This local environmental plan sets zoning, mapped controls and detailed rules for what can be built or used on land in the Cooma‑Monaro area. It replaces earlier local plans and specifies when development consent, exempt or complying development applies.
It affects landowners, developers and the Council (the consent authority) by allocating development rights, environmental and heritage constraints, subdivision and lot‑size rules, flood and biodiversity tests, and thresholds that determine compliance costs and approval discretion.
This local environmental plan (the Plan) sets out the land use controls, development standards and procedural rules that govern land in the Cooma‑Monaro area. Mechanically it does the following.
Declares the Plan’s name, commencement and aims. The Plan is the Cooma‑Monaro Local Environmental Plan 2013 and commences on publication on the NSW legislation website (cl 1.1AA; cl 1.1). Its stated aims include directing use and development in accordance with the relevant standard environmental planning instrument and particular objectives such as protecting environmental assets, supporting arts and culture and coordinating orderly land use (cl 1.2).
Identifies the land to which it applies, and the maps that fix zones, lot sizes, heights, floor space ratios and other mapped controls (cl 1.3; cl 1.7; cl 4.1(3); cl 4.3; cl 4.4). The Land Application Map, Land Zoning Map, Lot Size Map, Height of Buildings Map, Floor Space Ratio Map and other maps are incorporated by reference and govern spatial application of controls (cl 1.7).
Repeals earlier local environmental plans and deemed environmental planning instruments that previously applied to the area (cl 1.8). It includes a savings rule for development applications lodged before the Plan’s commencement to be determined as if the Plan had not commenced (cl 1.8A).
Establishes the consent authority as the Council, subject to the Act (cl 1.6), and sets out the Land Use Table linking zones to objectives and to lists of permitted, permitted‑with‑consent and prohibited development (Pt 2, cl 2.1-2.3; Land Use Table).
Prescribes procedural rules for development types: subdivision requires consent (cl 2.6), demolition requires consent (cl 2.7) except where listed as exempt, temporary uses are time‑limited (cl 2.8), and canal estate development is prohibited (cl 2.9).
Current sections
Direct links to the current provisions in Cooma-Monaro Local Environmental Plan 2013.
State Environmental Planning Policy (Transport and Infrastructure) 2021, Chapter 2—relating to infrastructure facilities, including air transport, correction, education, electricity generating works and solar energy systems, health services, ports, railways, roads, waste management and water supply systems
Aquaculture; Building identification signs; Cellar door premises; Dual occupancies; Dwelling houses; Extractive industries; Farm buildings; Intensive livestock agriculture; Intensive plant agriculture; Office premises; Open cut mining; Roads; Roadside stalls; Rural workers’ dwellings; Secondary dwellings; Any other development not specified in item 2 or 4
4
Prohibited
4 Prohibited
4 Prohibited
Amusement centres; Boat building and repair facilities; Charter and tourism boating facilities; Commercial premises; Exhibition villages; Health services facilities; Industrial retail outlets; Jetties; Local distribution premises; Marinas; Mooring pens; Mortuaries; Public administration buildings; Residential accommodation; Sex services premises; Signage; Storage premises; Vehicle body repair workshops; Vehicle repair stations; Warehouse or distribution centres; Water recreation structures; Wholesale supplies
Part 3
Exempt and complying development
Part 3 Exempt and complying development
Part 3 Exempt and complying development
Part 4
Principal development standards
Part 4 Principal development standards
Part 4 Principal development standards
Part 5
Miscellaneous provisions
Part 5 Miscellaneous provisions
Part 5 Miscellaneous provisions
5
Relevant acquisition authority
5 Relevant acquisition authority
5.1 Relevant acquisition authority
(1) The objective of this clause is to identify, for the purposes of section 3.15 of the Act, the authority of the State that will be the relevant authority to acquire land reserved for certain public purposes if the land is required to be acquired under Division 3 of Part 2 of the Land Acquisition (Just Terms Compensation) Act 1991 (the owner-initiated acquisition provisions).
Note.
If the landholder will suffer hardship if there is any delay in the land being acquired by the relevant authority, section 23 of the Land Acquisition (Just Terms Compensation) Act 1991 requires the authority to acquire the land.
(2) The authority of the State that will be the relevant authority to acquire land, if the land is required to be acquired under the owner-initiated acquisition provisions, is the authority of the State specified below in relation to the land shown on the Land Reservation Acquisition Map (or, if an authority of the State is not specified in relation to land required to be so acquired, the authority designated or determined under those provisions).
| Type of land shown on Map | Authority of the State |
| Zone RE1 Public Recreation and marked “Local open space” | Council |
| Zone RE1 Public Recreation and marked “Regional open space” | The corporation constituted under section 2.5 of the Act |
| Zone SP2 Infrastructure and marked “Classified road” | Transport for NSW |
| Zone C1 National Parks and Nature Reserves and marked “National Park” | Minister administering the National Parks and Wildlife Act 1974 |
(3) Development on land acquired by an authority of the State under the owner-initiated acquisition provisions may, before it is used for the purpose for which it is reserved, be carried out, with development consent, for any purpose.
Part 6
Additional local provisions
Part 6 Additional local provisions
Part 6 Additional local provisions
6
Earthworks
6 Earthworks
6.1 Earthworks
(1) The objective of this clause is to ensure that earthworks for which development consent is required will not have a detrimental impact on environmental functions and processes, neighbouring uses, cultural or heritage items or features of the surrounding land.
(2) Development consent is required for earthworks unless—
(a) the earthworks are exempt development under this Plan or another applicable environmental planning instrument, or
(b) the earthworks are ancillary to development that is permitted without consent under this Plan or to development for which development consent has been given.
(3) Before granting development consent for earthworks (or for development involving ancillary earthworks), the consent authority must consider the following matters—
(a) the likely disruption of, or any detrimental effect on, drainage patterns and soil stability in the locality of the development,
(b) the effect of the development on the likely future use or redevelopment of the land,
(c) the quality of the fill or the soil to be excavated, or both,
(d) the effect of the development on the existing and likely amenity of adjoining properties,
(e) the source of any fill material and the destination of any excavated material,
(f) the likelihood of disturbing relics,
(g) the proximity to, and potential for adverse impacts on, any waterway, drinking water catchment or environmentally sensitive area,
(h) any appropriate measures proposed to avoid, minimise or mitigate the impacts of the development.
Exempt development may be carried out without the need for development consent under the Act. Such development is not exempt from any approval, licence, permit or authority that is required under any other Act and adjoining owners’ property rights and the common law still apply.
sch 2: Am 2022 (831), Sch 1.6[8]–[18].
sch.2-sec
Advertising signs
sch.2-sec Advertising signs
Advertising signs
(1) Must be located in Zone RU5, R1, E1, E2, E3, E4, MU1, SP2 or RE2.
(2) Maximum area—
(a) if located on land in Zone E4 General Industrial or Zone SP2 Infrastructure—1.5m2, or
(b) if located on land in any other zone—1m2.
(3) Must not be illuminated.
(4) Maximum 1 sign per premises.
(5) Must be related to a lawful use carried out on the land on which the sign is located.
(6) If mounted to the front fence or front wall of a building, must not protrude beyond the physical limits of that fence or building.
(7) Must not be located on public land.
(8) Must not be located on or in, or in relation to, a heritage item or in a heritage conservation area.
sch.2-sec-oc.2
Advertising structures
sch.2-sec-oc.2 Advertising structures
Advertising structures
(1) Must be located on land in an employment or mixed use zone, Zone SP2 Infrastructure or Zone RE2 Private Recreation.
(2) Must not be erected on or above a roof line.
(3) Maximum height—2m.
(4) Maximum area—1m2.
(5) Must be constructed in accordance with an engineer’s certification for the structure and footings.
(6) Must not be illuminated.
(7) Must be constructed of weather-proof material.
(8) Maximum 1 structure per premises.
(9) Must not be erected on public land.
(10) Must not be located on or in, or in relation to, a heritage item or in a heritage conservation area.
sch.2-sec-oc.3
Building identification signs
sch.2-sec-oc.3 Building identification signs
Building identification signs
(1) Must be located on land in an employment or mixed use zone, Zone RU1 Primary Production, Zone RU5 Village, Zone R1 General Residential, Zone SP2 Infrastructure or Zone RE2 Private Recreation.
(2) Maximum area—
(a) if located on land in Zone SP2 Infrastructure, Zone E4 General Industrial or Zone RE2 Private Recreation—1.5m2, or
(b) if located on land in any other zone—1m2.
(3) Must not be illuminated.
(4) Maximum 1 sign per premises.
(5) Must relate to a lawful use carried out on the land.
(6) If mounted to the front fence or front wall of a building, must not protrude beyond the physical limits of that fence or building.
(7) Must not be located on public land.
(8) Must not be located on or in, or in relation to, a heritage item or in a heritage conservation area.
sch.2-sec-oc.4
Business identification signs
sch.2-sec-oc.4 Business identification signs
Business identification signs
(1) Maximum area—1m2.
(2) Must not be illuminated or flashing.
(3) May be either a shop window sign, under awning sign or front awning sign.
(4) Maximum 1 sign per premises.
(5) Must relate to a lawful use carried out on the land.
(6) If flush-mounted to the front fence or front wall of a building, must not protrude beyond the physical limits of that fence or building.
(7) Must not be located on public land.
(8) If there is no awning on the premises, no sign is to be extended more than 4.6m above ground level.
(9) Signs attached to an awning must be at least 2.7m above ground level (existing).
(10) Shop front signs must not cover more than 25% of the facade.
(11) Must not cover mechanical ventilation inlet or outlet vents.
(12) Must not be located on or in, or in relation to, a heritage item or in a heritage conservation area.
sch.2-sec-oc.5
External lighting
sch.2-sec-oc.5 External lighting
External lighting
(1) Must not be for the lighting of private tennis courts or sports fields.
(2) Must not cause glare to adjoining properties or street.
(3) Must not be a permanent free-standing structure.
(4) Maximum height—3m.
sch.2-sec-oc.6
Farm dams in Zone RU1
sch.2-sec-oc.6 Farm dams in Zone RU1
Farm dams in Zone RU1
(1) Must be 1ML or less in capacity.
(2) Must contain a means of managing water overflow.
(3) Must be a minimum of 50m from any property boundary.
(4) Must not involve works within 40m of the banks of a named watercourse.
(5) Must not contain a spillway more than 1m in height.
Inflatable signs (balloons and blimps) in employment or mixed use zones
sch.2-sec-oc.7 Inflatable signs (balloons and blimps) in employment or mixed use zones
Inflatable signs (balloons and blimps) in employment or mixed use zones
(1) Must not be attached to the roof or parapet of a building.
(2) Must be securely fixed to the ground.
(3) Maximum height—3m.
(4) Must not be inflated with flammable or explosive gases.
(5) Maximum 1 per business.
sch.2-sec-oc.8
Outdoor dining areas
sch.2-sec-oc.8 Outdoor dining areas
Outdoor dining areas
(1) Must be located at least 3m from any road.
(2) Must be located within 2m of property boundary.
(3) Outdoor furniture must not result in the approved seating capacity of the premises being exceeded.
(4) Must not extend beyond the frontage of the premises to which it relates.
(5) Must not be fixed or fastened to the footpath or building.
(6) Outdoor furniture and other equipment such as umbrellas, umbrella stands, pot plants and barriers used to define the seating area must be removed at close of business each day.
Classification and reclassification of public land
Schedule 4 Classification and reclassification of public land
Schedule 4 Classification and reclassification of public land
(Clause 5.2)
sch 4: Am 2021 (511), cl 4.
Maps: Am 2014 (344), cl 4; 2016 (247), cl 4. Entries discontinued from July 2021 when responsibility for map updates moved to Department of Planning, Industry and Environment.
Schedule 5
Environmental heritage
Schedule 5 Environmental heritage
Schedule 5 Environmental heritage
(Clause 5.10)
Schedule 6
Pond-based and tank-based aquaculture
Schedule 6 Pond-based and tank-based aquaculture
Schedule 6 Pond-based and tank-based aquaculture
(Clause 5.19)
Division 1
Site location requirements
Division 1 Site location requirements
Division 1 Site location requirements
Division 2
Operational requirements
Division 2 Operational requirements
Division 2 Operational requirements
7
Conservation exclusion zones
7 Conservation exclusion zones
7 Conservation exclusion zones
(1) Must not be carried out on the following land, except to the extent necessary to gain access to water—
(c) land within a wetland of international significance declared under the Ramsar Convention on Wetlands.
Note.
Nothing in this clause affects any requirement under an Act relating to land specified in this clause to obtain a licence or other authority under that Act for development of the land.
8
Flood liability
8 Flood liability
8 Flood liability
Must be designed or constructed on land so that it will not be inundated by the discharge of a 1:100 ARI (average recurrent interval) flood event.
9
Species selection
9 Species selection
9 Species selection
Species of fish or marine vegetation cultivated or kept must be consistent with the relevant aquaculture industry development plan (within the meaning of clause 5.19).
10
Pond design
10 Pond design
10 Pond design
(1) Must not require the construction of new ponds, water storages, dams or buildings.
(2) Must not be located on permanent watercourses, creeks, billabongs or isolated outreaches of creeks or rivers.
(3) Must be capable of preventing the escape of stock into natural waterbodies or wetlands.
11
Culture water
11 Culture water
11 Culture water
Must use freshwater.
Source text: opening excerpt
Sourced from legislation.nsw.gov.au, CC BY 4.0.
Part 1 Preliminary
Part 1 Preliminary
Part 1 Preliminary
1 Name of Plan
1 Name of Plan
1.1 Name of Plan
This Plan is Cooma-Monaro Local Environmental Plan 2013.
1 Commencement
1 Commencement
1.1AA Commencement
This Plan commences on the day on which it is published on the NSW legislation website.
1 Aims of Plan
1 Aims of Plan
1.2 Aims of Plan
(1) This Plan aims to make local environmental planning provisions for land in Cooma-Monaro in accordance with the relevant standard environmental planning instrument under section 3.20 of the Act.
(2) The particular aims of this Plan are as follows—
(aa) to protect and promote the use and development of land for arts and cultural activity, including music and other performance arts,
(a) to plan and manage for environmental sustainability,
(b) to promote and coordinate the orderly and economic use and development of land,
(c) to provide clarity and certainty for the community regarding the future development of Cooma-Monaro, while allowing flexibility to respond to change,
(d) to encourage opportunities for primary production in rural areas,
(e) to encourage opportunities for development in the urban area, including industrial land,
(f) to support the growth of villages while ensuring their character is retained,
(g) to protect historic, environmentally significant and cultural sites and areas of quality visual amenity,
(h) to encourage the siting and management of development to avoid, as far as practicable, conflict between adjoining and nearby land uses, both within and between zones having regard to likely future land uses,
(i) to provide a range of housing opportunities, including rural residential development in the vicinity of Cooma-Monaro and the villages,
Identifies categories of exempt and complying development and the compliance tests that make those categories available (Part 3, cl 3.1-3.3; Schedule 2; Schedule 3). It also excludes certain environmentally sensitive areas from exempt/complying pathways (cl 3.3).
Sets principal development standards and exceptions: minimum lot sizes (cl 4.1 and related clauses 4.1AA-4.1C), floor space ratio and height caps mapped (cl 4.3-4.5), and an exceptions mechanism allowing non‑compliance where planning grounds justify it (cl 4.6).
Adds miscellaneous provisions that allocate land acquisition authorities (cl 5.1), enable Council classification/reclassification of public land (cl 5.2 and Schedule 4), provide targeted controls for uses such as bed and breakfast, home industries, neighbourhood shops and industrial retail outlets (cl 5.4), and set out heritage, environmental, flood, aquaculture and music protections and requirements (cl 5.10; cl 5.19; cl 5.20; cl 5.21; cl 5.22).
Lists local particularities in schedules: Schedule 1 identifies an additional permitted use for specific Monaro Highway land at Nimmitabel; Schedule 5 lists heritage items and heritage conservation areas that attract added consent requirements; Schedule 6 specifies technical requirements for pond and tank aquaculture.
The Plan is iterative: many substantive controls operate by cross reference to the maps and schedules that accompany it. The consent framework is administrative: the Council is the primary decision maker for development consent unless the Act or a SEPP designates otherwise (cl 1.6; cl 1.9(1)). The Plan also preserves State instruments that prevail over local policy (cl 1.9).
Main concepts
The Plan organises land use regulation around a small set of core concepts: zoning and the Land Use Table, mapped development standards, consent pathways, mapped environmental overlays, locally specific schedule controls and the exercise of consent authority discretion.
Zoning and the Land Use Table. Land is placed in named zones (RU1, RU3, RU5, R1, R2, R5, E1-E4, MU1, SP2, RE1-RE2, C1-C4) and the Land Use Table prescribes objectives, permitted without consent, permitted with consent and prohibited uses for each zone (cl 2.1-2.3; Land Use Table). The consent authority must have regard to zone objectives when deciding applications (cl 2.3(2)).
Mapped standards. The Plan uses maps to give legal effect to spatial standards: Lot Size Map (minimum subdivision lot sizes cl 4.1 et seq), Height of Buildings Map (cl 4.3), Floor Space Ratio Map (cl 4.4) and various overlay maps such as Terrestrial Biodiversity, Riparian Land, Scenic Protection and Drinking Water Catchment (multiple clauses in Parts 4-6 cite these maps).
Consent pathways. The Plan distinguishes exempt development (Schedule 2) and complying development (Schedule 3 and cl 3.1-3.2) from development requiring consent under the Act (Parts 2 and 3). It excludes environmentally sensitive areas from exempt/compliant pathways (cl 3.3).
Development standards and exceptions. The Plan sets minimum lot sizes, FSR and height limits and provides an exceptions mechanism where compliance is shown to be unreasonable or unnecessary and where environmental planning grounds justify contravention (cl 4.6). The exceptions mechanism requires the consent authority to keep an assessment record (cl 4.6(4)).
Environmental and heritage overlays. The Plan contains operational clauses imposing substantive consent preconditions in key conservation areas: terrestrial biodiversity (cl 6.3), riparian land and watercourses (cl 6.6), wetlands (cl 6.7), groundwater vulnerability (cl 6.4), drinking water catchment (cl 6.5). Consent may be refused unless the development is designed, sited and managed to avoid, minimise or mitigate significant adverse environmental impacts (these clauses).
Heritage protection. Consent is required for demolition, exterior alterations to heritage items, disturbance of archaeological sites and development within heritage conservation areas; the consent authority may require heritage management documents and conservation management plans and must consult the Heritage Council and local Aboriginal communities in prescribed situations (cl 5.10).
Localised technical rules and permitted uses. Schedule 1 authorises a waste or resource transfer station on specified lots in Nimmitabel (Sch 1). Schedule 2 lists specific exempt development types and their quantitative limits, for example advertising signs and outdoor dining (Sch 2). Schedule 6 provides technical rules for pond and tank aquaculture (cl 5.19 and Sch 6).
Administrative allocations. The Plan sets the relevant acquisition authority for identified reservation types (cl 5.1 and Land Reservation Acquisition Map) and classifies/reclassifies public land with detailed schedules of parcels affected (cl 5.2; Sch 4).
These concepts together create a structure that translates strategic aims into parcel‑by‑parcel rules through mapped controls, lists of permitted/forbidden uses, and procedural tests that the Council applies in exercising consent. The Plan frequently cross‑refers to State instruments and the Act, for example preserving the operation of State Environmental Planning Policies and the Act’s Division 3.5 processes (cl 1.9; cl 1.8A note).
Who it affects
The Plan assigns legal rights, obligations and decision‑making responsibility to a predictable set of actors.
Council and the consent authority. The Plan designates the Council as the consent authority for development on land to which the Plan applies, subject to the Act (cl 1.6). The Council must implement mapped controls, assess applications against overlay and zone objectives and exercise its discretion under clauses such as the exceptions to development standards (cl 4.6), heritage (cl 5.10), flood planning (cl 5.21) and environmental overlays (cl 6.3-6.8).
Landowners and applicants. Owners and prospective developers are directly affected. Subdivision, demolition and most new development require development consent (cl 2.6; cl 2.7). Applicants must design proposals to meet mapped minimum lot sizes, height and FSR limits; they may seek development consent for uses listed as permitted with consent in a relevant zone. Where applicants seek to contravene development standards they must demonstrate that compliance is unreasonable or unnecessary and provide environmental planning grounds for the contravention (cl 4.6(3)). For exempt or complying pathways, applicants must meet the precise criteria in Schedule 2 or Schedule 3 and avoid environmentally sensitive areas identified in cl 3.3.
Neighbouring landowners and the public. The Plan structures potential externalities by requiring consent authorities to consider impacts on adjoining zoned land, amenity, riparian corridors, biodiversity and heritage values in multiple clauses (for example cl 2.4(2), cl 6.1(3), cl 6.6). It prescribes notification and consultation duties in certain heritage and Aboriginal heritage matters (cl 5.10(7)-(9)).
Specific industries and operators. The Plan imposes industry‑specific rules. Aquaculture operators face operational and site location tests under cl 5.19 and Sch 6; intensive livestock agriculture is subject to capacity thresholds and locational restrictions under cl 5.18; licensed premises are protected from refusal on the basis of music style or live performance where noise can be managed (cl 5.20); home businesses and home industries have floor area caps and other limits (cl 5.4).
State authorities. The Plan identifies which State authority would be the relevant acquisition authority for certain reservations (cl 5.1), and preserves the effect of State Environmental Planning Policies that prevail over the Plan (cl 1.9). It also links to other Acts such as the Crown Lands, National Parks and Wildlife, Local Government, Rural Fires and Fisheries management regimes via cross‑references in policy clauses, creating points of intergovernmental interaction (multiple clauses).
Community and cultural custodians. Local Aboriginal communities must be notified and their input considered for development within Aboriginal places of heritage significance (cl 5.10(8)). Heritage Council consultation is mandated for archaeological sites and nominated State heritage items (cl 5.10(7), (9)).
Who pays. The Plan imposes compliance costs on applicants: design and assessment costs, potential heritage reports, environmental impact statements for designated or sensitive proposals, and possible infrastructure upgrades to satisfy essential services (cl 6.10). Those costs are borne by developers and landowners seeking consent. The Council carries administrative costs of processing applications, keeping records under cl 4.6(4), and enforcing conditions. The Plan also creates potential opportunity costs for owners of land where uses are prohibited or restricted by zoning or mapped overlays.
Who decides. The Council is the primary decision maker under cl 1.6. Certain matters require the consent authority to consult or notify third parties before granting consent (cl 5.10(7)-(9)). The Plan also leaves open that State instruments or the Act may designate other decision makers in particular circumstances (cl 1.9(1)).
What behaviour changes. The Plan shifts developer behaviour toward: (a) designing within mapped floorspace, height and lot size limits; (b) preparing environmental and heritage impact documentation where overlays apply; (c) avoiding environmentally sensitive areas for exempt/compliant works; and (d) using the exceptions mechanism when non‑standard outcomes are sought (cl 4.6). It also directs agricultural and aquaculture operators to meet prescribed operational and locational conditions or thresholds (cl 5.18; cl 5.19; Sch 6).
Key duties and rights
The Plan creates specific statutory duties for the consent authority and applicants and confers regulated rights to carry out certain development where conditions are met.
Consent authority duties
Regard to zone objectives. The consent authority must have regard to the objectives for development in a zone when determining an application (cl 2.3(2)). This is a general duty shaping the assessment rather than a strict prohibition.
Record keeping for exceptions. If the consent authority considers a development that contravenes a development standard it must keep a record of its assessment under cl 4.6(4).
Heritage consultation and consideration. The consent authority must, in prescribed circumstances, notify and take into account responses from the Heritage Council regarding archaeological sites and nominated State heritage items and must notify local Aboriginal communities for Aboriginal places of heritage significance (cl 5.10(5), (7)-(9)).
Environmental overlay assessment duties. For lands affected by Terrestrial Biodiversity, Groundwater Vulnerability, Riparian Land, Wetlands and Drinking Water Catchment overlays, the consent authority must consider specified factors and be satisfied that the development will avoid, minimise or mitigate significant adverse environmental impacts before granting consent (cl 6.3(3)-(4); cl 6.4(3)-(4); cl 6.6(3)-(4); cl 6.7(3)-(4); cl 6.5(3)-(4)).
Flood planning tests. For land within the flood planning area the consent authority must be satisfied the development is compatible with flood function and behaviour; does not adversely affect flood behaviour or evacuation; incorporates risk management measures; and will not adversely affect the environment (cl 5.21(2)-(3)). For special flood considerations the consent authority must consider safe occupation and evacuation and the impact on emergency response and critical infrastructure (cl 5.22).
Applicant and landowner duties/conditions
Obtain development consent where required. Subdivision, demolition and most forms of development require development consent except where explicitly exempt or complying and applicable envelopes are met (cl 2.6; cl 2.7; cl 3.1-3.2).
Design to mapped standards or justify non‑compliance. Applicants must design to mapped lot sizes, heights and FSRs (cl 4.1; cl 4.3; cl 4.4). If seeking to contravene a development standard the applicant must demonstrate that compliance is unreasonable or unnecessary and provide environmental planning grounds (cl 4.6(3) and notes regarding the Regulation).
Meet exempt/compliant criteria. To rely on exempt development in Schedule 2, the works must meet the technical standards, Building Code of Australia provisions and not be on certain heritage or environmentally sensitive lands (cl 3.1; cl 3.3; Schedule 2). Complying development must satisfy Part 1 of Schedule 3 and related BCA tests and any local conditions (cl 3.2).
Provide environmental and heritage documentation when required. Where the consent authority requests heritage management documents or conservation plans, applicants must provide them; archaeological and Aboriginal heritage matters attract formal notification and consultation requirements (cl 5.10(5), (6), (7), (8), (9)).
Meet use‑specific caps. Applicants operating home businesses, home industries, bed and breakfast accommodation, neighbourhood shops and artisan food/drink industries must comply with the quantitative caps and conditions set out in cl 5.4 and related clauses and schedules.
Rights
Right to apply for consent. Landowners retain the right to apply for development consent for uses permitted with consent and to seek variations through the exceptions clause where statutory criteria are met (cl 2.3; cl 4.6).
Exempt and complying pathways. Where developments meet the criteria in Schedule 2 or Schedule 3 they can proceed without development consent, subject to other approvals under other Acts (cl 3.1; Schedule 2 notes).
Ability to replace lawfully erected dwellings. Clause 4.2B(5) allows replacement of lawfully erected dual occupancies and dwelling houses in certain rural and conservation zones subject to limits, providing a pathway to modernise rather than expand entitlements.
Conservation incentives. The consent authority may grant consent to otherwise prohibited development involving heritage items where conservation is facilitated and conditions require specified conservation works (cl 5.10(10)).
These duties and rights create a rules‑based environment that couples mapped certainty with discretionary assessment tools. The exceptions mechanism and consent authority’s duties to consult introduce administrative discretion, while the exempt/compliant categories provide limited regulatory relief where strict conditions are met.
Penalties and enforcement
The Plan itself focuses on permissioning and standards; it contains fewer express penal provisions. Enforcement and penalty mechanisms operate primarily through the Act and other relevant statutes that the Plan references. From the Plan text the enforcement implications are as follows.
Development without required consent. The Plan specifies which development requires consent and which may proceed as exempt or complying. The Act supplies the enforcement powers, penalties and remedial actions where unauthorised development occurs. The Plan’s role is to identify that consent is required for demolition (cl 2.7), subdivision (cl 2.6), and many other listed developments in the Land Use Table.
Conditions and covenants. The Plan allows the consent authority to impose conditions on development consent and to require covenants to prevent “double dipping” of floor space rights when a site comprises multiple lots (cl 4.5(9)-(10)). Failure to comply with conditions of consent can attract enforcement under the Act and local government regulatory frameworks.
Heritage and archaeological protections. The Plan makes demolition and alteration of heritage items consent‑triggering (cl 5.10(2)). It requires notification to and consideration of responses from the Heritage Council for archaeological sites and nominated State heritage items (cl 5.10(7), (9)). Where consent is required but not obtained, the Act provides compliance and enforcement processes; the Plan reinforces that unauthorised work in heritage areas is prohibited.
Environmental overlays and refusing consent. The Plan gives the consent authority express bases on which to refuse consent, for example where development on drinking water catchment land would adversely affect water quality (cl 6.5(3)) or where development in riparian land would have significant adverse impacts (cl 6.6(4)). Enforcement follows refusal and prohibition decisions.
No new express offence provisions in the Plan. The Plan does not create novel standalone criminal offences or penal schedules. Instead it embeds requirements to obtain consent, to meet mapped standards, and to satisfy overlay tests. Breach resolution relies on the Act, the Local Government Act, the Land and Environment Court jurisdiction and other enforcement vehicles available under NSW planning and environmental law.
Practical enforcement implications for practitioners and clients
The Council will need to monitor compliance and may pursue enforcement actions under the Act for unauthorised works and breaches of consent conditions. Applicants should treat the Plan’s consent triggers as mandatory preconditions for lawful development.
Where the Plan permits covenants or the registration of instruments as conditions of consent (cl 4.5(9)), those instruments create property‑level encumbrances that can be enforced through land law mechanisms.
For heritage and Aboriginal heritage matters, statutory consultation obligations and notification timeframes create procedural prerequisites. Failure to follow these steps can render an approval vulnerable to challenge or enforcement.
For specific regulated activities such as intensive livestock agriculture and aquaculture, the Plan sets capacity thresholds and locational constraints. Operating outside these parameters can attract regulatory action and may also trigger other licence regimes under fisheries, water management or biosecurity laws referenced in the Plan.
In short, the Plan structures the regulatory obligations; it relies on the Act and other statutory regimes for sanctions. Practitioners should align compliance strategies to the Plan’s mapped requirements, overlay tests and the prospect of conditions and covenants attached to consent.
How it interacts with other laws
The Plan is designed to operate within the NSW statutory architecture. It repeatedly cross‑refers to the Environmental Planning and Assessment Act and to multiple State and other Acts. The Plan’s interaction points are explicit.
Primacy of State environmental planning policies and the Act. Clause 1.9(1) makes the Plan subject to any State environmental planning policy that prevails under section 3.28 of the Act. The Plan therefore does not operate in isolation: State Environmental Planning Policies (SEPPs) and the Act can modify or displace local rules where they are expressed to do so. The Plan’s own notes and clauses direct users to SEPPs relevant to housing, transport and infrastructure, resources and energy, resilience and hazards, industry and primary production (Land Use Table notes).
Cross‑referenced licensing and approvals under other Acts. The Plan repeatedly acknowledges that development approved under it may nonetheless need licences or approvals under other laws. Examples include:
Heritage: the Heritage Act 1977 is referenced for State heritage register and interim heritage order matters (cl 3.1(3)(d); cl 5.10).
Crown land: clauses exclude certain covenant suspensions where Crown Land Management Act or related instruments apply (cl 1.9A(2)(b)).
Fisheries and aquaculture: cl 5.19 and Sch 6 cross‑refer to the Fisheries Management Act 1994 and aquaculture development plans; the Plan notes that nothing in its clauses affects other licence requirements under those Acts (Sch 6.1 note).
Water and water management: farm dams must comply with the Water Management Act 2000 (Sch 2 sch.2-sec-oc.6(6)); flood planning clauses reference the Flood Risk Management Manual and the Considering Flooding in Land Use Planning Guideline (cl 5.21; cl 5.22).
Rural Fires Act 1997: bush fire hazard reduction authorised by that Act may be carried out without development consent (cl 5.11).
Local Government Act 1993: classification of public land and approvals for on‑site effluent disposal (cl 5.2; cl 3.2(3)(c)).
Interaction with State acquisition and land reservation regimes. Clause 5.1 ties specific reservation types on the Land Reservation Acquisition Map to State acquiring authorities for owner‑initiated acquisitions under the Land Acquisition (Just Terms Compensation) Act 1991. The Plan’s schedule identifies which authority is the relevant authority for different reservation markings, creating a statutory link between the LEP and State acquisition processes.
Relationship to transport and infrastructure SEPP. Clause 5.12 explicitly states that the Plan does not restrict or prohibit development by or on behalf of public authorities where that development is permitted with or without consent under State Environmental Planning Policy (Transport and Infrastructure) 2021 (Chapter 2). It also preserves Crown use of existing buildings.
Environmental protection regimes overlay. The Plan directs assessment against environmental overlays but does not replace higher level environmental laws. For example the Plan’s biodiversity, groundwater and riparian protections require consent authorities to ensure development avoids, minimises or mitigates impacts; similar protections under the Biodiversity Conservation Act 2016, Water Management Act and other statutes can operate in parallel.
Compatibility with SEPPs on exempt and complying development. Schedule 2 notes that the State SEPP on Exempt and Complying Development Codes applies state‑wide and that the Plan supplements but does not supplant the State policy. Practitioners must reconcile the local Schedule 2 exemptions with SEPP thresholds and the Act’s provisions.
Takeaways for practitioners
The Plan is an instrument within a matrix of State laws. Where the Plan is silent or where a SEPP expressly prevails, the State instrument controls (cl 1.9(1)). Always check the relevant SEPPs and other Acts referenced in the Plan before advising clients.
Licences, approvals and permits under other Acts often remain necessary even when the Plan permits development as exempt or complying. The Plan’s notes repeatedly warn that exempt development is not exempt from approvals required under other Acts (Sch 2 note).
Where the Plan permits or requires works that touch on Crown land, native title, Aboriginal heritage, water extraction or aquaculture, parallel regulatory processes and licences will apply and can impose separate conditions or prohibitions referenced in the Plan.
Amendment history
The Plan text itself contains embedded amendment notes and references to statutory instruments that changed its content. The Plan has been amended on multiple occasions; the Plan’s clauses carry amendment annotations indicating the instrument and schedule or clause.
Key amendment entries visible in the text provided
Clause 1.8A (savings provision relating to development applications) shows amendments: Am 2019 (621), Sch 5[1]; 2023 (609), Sch 1.1[1]. The clause therefore has been updated at least in 2019 and 2023 to address application transitional arrangements and a specific 2023 SEPP amendment (State Environmental Planning Policy Amendment (Flood Planning) 2023) (cl 1.8A(2)).
Clause 2.1 (Land use zones) was amended in 2022 (2022 (831), Sch 1.6[1]) to include the enumerated zones.
Clause 4.1 (Minimum subdivision lot size) annotated Am 2022 (831), Sch 1.6[3], reflecting changes to lot size mapping or operation.
Clauses 4.1AA, 4.1A, 4.1B, 4.1C, 4.2A, 4.2B and related provisions show a series of amendments with dates and schedules, many referencing 2022 (831), Sch 1.6[4]-[6] and earlier amendments in 2014 (151). These amendments introduce community title scheme minimum lot size rules, lot size rules for multi‑dwelling development, average lot size subdivision pathways, split zone rules, strata plan lot sizes, and replacement/erection rules for dual occupancies and dwelling houses in certain rural/residential/conservation zones (see cl 4.1AA, 4.1A, 4.1B, 4.1C, 4.2A, 4.2B annotations).
Clause 4.4A (Maximum gross floor area for retail premises) shows an amendment in 2022 (831), Sch 1.6[7].
Schedule 2 (Exempt development) shows an Am 2022 (831), Sch 1.6[8]-[18], indicating substantial updates to the exempt development schedule in 2022.
Clause 5.10 (Heritage conservation) and Schedule 5 listing of items are part of the Plan as made but the Plan notes that heritage items and conservation areas are listed in Schedule 5; amendments to Schedule 5 would be by separate instrument.
Clause 5.22 (Special flood considerations) is annotated as Subst 2023 (609), Sch 1.7, showing a substantial replacement in 2023 consistent with flood planning reforms.
Schedule 4 classification/reclassification of public land has an amendment Am 2021 (511), cl 4 and map updates noted (am 2014, 2016), and a comment that entries were discontinued from July 2021 when responsibility for map updates moved to the Department.
How to read these entries
The Plan’s in‑text amendment notes identify the year and instrument number with the schedule or clause reference. They show that the Plan has been progressively updated to reflect State policy changes (for example flood planning in 2023), local administrative adjustments (public land classification) and to add new procedural or standards rules (lot size and subdivision rules in 2022).
For precise operative dates and text changes practitioners should consult the consolidated Plan on the NSW legislation website and review the amending instruments listed in the annotations for full amendment text and transitional provisions. The Plan as provided includes only the consolidated text and the footnoted amendment records.
Implications for practice
The presence of multiple recent amendments, notably on flood planning (2023) and lot size/subdivision rules (2022), indicates active updating in response to State policy. Practitioners must verify whether an application is subject to transitional clauses or to the pre‑amendment rules via the amending instruments and dates cited in the Plan annotations (for example cl 1.8A on savings/transition).
The Plan’s schedule and map responsibilities have shifted in administrative practice (map updates moved to the Department), so mapping queries and up‑to‑date overlays should be checked on the NSW Planning Portal as the Plan directs (cl 1.7 note).
Litigation history
The Plan text provided does not include any case law, judicial decisions or a litigation history. It lists no decisions of the Land and Environment Court or other courts, and there are no cases cited in the Plan itself.
What can be said from the Plan text
The Plan establishes the legal framework and the consent authority’s duties and procedural requirements. Where disputes arise about the interpretation or application of the Plan, those disputes are litigable under the Act. Typical litigation themes in relation to LEPs include challenges to Council refusals, to the validity of conditions, to the exercise of discretion in exceptions to development standards, and to whether development is exempt or complying. The Plan contains provisions that can attract litigation such as the exceptions mechanism in cl 4.6, heritage consents in cl 5.10, and flood and environmental overlay tests (cl 5.21; cl 6.3-6.7).
Clause 4.6 requires record keeping of assessments when the consent authority permits contraventions of development standards; those records form a procedural footprint that can be relevant in merits review or judicial review proceedings under the Act.
Clause 1.8A contains a savings provision for development applications lodged prior to the Plan’s commencement or before certain State policy commencements. Savings clauses are often the subject of dispute in litigation about transitional rights; the Plan’s explicit savings and the cross‑reference to Division 3.5 of the Act indicate that such transitional litigation pathways are contemplated.
Practical guidance for litigators and advisers
Because the Plan does not itself list litigation, practitioners should undertake jurisdictional searches of the Land and Environment Court decisions and other reporting services for precedent on how the Plan’s specific clauses have been interpreted since 2013, especially for disputed issues such as: application of cl 4.6 exceptions; the Plan’s approach to minimum lot sizes and split zones (cl 4.1C); heritage consent requirements and the weight given to heritage management documents (cl 5.10); and flood planning clauses post‑2023 substitution (cl 5.21; cl 5.22).
Where administrative procedural steps are mandated (for example cl 5.10 notifications), failure to comply may be relevant in judicial review challenges. The Plan’s internal record‑keeping and consultation steps will form part of the administrative record.
Because the provided text contains no reported litigation, any analysis of litigation trends must be based on external case law searches which are beyond the Plan document itself.
Gotchas
The Plan contains several technical traps and potential pitfalls that practitioners and clients commonly encounter. These are source‑grounded items to flag in project planning.
Maps are integral and binding. Many controls are map‑driven: Lot Size Map, Floor Space Ratio Map and Height of Buildings Map define numerical limits. Do not assume a zone rule in the Land Use Table applies uniformly across the LGA; always check the land’s zoning and the specific map entries for that parcel (cl 1.7; cl 4.1; cl 4.3; cl 4.4). The Plan notes that maps are available on the NSW Planning Portal and that they may be amended by environmental planning instruments (cl 1.7).
Exempt development exclusions. A development that might appear to be a small, low‑impact exempt matter under Schedule 2 can become non‑exempt if the land is an “environmentally sensitive area for exempt or complying development” as defined in cl 3.3. The list of excluded areas is extensive and includes mapped biodiversity and scenic protection areas (cl 3.3(2)(g), (ja), (jb)). Always check overlays before relying on an exempt pathway.
Heritage and Aboriginal heritage procedural steps. Where a proposal relates to a heritage item or an Aboriginal place of heritage significance, the consent authority may require heritage management documents and must notify local Aboriginal communities and the Heritage Council in prescribed circumstances (cl 5.10(3)-(9)). Failure to meet these procedural steps can nullify or complicate approvals and may provoke objections.
Exceptions to development standards have record obligations and limits. Clause 4.6 allows contravention of development standards but requires the applicant to justify why compliance is unreasonable or unnecessary and the consent authority to keep a record of its assessment (cl 4.6(3)-(4)). In specified rural, residential and conservation zones the clause prohibits consent if subdivisions would produce multiple lots below minimum areas or below 90% of minimum areas (cl 4.6(6)). The exceptions mechanism is not a free pass; it is procedural and subject to constrained application.
Subdivision and dwelling entitlements: multiple cross‑references. Minimum lot size rules for ordinary subdivisions (cl 4.1), community title schemes (cl 4.1AA), dual occupancy and multi dwelling minimum lot sizes (cl 4.1A), and strata plan lot size rules (cl 4.2A) interact. For example, cl 4.2B restricts the erection of dual occupancies and dwelling houses on certain rural and conservation land unless the lot meets mapped minimum sizes or falls within other narrow exceptions. Practitioners must trace the specific clause pathway that applies to a parcel to avoid advising on an impermissible subdivision or dwelling.
Flood planning and special flood considerations. The Plan incorporates the Considering Flooding in Land Use Planning Guideline and the Flood Risk Management Manual (cl 5.21(4)-(5); cl 5.22(4)-(5)). Applicants must account for climate change and evacuation capacity in areas that are in the flood planning area. The 2023 substitution of cl 5.22 (see Amendment history) signals enhanced scrutiny; practitioners should check the current guideline and manual referenced by the Plan rather than rely on pre‑2023 practice.
Aquaculture and intensive livestock thresholds. Aquaculture has bespoke site and operational controls in cl 5.19 and Schedule 6; intensive livestock agriculture is regulated via capacity thresholds and setbacks (cl 5.18). Small‑scale operations may be exempt from consent only if they meet those thresholds and site restrictions. Confusing aquaculture with general agricultural use risks non‑compliance.
Suspension of covenants limited. Clause 1.9A suspends private covenants to the extent necessary to enable development under the Plan, but the clause carves out exceptions, for example covenants imposed by Council, conservation agreements, biobanking agreements and planning agreements (cl 1.9A(2)(a)-(g)). Practitioners should not assume all private covenants can be overridden by the Plan.
Music and licensed premises protection is conditional. Clause 5.20 prevents refusal of consent to licensed premises on the basis of music genre and related features provided noise can be managed and minimised to an acceptable level (cl 5.20(1)-(2)). That protection does not remove noise control requirements; applicants must demonstrate noise management.
Public land classification consequences. Schedule 4 classes and reclassifications carry legal effects under the Local Government Act and may discharge or preserve trusts and reservations (cl 5.2(4)-(5)). Changing classification may require Governor approval for certain trust discharges. Local governments and applicants must track how Schedule 4 entries affect land title and existing interests.
Double counting of site area and FSR “double dipping”. Clause 4.5(9)-(10) permits covenants to prevent the creation of floor area on a restricted lot to avoid “double dipping” across consolidated sites. Practitioners should check whether a covenant has been imposed on a site before designing to an apparent FSR.
These are procedural and substantive traps that arise directly from the Plan’s text and schedules. They are practical gotchas for project programming, environmental and heritage risk management, and for structuring financing and title arrangements.
How to comply
Compliance under the Plan requires coordinated mapping checks, early risk assessment for overlays, pre‑application work on heritage and environmental matters, and careful use of the consent pathways. The Plan prescribes concrete steps and thresholds.
Identify the parcel’s zoning and mapped overlays
Start with the Land Zoning Map, Lot Size Map, Height of Buildings Map, Floor Space Ratio Map and overlay maps referenced in the Plan (cl 1.7; cl 4.1; cl 4.3; cl 4.4). All numerical limits and zone permissions are map‑specific.
Check whether the parcel appears on the Terrestrial Biodiversity, Riparian Land, Groundwater Vulnerability, Wetlands, Drinking Water Catchment, Scenic Protection and other overlay maps. If so, the overlay clauses impose substantive tests and documentary requirements (cl 6.3-6.7; cl 6.9).
Determine the land use category for the proposed activity
Consult the Land Use Table for the relevant zone to see whether the proposed use is permitted without consent, permitted with consent, or prohibited (cl 2.3). Remember permitted without consent is still subject to the Act’s environmental assessment and Part 5 approval requirements where relevant (cl 2.3 note).
If the proposed use is specifically listed in Schedule 1 for additional permitted uses, apply the conditions and allowances in that Schedule (cl 2.5; Sch 1 example for Nimmitabel).
Check whether the proposal is exempt or complying development
For low‑impact works, compare the proposal to Schedule 2 exempt development criteria and the State SEPP (cl 3.1; Sch 2). Confirm the site is not within an environmentally sensitive area as defined in cl 3.3.
For complying development, consult Part 1 of Schedule 3 and ensure BCA compliance and any local conditions in Part 2 of Schedule 3 (cl 3.2).
For development requiring consent, assemble pre‑application technical studies
Environmental overlays commonly require evidence that development will avoid, minimise or mitigate significant adverse impacts: ecological assessments, biodiversity impact statements, groundwater and hydrological reports, riparian and bank stability studies, wetland impact assessments and flood risk assessments (cl 6.3(3)-(4); cl 6.4(3)-(4); cl 6.6(3)-(4); cl 6.7(3)-(4); cl 5.21(2)-(3)).
Where heritage is involved, prepare a heritage management document, heritage impact statement or conservation management plan as requested by the consent authority, and plan to notify relevant bodies (cl 5.10(4)-(6)).
For intensive livestock or aquaculture, confirm capacity thresholds and locational buffers and prepare management and operational plans in accordance with Sch 6 and cl 5.18 (cl 5.18(4)-(5); cl 5.19; Sch 6 operational requirements).
Address mapped development standards in design
Confirm minimum lot sizes for proposed subdivisions under cl 4.1 and related clauses 4.1AA, 4.1A, 4.1B, 4.1C as relevant to community title, multi dwellings, average lot size subdivision and split zone lots.
Design building height and FSR to match mapped maxima (cl 4.3; cl 4.4). If you seek more, prepare a rigorous written justification for a development standard contravention under cl 4.6 demonstrating that compliance is unreasonable or unnecessary and that environmental planning grounds justify the contravention. Be prepared for the consent authority to require a detailed assessment and to keep a record of its decision (cl 4.6(3)-(4)).
Account for ancillary approvals and other Acts
Identify and obtain any licences or permits required under other Acts referenced in the Plan: Water Management Act, Fisheries Management Act, Heritage Act, Crown Lands, Local Government Act, Rural Fires Act and State infrastructure SEPPs where relevant. The Plan’s notes reiterate that exempt/compliant development is not exempt from other Act approvals (Sch 2 note; cl 5.12).
For works in public places, classified roads or public land, check approvals under the Roads Act and Local Government Act and the Plan’s Schedule 4 classification effects (cl 5.1; cl 5.2; Sch 4).
Expect conditions and possible covenants
The consent authority can impose conditions of consent and require covenants to control future floor area creation on multi‑lot sites (cl 4.5(9)-(10)). Prepare to accept or negotiate conditions and to register covenants on title where required.
Where replacement of existing dwellings is contemplated on rural holdings, confirm the matters in cl 4.2B(5) and timing requirements that might affect 1995/1997 holding definitions and time limits (cl 4.2B(6)).
Consultation and community engagement
For heritage and Aboriginal places, the consent authority must notify Heritage Council and local Aboriginal communities and consider their responses (cl 5.10(7)-(9)). Early engagement can reduce objection risk and accelerate consent.
Time limits and transitional rules
If an application was lodged before the Plan’s commencement or before a relevant SEPP commenced, check cl 1.8A and the Act’s Division 3.5 for transitional application of rules. The Plan includes explicit savings for certain pre‑commencement applications and for the commencement of flood planning SEPP amendments (cl 1.8A).
Noise and amenity for licensed premises
If advising licensed premises, note cl 5.20 protects live and amplified music from being treated as a refusal ground where noise can be managed and minimised. Prepare a noise management plan and evidence of noise mitigation measures as part of the application.
Practical checklist for first meeting with a client
Obtain the parcel identification and immediately map zoning, lot size, height, FSR and overlays on the NSW Planning Portal.
Confirm whether the proposed use appears in the Land Use Table as permitted, permitted with consent or prohibited.
If subdivision or demolition is proposed check cl 2.6 and cl 2.7 consent triggers.
Check Schedule 2 and Schedule 3 to see if an exempt or complying pathway exists and whether the parcel sits within an exclusion under cl 3.3.
If variation of development standards is contemplated, prepare to meet the cl 4.6 evidentiary test and be aware the consent authority must keep a record of the assessment.
Plan for heritage consultation and any necessary heritage documentation if Schedule 5 items or heritage conservation areas apply.
Following these steps and mapping the Plan’s clauses to project tasks aligns a development project with the Plan’s procedural and substantive rules and reduces risks of refusal, delay or enforcement action.
The Dictionary at the end of this Plan defines words and expressions for the purposes of this Plan.
1 Notes
1 Notes
1.5 Notes
Notes in this Plan are provided for guidance and do not form part of this Plan.
1 Consent authority
1 Consent authority
1.6 Consent authority
The consent authority for the purposes of this Plan is (subject to the Act) the Council.
1 Maps
1 Maps
1.7 Maps
(1) A reference in this Plan to a named map adopted by this Plan is a reference to a map by that name—
(a) approved by the local plan-making authority when the map is adopted, and
(b) as amended or replaced from time to time by maps declared by environmental planning instruments to amend or replace that map, and approved by the local plan-making authority when the instruments are made.
(1AA) (Repealed)
(2) Any 2 or more named maps may be combined into a single map. In that case, a reference in this Plan to any such named map is a reference to the relevant part or aspect of the single map.
(3) Any such maps are to be kept and made available for public access in accordance with arrangements approved by the Minister.
(4) For the purposes of this Plan, a map may be in, and may be kept and made available in, electronic or paper form, or both.
Note.
The maps adopted by this Plan are to be made available on the NSW Planning Portal. Requirements relating to the maps are set out in the documents entitled Standard technical requirements for LEP maps and Standard requirements for LEP GIS data which are available on the website of the Department of Planning and Environment.
1 Repeal of planning instruments applying to land
1 Repeal of planning instruments applying to land
1.8 Repeal of planning instruments applying to land
(1) All local environmental plans and deemed environmental planning instruments applying only to the land to which this Plan applies are repealed.
Note.
The following local environmental plans are repealed under this provision—
Cooma-Monaro Local Environmental Plan 1993—(Urban)
(2) All local environmental plans and deemed environmental planning instruments applying to the land to which this Plan applies and to other land cease to apply to the land to which this Plan applies.
Note.
Cooma-Monaro Local Environmental Plan 1999—(Rural) and Yarrowlumla Local Environmental Plan 2002 do not apply to the land to which this Plan applies.
1 Savings provision relating to development applications
1 Savings provision relating to development applications
1.8A Savings provision relating to development applications
(1) If a development application has been made before the commencement of this Plan in relation to land to which this Plan applies and the application has not been finally determined before that commencement, the application must be determined as if this Plan had not commenced.
Note.
However, under Division 3.5 of the Act, a development application may be made for consent to carry out development that may only be carried out if the environmental planning instrument applying to the relevant development is appropriately amended or if a new instrument, including an appropriate principal environmental planning instrument, is made, and the consent authority may consider the application. The Division requires public notice of the development application and the draft environmental planning instrument allowing the development at the same time, or as closely together as is practicable.
(2) A development application made, but not finally determined, before the commencement of State Environmental Planning Policy Amendment (Flood Planning) 2023 must be determined as if that policy had not commenced.
(1) This Plan is subject to the provisions of any State environmental planning policy that prevails over this Plan as provided by section 3.28 of the Act.
(2) The following State environmental planning policies (or provisions) do not apply to the land to which this Plan applies—
1 Suspension of covenants, agreements and instruments
1 Suspension of covenants, agreements and instruments
1.9A Suspension of covenants, agreements and instruments
(1) For the purpose of enabling development on land in any zone to be carried out in accordance with this Plan or with a consent granted under the Act, any agreement, covenant or other similar instrument that restricts the carrying out of that development does not apply to the extent necessary to serve that purpose.
(2) This clause does not apply—
(a) to a covenant imposed by the Council or that the Council requires to be imposed, or
(b) to any relevant instrument within the meaning of section 13.4 of the Crown Land Management Act 2016, or
(c) to any conservation agreement within the meaning of the National Parks and Wildlife Act 1974, or
(d) to any Trust agreement within the meaning of the Nature Conservation Trust Act 2001, or
(e) to any property vegetation plan within the meaning of the Native Vegetation Act 2003, or
(f) to any biobanking agreement within the meaning of Part 7A of the Threatened Species Conservation Act 1995, or
(g) to any planning agreement within the meaning of Subdivision 2 of Division 7.1 of the Act.
(3) This clause does not affect the rights or interests of any public authority under any registered instrument.
(4) Under section 3.16 of the Act, the Governor, before the making of this clause, approved of subclauses (1)–(3).
cl 1.9A: Am 2019 (621), Sch 5[2]–[4].
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
2 Land use zones
2 Land use zones
2.1 Land use zones
The land use zones under this Plan are as follows—
Rural Zones
RU1 Primary Production
RU3 Forestry
RU5 Village
Residential Zones
R1 General Residential
R2 Low Density Residential
R5 Large Lot Residential
Employment Zones
E1 Local Centre
E2 Commercial Centre
E3 Productivity Support
E4 General Industrial
Mixed Use Zones
MU1 Mixed Use
Special Purpose Zones
SP2 Infrastructure
Recreation Zones
RE1 Public Recreation
RE2 Private Recreation
Conservation Zones
C1 National Parks and Nature Reserves
C2 Environmental Conservation
C3 Environmental Management
C4 Environmental Living
cl 2.1: Am 2022 (831), Sch 1.6[1].
2 Zoning of land to which Plan applies
2 Zoning of land to which Plan applies
2.2 Zoning of land to which Plan applies
For the purposes of this Plan, land is within the zones shown on the Land Zoning Map.
2 Zone objectives and Land Use Table
2 Zone objectives and Land Use Table
2.3 Zone objectives and Land Use Table
(1) The Land Use Table at the end of this Part specifies for each zone—
(a) the objectives for development, and
(b) development that may be carried out without development consent, and
(c) development that may be carried out only with development consent, and
(d) development that is prohibited.
(2) The consent authority must have regard to the objectives for development in a zone when determining a development application in respect of land within the zone.
(3) In the Land Use Table at the end of this Part—
(a) a reference to a type of building or other thing is a reference to development for the purposes of that type of building or other thing, and
(b) a reference to a type of building or other thing does not include (despite any definition in this Plan) a reference to a type of building or other thing referred to separately in the Land Use Table in relation to the same zone.
(4) This clause is subject to the other provisions of this Plan.
Notes.
2
1
Schedule 1 sets out additional permitted uses for particular land.
2
2
Schedule 2 sets out exempt development (which is generally exempt from both Parts 4 and 5 of the Act). Development in the land use table that may be carried out without consent is nevertheless subject to the environmental assessment and approval requirements of Part 5 of the Act.
2
3
Schedule 3 sets out complying development (for which a complying development certificate may be issued as an alternative to obtaining development consent).
2
4
Clause 2.6 requires consent for subdivision of land.
2
5
Part 5 contains other provisions which require consent for particular development.
2 Unzoned land
2 Unzoned land
2.4 Unzoned land
(1) Development may be carried out on unzoned land only with development consent.
(2) In deciding whether to grant development consent, the consent authority—
(a) must consider whether the development will impact on adjoining zoned land and, if so, consider the objectives for development in the zones of the adjoining land, and
(b) must be satisfied that the development is appropriate and is compatible with permissible land uses in any such adjoining land.
2 Additional permitted uses for particular land
2 Additional permitted uses for particular land
2.5 Additional permitted uses for particular land
(1) Development on particular land that is described or referred to in Schedule 1 may be carried out—
(a) with development consent, or
(b) if the Schedule so provides—without development consent,
in accordance with the conditions (if any) specified in that Schedule in relation to that development.
(2) This clause has effect despite anything to the contrary in the Land Use Table or other provision of this Plan.
2 Subdivision—consent requirements
2 Subdivision—consent requirements
2.6 Subdivision—consent requirements
(1) Land to which this Plan applies may be subdivided, but only with development consent.
Notes.
(2) Development consent must not be granted for the subdivision of land on which a secondary dwelling is situated if the subdivision would result in the principal dwelling and the secondary dwelling being situated on separate lots, unless the resulting lots are not less than the minimum size shown on the Lot Size Map in relation to that land.
Note.
The definition of secondary dwelling in the Dictionary requires the dwelling to be on the same lot of land as the principal dwelling.
2
1
If a subdivision is specified as exempt development in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, the Act enables it to be carried out without development consent.
2
2
Part 6 of State Environmental Planning Policy (Exempt and Complying Development Codes) 2008 provides that the strata subdivision of a building in certain circumstances is complying development.
2 Demolition requires development consent
2 Demolition requires development consent
2.7 Demolition requires development consent
The demolition of a building or work may be carried out only with development consent.
Note.
If the demolition of a building or work is identified in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, as exempt development, the Act enables it to be carried out without development consent.
2 Temporary use of land
2 Temporary use of land
2.8 Temporary use of land
(1) The objective of this clause is to provide for the temporary use of land if the use does not compromise future development of the land, or have detrimental economic, social, amenity or environmental effects on the land.
(2) Despite any other provision of this Plan, development consent may be granted for development on land in any zone for a temporary use for a maximum period of 52 days (whether or not consecutive days) in any period of 12 months.
(3) Development consent must not be granted unless the consent authority is satisfied that—
(a) the temporary use will not prejudice the subsequent carrying out of development on the land in accordance with this Plan and any other applicable environmental planning instrument, and
(b) the te