Petroleum and Gas (General Provisions) Regulation 2017
sec.15Notice about ATP storage testing or PL storage testing
Start here
Get a plain-English read of sec.15
Turn the raw legal text into a practical explanation grounded in Petroleum and Gas (General Provisions) Regulation 2017.
sec.15 Notice about ATP storage testing or PL storage testing
For the 2004 Act , sections 71B (2) (a) and 150C (2) (a) , the following information is prescribed— the identifying number of the authority to prospect or petroleum lease; the day the testing started; the identifying name of the petroleum well for which the testing is being carried out; for each natural underground reservoir from which the testing is being carried out— an identification of the reservoir including, for example, a description of the geological features of the reservoir; and the type of reservoir; and the depth in metres of the top and bottom of the reservoir; details of substances to be used to carry out the testing.
- (a) the identifying number of the authority to prospect or petroleum lease;
- (b) the day the testing started;
- (c) the identifying name of the petroleum well for which the testing is being carried out;
- (d) for each natural underground reservoir from which the testing is being carried out— (i) an identification of the reservoir including, for example, a description of the geological features of the reservoir; and (ii) the type of reservoir; and (iii) the depth in metres of the top and bottom of the reservoir;
- (i) an identification of the reservoir including, for example, a description of the geological features of the reservoir; and
- (ii) the type of reservoir; and
- (iii) the depth in metres of the top and bottom of the reservoir;
- (e) details of substances to be used to carry out the testing.
- (i) an identification of the reservoir including, for example, a description of the geological features of the reservoir; and
- (ii) the type of reservoir; and
- (iii) the depth in metres of the top and bottom of the reservoir;