Petroleum and Gas (General Provisions) Regulation 2017
In ForceQLD
Jurisdiction
Queensland
Act Number
162 of 2017
Collection
regulation
Plain English Summary
7/10 complexity
This Regulation sets technical rules for petroleum and gas tenures: it defines which substances count as petroleum, fuel gas or regulated hydrogen; prescribes mandatory reports and notices (wells, seismic surveys, production, hydraulic fracturing) and sample‑keeping; sets meter accuracy, measurement and reporting methods; and fixes fees, rents and security forms. It applies to tenure and licence holders, pipeline and facility operators, contractors and affected landowners and defines what data the chief executive or Minister may publish (secs 36, 45, 58–61, 64). It raises compliance, metering and reporting costs and gives officials approval and publication discretion (secs 55, 57, 52, 53).
Mechanically, the Petroleum and Gas (General Provisions) Regulation 2017 prescribes a set of reporting, recordkeeping, sampling, metering, fee and security rules that operate under the Petroleum and Gas (Production and Safety) Act 2004 (the 2004 Act) and the Petroleum Act 1923 (the 1923 Act). The regulation: prescribes substances to be treated as petroleum, fuel gas or regulated hydrogen for specified purposes of the 2004 Act (secs 5, 6, 6A); sets out a wide range of notice and reporting obligations for tenure holders and licence holders, including notices for drilling, testing, seismic and hydraulic fracturing, daily drilling logs, well completion, abandonment and a variety of periodic reports (secs 8 to 45); prescribes the contents and confidentiality periods for required information that is lodged under the Acts (secs 52 to 53 and schedule 1 references); sets parameters for metering, measurement accuracy, inspection intervals and conversion methods (secs 58 to 63); details measurement and reporting for non associated water taken under a petroleum tenure (secs 54 to 57); specifies fees, rents, security forms and rates, and payment rules including a formula for a pipeline licence annual fee linked to State funding commitments to national energy market regulation (secs 64 to 71, 66A); and governs practical matters such as sample handling and retention, ways of lodging documents, and transitional arrangements (secs 47 to 51, 74, 75 to 77).
The regulation frequently ties its prescriptions back to particular provisions in the 2004 Act and the 1923 Act, for example prescribing what must appear in an authority to prospect work program (s 8) and the content of petroleum lease development plans (s 9). It sets timeframes for lodgement of notices and reports, for example 10 business days for many pre activity notices and 60 business days for several periodic reports (secs 29, 31, 32, 36, 38, 39, 42, 43). For hydraulic fracturing there are both pre activity notice requirements and substantive completion reporting obligations including a hydraulic fracturing fluid statement, with a maximum penalty for failing to include the fluid statement (s 45(4), penalty 20 penalty units). The regulation also prescribes forms of security acceptable to the State (cash, electronic transfer, an unconditional bank security) and fixed amounts for particular authorities (s 71). Measurement tolerances and checking frequencies are regulated according to throughput bands, including requirements for flow computers and checking every three months for meters over 1PJ per year (secs 58 to 61).
Current sections
Direct links to the current provisions in Petroleum and Gas (General Provisions) Regulation 2017.
113
pt.1
Preliminary
Preliminary
pt.1-div.1
Introduction
Introduction
sec.1
Short title
sec.1 Short title
This regulation may be cited as the Petroleum and Gas (General Provisions) Regulation 2017 .
sec.2
Commencement
sec.2 Commencement
This regulation commences on 1 September 2017.
pt.1-div.2
Interpretation
Interpretation
sec.3
Definitions
sec.3 Definitions
The dictionary in schedule 5 defines particular words used in this regulation.
sec.4
References to particular resource authorities and wells under this regulation
sec.4 References to particular resource authorities and wells under this regulation
A reference in this regulation to an authority to prospect is a reference to—
an authority to prospect under the 2004 Act ; and
an authority to prospect under the 1923 Act .
A reference in this regulation to a petroleum lease is a reference to—
a petroleum lease under the 2004 Act ; and
a lease under the 1923 Act .
A reference in this regulation to a petroleum tenure is a reference to—
a 2004 Act petroleum tenure; and
an authority to prospect and a lease under the 1923 Act .
A reference in this regulation to a petroleum well includes a reference to a well under the 1923 Act .
(sec.4-ssec.1) A reference in this regulation to an authority to prospect is a reference to— an authority to prospect under the 2004 Act ; and an authority to prospect under the 1923 Act .
(sec.4-ssec.2) A reference in this regulation to a petroleum lease is a reference to— a petroleum lease under the 2004 Act ; and a lease under the 1923 Act .
(sec.4-ssec.3) A reference in this regulation to a petroleum tenure is a reference to— a 2004 Act petroleum tenure; and an authority to prospect and a lease under the 1923 Act .
(sec.4-ssec.4) A reference in this regulation to a petroleum well includes a reference to a well under the 1923 Act .
(a) an authority to prospect under the 2004 Act ; and
(b) an authority to prospect under the 1923 Act .
(a) a petroleum lease under the 2004 Act ; and
(b) a lease under the 1923 Act .
(a) a 2004 Act petroleum tenure; and
(b) an authority to prospect and a lease under the 1923 Act .
pt.2
Substances prescribed for the 2004 Act
Substances prescribed for the 2004 Act
sec.5
Substances that are petroleum
sec.5 Substances that are petroleum
For the 2004 Act , section 10 (1) (d) , the following substances are prescribed—
biogas;
biomethane;
a substance that is a mixture of LPG and air, known as ‘synthetic natural gas’.
However, subsection (1) applies only for the purposes of the following provisions of that Act—
chapters 8 to 10; and
chapters 11 to 14, to the extent they apply for chapters 8 to 10.
For the 2004 Act , section 10 (1) (e) , carbon dioxide is prescribed.
However, subsection (3) applies only—
to a survey licence holder investigating and surveying an area for its potential and suitability for the construction and operation of pipelines for transporting carbon dioxide; or
to an authority to prospect holder evaluating or testing natural underground reservoirs for the storage of petroleum under the 2004 Act , section 32 (1) (d) if—
the testing is carried out on a particular block of the authority within—
2 years after the testing starts; or
a longer period decided by the Minister within the 2 years; and
the Minister approves the testing on the particular block; and
the holder complies with any conditions the Minister imposes on the approval.
s 5 amd 2021 SL No. 75 s 21
(sec.5-ssec.1) For the 2004 Act , section 10 (1) (d) , the following substances are prescribed— biogas; biomethane; a substance that is a mixture of LPG and air, known as ‘synthetic natural gas’.
(sec.5-ssec.2) However, subsection (1) applies only for the purposes of the following provisions of that Act— chapters 8 to 10; and chapters 11 to 14, to the extent they apply for chapters 8 to 10.
(sec.5-ssec.3) For the 2004 Act , section 10 (1) (e) , carbon dioxide is prescribed.
(sec.5-ssec.4) However, subsection (3) applies only— to a survey licence holder investigating and surveying an area for its potential and suitability for the construction and operation of pipelines for transporting carbon dioxide; or to an authority to prospect holder evaluating or testing natural underground reservoirs for the storage of petroleum under the 2004 Act , section 32 (1) (d) if— the testing is carried out on a particular block of the authority within— 2 years after the testing starts; or a longer period decided by the Minister within the 2 years; and the Minister approves the testing on the particular block; and the holder complies with any conditions the Minister imposes on the approval.
(a) biogas;
(b) biomethane;
(c) a substance that is a mixture of LPG and air, known as ‘synthetic natural gas’.
(a) chapters 8 to 10; and
(b) chapters 11 to 14, to the extent they apply for chapters 8 to 10.
(a) to a survey licence holder investigating and surveying an area for its potential and suitability for the construction and operation of pipelines for transporting carbon dioxide; or
(b) to an authority to prospect holder evaluating or testing natural underground reservoirs for the storage of petroleum under the 2004 Act , section 32 (1) (d) if— (i) the testing is carried out on a particular block of the authority within— (A) 2 years after the testing starts; or (B) a longer period decided by the Minister within the 2 years; and (ii) the Minister approves the testing on the particular block; and (iii) the holder complies with any conditions the Minister imposes on the approval.
(i) the testing is carried out on a particular block of the authority within— (A) 2 years after the testing starts; or (B) a longer period decided by the Minister within the 2 years; and
(A) 2 years after the testing starts; or
(B) a longer period decided by the Minister within the 2 years; and
(ii) the Minister approves the testing on the particular block; and
(iii) the holder complies with any conditions the Minister imposes on the approval.
(i) the testing is carried out on a particular block of the authority within— (A) 2 years after the testing starts; or (B) a longer period decided by the Minister within the 2 years; and
(A) 2 years after the testing starts; or
(B) a longer period decided by the Minister within the 2 years; and
(ii) the Minister approves the testing on the particular block; and
(iii) the holder complies with any conditions the Minister imposes on the approval.
(A) 2 years after the testing starts; or
(B) a longer period decided by the Minister within the 2 years; and
sec.6
Substances that are fuel gas
sec.6 Substances that are fuel gas
For the 2004 Act , section 11 (2) (d) , the following substances are prescribed—
biogas;
biomethane;
synthetic methane;
a substance that is a mixture of LPG and air, known as ‘synthetic natural gas’.
In this section—
synthetic methane means a substance—
that is in a gaseous state at standard temperature and pressure; and
the principal constituent of which is methane; and
that is produced by the methanation of carbon dioxide; and
that is suitable for consumption.
s 6 amd 2021 SL No. 75 s 22
sub 2024 SL No. 32 s 4
(sec.6-ssec.1) For the 2004 Act , section 11 (2) (d) , the following substances are prescribed— biogas; biomethane; synthetic methane; a substance that is a mixture of LPG and air, known as ‘synthetic natural gas’.
(sec.6-ssec.2) In this section— synthetic methane means a substance— that is in a gaseous state at standard temperature and pressure; and the principal constituent of which is methane; and that is produced by the methanation of carbon dioxide; and that is suitable for consumption.
(a) biogas;
(b) biomethane;
(c) synthetic methane;
(d) a substance that is a mixture of LPG and air, known as ‘synthetic natural gas’.
(a) that is in a gaseous state at standard temperature and pressure; and
(b) the principal constituent of which is methane; and
(c) that is produced by the methanation of carbon dioxide; and
(d) that is suitable for consumption.
sec.6A
Substances that are regulated hydrogen
sec.6A Substances that are regulated hydrogen
For the 2004 Act , section 11A (c) , the following substances are prescribed—
ammonia;
dimethyl-ether;
methanol;
methyl-cyclohexane (MCH);
toluene.
s 6A ins 2024 SL No. 32 s 4
(a) ammonia;
(b) dimethyl-ether;
(c) methanol;
(d) methyl-cyclohexane (MCH);
(e) toluene.
sec.7
Substance that may be transported under condition of pipeline licence
sec.7 Substance that may be transported under condition of pipeline licence
For the 2004 Act , section 402 (1) (b) , a distilled petroleum substance is prescribed.
In this section—
distilled petroleum substance means a substance—
produced by distilling crude oil; and
that consists of, or includes, hydrocarbons.
diesel, petrol, kerosene
(sec.7-ssec.1) For the 2004 Act , section 402 (1) (b) , a distilled petroleum substance is prescribed.
(sec.7-ssec.2) In this section— distilled petroleum substance means a substance— produced by distilling crude oil; and that consists of, or includes, hydrocarbons. diesel, petrol, kerosene
(a) produced by distilling crude oil; and
(b) that consists of, or includes, hydrocarbons.
pt.3
Reporting
Reporting
pt.3-div.1
Exploring for and producing petroleum
Exploring for and producing petroleum
sec.8
Authority to prospect—proposed work program
sec.8 Authority to prospect—proposed work program
For the 2004 Act , section 48 (2) (d) and the 1923 Act , section 25A (1) (i) , the matters prescribed in relation to an authority to prospect are—
a description of the geological model for the area of the authority to prospect; and
an assessment of the potential for petroleum discovery in the area; and
the rationale, in relation to the geological model for the area, for the activities proposed to be carried out under the authority to prospect.
s 8 amd 2022 SL No. 191 s 5
(a) a description of the geological model for the area of the authority to prospect; and
(b) an assessment of the potential for petroleum discovery in the area; and
(c) the rationale, in relation to the geological model for the area, for the activities proposed to be carried out under the authority to prospect.
sec.9
Petroleum lease—proposed development plan
sec.9 Petroleum lease—proposed development plan
For the 2004 Act , section 138 (1) (g) and the 1923 Act , section 53A (1) (g) , the matters prescribed in relation to a petroleum lease are—
for each natural underground reservoir within the area of the lease of which the applicant is aware, the location of the boundaries of—
the proved and probable reserves of petroleum in the reservoir; or
the reserves of petroleum in the reservoir worked out in another way approved by the chief executive; and
details, including the location, type and size, of any planned infrastructure intended to be located within the area of the lease or proposed lease.
plant or works, including, for example, communication systems, compressors, powerlines, pumping stations, reservoirs, roads, evaporation or storage ponds and tanks
temporary structures or structures of an industrial or technical nature, including, for example, mobile and temporary camps
(a) for each natural underground reservoir within the area of the lease of which the applicant is aware, the location of the boundaries of— (i) the proved and probable reserves of petroleum in the reservoir; or (ii) the reserves of petroleum in the reservoir worked out in another way approved by the chief executive; and
(i) the proved and probable reserves of petroleum in the reservoir; or
(ii) the reserves of petroleum in the reservoir worked out in another way approved by the chief executive; and
(b) details, including the location, type and size, of any planned infrastructure intended to be located within the area of the lease or proposed lease. Examples of infrastructure— 1 plant or works, including, for example, communication systems, compressors, powerlines, pumping stations, reservoirs, roads, evaporation or storage ponds and tanks 2 temporary structures or structures of an industrial or technical nature, including, for example, mobile and temporary camps
1 plant or works, including, for example, communication systems, compressors, powerlines, pumping stations, reservoirs, roads, evaporation or storage ponds and tanks
2 temporary structures or structures of an industrial or technical nature, including, for example, mobile and temporary camps
(i) the proved and probable reserves of petroleum in the reservoir; or
(ii) the reserves of petroleum in the reservoir worked out in another way approved by the chief executive; and
1 plant or works, including, for example, communication systems, compressors, powerlines, pumping stations, reservoirs, roads, evaporation or storage ponds and tanks
2 temporary structures or structures of an industrial or technical nature, including, for example, mobile and temporary camps
sec.10
Shorter period to change production commencement day
sec.10 Shorter period to change production commencement day
For the 2004 Act , section 175AA (b) , the shorter period is 3 months.
sec.11
Notice about conversion of petroleum well to bore
sec.11 Notice about conversion of petroleum well to bore
For the 2004 Act , section 284 and the 1923 Act , section 75M , the information is—
a description of the location of the bore; and
the day on which the petroleum well was converted to a bore.
(a) a description of the location of the bore; and
(b) the day on which the petroleum well was converted to a bore.
sec.12
Notice about bore to Water Act regulator
sec.12 Notice about bore to Water Act regulator
For the 2004 Act , section 543A (2) and the 1923 Act , section 75XA (2) , the following information about a bore is prescribed—
the name and postal address of the holder of the petroleum tenure or water monitoring authority for the area containing the bore;
the identifying name of the bore;
a description of the location of the bore;
the purpose of the bore;
the diameter and depth in metres of the bore;
the following days—
the day the drilling of the bore started;
the last day the drilling rig was used to drill the bore;
the drilling method used to drill the bore;
details of the casing, centralisers and equipment installed in the bore, including the type and location of centralisers;
the type of any slots or perforations in the casing, or screens installed, for water entry and the depth in metres of the top and bottom of the slots, perforations or screens;
details of the cementing in the bore, including the type of cement used and the depth in metres of the top and bottom of each cemented interval;
a geological interpretation of the bore, including the stratigraphy of the rock units it intersects;
details of the water produced by each stratum of rock, including—
the quality and supply rate of the water; and
the depth at which the water is struck; and
the depth to which the water naturally rises;
if, on completion, the bore is a subartesian bore—
the depth in metres to the standing water level, and either the pump suction inlet or bottom of the drill stem; and
details of the test used to estimate the groundwater supply rate;
if, on completion, the bore is an artesian bore—
the rate of flow of unimpeded water from the bore at the surface; and
the pressure head of the water mentioned in subparagraph (i) ; and
the temperature of the groundwater.
The information mentioned in subsection (1) must be given to the Water Act regulator in the approved form.
(sec.12-ssec.1) For the 2004 Act , section 543A (2) and the 1923 Act , section 75XA (2) , the following information about a bore is prescribed— the name and postal address of the holder of the petroleum tenure or water monitoring authority for the area containing the bore; the identifying name of the bore; a description of the location of the bore; the purpose of the bore; the diameter and depth in metres of the bore; the following days— the day the drilling of the bore started; the last day the drilling rig was used to drill the bore; the drilling method used to drill the bore; details of the casing, centralisers and equipment installed in the bore, including the type and location of centralisers; the type of any slots or perforations in the casing, or screens installed, for water entry and the depth in metres of the top and bottom of the slots, perforations or screens; details of the cementing in the bore, including the type of cement used and the depth in metres of the top and bottom of each cemented interval; a geological interpretation of the bore, including the stratigraphy of the rock units it intersects; details of the water produced by each stratum of rock, including— the quality and supply rate of the water; and the depth at which the water is struck; and the depth to which the water naturally rises; if, on completion, the bore is a subartesian bore— the depth in metres to the standing water level, and either the pump suction inlet or bottom of the drill stem; and details of the test used to estimate the groundwater supply rate; if, on completion, the bore is an artesian bore— the rate of flow of unimpeded water from the bore at the surface; and the pressure head of the water mentioned in subparagraph (i) ; and the temperature of the groundwater.
(sec.12-ssec.2) The information mentioned in subsection (1) must be given to the Water Act regulator in the approved form.
(a) the name and postal address of the holder of the petroleum tenure or water monitoring authority for the area containing the bore;
(b) the identifying name of the bore;
(c) a description of the location of the bore;
(d) the purpose of the bore;
(e) the diameter and depth in metres of the bore;
(f) the following days— (i) the day the drilling of the bore started; (ii) the last day the drilling rig was used to drill the bore;
(i) the day the drilling of the bore started;
(ii) the last day the drilling rig was used to drill the bore;
(g) the drilling method used to drill the bore;
(h) details of the casing, centralisers and equipment installed in the bore, including the type and location of centralisers;
(i) the type of any slots or perforations in the casing, or screens installed, for water entry and the depth in metres of the top and bottom of the slots, perforations or screens;
(j) details of the cementing in the bore, including the type of cement used and the depth in metres of the top and bottom of each cemented interval;
(k) a geological interpretation of the bore, including the stratigraphy of the rock units it intersects;
(l) details of the water produced by each stratum of rock, including— (i) the quality and supply rate of the water; and (ii) the depth at which the water is struck; and (iii) the depth to which the water naturally rises;
(i) the quality and supply rate of the water; and
(ii) the depth at which the water is struck; and
(iii) the depth to which the water naturally rises;
(m) if, on completion, the bore is a subartesian bore— (i) the depth in metres to the standing water level, and either the pump suction inlet or bottom of the drill stem; and (ii) details of the test used to estimate the groundwater supply rate;
(i) the depth in metres to the standing water level, and either the pump suction inlet or bottom of the drill stem; and
(ii) details of the test used to estimate the groundwater supply rate;
(n) if, on completion, the bore is an artesian bore— (i) the rate of flow of unimpeded water from the bore at the surface; and (ii) the pressure head of the water mentioned in subparagraph (i) ; and (iii) the temperature of the groundwater.
(i) the rate of flow of unimpeded water from the bore at the surface; and
(ii) the pressure head of the water mentioned in subparagraph (i) ; and
(iii) the temperature of the groundwater.
(i) the day the drilling of the bore started;
(ii) the last day the drilling rig was used to drill the bore;
(i) the quality and supply rate of the water; and
(ii) the depth at which the water is struck; and
(iii) the depth to which the water naturally rises;
(i) the depth in metres to the standing water level, and either the pump suction inlet or bottom of the drill stem; and
(ii) details of the test used to estimate the groundwater supply rate;
(i) the rate of flow of unimpeded water from the bore at the surface; and
(ii) the pressure head of the water mentioned in subparagraph (i) ; and
(iii) the temperature of the groundwater.
sec.13
Pipeline licence or petroleum facility licence—annual report
sec.13 Pipeline licence or petroleum facility licence—annual report
For the 2004 Act , section 552 (2) , the following information is prescribed—
the authorised activities for the pipeline licence or petroleum facility licence carried out during the period to which the report relates;
a statement of the authorised activities proposed to be carried out under the licence during the next 12 months.
(a) the authorised activities for the pipeline licence or petroleum facility licence carried out during the period to which the report relates;
(b) a statement of the authorised activities proposed to be carried out under the licence during the next 12 months.
pt.3-div.2
Testing
Testing
sec.14
Notice about ATP production testing or PL production testing
sec.14 Notice about ATP production testing or PL production testing
For the 2004 Act , sections 71A (2) (a) and 150A (2) (a) , the following information is prescribed—
the identifying number of the authority to prospect or petroleum lease;
the day the testing started;
the identifying name of the petroleum well for which the testing is being carried out;
for each natural underground reservoir from which the testing is being carried out—
an identification of the reservoir including, for example, a description of the geological features of the reservoir; and
the type of reservoir; and
the depth in metres of the top and bottom of the reservoir;
details of any stimulation to be carried out during the testing;
See sections 33 and 34 for notice requirements relating to hydraulic fracturing activities.
details of the use, or intended use, of petroleum in a gaseous state produced during the testing.
for an authorised activity for the petroleum tenure, flaring, venting, processing
(a) the identifying number of the authority to prospect or petroleum lease;
(b) the day the testing started;
(c) the identifying name of the petroleum well for which the testing is being carried out;
(d) for each natural underground reservoir from which the testing is being carried out— (i) an identification of the reservoir including, for example, a description of the geological features of the reservoir; and (ii) the type of reservoir; and (iii) the depth in metres of the top and bottom of the reservoir;
(i) an identification of the reservoir including, for example, a description of the geological features of the reservoir; and
(ii) the type of reservoir; and
(iii) the depth in metres of the top and bottom of the reservoir;
(e) details of any stimulation to be carried out during the testing; Note— See sections 33 and 34 for notice requirements relating to hydraulic fracturing activities.
(f) details of the use, or intended use, of petroleum in a gaseous state produced during the testing. Examples of use, or intended use, of the petroleum— for an authorised activity for the petroleum tenure, flaring, venting, processing
(i) an identification of the reservoir including, for example, a description of the geological features of the reservoir; and
(ii) the type of reservoir; and
(iii) the depth in metres of the top and bottom of the reservoir;
sec.15
Notice about ATP storage testing or PL storage testing
sec.15 Notice about ATP storage testing or PL storage testing
For the 2004 Act , sections 71B (2) (a) and 150C (2) (a) , the following information is prescribed—
the identifying number of the authority to prospect or petroleum lease;
the day the testing started;
the identifying name of the petroleum well for which the testing is being carried out;
for each natural underground reservoir from which the testing is being carried out—
an identification of the reservoir including, for example, a description of the geological features of the reservoir; and
the type of reservoir; and
the depth in metres of the top and bottom of the reservoir;
details of substances to be used to carry out the testing.
(a) the identifying number of the authority to prospect or petroleum lease;
(b) the day the testing started;
(c) the identifying name of the petroleum well for which the testing is being carried out;
(d) for each natural underground reservoir from which the testing is being carried out— (i) an identification of the reservoir including, for example, a description of the geological features of the reservoir; and (ii) the type of reservoir; and (iii) the depth in metres of the top and bottom of the reservoir;
(i) an identification of the reservoir including, for example, a description of the geological features of the reservoir; and
(ii) the type of reservoir; and
(iii) the depth in metres of the top and bottom of the reservoir;
(e) details of substances to be used to carry out the testing.
(i) an identification of the reservoir including, for example, a description of the geological features of the reservoir; and
(ii) the type of reservoir; and
(iii) the depth in metres of the top and bottom of the reservoir;
sec.16
Notice about stopping of testing
sec.16 Notice about stopping of testing
For the 2004 Act , sections 71C and 150E the following information is prescribed—
the identifying number of the authority to prospect or petroleum lease;
the identifying name of the petroleum well for which the testing was carried out;
the day the testing started;
the day the testing stopped;
the reason the testing stopped.
(a) the identifying number of the authority to prospect or petroleum lease;
(b) the identifying name of the petroleum well for which the testing was carried out;
(c) the day the testing started;
(d) the day the testing stopped;
(e) the reason the testing stopped.
pt.3-div.3
Relinquishment, surrender, end of tenure and end of authority
Relinquishment, surrender, end of tenure and end of authority
sec.17
Definitions for division
sec.17 Definitions for division
In this division—
general area information , for a relinquishment report or surrender report for a petroleum tenure, see section 18 .
hazard information , for a relinquishment report or surrender report for a petroleum tenure, see section 19 .
relinquished area , for a relinquishment report for a petroleum tenure, means the part of the area of the tenure that is relinquished.
relinquishment report means a report required to be lodged—
under the 2004 Act , section 545 if part of the area of a petroleum tenure is relinquished under that Act; or
under the 1923 Act , section 75Z if part of the area of a petroleum tenure is relinquished under that Act.
surrendered area , for a surrender report for a petroleum tenure or pipeline licence, means the part of the area of the tenure or licence—
to be surrendered; and
for which approval of surrender is sought under the application.
surrender report means a report—
required under the 2004 Act , section 576 (2) to accompany an application, under that Act, for approval to surrender all or part of the area of a petroleum authority; or
required under the 1923 Act , section 21 (4) (b) (ii) to accompany an application, under that Act, for approval to surrender all or part of the area of an authority to prospect.
s 17 def surrender report amd 2019 SL No. 53 s 18
tenure information , for a relinquishment report for a petroleum tenure, see section 20 .
(a) under the 2004 Act , section 545 if part of the area of a petroleum tenure is relinquished under that Act; or
(b) under the 1923 Act , section 75Z if part of the area of a petroleum tenure is relinquished under that Act.
(a) to be surrendered; and
(b) for which approval of surrender is sought under the application.
(a) required under the 2004 Act , section 576 (2) to accompany an application, under that Act, for approval to surrender all or part of the area of a petroleum authority; or
(b) required under the 1923 Act , section 21 (4) (b) (ii) to accompany an application, under that Act, for approval to surrender all or part of the area of an authority to prospect.
sec.18
Meaning of general area information
sec.18 Meaning of general area information
The following information is general area information for a relinquishment report or surrender report for a petroleum tenure—
spatial information showing the location of—
the area of the tenure immediately before the relinquishment or surrender (the previous tenure area ); and
the relinquished area or surrendered area;
spatial information showing the leads and prospects in the relinquished area or surrendered area;
any other data or information for the report required under the practice direction.
s 18 amd 2020 SL No. 208 s 4
(a) spatial information showing the location of— (i) the area of the tenure immediately before the relinquishment or surrender (the previous tenure area ); and (ii) the relinquished area or surrendered area;
(i) the area of the tenure immediately before the relinquishment or surrender (the previous tenure area ); and
(ii) the relinquished area or surrendered area;
(b) spatial information showing the leads and prospects in the relinquished area or surrendered area;
(c) any other data or information for the report required under the practice direction.
(i) the area of the tenure immediately before the relinquishment or surrender (the previous tenure area ); and
(ii) the relinquished area or surrendered area;
sec.19
Meaning of hazard information
sec.19 Meaning of hazard information
In this division, hazard information for a relinquishment report or surrender report for a petroleum tenure means the following information for a hazard relating to activities carried out under the tenure—
the nature of the hazard;
the cause, or reasons for existence, of the hazard;
the location of the hazard;
measures taken to prevent or reduce the risk of the hazard to mitigate the effects of the hazard.
s 19 amd 2019 SL No. 89 s 6
sub 2020 SL No. 208 s 5
(a) the nature of the hazard;
(b) the cause, or reasons for existence, of the hazard;
(c) the location of the hazard;
(d) measures taken to prevent or reduce the risk of the hazard to mitigate the effects of the hazard.
sec.20
Meaning of tenure information
sec.20 Meaning of tenure information
The following information is tenure information for a relinquishment report for a petroleum tenure—
the day the relinquishment takes effect;
the period of the work program or development plan for the tenure;
the blocks or sub-blocks comprising the relinquished area.
s 20 amd 2020 SL No. 208 s 6
(a) the day the relinquishment takes effect;
(b) the period of the work program or development plan for the tenure;
(c) the blocks or sub-blocks comprising the relinquished area.
sec.21
Authority to prospect—relinquishment or surrender report
sec.21 Authority to prospect—relinquishment or surrender report
This section prescribes—
other information for a relinquishment report for an authority to prospect for the 2004 Act , section 545 (b) and the 1923 Act , section 75Z (b) ; and
information for a surrender report for an authority to prospect for the 1923 Act , section 21 (4) (b) (ii) .
The information is each of the following—
the tenure information for the report;
the general area information for the report;
a summary of the results of all authorised activities for the authority carried out in the relinquished area or surrendered area since the authority took effect and the conclusions drawn by the holder based on the results, including any identified leads and prospects;
the hazard information for the report;
for each year since the authority took effect—
for a relinquishment report—the volume of petroleum or water produced from each petroleum well or bore in the relinquished area; or
for a surrender report—the location of each natural underground reservoir in the surrendered area and the volume of petroleum or water produced from each reservoir;
the reason the holder has relinquished the relinquished area or is applying to surrender the surrendered area;
any other data or information for the report required under the practice direction.
s 21 amd 2020 SL No. 208 s 7
(sec.21-ssec.1) This section prescribes— other information for a relinquishment report for an authority to prospect for the 2004 Act , section 545 (b) and the 1923 Act , section 75Z (b) ; and information for a surrender report for an authority to prospect for the 1923 Act , section 21 (4) (b) (ii) .
(sec.21-ssec.2) The information is each of the following— the tenure information for the report; the general area information for the report; a summary of the results of all authorised activities for the authority carried out in the relinquished area or surrendered area since the authority took effect and the conclusions drawn by the holder based on the results, including any identified leads and prospects; the hazard information for the report; for each year since the authority took effect— for a relinquishment report—the volume of petroleum or water produced from each petroleum well or bore in the relinquished area; or for a surrender report—the location of each natural underground reservoir in the surrendered area and the volume of petroleum or water produced from each reservoir; the reason the holder has relinquished the relinquished area or is applying to surrender the surrendered area; any other data or information for the report required under the practice direction.
(a) other information for a relinquishment report for an authority to prospect for the 2004 Act , section 545 (b) and the 1923 Act , section 75Z (b) ; and
(b) information for a surrender report for an authority to prospect for the 1923 Act , section 21 (4) (b) (ii) .
(a) the tenure information for the report;
(b) the general area information for the report;
(c) a summary of the results of all authorised activities for the authority carried out in the relinquished area or surrendered area since the authority took effect and the conclusions drawn by the holder based on the results, including any identified leads and prospects;
(d) the hazard information for the report;
(e) for each year since the authority took effect— (i) for a relinquishment report—the volume of petroleum or water produced from each petroleum well or bore in the relinquished area; or (ii) for a surrender report—the location of each natural underground reservoir in the surrendered area and the volume of petroleum or water produced from each reservoir;
(i) for a relinquishment report—the volume of petroleum or water produced from each petroleum well or bore in the relinquished area; or
(ii) for a surrender report—the location of each natural underground reservoir in the surrendered area and the volume of petroleum or water produced from each reservoir;
(f) the reason the holder has relinquished the relinquished area or is applying to surrender the surrendered area;
(g) any other data or information for the report required under the practice direction.
(i) for a relinquishment report—the volume of petroleum or water produced from each petroleum well or bore in the relinquished area; or
(ii) for a surrender report—the location of each natural underground reservoir in the surrendered area and the volume of petroleum or water produced from each reservoir;
sec.22
Petroleum lease—relinquishment report
sec.22 Petroleum lease—relinquishment report
This section prescribes other information for a relinquishment report for a petroleum lease for the 2004 Act , section 545 (b) and the 1923 Act , section 75Z (b) .
The information is each of the following—
the tenure information for the report;
the general area information for the report;
for each year since the lease took effect—
the volume of petroleum produced under the lease from each petroleum well in the relinquished area; and
the volume of water produced from each bore in the relinquished area;
the geological model of the natural underground reservoirs in the relinquished area;
a summary of the results of all authorised activities for the lease carried out in the relinquished area since the lease took effect and the conclusions drawn by the holder based on the results, including any identified leads and prospects;
the hazard information for the report;
the reason the holder has relinquished the area;
any other data or information for the report required under the practice direction.
s 22 amd 2020 SL No. 208 s 8
(sec.22-ssec.1) This section prescribes other information for a relinquishment report for a petroleum lease for the 2004 Act , section 545 (b) and the 1923 Act , section 75Z (b) .
(sec.22-ssec.2) The information is each of the following— the tenure information for the report; the general area information for the report; for each year since the lease took effect— the volume of petroleum produced under the lease from each petroleum well in the relinquished area; and the volume of water produced from each bore in the relinquished area; the geological model of the natural underground reservoirs in the relinquished area; a summary of the results of all authorised activities for the lease carried out in the relinquished area since the lease took effect and the conclusions drawn by the holder based on the results, including any identified leads and prospects; the hazard information for the report; the reason the holder has relinquished the area; any other data or information for the report required under the practice direction.
(a) the tenure information for the report;
(b) the general area information for the report;
(c) for each year since the lease took effect— (i) the volume of petroleum produced under the lease from each petroleum well in the relinquished area; and (ii) the volume of water produced from each bore in the relinquished area;
(i) the volume of petroleum produced under the lease from each petroleum well in the relinquished area; and
(ii) the volume of water produced from each bore in the relinquished area;
(d) the geological model of the natural underground reservoirs in the relinquished area;
(e) a summary of the results of all authorised activities for the lease carried out in the relinquished area since the lease took effect and the conclusions drawn by the holder based on the results, including any identified leads and prospects;
(f) the hazard information for the report;
(g) the reason the holder has relinquished the area;
(h) any other data or information for the report required under the practice direction.
(i) the volume of petroleum produced under the lease from each petroleum well in the relinquished area; and
(ii) the volume of water produced from each bore in the relinquished area;
sec.23
Petroleum lease—surrender report
sec.23 Petroleum lease—surrender report
For the 2004 Act , section 576 (2) , the following information is prescribed for a surrender report for a petroleum lease—
the hazard information for the report;
spatial information showing the location in the surrendered area of—
each petroleum well and bore drilled under the lease; and
each seismic line used for a seismic survey carried out under the lease;
structure contour spatial information showing the seismic horizons (seismic reflectors) in the surrendered area;
spatial information showing the leads and prospects in the surrendered area;
the reason the holder has applied to surrender the part of the area of the lease;
any other data or information for the report required under the practice direction.
s 23 amd 2020 SL No. 208 s 9
(a) the hazard information for the report;
(b) spatial information showing the location in the surrendered area of— (i) each petroleum well and bore drilled under the lease; and (ii) each seismic line used for a seismic survey carried out under the lease;
(i) each petroleum well and bore drilled under the lease; and
(ii) each seismic line used for a seismic survey carried out under the lease;
(c) structure contour spatial information showing the seismic horizons (seismic reflectors) in the surrendered area;
(d) spatial information showing the leads and prospects in the surrendered area;
(e) the reason the holder has applied to surrender the part of the area of the lease;
(f) any other data or information for the report required under the practice direction.
(i) each petroleum well and bore drilled under the lease; and
(ii) each seismic line used for a seismic survey carried out under the lease;
sec.24
Pipeline licence—surrender report
sec.24 Pipeline licence—surrender report
For the 2004 Act , section 576 (2) , the following information is prescribed for a surrender report for a pipeline licence—
in relation to the licence—
the day the licence was granted; and
the term of the licence; and
a description of the surrendered area;
a description of, and spatial information showing, the location of the pipeline in the surrendered area, including access to the pipeline;
a summary of the methods used to decommission the pipeline;
details of all maintenance carried out on the pipeline during the term of the licence;
the hazard information for the licence;
any other data or information for the report required under the practice direction.
s 24 amd 2020 SL No. 208 s 10
(a) in relation to the licence— (i) the day the licence was granted; and (ii) the term of the licence; and (iii) a description of the surrendered area;
(i) the day the licence was granted; and
(ii) the term of the licence; and
(iii) a description of the surrendered area;
(b) a description of, and spatial information showing, the location of the pipeline in the surrendered area, including access to the pipeline;
(c) a summary of the methods used to decommission the pipeline;
(d) details of all maintenance carried out on the pipeline during the term of the licence;
(e) the hazard information for the licence;
(f) any other data or information for the report required under the practice direction.
(i) the day the licence was granted; and
(ii) the term of the licence; and
(iii) a description of the surrendered area;
sec.25
End of tenure report
sec.25 End of tenure report
This section prescribes other information for an end of tenure report for the 2004 Act , section 546 (b) and the 1923 Act , section 76 (1) (b) .
The information is the information stated in the following sections that is not mentioned in the 2004 Act , section 546 (a) or the 1923 Act , section 76 (1) (a) —
sections 21 and 22 ;
for an end of tenure report for a petroleum lease— section 23 .
For subsection (2) , a reference in section 21 , 22 or 23 to the relinquished area or surrendered area is taken to be a reference to the area of the tenure immediately before it ended.
Subsection (2) does not apply to the extent the information has been included in a relinquishment report or surrender report lodged for the tenure.
(sec.25-ssec.1) This section prescribes other information for an end of tenure report for the 2004 Act , section 546 (b) and the 1923 Act , section 76 (1) (b) .
(sec.25-ssec.2) The information is the information stated in the following sections that is not mentioned in the 2004 Act , section 546 (a) or the 1923 Act , section 76 (1) (a) — sections 21 and 22 ; for an end of tenure report for a petroleum lease— section 23 .
(sec.25-ssec.3) For subsection (2) , a reference in section 21 , 22 or 23 to the relinquished area or surrendered area is taken to be a reference to the area of the tenure immediately before it ended.
(sec.25-ssec.4) Subsection (2) does not apply to the extent the information has been included in a relinquishment report or surrender report lodged for the tenure.
(a) sections 21 and 22 ;
(b) for an end of tenure report for a petroleum lease— section 23 .
sec.26
End of authority report
sec.26 End of authority report
For the 2004 Act , section 546A (2) , the following matters are prescribed—
the authorised activities for the data acquisition authority or survey licence carried out during the term of the authority or licence;
spatial information about each authorised activity carried out under the authority or licence;
any other data or information for the report required under the practice direction.
s 26 amd 2020 SL No. 208 s 11
(a) the authorised activities for the data acquisition authority or survey licence carried out during the term of the authority or licence;
(b) spatial information about each authorised activity carried out under the authority or licence;
(c) any other data or information for the report required under the practice direction.
pt.3-div.4
Prescribed notices and reports
Prescribed notices and reports
sec.27
Purpose of division
sec.27 Purpose of division
This division prescribes the notices and reports required to be kept or lodged—
under the 2004 Act , section 553 (1) (b) by the holder of a petroleum authority; and
under the 1923 Act , section 76G (1) (b) by the holder of a 1923 Act petroleum tenure.
(a) under the 2004 Act , section 553 (1) (b) by the holder of a petroleum authority; and
(b) under the 1923 Act , section 76G (1) (b) by the holder of a 1923 Act petroleum tenure.
sec.28
Owners and occupiers to be given copy of notices
sec.28 Owners and occupiers to be given copy of notices
If the holder of a petroleum tenure is required to lodge a notice under this subdivision, the holder must give a copy of the notice—
to each owner and occupier of the land on which the authorised activities to which the notice relates have been or are to be carried out; and
by the time the notice is required to be lodged under this subdivision.
The requirement under subsection (1) does not apply to the extent the holder is an owner or an occupier of the land.
(sec.28-ssec.1) If the holder of a petroleum tenure is required to lodge a notice under this subdivision, the holder must give a copy of the notice— to each owner and occupier of the land on which the authorised activities to which the notice relates have been or are to be carried out; and by the time the notice is required to be lodged under this subdivision.
(sec.28-ssec.2) The requirement under subsection (1) does not apply to the extent the holder is an owner or an occupier of the land.
(a) to each owner and occupier of the land on which the authorised activities to which the notice relates have been or are to be carried out; and
(b) by the time the notice is required to be lodged under this subdivision.
sec.29
Notice about intention to drill a petroleum well or bore
sec.29 Notice about intention to drill a petroleum well or bore
If the holder of a petroleum tenure intends to drill a petroleum well or bore, the holder must lodge a notice about the intended drilling.
The notice must—
be lodged at least 10 business days before the drilling starts; and
be in the digital form made or approved by the chief executive; and
for a notice about a petroleum well—state a proposed identifying name for the petroleum well.
The proposed identifying name for the petroleum well must not be the same, or substantially the same, as an identifying name for another well recorded in the register.
(sec.29-ssec.1) If the holder of a petroleum tenure intends to drill a petroleum well or bore, the holder must lodge a notice about the intended drilling.
(sec.29-ssec.2) The notice must— be lodged at least 10 business days before the drilling starts; and be in the digital form made or approved by the chief executive; and for a notice about a petroleum well—state a proposed identifying name for the petroleum well.
(sec.29-ssec.3) The proposed identifying name for the petroleum well must not be the same, or substantially the same, as an identifying name for another well recorded in the register.
(a) be lodged at least 10 business days before the drilling starts; and
(b) be in the digital form made or approved by the chief executive; and
(c) for a notice about a petroleum well—state a proposed identifying name for the petroleum well.
sec.30
Notice about completion, alteration or abandonment of petroleum well or bore
sec.30 Notice about completion, alteration or abandonment of petroleum well or bore
If any of the following events happens, the relevant holder must lodge a notice about the event—
drilling of a petroleum well or bore is completed;
the completion configuration of a petroleum well changes;
a petroleum well or bore is abandoned.
For subsection (1) (a) , drilling of a petroleum well or bore is completed if—
the drilling rig last used to drill the well or bore is moved so it is no longer above the well or bore; and
the relevant holder intends no further drilling of the well or bore to occur.
For subsection (1) (b) , the completion configuration of a petroleum well changes if, after drilling of the well is completed—
additional casing is installed in the well; or
any part of the well is plugged, other than for decommissioning the well; or
an interval in the well is altered in any other way.
The notice must be—
lodged within 10 business days after the event happens; and
in the digital form made or approved by the chief executive.
In this section—
relevant holder means—
if the bore was drilled under a water monitoring authority under the 2004 Act —the holder of the water monitoring authority; or
otherwise—the holder of the petroleum tenure under which the petroleum well or bore was drilled.
(sec.30-ssec.1) If any of the following events happens, the relevant holder must lodge a notice about the event— drilling of a petroleum well or bore is completed; the completion configuration of a petroleum well changes; a petroleum well or bore is abandoned.
(sec.30-ssec.2) For subsection (1) (a) , drilling of a petroleum well or bore is completed if— the drilling rig last used to drill the well or bore is moved so it is no longer above the well or bore; and the relevant holder intends no further drilling of the well or bore to occur.
(sec.30-ssec.3) For subsection (1) (b) , the completion configuration of a petroleum well changes if, after drilling of the well is completed— additional casing is installed in the well; or any part of the well is plugged, other than for decommissioning the well; or an interval in the well is altered in any other way.
(sec.30-ssec.4) The notice must be— lodged within 10 business days after the event happens; and in the digital form made or approved by the chief executive.
(sec.30-ssec.5) In this section— relevant holder means— if the bore was drilled under a water monitoring authority under the 2004 Act —the holder of the water monitoring authority; or otherwise—the holder of the petroleum tenure under which the petroleum well or bore was drilled.
(a) drilling of a petroleum well or bore is completed;
(b) the completion configuration of a petroleum well changes;
(c) a petroleum well or bore is abandoned.
(a) the drilling rig last used to drill the well or bore is moved so it is no longer above the well or bore; and
(b) the relevant holder intends no further drilling of the well or bore to occur.
(a) additional casing is installed in the well; or
(b) any part of the well is plugged, other than for decommissioning the well; or
(c) an interval in the well is altered in any other way.
(a) lodged within 10 business days after the event happens; and
(b) in the digital form made or approved by the chief executive.
(a) if the bore was drilled under a water monitoring authority under the 2004 Act —the holder of the water monitoring authority; or
(b) otherwise—the holder of the petroleum tenure under which the petroleum well or bore was drilled.
sec.31
Notice about intention to carry out seismic survey or scientific or technical survey
sec.31 Notice about intention to carry out seismic survey or scientific or technical survey
If the holder of a petroleum tenure intends to carry out a seismic survey or scientific or technical survey in either of the following areas, the tenure holder must lodge a notice about the survey—
the area of a petroleum tenure; or
the area subject to a data acquisition authority that relates to a 2004 Act petroleum tenure.
The notice must state the following matters—
an identifying name for the survey;
the type of survey to be carried out;
seismic, geophysical, geochemical, geotechnical
a description of the area to be surveyed;
the day the surveying will start;
the expected duration of the surveying.
The identifying name for the survey must not be the same, or substantially the same, as an identifying name for another survey recorded in the register.
The notice must be—
lodged at least 10 business days before the survey starts; and
in the approved form; and
accompanied by spatial information showing the location of the area to be surveyed.
(sec.31-ssec.1) If the holder of a petroleum tenure intends to carry out a seismic survey or scientific or technical survey in either of the following areas, the tenure holder must lodge a notice about the survey— the area of a petroleum tenure; or the area subject to a data acquisition authority that relates to a 2004 Act petroleum tenure.
(sec.31-ssec.2) The notice must state the following matters— an identifying name for the survey; the type of survey to be carried out; seismic, geophysical, geochemical, geotechnical a description of the area to be surveyed; the day the surveying will start; the expected duration of the surveying.
(sec.31-ssec.3) The identifying name for the survey must not be the same, or substantially the same, as an identifying name for another survey recorded in the register.
(sec.31-ssec.4) The notice must be— lodged at least 10 business days before the survey starts; and in the approved form; and accompanied by spatial information showing the location of the area to be surveyed.
(a) the area of a petroleum tenure; or
(b) the area subject to a data acquisition authority that relates to a 2004 Act petroleum tenure.
(a) an identifying name for the survey;
(b) the type of survey to be carried out; Examples— seismic, geophysical, geochemical, geotechnical
(c) a description of the area to be surveyed;
(d) the day the surveying will start;
(e) the expected duration of the surveying.
(a) lodged at least 10 business days before the survey starts; and
(b) in the approved form; and
(c) accompanied by spatial information showing the location of the area to be surveyed.
sec.32
Notice about completion of seismic survey or scientific or technical survey
sec.32 Notice about completion of seismic survey or scientific or technical survey
This section applies if a seismic survey or scientific or technical survey is completed in either of the following areas—
the area of a petroleum tenure; or
the area subject to a data acquisition authority that relates to a 2004 Act petroleum tenure.
The holder of the petroleum tenure must lodge a notice about the completion of the survey.
The notice must be—
lodged within 10 business days after the survey is completed; and
in the approved form.
For subsection (2) , a survey is completed as soon as all of the raw data for the survey has been recorded or recovered.
(sec.32-ssec.1) This section applies if a seismic survey or scientific or technical survey is completed in either of the following areas— the area of a petroleum tenure; or the area subject to a data acquisition authority that relates to a 2004 Act petroleum tenure.
(sec.32-ssec.2) The holder of the petroleum tenure must lodge a notice about the completion of the survey.
(sec.32-ssec.3) The notice must be— lodged within 10 business days after the survey is completed; and in the approved form.
(sec.32-ssec.4) For subsection (2) , a survey is completed as soon as all of the raw data for the survey has been recorded or recovered.
(a) the area of a petroleum tenure; or
(b) the area subject to a data acquisition authority that relates to a 2004 Act petroleum tenure.
(a) lodged within 10 business days after the survey is completed; and
(b) in the approved form.
sec.33
Notice about intention to carry out hydraulic fracturing activities
sec.33 Notice about intention to carry out hydraulic fracturing activities
If the holder of a petroleum tenure intends to carry out hydraulic fracturing activities in the prescribed area for a petroleum tenure, the tenure holder must lodge a notice about the intended activities.
The notice must be—
lodged at least 10 business days before the hydraulic fracturing activities start being carried out; and
in the digital form made or approved by the chief executive.
(sec.33-ssec.1) If the holder of a petroleum tenure intends to carry out hydraulic fracturing activities in the prescribed area for a petroleum tenure, the tenure holder must lodge a notice about the intended activities.
(sec.33-ssec.2) The notice must be— lodged at least 10 business days before the hydraulic fracturing activities start being carried out; and in the digital form made or approved by the chief executive.
(a) lodged at least 10 business days before the hydraulic fracturing activities start being carried out; and
(b) in the digital form made or approved by the chief executive.
sec.34
Notice about completion of hydraulic fracturing activities
sec.34 Notice about completion of hydraulic fracturing activities
If the holder of a petroleum tenure has finished carrying out hydraulic fracturing activities in the prescribed area for the tenure, the tenure holder must lodge a notice about the completion of the activities.
The notice must state—
the days the hydraulic fracturing activities started and ended; and
the name of the operator of the drilling project involving the activities; and
the name of the contractor who carried out the activities for the operator of the drilling project; and
details of the composition of the hydraulic fracturing fluid pumped into the petroleum well used for the activities.
The notice must be—
lodged within 10 business days after the hydraulic fracturing activities are completed; and
in the digital form made or approved by the chief executive.
(sec.34-ssec.1) If the holder of a petroleum tenure has finished carrying out hydraulic fracturing activities in the prescribed area for the tenure, the tenure holder must lodge a notice about the completion of the activities.
(sec.34-ssec.2) The notice must state— the days the hydraulic fracturing activities started and ended; and the name of the operator of the drilling project involving the activities; and the name of the contractor who carried out the activities for the operator of the drilling project; and details of the composition of the hydraulic fracturing fluid pumped into the petroleum well used for the activities.
(sec.34-ssec.3) The notice must be— lodged within 10 business days after the hydraulic fracturing activities are completed; and in the digital form made or approved by the chief executive.
(a) the days the hydraulic fracturing activities started and ended; and
(b) the name of the operator of the drilling project involving the activities; and
(c) the name of the contractor who carried out the activities for the operator of the drilling project; and
(d) details of the composition of the hydraulic fracturing fluid pumped into the petroleum well used for the activities.
(a) lodged within 10 business days after the hydraulic fracturing activities are completed; and
(b) in the digital form made or approved by the chief executive.
sec.35
Daily drilling report
sec.35 Daily drilling report
The holder of a petroleum tenure must keep a daily drilling report for each day on which drilling of a petroleum well is carried out under the tenure.
A copy of each daily drilling report must be lodged with the petroleum well or bore completion report lodged for the well.
Also, a copy of a daily drilling report must be lodged if the chief executive asks for the report to be lodged.
A daily drilling report for a petroleum well must contain the following information about the drilling carried out on the day to which the report relates—
the identifying name of the well;
the tenure holder’s name and the tenure under which the well was drilled;
the type of drilling rig used;
a summary of the drilling operations carried out;
the depth in metres of the well at the end of the day’s drilling;
the size and type of drill bit used;
the drilling fluids and additives used;
the size and depth in metres of any casing inserted in the well;
the depth in metres of the top and bottom of each cemented interval in the well;
the results of any deviation surveys carried out in the well;
a description of any drill stem tests or other tests carried out in the well;
the depth in metres of the top and bottom of the hydrocarbon show intervals in the well and the type and description of any surface observations of each interval;
the type of any perforations in the well and the depth in metres of the top and bottom of the perforated intervals;
details of any stimulation carried out;
details of any squeeze cementing or cement plugging carried out;
a description of any cores or cutting samples taken;
any other data or information for the report required under the practice direction.
In this section—
deviation survey means a survey of the path of a petroleum well that measures its direction in 3 dimensions.
s 35 amd 2020 SL No. 208 s 12
(sec.35-ssec.1) The holder of a petroleum tenure must keep a daily drilling report for each day on which drilling of a petroleum well is carried out under the tenure.
(sec.35-ssec.2) A copy of each daily drilling report must be lodged with the petroleum well or bore completion report lodged for the well.
(sec.35-ssec.3) Also, a copy of a daily drilling report must be lodged if the chief executive asks for the report to be lodged.
(sec.35-ssec.4) A daily drilling report for a petroleum well must contain the following information about the drilling carried out on the day to which the report relates— the identifying name of the well; the tenure holder’s name and the tenure under which the well was drilled; the type of drilling rig used; a summary of the drilling operations carried out; the depth in metres of the well at the end of the day’s drilling; the size and type of drill bit used; the drilling fluids and additives used; the size and depth in metres of any casing inserted in the well; the depth in metres of the top and bottom of each cemented interval in the well; the results of any deviation surveys carried out in the well; a description of any drill stem tests or other tests carried out in the well; the depth in metres of the top and bottom of the hydrocarbon show intervals in the well and the type and description of any surface observations of each interval; the type of any perforations in the well and the depth in metres of the top and bottom of the perforated intervals; details of any stimulation carried out; details of any squeeze cementing or cement plugging carried out; a description of any cores or cutting samples taken; any other data or information for the report required under the practice direction.
(sec.35-ssec.5) In this section— deviation survey means a survey of the path of a petroleum well that measures its direction in 3 dimensions.
(a) the identifying name of the well;
(b) the tenure holder’s name and the tenure under which the well was drilled;
(c) the type of drilling rig used;
(d) a summary of the drilling operations carried out;
(e) the depth in metres of the well at the end of the day’s drilling;
(f) the size and type of drill bit used;
(g) the drilling fluids and additives used;
(h) the size and depth in metres of any casing inserted in the well;
(i) the depth in metres of the top and bottom of each cemented interval in the well;
(j) the results of any deviation surveys carried out in the well;
(k) a description of any drill stem tests or other tests carried out in the well;
(l) the depth in metres of the top and bottom of the hydrocarbon show intervals in the well and the type and description of any surface observations of each interval;
(m) the type of any perforations in the well and the depth in metres of the top and bottom of the perforated intervals;
(n) details of any stimulation carried out;
(o) details of any squeeze cementing or cement plugging carried out;
(p) a description of any cores or cutting samples taken;
(q) any other data or information for the report required under the practice direction.
sec.36
Petroleum well or bore completion report
sec.36 Petroleum well or bore completion report
If the drilling of petroleum well or bore under a petroleum tenure is completed, the tenure holder must lodge a report about the completion of the well or bore (a petroleum well or bore completion report ).
The report must be lodged within 12 months after the rig release day for the well or bore.
The report must contain the following information—
the type and number of the petroleum tenure;
the name and postal address of the operator of the well or bore;
the identifying name of the well or bore;
a summary of the well or bore including the information for the well or bore required under the practice direction;
spatial information showing the location of the well or bore;
the height reference in metres for the drilling rig used to drill the well or bore;
the total depth in metres of the well or bore;
the following days—
the day the drilling of the well or bore started;
the day the total depth of the well or bore was reached;
the rig release day for the well or bore;
details of the drilling rig, the number and type of drill bits, and the drilling fluids, used in the well or bore;
the status of the well or bore on the rig release day;
the surveyed path of the well or bore;
details of the casing and equipment installed in the well or bore, with a diagram showing their location in the well or bore;
the type of any perforations in the well or bore, the depth in metres of the top and bottom of the perforated intervals and the perforation spacing in metres;
details of the cementing in the well or bore, including its location, the type of cement used and the depth in metres of the top and bottom of each cemented interval;
a description of all tests or surveys carried out in the well or bore, the depth in metres where each test was carried out and the distance in metres between the top and bottom of each testing interval;
a geological interpretation of the well or bore, including the stratigraphy of the rock units it intersects;
an identification of the intervals in the well that have the potential to produce petroleum;
the tenure holder’s reasons for choosing the location of the well or bore;
any other data or information for the report required under the practice direction.
For a directional well, the report must also state the position of each of the following—
the stratigraphic units intersected by the well;
the bottom of the well;
any intersection of the well with another petroleum well.
For subsection (4) , the position must be expressed in relation to—
total vertical depth in metres; and
the horizontal plane.
The report must be accompanied by each of the following—
a digital image of the cores taken during the drilling of the well or bore;
the raw data, in digital form, of each geophysical (or wireline) log that has been run in the well or bore;
a digital image of the graphic representations of the raw data mentioned in paragraph (b) .
If the petroleum well or bore is plugged and abandoned on or before the rig release day for the well or bore, the report must also contain the information stated in section 37 (4) .
s 36 amd 2020 SL No. 208 s 13
(sec.36-ssec.1) If the drilling of petroleum well or bore under a petroleum tenure is completed, the tenure holder must lodge a report about the completion of the well or bore (a petroleum well or bore completion report ).
(sec.36-ssec.2) The report must be lodged within 12 months after the rig release day for the well or bore.
(sec.36-ssec.3) The report must contain the following information— the type and number of the petroleum tenure; the name and postal address of the operator of the well or bore; the identifying name of the well or bore; a summary of the well or bore including the information for the well or bore required under the practice direction; spatial information showing the location of the well or bore; the height reference in metres for the drilling rig used to drill the well or bore; the total depth in metres of the well or bore; the following days— the day the drilling of the well or bore started; the day the total depth of the well or bore was reached; the rig release day for the well or bore; details of the drilling rig, the number and type of drill bits, and the drilling fluids, used in the well or bore; the status of the well or bore on the rig release day; the surveyed path of the well or bore; details of the casing and equipment installed in the well or bore, with a diagram showing their location in the well or bore; the type of any perforations in the well or bore, the depth in metres of the top and bottom of the perforated intervals and the perforation spacing in metres; details of the cementing in the well or bore, including its location, the type of cement used and the depth in metres of the top and bottom of each cemented interval; a description of all tests or surveys carried out in the well or bore, the depth in metres where each test was carried out and the distance in metres between the top and bottom of each testing interval; a geological interpretation of the well or bore, including the stratigraphy of the rock units it intersects; an identification of the intervals in the well that have the potential to produce petroleum; the tenure holder’s reasons for choosing the location of the well or bore; any other data or information for the report required under the practice direction.
(sec.36-ssec.4) For a directional well, the report must also state the position of each of the following— the stratigraphic units intersected by the well; the bottom of the well; any intersection of the well with another petroleum well.
(sec.36-ssec.5) For subsection (4) , the position must be expressed in relation to— total vertical depth in metres; and the horizontal plane.
(sec.36-ssec.6) The report must be accompanied by each of the following— a digital image of the cores taken during the drilling of the well or bore; the raw data, in digital form, of each geophysical (or wireline) log that has been run in the well or bore; a digital image of the graphic representations of the raw data mentioned in paragraph (b) .
(sec.36-ssec.7) If the petroleum well or bore is plugged and abandoned on or before the rig release day for the well or bore, the report must also contain the information stated in section 37 (4) .
(a) the type and number of the petroleum tenure;
(b) the name and postal address of the operator of the well or bore;
(c) the identifying name of the well or bore;
(d) a summary of the well or bore including the information for the well or bore required under the practice direction;
(e) spatial information showing the location of the well or bore;
(f) the height reference in metres for the drilling rig used to drill the well or bore;
(g) the total depth in metres of the well or bore;
(h) the following days— (i) the day the drilling of the well or bore started; (ii) the day the total depth of the well or bore was reached; (iii) the rig release day for the well or bore;
(i) the day the drilling of the well or bore started;
(ii) the day the total depth of the well or bore was reached;
(iii) the rig release day for the well or bore;
(i) details of the drilling rig, the number and type of drill bits, and the drilling fluids, used in the well or bore;
(j) the status of the well or bore on the rig release day;
(k) the surveyed path of the well or bore;
(l) details of the casing and equipment installed in the well or bore, with a diagram showing their location in the well or bore;
(m) the type of any perforations in the well or bore, the depth in metres of the top and bottom of the perforated intervals and the perforation spacing in metres;
(n) details of the cementing in the well or bore, including its location, the type of cement used and the depth in metres of the top and bottom of each cemented interval;
(o) a description of all tests or surveys carried out in the well or bore, the depth in metres where each test was carried out and the distance in metres between the top and bottom of each testing interval;
(p) a geological interpretation of the well or bore, including the stratigraphy of the rock units it intersects;
(q) an identification of the intervals in the well that have the potential to produce petroleum;
(r) the tenure holder’s reasons for choosing the location of the well or bore;
(s) any other data or information for the report required under the practice direction.
(i) the day the drilling of the well or bore started;
(ii) the day the total depth of the well or bore was reached;
(iii) the rig release day for the well or bore;
(a) the stratigraphic units intersected by the well;
(b) the bottom of the well;
(c) any intersection of the well with another petroleum well.
(a) total vertical depth in metres; and
(b) the horizontal plane.
(a) a digital image of the cores taken during the drilling of the well or bore;
(b) the raw data, in digital form, of each geophysical (or wireline) log that has been run in the well or bore;
(c) a digital image of the graphic representations of the raw data mentioned in paragraph (b) .
sec.37
Petroleum well or bore abandonment report
sec.37 Petroleum well or bore abandonment report
This section applies to a petroleum well or bore drilled under a petroleum tenure or water monitoring authority under the 2004 Act .
If the tenure holder or authority holder plugs and abandons the petroleum well or bore after its rig release day, the tenure holder or authority holder must lodge a report about the abandonment (a petroleum well or bore abandonment report ).
The report must be lodged within 6 months after the day the plugging and abandoning of the well or bore is completed.
The report must contain the following information—
the type and number of the tenure or authority;
the identifying name of the well or bore;
the name of the author of the report;
the name of the tenure or authority holder;
the name of the operator of the well or bore;
a summary of the well or bore including the information for the well or bore required under the practice direction;
the following information in relation to the completion or abandonment of the well or bore—
a full description of all equipment, including prescribed equipment, left in the well or bore, including the size and nature of the equipment and any features of the equipment that may cause a hazard to coal mining operations;
aluminium, electronics or batteries
the surveyed location of any prescribed equipment;
the method of the cementing operations carried out in or on the well or bore, including the location and type of plugs, the intervals covered by the operations, the volume and type of cement used, any losses of cement due to voids or permeable strata, and the methods used to overcome losses of cement;
the method, materials and volume of cement used to cement voids;
a description of procedures or activities undertaken for abandonment of the well or bore;
any other data or information for the report required under the practice direction.
In this section—
coal mining operations see the Coal Mining Safety and Health Act 1999 , schedule 3 .
prescribed equipment means—
metal equipment, other than casing; and
other equipment that may create a hazard to coal mining operations.
drilling equipment and geophysical logging tools
s 37 amd 2018 SL No. 135 s 183 ; 2020 SL No. 208 s 14
(sec.37-ssec.1) This section applies to a petroleum well or bore drilled under a petroleum tenure or water monitoring authority under the 2004 Act .
(sec.37-ssec.2) If the tenure holder or authority holder plugs and abandons the petroleum well or bore after its rig release day, the tenure holder or authority holder must lodge a report about the abandonment (a petroleum well or bore abandonment report ).
(sec.37-ssec.3) The report must be lodged within 6 months after the day the plugging and abandoning of the well or bore is completed.
(sec.37-ssec.4) The report must contain the following information— the type and number of the tenure or authority; the identifying name of the well or bore; the name of the author of the report; the name of the tenure or authority holder; the name of the operator of the well or bore; a summary of the well or bore including the information for the well or bore required under the practice direction; the following information in relation to the completion or abandonment of the well or bore— a full description of all equipment, including prescribed equipment, left in the well or bore, including the size and nature of the equipment and any features of the equipment that may cause a hazard to coal mining operations; aluminium, electronics or batteries the surveyed location of any prescribed equipment; the method of the cementing operations carried out in or on the well or bore, including the location and type of plugs, the intervals covered by the operations, the volume and type of cement used, any losses of cement due to voids or permeable strata, and the methods used to overcome losses of cement; the method, materials and volume of cement used to cement voids; a description of procedures or activities undertaken for abandonment of the well or bore; any other data or information for the report required under the practice direction.
(sec.37-ssec.5) In this section— coal mining operations see the Coal Mining Safety and Health Act 1999 , schedule 3 . prescribed equipment means— metal equipment, other than casing; and other equipment that may create a hazard to coal mining operations. drilling equipment and geophysical logging tools
(a) the type and number of the tenure or authority;
(b) the identifying name of the well or bore;
(c) the name of the author of the report;
(d) the name of the tenure or authority holder;
(e) the name of the operator of the well or bore;
(f) a summary of the well or bore including the information for the well or bore required under the practice direction;
(g) the following information in relation to the completion or abandonment of the well or bore— (i) a full description of all equipment, including prescribed equipment, left in the well or bore, including the size and nature of the equipment and any features of the equipment that may cause a hazard to coal mining operations; Example of features that may cause a hazard to coal mining operations— aluminium, electronics or batteries (ii) the surveyed location of any prescribed equipment; (iii) the method of the cementing operations carried out in or on the well or bore, including the location and type of plugs, the intervals covered by the operations, the volume and type of cement used, any losses of cement due to voids or permeable strata, and the methods used to overcome losses of cement; (iv) the method, materials and volume of cement used to cement voids; (v) a description of procedures or activities undertaken for abandonment of the well or bore;
(i) a full description of all equipment, including prescribed equipment, left in the well or bore, including the size and nature of the equipment and any features of the equipment that may cause a hazard to coal mining operations; Example of features that may cause a hazard to coal mining operations— aluminium, electronics or batteries
(ii) the surveyed location of any prescribed equipment;
(iii) the method of the cementing operations carried out in or on the well or bore, including the location and type of plugs, the intervals covered by the operations, the volume and type of cement used, any losses of cement due to voids or permeable strata, and the methods used to overcome losses of cement;
(iv) the method, materials and volume of cement used to cement voids;
(v) a description of procedures or activities undertaken for abandonment of the well or bore;
(h) any other data or information for the report required under the practice direction.
(i) a full description of all equipment, including prescribed equipment, left in the well or bore, including the size and nature of the equipment and any features of the equipment that may cause a hazard to coal mining operations; Example of features that may cause a hazard to coal mining operations— aluminium, electronics or batteries
(ii) the surveyed location of any prescribed equipment;
(iii) the method of the cementing operations carried out in or on the well or bore, including the location and type of plugs, the intervals covered by the operations, the volume and type of cement used, any losses of cement due to voids or permeable strata, and the methods used to overcome losses of cement;
(iv) the method, materials and volume of cement used to cement voids;
(v) a description of procedures or activities undertaken for abandonment of the well or bore;
(a) metal equipment, other than casing; and
(b) other equipment that may create a hazard to coal mining operations.
sec.38
Seismic survey reports
sec.38 Seismic survey reports
This section applies if the holder of a petroleum tenure—
carries out a seismic survey of an area of the tenure; or
for a 2004 Act petroleum tenure—carries out a seismic survey of an area subject to a data acquisition authority to which the tenure relates; or
reprocesses raw data obtained from a survey mentioned in paragraph (a) or (b) .
The tenure holder must lodge a seismic survey report within—
for a survey mentioned subsection (1) (a) or (b) —2 years after the completion day for the survey; or
if the tenure holder reprocesses raw data obtained as mentioned in subsection (1) (c) —2 years after the day the reprocessing is completed.
The report must contain the following information—
a description of the location of the area surveyed;
the objectives of the survey;
the activities carried out for the survey, including, for example, details of the seismic lines used and the days on which the activities were carried out;
a description of each method used to acquire raw data, including—
the equipment used for positioning, surveying, navigation or other purposes; and
the techniques and equipment used for recording and testing the data;
a description of how the raw data was processed or reprocessed;
an evaluation of the processed or reprocessed data;
any other data or information for the report required under the practice direction.
The report must be accompanied by—
each of the following in digital form—
the raw data obtained in relation to the survey and the record made as the data was recorded (commonly known as the ‘observer’s logs’);
a list of the seismic lines used and the range of the numbered stations on each line;
the surveyed location, including the elevation, of each seismic source and receiver point;
the processed or reprocessed data derived from each seismic line used for the survey; and
if an activity for the survey was carried out by a contractor of the tenure holder, a copy of any report given to the holder by the contractor in relation to the activity; and
spatial information showing the location of the seismic lines used for the survey.
s 38 amd 2019 SL No. 53 s 19 ; 2020 SL No. 208 s 15
(sec.38-ssec.1) This section applies if the holder of a petroleum tenure— carries out a seismic survey of an area of the tenure; or for a 2004 Act petroleum tenure—carries out a seismic survey of an area subject to a data acquisition authority to which the tenure relates; or reprocesses raw data obtained from a survey mentioned in paragraph (a) or (b) .
(sec.38-ssec.2) The tenure holder must lodge a seismic survey report within— for a survey mentioned subsection (1) (a) or (b) —2 years after the completion day for the survey; or if the tenure holder reprocesses raw data obtained as mentioned in subsection (1) (c) —2 years after the day the reprocessing is completed.
(sec.38-ssec.3) The report must contain the following information— a description of the location of the area surveyed; the objectives of the survey; the activities carried out for the survey, including, for example, details of the seismic lines used and the days on which the activities were carried out; a description of each method used to acquire raw data, including— the equipment used for positioning, surveying, navigation or other purposes; and the techniques and equipment used for recording and testing the data; a description of how the raw data was processed or reprocessed; an evaluation of the processed or reprocessed data; any other data or information for the report required under the practice direction.
(sec.38-ssec.4) The report must be accompanied by— each of the following in digital form— the raw data obtained in relation to the survey and the record made as the data was recorded (commonly known as the ‘observer’s logs’); a list of the seismic lines used and the range of the numbered stations on each line; the surveyed location, including the elevation, of each seismic source and receiver point; the processed or reprocessed data derived from each seismic line used for the survey; and if an activity for the survey was carried out by a contractor of the tenure holder, a copy of any report given to the holder by the contractor in relation to the activity; and spatial information showing the location of the seismic lines used for the survey.
(a) carries out a seismic survey of an area of the tenure; or
(b) for a 2004 Act petroleum tenure—carries out a seismic survey of an area subject to a data acquisition authority to which the tenure relates; or
(c) reprocesses raw data obtained from a survey mentioned in paragraph (a) or (b) .
(a) for a survey mentioned subsection (1) (a) or (b) —2 years after the completion day for the survey; or
(b) if the tenure holder reprocesses raw data obtained as mentioned in subsection (1) (c) —2 years after the day the reprocessing is completed.
(a) a description of the location of the area surveyed;
(b) the objectives of the survey;
(c) the activities carried out for the survey, including, for example, details of the seismic lines used and the days on which the activities were carried out;
(d) a description of each method used to acquire raw data, including— (i) the equipment used for positioning, surveying, navigation or other purposes; and (ii) the techniques and equipment used for recording and testing the data;
(i) the equipment used for positioning, surveying, navigation or other purposes; and
(ii) the techniques and equipment used for recording and testing the data;
(e) a description of how the raw data was processed or reprocessed;
(f) an evaluation of the processed or reprocessed data;
(g) any other data or information for the report required under the practice direction.
(i) the equipment used for positioning, surveying, navigation or other purposes; and
(ii) the techniques and equipment used for recording and testing the data;
(a) each of the following in digital form— (i) the raw data obtained in relation to the survey and the record made as the data was recorded (commonly known as the ‘observer’s logs’); (ii) a list of the seismic lines used and the range of the numbered stations on each line; (iii) the surveyed location, including the elevation, of each seismic source and receiver point; (iv) the processed or reprocessed data derived from each seismic line used for the survey; and
(i) the raw data obtained in relation to the survey and the record made as the data was recorded (commonly known as the ‘observer’s logs’);
(ii) a list of the seismic lines used and the range of the numbered stations on each line;
(iii) the surveyed location, including the elevation, of each seismic source and receiver point;
(iv) the processed or reprocessed data derived from each seismic line used for the survey; and
(b) if an activity for the survey was carried out by a contractor of the tenure holder, a copy of any report given to the holder by the contractor in relation to the activity; and
(c) spatial information showing the location of the seismic lines used for the survey.
(i) the raw data obtained in relation to the survey and the record made as the data was recorded (commonly known as the ‘observer’s logs’);
(ii) a list of the seismic lines used and the range of the numbered stations on each line;
(iii) the surveyed location, including the elevation, of each seismic source and receiver point;
(iv) the processed or reprocessed data derived from each seismic line used for the survey; and
sec.39
Scientific or technical survey report
sec.39 Scientific or technical survey report
This section applies if the holder of a petroleum tenure—
carries out a scientific or technical survey of an area of the tenure; or
for a 2004 Act petroleum tenure—carries out a scientific or technical survey of an area subject to a data acquisition authority to which the tenure relates; or
reprocesses raw data obtained from a survey mentioned in paragraph (a) or (b) .
The tenure holder must lodge a scientific or technical survey report within—
for a survey mentioned subsection (1) (a) or (b) —2 years after the completion day for the survey; or
if the tenure holder reprocesses raw data as mentioned in subsection (1) (c) —2 years after the day the reprocessing is completed.
The report must contain the following information—
a description of the location of the area surveyed;
the type of survey carried out;
the objectives of the survey;
the activities carried out for the survey, including, for example, the days on which the activities were carried out;
the methods and equipment used for acquiring and processing, or reprocessing, data;
an interpretation of the processed or reprocessed data derived from the survey;
spatial information showing the location of—
the area surveyed; and
where any measurements were made or samples were taken in connection with the survey;
any other data or information for the report required under the practice direction.
The report must be accompanied by each of the following in digital form—
the raw data obtained in relation to the survey;
the processed or reprocessed data derived from the survey.
s 39 amd 2019 SL No. 53 s 20; 2020 SL No. 208 s 16
(sec.39-ssec.1) This section applies if the holder of a petroleum tenure— carries out a scientific or technical survey of an area of the tenure; or for a 2004 Act petroleum tenure—carries out a scientific or technical survey of an area subject to a data acquisition authority to which the tenure relates; or reprocesses raw data obtained from a survey mentioned in paragraph (a) or (b) .
(sec.39-ssec.2) The tenure holder must lodge a scientific or technical survey report within— for a survey mentioned subsection (1) (a) or (b) —2 years after the completion day for the survey; or if the tenure holder reprocesses raw data as mentioned in subsection (1) (c) —2 years after the day the reprocessing is completed.
(sec.39-ssec.3) The report must contain the following information— a description of the location of the area surveyed; the type of survey carried out; the objectives of the survey; the activities carried out for the survey, including, for example, the days on which the activities were carried out; the methods and equipment used for acquiring and processing, or reprocessing, data; an interpretation of the processed or reprocessed data derived from the survey; spatial information showing the location of— the area surveyed; and where any measurements were made or samples were taken in connection with the survey; any other data or information for the report required under the practice direction.
(sec.39-ssec.4) The report must be accompanied by each of the following in digital form— the raw data obtained in relation to the survey; the processed or reprocessed data derived from the survey.
(a) carries out a scientific or technical survey of an area of the tenure; or
(b) for a 2004 Act petroleum tenure—carries out a scientific or technical survey of an area subject to a data acquisition authority to which the tenure relates; or
(c) reprocesses raw data obtained from a survey mentioned in paragraph (a) or (b) .
(a) for a survey mentioned subsection (1) (a) or (b) —2 years after the completion day for the survey; or
(b) if the tenure holder reprocesses raw data as mentioned in subsection (1) (c) —2 years after the day the reprocessing is completed.
(a) a description of the location of the area surveyed;
(b) the type of survey carried out;
(c) the objectives of the survey;
(d) the activities carried out for the survey, including, for example, the days on which the activities were carried out;
(e) the methods and equipment used for acquiring and processing, or reprocessing, data;
(f) an interpretation of the processed or reprocessed data derived from the survey;
(g) spatial information showing the location of— (i) the area surveyed; and (ii) where any measurements were made or samples were taken in connection with the survey;
(i) the area surveyed; and
(ii) where any measurements were made or samples were taken in connection with the survey;
(h) any other data or information for the report required under the practice direction.
(i) the area surveyed; and
(ii) where any measurements were made or samples were taken in connection with the survey;
(a) the raw data obtained in relation to the survey;
(b) the processed or reprocessed data derived from the survey.
sec.40
Definition for subdivision
sec.40 Definition for subdivision
In this subdivision—
6-month period , for a petroleum tenure, means a following period in a year during which, for all or part of the period, the tenure is in effect—
1 January to 30 June;
1 July to 31 December.
(a) 1 January to 30 June;
(b) 1 July to 31 December.
sec.41
How particular measurements must be stated in reports
sec.41 How particular measurements must be stated in reports
This section applies if this subdivision requires a measurement to be stated in a report.
The measurement of a volume or mass must be stated in—
for water—megalitres; or
for gas—million cubic metres (Mm3); or
for LPG—kilotonnes; or
for crude oil or condensate—million barrels (also known as MMbbl).
The measurement of energy must be stated in—
for petroleum, a prescribed storage gas or substance prescribed under the 2004 Act , section 402 (1) , including coal seam gas—petajoules; or
for crude oil or condensate—energy of oil in million barrels of oil equivalent (also known as MMBOE).
The measurement of a depth, length or other distance must be stated in metres.
s 41 sub 2020 SL No. 208 s 17
(sec.41-ssec.1) This section applies if this subdivision requires a measurement to be stated in a report.
(sec.41-ssec.2) The measurement of a volume or mass must be stated in— for water—megalitres; or for gas—million cubic metres (Mm3); or for LPG—kilotonnes; or for crude oil or condensate—million barrels (also known as MMbbl).
(sec.41-ssec.3) The measurement of energy must be stated in— for petroleum, a prescribed storage gas or substance prescribed under the 2004 Act , section 402 (1) , including coal seam gas—petajoules; or for crude oil or condensate—energy of oil in million barrels of oil equivalent (also known as MMBOE).
(sec.41-ssec.4) The measurement of a depth, length or other distance must be stated in metres.
(a) for water—megalitres; or
(b) for gas—million cubic metres (Mm3); or
(c) for LPG—kilotonnes; or
(d) for crude oil or condensate—million barrels (also known as MMbbl).
(a) for petroleum, a prescribed storage gas or substance prescribed under the 2004 Act , section 402 (1) , including coal seam gas—petajoules; or
(b) for crude oil or condensate—energy of oil in million barrels of oil equivalent (also known as MMBOE).
sec.42
Petroleum production report
sec.42 Petroleum production report
The holder of a petroleum lease must lodge a petroleum production report for the lease for each 6-month period.
The report must be lodged within 60 business days after the 6-month period ends.
The report must contain the following information—
the number of the lease;
an identification of each production interval or geological unit from which first-produced petroleum is produced under the lease during the 6-month period;
the volume of each of the following produced under the lease during the 6-month period—
each petroleum product derived from first-produced petroleum;
first-produced petroleum that was flared or vented in a gaseous state;
first-produced petroleum that was used to produce other petroleum;
the volume, or estimated volume, of associated water taken from each natural underground reservoir during the 6-month period and the lease period;
for each natural underground reservoir from which petroleum is produced under the lease—the number of petroleum wells producing petroleum from the reservoir;
for each petroleum well drilled for the purpose of producing coal seam gas within the area of the lease—the volume, or an estimate of the volume, of associated water taken from the well under the lease during the 6-month period;
if a petroleum well within the area of the lease changes after a report for the well is lodged under section 36 —details of the casing and equipment installed in the well and a diagram showing the location of the casing and equipment;
any other data or information for the report required under the practice direction.
In this section—
first-produced petroleum means petroleum extracted from a natural reservoir, other than petroleum that is stored, in a natural reservoir or otherwise, and later re-extracted.
lease period means—
for a volume of petroleum, or a petroleum product derived from petroleum, produced under a lease for a 6-month report—the period starting on the day petroleum was first produced under the lease and ending on the last day of the 6-month period; or
for a volume or estimated volume of associated water taken under a lease for a 6-month report—the period starting on the day associated water was first taken under the lease and ending on the last day of the 6-month period.
s 42 amd 2020 SL No. 208 s 18
(sec.42-ssec.1) The holder of a petroleum lease must lodge a petroleum production report for the lease for each 6-month period.
(sec.42-ssec.2) The report must be lodged within 60 business days after the 6-month period ends.
(sec.42-ssec.3) The report must contain the following information— the number of the lease; an identification of each production interval or geological unit from which first-produced petroleum is produced under the lease during the 6-month period; the volume of each of the following produced under the lease during the 6-month period— each petroleum product derived from first-produced petroleum; first-produced petroleum that was flared or vented in a gaseous state; first-produced petroleum that was used to produce other petroleum; the volume, or estimated volume, of associated water taken from each natural underground reservoir during the 6-month period and the lease period; for each natural underground reservoir from which petroleum is produced under the lease—the number of petroleum wells producing petroleum from the reservoir; for each petroleum well drilled for the purpose of producing coal seam gas within the area of the lease—the volume, or an estimate of the volume, of associated water taken from the well under the lease during the 6-month period; if a petroleum well within the area of the lease changes after a report for the well is lodged under section 36 —details of the casing and equipment installed in the well and a diagram showing the location of the casing and equipment; any other data or information for the report required under the practice direction.
(sec.42-ssec.4) In this section— first-produced petroleum means petroleum extracted from a natural reservoir, other than petroleum that is stored, in a natural reservoir or otherwise, and later re-extracted. lease period means— for a volume of petroleum, or a petroleum product derived from petroleum, produced under a lease for a 6-month report—the period starting on the day petroleum was first produced under the lease and ending on the last day of the 6-month period; or for a volume or estimated volume of associated water taken under a lease for a 6-month report—the period starting on the day associated water was first taken under the lease and ending on the last day of the 6-month period.
(a) the number of the lease;
(b) an identification of each production interval or geological unit from which first-produced petroleum is produced under the lease during the 6-month period;
(c) the volume of each of the following produced under the lease during the 6-month period— (i) each petroleum product derived from first-produced petroleum; (ii) first-produced petroleum that was flared or vented in a gaseous state; (iii) first-produced petroleum that was used to produce other petroleum;
(i) each petroleum product derived from first-produced petroleum;
(ii) first-produced petroleum that was flared or vented in a gaseous state;
(iii) first-produced petroleum that was used to produce other petroleum;
(d) the volume, or estimated volume, of associated water taken from each natural underground reservoir during the 6-month period and the lease period;
(e) for each natural underground reservoir from which petroleum is produced under the lease—the number of petroleum wells producing petroleum from the reservoir;
(f) for each petroleum well drilled for the purpose of producing coal seam gas within the area of the lease—the volume, or an estimate of the volume, of associated water taken from the well under the lease during the 6-month period;
(g) if a petroleum well within the area of the lease changes after a report for the well is lodged under section 36 —details of the casing and equipment installed in the well and a diagram showing the location of the casing and equipment;
(h) any other data or information for the report required under the practice direction.
(i) each petroleum product derived from first-produced petroleum;
(ii) first-produced petroleum that was flared or vented in a gaseous state;
(iii) first-produced petroleum that was used to produce other petroleum;
(a) for a volume of petroleum, or a petroleum product derived from petroleum, produced under a lease for a 6-month report—the period starting on the day petroleum was first produced under the lease and ending on the last day of the 6-month period; or
(b) for a volume or estimated volume of associated water taken under a lease for a 6-month report—the period starting on the day associated water was first taken under the lease and ending on the last day of the 6-month period.
sec.43
Petroleum resources and reserves report
sec.43 Petroleum resources and reserves report
A petroleum tenure holder must lodge a petroleum resources and reserves report for the tenure for each calendar year.
The report must be lodged within 60 business days after the calendar year ends.
The report must contain the following information—
the type and number of the tenure;
an identification of each natural underground reservoir in which there were, during the period, any 2C contingent resources, 1P reserves, 2P reserves or 3P reserves under the PRMS;
the amount of any 2C contingent resources, 1P reserves, 2P reserves or 3P reserves under the PRMS within the area of the tenure worked out on the last day of the period;
details of project maturity subclasses for any 2P reserves or 2C contingent resources under the PRMS that relate to the tenure worked out on the last day of the period;
any change not less than 10% for any 2P reserves under the PRMS within the area of the tenure at field-level or basin-level that occurred during the period;
any other data or information for the report required under the practice direction.
In this section—
PRMS means the document called ‘Petroleum Resources Management System’, also referred to as the SPE Code, published in 2018 by the Society of Petroleum Engineers.
project maturity subclass means a sub-classification of activities for a project mentioned in the PRMS , part 2.1.3.5 .
s 43 amd 2020 SL No. 208 s 19
(sec.43-ssec.1) A petroleum tenure holder must lodge a petroleum resources and reserves report for the tenure for each calendar year.
(sec.43-ssec.2) The report must be lodged within 60 business days after the calendar year ends.
(sec.43-ssec.3) The report must contain the following information— the type and number of the tenure; an identification of each natural underground reservoir in which there were, during the period, any 2C contingent resources, 1P reserves, 2P reserves or 3P reserves under the PRMS; the amount of any 2C contingent resources, 1P reserves, 2P reserves or 3P reserves under the PRMS within the area of the tenure worked out on the last day of the period; details of project maturity subclasses for any 2P reserves or 2C contingent resources under the PRMS that relate to the tenure worked out on the last day of the period; any change not less than 10% for any 2P reserves under the PRMS within the area of the tenure at field-level or basin-level that occurred during the period; any other data or information for the report required under the practice direction.
(sec.43-ssec.4) In this section— PRMS means the document called ‘Petroleum Resources Management System’, also referred to as the SPE Code, published in 2018 by the Society of Petroleum Engineers. project maturity subclass means a sub-classification of activities for a project mentioned in the PRMS , part 2.1.3.5 .
(a) the type and number of the tenure;
(b) an identification of each natural underground reservoir in which there were, during the period, any 2C contingent resources, 1P reserves, 2P reserves or 3P reserves under the PRMS;
(c) the amount of any 2C contingent resources, 1P reserves, 2P reserves or 3P reserves under the PRMS within the area of the tenure worked out on the last day of the period;
(d) details of project maturity subclasses for any 2P reserves or 2C contingent resources under the PRMS that relate to the tenure worked out on the last day of the period;
(e) any change not less than 10% for any 2P reserves under the PRMS within the area of the tenure at field-level or basin-level that occurred during the period;
(f) any other data or information for the report required under the practice direction.
sec.44
Production testing report
sec.44 Production testing report
This section applies if production testing for a petroleum well is carried out under a petroleum tenure.
The tenure holder must lodge a production testing report for the relevant testing period.
The report must be lodged within 60 business days after the relevant testing period ends.
The report must contain the following information—
the type and number of the tenure;
the identifying name of the petroleum well;
an identification of each natural underground reservoir and the reservoir formation (or geological unit) from which petroleum was produced as part of the production testing;
the duration of the production testing carried out during the period;
the type of any perforations in the well and the depth in metres of the top and bottom of the perforated intervals;
the volumes, or estimated volumes, of gas, oil and water produced from the testing during the period;
the choke size used for the well;
the density of any oil produced from the testing during the period, measured using the American Petroleum Institute’s scale of measuring the specific gravity of oil, commonly known as the ‘API gravity’ of the oil;
the pressure in the well, measured during the period, at which petroleum can not escape from the wellhead, commonly known as the ‘shut-in pressure’ of the well;
if petroleum in a gaseous state was produced during the testing—
details of the use, or intended use, of the petroleum; and
for an authorised activity for the petroleum tenure, flaring, venting, processing
the volume, or estimated volume, of the petroleum used, or intended to be used, other than by flaring or venting;
data in relation to samples, and the analysis of the samples, taken from the area of the tenure;
any other data or information for the report required under the practice direction.
In this section—
end day , for production testing for a petroleum well, means—
if the well intersects a natural underground reservoir containing coal seam gas, shale gas, tight gas or basin-centred gas and the testing relates to petroleum produced from the reservoir—the day that is 13 months after the testing starts; or
otherwise—the day that is 6 months after the testing starts.
production testing means testing for petroleum production from a petroleum well within the area of the petroleum tenure.
relevant testing period means—
the period starting on the first day production testing for the petroleum well is carried out and ending on the earlier of—
the end day; or
the last day the testing is carried out; and
if the production testing is carried out after the end day with the Minister’s approval—the period starting on the day after the end day and ending on the last day the testing is carried out.
s 44 amd 2020 SL No. 208 s 20
(sec.44-ssec.1) This section applies if production testing for a petroleum well is carried out under a petroleum tenure.
(sec.44-ssec.2) The tenure holder must lodge a production testing report for the relevant testing period.
(sec.44-ssec.3) The report must be lodged within 60 business days after the relevant testing period ends.
(sec.44-ssec.4) The report must contain the following information— the type and number of the tenure; the identifying name of the petroleum well; an identification of each natural underground reservoir and the reservoir formation (or geological unit) from which petroleum was produced as part of the production testing; the duration of the production testing carried out during the period; the type of any perforations in the well and the depth in metres of the top and bottom of the perforated intervals; the volumes, or estimated volumes, of gas, oil and water produced from the testing during the period; the choke size used for the well; the density of any oil produced from the testing during the period, measured using the American Petroleum Institute’s scale of measuring the specific gravity of oil, commonly known as the ‘API gravity’ of the oil; the pressure in the well, measured during the period, at which petroleum can not escape from the wellhead, commonly known as the ‘shut-in pressure’ of the well; if petroleum in a gaseous state was produced during the testing— details of the use, or intended use, of the petroleum; and for an authorised activity for the petroleum tenure, flaring, venting, processing the volume, or estimated volume, of the petroleum used, or intended to be used, other than by flaring or venting; data in relation to samples, and the analysis of the samples, taken from the area of the tenure; any other data or information for the report required under the practice direction.
(sec.44-ssec.5) In this section— end day , for production testing for a petroleum well, means— if the well intersects a natural underground reservoir containing coal seam gas, shale gas, tight gas or basin-centred gas and the testing relates to petroleum produced from the reservoir—the day that is 13 months after the testing starts; or otherwise—the day that is 6 months after the testing starts. production testing means testing for petroleum production from a petroleum well within the area of the petroleum tenure. relevant testing period means— the period starting on the first day production testing for the petroleum well is carried out and ending on the earlier of— the end day; or the last day the testing is carried out; and if the production testing is carried out after the end day with the Minister’s approval—the period starting on the day after the end day and ending on the last day the testing is carried out.
(a) the type and number of the tenure;
(b) the identifying name of the petroleum well;
(c) an identification of each natural underground reservoir and the reservoir formation (or geological unit) from which petroleum was produced as part of the production testing;
(d) the duration of the production testing carried out during the period;
(e) the type of any perforations in the well and the depth in metres of the top and bottom of the perforated intervals;
(f) the volumes, or estimated volumes, of gas, oil and water produced from the testing during the period;
(g) the choke size used for the well;
(h) the density of any oil produced from the testing during the period, measured using the American Petroleum Institute’s scale of measuring the specific gravity of oil, commonly known as the ‘API gravity’ of the oil;
(i) the pressure in the well, measured during the period, at which petroleum can not escape from the wellhead, commonly known as the ‘shut-in pressure’ of the well;
(j) if petroleum in a gaseous state was produced during the testing— (i) details of the use, or intended use, of the petroleum; and Examples of use, or intended use, of the petroleum— for an authorised activity for the petroleum tenure, flaring, venting, processing (ii) the volume, or estimated volume, of the petroleum used, or intended to be used, other than by flaring or venting;
(i) details of the use, or intended use, of the petroleum; and Examples of use, or intended use, of the petroleum— for an authorised activity for the petroleum tenure, flaring, venting, processing
(ii) the volume, or estimated volume, of the petroleum used, or intended to be used, other than by flaring or venting;
(k) data in relation to samples, and the analysis of the samples, taken from the area of the tenure;
(l) any other data or information for the report required under the practice direction.
(i) details of the use, or intended use, of the petroleum; and Examples of use, or intended use, of the petroleum— for an authorised activity for the petroleum tenure, flaring, venting, processing
(ii) the volume, or estimated volume, of the petroleum used, or intended to be used, other than by flaring or venting;
(a) if the well intersects a natural underground reservoir containing coal seam gas, shale gas, tight gas or basin-centred gas and the testing relates to petroleum produced from the reservoir—the day that is 13 months after the testing starts; or
(b) otherwise—the day that is 6 months after the testing starts.
(a) the period starting on the first day production testing for the petroleum well is carried out and ending on the earlier of— (i) the end day; or (ii) the last day the testing is carried out; and
(i) the end day; or
(ii) the last day the testing is carried out; and
(b) if the production testing is carried out after the end day with the Minister’s approval—the period starting on the day after the end day and ending on the last day the testing is carried out.
After the holder of a petroleum tenure has finished carrying out hydraulic fracturing activities in the prescribed area for the tenure, the tenure holder must lodge a hydraulic fracturing activities completion report.
The report must be lodged within 6 months after the hydraulic fracturing activities are completed.
The report must contain the following information—
the type and number of the tenure;
the name and postal address of the contractor who carried out the hydraulic fracturing activities on behalf of the operator of the drilling project;
the identifying name of each treatment well or observation well for which the activities were carried out;
the days the activities for each petroleum well started and ended;
a description of each method of activities carried out;
the depth in metres of the top and bottom of—
each stage over which the activities were carried out; and
each geological interval over which activities were carried out and the name of each geological interval;
a summary of the operations performed at each stage in carrying out the activities, including the volume and type of chemical used at each stage;
an assessment of the implications of the activities for each petroleum well for the future management of the natural underground reservoir involved, including for each stage of the activities, over the geological interval, a graphic representation of the following—
casing pressure with time;
calculated bottom hole pressure with time;
calculated bottom hole concentration with time;
the rate at which the hydraulic fracturing fluid is pumped into the well used for the activities with time;
the concentration of proppant in the hydraulic fracturing fluid with time;
maximum surface treatment pressure reached during each stage of the activities;
the estimated targeted fracture pressure over the geological interval during each stage of the activities;
details of—
the equipment used to carry out and monitor the activities; and
the diagnostic techniques used to monitor the activities;
if known, details of—
any geological connection between a geological interval over which activities were carried out and an aquifer; and
In the Surat Basin, if a Walloon subgroup geological interval hydraulic fracture treatment stage breaks through to the Upper Springbok Formation, the holder must include details of this event.
the distance separating a geological interval over which activities were carried out from an aquifer;
details of the total volume of hydraulic fracturing fluid, in kilolitres, pumped into each petroleum well during each stage of the activities;
if activities were carried out on a coal seam—any other details about the activities that would assist a person to make a future assessment of the impact of the activities on the coal seam and any increased risk to safe and optimal mining of coal;
if a known event related to the activities has caused material environmental harm or serious environmental harm under the Environmental Protection Act 1994 —details of each step taken to mitigate the harm;
any other data or information for the report required under the practice direction.
The holder must ensure the report is accompanied by a hydraulic fracturing fluid statement about the composition of the hydraulic fracturing fluid used in carrying out the activities, including—
the quantity of each component of the hydraulic fracturing fluid; and
the concentration of each component in the hydraulic fracturing fluid; and
the name of any chemical compound contained in the hydraulic fracturing fluid.
Maximum penalty for subsection (4) —20 penalty units.
s 45 amd 2020 SL No. 208 s 21
(sec.45-ssec.1) After the holder of a petroleum tenure has finished carrying out hydraulic fracturing activities in the prescribed area for the tenure, the tenure holder must lodge a hydraulic fracturing activities completion report.
(sec.45-ssec.2) The report must be lodged within 6 months after the hydraulic fracturing activities are completed.
(sec.45-ssec.3) The report must contain the following information— the type and number of the tenure; the name and postal address of the contractor who carried out the hydraulic fracturing activities on behalf of the operator of the drilling project; the identifying name of each treatment well or observation well for which the activities were carried out; the days the activities for each petroleum well started and ended; a description of each method of activities carried out; the depth in metres of the top and bottom of— each stage over which the activities were carried out; and each geological interval over which activities were carried out and the name of each geological interval; a summary of the operations performed at each stage in carrying out the activities, including the volume and type of chemical used at each stage; an assessment of the implications of the activities for each petroleum well for the future management of the natural underground reservoir involved, including for each stage of the activities, over the geological interval, a graphic representation of the following— casing pressure with time; calculated bottom hole pressure with time; calculated bottom hole concentration with time; the rate at which the hydraulic fracturing fluid is pumped into the well used for the activities with time; the concentration of proppant in the hydraulic fracturing fluid with time; maximum surface treatment pressure reached during each stage of the activities; the estimated targeted fracture pressure over the geological interval during each stage of the activities; details of— the equipment used to carry out and monitor the activities; and the diagnostic techniques used to monitor the activities; if known, details of— any geological connection between a geological interval over which activities were carried out and an aquifer; and In the Surat Basin, if a Walloon subgroup geological interval hydraulic fracture treatment stage breaks through to the Upper Springbok Formation, the holder must include details of this event. the distance separating a geological interval over which activities were carried out from an aquifer; details of the total volume of hydraulic fracturing fluid, in kilolitres, pumped into each petroleum well during each stage of the activities; if activities were carried out on a coal seam—any other details about the activities that would assist a person to make a future assessment of the impact of the activities on the coal seam and any increased risk to safe and optimal mining of coal; if a known event related to the activities has caused material environmental harm or serious environmental harm under the Environmental Protection Act 1994 —details of each step taken to mitigate the harm; any other data or information for the report required under the practice direction.
(sec.45-ssec.4) The holder must ensure the report is accompanied by a hydraulic fracturing fluid statement about the composition of the hydraulic fracturing fluid used in carrying out the activities, including— the quantity of each component of the hydraulic fracturing fluid; and the concentration of each component in the hydraulic fracturing fluid; and the name of any chemical compound contained in the hydraulic fracturing fluid. Maximum penalty for subsection (4) —20 penalty units.
(a) the type and number of the tenure;
(b) the name and postal address of the contractor who carried out the hydraulic fracturing activities on behalf of the operator of the drilling project;
(c) the identifying name of each treatment well or observation well for which the activities were carried out;
(d) the days the activities for each petroleum well started and ended;
(e) a description of each method of activities carried out;
(f) the depth in metres of the top and bottom of— (i) each stage over which the activities were carried out; and (ii) each geological interval over which activities were carried out and the name of each geological interval;
(i) each stage over which the activities were carried out; and
(ii) each geological interval over which activities were carried out and the name of each geological interval;
(g) a summary of the operations performed at each stage in carrying out the activities, including the volume and type of chemical used at each stage;
(h) an assessment of the implications of the activities for each petroleum well for the future management of the natural underground reservoir involved, including for each stage of the activities, over the geological interval, a graphic representation of the following— (i) casing pressure with time; (ii) calculated bottom hole pressure with time; (iii) calculated bottom hole concentration with time; (iv) the rate at which the hydraulic fracturing fluid is pumped into the well used for the activities with time; (v) the concentration of proppant in the hydraulic fracturing fluid with time; (vi) maximum surface treatment pressure reached during each stage of the activities; (vii) the estimated targeted fracture pressure over the geological interval during each stage of the activities;
(i) casing pressure with time;
(ii) calculated bottom hole pressure with time;
(iii) calculated bottom hole concentration with time;
(iv) the rate at which the hydraulic fracturing fluid is pumped into the well used for the activities with time;
(v) the concentration of proppant in the hydraulic fracturing fluid with time;
(vi) maximum surface treatment pressure reached during each stage of the activities;
(vii) the estimated targeted fracture pressure over the geological interval during each stage of the activities;
(i) details of— (i) the equipment used to carry out and monitor the activities; and (ii) the diagnostic techniques used to monitor the activities;
(i) the equipment used to carry out and monitor the activities; and
(ii) the diagnostic techniques used to monitor the activities;
(j) if known, details of— (i) any geological connection between a geological interval over which activities were carried out and an aquifer; and Example— In the Surat Basin, if a Walloon subgroup geological interval hydraulic fracture treatment stage breaks through to the Upper Springbok Formation, the holder must include details of this event. (ii) the distance separating a geological interval over which activities were carried out from an aquifer;
(i) any geological connection between a geological interval over which activities were carried out and an aquifer; and Example— In the Surat Basin, if a Walloon subgroup geological interval hydraulic fracture treatment stage breaks through to the Upper Springbok Formation, the holder must include details of this event.
(ii) the distance separating a geological interval over which activities were carried out from an aquifer;
(k) details of the total volume of hydraulic fracturing fluid, in kilolitres, pumped into each petroleum well during each stage of the activities;
(l) if activities were carried out on a coal seam—any other details about the activities that would assist a person to make a future assessment of the impact of the activities on the coal seam and any increased risk to safe and optimal mining of coal;
(m) if a known event related to the activities has caused material environmental harm or serious environmental harm under the Environmental Protection Act 1994 —details of each step taken to mitigate the harm;
(n) any other data or information for the report required under the practice direction.
(i) each stage over which the activities were carried out; and
(ii) each geological interval over which activities were carried out and the name of each geological interval;
(i) casing pressure with time;
(ii) calculated bottom hole pressure with time;
(iii) calculated bottom hole concentration with time;
(iv) the rate at which the hydraulic fracturing fluid is pumped into the well used for the activities with time;
(v) the concentration of proppant in the hydraulic fracturing fluid with time;
(vi) maximum surface treatment pressure reached during each stage of the activities;
(vii) the estimated targeted fracture pressure over the geological interval during each stage of the activities;
(i) the equipment used to carry out and monitor the activities; and
(ii) the diagnostic techniques used to monitor the activities;
(i) any geological connection between a geological interval over which activities were carried out and an aquifer; and Example— In the Surat Basin, if a Walloon subgroup geological interval hydraulic fracture treatment stage breaks through to the Upper Springbok Formation, the holder must include details of this event.
(ii) the distance separating a geological interval over which activities were carried out from an aquifer;
(a) the quantity of each component of the hydraulic fracturing fluid; and
(b) the concentration of each component in the hydraulic fracturing fluid; and
(c) the name of any chemical compound contained in the hydraulic fracturing fluid.
pt.4
Matters relating to records, samples and required information
Matters relating to records, samples and required information
pt.4-div.1
Records
Records
sec.46
Record of supply of gas from PGPLR land
sec.46 Record of supply of gas from PGPLR land
For the 2004 Act , section 175H (2) , a record of the following information must be kept—
details of the petroleum lease for the PGPLR land, including its number and the area of the lease;
the entity to whom the gas was supplied;
the volume of gas supplied to the entity.
Each record must be kept—
for at least 7 years after the day the record was made; and
in a way that enables the selling entity to comply with a request for a copy of the record within the time stated in a notice given under the 2004 Act , section 175H (3) .
hard copy or electronic format
(sec.46-ssec.1) For the 2004 Act , section 175H (2) , a record of the following information must be kept— details of the petroleum lease for the PGPLR land, including its number and the area of the lease; the entity to whom the gas was supplied; the volume of gas supplied to the entity.
(sec.46-ssec.2) Each record must be kept— for at least 7 years after the day the record was made; and in a way that enables the selling entity to comply with a request for a copy of the record within the time stated in a notice given under the 2004 Act , section 175H (3) . hard copy or electronic format
(a) details of the petroleum lease for the PGPLR land, including its number and the area of the lease;
(b) the entity to whom the gas was supplied;
(c) the volume of gas supplied to the entity.
(a) for at least 7 years after the day the record was made; and
(b) in a way that enables the selling entity to comply with a request for a copy of the record within the time stated in a notice given under the 2004 Act , section 175H (3) . Examples of ways records may be kept— hard copy or electronic format
pt.4-div.2
Samples
Samples
sec.47
Purpose of division
sec.47 Purpose of division
This division prescribes matters for the 2004 Act , section 547 (1) and the 1923 Act , section 76A (1) .
sec.48
Keeping samples
sec.48 Keeping samples
A sample must be kept until the later of the following—
the end of the term of the petroleum tenure;
the sample, or part of the sample, is lodged under the 2004 Act , section 548 or the 1923 Act , section 76B .
A sample must be kept in a way that prevents unnecessary deterioration or loss of the sample.
s 48 amd 2020 SL No. 70 s 9
(sec.48-ssec.1) A sample must be kept until the later of the following— the end of the term of the petroleum tenure; the sample, or part of the sample, is lodged under the 2004 Act , section 548 or the 1923 Act , section 76B .
(sec.48-ssec.2) A sample must be kept in a way that prevents unnecessary deterioration or loss of the sample.
(a) the end of the term of the petroleum tenure;
(b) the sample, or part of the sample, is lodged under the 2004 Act , section 548 or the 1923 Act , section 76B .
sec.49
Cutting samples
sec.49 Cutting samples
Each cutting sample of geological formations taken as follows must be kept—
when the formations are penetrated making a petroleum well under a petroleum tenure;
at each interval stated in subsection (2) .
For subsection (1) (b) , the intervals are—
for a petroleum well other than a development well—each 10m interval, or part of a 10m interval, from the surface to as close as practicable to the top of the geological formation nearest to the surface that is likely to contain a natural underground reservoir; and
each 3m interval, or part of a 3m interval, from as close as practicable to the top of the geological formation mentioned in paragraph (a) to the bottom of the well.
However, subsection (1) applies to a cutting sample taken when making a petroleum well solely for coal seam gas exploration or production only if, before the well was made, the chief executive gave the tenure holder notice that the sample must be kept.
The part of the sample lodged under the 2004 Act , section 548 (1) or the 1923 Act , section 76B (1) must be—
at least 250g, but not more than 500g; and
washed and dried; and
in a container that is suitable for long-term storage and handling, and is labelled with—
the identifying name of the well from which the sample was taken; and
the depth in metres of the top and bottom of the interval from which the sample was taken.
In this section—
cutting sample means a sample of the cuttings produced making the well.
(sec.49-ssec.1) Each cutting sample of geological formations taken as follows must be kept— when the formations are penetrated making a petroleum well under a petroleum tenure; at each interval stated in subsection (2) .
(sec.49-ssec.2) For subsection (1) (b) , the intervals are— for a petroleum well other than a development well—each 10m interval, or part of a 10m interval, from the surface to as close as practicable to the top of the geological formation nearest to the surface that is likely to contain a natural underground reservoir; and each 3m interval, or part of a 3m interval, from as close as practicable to the top of the geological formation mentioned in paragraph (a) to the bottom of the well.
(sec.49-ssec.3) However, subsection (1) applies to a cutting sample taken when making a petroleum well solely for coal seam gas exploration or production only if, before the well was made, the chief executive gave the tenure holder notice that the sample must be kept.
(sec.49-ssec.4) The part of the sample lodged under the 2004 Act , section 548 (1) or the 1923 Act , section 76B (1) must be— at least 250g, but not more than 500g; and washed and dried; and in a container that is suitable for long-term storage and handling, and is labelled with— the identifying name of the well from which the sample was taken; and the depth in metres of the top and bottom of the interval from which the sample was taken.
(sec.49-ssec.5) In this section— cutting sample means a sample of the cuttings produced making the well.
(a) when the formations are penetrated making a petroleum well under a petroleum tenure;
(b) at each interval stated in subsection (2) .
(a) for a petroleum well other than a development well—each 10m interval, or part of a 10m interval, from the surface to as close as practicable to the top of the geological formation nearest to the surface that is likely to contain a natural underground reservoir; and
(b) each 3m interval, or part of a 3m interval, from as close as practicable to the top of the geological formation mentioned in paragraph (a) to the bottom of the well.
(a) at least 250g, but not more than 500g; and
(b) washed and dried; and
(c) in a container that is suitable for long-term storage and handling, and is labelled with— (i) the identifying name of the well from which the sample was taken; and (ii) the depth in metres of the top and bottom of the interval from which the sample was taken.
(i) the identifying name of the well from which the sample was taken; and
(ii) the depth in metres of the top and bottom of the interval from which the sample was taken.
(i) the identifying name of the well from which the sample was taken; and
(ii) the depth in metres of the top and bottom of the interval from which the sample was taken.
sec.50
Cores
sec.50 Cores
Each core recovered from a petroleum well under a petroleum tenure must be kept.
However, subsection (1) applies in relation to a core from a petroleum well made solely for coal seam gas exploration or production only if—
the holder gives the chief executive notice, in the approved form, offering to give the chief executive a sample of the core; and
the notice is received within 5 months after the day the core is recovered; and
within 20 business days after receiving the notice, the chief executive gives the holder notice that the sample must be kept.
The part of the core lodged under the 2004 Act , section 548 (1) or the 1923 Act , section 76B (1) must—
be at least 50% of the core recovered; and
have as complete a vertical face as is practicable; and
be lodged in a box or other suitable container that is suitable for long-term storage and handling, and is labelled with—
the identifying name of the well from which the core was recovered; and
if more than 1 core is recovered from the well—the number of the core; and
the depth in metres of the top and bottom of the interval cored; and
the length in metres of the core recovered.
(sec.50-ssec.1) Each core recovered from a petroleum well under a petroleum tenure must be kept.
(sec.50-ssec.2) However, subsection (1) applies in relation to a core from a petroleum well made solely for coal seam gas exploration or production only if— the holder gives the chief executive notice, in the approved form, offering to give the chief executive a sample of the core; and the notice is received within 5 months after the day the core is recovered; and within 20 business days after receiving the notice, the chief executive gives the holder notice that the sample must be kept.
(sec.50-ssec.3) The part of the core lodged under the 2004 Act , section 548 (1) or the 1923 Act , section 76B (1) must— be at least 50% of the core recovered; and have as complete a vertical face as is practicable; and be lodged in a box or other suitable container that is suitable for long-term storage and handling, and is labelled with— the identifying name of the well from which the core was recovered; and if more than 1 core is recovered from the well—the number of the core; and the depth in metres of the top and bottom of the interval cored; and the length in metres of the core recovered.
(a) the holder gives the chief executive notice, in the approved form, offering to give the chief executive a sample of the core; and
(b) the notice is received within 5 months after the day the core is recovered; and
(c) within 20 business days after receiving the notice, the chief executive gives the holder notice that the sample must be kept.
(a) be at least 50% of the core recovered; and
(b) have as complete a vertical face as is practicable; and
(c) be lodged in a box or other suitable container that is suitable for long-term storage and handling, and is labelled with— (i) the identifying name of the well from which the core was recovered; and (ii) if more than 1 core is recovered from the well—the number of the core; and (iii) the depth in metres of the top and bottom of the interval cored; and (iv) the length in metres of the core recovered.
(i) the identifying name of the well from which the core was recovered; and
(ii) if more than 1 core is recovered from the well—the number of the core; and
(iii) the depth in metres of the top and bottom of the interval cored; and
(iv) the length in metres of the core recovered.
(i) the identifying name of the well from which the core was recovered; and
(ii) if more than 1 core is recovered from the well—the number of the core; and
(iii) the depth in metres of the top and bottom of the interval cored; and
(iv) the length in metres of the core recovered.
sec.51
Fluid samples
sec.51 Fluid samples
A sample (a fluid sample ) of liquid petroleum recovered from a petroleum well under a petroleum tenure must be kept if—
the sample is more than 10l; and
within 5 months after the day the sample is recovered, the chief executive gives the holder of the petroleum tenure notice that the sample must be kept.
For the 2004 Act , section 548 (1) and the 1923 Act , section 76B (1) , the part of the fluid sample lodged must be—
at least 500ml of the fluid sample recovered; and
in a glass bottle that is teflon sealed with a screw top; and
labelled with at least—
the identifying name of the well; and
the depth in metres of the top and bottom of the interval from which the sample was recovered; and
the day on which the sample was recovered; and
the method by which the fluid sample was recovered.
drill stem tests, production tests
(sec.51-ssec.1) A sample (a fluid sample ) of liquid petroleum recovered from a petroleum well under a petroleum tenure must be kept if— the sample is more than 10l; and within 5 months after the day the sample is recovered, the chief executive gives the holder of the petroleum tenure notice that the sample must be kept.
(sec.51-ssec.2) For the 2004 Act , section 548 (1) and the 1923 Act , section 76B (1) , the part of the fluid sample lodged must be— at least 500ml of the fluid sample recovered; and in a glass bottle that is teflon sealed with a screw top; and labelled with at least— the identifying name of the well; and the depth in metres of the top and bottom of the interval from which the sample was recovered; and the day on which the sample was recovered; and the method by which the fluid sample was recovered. drill stem tests, production tests
(a) the sample is more than 10l; and
(b) within 5 months after the day the sample is recovered, the chief executive gives the holder of the petroleum tenure notice that the sample must be kept.
(a) at least 500ml of the fluid sample recovered; and
(b) in a glass bottle that is teflon sealed with a screw top; and
(c) labelled with at least— (i) the identifying name of the well; and (ii) the depth in metres of the top and bottom of the interval from which the sample was recovered; and (iii) the day on which the sample was recovered; and (iv) the method by which the fluid sample was recovered. Examples— drill stem tests, production tests
(i) the identifying name of the well; and
(ii) the depth in metres of the top and bottom of the interval from which the sample was recovered; and
(iii) the day on which the sample was recovered; and
(iv) the method by which the fluid sample was recovered. Examples— drill stem tests, production tests
(i) the identifying name of the well; and
(ii) the depth in metres of the top and bottom of the interval from which the sample was recovered; and
(iii) the day on which the sample was recovered; and
(iv) the method by which the fluid sample was recovered. Examples— drill stem tests, production tests
pt.4-div.3
Releasing required information
Releasing required information
sec.52
Confidentiality periods for required information for petroleum tenures
sec.52 Confidentiality periods for required information for petroleum tenures
This section prescribes, for the 2004 Act , section 550 (2) and the 1923 Act , section 76D (2) , the confidentiality period for the required information stated in schedule 1 , column 1.
The confidentiality period for the required information starts on the day the information is lodged and ends on the day stated in schedule 1 , column 2 opposite the required information.
However, there is no confidentiality period for a petroleum well or bore abandonment report under section 37 if—
the report is to be made available to a person under the 2004 Act , section 550 (1) (b) or the 1923 Act , section 76D (1) (b) ; and
the person is the holder of a coal or oil shale mining tenement; and
the well or bore was drilled in the area of the person’s coal or oil shale mining tenement.
Also, there is no confidentiality period for required information not mentioned in subsection (2) .
s 52 sub 2020 SL No. 208 s 22
amd 2022 SL No. 191 s 6 ; 2025 SL No. 48 s 14 sch 1
(sec.52-ssec.1) This section prescribes, for the 2004 Act , section 550 (2) and the 1923 Act , section 76D (2) , the confidentiality period for the required information stated in schedule 1 , column 1.
(sec.52-ssec.2) The confidentiality period for the required information starts on the day the information is lodged and ends on the day stated in schedule 1 , column 2 opposite the required information.
(sec.52-ssec.3) However, there is no confidentiality period for a petroleum well or bore abandonment report under section 37 if— the report is to be made available to a person under the 2004 Act , section 550 (1) (b) or the 1923 Act , section 76D (1) (b) ; and the person is the holder of a coal or oil shale mining tenement; and the well or bore was drilled in the area of the person’s coal or oil shale mining tenement.
(sec.52-ssec.4) Also, there is no confidentiality period for required information not mentioned in subsection (2) .
(a) the report is to be made available to a person under the 2004 Act , section 550 (1) (b) or the 1923 Act , section 76D (1) (b) ; and
(b) the person is the holder of a coal or oil shale mining tenement; and
(c) the well or bore was drilled in the area of the person’s coal or oil shale mining tenement.
sec.53
Publication of required information
sec.53 Publication of required information
For the 2004 Act , section 550 (1) (a) and the 1923 Act , section 76D (1) (a) , the chief executive may publish required information in the following ways—
in a journal published by the department or under the Minister’s authority;
in another publication considered appropriate by the chief executive;
on the department’s website;
in a publicly available database;
on a map that is made available to the public for inspection or purchase;
in digital or electronic form, including, for example, on a disc or tape;
by displaying it on a notice that is available to the public for inspection at—
the department’s head office; and
other places the chief executive considers appropriate;
by telling it to another person or presenting it to the person in a visual form.
(a) in a journal published by the department or under the Minister’s authority;
(b) in another publication considered appropriate by the chief executive;
(c) on the department’s website;
(d) in a publicly available database;
(e) on a map that is made available to the public for inspection or purchase;
(f) in digital or electronic form, including, for example, on a disc or tape;
(g) by displaying it on a notice that is available to the public for inspection at— (i) the department’s head office; and (ii) other places the chief executive considers appropriate;
(i) the department’s head office; and
(ii) other places the chief executive considers appropriate;
(h) by telling it to another person or presenting it to the person in a visual form.
(i) the department’s head office; and
(ii) other places the chief executive considers appropriate;
pt.5
Matters relating to taking non-associated water
Matters relating to taking non-associated water
sec.54
Definition for part
sec.54 Definition for part
In this part—
reporting period , for a petroleum tenure, means each period—
that starts on 1 January and ends on—
30 June; or
if the tenure expires or is surrendered on a day falling between 1 January and 30 June—that day; or
that starts on 1 July and ends on—
31 December; or
if the tenure expires or is surrendered on a day falling between 1 July and 31 December—that day.
(a) that starts on 1 January and ends on— (i) 30 June; or (ii) if the tenure expires or is surrendered on a day falling between 1 January and 30 June—that day; or
(i) 30 June; or
(ii) if the tenure expires or is surrendered on a day falling between 1 January and 30 June—that day; or
(b) that starts on 1 July and ends on— (i) 31 December; or (ii) if the tenure expires or is surrendered on a day falling between 1 July and 31 December—that day.
(i) 31 December; or
(ii) if the tenure expires or is surrendered on a day falling between 1 July and 31 December—that day.
(i) 30 June; or
(ii) if the tenure expires or is surrendered on a day falling between 1 January and 30 June—that day; or
(i) 31 December; or
(ii) if the tenure expires or is surrendered on a day falling between 1 July and 31 December—that day.
More sections below
Source text: opening excerpt
Sourced from Queensland Legislation (legislation.qld.gov.au), CC BY 4.0.
pt.1 Preliminary
Preliminary
pt.1-div.1 Introduction
Introduction
sec.1 Short title
sec.1 Short title
This regulation may be cited as the Petroleum and Gas (General Provisions) Regulation 2017 .
sec.2 Commencement
sec.2 Commencement
This regulation commences on 1 September 2017.
pt.1-div.2 Interpretation
Interpretation
sec.3 Definitions
sec.3 Definitions
The dictionary in schedule 5 defines particular words used in this regulation.
sec.4 References to particular resource authorities and wells under this regulation
sec.4 References to particular resource authorities and wells under this regulation
A reference in this regulation to an authority to prospect is a reference to—
an authority to prospect under the 2004 Act ; and
an authority to prospect under the 1923 Act .
A reference in this regulation to a petroleum lease is a reference to—
a petroleum lease under the 2004 Act ; and
a lease under the 1923 Act .
A reference in this regulation to a petroleum tenure is a reference to—
a 2004 Act petroleum tenure; and
an authority to prospect and a lease under the 1923 Act .
A reference in this regulation to a petroleum well includes a reference to a well under the 1923 Act .
(sec.4-ssec.1) A reference in this regulation to an authority to prospect is a reference to— an authority to prospect under the 2004 Act ; and an authority to prospect under the 1923 Act .
(sec.4-ssec.2) A reference in this regulation to a petroleum lease is a reference to— a petroleum lease under the 2004 Act ; and a lease under the 1923 Act .
(sec.4-ssec.3) A reference in this regulation to a petroleum tenure is a reference to— a 2004 Act petroleum tenure; and an authority to prospect and a lease under the 1923 Act .
(sec.4-ssec.4) A reference in this regulation to a petroleum well includes a reference to a well under the 1923 Act .
(a) an authority to prospect under the 2004 Act ; and
(b) an authority to prospect under the 1923 Act .
(a) a petroleum lease under the 2004 Act ; and
(b) a lease under the 1923 Act .
(a) a 2004 Act petroleum tenure; and
(b) an authority to prospect and a lease under the 1923 Act .
pt.2 Substances prescribed for the 2004 Act
Substances prescribed for the 2004 Act
sec.5 Substances that are petroleum
The regulation therefore formalises operational data flows to government, technical minimums for measurement and sample retention, and fiscal and administrative rules connected to tenure and licence management. The provisions allocate ongoing compliance costs to tenure and licence holders through reporting burdens, sample retention obligations and fees, while the State gains information and financial contributions with defined confidentiality timeframes and publication mechanisms (secs 52 to 53).
Main concepts
The instrument relies on a set of recurring concepts that structure obligations and rights. Petroleum and related substances, tenure and licence types, required information and confidentiality periods, measurement schemes, and financial securities are the principal threads.
Substances and categorisation: Sections 5 and 6 specify which non conventional or derived substances are to be treated as petroleum or fuel gas for particular parts of the 2004 Act. Biogas, biomethane and synthetic natural gas are prescribed as petroleum for chapters 8 to 10 and parts of chapters 11 to 14 (s 5). Carbon dioxide is prescribed for certain survey and testing activities dealing with CO2 storage under section 32(1)(d) of the 2004 Act, but only subject to approval and conditions and time limits (s 5(3) and (4)). Section 6 prescribes synthetic methane, with a technical definition, and other gases as fuel gas for s 11(2)(d) of the 2004 Act.
Tenures, licences and authorities: The regulation interacts with different tenure categories under both the contemporary 2004 Act and the earlier 1923 Act, and s 4 clarifies cross references so that requirements apply to both regimes where stated. It addresses authorities to prospect, petroleum leases, pipeline licences, survey and data acquisition licences, water monitoring authorities and storage arrangements, imposing tailored reporting and security obligations for each.
Reporting and notice architecture: The regulation sets minimum contents and timing for pre activity notices (drilling, surveys, hydraulic fracturing) and post activity and periodic reports (daily drilling reports s 35, well completion s 36, abandonment s 37, seismic and scientific survey reports s 38, s 39, petroleum production reports s 42, resources and reserves annual report s 43). Several provisions refer to a practice direction, allowing the chief executive to require additional data or formats for reports (for example ss 18, 21, 22, 23). Confidentiality periods for required information are prescribed and start on the lodgement day, with schedule 1 setting the end points (s 52). Section 53 lists publication channels by which the chief executive may disclose required information.
Samples, records and retention: The instrument prescribes which physical samples must be retained and for how long. Cutting samples intervals are specified (every 10m or 3m depending on well type) and parts of samples to be lodged are prescribed (s 49). Cores and fluid samples have specific retention and submission rules, including sizes and packaging (secs 50 to 51). Records of gas supplied from PGPLR land must be kept for seven years and be readily producible (s 46).
Metering and measurement: Meter tolerances are specified by throughput (s 58), with additional hardware requirements and checking frequencies for high throughput meters (ss 59 to 61). Measurement schemes must state conversion methods when a measurement is to be converted into another form (s 61). Controllers of meters must ensure regulators and correction factors do not disadvantage consumers and mark operating pressures clearly, with specified penalties (ss 62 to 63).
Financial mechanics: Fees and rents are referenced to schedules and to formulae, notably the pipeline licence annual fee formula in s 66A which allocates a share of State funding commitments to combined energy market regulation across pipeline licence holders based on pipeline kilometres. Security forms and fixed security amounts for different tenure types are prescribed (s 71).
Procedural mechanics: Section 74 prescribes electronic lodgement as primary method with the department’s online system on a Queensland Government website and preserves postal and facsimile options if listed; the chief executive may require hard copies; timing rules for documents lodged outside office hours are set.
These concepts combine to create a regulatory information ecosystem in which tenure and licence holders provide technical, environmental, production and financial information on a set timetable, retain physical and electronic evidence, and face measurement standards and fees prescribed in the schedules and sections cited above.
Who it affects
Primary regulated persons: The regulation targets holders of petroleum tenures, pipeline licences, petroleum facility licences, survey licences, data acquisition authorities and water monitoring authorities under the 2004 Act and the 1923 Act. Many obligations are framed as applying to “the holder” of the relevant tenure or licence, for example daily drilling reports (s 35), completion and abandonment reports (ss 36 to 37), production and reserves reporting (ss 42 to 44), and seismic and survey reports (ss 38 to 39). The regulation also prescribes obligations specific to pipeline licence controllers for metering (ss 58 to 61) and a formula for pipeline licence annual fees that uses kilometres of scheme and licensed pipeline (s 66A).
Operators and contractors: Many reporting requirements require identification of operators and contractors. For hydraulic fracturing completion reports, the contractor who carried out the activities and the operator of the drilling project must be named, and the report must include contractor-provided data such as fluid compositions and treatment stage performance (s 45). Daily drilling reports and well completion reports require the name and postal address of the operator and detailed drilling rig and equipment information (ss 35, 36).
Third parties with adjacent or overlapping interests: Landowners and occupiers must be given copies of some notices, since section 28 requires that tenure holders give a copy of a lodged notice to each owner and occupier of the land where authorised activities are or will be carried out. Coal and oil shale miners receive preferential access to abandonment reports where a well or bore was drilled in their tenement area; s 52(3) removes confidentiality for abandonment reports where they are to be made available to a coal or oil shale mining tenement holder under the 2004 Act s 550(1)(b) or the 1923 Act s 76D(1)(b).
Regulatory bodies and the public: The chief executive and the Minister are the public decision makers in many respects. The chief executive approves alternative measurement methods (s 55(3)), may require hard copies of electronically lodged documents (s 74(3)), may review alternative measurement methods (s 57), and decides on publication of required information via multiple channels (s 53). The public and specific stakeholders may access required information after confidentiality periods expire under s 52 and s 53.
Commercial counterparties, purchasers and end users: Producers, traders and buyers of petroleum products and stored petroleum are affected via metering and record rules (secs 58 to 63, 46) and through financial obligations such as fees and storage rent (secs 64 to 70). For example, controllers of meters must ensure regulators do not disadvantage consumers, which imposes an operational constraint with a monetary penalty attached (s 62).
Insurance, finance and banking interests: The prescribed forms of security (s 71), including unconditional securities from financial institutions, affect banks and insurers providing guarantees or performance securities to tenure holders or applicants.
Who pays and who decides: The regulated entities , tenure and licence holders , bear primary compliance costs including preparing and lodging detailed technical and environmental reports, keeping samples and records, installing and maintaining metering equipment and paying fees, rents and securities. The chief executive holds discretion on approvals, publication channels and practice directions that may add further data requirements. The Minister has residual decision making on matters referenced in the 2004 Act such as approvals for testing of reservoirs for CO2 storage (s 5(4)).
Behavioural effects: The information obligations and metering standards channel behaviour toward formalised data collection, routine measurement verification and longer term sample retention. Operators must adopt systems to capture digital information in approved formats and to make submissions through the online system or approved forms (s 74). The financial mechanics encourage timely rent and fee payment and the provision of security at prescribed levels (secs 64 to 71).
Key duties and rights
This regulation creates a comprehensive set of prescriptive duties for tenure and licence holders and confers procedural rights for the chief executive, the Minister and certain third parties. Below are the principal duties and associated rights as set out in the text.
Notice and reporting duties: Tenure and licence holders must give advance notices for drilling, surveying, seismic operations and hydraulic fracturing, usually at least 10 business days before start (secs 29, 31, 33). They must lodge completion notices within 10 business days of events such as drilling completion or well abandonment (s 30). Daily drilling reports must be kept for each drilling day and copies lodged with completion reports or on request (s 35). Well completion reports must be lodged within 12 months of rig release and contain detailed technical, spatial and equipment information including digital geophysical logs and core images (s 36). Abandonment reports must be lodged within six months of plugging and abandonment and include detailed equipment inventories and cementing methods with attention to coal mining safety risks (s 37). Periodic production, resources and reserves, seismic and survey reports have set deadlines , for example petroleum production reports and petroleum resources and reserves reports must be lodged within 60 business days after the period ends (ss 42, 43). Hydraulic fracturing completion reports must be lodged within six months and must include a hydraulic fracturing fluid statement; failure to supply that statement attracts a maximum penalty of 20 penalty units (s 45(2) and (4)).
Sample and recordkeeping duties: Cutting samples, cores and fluid samples are required to be kept, with specific interval rules for cutting samples and minimum sample sizes and packaging for lodged parts of samples (secs 48 to 51). Records of gas supply from PGPLR land must be retained for at least seven years and kept so they can be produced in response to statutory requests (s 46).
Metering and measurement duties: Meter accuracy tolerances are prescribed by throughput bands (s 58). High throughput meters have equipment and checking frequency obligations, for example flow computers for meters over 1PJ per year and checks every three months (s 60). Measurement schemes must set conversion methods when converting to other measurement forms (s 61). Controllers must ensure gas pressure regulators do not disadvantage consumers and must mark operating pressure where correction factors are applicable (ss 62, 63).
Financial duties: Fees and rents payable under the 2004 Act are prescribed in schedules and via formulae. The pipeline licence annual fee formula in s 66A allocates State costs based on kilometres of pipeline and cost shares set by the MCE and AEMC. Annual fees and rents must generally be paid on or before 31 August, with special timings on grant or first-time rent liability (s 68). Security must be provided in prescribed forms and amounts for specified authorities (s 71).
Rights and discretions of officials: The chief executive may publish required information by various methods (s 53), may approve alternative metering or measurement methods (s 55(3)), may review an approved alternative and require reversion to specified methods if accuracy is doubted (s 57), and may require hard copies of electronically lodged documents (s 74(3)). The Minister has decision-making roles referenced in the 2004 Act that are picked up by this regulation, including deciding owner status for storage rent commencement and approving tests for CO2 storage under restrictive conditions (s 5(3)-(4), s 68).
Confidentiality and access rights: The regulation prescribes confidentiality periods for required information lodged under the Acts in accordance with schedule 1, with those periods starting on lodgement day and ending as stated in schedule 1 (s 52). There are explicit carve outs where abandonment reports must be made available to holders of coal or oil shale mining tenements when relevant, removing confidentiality in those circumstances (s 52(3)).
Procedural rights of applicants and holders: Applicants may offer samples to the chief executive and receive direction whether samples must be kept, for example cores from coal seam gas exploration wells (s 50). Holders can propose and seek approval for alternative measurement methods by providing supporting reliability and accuracy information and rationale to the chief executive (s 55(3)). The chief executive must provide notice if an approved alternative is later withdrawn (s 57).
Enforcement mechanics embedded in duties: The regulation includes explicit penalties for failure to comply with some duties, for example the 20 penalty unit maximum for failing to include a hydraulic fracturing fluid statement (s 45(4)), and the requirement that meter additions not disadvantage consumers is enforceable with a maximum penalty of 20 penalty units (s 62).
Collectively, these duties impose recurring data, technical and financial obligations on tenure and licence holders, while providing officials with rights to demand further data, to publish information, and to approve or revoke technical alternatives.
Penalties and enforcement
The regulation itself contains only a small number of explicit penalty figures, but it connects to the enforcement architecture of the underlying Acts. Where specific penalties are stated in the regulation, they tend to be modest maximum monetary penalties expressed in penalty units. For example, failing to provide a hydraulic fracturing fluid statement with the completion report carries a maximum penalty of 20 penalty units (s 45(4)). The addition of a gas pressure regulator that disadvantages a consumer attracts a maximum penalty of 20 penalty units (s 62). Section 63 states a maximum penalty of 20 penalty units where marking requirements failed to be met for metering factors.
Many of the obligations in the regulation are framed as prescriptions under the 2004 Act or the 1923 Act, which carry their own enforcement regimes in those Acts including civil penalties, compliance notices, suspension or cancellation powers and criminal sanctions where the primary Act provides. The regulation therefore supplements primary legislation by specifying content, form and timing requirements that can be the basis of enforcement action under the parent Acts; see, for example, how various reporting obligations are “for the 2004 Act, section X” meaning noncompliance could attract remedies available under those Act provisions (throughout parts 3 to 6).
Enforcement actors and processes: The chief executive is the primary enforcement actor with powers to request reports, require particular forms or lodgement of hard copies, approve or revoke measurement methods, and publish required information (secs 35, 55(3), 57, 53, 74). The Minister retains strategic decision rights under the 2004 Act that condition certain provisions in this regulation, for example approval of testing on a particular block for CO2 under s 5(4). The regulation also contemplates notices to tenure holders and applicants, for example notice from the chief executive requiring retention of certain cores or samples (s 50).
Practical enforcement levers: The regulation creates detectability by requiring digital lodgement and specific report content, including raw data in digital form and spatial information (secs 36, 38, 39). This increases the capacity of regulators to review compliance and to identify deviations from required measurement tolerances or incomplete records. The prescribed checking frequencies for meters, and the requirement to lodge raw data for seismic and scientific surveys, mean the regulator can audit metering accuracy and survey completeness.
Administrative remedies and financial stakes: Security amounts are prescribed and may be called upon for certain authorised activities; section 71 prescribes forms of security and fixed amounts by authority type, which creates an immediate financial stake for applicants and tenure holders where security is required. Late or non payment of fees and rents would interact with the payment rules in this regulation and recovery or interest provisions in the parent Acts; this regulation prescribes a prescribed interest rate for amounts owing to the State of 15% a year (s 72). That rate is a direct financial enforcement mechanism for overdue liabilities.
Confidentiality and disclosure enforcement: Section 52 prescribes confidentiality periods for required information and sets exceptions where information becomes available to coal or oil shale mining tenement holders; the chief executive’s power to publish required information under s 53 functions as both a transparency tool and a compliance incentive because publication follows the expiry of confidentiality periods and can be used to make noncompliance visible.
Scope of criminal sanctions in the regulation: The regulation itself provides only limited explicit criminal or pecuniary penalties, relying largely on the underlying Acts for a fuller enforcement regime. Specific civil or criminal penalties beyond those mentioned in the regulation would be found in the 2004 Act and the 1923 Act provisions the regulation implements or supplements.
In sum, enforcement is a combination of discrete regulatory penalties written into the regulation, the exercise of administrative discretion by the chief executive and the Minister, financial securities and prescribed interest rates, and the capacity to publish required information. The regulation increases government oversight and the evidentiary basis for enforcement while placing defined financial and timing obligations on regulated parties.
How it interacts with other laws
This regulation operates as subordinate legislation that implements and supplements obligations and powers in the Petroleum and Gas (Production and Safety) Act 2004 and the Petroleum Act 1923. Multiple sections explicitly reference provisions in those Acts, making the regulation a device for operationalising statutory duties.
Linkage to the 2004 Act and 1923 Act: Many obligations are prescribed “for the 2004 Act, section X” or “for the 1923 Act, section Y” (see e.g. ss 5, 6, 8, 9, 21, 22, 23). The regulation therefore functions as a set of implementational rules; noncompliance will interact with enforcement mechanisms and definitions in the parent Acts. Section 4 expressly clarifies that references to resource authorities and wells in the regulation encompass authorities and wells under both Acts, which ensures the regulation applies across the two legislative regimes.
Interaction with environmental and water law: The regulation requires detailed reporting about bores, water production, groundwater pressures and water quality (s 12), and prescribes measurement and reporting of non associated water taken under a petroleum tenure, including the geological formation source and whether it is artesian or subartesian (secs 54 to 56). Those obligations will overlap with the Water Act and its regulators, and s 12 specifically requires that the bore information be given to the Water Act regulator in the approved form, creating an operational interface. Hydraulic fracturing reporting intersects with the Environmental Protection Act 1994 in that s 45(3)(m) requires reporting where an event causes material or serious environmental harm under that Act, and the report must detail mitigation steps. Therefore the regulation channels information to environmental and water regulators and provides data that may underpin separate regulatory action under those Acts.
Interaction with coal mining safety law: Abandonment reporting requires attention to hazards affecting coal mining operations; s 37 references the Coal Mining Safety and Health Act 1999 schedule 3 when defining coal mining operations, and mandates reporting of equipment left in wells that may create hazards to coal mining operations. Section 52 removes confidentiality for abandonment reports when the recipient is a coal or oil shale mining tenement holder and the well was drilled in that tenement area, enabling mining safety authorities and tenement holders to access relevant safety information.
Interaction with national energy market law and institutions: Section 66A links State-level pipeline licence fees to the costs of State funding commitments for combined energy market regulation decided by the MCE, and apportions a proportion decided by the AEMC. The regulation therefore embeds an explicit financial interaction with national energy market governance and cost sharing arrangements, referencing the National Gas (Queensland) Law and institutional acronyms such as MCE and AEMC.
Interaction with safety regulation: The regulation cross references the Petroleum and Gas (Safety) Regulation 2018 for safety and health fee returns, and sandals the online lodgement exception for safety and health fee returns under s 74(4), maintaining coherence with safety fee systems.
Publication and confidentiality interplay: Section 52 prescribes confidentiality periods for required information lodged under the 2004 Act and the 1923 Act, with schedule 1 setting the periods. Section 53 lists multiple publication methods available to the chief executive, giving effect to the parent Act transparency provisions and creating an interface between confidentiality entitlements and public disclosure obligations under other legislation, such as freedom of information frameworks.
Transitional and amendment interaction: The regulation includes transitional provisions that treat documents lodged under repealed or expired instruments as having been lodged under the corresponding provisions of this regulation (s 75) and transitional treatment of reporting dates and confidentiality under the 2020 amendment regulation (ss 76 to 77). These provisions manage continuity with earlier regulatory instruments and preserve legal effect of prior compliance.
In summary, the regulation is a targeted operational instrument that interfaces with water, environmental and mining safety statutes, with national energy market governance, and with the broader statutory architecture of the 2004 Act and the 1923 Act. It creates shared data flows and institutional touchpoints across those regimes by prescribing report content, timing and data formats that other regulators can use.
Amendment history
The text includes explicit amendment annotations and insertion markers that indicate the regulation has been amended several times since its 2017 commencement. The instrument itself commences on 1 September 2017 (s 2). Within the provided text there are multiple amendment notes appended to sections, showing the regulation has been revised, sometimes to add or change prescribed substances, reporting items, or procedural rules. Key amendments recorded in the text include:
Sections 5 and 6 were amended in 2021 and 2024 respectively, with s 5 showing an amendment note “s 5 amd 2021 SL No. 75 s 21” and s 6 showing “s 6 amd 2021 SL No. 75 s 22 sub 2024 SL No. 32 s 4”, indicating updates to the substances prescribed as petroleum and fuel gas, and the insertion of synthetic methane definitions (s 6(2)). These amendments expand the list of substances treated as petroleum or fuel gas for certain statutory purposes.
Section 6A was inserted in 2024 by “s 6A ins 2024 SL No. 32 s 4”, prescribing substances that are regulated hydrogen for section 11A(c) of the 2004 Act, listing ammonia, dimethyl ether, methanol, methyl-cyclohexane and toluene.
Sections relating to reporting content for authority to prospect work programs, petroleum lease development plans and other reporting requirements show amendment footnotes such as “s 8 amd 2022 SL No. 191 s 5” and multiple 2019, 2020, 2022 and 2024 amendment markers across parts 3 and 4, indicating iterative updates particularly to reporting and surrender/relinquishment content and timelines (e.g. ss 21, 22, 23, 36, 37, 38, 39, 42 to 45).
Section 35 and subsequent sections show amendments “s 35 amd 2020 SL No. 208 s 12” and related s 36 amendments “s 36 amd 2020 SL No. 208 s 13”, indicating the 2020 Reporting Requirements Amendment Regulation introduced or refined daily drilling report requirements, completion reporting timeframes and content including digital data requirements.
Section 66A and provisions regarding payment of State funding commitments for combined energy market regulation were inserted in 2022 and amended in 2024 (“s 66A ins 2022 SL No. 47 s 26 amd 2022 SL No. 84 s 6 sub 2024 SL No. 68 s 4”), establishing the formulaic approach for pipeline licence annual fees tied to MCE and AEMC determinations.
Section 52 has been amended multiple times and contains a schedule change in 2020 and later amendments in 2022 and 2025 (“s 52 sub 2020 SL No. 208 s 22 amd 2022 SL No. 191 s 6 ; 2025 SL No. 48 s 14 sch 1”), reflecting updates to confidentiality periods and schedule 1 content.
Section 59 was amended in 2024 (“s 59 amd 2024 SL No. 32 s 5”) to update accuracy checking frequency and technical requirements for meters measuring between 100TJ and 1PJ per year.
Section 71 shows an amendment note “s 71 amd 2019 SL No. 53 s 21”, indicating that prescribed forms and amounts of security were clarified or updated in 2019.
The regulation contains explicit transitional sections tied to the commencement and to an amendment regulation in 2020 (secs 75 to 77), including provisions treating earlier lodged notices and reports under repealed instruments as properly lodged under the new provisions and postponing lodgement deadlines to 30 June 2021 for certain sections.
The amendment markers attached to sections show the regulation has been iteratively updated to add new regulated substances, refine reporting requirements, align metering standards with technological thresholds, and introduce fee mechanisms linked to national institutions. The schedule references for fees, rents and confidentiality periods have been subject to later amendments as the regulatory regime evolved.
Where the text cites “s … ins” or “s … amd” with a statutory instrument number and year, that identifies the subordinate legislation instrument effecting the amendment. The regulation therefore has a history of periodic modification to account for technological changes (metering and synthetic gases), reporting needs, and fiscal arrangements. Any practitioner relying on this instrument should check the official consolidated version and the specified amending statutory instruments referenced in the annotations for precise amendment dates and operative text.
Litigation history
The regulation text itself does not record any cases, judicial interpretations, or litigation outcomes. There are no judicial decisions named or summarised in the instrument. As a subordinate legislative instrument, its provisions will be enforced and interpreted within the broader framework of the 2004 Act and the 1923 Act; litigation that might arise would likely concern compliance with reporting or measurement obligations, the validity of publication or confidentiality decisions, or the exercise of discretion by the chief executive or the Minister.
Because the instrument prescribes technical standards, measurement tolerances and the form and timing of reports, potential litigation could focus on issues such as whether a particular report met the content requirements of a section, whether confidentiality periods in schedule 1 were properly applied, or whether the chief executive lawfully exercised discretion in approving or revoking an alternative measurement method under s 55 and s 57. Disputes might also arise about the sufficiency of security given under s 71 or about fee calculations under s 66A, where the formula depends on determinations by bodies such as the MCE and AEMC.
The regulation also contains provisions with cross statutory impacts, for example reporting obligations that intersect with the Environmental Protection Act 1994 and the Water Act, creating potential for cross regime disputes about disclosure of information, mitigation steps, or the adequacy of reported environmental remediation measures under those Acts; however such litigation would be grounded in the parent Acts and environmental law rather than in the regulation alone.
Practitioners should note that the regulation increases the quantity and specificity of technical data required to be lodged in digital form, including raw seismic data, geophysical logs and core images (see ss 36, 38, 39). That data-centric approach increases the evidentiary record available to regulators and third parties and may affect the nature of any legal challenges or compliance audits. For litigation or dispute tasks, parties will lean heavily on the actual lodged data and the precise timing rules in the regulation.
In the absence of reported decisions referenced in the instrument, the regulation’s litigation history is effectively silent; courts or tribunals may have considered these provisions in subsequent cases, but any such judicial treatment would need to be located in external case law repositories. Users requiring up-to-date judicial interpretations should search case law databases for decisions citing the specific sections of this regulation or the related parent Acts.
Gotchas
The regulation contains numerous technical and procedural traps for the unwary. Practitioners and compliance officers should note the following concrete points drawn from the text.
Digital form and approved formats: Many notices and reports must be lodged “in the digital form made or approved by the chief executive” (e.g. ss 29, 30, 33, 34). A failure to use the approved digital format may render a lodgement non compliant even if the substantive material is provided. The chief executive may also require a hard copy in addition to electronic lodgement (s 74(3)). Check the department’s current approved digital forms and any practice directions referenced.
Timing is specific and often short: Several pre activity notices must be lodged at least 10 business days before start (ss 29, 31, 33). Completion and stoppage notices frequently require lodgement within 10 business days of the event (s 30 for completion, alteration or abandonment; s 32 for survey completion). Production and annual reports have 60 business day lodgement deadlines (ss 36, 38, 39, 42, 43, 44). The regulation includes transitional adjustments for some reporting deadlines but those are time limited (s 76). Missed deadlines open the holder to enforcement under the parent Acts and can trap automated compliance systems.
Confidentiality periods and publication: Required information is subject to confidentiality periods that start on lodgement and end as specified in schedule 1 (s 52). Practitioners should not assume indefinite confidentiality; schedule 1 must be checked for each information type. There is an explicit exception removing confidentiality for abandonment reports when provided to coal or oil shale mining tenement holders and other carve outs (s 52(3)). Publication options are broad under s 53 and include on the department’s website and in publicly available databases.
Data and raw data obligations: Seismic and scientific survey reports must be accompanied by raw data in digital form and observer logs, processed data and spatial information (s 38); scientific and technical surveys must lodge raw and processed data (s 39). Well completion reports must include raw geophysical logs and digital images of cores (s 36). These requirements increase data handling burdens and require secure storage and transmission capabilities. Ensure data formats comply with practice directions and the chief executive’s requirements.
Sample retention and minimum sizes: Cutting samples and core sample retention rules are precise. Cutting interval prescriptions differ by well type , 10 metre intervals from surface down to the top of reservoir prone formation, then 3 metre intervals (s 49). Fluid samples exceeding 10 litres must be kept if the chief executive directs within five months; lodged parts must be at least 500 millilitres and teflon sealed glass bottles are mandated (s 51). Failure to retain or to lodge samples in the specified form may be non compliant.
Hydraulic fracturing reporting specifics and penalties: Hydraulic fracturing has both pre notice and completion reporting requirements. Completion reports must include detailed time series and stage by stage data including casing pressure, bottom hole pressure and concentration with time, proppant concentration, and total volumes in kilolitres (s 45). The hydraulic fracturing fluid statement is mandatory and failure to include it attracts a maximum penalty of 20 penalty units (s 45(4)). Practitioners must ensure accurate compositional inventory and quantities.
Metering thresholds and checking frequencies: Meter accuracy tolerance and checking obligations depend on throughput. Meters under 25 cubic metres per hour have tolerance bands that depend on installation date (s 58). Meters measuring 100TJ to 1PJ per year require temperature and pressure correcting devices and six monthly checks (s 59). Meters over 1PJ per year require flow computers and checks every three months (s 60). Controllers must ensure regulators or correction devices do not disadvantage consumers and must mark operating pressure where correction factors exist (ss 62, 63). These technical thresholds can affect capex decisions for metering hardware and ongoing calibration schedules.
Fees and the pipeline annual fee formula: Section 66A establishes a formula allocating a proportion of State funding commitments for combined energy market regulation across pipeline licence holders using kilometres of scheme pipeline and kilometres of subject pipeline. The variables B and C require determinations by the MCE and AEMC. The practical implication is that licence fees may change in line with external institutional decisions and the number of pipeline kilometres under a licence; pipeline holders should monitor MCE and AEMC decisions.
Security amounts and acceptable forms: Section 71 prescribes specific security amounts for authorities and acceptable forms, including unconditional bank securities payable to the State and with no expiry. Banks providing securities need to ensure their instruments meet the specific form requirements including naming the authority number and address of the financial institution, and being signed by an officer authorised to sign.
Interaction with other regulators: Several provisions require information be given to the Water Act regulator in the approved form (s 12), create disclosure rights for coal mining tenement holders (s 52), and require reporting where environmental harm under the Environmental Protection Act 1994 occurs (s 45(3)(m)). Coordination with those regulators is necessary.
Practice direction references: The regulation repeatedly refers to “any other data or information for the report required under the practice direction” (see ss 18, 21, 22, 23, 36, 38, 39 etc.). The practice direction can expand the content of reports beyond the statutory text; stay current with published practice directions.
In short, compliance requires programme controls across digital lodgement formats, tight deadlines, data management systems for raw and processed datasets, chain of custody for samples, metering calibration regimes tied to throughput bands, and active monitoring of external institutional decisions that feed into fee calculations.
How to comply
Compliance requires an integrated operational, technical and administrative approach. The regulation sets specific content, timing, storage and format requirements that tenure and licence holders must meet. Below are concrete steps and controls mapped to the regulation’s principal obligations.
Establish a digital lodgement and records system aligned to approved formats
Use the department’s online system or approved digital forms for all notices and reports where the regulation requires digital lodgement (s 74(2)(a)). Confirm the chief executive’s current approved digital formats and ensure staff understand the lodgement cut off mechanics; electronic lodgements after 4.30 pm are treated as lodged at 8.30 am on the next working day (s 74(4)). Retain capability to produce hard copies if required by notice (s 74(3)).
Implement calendarised notice and reporting workflows
Automate reminders for pre activity notices that must be lodged at least 10 business days before activities such as drilling, surveys and hydraulic fracturing (ss 29, 31, 33). Schedule completion and stoppage notices to be lodged within 10 business days (s 30), and allocate resources to meet 60 business day deadlines for periodic and annual reports (ss 36, 38, 39, 42, 43, 44). For end of tenure and transitional deadlines verify dates against ss 25, 76, 77 if transitional rules apply.
Data capture and storage for raw and processed datasets
For seismic and scientific surveys, collect and store raw observer logs, processed datasets, location and elevation of source and receiver points and accompanying spatial information (s 38). For wells, ensure geophysical logs are kept in raw digital form and prepare digital images of cores and logs for lodgement with completion reports (s 36). Adopt secure file naming, metadata practices and backup regimes consistent with the practice direction.
Sample collection, labelling and retention protocols
For cutting samples follow the interval prescriptions: 10m intervals from surface down to the reservoir-proximate formation and 3m thereafter, with exceptions for development wells and special notice requirements for coal seam gas wells (s 49). Core samples and parts offered to the chief executive must meet 50 per cent minimum and be labelled with well name, core number and depths (s 50). Fluid samples over 10 litres should be retained if requested within five months and lodged parts must be at least 500ml in teflon sealed glass bottles with prescribed labelling (s 51). Maintain chain of custody and storage conditions to “prevent unnecessary deterioration” (s 48).
Metering hardware, checking and calibration scheduling
Identify meters by throughput bands and meet hardware requirements: install temperature and pressure correction devices for meters between 100TJ and 1PJ and a flow computer for meters over 1PJ (ss 59 to 60). Ensure overall tolerance for error does not exceed plus or minus 1 per cent for high throughput meters and adhere to checking frequencies , six monthly checks for 100TJ to 1PJ meters and three monthly for over 1PJ meters (ss 59 to 60). Replace or test meters over 25m3 per hour at least every 10 years (s 61). Where conversion between energy, mass and volume is required include the conversion method in the measurement scheme (s 61).
Hydraulic fracturing specific compliance
Lodge pre notice at least 10 business days before starting hydraulic fracturing and lodge completion reports within six months that include stage by stage treatment data, time series of casing pressure and bottom hole pressures, total volumes in kilolitres, and a hydraulic fracturing fluid statement detailing each component’s quantity and concentration; omission of the fluid statement attracts a 20 penalty unit maximum penalty (ss 33, 34, 45(2) and (4)). Include geological connection information where known and, in the Surat Basin, report any Walloon subgroup treatments that break through to the Upper Springbok Formation (s 45(3)(j)).
Financial and security housekeeping
Determine applicable fees and rents from schedule 2 and schedule 3 and pay on or before 31 August or within 20 business days in the event of grant or ownership day triggers (ss 64, 68). Implement systems to calculate pipeline licence fees under s 66A, noting variables B and C depend on MCE and AEMC determinations; monitor these bodies and the department’s notices. Provide security in prescribed forms and amounts for applications where security is required (s 71). Account for the prescribed interest rate of 15 per cent for amounts owing to the State (s 72).
Privacy, confidentiality and publication monitoring
Record lodgement dates accurately since confidentiality periods commence on lodgement day and schedule 1 defines end points (s 52). Maintain an index of required information types to map confidentiality expiry and proactive publication (s 53). Anticipate that abandonment reports may have no confidentiality where they are required to be provided to coal or oil shale mining tenement holders (s 52(3)).
Liaison with other regulators and stakeholders
Coordinate with the Water Act regulator for bore data transmission in the approved form (s 12). Communicate with coal and oil shale tenement holders when wells intersect their tenements, and integrate environmental reporting with obligations under the Environmental Protection Act 1994 where material environmental harm is implicated (s 45(3)(m)). Provide copies of notices to landowners and occupiers as required by s 28.
Maintain awareness of practice directions and amending instruments
The regulation repeatedly defers some detail to practice directions and amending subordinate instruments. Maintain subscriptions to departmental practice directions and review amending SL instruments cited in section annotations to ensure compliance with current substantive and format requirements (see amendment notes throughout the text).
Practical implementation checklist
Confirm digital format and practice direction requirements with the department.
Map all tenure and licence activities to notice and report schedules.
Establish data management systems capable of storing and producing raw seismic logs, wireline logs and core images.
Implement physical sample protocols with correct containers, labels and minimum quantities.
Inventory meters and implement calibration and replacement schedules per throughput thresholds.
Maintain finance and security schedules for fees, rents and securities and monitor MCE/AEMC determinations.
Document procedures for interactions with Water Act, environmental and mining authorities.
Conduct periodic compliance audits against the specific section references cited above to detect lapses.
Following these steps, and cross referencing the precise statutory text for each obligation (for example ss 35, 36, 37, 38, 39, 42, 43, 44, 45, 48 to 51, 55 to 61, 64 to 71), will materially reduce regulatory risk associated with the reporting, measurement and financial duties imposed by the regulation.
For the 2004 Act , section 10 (1) (d) , the following substances are prescribed—
biogas;
biomethane;
a substance that is a mixture of LPG and air, known as ‘synthetic natural gas’.
However, subsection (1) applies only for the purposes of the following provisions of that Act—
chapters 8 to 10; and
chapters 11 to 14, to the extent they apply for chapters 8 to 10.
For the 2004 Act , section 10 (1) (e) , carbon dioxide is prescribed.
However, subsection (3) applies only—
to a survey licence holder investigating and surveying an area for its potential and suitability for the construction and operation of pipelines for transporting carbon dioxide; or
to an authority to prospect holder evaluating or testing natural underground reservoirs for the storage of petroleum under the 2004 Act , section 32 (1) (d) if—
the testing is carried out on a particular block of the authority within—
2 years after the testing starts; or
a longer period decided by the Minister within the 2 years; and
the Minister approves the testing on the particular block; and
the holder complies with any conditions the Minister imposes on the approval.
s 5 amd 2021 SL No. 75 s 21
(sec.5-ssec.1) For the 2004 Act , section 10 (1) (d) , the following substances are prescribed— biogas; biomethane; a substance that is a mixture of LPG and air, known as ‘synthetic natural gas’.
(sec.5-ssec.2) However, subsection (1) applies only for the purposes of the following provisions of that Act— chapters 8 to 10; and chapters 11 to 14, to the extent they apply for chapters 8 to 10.
(sec.5-ssec.3) For the 2004 Act , section 10 (1) (e) , carbon dioxide is prescribed.
(sec.5-ssec.4) However, subsection (3) applies only— to a survey licence holder investigating and surveying an area for its potential and suitability for the construction and operation of pipelines for transporting carbon dioxide; or to an authority to prospect holder evaluating or testing natural underground reservoirs for the storage of petroleum under the 2004 Act , section 32 (1) (d) if— the testing is carried out on a particular block of the authority within— 2 years after the testing starts; or a longer period decided by the Minister within the 2 years; and the Minister approves the testing on the particular block; and the holder complies with any conditions the Minister imposes on the approval.
(a) biogas;
(b) biomethane;
(c) a substance that is a mixture of LPG and air, known as ‘synthetic natural gas’.
(a) chapters 8 to 10; and
(b) chapters 11 to 14, to the extent they apply for chapters 8 to 10.
(a) to a survey licence holder investigating and surveying an area for its potential and suitability for the construction and operation of pipelines for transporting carbon dioxide; or
(b) to an authority to prospect holder evaluating or testing natural underground reservoirs for the storage of petroleum under the 2004 Act , section 32 (1) (d) if— (i) the testing is carried out on a particular block of the authority within— (A) 2 years after the testing starts; or (B) a longer period decided by the Minister within the 2 years; and (ii) the Minister approves the testing on the particular block; and (iii) the holder complies with any conditions the Minister imposes on the approval.
(i) the testing is carried out on a particular block of the authority within— (A) 2 years after the testing starts; or (B) a longer period decided by the Minister within the 2 years; and
(A) 2 years after the testing starts; or
(B) a longer period decided by the Minister within the 2 years; and
(ii) the Minister approves the testing on the particular block; and
(iii) the holder complies with any conditions the Minister imposes on the approval.
(i) the testing is carried out on a particular block of the authority within— (A) 2 years after the testing starts; or (B) a longer period decided by the Minister within the 2 years; and
(A) 2 years after the testing starts; or
(B) a longer period decided by the Minister within the 2 years; and
(ii) the Minister approves the testing on the particular block; and
(iii) the holder complies with any conditions the Minister imposes on the approval.
(A) 2 years after the testing starts; or
(B) a longer period decided by the Minister within the 2 years; and
sec.6 Substances that are fuel gas
sec.6 Substances that are fuel gas
For the 2004 Act , section 11 (2) (d) , the following substances are prescribed—
biogas;
biomethane;
synthetic methane;
a substance that is a mixture of LPG and air, known as ‘synthetic natural gas’.
In this section—
synthetic methane means a substance—
that is in a gaseous state at standard temperature and pressure; and
the principal constituent of which is methane; and
that is produced by the methanation of carbon dioxide; and
that is suitable for consumption.
s 6 amd 2021 SL No. 75 s 22
sub 2024 SL No. 32 s 4
(sec.6-ssec.1) For the 2004 Act , section 11 (2) (d) , the following substances are prescribed— biogas; biomethane; synthetic methane; a substance that is a mixture of LPG and air, known as ‘synthetic natural gas’.
(sec.6-ssec.2) In this section— synthetic methane means a substance— that is in a gaseous state at standard temperature and pressure; and the principal constituent of which is methane; and that is produced by the methanation of carbon dioxide; and that is suitable for consumption.
(a) biogas;
(b) biomethane;
(c) synthetic methane;
(d) a substance that is a mixture of LPG and air, known as ‘synthetic natural gas’.
(a) that is in a gaseous state at standard temperature and pressure; and
(b) the principal constituent of which is methane; and
(c) that is produced by the methanation of carbon dioxide; and
(d) that is suitable for consumption.
sec.6A Substances that are regulated hydrogen
sec.6A Substances that are regulated hydrogen
For the 2004 Act , section 11A (c) , the following substances are prescribed—
ammonia;
dimethyl-ether;
methanol;
methyl-cyclohexane (MCH);
toluene.
s 6A ins 2024 SL No. 32 s 4
(a) ammonia;
(b) dimethyl-ether;
(c) methanol;
(d) methyl-cyclohexane (MCH);
(e) toluene.
sec.7 Substance that may be transported under condition of pipeline licence
sec.7 Substance that may be transported under condition of pipeline licence
For the 2004 Act , section 402 (1) (b) , a distilled petroleum substance is prescribed.
In this section—
distilled petroleum substance means a substance—
produced by distilling crude oil; and
that consists of, or includes, hydrocarbons.
diesel, petrol, kerosene
(sec.7-ssec.1) For the 2004 Act , section 402 (1) (b) , a distilled petroleum substance is prescribed.
(sec.7-ssec.2) In this section— distilled petroleum substance means a substance— produced by distilling crude oil; and that consists of, or includes, hydrocarbons. diesel, petrol, kerosene
(a) produced by distilling crude oil; and
(b) that consists of, or includes, hydrocarbons.
pt.3 Reporting
Reporting
pt.3-div.1 Exploring for and producing petroleum
Exploring for and producing petroleum
sec.8 Authority to prospect—proposed work program
sec.8 Authority to prospect—proposed work program
For the 2004 Act , section 48 (2) (d) and the 1923 Act , section 25A (1) (i) , the matters prescribed in relation to an authority to prospect are—
a description of the geological model for the area of the authority to prospect; and
an assessment of the potential for petroleum discovery in the area; and
the rationale, in relation to the geological model for the area, for the activities proposed to be carried out under the authority to prospect.
s 8 amd 2022 SL No. 191 s 5
(a) a description of the geological model for the area of the authority to prospect; and
(b) an assessment of the potential for petroleum discovery in the area; and
(c) the rationale, in relation to the geological model for the area, for the activities proposed to be carried out under the authority to prospect.
sec.9 Petroleum lease—proposed development plan
sec.9 Petroleum lease—proposed development plan
For the 2004 Act , section 138 (1) (g) and the 1923 Act , section 53A (1) (g) , the matters prescribed in relation to a petroleum lease are—
for each natural underground reservoir within the area of the lease of which the applicant is aware, the location of the boundaries of—
the proved and probable reserves of petroleum in the reservoir; or
the reserves of petroleum in the reservoir worked out in another way approved by the chief executive; and
details, including the location, type and size, of any planned infrastructure intended to be located within the area of the lease or proposed lease.
plant or works, including, for example, communication systems, compressors, powerlines, pumping stations, reservoirs, roads, evaporation or storage ponds and tanks
temporary structures or structures of an industrial or technical nature, including, for example, mobile and temporary camps
(a) for each natural underground reservoir within the area of the lease of which the applicant is aware, the location of the boundaries of— (i) the proved and probable reserves of petroleum in the reservoir; or (ii) the reserves of petroleum in the reservoir worked out in another way approved by the chief executive; and
(i) the proved and probable reserves of petroleum in the reservoir; or
(ii) the reserves of petroleum in the reservoir worked out in another way approved by the chief executive; and
(b) details, including the location, type and size, of any planned infrastructure intended to be located within the area of the lease or proposed lease. Examples of infrastructure— 1 plant or works, including, for example, communication systems, compressors, powerlines, pumping stations, reservoirs, roads, evaporation or storage ponds and tanks 2 temporary structures or structures of an industrial or technical nature, including, for example, mobile and temporary camps
1 plant or works, including, for example, communication systems, compressors, powerlines, pumping stations, reservoirs, roads, evaporation or storage ponds and tanks
2 temporary structures or structures of an industrial or technical nature, including, for example, mobile and temporary camps
(i) the proved and probable reserves of petroleum in the reservoir; or
(ii) the reserves of petroleum in the reservoir worked out in another way approved by the chief executive; and
1 plant or works, including, for example, communication systems, compressors, powerlines, pumping stations, reservoirs, roads, evaporation or storage ponds and tanks
2 temporary structures or structures of an industrial or technical nature, including, for example, mobile and temporary camps
sec.10 Shorter period to change production commencement day
sec.10 Shorter period to change production commencement day
For the 2004 Act , section 175AA (b) , the shorter period is 3 months.
sec.11 Notice about conversion of petroleum well to bore
sec.11 Notice about conversion of petroleum well to bore
For the 2004 Act , section 284 and the 1923 Act , section 75M , the information is—
a description of the location of the bore; and
the day on which the petroleum well was converted to a bore.
(a) a description of the location of the bore; and
(b) the day on which the petroleum well was converted to a bore.
sec.12 Notice about bore to Water Act regulator
sec.12 Notice about bore to Water Act regulator
For the 2004 Act , section 543A (2) and the 1923 Act , section 75XA (2) , the following information about a bore is prescribed—
the name and postal address of the holder of the petroleum tenure or water monitoring authority for the area containing the bore;
the identifying name of the bore;
a description of the location of the bore;
the purpose of the bore;
the diameter and depth in metres of the bore;
the following days—
the day the drilling of the bore started;
the last day the drilling rig was used to drill the bore;
the drilling method used to drill the bore;
details of the casing, centralisers and equipment installed in the bore, including the type and location of centralisers;
the type of any slots or perforations in the casing, or screens installed, for water entry and the depth in metres of the top and bottom of the slots, perforations or screens;
details of the cementing in the bore, including the type of cement used and the depth in metres of the top and bottom of each cemented interval;
a geological interpretation of the bore, including the stratigraphy of the rock units it intersects;
details of the water produced by each stratum of rock, including—
the quality and supply rate of the water; and
the depth at which the water is struck; and
the depth to which the water naturally rises;
if, on completion, the bore is a subartesian bore—
the depth in metres to the standing water level, and either the pump suction inlet or bottom of the drill stem; and
details of the test used to estimate the groundwater supply rate;
if, on completion, the bore is an artesian bore—
the rate of flow of unimpeded water from the bore at the surface; and
the pressure head of the water mentioned in subparagraph (i) ; and
the temperature of the groundwater.
The information mentioned in subsection (1) must be given to the Water Act regulator in the approved form.
(sec.12-ssec.1) For the 2004 Act , section
This is an opening excerpt, not the complete document.