building, albeit attached to it.
(Emphasis added.)
(a) means personal property of every kind (whether tangible or intangible), other than money and choses in action; and
(b) includes -
(i) goods attached to, or incorporated in, any real or personal property:
(ii) ships, aircraft, and vehicles:
(iii) animals, including fish:
(iv) minerals, trees, and crops, whether on, under, or attached to land or not:
(v) non-reticulated gas:
(vi) to avoid doubt, water and computer software; but
(c) despite paragraph (b)(i), does not include a whole building, or part of a whole building, attached to land unless the building is a structure that is easily removable and is not designed for residential accommodation
goods includes:
(a) ships, aircraft and other vehicles; and
(b) animals, including fish; and
(c) minerals, trees and crops, whether on, under or attached to land or not; and
(d) gas and electricity; and
(e) computer software; and
(f) second‑hand goods; and
(g) any component part of, or accessory to, goods.
goods includes:
(a) ships, aircraft and other vehicles;
(b) animals, including fish;
(c) minerals, trees and crops, whether on, under or attached to land or not; and
(d) gas and electricity.
For the purposes of this Schedule, goods are taken to be supplied to a consumer even if they are affixed to land or premises at the time of the supply.
premises means:
(a) an area of land or any other place (whether or not it is enclosed or built on); or
(b) a building or other structure; or
(c) a vehicle, vessel or aircraft; or
(d) a part of any such premises.
Even if the Alucobond panels came within the definition of "goods" for the purposes of the Consumer Guarantees Act, it is we think clear that those panels are not goods of a kind ordinarily acquired for personal, domestic or household use or consumption.
[85] Mr Farmer placed considerable emphasis on the express inclusion in the definition of "goods" of goods attached to, or incorporated in, any real or personal property. However when this limb of the definition is read together with para (c) it seems clear to us that it refers to chattels such as kitchen appliances that remain identifiable as separate goods, albeit attached to or incorporated into a building. This limb of the definition does not include the building as a whole, or elements of the building that do not retain a separate identity as goods. Where for example Consumer A builds a new house, and purchases appliances for that house, then sells the house with those appliances to Consumer B, Consumer B will have rights of redress against the manufacturer of the appliances. But Consumer B will not have rights of redress against the manufacturer of integral elements of the structure of the house itself, such as its exterior cladding or its roof, which have been incorporated into the building and have lost any separate identity as goods.
...
[87] ...It is artificial to describe the cladding which has been fabricated and installed as an integral part of the building as goods for the purposes of the Consumer Guarantees Act. The cladding has lost its separate identity. It forms part of a building which is expressly excluded from the scope of the "goods" to which the Act applies.
[88] That view is confirmed by the scheme of the Act, which assumes that the goods have a continuing separate identity. The focus of the remedial provisions is on repair of the goods or replacement of the goods, or loss in value of the goods. There are other remedies, including damages for any loss or damage to the consumer resulting from the failure to comply with the guarantee. But the remedial provisions of the Act are not readily applied to claims in respect of items that have been incorporated into a building so as to lose their separate identity.
(Emphasis added.)
[9] The principal commentators have generally treated the definition as reflecting the traditional common law distinction between "fixtures" and "moveables", with some specific extensions...
...
[15] In the course of argument it was suggested that where ''goods'', although incorporated into a building, are capable of continued identification and capable of removal without substantial damage to the building (or presumably to the ''goods''), they may be goods for the purposes of s 65F(1). Nothing in the Act suggests such an approach...
...
[17] ... Parliament has used a term ("goods") which has a commonly understood meaning and has defined that term in a way which seems to reinforce that common understanding, albeit with some express extensions. If the clear distinction between goods and fixtures on land is to be abandoned, then that common understanding would be seriously undermined. Such an outcome would be inconsistent with Parliament's adoption and definition of the term in question.
consumer goods means goods that are intended to be used, or are of a kind likely to be used, for personal, domestic or household use or consumption, and includes any such goods that have become fixtures since the time they were supplied if:
(a) a recall notice for the goods has been issued; or
(b) a person has voluntarily taken action to recall the goods.
For the purposes of the ACL, goods are taken to be supplied to a consumer (within the meaning of section 3) even if they are affixed to land or premises at the time of the supply. Goods supplied in relation to another transaction, for example the transfer of an interest in a property, are subject to the ACL for certain purposes. This could include, for example, kitchen or laundry fittings supplied as part of a home construction contract, which would otherwise become fixtures at the time of their installation.
(Emphasis added.)
7.3 Issue 5 - Whether a person "supplied" Alucobond PE or Alucobond Plus to a "consumer": TPA, s 74D(1)(b); ACL, s 54(1)(a)
(a) as owners corporations, they were supplied with, and acquired as consumers, the Alucobond PE or Alucobond Plus (as the case may be) upon their creation under the NSW strata schemes legislation; and
(b) alternatively, the developers of the Shore Building and the Five Dock Building were consumers who were supplied with the Alucobond products, and the Applicants acquired Alucobond PE or Alucobond Plus from those consumers, or derived title to the goods through or under them.
(a) first, the vesting of the common property of a strata title building in an owners corporation does not satisfy the definition of "supply" under the TPA or ACL - issue 5(a)(i);
(b) second, in respect of the Shore Building, the Shore OC could not have acquired or been supplied with the Alucobond PE fitted to the Shore Building as a "consumer", because:
(i) the price of the goods was not lower than $40,000 - issue 5(a)(ii)(A);
(ii) the products were not "of a kind ordinarily acquired for personal, domestic or household use or consumption" - issue 5(a)(ii)(B); and
(c) third, neither the developers of the Shore Building nor the Five Dock Building could be taken to have acquired or to have been supplied with Alucobond PE or Alucobond Plus as "consumers" for the reasons that:
(i) as to the Shore Building:
(A) the price of the goods acquired was not lower than $40,000 - issue 5(b)(i);
(B) the goods were not "of a kind ordinarily acquired for personal, domestic or household use or consumption" - issue 5(b)(ii);
(ii) the developers acquired, or held themselves out as acquiring, Alucobond PE and Alucobond Plus:
(A) for the purposes of re-supply in trade or commerce and thereby fell within the exception under s 3(2)(a)(i) of the ACL - issue 5(b)(iii)(A); or
(B) for the purposes of using the Alucobond PE and Alucobond Plus up, or transforming it, in trade or commerce, in the course of a process of production or manufacture or in the course of repairing or treating other goods or fixtures on land pursuant to s 4B(1) of the TPA, and s 3(2)(b) of the ACL - issue 5(b)(iii)(B).
7.3.1 To whom was a relevant supply made? Issue 5(a)(i) and 5(b)(iii)
If it is alleged in any proceeding under this Schedule, or in any other proceeding in respect of a matter arising under this Schedule, that a person was a consumer in relation to particular goods or services, it is presumed, unless the contrary is established, that the person was a consumer in relation to those goods or services.
7.3.1.1 "Supply" to the owners corporations - Issue 5(a)(i)
(a) in relation to goods - acquire by way of purchase, exchange or taking on lease, on hire or on hire-purchase; and
(b) in relation to services - accept.
...
supply, when used as a verb, includes:
(a) in relation to goods - supply (including re-supply) by way of sale, exchange, lease, hire or hire-purchase; and
(b) in relation to services - provide, grant or confer;
and, when used as a noun, has a corresponding meaning, and supplied and supplier have corresponding meanings.
(a) a reference to the acquisition of goods includes a reference to the acquisition of property in, or rights in relation to, goods pursuant to a supply of the goods; and
(b) a reference to the supply or acquisition of goods or services includes a reference to agreeing to supply or acquire goods or services; and
(c) a reference to the supply or acquisition of goods includes a reference to the supply or acquisition of goods together with other property or services, or both; and
(d) a reference to the supply or acquisition of services includes a reference to the supply or acquisition of services together with property or other services, or both; and
(e) a reference to the re‑supply of goods acquired from a person includes a reference to:
(i) a supply of the goods to another person in an altered form or condition; and
(ii) a supply to another person of goods in which the first‑mentioned goods have been incorporated; and
(f) a reference to the re‑supply of services (the original services) acquired from a person (the original supplier) includes a reference to:
(i) a supply of the original services to another person in an altered form or condition; and
(ii) a supply to another person of other services that are substantially similar to the original services, and could not have been supplied if the original services had not been acquired by the person who acquired them from the original supplier.
(a) the Strata Schemes (Freehold Development) Act 1973 (NSW) and the Strata Schemes Management Act 1996 (NSW) in respect of the Shore Building; and
(b) the Strata Schemes Development Act 2015 (NSW) and the Strata Schemes Management Act 2015 (NSW) in respect of the Five Dock Building.
(a) upon registration of a strata plan for a strata scheme, there was established an owners corporation (or body corporate) for the strata scheme constituted by the owners of the lots from time to time: SSMA 1996, ss 8, 11; SSMA 2015, s 8;
(b) upon registration of a strata plan, common property (being property that is not comprised in a lot) vests in the owners corporation of the strata scheme. The common property is freed and discharged from any mortgage, charge, covenant charge, lease, writ, or caveat affecting the land immediately before the registration of the plan: SSFDA 1973, s 18; SSDA 2015, s 24(2);
(c) the owners corporation holds the common property in the strata scheme as "agent" for the owners of the lots as tenants in common in shares proportional to the unit entitlement of the owners' lots. An owner's interest in common property cannot be severed from, or dealt with separately from, the owner's lot: SSFDA 1973, ss 20, 24; SSDA 2015, s 28.
The definitions of "supply" and "acquire" are symmetrical: a supply of goods must occur as part of a bilateral "transaction" or "dealing" under which the other party acquires them.
It is true, as counsel for the applicants points out, that the definition is an inclusory one but it seems to me that an essential element of supply is that it is a bilateral and consensual process which has no application to a case such as the present one where the applicants' case is that the emissions were inflicted upon them without their consent.
[A] transfer of dutiable property from an apparent purchaser to the real purchaser, in a case where dutiable property is vested in an apparent purchaser upon trust for the real purchaser who provided the money for the purchase of the dutiable property.
That which was transferred to the partners differed from what Queenscliff had purchased by exclusion of the common property and, notwithstanding that the common property was held in trust for the partners, the congeries of rights attached to it were vested in Queenscliff and not in the partners... There was a significant reduction in the rights acquired by the partners in comparison with the rights acquired by Queenscliff on purchase of the land.
...
In cases where common property is created upon registration of a strata plan, there can be no transfer of rights that in aggregate are equivalent to the congeries of rights acquired on purchase of the original properties. If no common property is created, and at least part of one lot is superimposed on at least a part of another lot, again, the congeries of rights change.
...
In my view, s 55(1)(b) of the Duties Act 1997 required an identity between the dutiable property transferred from the apparent purchaser with the dutiable property vested in the apparent purchaser and that identity was lacking in the instant circumstances. In my view s 55(1)(b) did not apply to the transfers.
An analysis of interests in land that attributes the creation of new rights to the issue of a new certificate of title and the cancellation of rights in the former registered proprietor does not sit well with the Duties Act 1997. If that analysis were applied, s 55(1)(b) would never relieve a real purchaser from duty upon a transfer from the apparent purchaser as the rights acquired by the real purchaser on transfer would not have been purchased by the apparent purchaser.
It is to be noted that it was unnecessary for his Honour to decide whether the new congeries of rights were attributable to a redistribution of earlier rights or were new rights substituted for old rights that had been cancelled. For the reasons already indicated, I am of the view that an analysis based upon the substitution of new rights for old rights does not apply to the Duties Act 1997.
[T]he process nowadays is for the Registrar General to issue a new certificate of title or the equivalent and there is authority for the proposition that every time the Registrar General does that, a new title is created as Barwick CJ said in Breskvar v Wall (1971) 126 CLR 376 at 385-6; [1972] ALR 205 at 209:
That which the certificate of title describes is not the title which the registered proprietor formerly had, or which but for registration would have had. The title it certifies is not historical or derivative. It is the title which registration itself has vested in the proprietor.
It follows that when a strata plan is registered the congerie of rights that constituted the grant of a fee simple over the whole parcel is now resubdivided so that various rights are created in different groups of cubic meterages of air space. The sum total of the whole of those rights will equal the sum total of the congerie of rights in the original certificate of title, but they will be completely redistributed. Alternatively, the old rights in land have been cancelled and new rights whose totality is the same quantum are created. It matters little for present purposes which it is.
[U]nnecessary to consider whether any of these changes...represented departures of substance from the obligations under the new lease...because all of these changes were the direct consequence of the situation brought about and intended to be brought about by the joint action of the parties when the lessor (with the lessee's cooperation) proceeded to obtain registration of the new strata plan.
7.3.1.2 Did the developers acquire the Alucobond products as "consumers" - Issue 5(b)(iii)
(1) A person is taken to have acquired particular goods as a consumer if, and only if:
(a) the amount paid or payable for the goods, as worked out under subsections (4) to (9), did not exceed:
(i) $40,000; or
(ii) if a greater amount is prescribed for the purposes of this paragraph - that greater amount; or
(b) the goods were of a kind ordinarily acquired for personal, domestic or household use or consumption; or
(c) the goods consisted of a vehicle or trailer acquired for use principally in the transport of goods on public roads.
(2) However, subsection (1) does not apply if the person acquired the goods, or held himself or herself out as acquiring the goods:
(a) for the following purpose:
(i) for goods other than gift cards - for the purpose of re‑supply;
...
(b) for the purpose of using them up or transforming them, in trade or commerce:
(i) in the course of a process of production or manufacture; or
(ii) in the course of repairing or treating other goods or fixtures on land.
(1) For the purposes of this Act, unless the contrary intention appears:
(a) a person shall be taken to have acquired particular goods as a consumer if, and only if:
(i) the price of the goods did not exceed the prescribed amount; or
(ii) where that price exceeded the prescribed amount - the goods were of a kind ordinarily acquired for personal, domestic or household use or consumption or the goods consisted of a commercial road vehicle;
and the person did not acquire the goods, or hold himself or herself out as acquiring the goods, for the purpose of re‑supply or for the purpose of using them up or transforming them, in trade or commerce, in the course of a process of production or manufacture or of repairing or treating other goods or fixtures on land; and
...
(2) For the purposes of subsection (1):
(a) the prescribed amount is $40,000 or, if a greater amount is prescribed for the purposes of this paragraph, that greater amount;
(b) subject to paragraph (c), the price of goods or services purchased by a person shall be taken to have been the amount paid or payable by the person for the goods or services;
(c) where a person purchased goods or services together with other property or services, or with both other property and services, and a specified price was not allocated to the goods or services in the contract under which they were purchased, the price of the goods or services shall be taken to have been:
(i) the price at which, at the time of the acquisition, the person could have purchased from the supplier the goods or services without the other property or services;
(ii) if, at the time of the acquisition, the goods or services were not available for purchase from the supplier except together with the other property or services but, at that time, goods or services of the kind acquired were available for purchase from another supplier without other property or services - the lowest price at which the person could, at that time, reasonably have purchased goods or services of that kind from another supplier; or
(iii) if, at the time of the acquisition, goods or services of the kind acquired were not available for purchase from any supplier except together with other property or services - the value of the goods or services at that time;
...
(3) Where it is alleged in any proceeding under this Act or in any other proceeding in respect of a matter arising under this Act that a person was a consumer in relation to particular goods or services, it shall be presumed, unless the contrary is established, that the person was a consumer in relation to those goods or services.
(a) for the purpose of re-supply under s 3(2)(a)(i) of the ACL or s 4B(1) of the TPA; or
(b) for the purpose of using them up or transforming them, in trade or commerce, in the course of a process of production or manufacture, or in the course of repairing or treating other goods or fixtures on land under s 3(2)(b) of the ACL or s 4B(1) of the TPA.
For the purpose of re-supply - Issue 5(b)(iii)(A)
For the purpose of using up or transforming - Issue 5(b)(iii)(B)
(a) first, in the process of producing or manufacturing a façade system for those buildings; and
(b) second, in the course of treating fixtures on land, being the Shore Building and Five Dock Building.
7.3.2 The price limb - Issue 5(a)(ii)(A) and 5(b)(i)
(a) the amount paid or payable for the Alucobond products, as worked out under subsections 3(4) to (9), did not exceed $40,000; or
(b) the Alucobond products were goods of a kind ordinarily acquired for personal, domestic or household use or consumption.
3 Meaning of consumer
Acquiring goods as a consumer
(1) A person is taken to have acquired particular goods as a consumer if, and only if:
(a) the amount paid or payable for the goods, as worked out under subsections (4) to (9), did not exceed:
...
Amounts paid or payable for purchases
(4) For the purposes of subsection (1) or (3), the amount paid or payable for goods or services purchased by a person is taken to be the price paid or payable by the person for the goods or services, unless subsection (5) applies.
(5) For the purposes of subsection (1) or (3), if a person purchased goods or services by a mixed supply and a specified price was not allocated to the goods or services in the contract under which they were purchased, the amount paid or payable for goods or services is taken to be:
(a) if, at the time of the acquisition, the person could have purchased from the supplier the goods or services other than by a mixed supply - the price at which they could have been purchased from the supplier; or
(i) paragraph (a) does not apply; but
(ii) at the time of the acquisition, goods or services of the kind acquired could have been purchased from another supplier other than by a mixed supply;
the lowest price at which the person could, at that time, reasonably have purchased goods or services of that kind from another supplier; or
(c) if, at the time of the acquisition, goods or services of the kind acquired could not have been purchased from any supplier except by a mixed supply - the value of the goods or services at that time.
(11) A purchase or other acquisition of goods or services is made by a mixed supply if the goods or services are purchased or acquired together with other property or services, or together with both other property and other services.
7.3.3 The consumer goods limb - Issue 5(a)(ii)(B), 5(b)(ii)
7.4 Issue 6 - Whether the Applicants derived title to the Alucobond products through or under the developers?
affected person, in relation to goods, means:
(a) a consumer who acquires the goods; or
(b) a person who acquires the goods from the consumer (other than for the purpose of re-supply); or
(c) a person who derives title to the goods through or under the consumer.
[73] ... Are the Channar Joint Venturers "persons or corporations deriving title through or under [MBM] to [Channar A]"?
[74] That question raises a constructional choice. Is the phrase "persons or corporations deriving title through or under" MBM limited to succession, assignment or conveyance or is it sufficiently broad to cover a close practical or causal connection between the rights exercised by the Channar Joint Venturers and the rights which MBM obtained from Hanwright under the 1970 Agreement? The Court of Appeal adopted the former, narrow construction and held that the Channar Joint Venturers' rights in respect of Channar A could not be traced back to any "title" of MBM to the land.
[75] The text of the 1970 Agreement itself provides indications that the phrase "through or under" is broader than formal succession, assignment or conveyance.
[76] First, cl 3.1 of the 1970 Agreement read with cl 24(iii) of the 1962 Agreement extends the royalty obligation. It is a royalty obligation of MBM which was and remains tied to identified areas of land - the MBM area. But, as has been seen, that area of land was accepted to be likely to be subject to some adjustment and change. Secondly, cl 3.1 does not refer to deriving title "from" MBM but rather it refers to deriving title "through or under" MBM. The expression "through or under" has been acknowledged to be a relatively flexible one.
...
[81] ... [T]he Court of Appeal erred in adopting a narrow construction of the phrase "through or under". The Court of Appeal correctly identified that it was faced with a constructional choice that had to be resolved not by reference to authority but by reference to the text and context of the 1970 Agreement. However, the Court took as its starting point its decision in Sahab Holdings Pty Ltd v Registrar-General (No 2), which concerned the statutory phrase "any person claiming through or under that person" in the Real Property Act 1900 (NSW). It did not follow from Sahab that continuity of a chain of title is always invoked by the phrase any person "deriving title through or under". Having regard to the proper construction of "through or under" in the context of the 1970 Agreement, the want of unbroken chain of "title" which the Court of Appeal relied upon was not determinative. The Court's reasoning would have had more force if cl 3.1 of the 1970 Agreement (incorporating cl 24(iii) of the 1962 Agreement) had referred to deriving title "from" MBM. That was not the language of the clause.
(Citations omitted.)
(a) of rendering limb (b) of the definition of "affected person" otiose contrary to the principles in Project Blue Sky Inc v Australian Broadcasting Authority (1998) 194 CLR 355 at 382 (McHugh, Gummow, Kirby and Hayne JJ); and
(b) that the general words of limb (c) will outflank the qualification contained in the parenthesise in limb (b) contrary to the principle in David Grant & Co Pty Ltd v Westpac Banking Corporation [1995] HCA 43; (1995) 184 CLR 265 at 276 (Brennan CJ, Gummow J, Dawson, Gaudron and McHugh JJ agreeing).
(a) the words "through or under" must take their meaning from the context in which they appear: Capic SCQOI [64], [67], citing Mount Bruce Mining [96] and Kain v R&B Investments Pty Ltd [2025] HCA 28; 423 ALR 413 at [30]. The relevant context here is remedial consumer protection legislation;
(b) the applicant's interpretation was supported by extrinsic material. The second reading speech and explanatory memoranda for the amending legislation that introduced the predecessor provision into the TPA (s 74D, which incorporates the same language as s 2 of the ACL) included explicit statements that the statutory protections would be "extended to successors in title to a consumer" and that a manufacturer's liability "follows title in the goods": Capic SCQOI [51]. This supported the applicant's interpretation: Capic SCQOI [52], [64(1)]; and
(c) there was no reason why the Parliament would have adopted the narrow (and idiosyncratic) interpretation contended for by Ford. As Perram J explained at Capic SCQOI [66]:
[T]he extrinsic materials do not provide any explanation for why it was thought appropriate to afford consumer remedies to persons who derived their title from a consumer by devolution (such as a trustee in bankruptcy or a legatee) but to deny it to persons who derived their title to goods more conventionally by an act of acquisition such as a purchase...it is difficult to see what end could have been intended by such an idiosyncratic operation for limb (c).
8. WHETHER THE ALUCOBOND PRODUCTS WERE NOT OF MERCHANTABLE OR ACCEPTABLE QUALITY: ACL, S 54(2)-(3); TPA, S 74D(2)-(3) (ISSUE 8)
54 Guarantee as to acceptable quality
(1) If:
(a) a person supplies, in trade or commerce, goods to a consumer; and
(b) the supply does not occur by way of sale by auction;
there is a guarantee that the goods are of acceptable quality.
(2) Goods are of acceptable quality if they are as:
(a) fit for all the purposes for which goods of that kind are commonly supplied; and
(b) acceptable in appearance and finish; and
(c) free from defects; and
(d) safe; and
(e) durable;
as a reasonable consumer fully acquainted with the state and condition of the goods (including any hidden defects of the goods), would regard as acceptable having regard to the matters in subsection (3).
(3) The matters for the purposes of subsection (2) are:
(a) the nature of the goods; and
(b) the price of the goods (if relevant); and
(c) any statements made about the goods on any packaging or label on the goods; and
(d) any representation made about the goods by the supplier or manufacturer of the goods; and
(e) any other relevant circumstances relating to the supply of the goods.
74D Actions in respect of goods of unmerchantable quality
(1) Where:
(a) a corporation, in trade or commerce, supplies goods manufactured by the corporation to another person who acquires the goods for re‑supply;
(b) a person (whether or not the person who acquired the goods from the corporation) supplies the goods (otherwise than by way of sale by auction) to a consumer;
(c) the goods are not of merchantable quality; and
(d) the consumer or a person who acquires the goods from, or derives title to the goods through or under, the consumer suffers loss or damage by reason that the goods are not of merchantable quality;
the corporation is liable to compensate the consumer or that other person for the loss or damage and the consumer or that other person may recover the amount of the compensation by action against the corporation in a court of competent jurisdiction.
(3) Goods of any kind are of merchantable quality within the meaning of this section if they are as fit for the purpose or purposes for which goods of that kind are commonly bought as it is reasonable to expect having regard to:
(a) any description applied to the goods by the corporation;
(b) the price received by the corporation for the goods (if relevant); and
(c) all the other relevant circumstances.
(a) the spread and severity of the fire, including: the rapid vertical spread and/or horizontal spread of the fire on and in the building; the loss of fire compartmentation; and/or the spread of fire to multiple floors of a multi-storey building;
(b) debris falling from the building, including: molten or burning material from the PE core; and/or the whole or part of the aluminium cover sheets;
(c) the fire, and smoke from the fire, overwhelming or compromising any fire safety, suppression and/or smoke control systems in the building; and
(d) the release of toxic products of combustion.
(a) increase the risk of loss of life;
(b) increase the risk of damage to the building or an adjacent building, and/or building contents in either building;
(c) adversely impact the ability of the building's occupants to evacuate; and/or
(d) adversely impact the ability of the firefighting authorities to minimise the damage to the building and building contents, and to mitigate against the loss of life or injury to persons in the building.
(a) could be determined by relevant government authorities to be unsafe or create a risk of death or serious injury regardless of its compliance or otherwise with the BCA; and
(b) could be the subject of a legally-binding direction to be removed and/or replaced,
together referred to as Alucobond PE's "Prohibition Risk Properties".
(a) Alucobond PE was fit for all of the relevant Purposes;
(b) Alucobond PE did not have the Material Fire Risk Properties and/or the Prohibition Risk Properties;
(c) when used on any building, or for any of the Purposes, Alucobond PE was safe, did not pose a material risk (or materially increased risk) to the health or safety of occupants of the building to which the cladding was fitted, and did not pose a material risk (or materially increased risk) of damage to the building or to property therein; and/or
(d) Alucobond PE could be fabricated and affixed to a building using any of a number of suggested fabrication and affixation methods without compromising its fire performance and/or giving rise to the Material Fire Risk Properties.
(a) fit for all of the purposes for which goods of the kind were commonly bought; and/or
(b) safe,
to the degree that a reasonable consumer fully acquainted with the relevant properties would regard as acceptable (by reference to the expectation outlined above). On this basis, the Shore OC plead that Alucobond PE is not of acceptable quality.
(a) determined by relevant government authorities to be non-compliant with relevant building codes and standards; and
(b) the subject of a legally-binding direction to be removed and/or replaced.
Akin to the Prohibition Risk Properties, the Applicants define this as the "BCA-Related Prohibition Risk Properties".
(a) Alucobond PE was compliant with the BCA when fitted as part of or as an attachment to an external wall or other building element of Class 2 to 9 buildings;
(b) the use of Alucobond PE for any of the "Purposes" would not cause any Class 2 to 9 building to be or to become non-compliant; and/or
(c) Alucobond PE did not have the BCA Non-compliance Risk Properties and/or the BCA‑Related Prohibition Risk Properties.
(a) fit for all of the purposes for which goods of the kind were commonly brought; and/or
(b) safe,
as a reasonable consumer fully acquainted with the relevant properties would regard as acceptable (by reference to the expectation outlined above). On this basis, the Applicants plead that Alucobond PE is not of acceptable quality.
The test contained in s 74D(3) is a test that requires the making of a comparison. It calls for the fitness for purpose of the goods in question to be measured against what it was objectively reasonable to expect, in terms of fitness for purpose, in all the relevant circumstances. Those circumstances include the description applied to the goods by the manufacturer and the price received by the manufacturer for the goods. What it is objectively reasonable to expect in terms of fitness for purpose of goods of one description may be quite different from what it would be reasonable to expect of goods of another description. What it would be reasonable to expect in terms of fitness for purpose of an inexpensive product might be quite different from what it would be reasonable to expect of an expensive product of the same kind.
There is no textual basis for confining the statutory language of "acceptable quality" in s 54 of the ACL, to "not potentially fatal" or "unusable". This is demonstrated by the nature of the requirements in s 54(2) which include but are not limited to the appearance or finish of the goods and durability. Thus, the guarantee may be breached in circumstances which fall short of a possible fatality or complete uselessness.
Consistently with that policy, if the manufacturer knows that it cannot be sure to meet those expectations, it must cease manufacturing, or, if possible, ensure that the consumer has agreed to bear the risk (perhaps by an appropriate warning with the result that the consumer's otherwise reasonable expectations are made unreasonable).
8.4 The Applicants' merchantable and acceptable quality case
(a) the Alucobond products' combustible core had a significant calorific value and was encapsulated only by thin sheets of aluminium. Therefore, each product had a propensity to burn and spread fire when exposed to relatively small fires in a building (Material Fire Risk Properties). The BCA Non-compliance Risk Properties and the BCA‑Related Prohibition Risk Properties were, in the Applicants' submission, a result of these inherent qualities in the Alucobond products; and
(b) due to the danger that the Alucobond products presented, they could not be used compliantly with the DtS Provisions of the BCA for all of the uses for which they were commonly bought during the relevant period (ie, the Purposes). And the assistance of an unusually knowledgeable and skilful FSE was required if they were to be used at all.
(a) were suitable products for use as external cladding on all building types including high‑rise buildings and residential applications;
(b) did not present a material fire hazard and could be used in the manner set out in the Respondents' brochures and technical material without compromising their fire properties; and
(c) could be used in a way that was compliant with the BCA without the assistance of a qualified fire safety officer.
8.5 Findings regarding Material Fire Risk Properties
(a) the composition of the core of Alucobond Plus;
(b) the composition of the core of Alucobond PE;
(c) whether the cover sheets protect the core of Alucobond PE and Alucobond Plus; and
(d) as a result of the above, the risks associated with the reaction-to-fire properties of Alucobond PE and Alucobond Plus.
The calorific values rather than the mineral content are the metrics that are being measures [sic] for the certifications therefore we do not have certificates for ALUCOBOND Plus that explicitly mention its mineral content.
The request is very specific, we need to provide evidence of the mineral content. It has been marketed as min 70% for as long as I have been with Alucobond Architectural, this must have come from somewhere.
Do you have contacts with local testing labs that can provide the data?
I can't stress how critical this is.
This is not good news, 70% seems very specific after a burn test.
We have tech data attached showing more than 70% mineral content, now we can't prove this?
It now brings in to question whether we have changed the PLUS formulation.
When changing to the industrial production of Plus we changed to a formulation containing less PE. This optimized formulation does not change the fire behaviour and complies with all regulations and approvals for Alucobond Plus. We are preparing a product description of our formulation and I will send you this soon.
Regarding the Victorian Government Ruling it is very confusing for us:
Our ALUCOBOND plus does contain significantly less Polyethylen [sic] than the mentioned 30%.
The Polyethylene content of the core is less than 20% by weight, so significantly less than required.
The rest of the core is mineral content and other plastics.
This is the case already for many years.
If the Victorian Government only limits Polyethylene, we are fine.
The documents you sent only refer to Polyethylene, I did read them carefully, they do not mention other plastics.
All the recent questions from your people had been on mineral content, but not on Polyethylene content.
We on our end think in combustion load not in material content.
Please clarify whether our ALUCOBOND plus with a Polyethylene content of less than 20% is still a good enough product.
If so, Amin Emami can send an official document giving the Polyethylene content.
(Original emphasis.)
This brings NSW into line with Victoria to a great extent and we supported the ban on 100% PE material in a submission a couple of months ago.
Note the 30% limit. It is critically important that EVERY shipment of Alucobond PLUS we receive has non-combustible core material of greater than 70% and a PE content of less than 30%.
Is it possible to determine which batches of material have a higher mineral content?
With chain of custody requirements for testing, we are being asked to also test from stock.
If we knew which products were higher content, we can put those forward.
Not sure if it can be done but thought I would ask.
Apologies for all the communications, it's really ridiculous what is going on here. We are just trying to defend our position.
[T]hat's hardly possible.
The only fact is, that panels longer than 6800 mm and wider than 1575 mm, 6 mm thickness and NaturAl Reflect have lower mineral content than the rest.
Is it safe to assume that whatever sample that is tested from our stock will be less than 70%?
[T]he nominal mineral content is 70%, the tolerance is ±3% by the balances.
Hence there are panels above and below...
Panels produced before 2015 have in [sic] tendency an [sic] higher mineral content (the mineral component is cheaper) and have predominantly a mineral content ≥70%.
Due to the reconstruction of the lamination line during 2015, the scrap rate rises now dramatically when we increase the mineral content. Therefore we are investigating a new formulation.
Only panels from line 4 (see previous email) use the edge trimming "scrap" (incl. adhesive foil) of line 2 and therefore have in tendency [sic] lower mineral content.
8.5.3 Do the cover sheets protect the core of Alucobond PE or Alucobond Plus?
8.5.4 Risks associated with the fire behaviour of Alucobond PE and Alucobond Plus
54. The extent to which all of the above reaction-to-fire behaviours will occur in any given situation, the consequences of their occurrence for any given building, and the need for specific design measures to prevent or mitigate these behaviours will all depend on the particular building under consideration and the fire safety strategy of that building.
55. As a result, assessment of any specific external wall system incorporating Alucobond PE ACPs, by a suitably careful and competent engineering professional, is necessary in order to properly establish its performance. Only practitioners who are sufficiently informed of the reaction-to-fire properties of the products, or who are otherwise advised of potential hazards associated with their use, and who are qualified with the relevant expertise, will be able to engage with such considerations and make appropriate judgements.
56. For the above reasons, manufacturers of ACP cladding products need to behave with competency and integrity in the use of the test methods and in the reporting of the data. Test data and marketing claims need to be relevant, credible, transparent, easily accessible, complete, and unambiguously presented within product literature and brochures; full and transparent disclosure of the testing conditions used in any compliance testing is therefore essential.
104. Understanding the risk to life and/or property presented by the use of Alucobond PE as part of or as an attachment to an external wall or building element requires consideration of the potential external fire spread mechanisms via the building façade system and the interactions with, and impacts upon, the overall fire safety strategy of any specific building to this event. Where such understanding does not exist or cannot be developed for a given product that generates such hazards (as in the case of Alucobond PE) this product should not be used.
...
109. Any cladding element installed on a building will present certain hazards which need to be managed through the fire safety strategy of that building to such an extent that the residual risk is at a level that is satisfactory for all stakeholders...
The evaluation of compliance to Clause 2.4(a)(ii) and (iii) of Specification C1.1 has been reviewed in fire product assessment M13074 dated 19 July 2013 and deemed compliant based on their evaluation and the supporting information including international test results included within the evaluation.
(a) Alucobond PE and Alucobond Plus are combustible for the purposes of the BCA;
(b) under the DtS Provisions of the BCA, the external walls of Type A and Type B construction must be non-combustible: Specification C1.1 - 3.1(b); Specification C1.1 - 4.1(b);
(c) the two relevant potential exceptions are the bonded laminate exception under C1.12(f) of the BCA, and the attachment exception under Specification C1.1, cl 2.4, both of which appear to have been used as compliance pathways during the relevant period.
[T]he material is exempted under C1.10 or complies with the fire hazard properties prescribed in Specification C1.10
Fire hazard properties means the following properties of a material or assembly that indicate how they behave under specific fire test conditions:
...
(b) Smoke-Developed Index, smoke development rate and Spread-of-Flame Index, determined in accordance with Specification A2.4.
1. Scope
This Specification sets out the procedures for determining the fire hazard properties of assemblies tested to AS/NZS 1530.3.
2. Assemblies
2.1 General requirement
The fire hazard properties of assemblies and their ability to screen their core materials as required under Specification C1.10 must be determined by testing in accordance with this Clause.
2.2 Form of test
Tests must be carried out in accordance with-
(a) for the determination of the Spread-of-Flame Index and Smoke-Developed Index - AS/NZS 1530.3; and
(b) for the determination of the ability to prevent ignition and to screen its core material from free air - AS 1530.4.
2.3 Test specimens
Test specimens must incorporate-
(a) all types of joints; and
(b) all types of perforations, recesses or the like for pipes, light switches or other fittings, which are proposed to be used for the member or assembly of members in the building.
2.4 Concession
Clause 2.3 does not apply to joints, perforations, recesses or the like that are larger than those in the proposed application and have already been tested in the particular form of construction concerned and found to comply with the conditions of the test.
To specify the details required for the test specimen.
The assembly to be tested must include all joints, perforations, recesses, and the like. These parts may affect not only its early fire-hazard properties, but are also more likely to affect the passage of air and fire to the assembly's inner core. The requirements for the test specimen apply to both tests required by Clause 2.
(a) any material which does not comply with this Table is protected on all sides and edges from exposure to the air; and > > (b) the member or assembly, when tested in accordance with Specification A2.4, has a Spread-of-Flame Index and a Smoke-Developed Index not exceeding those prescribed in this Table; and > > (c) the member or assembly retains the protection in position so that it prevents ignition of the material and continues to screen it from access to free air for a period of not less than 10 minutes.
[T]here is no real dispute that undue risk for the purposes of cl 2.4(a)(iii) means risk of fire spread via the façade of the Buildings that is unwarranted or excessive. The meaning given by the Appeal Panel to "undue" accords with the ordinary English meaning of the word and, in my view, correctly reflects that the word has no unusual or technical meaning, unlike some other terms used in the BCA, such as "Spread of Flame Index". The Appeal Panel did not err by adopting that meaning.
The BCA does not specify the particular matters or precise parameters for determining whether the use of combustible material as an attachment constitutes a risk of fire spread via a building façade that is unwarranted or excessive for the purposes of cl 2.4(a)(iii). In my view, the determination as to whether the risk is undue (or unwarranted or excessive) involves an evaluative task that requires consideration of the circumstances and context in which the Biowood combustible cladding is used as an attachment to the external walls of the Buildings. That includes consideration of the objective of Section C of the BCA of ensuring the safety of people from fire, the BCA requirement that external walls in Type A buildings are to be constructed using non‑combustible material, the possibility of fire spread eventuating, and the gravity of the risk from such use. Factors such as the ignitability of the combustible material and the likely rate of fire spread, the location of the material, and relevant safety features of the Buildings would also be germane to consider.
The current BCA.... [G]enerally uses the combustibility test AS1530.1... and the early fire hazard test AS1530.3... to control materials used for external walls and claddings. The existing controls are in some cases not sufficiently specific, for example, the expression "it does not otherwise constitute an undue risk of fire spread via the façade of the building" seems out of place in a deemed-to-satisfy solution. The existing AS1530.3 requirements may also not be able to adequately evaluate the performance of full-scale cladding systems in their end-use installation.
In my opinion the criteria for undue risk of fire spread could not be satisfied for Alucobond PE in any circumstances, and would be extremely difficult or expensive to satisfy for Alucobond Plus
[S]o you're saying designing a product to the compliance of the building code using engineering principles around cost benefit and - because, in my view, for example, you can theoretically design anything to comply but the cost of compliance will mean you would never actually do it... I don't think you can get through the design process to design a façade using PE at any point in the relevant period based on normal engineering practice.
...
[I]f I can explain the process as it would happen in my period of practice, so if you came to me and said, "I want to put aluminium composite panels on my building", I wouldn't design it. I would say, "well, what are the products that we have got to choose here and what is the cost per square metre and what will the cost penalty be for the cheaper products?" And that analysis, which is not really engineering, it's just accounting, would be probably that would knock back PE out on almost every project and I would argue actually every project because an engineer's responsibility is to make sure their clients have an economical building... It's not enough to say, "I can build you the most expensive building ever using the worst products as long as it's shiny." That's not what engineering is.
...
I'm making a point about practical engineering. It's an ethical obligation to make sure we don't waste a client's money, and this theoretical design you are proposing to me seems, without any analysis, a waste of money. Now, I don't disagree with, conceptually, that you can theoretically design anything.
...
[T]he evidence around a polyethylene core ACP, compared to a product that is modestly more expensive and is better... in the relevant period, there was PE, Plus and A2, and solid aluminium and other products, and in some jurisdictions stainless steel composite panels and zinc composite panels, and a whole range of panels. That's the boots on the ground engineering analysis. What are you trying to do? It sounds like it will fail the cost benefit analysis pretty quickly. So you wouldn't proceed.
8.6.3.1 Engagement of FSEs to design a Performance Solution
8.6.3.2 What would have occurred if an FSE was engaged
The conclusion of all the work conducted, post-Grenfell demonstrated that the existing tools and testing practices are inadequate for the assessment of the performance of modern facade systems. None of the existing tools can reproduce the different phenomena observed, in particular, the strongly coupled thermal mechanical behaviour that results in deformations, rupture and complex interactions between combustible and non-combustible materials. Existing standard testing methodologies have proven incapable of delivering adequate, relevant or sufficient information for performance assessment of systems, and scenario testing are not only too complex, lack adequate instrumentation are too sensitive to construction detailing but more fundamentally cannot recreate the desired conditions or deliver the necessary information for design.
Mr Free: [The Cladding Material Library] was developed in response to a perceived lack of information being available to fire safety engineers and other professionals within Australia?
Professor Torero: I mean, technically speaking, you can argue that, and I think many times a perceived lack of information is simply not being able to have that information at the tip of your fingers. But, yes, I think, in the period, there was a sense that there was a need to compile all that information and put it in one specific place, and whenever there were uncertainties, try to do the testing to try to enable people to make refined assessments of the performance of existing systems.
(a) the Group 3 Joint Report noted that an assessment of the hazards posed by Alucobond PE and Alucobond Plus could have been developed using the available properties of construction materials (including PE and aluminium) and relatively simple methods of analysis, as was illustrated by the analysis utilised in Professor Torero's assessment of the Shore Building. None of the data or information used in Professor Torero's analysis was unavailable to FSEs in Australia. While a simpler analysis and solution may require a greater number of safety factors to be incorporated, which may restrict how Alucobond PE or Alucobond Plus is used as part of the Performance Solution, it is not the case that a proper assessment of Alucobond PE and Alucobond Plus was not possible on the information available;
(b) Professor Torero's evidence that, to assess the more complex behaviour of Alucobond Plus where combustible material was diluted through the use of an inert filler, a conservative approach could only be taken by considering a fraction of the gain that may be obtained relative to Alucobond PE's reaction-to-fire behaviour;
(c) the Expert Group 4-5 evidence that, in assessing the suitability of combustible ACPs being used on a building, FSEs would consider the relevant fire tests identified in the BCA, or if such tests were not available or insufficient, the results of overseas tests. As the Group 4-5 Joint Report stated, the results of these tests would need to be properly understood and contextualised. Additionally, consideration might also be given to scientific papers, fire engineering principles, reports or investigations of cladding fires, relevant textbooks and other resources;
(d) the Applicants sought to identify a number of limitations in respect of how particular fire tests were conducted (setting aside, for the moment, issues of propriety in doing so). But the evidence of the experts was not that the information from the fire tests could not be used in the development of an appropriate Performance Solution. Rather, the evidence was that the relevant limitations in each test would need to be properly understood, so that a careful assessment could be made as to the extent to which the results of particular fire tests could inform the development of a Performance Solution for a particular application of panels. It may be the case that a particular fire test, for one reason or another, cannot be meaningfully extrapolated. For example, Mr Moore provided the following evidence in the course of the Expert Group 4-5 conclave:
If the fire engineer asks for a test and they come back with something that was tested to, say, this arrangement that is very atypical of what would be put on a building, then you would start to look at those factors, say, the edge is being protected in this test, is it protected in a similar way? So we don't - when we request a test, it's not like we give a test tick, you look at the test, you look at the results and you look at the limitations of that test, one of them being how the material is fixed and whether it's applicable to your one.
(e) Additionally, Expert Group 4-5 agreed that theoretically, a Performance Solution could be designed without having large-scale fire results for ACPs. The experts recognised that the use of small-scale fire tests to understand the reaction‑to‑fire behaviour of the Alucobond panels allows for only limited and conservative extrapolation of any results. Again, while this would narrow what might be determined as an acceptable application of ACPs, it cannot be said that the lack of large-scale fire results would, by itself, prevent the formulation of a Performance Solution: [T533.15-45]. As an illustration of this point, Professor Torero noted that a conservative assumption could be made that all of the PE would burn, and consider a Performance Solution on that basis (noting that such an assumption would not be necessary to develop a Performance Solution): [T534.2-46]. While making such conservative assumptions would, naturally, significantly restrict what might be considered an acceptable use of the Alucobond panels, it is illustrative of the point the experts sought to make.
[T]here is a risk that the fire engineer appointed to a project would not have competence to deal with the challenges of that project. I don't think there is a way to say with any degree of certainty what the level of competence of fire safety engineers broadly was over the period in question.
The manner in which high-rise building construction has evolved in the last two decades has resulted in the number of very large-scale building fires increasing in a dramatic way... These fires have been documented extensively and in the majority of the cases the fast spread and ultimate magnitude of the fire is related to the manner in which the façade system was designed. Despite the numerous failures, it remains unclear how to address these complex systems to deliver a quantitative performance assessment that enables fire safety engineers to establish, in an explicit manner, an adequate fire safety strategy.
...
Other drivers such as ease of construction, cost, aesthetics and acoustics have also emerged, and the continuous building envelope has become the preferred solution for retrofit and new builds.
The continuous building envelope brings an inherent problem in that it is susceptible to deformations that are very different to the structure to which it is attached. This creates the potential to render firestop arrangements ineffective, and allow penetration of the fire from a lower compartment to one above. This problem is further exacerbated by the use of specific materials, such as aluminium, to respond to other drivers such as weight reduction and ease of manufacturing. Aluminium loses all mechanical integrity by 550°C and melts at 650°C, which are well below the temperatures of typical fires... Thus, these materials represent no barrier to a fire.
...
In summary, compartmentation provided by façade systems is critical to the fire safety strategy. The capacity of façade systems to constrain and slow the spread of a fire needs to be quantified to establish the adequacy of the fire safety strategy. Extrinsic drivers have resulted in façade systems of unknown fire performance and unpredictable fire safety outcomes. Therefore, it is essential to revisit the fundamental processes determining how a façade system supports the desired level of fire safety performance and, as a result, delivers tools that enable engineers to quantify such performance.
...
The strategy of encapsulation thus became a driving force for the use of combustible materials within the building envelope. Aluminium Composite Panels (ACPs) or aluminium foil covered cellular plastic insulation are perfect examples of systems where encapsulated combustible materials are used. These systems spread widely because of their reduced cost and because they provided an effective solution to many of the required building functionalities.
The combination of an encapsulated combustible product added to a continuous, lightweight building envelope results in systems of enormous complexity and innumerable components. Many of these components have been fixed in manners that favour ease of construction but do not necessarily take into consideration their performance in fire.
As a consequence, existing combustibility tests can no longer be used in their standardised form for these encapsulated products in a way that gives meaningful data. This is because they are designed to assess individual materials rather than composite products.
The statements above do not negate the fact that ACPs such as Alucobond PE and Alucobond Plus, and the external wall systems in which they are commonly used, are very complex systems. Nor does it negate the fact that the properties of these products' component materials can lead to significant fire hazards. A detailed hazard analysis can therefore be extremely complex and might not have been accessible to a typical FSE in Australia during the relevant period ... Nevertheless, simpler solutions that carry large factors of safety and restrict the manner and extent of ACP use on any particular building could - in principle - have been demonstrated to result in adequate safety using simpler tools and methods that may have been in common use by FSEs in Australia during the relevant period.
(a) the Alucobond brochures to which he was referred did not provide adequate information for him to assess the overall fire safety strategies for the buildings shown in the brochures;
(b) he had not made any inspection of those buildings; and
(c) he could not say whether the use of Alucobond PE or Alucobond Plus on those buildings gave rise to a risk to life or property that had not been adequately mitigated [T419.43-420.24].
(d) he could give no evidence as to whether any particular use of the Alucobond PE or Alucobond Plus shown in the brochures or otherwise, would or would not comply with the BCA [T378.12-24].
8.6.3.3 Practical barriers to the pursuit of a Performance Solution
1. Introduction
Aluminium composite panels (ACPs) are widely used for external cladding throughout Australia and the world. Concerns have been raised in the Australian Capital Territory (ACT) regarding whether the material complies with the deemed-to-satisfy (DTS) provisions of the Building Code of Australia 2010 (BCA). Given the economic, social and environmental impacts that have emerged from this issue it is important that the matter be readily resolved.
This report is intended as a proposal for change (PFC)... Defire undertook application at the request of Alucobond Architectural and SGI Architectural.
...
3. The current problem
3.1 The issue to be resolved
The main building code compliance issue associated with ACPs is that clauses 3.1(b) and 4.1(b) of specification C1.1 of the BCA require external walls to be non‑combustible for buildings are of type A and type B construction.
The BCA specifies AS1530.1 - 1994 as the relevant test procedure to determine combustibility of a material for the use in external facades. Clause 1.4 of AS1530.1 - 1994 requires each individual component to be tested separately. On this basis the test is not demonstrative on how the products are applied to a building. It is likely that the majority of products tested under this test method will be deemed combustible due to the composition of the core layer - even those containing in most part a non-combustible mineral filled core. For this reason particular [sic], ACPs cannot be used on buildings of type A or type B construction.
It is also noted that clause 2.4 of specification C1.1 provides a concession which allows the use [sic] combustible finishes for external walls if certain requirements are met. This clause is open to interpretation regarding whether products such as ACPs can or can't be used.
On this basis the ACT Fire Brigade have noted that ACPs may be assumed to be DTS where they are attached to an external wall. This is appropriate when the element behind the attachment is still able to function as an external wall and be weatherproof, etc - ie attached to masonry walls that achieve the required FRL. The requirements in clause 2.4 of specification C1.1 are not fully understood and may be interpreted that ACPs are suitable for use as long as the product meets the requirements for fire hazard properties prescribed in clause 2 of specification C1.10 or clause 2 and 3 of specification C1.10a.
...
4. Objective
4.1 How the proposal will solve the problem
It must be noted that this issue currently seems to be isolated to the ACT, but it is beginning to advance to other States and Territories. If concerns progress widespread to other States and Territories prior to amendment, modification or technical change to the BCA, it is likely that a large portion of the ACP industry may collapse and the number of people affected will increase tenfold.
...
4.2 Alternatives to the problem
The preferred outcome for this application is to allow the use of ACPs that achieve the appropriate fire resisting properties so they be used [sic] on buildings of type A and type B construction. It may be possible to provide BCA compliance on a performance basis through an alternative solution. However, each job would be site specific and all aspects of the building would require consideration. This is neither a practical nor a fully effective solution to the problem and should only be used as a temporary measure until the ABCB can modify or provide a technical change to the BCA.
There are also cost implications involved with providing individual alternative solution reports for the use of these products. Depending on the size and scale of each building or development costs may vary from $1500 to $7000. These are not costs that can be endured by the manufacturers, nor is it practical to pass costs on the client.
(Emphasis added.)
A. It was not possible, or alternatively reasonably practicable, to design or certify an Alternative Solution incorporating Alucobond Plus because at all material times:
...
d. even assuming stakeholder approval was obtained, significant fire mitigation measures would be required including (at a minimum) fire breaks, fire sprinklers, shielding of the PE Core with non-combustible or fire-resting construction, limited combustibility insulation, sarkings and fixings behind the cladding, and limitations on the use of areas such as balconies, all of which are expensive and onerous (as compared to using a non-combustible alternative product).
8.7 The Purposes for which Alucobond PE and Alucobond Plus were commonly supplied
[I]t is clear that parliament intended that in relation to medical goods supplied to doctors rather than directly to patients, manufacturers provide doctors with sufficient information, advice and warnings about any material risk of harm presented by the goods so as to properly inform the doctor about the risk, in order that the doctor can appropriately inform or warn his or her patient":
(a) firstly, that FSEs were not commonly involved in assessing the use of combustible ACPs on buildings during the relevant period as those responsible for specifying and approving the use of ACPs generally considered that the products were DtS compliant or otherwise complied with CodeMark Certificates. The Applicants submit that on this basis the general state of knowledge held by FSEs of the specific risks associated with the use of Alucobond Plus is, therefore, strictly irrelevant to the reasonable expectation of a consumer;
(b) secondly, to the extent that the state of knowledge of FSEs is relevant, that FSEs were not aware of the specific risks associated with the use of combustible ACPs during the relevant period and were ill-equipped to deal with those risks;
(c) thirdly, even if an FSE was engaged, the limited knowledge and expertise of FSEs at the time meant that there was no assurance that the risks associated with the use of combustible ACPs would be adequately addressed.
(a) first, that where a material was in common usage or had been previously used successfully on a project on which they were involved, it was common for architects and building professionals to rely on marketing material provided by suppliers or manufacturers, unless contradicted by any other building specialists;
(b) second, that ACPs were used by architects (and other building professionals) up until 2017-18 on the basis that they were (and were promoted as) appropriate, and that issues of combustibility did not arise with Alucobond products whether with architects, building surveyors, building certifiers and FSEs during the relevant period, and that these building professionals were not aware of the combustibility or non-compliance of Alucobond PE or Alucobond Plus being raised by the manufacturer or supplier, professional journals, lectures or industry façade experts in the period prior to 2017-18;
(c) third, that following the Grenfell Fire, the architects relied on representations made in marketing materials to select products that were perceived to have better fire performance; and
(d) fourth, that it was unlikely that a reasonably competent architect or project manager would support the use of Alucobond PE or Alucobond Plus had those professionals been made aware that the goods were combustible, non-compliant, and had the relevant fire risk properties.
What I would say, put simply, is that it would have taken extra costs and time and significantly heightened the approvals risk for a reasonably prudent building professional to have gone down the path of designing a performance solution... and the reasonable risk management approach would have been to specify alternative non‑ combustible facade material at that time. And even at that time, there were very few fire engineers around and there would have been significant risk in even finding a fire engineer, let alone going through that alternative process.
8.9 Findings on the merchantable or acceptable quality of Alucobond PE or Alucobond Plus
(a) there are laws and regulations that govern minimum requirements, including the safety requirements, of a building;
(b) the regime requires that buildings must be designed and constructed by Qualified Professionals;
(c) buildings may be constructed out of many different materials, some of which have complex properties, some of which might be combustible in a fire, or otherwise dangerous, if used improperly; and
(d) it was the responsibility of Qualified Professionals to ensure that the materials used on a building were used in a way to ensure the building complied with applicable building and safety regulations.
8.10.1 Acts or omissions of third parties: ACL s 271(2)(a)
(2) subsection (1) does not apply if the guarantee under section 54 is not complied with only because of:
(a) an act, default or omission of, or any representation made by, any person other than the manufacturer or an employee or agent of the manufacturer, or ...
A manufacturer is not required to pay damages to a consumer if an act, default or omission or representation made by some other person, not being an employee or agent of the manufacturer, resulted in or caused goods to be of less than acceptable quality. This ensures that manufacturers are not held liable for issues with goods that are beyond their control.
(Emphasis added.)
(a) whether 3A distributed and/or published the brochures in Australia;
(b) whether 3A authorised or approved HVG distributing and/or publishing the brochures in Australia;
(c) whether, if 10(b) is established, that is sufficient to establish that 3A "made" any representations conveyed by the brochures;
(d) whether the brochures conveyed the alleged representations.
- Whether the alleged representations were misleading for the reasons alleged in the SOC.
- [Warnings] Whether 3A or HVG were obliged to, and did not, publicly disclose, adequately or at all, the Suitability Warning, Limitation of Use Warning, Fabrication and Affixation Warning, Fire Risk Warning, Plus Composition Warning, Non-compliance Warning, Non-compliance Limitation Warning or the Fire Advice Limitation Warnings.
29 False or misleading representations about goods or services
(1) A person must not, in trade or commerce, in connection with the supply or possible supply of goods or services or in connection with the promotion by any means of the supply or use of goods or services:
(a) make a false or misleading representation that goods are of a particular standard, quality, value, grade, composition, style or model or have had a particular history or particular previous use; or
...
(g) make a false or misleading representation that goods or services have sponsorship, approval, performance characteristics, accessories, uses or benefits; or
...
33 Misleading conduct as to the nature etc. of goods
A person must not, in trade or commerce, engage in conduct that is liable to mislead the public as to the nature, the manufacturing process, the characteristics, the suitability for their purpose or the quantity of any goods.
(a) Alucobond PE and Alucobond Plus were suitable for all of the uses for which they were commonly acquired (which included use as external cladding on high or low‑rise buildings used for residential, commercial or public purposes), and would be suitable for such uses once affixed to a building (Suitability Representation);
(b) Alucobond PE and Alucobond Plus could be fabricated and affixed to buildings by third parties prior to (or as part of) being fitted to buildings, in accordance with the methodologies set out in the technical manuals and marketing materials, without materially affecting their fire performance and safety (Fabrication and Affixation Representation);
(c) Alucobond PE and Alucobond Plus were safe and suitable, and would present no material increase in risk to the life or safety of occupants, or damage to property in the event of a building fire, because:
(i) in the case of both Alucobond PE and Alucobond Plus, the aluminium cover sheets protected the core and/or they had passed or satisfied various local and international fire performance tests; and
(ii) additionally, in the case of Alucobond Plus, it was fire resistant, hardly inflammable and/or had low flammability,
(respectively, the PE Fire Performance Representations and Plus Fire Performance Representations);
(d) Alucobond PE and Alucobond Plus were compliant with all relevant building codes and standards for use on all buildings in Australia as part of or as an attachment to an external wall or other building element for its common uses, or would be so compliant once affixed (Compliance Representation);
(e) the core of Alucobond Plus contained no more than 30% plastic binders and/or not less than 70% non-combustible mineral filler (Plus Composition Representation),
collectively, the Positive Representations.
Alucobond: Vision Materialized (one page brochure), together with safety data sheets and fire test reports [
Alucobond's Distinct Advantages Make Specifying Easy
Alucobond Plus: For greater protection against fire
Architecture Product News & Architecture Australia Newsletter
Architectural Product News/Architecture Australia Newsletter
NATSPEC Product Partners Booklet [3AC.402.001.3969/0004]
Architectural Product News: Urban Design range from Alucobond Architectural [HVG.006.017.0076]
Architectural Product News: Alucobond now CodeMark certified [3AC.403.001.0008]
News: Homepage and Text for social media (Facebook and LinkedIn) [3AC.502.006.4940]
*where references are to listed Australian website)
Admitted (*where references are to listed Australian website)_
Alucobond.com - References / Architecture/ Corporate Design / Case Studies
https://alucobond.com/references 0.html ; http://www.alucobond.com /products.html
[TEN.001.001.0069] [TEN.001.001.0138] [TEN.001.001.0140]
Products - ALUCOBOND (PE) - Approvals and Fire Classification
Alucobond.com Products - Alucobond (PE) - Processing
Alucobond.com - ALUCOBOND PLUS http://www.alucobond.com/plus-alucobond.html https://alucobond.com/plus-start.html
Alucobond.com - ALUCOBOND PLUS - Product Properties
Alucobond.com.au - ALUCOBOND PLUS http://www.alucobond.com.au/products /alucobond-plus
Alucobond.com.au - ALUCOBOND PLUS http://www.alucobond.com.au/products /alucobond-plus
Alucobond.com.au - ALUCOBOND PLUS http://www.alucobond.com.au/product /alucobond-plus
Alucobond AU - "Specify Now" - Alucobond PLUS http://alucobond.com.au/specify-now/alucobond-plus
Alucobond AU - "Specify Now" - Alucobond PLUS http://alucobond.com.au/specify-now/alucobond-plus
Alucobond.com Products - ALUCOBOND PLUS - Approvals and Fire Classification www.alucobond.com/plus-approvals.html
Alucobond.com Products - Alucobond (Plus) - Processing
Alucobond.com.au -- Gallery http://alucobond.com.au/gallery
9.2.2.2 3A's liability for representations in HVG's brochures
In our opinion, the determination of the question whether any, and, if so, when a representation of the kind proscribed by s. 53(a) or (c) has been made is essentially one of fact. In a case such as this, it is possible that a number of representations as to the goods will be made to a number of persons by the wholesale distributor: he may make representations to the reseller on their wholesale acquisition, although no charge is made here on this account; and he may make representations to the ultimate purchaser even if, as a matter of contract, that purchaser deals only with the retailer. In our opinion, there is no reason of principle, derived from the construction of the statute or otherwise, why the defendant may not be liable for contraventions of s. 53(a) and (c) in the event that it be established that it made representations of the proscribed kind to prospective retail purchasers, even if it were also previously engaged in a transaction with Woolworths for the sale by wholesale of those goods and whether or not it made similar representations to Woolworths: the question is whether the defendant made a representation to prospective purchasers by means of the label affixed to the goods upon the occasion when Woolworths displayed them for sale. In this connection, the circumstance that Woolworths may be making a concurrent representation to the same effect is, in our view, irrelevant to the question whether the defendant made such a representation. This is not to say that, ultimately, the position under the Act of Woolworths would be the same as that of the defendant: for example: Woolworths may have the benefit of a defence under s 85(4) of the Act.
In our opinion, when the conduct of the defendant is looked at as a whole and all the surrounding circumstances are taken into account, the statements made in the labels affixed by the defendant to the goods displayed for sale to the public by Woolworths can properly be treated as representations made by the defendant at that point of time. We see nothing artificial or oppressive in such a result: it was the very thing the defendant wished to happen.
It is true, as the defendant submits, that the prospective purchaser never made any direct contact with the defendant. It may also be accepted, for present purposes, as the defendant contends, that Woolworths was at liberty to do what itliked [sic] with the goods and that the defendant had no control over Woolworths in this respect. It is also true, as the defendant argues, that the defendant cannot be held vicariously liable for the actions of Woolworths: the parties were at arms' length, there was no joint enterprise between them and the defendant had no claim to share in any part of the proceeds of sale of the goods by Woolworths. Nonetheless, the surrounding circumstances indicate that the defendant was seeking to implement a scheme for the marketing of the goods, a central feature of which was the display for sale to the public of goods bearing labels intended to be read by the public. The defendant required a retail outlet to market its product, and Woolworths, by assuming that role in the defendant's marketing plan, acted as an intermediary between the defendant and the ultimate purchasers.
In this sense, the defendant's conduct may be seen as the projection by it of the goods into the course of trade accompanied by representations as to their history, standard and sponsorship, intended for publication, not to its retail outlet, Woolworths, or some other reseller, but to potential purchasers in the form of members of the public who might be expected to see the labels on display with the goods at the retail outlet. In this sense also the position of Woolworths may be seen, not as the agent of the defendant in any strict sense, but rather as a convenient medium through which the defendant chose to pass its message - as a channel for communication between the defendant and consumers, the class of persons primarily intended to be protected by s. 53. We think that representations made under these circumstances may properly be characterised as a representation of the kind contemplated by s. 53(a) and (c) and that such representations should be regarded as having been made whenever they are communicated to consumers. In the present case, since Woolworths was chosen by the defendant as its vehicle for the purpose of communicating with the public, the representations in question should be regarded as having occurred whenever Woolworths offered the goods to the public for sale.
[48] ... The difficulty with this submission is that the obvious reason for wanting to protect the goodwill in the appellant's name and logo is to prevent either of them being associated with content in the brochure that the appellant did not actually endorse. It is this authorized association that the appellant now seeks to deny. The presence of the official name and logo of the appellant means that a reader of the advertising material was entitled to conclude that the information about the reasons for the appellant's involvement in the project presented in the material was a statement of the appellant's actual reasons for its involvement. As in Barton v Croner Trading Pty Ltd, the publication of the material was merely providing the means for the appellant to communicate its own message to prospective consumers.
[49] In my opinion, the learned primary judge was correct to conclude that the appellant would be regarded by those to whom the advertising material was published as having adopted the representations conveyed thereby.
(a) HVG was required to obtain 3A's approval of any publication or material prepared by HVG in connection with the sale of the Alucobond products prior to any use, and had an obligation to not do anything which might contest or impair the Alucobond trademark;
(b) Whenever HVG used the Alucobond trademark, it was required to clearly indicate in each publication 3A's ownership of the trademark by displaying 3A's logo and the address of 3A's office;
(c) HVG was required to present a marketing plan each year, explicitly said to include advertisements, which required 3A's approval prior to implementation;
(d) 3A was required to consider, on a case-by-case basis, a cost contribution to the expenditure for marketing and promotional activities by HVG;
(e) 3A was required to provide HVG with such quantities of promotional material and literature of Alucobond as published from time to time by 3A, as necessary for the purposes of the Distributor Agreements. 3A was also required to give HVG technical details and assistance as HVG might require from time to time. The relevant promotional material, literature, technical details and assistance were required to be provided by 3A free of charge.
Dear Bruce,
thanks for sending the draft of the "Australian Market Brochure". As expected it shows the outstanding work done at your end, congratulations this is really fantastic !
...
With regards to the manufacturer name our new company name is 3A Composites GmbH. So, the correct way to mention this on the leaflet is Manufactured by 3A Composites GmbH, 78224 Singen / Germany.
However, before you initiate the final print pls await our green light first, just in case there is any unforeseen changes at last minutes....you never know. Thanks for your understanding.
We will go through this comprehensive brochure with Guntram and his marketing team and come back with final comments within the next 1-2 weeks. Please bear with us until then.
Bruce,
Had a discussion with Guntram Eydner in the morning with regards to what we think should be amended on the brochure. We have scanned the relevant pages and put some handwritten comments on it. Can you please have a look at our comments and give me a call once you had a chance to look into it. It is probably easier to discuss details over the phone.
Dear Kate,
thanks for forwarding the latest version of the Beyond Facades.
As discussed during our meeting in Australia I have asked Elfie from our marketing dept. to run through the document. As anticipated there are a couple of changes necessary, mainly of "cosmetic" nature with our product names not typed in line with our 3A Corporate design...
To facilitate things all changes are marked in yellow, together with comments from Elfie.
Can I ask you to please consider these changes in your next edition, when you re-print the brochure.
For reasons explained during my visit please ensure that in future, and what was common practise in the past, always forward draft copies of any potential print document to me for final approval. Please understand that this is not meant to make your life more difficult, but this is common practise with all our other partners too and acknowledging the fact that 3A is producer and holder of the brand Alucobond and we need to ensure it's used in the right way. Thanks for your understanding and continued support, which you know I value a lot.
(a) "3A Composites and Alucobond Architectural do not recommend installation of untrimmed ALUCOBOND® panels;
(b) "[t]he quality of coating is tested according to standards established by E.C.C.A...of which 3A Composites is a member";
(c) "[t]hese eye-catching finishes...provide evidence of 3A Composite's know-how and competency"; and
(d) "3A Composites were one of the first companies to develop its own environmental management system."
(a) "...Alcan Singen GmhB has been a pioneer in processing aluminium for more than 90 years";
(b) "Manufactured since 1969, by one of the world's largest and longest established aluminium producers, Alcan Singen GmbH;
(c) "Alcan Composites and Alucobond Architectural do not recommend installation of untrimmed Alucobond panels";
(d) "[t]he quality of coating is tested according to standards established by E.C.C.A...of which 3A Composites is a member";
(e) "[t]hese eye-catching finishes...provide evidence of Alcan's know-how and competency"; and
(f) "Alucobond, Alucore and Dibond are manufactured by Alcan Singen GmbH, 78224 Singen / Germany".
This Court has drawn a practical distinction between the approach to characterisation of conduct as misleading or deceptive when the public is involved, on the one hand, and where the conduct occurs in dealings between individuals on the other. In the former case, the sufficiency of the connection between the conduct and the misleading or deception of prospective purchasers "is to be approached at a level of abstraction not present where the case is one involving an express untrue representation allegedly made only to identified individuals". Where the conduct is directed to members of a class in a general sense, then the characterisation inquiry is to be made with respect to a hypothetical individual "isolate[d] by some criterion" as a "representative member of that class". In the case of an individual it is not necessary that he or she be reconstructed into a hypothetical, "ordinary" person. Characterisation may proceed by reference to the circumstances and context of the questioned conduct. The state of knowledge of the person to whom the conduct is directed may be relevant, at least in so far as it relates to the content and circumstances of the conduct.
Where the persons in question are not identified individuals to whom a particular misrepresentation has been made or from whom a relevant fact, circumstance or proposal was withheld, but are members of a class to which the conduct in question was directed in a general sense, it is necessary to isolate by some criterion a representative member of that class. The inquiry thus is to be made with respect to this hypothetical individual why the misconception complained has arisen or is likely to arise if no injunctive relief be granted.
[36] The relevant class addressed. Questions of allegedly misleading conduct, including questions as to what the conduct was, can be analysed from two points of view. One is employed in relation to "members of a class to which the conduct in question [is] directed in a general sense". The other, urged by the purchasers here, is employed where the objects of the conduct are "identified individuals to whom a particular misrepresentation has been made or from whom a relevant fact, circumstance or proposal was withheld"; they are considered quite apart from any class into which they fall. Adoption of the former point of view requires isolation by some criterion or criteria of a representative member of the class. To some extent the trial judge adopted the former approach, pointing out that the class - potential home buyers for Pittwater properties in a price range exceeding $1m - was small (as suggested by the fact that only 100 brochures were printed), and its members could be expected to have access to legal advice.
[37] The former approach is common when remedies other than those conferred by s 82 (or s 87) of the Act are under consideration. But the former approach is inappropriate, and the latter is inevitable, in cases like the present, where monetary relief is sought by a plaintiff who alleges that a particular misrepresentation was made to identified persons, of whom the plaintiff was one. The plaintiff must establish a causal link between the impugned conduct and the loss that is claimed. That depends on analysing the conduct of the defendant in relation to that plaintiff alone. So here, it is necessary to consider the character of the particular conduct of the particular agent in relation to the particular purchasers, bearing in mind what matters of fact each knew about the other as a result of the nature of their dealings and the conversations between them, or which each may be taken to have known. Indeed, counsel for the purchasers conceded that the mere fact that a person had engaged in the conduct of supplying a document containing misleading information did not mean that that person had engaged in misleading conduct: it was crucial to examine the role of the person in question.
In the present case, the complaint is made in an action to recover actual loss or damage, not an application for injunctive relief brought by one trader concerning conduct of another trader in respect of third parties. Further, the complaint arises from particular negotiations and other conduct of identified individuals with reference to particular transactions. In such proceedings, primary attention will of necessity be focused upon the conduct of those individuals and the establishment of a sufficient causal link between the respondent's conduct and the applicant's loss or damage...
(a) the conduct in question, being advertising and promoting the Alucobond products, was directed towards the Design Professionals (defined below); it was not, as advertising almost invariably is not, directed or targeted towards a specific, identifiable person or persons; and
(b) in any event, the Applicants accept that the question of causation and loss are not common questions, but rather require the Applicants to prove that each of the Shore OC and Five Dock OC have suffered loss as a consequence of the alleged misleading conduct.
(a) Mr Incoll, in his first expert report in the Expert Group 7 (Architects) discussed the role of a number of Qualified Professionals, including that architects were the principal product specifiers, with façade subcontractors and design consultants sometimes being involved, and certifiers commenting on material selection where relevant. Later in his first expert report, Mr Incoll said that ACPs were marketed to building industry participants which included façade fabricators/contractors. Mr Incoll said that façade fabricators/contractors used information in marketing brochures to suggest alternative ACPs;
(b) Mr Incoll said in his first expert report that the suitability of ACPs was informed by the wide-spread dissemination of product information, brochures and promotional material from companies that manufactured and/or supplied ACPs to building industry participants which included façade fabricators/contractors; and
(c) Mr Smithson, in his expert report, said that façade fabricators/contractors would provide technical input regarding installation of ACPs. Façade fabricators/contractors would provide design advice as how best to transform the ACPs and install them in a façade system. Mr Smithson said that façade fabricators/contractors and designers would advise on developing the façade system by applying their own skill, experience, and expertise to procure, fabricate, and install the façade system on buildings.
(a) the different compliance pathways available under the BCA;
(b) the different classes of buildings and types of construction under the BCA;
(c) that a building's compliance with the performance requirements depends on the particular characteristics and use of the building as a whole, and particularly in relation to fire resistance requirements under the BCA; and
(d) that the BCA imposes stricter fire resistance requirements in respect of Type A and Type B construction relative to Type C construction.
[T652.13-36]: MR SHIPWAY: ... I understand that it's your opinion, isn't it, that a reasonably prudent and suitably qualified architect could have been expected to have had a working knowledge, at least, of the BCA during the relevant period.
MR QUIGLEY: That's correct.
MR SHIPWAY: Because some understanding of the requirements of the BCA was essential, wasn't it, to the architect discharging his or her professional obligations?
MR QUIGLEY: That is correct, but it also was so that you didn't have to backtrack. So that if you designed something and the building certifier said it doesn't comply, you would have to go back and start again... [s]o it was important that you had a basic understanding of the BCA.
MR SHIPWAY: A qualified architect would have been aware then, during the relevant period, that the BCA requires compliance with what I call performance requirements. Is that correct?
MR QUIGLEY: That's correct from my own experience, yes. I can't speak for other architects.
...
[T654.1-46]: MR SHIPWAY: So a qualified architect would have been aware, to your understanding, that the BCA divides buildings into different classes depending on the building's use. Is that correct?
MR QUIGLEY: That's correct.
MR SHIPWAY: Sometimes different parts of a single building will be different classes; correct?
MR QUIGLEY: Correct.
MR SHIPWAY: A qualified architect would also have appreciated during the relevant period that compliance with the performance requirements depended on the characteristics, then, of a building as a whole and its function and use; correct?
MR QUIGLEY: Correct.
MR SHIPWAY: A qualified architect would have been aware that there were two pathways to comply with the performance requirements that we have seen. The first is satisfying the deemed-to-satisfy provisions. You are aware of that pathway?
MR QUIGLEY: I am.
MR SHIPWAY: The second is preparing what's called a performance solution. You are aware of that pathway?
MR QUIGLEY: I am, yes.
MR SHIPWAY: And there is also the third pathway, which is a combination of the first two; correct?
MR QUIGLEY: Yes.
MR SHIPWAY: A qualified architect would have been aware that if we are looking at the deemed-to-satisfy pathway, the deemed-to-satisfy provisions prescribed three types of construction: Types A, B and C; correct?
MR QUIGLEY: Correct.
MR SHIPWAY: And the fire resistance requirements differ between those types. The most stringent apply to larger buildings, which are type A, relatively larger, whereas the least stringent fire resistance requirements apply to smaller buildings, type C; correct?
MR QUIGLEY: Not absolutely. So I mean type A is generally defined by the height of the building rather than the size of the building.
...
[T655.5-10]: MR SHIPWAY: Thank you. A qualified architect would have been aware that, by reason of those building specific requirements, the obligation to comply with the performance requirements mandated in the BCA is an obligation that applies to the building as a whole. I think you would agree with me about that; correct?
MR QUIGLEY: Yes.
MR QUIGLEY: Well, I - when I read those results, back at that time, my understanding - the way I took those results was it meant that the material was not combustible. Now, I didn't appreciate at the time that there were various parts of AS 1530 and that it was part 1 that the BCA relied on in testing for combustibility rather than part 3.
MR SHIPWAY: So it must be the case, mustn't it, that a reasonably prudent and qualified architect would have appreciated, having regard to those international fire classifications and these descriptions in the product range page, that the products were not identical in terms of their combustibility; correct?
MR QUIGLEY: That's correct, yes. Well, it certainly would indicate that the cores of those products were - had a different degree of fire resistance.
MR SHIPWAY: Thank you.
MR QUIGLEY: However, the same document makes reference to a suggestion from the supplier that the aluminium skin protected the core and, as a result, the fire properties of the core were less relevant. Now, the standards referred to here are international standards that I am not, and wasn't at the time, familiar with. And in selecting these products I relied on the expertise of the building certifier to determine whether, in their opinion, the product was non-combustible and, therefore, satisfied the deemed-to-satisfy requirements of the BCA. And I, in my experience, have not had a building certifier raising any issues or any concerns about the fire performance of that - of Alucobond. And my assumption was that they had a much more detailed knowledge of the fire performance of these materials.
9.4 Whether the marketing material conveyed the alleged Positive Representations (Issue 10(d))?
[10] In the ordinary course of commercial dealings, a certain degree of puffery or exaggeration is to be expected. Indeed, puffery has been taken to be part of the ordinary stuff of commerce. This is particularly so in the case of advertising where a degree of latitude is to be allowed given the nature of advertising reflects the enthusiasm of the advertiser to place its product or service in a favourable light...
[11] That is not to say that representations which could be characterised as puffery are immune from provisions prohibiting misleading or deceptive conduct. The applicant relied upon the following statements by Murphy J in REA Group Ltd v Fairfax Media Ltd [2017] FCA 91 at [89]-[90] :
[89] That is not to say that puffed statements cannot convey a definite meaning upon which an ordinary or reasonable reader could rely...
[90] However the question of whether a puffing advertising claim conveys a definite representation or not will depend upon the context and setting in which the claims appear and may involve questions of degree and impression. To a significant extent the authorities turn on their own facts.
The reality is that a certain amount of hyperbole is permissible and to be expected in business without attracting legal sanctions. Thus, a statement that a bank customer's affairs "will be in the best of hands" or that someone will "guarantee payment for the shipments with his life" must be recognised as a mere puff not actionable under s 52.
(Citations omitted.)
9.4.1 Generation One: The Face of Tomorrow, Today (2004 to 2013)
(a) "anything is possible with Alucobond";
(b) "[s]ince 1969, building owners and architects have successfully chosen Alucobond as a versatile construction material to turn their ideas into reality and to give buildings and skylines the shape of the future".;
(c) "high rise" and "low rise";
(d) "Australia's most popular composite panel";
(e) "Alucobond can be used as a facia, as a cladding panel for interiors or signage";
(f) "Alucobond is ideal to fit into any curtain wall system"
(g) "exceptional strength for resistance to blows and breakage";
(h) "simple but extremely versatile product concept has been developed "to provide a façade material with a host of distinct advantages for architects"; and
(i) "the ideal material for suspended rear-ventilated façades, claddings for roof edges and fascias".
9.4.1.2 Fire Performance and Compliance Representation
9.4.1.3 Fabrication and Affixation Representation
9.4.2 Generation Two: Vision Materialized (2009-2013)
(a) "...architects and designers soon discovered the host of advantages of Alucobond for the use in exterior architectural applications and corporate identity programs, particularly in façades, wall cladding, and roof edging";
(b) "...the possibilities for implementing the Alucobond for interior and exterior applications are extremely varied. It is used in projects ranging from the precise construction of residential buildings, representative public buildings, company headquarters, commercial and industrial buildings to the prestigious landmarks of modern urban construction";
(c) "Alucobond offers architects and designers unlimited opportunities...the wide range of interior and exterior applications are matched only by the products' versatility";
(d) "[o]ur product and application expertise is the fastest and safest way to success, whether it be for buildings, renovation projects, or interior and exterior applications";
(e) "Alucobond is ideal to fit into any curtain wall system";
(f) the headings: "High Rise", "Low rise", and "Public Buildings";
(g) under the heading "Residential Applications": "allows almost unlimited scope to create the ultimate dream home";
(h) "the most efficient and effective way to restore exterior surfaces and protect asset value is with Alucobond"; and
(i) "Alucobond...is a "prominent feature in a large number of attractive, distinctive architectural projects around the world"
The technical service teams at Alucobond Architectural support architects and building owners right from the planning stage. They provide comprehensive technical information and customized advice to assist with the perfect implementation of all ideas and plans. For every project, the proven strategy to achieve a smooth completion lies in an early coordination between vision, architectural plans and the many possibilities which our unique panels give to fabricators and installers. Our product and application expertise is the fastest and safest way to success, whether it be for buildings, renovation projects or interior and exterior applications.
9.4.2.2 Fire Performance Representations and Compliance Representation
(a) Alucobond Plus is "hardly inflammable";
(b) "[t]he non-combustible aluminium cover sheets protect the PE core", together with the visual images depicted; and
(c) "[w]hen properly designed and installed, Alucobond panels will keep their shape and remain flat for life, even when exposed to extreme temperature changes".
(a) identical results under AS1530.3 for all three products;
(b) classification under EN 13501-1 of Class D for Alucobond PE and Class B, s1, d0 for Alucobond Plus;
(c) a statement that Alucobond PE had "passed" ASTM E108 modified; and
(d) a statement that Alucobond Plus had "passed" UBC 26-9 (NFPA 285).
9.4.2.3 Fabrication and Affixation Representation
(a) "the components can easily be fabricated and fitted onsite"; and
(b) "Alucobond can be bent, curved, or shaped to any required angle".
(a) "[t]he plastic core of ALUCOBOND® can be hot-air welded using conventional hot‑air welding equipment and plastic filler rod. Hot-air welding provides a water-tight joint for decorative purpose only. It is not suitable for joints where structural strength is required";
(b) "[a]dhesives and sealants do not adhere to the plastic core";
(c) "[y]our nearest fabricator will provide a tailor-made solution that will stand the test of time";
(d) "ALUCOBOND® composite panels can be shaped using a very simple processing method. The technique, called the routing and folding method, enables a fabricator to produce shapes of various kinds and sizes";
(e) under the heading, "Fabrication Centres":
During the past 40 years, qualified, independent fabricators and installers have become firmly established, offering professional service to the building industry. They have acquired deep knowledge in the processing of ALUCOBOND® and their skilled personnel and specialised processing equipment ensure that your project is completed on time and within budget.
The technical service teams at Alucobond Architectural support architects and building owners right from the planning stage. They provide comprehensive technical information and customized advice to assist with the perfect implementation of all ideas and plans. For every project, the proven strategy to achieve a smooth completion lies in an early coordination between vision, architectural plans and the many possibilities which our unique panels give to fabricators and installers. Our product and application expertise is the fastest and safest way to success, whether it be for buildings, renovation projects or interior and exterior applications.
(a) "...architects and designers soon discovered the host of advantages of Alucobond for the use in exterior architectural applications and corporate identity programs, particularly in façades, wall cladding and roof edging";
(b) "...the possibilities for implementing Alucobond for interior and exterior applications are extremely varied. It is used in projects ranging from the precise construction of residential buildings, representative public buildings, company headquarters, commercial and industrial buildings, to prestigious landmarks of modern construction";
(c) "Alucobond offers architects and designers unlimited opportunities...The wide range of interior and exterior applications are matched only by the product's versatility";
(d) "Alucobond is ideal to fit into any curtain wall system";
(e) "Alucobond can be used as a facia, as a cladding panel for interiors, or signage";
(f) "[s]ince 1976, numerous prestigious projects have been carried out in Australia using Alucobond" and "high rise, low rise, public buildings, residential applications";
(g) the headings "High Rise", "Low Rise", "Public Buildings" and, "Residential Applications"; and
(h) "...they [Alucobond panels] are highly rigid and strong, thus making them the most suitable for exterior wall cladding."
9.4.3.2 Fire Performance Representations and Compliance Representation
(a) Alucobond "normal flammability";
(b) Alucobond Plus "hardly inflammable according to EN13501-1";
(c) "the non-combustible Aluminium cover sheets protect the PE core" together with associated images of flame; and
(d) "when properly designed and installed, Alucobond panels will keep their shape and remain flat for life, even when exposed to extreme temperatures".
9.4.3.3 Fabrication and Affixation Representation
(a) "[f]or every project, the proven strategy to achieve a smooth completion lies in an early coordination between vision, architectural plans and the many possibilities which our unique panels give to fabricators and installers";
(b) "[y]our nearest fabricator will provide a tailor-made solution that will stand the test of time"; and
(c) "[d]uring the past 40 years, qualified, independent fabricators and installers have become firmly established, offering professional service to the building industry. They have acquired deep knowledge in the processing of ALUCOBOND® and their skilled personnel and specialised processing equipment ensure that your project is completed on time and within budget".
(a) "...architects and designers soon discovered the host of advantages of Alucobond for use in exterior architectural applications and corporate identity programs, particularly in façades, wall cladding and roof edging";
(b) "...the possibilities for implementing Alucobond for interior and exterior applications are extremely varied. It is used in projects ranging from the precise construction of residential buildings, representative public buildings, company headquarters, commercial and industrial buildings, to the prestigious landmarks of modern urban construction";
(c) "our product and application expertise is the fastest and safest way to success, whether it be for buildings, renovation projects or interior and exterior applications";
(d) "your nearest fabricator will provide a tailor-made solution that will stand the test of time"; and
(e) "Alucobond is ideal to fit into any curtain wall system" and "high-rise, low-rise and public buildings". The Applicants rely upon the residential applications referred to in the brochure and the text "modern refurbishment" and "protecting asset value".
9.4.4.2 Fire Performance Representations and Compliance Representation
(a) "internationally proven and recognised fire performance";
(b) "CodeMark Certified for complete compliance with the fire requirements of the BCA";
(c) Alucobond Plus is "hardly inflammable" and Alucobond PE is "normal flammability";
(d) Alucobond Plus has "70% mineral filling"; and
(e) "reinforcing fire safety in Australia...globally, suppliers, architects and building owners have a 'duty of care' and are required to meet the stringent regulations aimed at protecting the building structure, surrounding environments and, more importantly, the inhabitants or visitors to a building...As a trusted supplier, Alucobond Architectural have, and continue to, provide the knowledge, technology and compliance required to assist you in your selection process. Safety is paramount and we aim to ensure you are kept up to date with correct information and are offered products that are best suited to your project needs".
When making your product and system selection, it's imperative that you fully understand the product that you are looking to choose and ensuring that it is actually safe.
9.4.4.3 Fabrication and Affixation Representations
(a) "the components can easily be fabricated and fitted onsite"; and
(b) "Alucobond can be bent, curved or shaped to any required angle."
(a) "[t]he plastic core of ALUCOBOND® can be hot air welded using conventional hot‑air welding equipment and plastic filler rod. Hot-air welding provides a water-tight joint for decorative purpose only. It is not suitable for joints where structural strength is required";
(b) "[t]he components can easily be fabricated and fitted on site";
(c) "[f]or every project, the proven strategy to achieve a smooth completion lies in an early coordination between vision, architectural plans and the many possibilities which our unique panels give to fabricators and installers"; and
(d) [y]our nearest fabricator will provide a tailor-made solution that will stand the test of time."
(a) "[t]he superb qualities of this material boost one's inspiration and offer architecture a whole new range of solutions - whether your project is a private home, a public building, a corporate headquarter and offices, or a trading or industrial complex";
(b) "[u]nlimited applications - For interiors and exteriors: industrial buildings, public buildings, hotels, hospitals, shopping centres, sports-stadiums, event halls, railway and underground stations";
(c) "ALUCOBOND plus has been developed exclusively for the higher requirements of the fire regulations in architecture. Due to its mineral-filled core ALUCOBOND plus meets the higher requirements of the fire classifications. It is hardly inflammable and offers all the proven product properties of the ALUCOBOND family"; and
(d) "[f]ire classification according to EN 13501-1, class B, s1, d0... Generates no harmful gases in case of fire", without disclosing the "B" classification is based on a riveted system or that Alucobond Plus has achieved worse results with other systems.
9.4.5.2 Fire Performance Representations and Compliance Representation
(a) "...whether your project is a private home, public building, a corporate headquarter and offices, or a trading or industrial complex";
(b) "[f]ire Behaviour - Alucobond Plus has been developed exclusively for the higher requirements of the fire regulations in architecture. Due to its mineral-filled core, Alucobond Plus meets the higher requirements of the fire classifications. It is hardly inflammable and offers all the proven product properties of the Alucobond family";
(c) "[f]ire Classification according to EN1350-1";
(d) "[u]nlimited applications - For interiors and exteriors: industrial buildings, public buildings, hotels, hospitals, sports-stadiums, event halls, railway and underground stations"; and
(e) "Fire behaviour of Alucobond Plus panels", listing international tests.
9.4.5.3 Fabrication and Affixation Representation
The finish and flatness of Alucobond Plus, its dynamic range of colours, formability and weather resistance allow designers complete freedom of creativity in projects ranging from apartment buildings, high-rises and commercial and industrial buildings to the prestigious landmarks of modern urban construction.
9.4.6.2 Fire Performance Representations and Compliance Representation
(a) "...suppliers, architects and building owners have a 'duty of care' and they are required to meet the stringent regulations...";
(b) "[a]s a trusted supplier, Alucobond Architectural have, and continue to provide, the knowledge and technology and compliance required to assist you in your selection process. Safety is paramount and we aim to ensure you are kept up to date with correct information and are offered products that are best suited to your project needs";
(c) "Alucobond Plus is the most international tested ACP in the world";
(d) "[i]n addition to bench scale fire tests, results from large scale BS8414 façade fire tests (as prescribed in AS5113) have been considered and addressed in justification of the Alucobond Plus CodeMark certificate of conformity";
(e) "...all Alucobond products must be tested under EN13501.1 'reaction to fire' test. This test addresses the performance and safety of the complete product being supplied as it would be installed";
(f) the heading "Fire behaviour in a building' - accompanied by a diagram of fire spread from use of "regular ACP without vertical fire separation" versus "fire resistant Alucobond Composite Panel (ACP) ... min 70% mineral content";
(g) "Alucobond Architectural have chosen the Performance Solution [under the NCC] pathway for their Alucobond products ... utilising this compliance pathway ensures the Alucobond products are tested as they would be installed in a full-wall make-up, including vertical fire separation";
(h) "[t]he latest CodeMark Certificate of conformity reinforces the safe and compliant use of Alucobond Plus for type A and type B construction";
(i) "[t]he Alucobond Plus CodeMark Certificate of conformity addresses the vertical fire separation for easy compliance and safety of the building";
(j) "projects ranging from apartment buildings, high-rises and commercial and industrial buildings to the prestigious landmarks of modern urban construction"; and
(k) "[i]mportant: When evaluating comparable products, architects and designers should ensure that manufacturers provide independent fire rest results from MATA accredited testing laboratories. To avoid confusion and reduce risk, the product should be tested as a complete panel, as it would be installed on the building.
9.4.6.3 Fabrication and Affixation Representation
[G]eneral representations to the world at large. They are not representations to any person or to any Australian consumer. Until the representations were accessed, the representations were meaningless and could not be the subject of any alleged contravening conduct.
9.4.7.1 Architectural Product News/Architecture Australia Newsletter (2015)
(a) "Alucobond is a leader in ACM"; and
(b) "[u]nrivalled qualities of Alucobond".
9.4.7.3 Fire Performance Representations and Compliance Representation
(a) "Alucobond Plus undergoes stringent European and Australian quality testing";
(b) "[m]anufactured in Germany, Alucobond achieves international fire compliance and sets itself apart through excellent UV stability, high formability, and rigidity";
(c) "[t]his remarkable aluminium composite material is not only sophisticated, it offers unbeatable rigidity, excellent formability, outstanding weather, UV and fire resistance"; and
(d) "Alucobond has local fire compliance and proven long-term performance."
9.4.8.2 Fire Performance Representations and Compliance Representation
9.4.9.2 Fire Performance Representations and Compliance Representation
9.4.11 Alucobond.com.au website - Home page (2009)
(a) "Alucobond and Alucore are not only applicable to the building and construction industry but also for corporate image programs and for vehicle and marine manufacturing industries"; and
(b) "[f]or every project, early co-ordination of the designer's planning with our product know-how is a sure way to success whether for new constructions, refurbishments, interiors or exteriors".
A national business, Alucobond Architectural aims to support architects and designers' aspirations from initial concept to project completion, providing individual consultancy, detailed technical support, colour charts and sampling.
(a) "[s]pecify Alucobond for your next project";
(b) "Alucobond Architectural, a division of HVG, distributes a range of superior and innovative façade products throughout Australia"; and
(c) "[e]xplore our inspirational projects".
9.4.14 Alucobond AU website - Homepage (August 2017)
9.4.15 Alucobond AU website - Homepage (November 2017)
9.4.16 Alucobond.com - Products - Alucobond (PE) - Processing
(a) cutting;
(b) punching;
(c) contour cutting;
(d) bending;
(e) routing & folding;
(f) riveting; and
(g) screwing.
9.4.17 Alucobond.com - Products - Alucobond (Plus) - Processing
(a) screwing;
(b) contour cutting;
(c) riveting;
(d) shearing;
(e) routing & folding; and
(f) cutting.
9.5 Issue 11 - Were the representations misleading?
[37] The principles which the Court applies when considering alleged contraventions of ss 29(1) and 33 of the ACL are settled... It was also common ground that, despite the slight differences in language between the terms "misleading or deceptive" and "mislead or deceive" used in s 18 of the ACL and the term "false or misleading" used in s 29(1), the terms have the same meaning: Australian Competition and Consumer Commission v Dukemaster Pty Ltd [2009] FCA 682 at [14], cited with approval by Allsop CJ in Australian Competition and Consumer Commission v Coles Supermarkets Australia Pty Ltd [2014] FCA 634; (2015) 317 ALR 73 at [40]. It has, however, been held that conduct which is "liable to mislead" (being the term used in s 33) applies to a narrower range of conduct than does conduct which is "likely to mislead or deceive" (being the term used in s 18): Coles Supermarkets at [44] and the cases cited therein. Under s 33, what is required is that there be an actual probability that the public would be misled: Trade Practices Commission v J&R Enterprises Pty Ltd [1991] FCA 23; (1991) 99 ALR 325 at 339.
[38] Provisions such as ss 18, 29 and 33 of the ACL are remedial in character and so should be construed so as to give the fullest relief which the fair meaning of their language would allow: Accounting Systems 2000 (Developments) Pty Ltd v CCH Australia Ltd (1993) 42 FCR 470 at 503; New South Wales Lotteries Corporation Pty Ltd v Kuzmanovski [2011] FCAFC 106; (2011) 195 FCR 234 at [105].
[39] A representation will be false if it is contrary to the relevant fact and misleading if it has a tendency to lead into error. The causing of confusion or questioning is insufficient; it is necessary to establish that the ordinary or reasonable consumer is likely to be led into error: Coles Supermarkets at [39].
[40] The question of whether conduct, including conduct by way of representations, contravenes s 29 or s 33 of the ACL is one of fact to be determined by an objective consideration in the light of all the relevant surrounding circumstances: Parkdale Custom Built Furniture Pty Ltd v Puxu Pty Ltd [1982] HCA 44; (1982) 149 CLR 191 at 198-9; Butcher v Lachlan Elder Realty Pty Ltd [2004] HCA 60; (2004) 218 CLR 592 at [109].
[41] The application of ss 29 and 33 requires the Court to identify the conduct said to be false or misleading or liable to mislead and then to consider separately whether the conduct was false or misleading or liable to mislead: Google Inc v Australian Competition and Consumer Commission (2013) 249 CLR 435; 294 ALR 404; 99 IPR 197; [2013] HCA 1 at [89].
[42] Consideration of the conduct as a whole in its proper context may require consideration of the type of market, the manner in which the goods or services are sold, the habits and characteristics of purchasers in that market as well as of any relevant disclaimers or explanations: Coles Supermarkets at [41]. It also includes any relevant disclaimers, qualifications or explanations: Butcher v Lachlan Elder Realty at [49]. When the impugned conduct involves representations to the public at large or to a section of the public, such as prospective retail purchasers of a product or service, regard must be had to the effect of the representations on "ordinary" or "reasonable" members of the class of prospective purchasers. The range of persons in such a class may be quite broad and may include the intelligent as well as the less intelligent, and those who are well educated as well as those who are less literate.
[43] In many cases, the words and images used in advertising or promotional material are capable of conveying different meanings. In such cases, the question is whether the meaning said to be false or misleading is reasonably open and may be drawn by a significant number of persons to whom the representation was addressed. Thus, in CPA Australia Ltd v Dunn (2007) 74 IPR 495; [2007] FCA 1966 at [28], Weinberg J said:
Statements that are capable of more than one meaning may be misleading or deceptive provided that the meaning for which the applicant contends is one that would be reasonably open, and might be drawn by a significant number of those to whom the representation is made. In the same way, a statement may contain a representation that is implied, rather than express. That is why a statement that is literally true can be misleading or deceptive.
(Citation omitted)
[44] In Coles Supermarkets at [46], Allsop CJ quoted with approval the following statement by Hill J in Tobacco Institute of Australia Ltd v Australian Federation of Consumer Organisations Inc (1992) 38 FCR 1 at 50:
Where, as in the present case, the advertisement is capable of more than one meaning, the question of whether the conduct of placing the advertisement in a newspaper is misleading or deceptive conduct must be tested against each meaning which is reasonably open. This is perhaps but another way of saying that the advertisement will be misleading or likely to mislead or deceive if any reasonable interpretation of it would lead a member of the class, who can be expected to read it, into error ...
Allsop CJ went on to say at [47], that "if any one or more of the reasonably available different meanings is misleading, the conduct may well be misleading or deceptive, or false and misleading".
[45] Generally speaking, however, the class will not include those who fail to take reasonable care for their own interests: Campomar Sociedad, Limitada v Nike International Ltd (2000) 202 CLR 45; 169 ALR 677; 46 IPR 481; [2000] HCA 12 at [101]-[103]; Coles Supermarkets at [43].
[46] In cases in which the conduct and representations are to the public generally and concern simple advertising, the absence of individuals saying that they were misled will usually be of little significance. In such circumstances, the Court can carry out an objective assessment of the advertising and promotional material itself without evidence from individual witnesses: Coles Supermarkets at [45].
[47] In assessing advertising material, the "dominant message" of the material will be of crucial importance: Australian Competition and Consumer Commission v TPG Internet Pty Ltd (2013) 250 CLR 640; 304 ALR 186; 96 ACSR 475; [2014] HCA 54 (ACCC v TPG) at [45]; Coles Supermarkets at [47].
It has long been recognised that, where a representation is made in terms apt to create a particular mental impression in the representee, and is intended to do so, it may properly be inferred that it has had that effect. Such an inference may be drawn more readily where the business of the representor is to make such representations and where the representor's business benefits from creating such an impression.
(Citations omitted.)
Conduct can be misleading or deceptive regardless of the intention of the alleged wrongdoer; the section is concerned with the effects or consequences (actual or likely) of the conduct. Nor does it matter whether the wrongdoer took reasonable care. No question of fault is involved. That said, where an intention to deceive is established, a court may more readily infer that the intention will probably be effective.
(Citations omitted).
The manner by which a representation may be proved to be false does not control the content or meaning of the representation. There is no reason in logic or principle why the ACCC cannot prove the falsity of a representation concerning the quality of a product by resort to expert evidence concerning features of the product about which the consumer may be unaware or have overlooked. It is commonly the case that the features of a product which make representations about it misleading are revealed only by expert investigation or analysis.
[796] ... it is useful initially to deal with the submission that no evidence was adduced from any treating doctor or individual patient, thus preventing a finding that contravening conduct had been established.
[797] In explaining why this complaint is misconceived, it is necessary to emphasise some bedrock notions which inform the assessment as to whether contravening conduct is established. Whether particular conduct is misleading or deceptive is a question of fact to be determined in the context of the evidence about the alleged conduct and all relevant surrounding facts and circumstances. The relevant inquiry is whether, in the circumstances, the impugned conduct induces or is capable of inducing error.
[798] It is correct, as Gibbs CJ observed in Parkdale [Custom Built Furniture Pty Ltd v Puxu Pty Ltd [1982] HCA 44; (1982) 149 CLR 191] at 198, that this means that consideration must be given to the class of persons likely to be affected by the conduct. But in this regard, the characterisation exercise involves consideration of a notional cause and effect relationship between the conduct and the state of mind of the relevant person or class of persons. The test is necessarily objective.
[799] In considering the appellants' submissions it is important to be alive to the distinction between the characterisation task (whether conduct is misleading or deceptive or likely to mislead or deceive) and the causation inquiry (whether any person has suffered loss or damage by reason of that conduct). The first task is logically anterior to the second. In a case such as the present, as the primary judge accepted (at [4357]), the issue of causation could not be a common issue. The common questions answered by her Honour were directed to the first of these inquiries and while similar contextual factors relevant to characterisation may play a role in determining causation for any individual group member, no issue as to causation has been determined for any claimant beyond Mrs Sanders.
[800] An answer to a common question directed to whether contravening conduct took place is possible because determining whether any particular conduct is misleading or deceptive is a question of fact to be determined objectively. In Campbell [v Backoffice Investments Pty Ltd (2009) 238 CLR 304] at [102], Gummow, Hayne, Heydon and Kiefel JJ approved the following statements of McHugh J in Butcher v Lachlan Elder Realty Pty Ltd [2004] HCA 60; (2004) 218 CLR 592 at [109]:
The question whether conduct is misleading or deceptive or is likely to mislead or deceive is a question of fact. In determining whether a contravention of s 52 has occurred, the task of the court is to examine the relevant course of conduct as a whole. It is determined by reference to the alleged conduct in the light of the relevant surrounding facts and circumstances. It is an objective question that the court must determine for itself. It invites error to look at isolated parts of the [alleged contravener's] conduct...
(Citation omitted).
...
[802] Contrary to the appellants' submissions, in resolving the objective characterisation task, it was not necessary for any doctors to be called to state that they had read, received and relied on Ethicon's marketing materials. The characterisation issue was whether the appellants' conduct, in marketing the products and continuing to market them without proper disclosure or warning as to their complications and the gravity of them, in the light of all relevant surrounding facts and circumstances including the class of persons to which the conduct was directed and the applicable regulatory regime, was conduct capable of inducing error. Given the primary judge's findings about the deficiencies in the conduct of the appellants as it related (as senior counsel for the appellants described it below) to "the failure to warn about...the mesh and tape complications, including the removal complications"...the result of the characterisation exercise was obvious.
(Original emphasis, citations omitted.)
9.5.2 Generation 1: The Face of Tomorrow, Today (2004 - 2013)
9.5.2.1 Suitability and Compliance Representations
9.5.2.3 Fabrication and Affixation Representation
The above reaction-to-fire behaviours will be influenced, for better or for worse, by the methods of forming, fixing, and mounting of the Alucobond PE panels. This includes the manner of cutting, routing, folding, and forming Alucobond PE into cladding panels, as well as the mounting and affixation methods used to fix the panels to the outside of a building, as described in detail by Professor Bisby in his expert report.
The above reaction-to-fire behaviours will also be influenced by the configuration, materiality, and geometry of any cladding system that Alucobond PE panels are used within; the effects of internal cavities, thermal feedback, and interactions with other materials and products within the cladding system may all play important roles that need to be considered by specifiers, designers, and approvers.
I consider that the particular method of affixation is unlikely to entirely avoid the fire behaviours I have identified above. However, the manner of shaping of the cladding panels, and the manner of fixing them to a building, may affect the way in which any fire spreads on and in the cladding system and the resulting external fire spread hazards associated with their use.
However, as I explain below, in [sic] ways in which this could occur are unlikely to be well characterised or easily quantified.
9.5.3 Generation 2: Vision Materialized (2009 - 2013)
(a) Alucobond AU - "Specify Now" - Alucobond PLUS (Feb 2015) (http://alucobond.com.au/specify-now/alucobond-plus); and
(b) Alucobond AU - "Specify Now" - Alucobond PLUS (February 2016 and December 2017) (http://alucobond.com.au/specify-now/alucobond-plus).
...
The term "future matter" is not defined in the ACL. Whether a statement relates to a future matter depends upon the words used and the context in which they were used (Digi-Tech (Australia) Ltd v Brand [2004] NSWCA 58; (2004) 62 IPR 184 at [99]- [102] (per Sheller, Ipp and McColl JJA)).
Section 4 is in substantially the same terms as its predecessor - s 51A of the Trade Practices Act 1974 (Cth) (TPA). When that provision was introduced into the TPA, there was a line of authority in this Court exemplified by Bill Acceptance Corporation Ltd v GWA Ltd (1983) 78 FLR 171 at 175-178; 50 ALR 242 at 246-249 (per Lockhart J) and Global Sportsman at 88 (per Bowen CJ, Lockhart and Fitzgerald JJ) in which the Court sought to address the perceived difficulty that a prediction, forecast or promise as to what would occur in the future was not misleading or deceptive merely because the event did not come to pass. The principle developed was that a statement as to what would occur in the future could be misleading if the statement could properly be viewed as an implied representation as to the representor's state of mind and if it could be established that the representor either did not intend to carry out the promise or did not have proper grounds for making the statement (because he did not believe the prediction or was indifferent as to its truth) and therefore did not have the state of mind which he had represented he had.
...
- At [23]-[25] of its Written Submissions dated 6 February 2020, Woolworths made the following submissions:
There is therefore an unusually clear indication of the mischief which s 51A was designed to address - the difficulty of establishing the state of mind of a representor in relation to a prediction, promise or similar statement about the future. What s 51A was not designed to do was to reverse the onus in relation to conventional representations of fact already actionable under the existing provisions. Such representations did not, and do not, give rise to difficulties of proving a state of mind. They were, and are, either true or false - and capable of being demonstrated to be so - at the time that they are made, and irrespective of the state of mind of the person making them. As the trial judge observed (at [103]), that construction is also consistent with the concept of "reasonable grounds", the purpose of which "is to require an appropriate basis for the state of mind (being the opinion or prediction) disclosed by the representation".
Section 4(1) is in near identical terms to s 51A(1). There is nothing in either the language or context of s 4 to suggest that it was intended to depart in any relevant sense from its predecessor (as to which, see the Explanatory Memorandum to the Trade Practices Amendment (Australian Consumer Law) Bill (No 2) 2010 at [2.22]-[2.27]). The mischief to which the provision was addressed remained that of proving that statements not presently capable of being true or false were nevertheless misleading.
That history also accords with the natural meaning of the term "future matter" - as something occurring in the future, the accuracy of which is thus not presently ascertainable. It is also consistent with a stated object of the CCA - the protection of consumers. In line with that object, s 4 does not apply to representations which are true when made because, in such circumstances, no consumer will be misled, nor in need of protection.
(Emphasis in original.)
130. Those submissions are correct. We accept them.
...
- We do not think that, generally speaking, a representation about the nature, quality, character or capability of a product based upon its inherent characteristics is a representation with respect to a future matter. A representation will only be with respect to a future matter if it is in the nature of a promise, forecast, prediction or other like statement about something that will only transpire in the future - that is, a representation which is not capable of being proven to be true or false when made. This interpretation of "... a representation with respect to a future matter" in s 4(1) is the interpretation propounded by Nicholas J in [Samsung Electronics Australia Pty Ltd v LG Electronics Australia Pty Ltd [2015] FCA 227; (2015) 113 IPR 11] at [83]- [86], by Rares J in Ackers v Austcorp International Ltd [2009] FCA 432 at [359] and by Gleeson J in Kimberly-Clark at [276]-[286] esp at [285]. At [285] in [Australian Competition and Consumer Commissioner v Kimberly-Clark Australia Pty Ltd [2019] FCA 992], Gleeson J said:
I am not satisfied that the "flushability" representation (or either of the alleged characteristics and disintegration representations) is a representation with respect to any future matter, for reasons identified by KCA which are as follows:
(1) The "flushability" representation is expressed as a representation about the characteristics of the KCFC wipes as manufactured, that is, that the wipes are suitable for flushing. The representation is not couched in conditional terms, nor as a prediction. It does not depend upon whether or not some uncertain event occurred.
(2) The fact that a consumer needs to actually use the product is hardly grounds to give the representations a futuristic quality. If that was the effect of s 4 of the ACL, then any representation made about the characteristics of goods sold in Australia, in respect of their intended use after sale, would be taken to be with respect to a future matter and the maker of the representation would be taken to have contravened the ACL absent evidence of reasonable grounds. It would substantially mischaracterise claims that something is "soluble", "edible", "dishwasher safe", "water-proof" or "scratch resistant", to describe them as predictions, forecasts or, in any substantial sense, representations as to future matters. Rather, in substance and effect, each is a statement of present fact as to the performance characteristics of the product as it has been manufactured. In the forms ending "-ble" the expression means "able to be" (dissolved or eaten or flushed as the case may be). As a matter of grammar and as a matter of substance that is an assertion in the present tense. And each such assertion is true or false whether or not the item is ever used as described. It is edible whether or not it is ever eaten. It is flushable whether or not it is ever flushed. The assertion is about the present quality of the thing.
(3) The ACCC's submission does not reflect the intention behind s 4, or its predecessor in s 51A of the Trade Practices Act 1974 (Cth) (TPA). Allsop J traced the enactment history of this section in detail in McGrath v Australian Naturalcare Products Pty Ltd [2008] FCAFC 2; (2008) 165 FCR 230 (McGrath) at [165]- [195]. The particular mischief to which the section was directed was in overcoming the difficulty in obtaining "conclusive proof of dishonesty or recklessness from the surrounding circumstances without an admission of guilt from the defendant" in relation to statements, representations or predictions about future matters: Explanatory Memorandum, Trade Practices Amendment Bill 1986 (Cth) at [72], quoted in McGrath at [167]. Relevantly, the Explanatory Memorandum and the Senate Standing Committee for the Scrutiny of Bills both referred in this respect to the concepts of "promises", "predictions" or "forecasts" when considering the proposed application of the section: see extracts quoted in McGrath at [167] and [169]-[170].
In our judgment., the above three authorities correctly state the law on this point.
(a) the products were not safe and suitable for use on all buildings for all of the Purposes (Suitability Warning) or some of the Purposes, or were only safe for some Purposes when combined with particular materials designed to resist the spread of fire (Limitation of Use Warning);
(b) the behaviour of Alucobond PE and Alucobond Plus in a fire was affected in a material way by the method of fabrication or affixation chosen (Fabrication and Affixation Warning);
(c) the aluminium coversheets did not protect the PE core from igniting in a fire, and that the products had the Material Fire Risk Properties (Fire Risk Warning);
(d) the core of Alucobond Plus could, and did at times, contain less than 70% mineral filler (Plus Composition Warning);
(e) the products had not passed fire safety test AS 1530.1 and there was a material risk that the products were not compliant with the BCA (Non-compliance Warning);
(f) alternatively, that the products were only compliant with the BCA when used on some buildings, or for some Purposes or when combined with other materials and/or technology to resist the spread of fire (Non-compliance Limitation Warning); and
(g) the products could not be used safely or in a manner compliant with the BCA without advice from a competent fire safety engineer (Fire Advice Limitation Warning).
(a) a prudent architect would have understood that the question of whether a material complies with the performance requirements of the BCA including as to fire risk was a question that is answered having regard to the particular use of the material and the particular building [T656.26-31], and it might, therefore, be the case that a combustible material could not be used compliantly on one type of building, but may be able to be used compliantly on another [T655.39-47 - T656.1-6];
(b) it was plain from the International Fire Classifications table in the "Vision Materialized" brochure referred to in Mr Quigley's report, as well as the "Product Range" page that Alucobond PE, Alucobond Plus and Alucobond A2 were not identical in terms of the combustibility of their cores, contrary to what Mr Quigley had said at [67] of his report ([T657.35-47, T660.31-37];
(c) in selecting panels, he relied on the expertise of a building certifier to determine whether, in that person's opinion, the product was non-combustible and, therefore, satisfied the DtS Provisions under the BCA [T660.41-47 - T661.1-3];
(d) Mr Quigley's practice when specifying ACPs was to describe the product in a way that afforded flexibility: "[s]o in describing the façade in a set of DA drawings, I would talk about painted metal panels rather than an ACP, painted ACP. And that would mean that there could be some flexibility when you got down the track ..." [T664.5-9]. He continued (at [T664.10-25]):
Because if you said ACP and that was included on the planning permit drawings and you subsequently wanted to change to a solid aluminium panel, you would have to go back and get an amendment to the planning approval and that is annoying and time-consuming. Now, in terms of the involvement of the building certifier, my approach has always been to get them involved as early as possible...
So things, for example, like the number and location of stairs, the size of the building, the materials we were proposing in a general sense. And as that - as our design developed and became more detailed, the building certifier would look in more detail at each of the proposals. So that by the time we got to preparing the construction drawings, I would be reasonably confident that the certifier wouldn't have any objections to what we were proposing to do...
(a) competent architects would not take it upon themselves to assess that aspect of a proposed façade system using Alucobond PE or Alucobond Plus, but would rather defer to a BCA certifier or FSE; and
(b) competent BCA certifiers and FSEs would be expected to have an awareness of BCA clause A 1.1, the fact that Alucobond PE and Alucobond Plus were combustible, and the necessity to assess the proposed use of those products as external cladding on a building having regard to its features, not because of some general "reliance" on marketing material in brochures.
(a) in the Group 4-5 Joint Report, answer (d), the expert practising FSEs agreed that the information relied upon by FSEs when assessing the suitability or compliance of combustible ACPs for use on a building were fire tests carried out by NATA accredited bodies and, if such tests were not available, overseas fire tests "properly understood and contextualised", as well as any available and relevant scientific papers and fire safety engineering principles generally. At answer 5(a), they said that:
...Some of the tests could support the use of a performance-based solution depending upon the circumstances. A reasonable and competent FSE would not rely upon any test results stated in the marketing material but should ask to be provided with the relevant test report and results, including certificates.
A reasonable and competent fire safety engineer would not usually rely upon any test results stated in the marketing material, but would interrogate publicly available information ... [and then] ask [for] the relevant fire test reports.
My view of the test results and tests referred to in the marketing material is that they are just reflecting that the products have been tested to the standards that have been called up by the various building codes and not that they would necessarily support or unsupport [sic] the use of a performance solution. So if it was not Alucobond PE or Plus, but another panel, and I saw that it had been tested in the marketing material to 5113, I would jump on that and get that report in a lot of detail.
So those fire tests, as I said, I see them as reflecting what the building codes from those various countries have called up and that is all they - if I know the test or one of them, say, BS467, if I thought that was relevant, I would get the test result and start looking at how it applied to my situation and then take the data. I wouldn't take the "Yes, it complied with that, hence I can say it complies with mine." I would take the exposure, the amount of fire spread that it had, and then relate that to my situation and the exposures that I have in my building. So it can support performance solutions. I'm not saying that the performance solution is always going to come out positive.
When the Applicants' counsel, Mr Roberts SC suggested to Mr Moore that he would not have used certain tests for Performance Solutions in respect of "a substantial use on a building", Mr Moore said at [T547.32-47] that he agreed, subject to the qualification that it would, "depend upon the application, what the deviation is, how far it is ...";
(e) Mr Davis said that he did not regard marketing material from suppliers and manufacturers as "technical data", and that he would seek the test reports and the test data [T508.24-29];
(f) during the Group 3 concurrent evidence, Professor Torero said that "anything that could affect the outcome of the test should be part of the test report" (at [T438.25-26]) and that, in developing a fire safety engineering solution for a particular building, he would ask for the test data and the videos of the fire tests referred to, so that he could extrapolate from the test properly (at [T442.29-33]; [T443.38-40]). Professor Torero was asked whether, if it were the case that a different classification was attributed to Alucobond Plus when affixed in a certain manner, he would expect to see that qualification in the marketing material. Professor Torero said, in implicit disagreement, that that was a question he would ask the manufacturer, and he would be expected to be told the answer (at [T444.5‑6]).
10.1 Issues 13 and 14 - Loss and causation (consumer guarantee claim)
an affected person in relation to goods is entitled to recover damages for ... any loss or damage suffered by the affected person because of a failure to comply with the guarantee to which the action relates if it was reasonably foreseeable that the affected person would suffer such loss or damage as a result of such a failure.
(Emphasis added).
10.1.1 Loss or damage and reasonable foreseeability
[A]llows for recovery of further loss or damage for a relevant failure to comply with a guarantee as provided in s 267(1) "if it was reasonably foreseeable that the consumer would suffer such loss or damage as a result of such a failure". The assumption of all the parties to this litigation has been that the damages recoverable under s 267(4) for non-economic loss are governed by the same principles as common law damages for breach of contract.
[94] Although the remedies in Pt 5-4 of the Australian Consumer Law do not precisely replicate the common law model of damages for breach of contract, the basic architecture concerning breach and remedies is the same, as was intended.
...
[104] [L]oss-based remedies to rectify the consequences of the breach ("consequential loss") are necessarily assessed by reference to facts that are proved to exist at any time from the failure to comply with the guarantee until the time of judgment. It has been held in this Court that the damages award in such cases follows the "universal" rule "that a plaintiff cannot recover more than he or she has lost". A loss involves any "adverse effect experienced by the plaintiff either on their mind, on the way they conduct their business or live their life, or on their financial position".
(Citations omitted).
10.1.2 Shore Building - Causation and reasonable foreseeability
(a) $9,328 in respect of building safety assessments and reports
(b) $451,979 in respect of the removal and disposal of Alucobond PE, and the purchase and installation of replacement cladding;
(c) $16,632.86 in respect of insurance premiums increases; and
(d) $113,704.92 in respect of pre-judgment interest.
(a) invoice issued by Core Project Consulting: $528 (incl GST);
(b) invoice issued by Defire: $8,800 (incl GST); and
(c) invoices issued by Restorial: $451,979 (incl GST).
I, Rosemary Ann Webb, Commissioner for Fair Trading, Department of Finance, Services and Innovation:
PROHIBIT the use of aluminium composite panels (ACP) with a core comprised of greater than 30 per cent polyethylene (PE) by mass ('the building product') in any external cladding, external wall, external insulation, façade or rendered finish in:
Class 2, 3 and 9 buildings with a rise in storeys of three or more and Class 5, 6, 7 and 8 buildings with a rise in storeys of four or more (Type A construction as defined in the Building Code of Australia); and
Class 2, 3 and 9 buildings with a rise in storeys of two or more and Class 5, 6, 7 and 8 buildings with a rise in storeys of three or more (Type B construction as defined in the Building Code of Australia),
subject to the following exceptions:
a) the building product is not deemed combustible by successfully passing a test in accordance with Australian Standard 1530.1-1994 'Methods for fire tests on building materials, components and structures' (AS 1530.1);
or
b) the building product and proposed external wall assembly has successfully passed a test for both the EW (external wall fire spread) and BB (building-to-building fire spread) classifications in accordance with Australian Standard 5113 'Fire Propagation testing and classification of external walls of buildings' (AS 5113) and the proponent of the use of the building product tested to AS 5113 documents by statutory declaration that the building product will be installed in a manner identical to the tested prototype wall assembly or façade,
c) the AS 1530.1 or AS 5113 test results to be relied upon to except a building product from the ban are produced by an Accredited Testing Laboratory, and describe the methods and conditions of the test and the form of construction of the tested building product or prototype wall assembly or façade, and are dated on or after 1 July 2017.
Cladding, including ACP [sic] with a PE core of some proportion, is often used for the purposes of aesthetics to act as a cover for part or all of external walls of a building. In the event of a fire, the use of ACP with a PE core on a multi storey building can significantly increase the amount of energy that is released by the cladding and contribute to the rapid spread of fire.
...
A ban directed only to ACP with a core comprised of greater than 30 per cent PE targets the impact of the product ban and focuses regulatory intervention on the types of ACP panels that are most likely to pose a safety risk. This threshold aligns with the FR European standard which is considered the benchmark for an ACP product to be of low flammability.
...
At present, the NCC is not sufficient to regulate building products and cannot be relied on in isolation to address the safety risks associated with the use of ACP with a core comprised of greater than 30 per cent PE by mass.
(Emphasis added).
Bayside Council is in receipt of correspondence that indicates that the Aluminium Composite Panelling (ACP) installed on the subject premises is a product that contains a core material that is greater than 30% Polyethylene (PE) and is therefore a Banned Product pursuant to the Building Products Safety Act 2017. Such products cause an unreasonable risk to the spread of fire around a building.
Accordingly, Bayside Council intends to give you the attached Fire Order, in accordance with Section 9.34 & Schedule 5 of the Environmental Planning & Assessment Act, 1979 (the "Act") and Section 20 of the Building Products Safety Act 2017, which will require you to do the things specified in the proposed Order, within the period specified in the proposed Order.
...
(Emphasis in the original).
5. To improve the current level of fire safety at the premises.
[I]n light of the recent cladding update onsite, the current insurer ... has declined renewing the schemes policy[.]
Having obtained the attached report from Core Project, we raised the concern of cladding being present onsite to the existing insurer early this year, and their reply to not renew has only just been received now when renewal is due.
The broker accordingly tendered the policy and has received the attached tow [sic] option from CHU & SCI insurance for the committee's review...
...
CHU will cover the building in full however please note page 3 . comments [sic] on a $5000.00 excess applicable for damage caused by fire in a resultant claim associated to external cladding.
SCI - have not provided a cover in the case damage caused by fire in a resultant claim associated to external cladding.
Explaining the above CHU have quoted $17,743.26 for the annual premium.
The current premium with CSI was $9,288.66 however, they will not renew.
Explaining the above - insurance premiums were expected to rise over the coming year - some cases by 20 to 25%[.]
With the added risk of cladding being identified on site, the increase has way exceeded the anticipated rise.
We strongly recommend the committee to renew with CHU and ensure the scheme is covered in full.
Moving forward, a risk assessment will be proposed. Either to confirm the cladding is or is not combustible or any alternative solutions in order to help reduce any risk [sic] increase in premium [sic].
Section 37M(2)(e) [of the Federal Court of Australia Act 1976 (Cth)] provides that one of the objectives of s 37M is "the resolution of disputes at a cost that is proportionate to the importance and complexity of the matters in dispute". In my view, that objective requires that the costs of establishing a certain fact or point of law in a proceeding is proportionate to the importance of that point in ultimately obtaining the relief sought in the proceeding.
10.1.3 Five Dock Building - Causation and reasonable foreseeability
(a) $339,705.70 in respect of the cost of replacing all the Alucobond Plus panels with a non-combustible alternative;
(b) $49,036.85 in respect of excess insurance premiums; and
(c) $3,061.76 in respect of pre-judgment interest claimed for the excess insurance premiums.
(a) the burden of proof for establishing loss lies on the claimant (the Five Dock OC): at [71];
(b) by contrast, the party in breach (the Respondents) have the onus of displacing the prima facie rule for assessing damages as the cost of reinstatement: at [71];
(c) the onus is at least an evidentiary onus in the sense referred to by Barwick CJ, Kitto and Taylor JJ in Purkess v Crittenden [1965] HCA 34; (1965) 114 CLR 164 at 168; [1965] HCA 34 when speaking of the "burden of proof in the secondary sense" of introducing evidence: at [72].
(d) such evidence could include adducing evidence of functional equivalence of an alternative solution, such that reinstatement is unnecessary: at [73];
(e) the High Court has expressed reluctance to confine a plaintiff to a "a doubtful remedy", in contrast to a case where it is clear that the "expenditure imposed on the defendant is disproportionate to any benefit to the plaintiff in terms of the vindication of the plaintiff's right to recover its actual loss from the defendant": at [75], discussing Kirby v Coote [2006] QCA 61 at [52] (Keane JA, Williams JA agreeing generally at [1]), referring to Bellgrove;
(f) an assessment of what is reasonable in a particular case is not to be measured in purely economic terms. Personal preferences of a subjective nature are not irrelevant when choosing the appropriate measure of damage: This is especially so if the plaintiff's "predelictions" [sic]...are not excessive or extravagant (citations omitted): at [78], quoting Bowen Investments Pty Ltd v Tabcorp Holdings Ltd (2008) 166 FCR 494; [2008] FCAFC 38 (Finkelstein and Gordon JJ), decision affirmed on appeal in Tabcorp Holdings Ltd v Bowen Investments Pty Ltd (2009) 236 CLR 272; [2009] HCA 8; and
(g) the qualification in Bellgrove indicates that "unreasonableness" is only to be satisfied by "fairly exceptional circumstances": at [79], discussing Tabcorp Holdings at [17] (French CJ, Gummow, Heydon, Crennan and Kiefel JJ).
[T]he respondent's house is a house which is affected by a degree of instability which would not have been present had the first appellant properly discharged his duty ... because the respondents' damages are assessed 'once and for all' the law must be astute to ensure that the measure of damages accurately reflects the restoration of the respondents to the position they would have been in had the appellants not failed in their duty. The respondents should recover the amount of damages necessary to enable them to own a house free of risk so far as its stability was concerned. As McLure JA, with whom Steytler P and Wheeler JA agreed, said in J-Corp Pty Ltd v Gilmour [[2005] WASCA 136 at [47]]: "Reasonableness does not require the respondent to carry those risks."
(a) the retrospective performance solutions designed by Mr Davis do not adequately assess the fire hazards presented by Alucobond Plus or provide any comfort that the relevant authorities would accept the cladding as compliant (particularly given that ACPs with a core of more than 30% PE have now been banned). Mr Davis accepted that there is no guarantee that a performance solution such as the ones that he prepared would be accepted and approved. Reasonableness does not require the Five Dock OC to carry those risks: JKN Para 1 at [76], quoting Keane JA in Kirby v Coote. It is, therefore, reasonable for the Five Dock OC to prefer to replace the entire façade and remove the risk entirely;
(b) Mr Abbott has quantified the cost of implementing those measures for the Five Dock Building and the difference between Mr Abbott's assessment of the cost of replacing all the panels and the Davis' Solution is around $129,000, before accounting for the additional costs of $36,520 (incl GST) for "project management of fire engineering activities" and the costs of an FSE undertaking the work which could be in the range of $10,000 to $100,000;
(c) the Respondents have not demonstrated that it was unreasonable for the Five Dock OC not to have incurred the cost of retaining an FSE to investigate the possibility of such a bespoke solution, in circumstances where the outcome of that exercise would have been unpredictable and may have involved wasted time and money; and
(d) the Davis' Solution has aesthetic disadvantages because it would have the effect of changing the design and visual façade of the building, by interspersing Alucobond panels with other non-identical panels; effectively removing a patchwork of panels from various sections and having to replace them, presumably, with something else which may or may not be of the same appearance and may or may not be of the same aesthetic standard.
$7,000,000
(increased to $10,000,000 from 23 July 2021)
$14,097.72
(being $12,239.57 December from the invoice dated 23 July 252 2021)
*Fire Excess
All Damage arising directly or indirectly caused by fire resulting in any claim to the internal or external cladding materials, generally known as 'Aluminium Composite Panels' (ACP), affixed to buildings as defined under 'Policy 1 - Insured Policy a. Buildings' is subject to Fire Excess shown in the Schedule any one Event.
The owners corporation received a fire inspection report in 2021, and have made considerable progress resolving items in the report over the last few years working with the builder, developer and private contractors. The remaining work is to do with the mechanical air balancing in the basement. We received a quotation recently from Ventrite for $75,000, and are looking into options.
10.2 Issues 15 to 17 - Loss and causation (misleading conduct claim)
(1) If:
(a) a person (the claimant) suffers loss or damage because of the conduct of another person; and
(b) the conduct contravened a provision of Chapter 2 or 3;
the claimant may recover the amount of the loss or damage by action against that other person, or against any person involved in the contravention.
Please note: external cladding is out of the scope of this Fire Engineering Report. External cladding has been identified onsite by our office, however after requests to the builder to provide information confirming compliance to the PCA [sic] for assessment, to our knowledge no such information has been provided. Neither myself or our office take any responsibility for the type of cladding used if it deemed to be not in accordance with the BCA as this is out of the scope of our engagement and was mentioned numerous times during the design and construction phases of the project.
11.1 Issue 18 - The date the amendments take effect
(a) amendments to the description of the group members;
(b) an expansion on the factual and legal allegations that supported the consumer guarantee claim; and
(c) the addition of the misleading conduct claim.
Although it is undoubtedly the case in ordinary inter partes litigation, that amendments often take effect from the commencement of the proceeding, this is in circumstances where the amendment is to add a claim between existing parties that arises out of the same or substantially the same facts. This flexibility operates as an amelioration of the rule of practice established by Weldon v Neal (1887) 19 QBD 394.
[T]he relation-back doctrine is a manifestation of the general principle that, except insofar as the nature of the proceedings or the relief claimed requires attention to be given to the actual position of the parties at the time of judgment (such as, for example, the assessment of damages, and discretionary equitable remedies including injunctions), the rights and liabilities of parties are determined as at the date of the commencement of the proceedings, unless a statute changing the law expresses a clear contrary intention [Hutchinson v Jauncey [1950] 1 KB 574; Wilson v Dagnall [1972] 1 QB 509; Application Des Gaz SA v Falks Veritas Ltd [1974] Ch 381 at 392 and 399]. Relation-back recognises that a pleading speaks from the date it bears, and that an amendment speaks from the date of the original pleading that it amends, so as to state a claim for relief to which the party is entitled as at the date at which the rights and liabilities of the parties will be judged.
[23] It would perhaps be an understatement to say that the amendments to the statement of claim are extensive and substantial. Virtually every paragraph of the existing pleading has been the subject of some amendment. The vast majority of the amended pleading is entirely new. The original statement of claim was 19 pages in length (without annexures) and contained 25 paragraphs. The amended statement of claim is 49 pages in length (without annexures) and contains 89 paragraphs. More significantly, the new pleading contains entirely new causes of action and, while the original causes of action are retained, for the most part they are now supported by substantially new or reformulated allegations and particulars.
[24] Owners contended that, while the amendments to the statement of claim are extensive and substantial, the "core" of the case nevertheless remained the same. The core of the case was said to be the "risk of fire associated with this product" and the "TPA [Trade Practices Act] merchantable acceptable quality cause of action, which fixes upon the risks that are associated with this product". Owners sought to characterise the amendments to the existing causes of action as simply "restructur[ing] the existing pleading to more clearly identify the different elements of the cause of action" and suggested that the amendments did not introduce "any significant new factual matters". As for the new causes of action, Owners contended that they arose substantially from facts "already pleaded".
[25] While at an entirely superficial level it might be said that the core of Owners' case may remain the same, the suggestion that the new pleading simply provides a clearer explanation of the existing causes of action and does not introduce substantially new factual allegations is nonsense. So too is the claim that the new causes of action arise from facts already pleaded. It would be more accurate to characterise the new pleading as an almost entirely new case.
(a) the expansion of the "Material Fire Risk Properties" at [10] to [12];
(b) a new allegation of the existence of "Prohibition Risk Properties" at [17];
(c) the introduction of existence of the "BCA Non-compliance Properties" and the "BCA Non-compliance Risk Properties" at [28] to [34];
(d) the insertion of an extensive pleading of non-compliance with the fire resistance requirements in BCA in new [18] to [36] (where originally the allegation was one of non-compliance with the "Fire Resistance Performance Requirements" which were defined as "the Performance Requirements in respect of fire resistance under the BCA": c.f. [12]-[15] and [16(b)] of the original Statement of Claim and [18]-[36] of the ASOC); and
(e) the insertion of an entirely new cause of action founded new facts in respect of the making of misleading or deceptive representations and misleading or deceptive conduct at [75]-[82] and [86]-[89].
[A]n amendment to introduce a claim that may be barred by the period of limitation at the time the amendment is made is not an ordinary amendment. If it were to be allowed to relate back then it would prejudice the opposing party's ability to raise a limitation point even though the claim was out of time. Such amendments are only treated as taking effect from the date of the original document where the amendment introduces a claim that 'arises out of the same or substantially the same facts' as the claims that have been brought within time : Ethicon Sàrl v Gill [2018] FCAFC 137; (2018) 264 FCR 394 at [47] (Allsop CJ, Murphy and Lee JJ).
(1) Unless rule 16.51 applies, a party must apply for the leave of the Court to amend a pleading.
(2) A party may apply for leave to amend a pleading to add or substitute a new claim for relief, or a new foundation in law for a claim for relief that arises out of the same facts or substantially the same facts as those already pleaded to support an existing claim for relief by the party, even if the application is made after the end of any relevant period of limitation applying at the date the proceeding was started.
This proceeding is commenced as a representative proceeding pursuant to Part IVA of the Federal Court of Australia Act 1976 (Cth) by the Applicant on its own behalf and on behalf of all person (Group Members) who, as at the date of this Amended Statement of Claim:
(a) either:
(i) own or have previously owned a building situated in Australia (Relevant Building), or have or have previously had an ownership interest in a part of a building situated in Australia (Relevant Building Part); or
(ii) have or have previously had a leasehold interest in a Relevant Building and/or a Relevant Building Part which includes an obligation to rectify defects of a kind associated with Alucobond PE Core Cladding in the Relevant Building or the Relevant Building Part; and
(b) where the Relevant Building and/or the Relevant Building Part is or was fitted with Alucobond PE Core Cladding; and
(c) have suffered loss or damage as a result of the failure of Alucobond PE Core Cladding to meet the applicable requirements for which statutory damages or compensation is claimed, as pleaded in in this the Amended Statement of Claim; and
(d) where the Alucobond PE Core Cladding was first supplied to a Consumer in the period that commences on the day that is 10 years before the date of this Statement of Claim 14 February 2009 and ends on 14 February 2019 the date of this Statement of Claim (Relevant Period); and
(e) were not during the Relevant Period, and are not, any of the following:
(i) a related party (as defined by s. 228 of the Corporations Act 2001 (Cth) (Corporations Act)) of 3A Composites or HVG;
(ii) a related body corporate (as defined by s. 50 of the Corporations Act) of 3A Composites or HVG;
(iii) an associated entity (as defined by s 50AAA of the Corporations Act) of 3A Composites or HVG;
(iv) a director, an officer, or a close associate (as defined by s. 9 of the Corporations Act) of 3A Composites or HVG; or
(v) a judge or the Chief Justice of the Federal Court of Australia or a Justice or the Chief Justice of the High Court of Australia.
[51] It is consistent with the scheme introduced by Part IVA and, in particular, the need for there to be certainty as to the persons who comprise the class at all times, that the Group Definition Amendment should have been ordered to take effect from the date of amendment, being the date of filing of the 5FASOC...Apart from anything else, this prevents the topsy turvy notion that someone retrospectively becomes a group member on commencement, when the Court has thus far proceeded on the basis that they are not group members. As a matter of principle, such an approach would avoid the vice of potentially resuscitating causes of action by persons who have never sought to agitate them. It would be odd that by becoming a group member through the augmentation of a class, substantive rights were conferred on a claimant that had been either extinguished or barred by operation of statute and could not otherwise be advanced by that claimant.
[52] Before leaving this topic, it is worth making a further point. Given the suspension of limitations caused by the operation of s 33ZE, the question of inclusion (or, as occurred here, unusually, exclusion) of group members has potentially important consequences on substantive rights. As does the date when any such order is to take effect. Whatever might be the nature of other amendments to a statement of claim, or to relief claimed in an application, attention must be given by parties to the legal consequences of class composition changes. Irrespective as to when other amendments might take effect, the consequences of amendments to group definition can affect the rights of third parties, being the absent group members or proposed group members. Although it would be inappropriate to lay down inflexible rules, the default position is that a s 33K order (or an equivalent order under s 33ZF) has effect from the time the definition is changed, consistent with the requirements of class certainty. It is a sound practice for applicants, in seeking such orders, to deal separately with amendments concerning class composition to assist in avoiding any confusion.
11.2 Issue 19 - The consumer guarantee claim: s 273
An affected person may commence an action for damages under this Division at any time within 3 years after the day on which the affected person first became aware, or ought reasonably to have become aware, that the guarantee to which the action relates has not been complied with.
[20] I was taken to authorities that have considered the issue of a plaintiff's awareness in the context of seeking from a Court an extension of time after particular limitation periods in relation to personal injury negligence claims had expired: AME Hospitals Pty Ltd v Dixon [2015] WASCA 63; (2015) 48 WAR 139; Commonwealth v Shaw [2006] NSWCA 209; (2006) 66 NSWLR 325. Both of these authorities indicate that the inquiry as to the proper construction of the particular sections in question there were multifaceted and fact-heavy as to the timing of the awareness of the plaintiff of matters relevant to their injury.
[21] There are no authorities on the proper construction of s 273 ACL. However, intermediate appellate courts have considered in detail the proper construction of what the parties considered were arguably similar provisions. These factors tell against it being appropriate to determine the issue of the proper construction of s 273 ACL on a strike out application. This is further so in circumstances where the evidence is not obviously one way. That is a sufficient reason to reject 3A Composite's submissions.
(a) the Shore OC should have been put on notice that aluminium cladding potentially possessed the properties that the Applicants rely upon in these proceedings as establishing that Alucobond PE and Alucobond Plus do not comply with the consumer guarantee,
(b) acting reasonably, a representative of the strata committee would have made enquiries about whether the cladding posed a risk. That is what ultimately occurred after the Grenfell Fire; and
(c) there is no meaningful explanation for why the Lacrosse Fire did not put a member of the strata committee for the Shore Building on notice that the guarantee to which the action relates has not been complied with.
[T189.32]: [M]oving into the Shore building, I considered it to be a pristine building. I didn't think there was anything wrong with it. I thought it was - it - it was compliant in all respects because I suppose, being a bit selfish, there was no cladding on the floor where I live; it was on the upper floors. Although I knew it was there - it was shiny, bright aluminium cladding - I didn't - I - I just took it for granted that everything in the building was compliant.
(a) there was a view held by some building professionals that the Lacrosse Fire may have been caused by substitution of an inferior product;
(b) this view changed after the Grenfell Fire;
(c) for the period before 2017/2018, ACPs were not considered to be combustible, nor non‑compliant with the DtS Provisions of the BCA, nor to have the fire risk properties pleaded by the Applicants;
(d) however, from 2017/2018 to 2019, this view began to slowly change as architects and building specialists became aware of the combustibility and non-compliance with the DtS Provisions of the BCA of ACPs, although views did not change regarding the fire risk properties of ACPs; and
(e) there was 'a clear realisation' in respect of these issues after the NSW regulation banning the use of ACPs with a core of more than 30% PE (which came into effect in August 2018).
11.3 Issue 20 - Whether 14 February 2019 or 3 March 2020 (whichever is applicable) is within 6 years after the day on which the Applicants' causes of action under s 236(1) accrued: ACL s 236(2)
Economic loss may take a variety of forms and, as Gaudron J. noted in Hawkins v Clayton, the answer to the question when a cause of action for negligence causing economic loss accrues may require consideration of the precise interest infringed by the negligent act or omission. The kind of economic loss which is sustained and the time when it is first sustained depend upon the nature of the interest infringed and, perhaps, the nature of the interference to which it is subjected. With economic loss, as with other forms of damage, there has to be some actual damage...
[footnotes omitted]
The conclusion which we have reached with respect to the time when the plaintiff first suffers loss in respect of contingent loss or liability accords with the comment of Gaudron J. in Hawkins v Clayton:
"[I]f the interest infringed is an interest in recouping moneys advanced it may be appropriate to fix the time of accrual of the cause of action when recoupment becomes impossible rather than at the time when the antecedent right to recoup should have come into existence, for the actual loss is sustained only when recoupment becomes impossible. (Emphasis added.)"
The conclusion which we have reached is reinforced by the general considerations to which we referred earlier. It is unjust and unreasonable to expect the plaintiff to commence proceedings before the contingency is fulfilled...
[footnotes omitted; underlining added]
Determining whether a cause of action has arisen involves an assessment of objective fact, rather than an assessment of the subjective capacity of a plaintiff to muster proof.
It follows that hindsight is permitted in determining when a cause of action accrues. The aim is to ascertain when relevant facts, namely the presence of compensable damage, objectively came into existence. A Court should not be limited to ascertaining whether relevant facts were provable or discoverable at a particular time.
In the state of the present law, which can fairly be criticised as working hardship in difficult cases, it must be accepted, at least in this Court, that there is no general rule that time will only run from the point when damage was reasonably discoverable.
Commonly in [cases where economic loss is sustained as a consequence of the development of a latent defect in a building] the building never existed and was never owned without the defect and (in the absence of consequential collapse or physical damage or injury) the only loss which could have been sustained by the owner was the economic loss which would be involved if and when the defect was actually discovered or became manifest, in the sense of being discoverable by reasonable diligence, with the consequence that the damage was then sustained by the then owner: cf. Sutherland Shire Council v. Heyman. The position is different in cases where all or some of the damage, be it in the form of physical injury to person or property or present economic loss, is directly sustained in the sense that it does not merely reflect diminution in value or other consequential damage which occurs or is sustained only when a latent defect which has existed at all relevant times becomes manifest. In those cases, damage is sustained when it is inflicted or first suffered and the cause of action accrues at that time.
[Emphasis added.]
If the interest infringed is the value of property, it may be appropriate to speak of a cause of action in negligence for economic loss sustained by reason of latent defect as accruing when the resultant physical damage is known or manifest, for as was explained by Deane J. in Heyman it is only then the actual diminution in market value occurs. If, on the other hand, the interest infringed is the physical integrity of property then there is a certain logic in looking at the time when physical damage occurs, as was done in Pirelli.
I certify that the preceding nil (1907) numbered paragraphs are a true copy of the Reasons for Judgment of the Honourable Justice Anderson.
ANNEXURE A - COMMON QUESTIONS AND QUESTIONS OF COMMONALITY
CQ1: Was 3A Composites a company incorporated under the laws of Germany and capable of being sued in its corporate name?
CQ2: Did 3A Composites, during the Relevant Period, own the Trademark?
(a) Was 3A Composites a "manufacturer" of Alucobond PE Core Cladding (within the meaning of that term in s. 7 of the ACL) and a corporation that "manufactured" Alucobond PE Core Cladding (within the meaning of s. 74A(1) and (3) of the TPA) supplied during the Relevant Period?
(b) If so, were there any periods that 3A Composites ceased to be a "manufacturer" or to have "manufactured" Alucobond PE Core Cladding?
CQ4: Did 3A Composites have a place of business in Australia for the purposes of s. 7(1)(e)(ii) of the ACL and s. 74A(4) of the TPA at the time that the Alucobond PE Core Cladding supplied during the Relevant Period was imported?
(a) Did 3A Composites during the Relevant Period engage in conduct within Australia in respect of the Alucobond PE Core Cladding supplied?
(b) Did 3A Composites, during the Relevant Period, carry on business within Australia for the purposes of s. 5(1) of the TPA and s. 5(1) of the CCA? If so, were there periods that 3A Composites did not carry on business in Australia?
CQ6: Is HVG a company incorporated in Australia and capable of being sued in its corporate name?
CQ7: Was HVG the sole and exclusive importer and distributor of Alucobond PE Core Cladding in Australia on and from about 8 or 17 August 2007?
(a) Was HVG a "manufacturer" of Alucobond PE Core Cladding (within the meaning of that term in s. 7(1)(e) and 7(3) of the ACL) and a corporation that "manufactured" Alucobond PE Core Cladding (within the meaning of s. 74A(1) and (3) of the TPA) supplied during the Relevant Period?
(b) If so, were there any periods that HVG was not a "manufacturer" or not a corporation which "manufactured" Alucobond PE Core Cladding?
CQ9: Was Alucobond PE Core Cladding a good of the kind commonly known as an "Aluminium Composite Panel" ("ACP") which consisted of three bonded laminates, being two aluminium cover sheets and a core throughout the Relevant Period?
(a) were there goods commonly known as 'combustible ACPs'?
(b) were there goods commonly known as 'non-combustible ACPs'?
(c) if the answer to (a) and/or (b) is "yes", was it commonly known that each of Alucobond PE and Alucobond Plus were 'combustible ACPs' and not 'noncombustible ACPs'?
CQ11: Throughout the Relevant Period, were ACPs (including Alucobond PE Core Cladding) commonly used in Australia for the Relevant Uses (as pleaded in the 2FASOC at paragraph 7)?
CQ12: Throughout the Relevant Period, were ACPs (including Alucobond PE Core Cladding), Third Party Products and products transformed, manipulated or fabricated from ACPs:
(a) only supplied to Qualified Professionals (as pleaded in the 3A Defence at paragraph 7(b) and pleaded in the HVG Defence at paragraphs 7(f) and (g));
(b) used in Australia in accordance with designs, plans and specifications prepared, reviewed, approved or certified and/or used by Qualified Professionals in accordance with the BCA and Relevant Building Legislation; and/or
(c) only able to be used for their intended purposes including the Relevant Uses (as defined in paragraph 7(i) of the HVG Defence), with specialised knowledge and/or training and/or specialised equipment, which at all material times was not sold or available to the general public.
CQ13: Throughout the Relevant Period, did Alucobond PE Core Cladding have:
(b) was it the subject of technical support in Australia from 3A and/or HVG, as pleaded at paragraph 8 of the 2FASOC?
CQ14: Throughout the Relevant Period, did Alucobond PE Cladding have a PE Core as pleaded at paragraph 9 of the 2FASOC?
CQ15: Throughout the Relevant Period, what was the percentage of PE or Plastic Binders, by weight, in the core of each of Alucobond PE; and Alucobond Plus?
CQ16: Did the percentage, by weight, of PE or Plastic Binders in the core of Alucobond Plus supplied by 3A Composites and/or HVG in Australia vary during the Relevant Period ?
CQ17: Throughout the Relevant Period, did 3A Composites and/or HVG know the precise composition of the core of Alucobond Plus supplied in Australia?
C. STATE AND CONDITION OF THE GOOD (ALL BUILDINGS)
CQ18: Throughout the Relevant period, did PE and Plastic Binders have the characteristics pleaded at paragraphs 11 and 11A of the 2FASOC? And if so, which characteristics?
CQ19: Throughout the Relevant Period, did the aluminium cover sheets of Alucobond PE Core Cladding fail to protect the PE Core from ignition in the event of a building fire for the reasons pleaded at paragraph 12 of the 2FASOC?
CQ20: By reason of the answers to questions CQ18 and/or CQ19, throughout the Relevant Period, was Alucobond PE Core Cladding combustible due to its PE core within the natural and ordinary meaning of the word?
C.2 Risks associated with use of Alucobond PE Core Cladding
CQ21: By reason of the answers to questions CQ14 to CQ20 above, when used as cladding fitted as part of or as an attachment to an external wall or other building element, did and does Alucobond PE Core Cladding pose a material risk that it will:
(a) cause or contribute to the rapid spread and severity of fire, including the rapid vertical spread and/or horizontal spread of a fire in the building?
(b) cause or contribute to debris falling from the building?
(c) cause or contribute to fire and smoke from fire overwhelming or compromising any fire safety, suppression and/or smoke control systems in the building?
(d) cause or contribute to the release of toxic products of combustion?
(e) if the answer to any or all of CQ21(a) to (d) is "yes" did and does Alucobond PE Core Cladding:
(i) increase the risk of loss of life in the event of a building fire;
(ii) increase the risk of damage to the building and/or building contents in the event of a building fire;
(iii) in the event of a building fire, adversely impact the ability of occupants of the building to evacuate;
(iv) in the event of a building fire, adversely impact the ability of the firefighting authorities to minimise the damage to the building and building contents, and to mitigate against the loss of life or injury to persons in the building?
CQ22: By reason of the answers to CQ14 to CQ21, did Alucobond PE Core Cladding have the Material Fire Risk Properties throughout the Relevant Period? And if so, which ones?
CQ23: Throughout the Relevant Period, was the suitable use of Alucobond PE or Alucobond Plus on a building (as defined in the BCA) required to be determined by those Qualified Professionals with responsibility for the design, construction and/or certification of that building having regard to the matters pleaded in paragraph 14(a) of the HVG Defence?
CQ24: Throughout the Relevant Period was it reasonable for a consumer to expect that, prior to using or installing Alucobond PE or Alucobond Plus on a building (as defined in the BCA), each of those Qualified Professional involved in the design and/or construction of that building would consider or cause to be considered the matters pleaded in paragraph 14(b) of the HVG Defence?
CQ25: Throughout the Relevant Period was it reasonable for a consumer to expect that, prior to issuing any certification for a building (as defined in the BCA), the relevant Qualified Professional involved in the certification of that building or causing the certification of the building would consider the matters pleaded in paragraph 14(c) of the HVG defence?
CQ26: Were the Relevant Regulations introduced because Alucobond PE Core Cladding had the Material Fire Risk Properties?
CQ27: By reason of the answers to CQ14 to CQ21, did Alucobond PE Core Cladding have the Prohibition Risk properties throughout the Relevant Period?
D. STATE AND CONDITION OF THE GOODS (CLASS 2 TO 9 BUILDINGS)
CQ28: Was Alucobond PE Core Cladding, at all material times, including throughout the Relevant Period, "combustible" as that term is used in the BCA (i.e. did it fail the combustibility test pursuant to AS 1530.1)?
CQ29: If the answer to question CQ28 is yes, could Alucobond PE Core Cladding be used wherever a non-combustible material was required by the BCA, having regard to the matters pleaded at paragraphs 27(a) to (c) of the 2FASOC?
CQ30: Throughout the Relevant Period, could Alucobond PE Core Cladding when used as part of or as an attachment to an external wall or other building element of a Class 2 to 9 Building comply with the Deemed-to-Satisfy Provisions of:
in each case as applied in each State and Territory of Australia, having regard to the matters pleaded in paragraphs 28 and 30 of the 2FASOC?
CQ31: Throughout the Relevant Period, could Alucobond PE Core Cladding when used as part of or as an attachment to an external wall or other building element of a Class 2 to 9 Building meet the Fire Resistance Performance Requirements for all Class 2 to 9 Buildings by means of an Alternative Solution, in accordance with the:
(a) BCA 2008 to BCA 2016;
(b) BCA 2016 (Amendment 1),
in each case as applied in each State and Territory of Australia, having regard to the matters pleaded in paragraph 32 of the 2FASOC?
CQ32: Throughout the Relevant Period, was it reasonably practicable to design or certify an Alternative Solution that would allow the use of Alucobond Plus in accordance with the Fire Resistance Performance Requirements (other than where used in insubstantial quantities), in accordance with the:
(a) BCA 2008 to BCA 2016;
(b) BCA 2016 (Amendment 1),
in each case as applied in each State and Territory of Australia, having regard to the matters pleaded in paragraph 32A of the 2FASOC?
CQ33: By reason of the answers to questions CQ28 to CQ31,
(a) did Alucobond PE Core Cladding, throughout the Relevant Period, have:
(i) the BCA Non-compliance Properties; and/or
(ii) the BCA Non-compliance Risk Properties;
(b) if the answer to CQ33(a) is "yes", did Alucobond PE Core Cladding, throughout the Relevant Period have the BCA-Related Prohibition Risk Properties?
E.1 Supply to consumer otherwise than by sale by auction
CQ34: Is the price of Alucobond PE Core Cladding for the purposes of the definition of "Consumer" in s. 4B of the TPA, s. 3 of the ACL, and to the extent that it applies (noting s. 4KA of the CCA) s. 4B of the CCA, to be determined by the price per panel, the price per quantity ordered per delivery, or the price per quantity ordered per Relevant Building or Relevant Building Part?
CQ35: Was Alucobond PE Core Cladding a good of a kind ordinarily acquired for personal, domestic or household use or consumption within the meaning of s. 3(1)(b) of the ACL and s. 74A(2) of the TPA throughout the Relevant Period?
CQ36: Was Alucobond PE Core Cladding only supplied by HVG to persons in the Construction Industry Market during the Relevant Period?
CQ37: To the extent that Alucobond PE Core Cladding was incorporated into any building product or system manufactured by a person other than 3A or HVG (in the manner pleaded at paragraphs 1(d) of the 3A Defence and 7(h) of the HVG Defence) (the "Third Party Products"), were such Third Party Products different goods to Alucobond PE Core Cladding for the purpose of the TPA and ACL, having regard to:
(a) the ordinary or common means of using or affixing Alucobond PE Core Cladding to a building; and/or
(b) the Fabrication and Affixation Representations made by 3A and HVG (to the extent those representations are found to have been made)?
CQ38: Did the supply of Third Party Products (as defined in the 3A Defence and HVG Defence) during the Relevant Period constitute:
(a) the supply of Alucobond PE Core Cladding together with other goods or services; and/or
(b) the supply of Alucobond PE Core Cladding in an altered form or condition or incorporated into other goods,
for the purposes of s 4C of the TPA and s 11 of the ACL, such that the supply of Third Party Products was also supply or resupply of Alucobond PE Core Cladding?
CQ39: To the extent that the Third Party Products were different goods to Alucobond PE Core Cladding or did not constitute a relevant supply of Alucobond PE Core Cladding, throughout the Relevant Period, were 3A and/or HVG the manufacturer of those goods within the meaning of the TPA and ACL, having regard to:
(a) the ordinary or common means of using or affixing Alucobond PE Core Cladding to a building;
(b) the Fabrication and Affixation Representations made by 3A and HVG (to the extent those representations are found to have been made);
(c) 3A holding itself out (or causing or permitting HVG to hold it out) to the public as the manufacturer of the Third Party Products (in the manner pleaded and particularised in the Applicant's Reply at paragraph 2(d))?
CQ40: Was Alucobond PE Core Cladding commonly bought or supplied in Australia for the Purposes throughout the Relevant Period?
CQ41: Throughout the Relevant Period, was Alucobond PE Core Cladding commonly bought or supplied in Australia for use in accordance with designs, plans and specifications prepared, reviewed approved, certified and/or used by one or more Qualified Professionals in accordance with the BCA and Relevant Building Legislation.
CQ42: Did 3A Composites and/or HVG make the Suitability Representation? If so, in what period and in respect of which product(s)?
CQ43: Did 3A Composites and/or HVG make the Plus Composition Representations? If so, in what period?
CQ44: Did 3A Composites and/or HVG make the Fabrication and Affixation Representation? If so, in what period and in respect of which product(s)?
CQ45: Did 3A Composites and/or HVG make the PE Fire Performance Representations? If so, in what period?
CQ46: Did 3A Composites and/or HVG make the Plus Fire Performance Representations? If so, in what period?
CQ47: Did 3A Composites and/or HVG make the Compliance Representation? If so, in what period and in respect of which product(s)?
CQ48: If any of the answers to any of questions CQ42 to CQ47 is "yes", did either of 3A Composites or HVG qualify those representations (and if so, which representations) during the Relevant Period by:
(a) representing in that Alucobond PE and/or Alucobond Plus (or any Third Party Products derived therefrom) were capable of being used in accordance with designs, plans and specifications prepared, reviewed, certified and/or used by one or more Qualified Professionals in compliance with the requirements of the BCA and the Relevant Building Legislation;
(b) representing that Alucobond PE and Alucobond Plus were capable of being used on or fitted to buildings by Qualified Professionals for the purposes identified in paragraph 7 of the HVG Defence in accordance with the obligations imposed on those professionals by Relevant Codes and Standards, including without limitation the BCA and/or the NCC, as in force at the relevant time; and/or
(c) using any one or more of the terms or phrases "PE", "polyethylene"; "flammability"; and/or "normal flammability" in connection with Alucobond PE, so as to expressly or by implication or otherwise represent that Alucobond PE was flammable, or and/or "combustible" for purposes of the BCA?
CQ49: If any of the Representations were conveyed by 3A or HVG in the Relevant Period, were they only conveyed to the Construction Industry Market?
CQ50: If the answer to CQ49 is "yes", was it common knowledge within the Construction Industry Market during the Relevant Period that ACPs had the Known Fire Properties as that term is defined in the 3A Defence and/or the HVG Defence?
CQ51: Did 3A Composites or HVG, at any time during the Relevant Period, provide any of the:
CQ52: If any of the Relevant Warnings or Relevant Limitation Warnings were given at some point during the Relevant Period, given by either of 3A Composites or HVG, or were made in respect of certain types of Alucobond PE Core Cladding, when were the warnings given and in relation to which types of cladding?
F.4 Reasonable expectation as to fitness of goods
CQ53: Having regard to the answers to questions at paragraphs CQ9 to CQ15 and CQ40 above, any combination of the answers to the questions at paragraphs CQ42 to CQ49 above, and/or any combination of the answers to the questions at paragraphs CQ51to CQ52, was it reasonable to expect Alucobond PE Core Cladding to be fit for all of the Purposes, only if:
(a) Alucobond PE Core Cladding did not have the Material Fire Risk Properties;
(b) Alucobond PE Core Cladding did not have the Prohibition Risk Properties;
(c) when used on any building, or for any of the Purposes, Alucobond PE Core Cladding:
(i) was safe;
(ii) did not pose a material risk to the health or safety of occupants of the building to which the cladding was fitted; and
(iii) did not pose a material risk of damage to the building or to property in the building; and/or
(d) Alucobond PE Core Cladding could be fabricated by applying any of the Fabrication or Affixation Methods without compromising its fire performance and or giving rise to any of the material risks found in response to question CQ21 above?
CQ54: Having regard to the answers to questions at paragraphs CQ9 to CQ15 and CQ40 above, any combination of the answers to the questions at paragraphs CQ42 to CQ49 above, and/or any combination of the answers to the questions at paragraphs CQ51 to CQ52, would a reasonable consumer fully acquainted with the state and condition of Alucobond PE Core Cladding (including any hidden defects) only regard the goods as acceptable for the Purposes and safe if:
(a) Alucobond PE Core Cladding did not have the Material Fire Risk Properties;
(b) Alucobond PE Core Cladding did not have the Prohibition Risk Properties;
(c) when used on any building, or for any of the Purposes, Alucobond PE Core Cladding:
(i) was safe;
(ii) did not pose a material risk to the health or safety of occupants of the building to which the cladding was fitted; and
(iii) did not pose a material risk of damage to the building or to property in the building; and/or
(d) Alucobond PE Core Cladding could be fabricated by applying any of the Fabrication or Affixation Methods without compromising its fire performance and/or giving rise to any of the material risks found in response to question CQ21 above?
CQ55: Having regard to the answers to questions at paragraphs CQ9 to CQ15 and CQ40 above, any combination of the answers to the questions at paragraphs CQ42 to CQ49 above, and/or any combination of the answers to the questions at paragraphs CQ51 to CQ52, was it reasonable to expect Alucobond PE Core Cladding to be fit for all of the Purposes, only if:
(a) Alucobond PE Core Cladding was compliant with the BCA when fitted as part of or as an attachment to an external wall of all Class 2 to Class 9 Buildings;
(b) the use of Alucobond PE Core Cladding for any of Purposes would not cause any Class 2 to Class 9 Building to be or to become non-compliant with the BCA;
(c) Alucobond PE Core Cladding did not have the BCA Non-compliance Risk Properties; and/or
(d) Alucobond PE Core Cladding did not have the BCA-Related Prohibition Risk Properties?
CQ56: Having regard to the answers to questions at paragraphs CQ9 to CQ15 and CQ40 above, any combination of the answers to the questions at paragraphs CQ42 to CQ49 above, and/or any combination of the answers to the questions at paragraphs CQ51 to CQ52, would a reasonable consumer fully acquainted with the state and condition of Alucobond PE Core Cladding (including any hidden defects) only regard the goods as acceptable for the Purposes and safe if:
(a) Alucobond PE Core Cladding was compliant with the BCA when fitted as part of or as an attachment to an external wall of all Class 2 to Class 9 Buildings;
(b) the use of Alucobond PE Core Cladding for any of Purposes would not cause any Class 2 to Class 9 Building to be or to become non-compliant with the BCA;
(c) Alucobond PE Core Cladding did not have the BCA Non-compliance Risk Properties; and/or
(d) Alucobond PE Core Cladding did not have the BCA-Related Prohibition Risk Properties?
G. GOODS NOT OF MERCHANTABLE OR ACCEPTABLE QUALITY
CQ57: Having regard to the answers to the above questions, was Alucobond PE of:
(a) merchantable quality within the meaning of s 74D(3) of the TPA; and/or
(b) acceptable quality within the meaning of s 54(2)-(3) of the ACL,
subject to the application of s 74D(2) of the TPA or ss 54(4), (7) and/or 271(2) of the ACL in respect of any individual group member's claim.
CQ58: Having regard to the answers to the above questions, was Alucobond Plus of:
(a) merchantable quality within the meaning of s 74D(3) of the TPA;
(b) acceptable quality within the meaning of s 54(2)-(3) of the ACL,
subject to the application of s 74D(2) of the TPA or SS 54(4), (7) and/or 271(2) of the ACL in respect of any individual group member's claims.
(a) was any failure of the goods to be of merchantable quality and/or to comply with the acceptable quality guarantee by reason of the act or default of a person or persons other than 3A or HVG or a cause independent of human control within the meaning of s 74D(2)(a) of the TPA or s 271(2) of the ACL?
(b) would an examination of the goods reasonably have revealed that they were defective or not of acceptable quality within the meaning of ss 74D(2)(c) or 54(7) of the ACL?
H.1 False or misleading representations about goods
CQ60: If 3A Composites and/or HVG made any of the Suitability Representation, Fabrication and Affixation Representation, PE Fire Performance Representation, Plus Fire Performance Representation, and Compliance Representation (the "Representations") during the Relevant Period, were those representations made in trade or commerce in connexion with the supply or possible supply of Alucobond PE Core Cladding or in connexion with the promotion of the supply of Alucobond PE Core Cladding?
(a) a representation that Alucobond PE Core Cladding had specified performance characteristics, uses and benefits?
(b) false or misleading because Alucobond PE Core Cladding was not suitable for all of the Purposes by reason of the answers to the questions at paragraphs CQ21, CQ22, and/or CQ27 above?
CQ62: Was the Fabrication and Affixation Representation:
(a) a representation that Alucobond PE Core Cladding had specified performance characteristics, uses and benefits?
(b) false or misleading because all or some of the Fabrication Methods caused Alucobond PE Core Cladding to have the Material Fire Risk Properties or the Prohibition Risk Properties addressed in questions CQ22 and CQ27 above?
CQ63: Were each of the PE Fire Performance Representation and Plus Fire Performance Representation:
(a) a representation that Alucobond PE Core Cladding:
(i) was of a particular standard or quality; or
(ii) had specified performance characteristics, uses and benefits?
(b) false or misleading because of the answers to the questions at paragraphs CQ19 and CQ21 above?
(c) false or misleading because Alucobond PE Core Cladding had not passed or satisfied all of the local and international fire tests referred to in the promotional material?
(d) false or misleading because the fire tests did not provide a reasonable basis for 3A Composites and/or HVG to represent that Alucobond PE Core Cladding was suitable or safe for use on a building for the Purposes and/or did not present any material increase in risk in the event of a building fire?
(a) a representation that Alucobond PE Core Cladding:
(ii) had specified performance characteristics, uses and benefits?
(i) because Alucobond PE Core Cladding had not passed all of the fire safety tests required by relevant building codes and standards, including AS1530.1; and/or
(ii) by reason of the answers to the question at paragraph CQ33(a) and (b)above?
CQ65: Were any or all of the Suitability Representations, Fabrication and Affixation Representation, PE Fire Performance Representation, Plus Fire Performance Representation and/or Compliance Representations ("Future Representations") representations with respect to a future matter?
CQ66: Did 3A Composites and/or HVG have reasonable grounds for making the Future Representations?
CQ67: Did each of 3A Composites and HVG contravene s. 53 of the TPA and s. 29 of the ACL by making the Representations?
H.2 Misleading conduct as to the nature of goods
CQ68: To the extent it is found that 3A Composites and/or HVG:
(a) made the Representations;
(b) failed to give the Relevant Warnings; and/or
(c) failed to give the Relevant Limitation Warnings,
during the Relevant Period, was this conduct, in trade or commerce, that was liable to mislead the public as to the:
(d) nature;
(e) characteristics; and
(f) suitability for purpose,
CQ69: Did each of 3A Composites and HVG contravene s. 55 of the TPA and s. 33 of the ACL, and if so, in what period?
CQ70: Do the transitional provisions in item 6 of Schedule 7 of the Trade Practices Amendment (Australian Consumer Law) Act (No. 2) 2010 (Cth) have the effect that:
(a) the TPA applies to any claim by a Group Member where the relevant Alucobond PE Core Cladding was supplied to a consumer prior to 1 January 2011; and
(b) the ACL applies to any claim by a Group Member where the relevant Alucobond PE Core Cladding was supplied to a consumer on or after 1 January 2011?
CQ71 For the purposes of any of the limitation defences raised in the 3A Defence or HVG Defence, is 2 March 2020 (being the date the Amended Statement of Claim was filed) the relevant date that the proceedings were commenced (and the date on which the suspension of limitation periods with respect to Group Members pursuant to s 33ZE takes effect) in respect of any of the claims advanced in the 2FASOC? If so, in relation to which aspects of the claim? Group members who have TPA claims but not ACL claims (see CQ70 above)
I.2 Group members who have TPA claims but not ACL claims (see CQ70 above)
CQ72: Subject to CQ37, CQ38 and CQ39, and depending on the answer to CQ70 above, if Group Members only have claims under the TPA, and not the ACL, then, in respect of those group members:
(a) Did 3A Composites supply all Alucobond PE Core Cladding in Australia to its exclusive distributor (at all material times, HVG)?
(b) Were the supplies referred to in (a) above in trade or commerce?
(c) Did 3A Composites' exclusive distributor (at all material times, HVG) acquire the Alucobond PE Core Cladding for the purpose of re-supplying it?
(d) By reason of the answers to paragraphs (a) to (c), did 3A Composites supply all of the Alucobond PE Core Cladding fitted on the Relevant Buildings and/or Relevant Building Parts of those Group Members to another person who acquired those goods for the purposes of re-supply, within the meaning of s 74D(1)(a) of the TPA?
I.3 Group members who are owners' corporations or derived title through owners' corporations
(a) the Applicant;
(b) any Group Member who acquired the Alucobond PE Core Cladding affixed to their Relevant Building or Relevant Building Part by operation of the legislation specified in Note 1 of this Annexure A; and
(c) any Group Member who acquired or derived title to the Alucobond PE Core Cladding from or through an Original Consumer Owner who acquired their interest in the Alucobond PE Core Cladding in the manner described in the preceding paragraph,
does the transfer of title by operation of the relevant legislation constitute a "supply" of Alucobond PE Core Cladding to the Applicant, Group Member or Original Consumer Owner (as applicable), within the meaning of the TPA and ACL?
I.4 Group members who are subject to a legally-binding direction to remove and replace Alucobond PE Core Cladding
CQ74: With respect to the Applicant and any Group Members who are the subject of a legally-binding direction to remove and replace their Alucobond PE Core Cladding at their own cost, is the cost of removing and replacing the Alucobond PE Core Cladding, or of implementing other measures to rectify the impact of the cladding on their building, loss or damage suffered by the Applicant or Group Member:
(a) by reason of Alucobond PE Core Cladding not being of merchantable quality; or
(b) because of the failure of Alucobond PE Core Cladding to comply with the Acceptable Quality Guarantee?
CQ75: Are any of the above questions and their answers not common to all group members? If so, which questions and answers?
CQ76: If the answer to question CQ75 is "yes", are the questions and their answers sufficiently common to some of the group members so as to be the subject of an order under s 33ZB of the Federal Court of Australia Act 1976 (Cth) that binds those group members and the defendant in relation to those answers? If so, which questions and answers and in relation to which group members?
The version of the legislation referred to below is the version in force in the period from February 2009 to February 2019.
1. Strata Schemes Development Act 2015 (NSW)
4. Subdivision Act 1988 (Vic)
8. Strata Titles Act 1985 (WA)
Sch 2 to the Competition and Consumer Act 2010 (Cth) (the Australian Consumer Law)
ACP Cladding Solutions Pty Ltd - installers of the Alucobond Plus affixed to the Five Dock Building.
Australasian Fire and Emergency Service Authorities Council.
A representative of Buildrite, the builders of the Five Dock Building.
The Further Amended Originating Application and the Amended Statement of Claim
An Australian Standard relating to the fire testing of building materials, components and structures. The standard is comprised of four parts.
A simple, small-scale test to determine whether a material is considered non-combustible for the purposes of the BCA. The test involves a small-scale cylindrical sample of the material being lowered into a small furnace held at a constant temperature of 750°C, with a pilot flame located above the furnace. The test measures whether the relevant product burns under such circumstances. Where a material is not deemed combustible as determined by AS 1530.1, it is classified as non-combustible for the purposes of the BCA.
A test designed to assess the fire hazard properties of materials, namely: ignitability, flame propagation, heat release, and smoke release. The test involves a 600 x 450 mm sample which is held onto a supporting frame in a vertical orientation and exposed to heating from a radiant panel source. The sample is progressively moved closer to the radiant heater over a period of 20 minutes or until ignition occurs. A pilot flame is maintained above the sample. The response of the sample is then measured with the results reported as indices for time to ignition, intensity of radiation, spread of flame, and smoke detection. AS 1530.3 allows a cascading level of fire safety for materials which are combustible.
A test which relates to the fire resistance level of a material, whether or not it is combustible.
The first Australian Standard testing method specifically for the external fire performance of cladding systems. In contrast to the other tests discussed above, AS 5113 is a large-scale test. Based on the earlier UK test BS 8414, the product is applied over the front face of a testing rig which is around eight to nine metres high. The testing rig also includes a "wing wall" at right angles to the main face. A combustion chamber sits at the bottom of the testing rig, into which a wooden crib is placed and ignited, developing into a severe fire source which vents from the combustion chamber and impinges on the cladding above the opening.
Attenuated Total Reflectance Fourier Transform Infrared Spectroscopy. One of the methods used by Expert Group 1 (Chemists) in testing the chemical composition of Alucobond Plus.
BAC Insurance Brokers Pty Ltd - Five Dock OC's insurance brokers.
BCA Innovations Pty Ltd - fire safety engineers engaged by Buildrite in relation to the Five Dock Building.
The Applicants pleaded claim that the Alucobond products do not and did not comply with the BCA. This is pleaded on the basis that the panels could not be used as part of a design that was compliant with the DtS Provisions of the BCA, and could not reasonably practicably form part of an alternative solution, other than where used in insubstantial quantities.
The Applicant's pleaded claim that there was a material risk that the Alucobond products did not comply with the BCA for the same reasons as pleaded in respect of the BCA Non-compliance properties.
The Applicants' pleaded claim that by reason of the BCA Non‑compliance Risk Properties of the panels, there was at all material times a risk that the Alucobond products could be the subject of a legally binding direction to be removed and/or replaced at the cost of the owner or leaseholder.
The chairman of the Five Dock OC strata committee. Has been a lot owner since January 2019, a member of the strata committee of the Five Dock OC since 25 May 2020 and chairperson since 30 March 2021. Mr Filippopoulos gave evidence on behalf of the Five Dock OC.
Buildrite Australia Pty Ltd - builders of the Five Dock Building
ACP cladding panels being routed and folded to create shallow box shapes that can then (typically) be hung from cladding rails on the outside of a building.
Consumer Guarantees Act 1993 (NZ) a
One of the sample preparation methods used by Expert Group 1 (Chemists) in testing the chemical composition of Alucobond Plus.
Alucobond PE and Alucobond Plus were compliant with all relevant building codes and standards for use on all buildings in Australia as part of or as an attachment to an external wall or other building element for its common uses, or would be so compliant once affixed.
Occurs where the flame propagates in the same direction as the flow of hot combustion products. The most common case of concurrent flame spread is upwards flame spread.
A piece of specialist fire science equipment which is used to apply a controlled level of radiant heat to a test sample. An electrical spark is generally used to provide an ignition source immediately above the sample. It enables the calculation of various factors which can be used to describe the flammability of a material, including the heat release rate, smoke production, and the critical heat flux for ignition.
Core Project Consulting produced a report dated 30 September 2020 in which they identified that both samples had a core containing 29% PE.
Authors of the Core Shore Report and the Core Five Dock Report.
Report dated 19 January 2018 by Core Project Consulting which identified that the cladding applied to the Shore Building was most likely to have a PE core.
Refers to the minimum heat flux at which a material will ignite when exposed to heating for a specified time period (generally, 15 minutes)
One of the sample preparation methods used by Expert Group 1 (Chemists) in testing the chemical composition of Alucobond Plus, which creates free-flowing powder, with the intent to homogenise, as far as is possible, the sample.
The second proposed Performance Solution prepared by Mr Davis in respect of the Five Dock Building - being a Performance Solution prepared from the perspective of offering remediation measures to achieve BCA compliance with the performance requirements under BCA 2019 Amendment 1. Specifically, the first remedial measure proposed, being: removal of Alucobond Plus panels that connect vertically between apartment windows on the building's eastern elevation (ie, the back of the building), replacing them with a non‑combustible cladding option if necessary and installing mineral wool batting with a minimum density of 60 kg/m3 behind panels around all windows on the eastern elevation.
Defire (NSW) Pty Ltd - fire safety engineers engaged by the Shore OC to produce a report on the compliance or otherwise of the cladding affixed on the Shore Building.
A narrative structure of a fire event that accounts explicitly for the features of a particular building and the reaction-to-fire behaviours of its various components. A design fire scenario can be used subsequently as the basis for the development of models of fire scenarios for the performance assessment of the building.
Qualified Professionals who were responsible for designing, constructing and certifying buildings that complied with the BCA including architects and designers who specified ACPs, façade fabricators, who constructed facades using ACPs and building certifiers who certified compliance with the BCA.
The developers of the Shore Building (Ronnstar Pty Ltd and Lawtow Pty Ltd) and of the Five Dock Building (Abdul-Rahman)
The distributor agreements between 3A and HVG dated 1 July 2007, 1 September 2010, 1 September 2015 and 1 January 2018.
Managing Director of 3A since 2003 with responsibility for the Singen plant that manufactured the Alucobond products including oversight of the production and operation of the plant. Dr Werner gave evidence on behalf of 3A.
One of the sample preparation methods used by Expert Group 1 (Chemists) in testing the chemical composition of Alucobond Plus. It involves pre-drying a sample and then placing the sample into a muffle furnace for a period of time, to ensure the ashing of the sample. The relative weight loss between the pre-dried sample and the ash is calculated to enable the quantification of the inorganic content of the samples.
Alucobond PE and Alucobond Plus could be fabricated and affixed to buildings by third parties prior to (or as part of) being fitted to buildings, in accordance with the methodologies set out in the technical manuals and marketing materials, without materially affecting their fire performance and safety.
the behaviour of Alucobond PE and Alucobond Plus in a fire was affected in a material way by the method of fabrication or affixation chosen.
Federal Court Rules 2011 (Cth)
One of the sample preparation methods used by Expert Group 1 (Chemists) in testing the chemical composition of Alucobond Plus.
the products could not be used safely or in a manner compliant with the BCA without advice from a competent fire safety engineer.
the aluminium coversheets did not protect the PE core from igniting in a fire, and that the products had the Material Fire Risk Properties.
A residential building located in Five Dock, NSW, The owners corporation is the Five Dock OC.
The Owners - Strata Plan 98297 (sub-group representative)
Occurs when heat is transferred from a burning region to adjacent unburnt material. It can be thought of as a series of ignitions, where sufficient energy is applied to the fuel ahead of the flame such that pyrolysis can occur. As the rate of flame spread is governed by the rate at which the material ahead of the burning region can be heated to its pyrolysis temperature, the rate of flame spread is dependent on the heat transferred to the material and the material's thermal inertia.
The ease with which the material ignites and the manner in which it burns.
Fire Propagation Apparatus which consists of two main components, being the fire model and the gas analyser system. The fire model is fitted with a sample holder, infrared lamp heaters to irradiate heat above the sample, and a piloted flame that sits above the sample to induce ignition.
The amount of energy required to increase the temperature of a unit mass of the material by one degree Celsius.
The total amount of energy that is available to be released from a material. It is a measure of the maximum energy that a material can be expected to release via combustion, or in other words, the amount of "fuel" that a material may provide for a fire. It is reported in units of megajoules per kilogram (MJ/kg) and provides an upper limit on the amount of energy that can be released by burning a material, but does not give any information regarding the rate at which energy is released.
Describes the rate of energy release, per unit of time, as a material burns. The heat release rate of a material is dictated by the pyrolysis mechanism of the material, the physical geometry of the sample, the boundary conditions of the materials, and the presence of an external heat source. Heat release rate is commonly expressed in terms of the area of burning, being the heat release rate per unit area.
Inductively Coupled Plasma Mass Spectroscopy. One of the methods used by Expert Group 1 (Chemists) in testing the chemical composition of Alucobond Plus
The initiation of sustained flaming combustion of pyrolysis gases. Ignition only occurs after a period of heating of the solid material, such that the surface temperature of the material reaches pyrolysis temperature.
A test used to determine materials to be used in internal applications such as floor materials, floor coverings, and wall and ceiling lining materials. The test determines a "group number" for materials. Involves a set up that replicates the corner of a room with a gas burner situated on the floor in the corner. The gas burner is ignited, and the growth rate of the fire resulting from involvement of the lining products, as well as the total heat released and amount of smoke generated, is measured. For the first 10 minutes, the heat output of the burner is set to 100 kW, after which the heat output of the burner is increased to 300 kW for another 10 minutes.
Lacrosse building fire in Melbourne in November 2014
Lateral Ignition and Flame spread Test - a method of testing the flame spread of a material.
The products were not safe and suitable for use on all buildings for some of the Purposes, or were only safe for some Purposes when combined with particular materials designed to resist the spread of fire.
A lot owner in the Shore Building and member of the strata committee since 1 October 2023. Ms Hall gave evidence on behalf of the Shore OC.
The Applicant's pleaded claim that when the Alucobond products were fitted as part of or as an attachment to the external wall or other building element, there was, and is, a material risk that the cladding will, in the event of a fire: cause or contribute to the spread and severity of the fire, cause or contribute to debris falling from the building, cause or contribute to fire and smoke overwhelming or compromising any fire safety measures in the building, and cause or contribute to the release of toxic products of combustion. As a result of all, any, or a combination of the above matters, that the Alucobond products increase the risk of loss of life and damage to property, adversely impact the ability of occupants to evacuate, and/or adversely impact the ability of firefighting authorities to fight the fire.
A lot owner in the Shore Building and member of the strata committee of the Shore OC since 1 October 2013. As a member of the strata committee, Mr Sheils gave evidence on behalf of the Shore OC.
Installers of the Alucobond PE cladding on the Shore Building
A representative of the Shore Developers and Prestige Apartments
A fire safety engineer from BCA Innovations - the fire safety engineer firm engaged by the Five Dock OC in respect of the Five Dock Building.
A representative of the builder of the Five Dock Building: Buildrite
One of the most widely used large-scale cladding fire tests and was developed in the United States of America. Involves a testing rig that is 7.32 m high. The candidate cladding is installed over the exterior wall of the testing rig and a combustion chamber is placed near the base of the wall, with the fire allowed to vent to the exterior wall, resulting in direct impingement of a fire plume on the exterior cladding system being assessed.
Alternatively, that the products were only compliant with the BCA when used on some buildings, or for some Purposes or when combined with other materials and/or technology to resist the spread of fire.
The products had not passed fire safety test AS 1530.1 and were not compliant and there was a risk they were not compliant with the BCA.
Occurs when the flame spread is in the opposite direction to the flow of hot gases. This is most commonly observed where a flame is spreading downwards or horizontally. Concurrent flame spread is generally faster than opposed-flow flame spread given that the hot combustion products rise due to buoyancy, resulting in higher rates of heat transfer to the surface of the material.
Alucobond PE was safe and suitable, and would present no material increase in risk to the life or safety of occupants, or damage to property in the event of a building fire, because the aluminium cover sheets protected the core and/or it had passed or satisfied various local and international fire performance tests.
Chairperson of the Shore OC strata committee in August 2018
The core of Alucobond Plus contained no more than 30% plastic binders and/or not less than 70% non-combustible mineral filler.
The core of Alucobond Plus could, and did at times, contain less than 70% mineral filler.
Alucobond Plus was safe and suitable, and would present no material increase in risk to the life or safety of occupants, or damage to property in the event of a building fire, because the aluminium cover sheets protected the core and/or it had passed or satisfied various local and international fire performance tests, and it was fire resistant, hardly inflammable and/or had low flammability.
Each of the Suitability Representation, the Fabrication and Affixation Representation, the PE Fire Performance Representation, the Plus Fire Performance Representation, the Compliance Representation and the Plus Composition Representation.
The Applicants' pleaded claim that by reason of the BCA Non‑compliance Properties, there was at all material times a risk that the Alucobond products could be the subject of a legally binding direction to be removed and/or replaced at the cost of the owner or leaseholder.
The purposes which the Applicants plead the Alucobond products were commonly bought and supplied in Australia for, being: use as part of an external wall (or as an attachment thereto or other building element) on high-rise or low-rise buildings, where such buildings were for residential purposes, commercial purposes or public or government administration purposes.
The process of thermal decomposition of a solid material and results in the production of flammable vapours which fuel the flaming combustion of a solid. Materials with higher pyrolysis temperatures are more difficult to ignite.
Professionals involved in the design, construction and approval of buildings, including being architects, builders, surveyors, certifiers, developers, project managers, FSEs, as well as consent authorities, façade engineers, façade contractors and sub-contractors.
Fire Order & Building Product Rectification Order issued by Bayside Council to the Shore OC on 29 May 2019.
Restorial Remedial Building Services - engaged by the Shore OC to carry out rectification works for the removal Alucobond PE on the Shore Building.
Scanning Electron Microscopy Energy Dispersive Spectroscopy. One of the methods used by Expert Group 1 (Chemists) in testing the chemical composition of Alucobond Plus
A residential building in Dolls Point, NSW. The owners corporation is the Shore OC.
The developers of the Shore Building - Ronnstar Pty Ltd and Lawtow Pty Ltd
3A's large-scale industrial manufacturing plant in Singen, Germany.
Alucobond PE and Alucobond Plus were suitable for all of the uses for which they were commonly acquired (which included use as external cladding on high or low rise buildings used for residential, commercial or public purposes), and would be suitable for such uses once affixed to a building.
The products were not safe and suitable for use on all buildings for all of the Purposes.
Senior sales manager from 3A in Germany. Appears to have been largely responsible for the Australian market during the relevant period, and made numerous marketing trips to Australia.
Report of the Trade Practices Act Review Committee dated August 1976.
Thermogravimetric Analysis - used to measure weight loss as a function of temperature, to monitor any decomposition/dehydration processes. One of the methods used by Expert Group 1 (Chemists) in testing the chemical composition of Alucobond Plus.
Refers generally to the time required to heat the relevant solid to pyrolysis temperature, where pyrolysis occurs at a rate sufficient to form a flammable mixture. A material's time to ignition depends on the heat flux and the material's thermal inertia. Where the applied heat flux is increased, and/or a material has a lower thermal inertia, the time to ignition decreases
On 10 Aug 2018, a "ban notice" was issued under s 9(1) of the Building Products (Safety) Act 2017 (NSW).
The ability of the material to transfer thermal energy internally
represents the ease with which the surface temperature of a material will change, where materials with high thermal inertia are slow to react to changes in temperature. The thermal inertia of a material is a product of its thermal conductivity, the density of the material, and the material's specific heat capacity. Materials with a low thermal inertia will initially experience more rapid pyrolysis than materials with high thermal inertia.
Representative of the Shore Developers and Prestige Apartments.
M.S. McLaggan et al, "Towards a better understanding of fire performance assessment of façade systems: Current situation and proposed new assessment framework" (2021) 300 Construction and Building Materials.
Professor Torero and Associate Professor Lange were two of the co-authors of this article.
Trade Practices Act 1974 (Cth)
Victor Robert Bryce Lake and Associates Pty Ltd - architects of the Shore Building.
The architects of the Shore Building - Victor Robert Bryce Lake & Associates Pty Ltd.
X-ray Powder Diffraction - a method routinely used in the characterisation of solid compounds. One of the methods used by Expert Group 1 (Chemists) in testing the chemical composition of Alucobond Plus.
The Owners - Strata Plan No 87231
3A Composites GmbH
Actol Pty Ltd v Rise Products [2022] NSWCATCD 150
Agtrack (NT) Pty Ltd t/as Spring Air v Hatfield (2003) 7 VR 63; [2003] VSCA 6
Air Link Pty Ltd v Paterson (No 2) (2003) 58 NSWLR 388; [2003] NSWCA 251
Alcan Gove Pty Ltd v Zabic [2015] HCA 33; (2015) 257 CLR 1
Anchorage Capital Partners Pty Ltd v ACPA Pty Ltd (2018) 259 FCR 514; [2018] FCAFC 6
Australian Competition and Consumer Commission v Birubi Art Pty Ltd [2018] FCA 1595
Australian Competition and Consumer Commission v Coles Supermarkets Australia Pty Ltd [2014] FCA 634; (2014) 317 ALR 73
Australian Competition and Consumer Commission v Flight Centre Travel Group Ltd (2016) 261 CLR 203; [2016] HCA 49
Australian Competition and Consumer Commission v HJ Heinz Co Australia Ltd (2018) 363 ALR 136; [2018] FCA 360
Australian Competition and Consumer Commission v Jayco Corporation Pty Ltd [2020] FCA 1672
Australian Competition and Consumer Commission v Meriton Property Services Pty Ltd (2017) 350 ALR 494; [2017] FCA 1305
Australian Competition and Consumer Commission v TPG Internet Pty Ltd (2013) 250 CLR 640; [2014] HCA 53
Australian Competition and Consumer Commission v Valve Corporation (No 3) (2016) 337 ALR 647; [2016] FCA 196
Australian Competition and Consumer Commission v Woolworths Group Ltd (2020) 281 FCR 108; [2020] FCAFC 162
Australian Securities and Investments Commission v Australian Property Custodian Holdings Limited (Receivers and Managers appointed) (in liquidation) (Controllers appointed) (No 2) [2013] FCA 409; (2013) 213 FCR 289
Barton v Croner Trading Pty Ltd [1984] FCA 195; (1984) 3 FCR 95
Bed Bath 'N' Table Pty Ltd v Global Retail Brands Australia Pty Ltd (No 3) [2024] FCA 226
Bellgrove v Eldridge [1954] HCA 36; (1954) 90 CLR 613
Body Corporate Number DPS 91535 v 3A Composites GmbH (2023) 16 TCLR 719; [2023] NZCA 647
Body Corporate Number DPS 91535 v 3A Composites GmbH [2022] NZCCLR 4; [2022] NZHC 985
Body Corporate Number DPS 91535 v 3A Composites GmbH [2024] NZSC 53
Bowen Investments Pty Ltd v Tabcorp Holdings Ltd (2008) 166 FCR 494; [2008] FCAFC 38
Bunnings Group Ltd v Laminex Group Ltd (2006) 153 FCR 479; [2006] FCA 682
Butcher v Lachlan Elder Realty Pty Ltd [2004] HCA 60; (2004) 218 CLR 592
Campbell v Gebo Investments (Labuan) Ltd (2005) 190 FLR 209; [2005] NSWSC 544
Campomar Sociedad, Limitada v Nike International Ltd [2000] HCA 12; (2000) 202 CLR 45
Capic v Ford Motor Co of Australia Pty Ltd (2021) 154 ACSR 235; [2021] FCA 715
Capic v Ford Motor Company of Australia Pty Ltd (2024) 419 ALR 437; [2024] HCA 39
Capic v Ford Motor Company of Australia Pty Ltd (Supplementary Common Questions and Other Issues) [2026] FCA 38
Cassidy v Saatchi & Saatchi Australia Pty Ltd (2004) 134 FCR 585; [2004] FCAFC 34
Chief Executive Officer of Customs v Adelaide Brighton Cement Ltd (2004) 139 FCR 147; [2004] FCAFC 183
Commonwealth of Australia v Shaw (2006) 66 NSWLR 325; [2006] NSWCA 209
Commonwealth v Amann (1991) 174 CLR 64; [1991] HCA 54
Concrete Constructions (NSW) Pty Ltd v Nelson [1990] HCA 17; (1990) 169 CLR 594
Cook v Pasminco Ltd (2000) 99 FCR 548; [2000] FCA 677
Cyril Smith & Associates Pty Ltd v The Owners-Strata Plan No. 64970 [2011] NSWCA 181
David Grant & Co Pty Ltd v Westpac Banking Corporation [1995] HCA 43; (1995) 184 CLR 265
Downey v Carlson Hotels Asia Pacific Pty Ltd [2005] QCA 199
Ethicon Sàrl and Others v Gill and Others (2021) 288 FCR 338; [2021] FCAFC 29
Ethicon Sàrl v Gill (2018) 264 FCR 394; [2018] FCAFC 137
Ezy Fit Engineering Group Pty Limited v Microm Nominees Pty Limited [2024] FCA 441
Facebook Inc v Australian Information Commissioner (2022) 289 FCR 217; [2022] FCAFC 9
First Mortgage Managed Investments Ltd v Oberlechner [2006] NSWSC 1397
Ford Motor Company of Australia Pty Ltd v Capic (2023) 300 FCR 1; [2023] FCAFC 179
Gardam v George Wills & Co Ltd [1988] FCA 289; (1988) 82 ALR 415 at 427
Gardez Nominees Pty Ltd v NSW Self Insurance Corporation [2016] NSWSC 532
Gibson v Malaysian Airline System Berhad [2016] FCA 1476
Gill v Ethicon Sàrl (No 5) [2019] FCA 1905
Graham Barclay Oysters Pty Ltd v Ryan (2000) 102 FCR 307; [2000] FCA 1099
H Lundbeck A/S v Sandoz Pty Ltd (2022) 276 CLR 170; [2022] HCA 4
Henville v Walker (2001) 206 CLR 459; [2001] HCA 52
Impiombato v BHP Group Ltd (2025) 308 FCR 250; [2025] FCAFC 9
Kain v R&B Investments Pty Ltd [2025] HCA 28; 423 ALR 413
Karpik v Carnival plc (2023) 280 CLR 640; [2023] HCA 39 at [41]
Kirby v Coote [2006] QCA 61
Luckins (Receiver and Manager of Australian Trailways Pty Ltd) v Highway Motel (Carnarvon) Pty Ltd [1975] HCA 50; (1975) 133 CLR 164
Magman International Pty Ltd v Westpac Banking Corporation [1991] FCA 41; (1991) 32 FCR 1
McGraw-Hill Financial, Inc v Clurname Pty Ltd (2017) 123 ACSR 467; [2017] FCAFC 211
Medtel Pty Ltd v Courtney (2003) 130 FCR 182; [2003] FCAFC 151
Merck Sharp & Dohme (Australia) Pty Ltd v Peterson (2011) 196 FCR 145; [2011] FCAFC 128
Miller & Associates Insurance Broking Pty Ltd v BMW Australia Finance Ltd (2010) 241 CLR 357; [2010] HCA 31
Moore v Scenic Tours Pty Ltd (2020) 268 CLR 326; [2020] HCA 17
Mount Bruce Mining Pty Ltd v Wright Prospecting Pty Ltd (2015) 256 CLR 104; [2015] HCA 37
Murphy Operator & Ors v Gladstone Ports Corporation (No 9) [2023] QSC 035
Murphy v Overton Investments Pty Ltd (2004) 216 CLR 388; [2004] HCA 3
Norcast S.ár.L v Bradken Ltd (No 2) (2013) 219 FCR 14; [2013] FCA 235
Overlook v Foxtel (2002) ATPR (Digest) 46-219; [2002] NSWSC 17
Owners SP 92450 v JKN Para 1 Pty Ltd [2023] NSWCA 114
Peterson v Merck Sharpe & Dohme (Aust) Pty Ltd (2010) 184 FCR 1; [2010] FCA 180
Purkess v Crittenden [1965] HCA 34; (1965) 114 CLR 164 at 168; [1965] HCA 34
RB (Hygiene Home) Australia Pty Ltd v SC Johnson & Son Pty Ltd [2020] FCA 1783
Rural Press Ltd v Australian Competition and Consumer Commission (2003) 216 CLR 53; [2003] HCA 75
Scarcella v Lettice [2000] NSWCA 289; (2000) 51 NSWLR 302
Self Care IP Holdings Pty Ltd v Allergan Australia Pty Ltd (2023) 277 CLR 186; [2023] HCA 8
Sportscorp Australia Pty Ltd v Chief Commissioner of State Revenue (2004) 213 ALR 795; [2004] NSWSC 1029
Strata Plan 88695 v Metlege [2025] NSWSC 535
Street v Luna Park Sydney Pty Ltd [2006] NSWSC 230
Sutherland Shire Council v Heyman [1985] HCA 41; (1985) 157 CLR 424
Sydney Subdivision Pty Ltd (in liq) v Chow [2023] FCA 8
Tabcorp Holdings Ltd v Bowen Investments Pty Ltd (2009) 236 CLR 272; [2009] HCA 8
Tanah Merah Vic Pty Ltd v Owners Corporation No 1 of PS613436T [2021] VSCA 72
Taylor Construction Group Pty Ltd v Strata Plan 9288 t/as The Owners Strata Plan 9288 [2021] NSWSC 1315
The Owners - Strata Plan No 91086 v Fairview Architectural Pty Ltd (No 3) [2023] FCA 814
The Owners - Strata Plan No 91322 v Trustees of the Roman Catholic Church for the Archdiocese of Sydney [2019] NSWCA 89
The Owners-Strata Plan No 87231 v 3A Composites GmbH (No 2) [2020] FCA 333
Theo Holdings Pty Ltd v Hockey (2000) 99 FCR 232; [2000] FCA 665
Toyota Motor Corporation Australia Limited v Williams (2023) 296 FCR 514; [2023] FCAFC 50
Valve Corporation v Australian Competition and Consumer Commission (2017) 258 FCR 190; [2017] FCAFC 224
Vautin v BY Winddown, Inc. (formerly Bertram Yachts) (No 4) (2018) 362 ALR 702; [2018] FCA 426
Voth v Manildra Flour Mills Pty Ltd [1990] HCA 55; (1990) 171 CLR 538
W & A McArthur Ltd v Queensland [1920] HCA 77; (1920) 28 CLR 530
Ward Group Pty Ltd v Brodie & Stone Plc (2005) 143 FCR 479; [2005] FCA 471
Wardley Australia Ltd v Western Australia [1992] HCA 55; (1992) 175 CLR 514
Webb Distributors (Aust) Pty Ltd v Victoria [1993] HCA 61; (1993) 179 CLR 15
Williams v Toyota Motor Corp Australia Ltd (2024) 419 ALR 373; [2024] HCA 38
Williams v Toyota Motor Corp Australia Ltd (Initial Trial) [2022] FCA 344
(1920) 28 CLR 530
(2005) 143 FCR 479
(1993) 179 CLR 15
(2000) 175 ALR 50
(2002) 118 FCR 1
(1982) 149 CLR 191
(1992) 38 FCR 1
(1983) 78 FLR 171
(2015) 113 IPR 11
(2018) 259 FCR 514
(2018) 363 ALR 136
(2013) 250 CLR 640
(2020) 281 FCR 108
(2004) 218 CLR 592
(2018) 264 FCR 394
(1985) 157 CLR 215
(1988) 164 CLR 539
(2020) 268 CLR 326
(2013) 219 FCR 14
(2010) 184 FCR 1
(1998) 194 CLR 355
(2000) 51 NSWLR 302
(2004) 213 ALR 795
(2009) 236 CLR 272
(2000) 99 FCR 232
(1990) 171 CLR 538
(1966) 115 CLR 10
(1990) 171 CLR 338
(1985) 4 IPR 227
(1933) 50 CLR 268
(2013) 249 CLR 435
(2003) 58 NSWLR 388
(2015) 257 CLR 1
(2013) 213 FCR 289
(2008) 166 FCR 494
(2006) 153 FCR 479
(2009) 238 CLR 304
(2024) 419 ALR 437
(2004) 134 FCR 585
(2004) 139 FCR 147
(2006) 66 NSWLR 325
(1993) 42 FCR 470
(2003) 7 VR 63
(2014) 317 ALR 73
(2016) 261 CLR 203
(2017) 350 ALR 494
(2016) 337 ALR 647
(1984) 3 FCR 95
(1954) 90 CLR 613
(1971) 126 CLR 376
(2005) 190 FLR 209
(2000) 202 CLR 45
(1991) 174 CLR 64
(2000) 99 FCR 548
(1995) 184 CLR 265
(2021) 288 FCR 338
(2001) 206 CLR 459
(1975) 133 CLR 164
(1991) 32 FCR 1
(2011) 196 FCR 145
(2010) 241 CLR 357
(2015) 256 CLR 104
(2004) 216 CLR 388
(1965) 114 CLR 164
(2003) 216 CLR 53
(2023) 277 CLR 186
(1985) 157 CLR 424
(2023) 296 FCR 514
(2017) 258 FCR 190
(2018) 362 ALR 702
(2024) 419 ALR 373
(1998) 83 ALR 299
(1980) 144 CLR 1
(1979) 142 CLR 509
(1990) 21 FCR 241
(1985) 7 FCR 195
(2015) 317 ALR 73
(1990) 169 CLR 594
(1987) 78 ALR 19
(2022) 289 FCR 217
(2023) 300 FCR 1
(1988) 82 ALR 415
(2000) 102 FCR 307
(2022) 276 CLR 170
(2025) 308 FCR 250
(2023) 280 CLR 640
(2003) 130 FCR 182
(2003) 132 FCR 437
(1992) 175 CLR 514
(2005) 143 FCR 345
(1991) 172 CLR 32
(1991) 99 ALR 325
(2011) 195 FCR 234
(2007) 74 IPR 495
(2004) 62 IPR 184
(2008) 165 FCR 230
(2015) 48 WAR 139