Petroleum and Gas (General Provisions) Regulation 2017
sec.61Requirements for measurement scheme
Start here
Get a plain-English read of sec.61
Turn the raw legal text into a practical explanation grounded in Petroleum and Gas (General Provisions) Regulation 2017.
sec.61 Requirements for measurement scheme
For the 2004 Act , section 637 (1) (d) , a meter that measures more than 25m 3 of petroleum or fuel gas in an hour must be replaced or tested at least once every 10 years. For the 2004 Act , section 637 (1) (k) , if a measurement of petroleum or fuel gas is to be converted into another form of measurement under a measurement scheme, the scheme must state the method for converting the measurement. For this section— form of measurement means any of the following— a measurement of the energy of the petroleum or fuel gas; a measurement of the mass of the petroleum or fuel gas; a measurement of the volume of the petroleum or fuel gas. (sec.61-ssec.1) For the 2004 Act , section 637 (1) (d) , a meter that measures more than 25m 3 of petroleum or fuel gas in an hour must be replaced or tested at least once every 10 years. (sec.61-ssec.2) For the 2004 Act , section 637 (1) (k) , if a measurement of petroleum or fuel gas is to be converted into another form of measurement under a measurement scheme, the scheme must state the method for converting the measurement. (sec.61-ssec.3) For this section— form of measurement means any of the following— a measurement of the energy of the petroleum or fuel gas; a measurement of the mass of the petroleum or fuel gas; a measurement of the volume of the petroleum or fuel gas.
- (a) a measurement of the energy of the petroleum or fuel gas;
- (b) a measurement of the mass of the petroleum or fuel gas;
- (c) a measurement of the volume of the petroleum or fuel gas.