[2011] HCA 8
plaintiff. Writ of certiorari issued quashing the decisions of Logan J made on 18 December 2009 and 17 March 2010 and the Full Court decision of 4 June 2010; application for mandamus dismissed; first, second...
Native title claimants negotiating a fresh land use agreement with a gas company were told that old exploration permits from before the Native Title Act would automatically give the company future leases without any need to negotiate native title rights. The claimants asked the Federal Court to declare that this was legally wrong. The Federal Court and Full Court threw the case out early, saying it was just asking for an opinion on a hypothetical future grant and that the claimants had no real stake in the matter. The High Court disagreed. It held that the company's clear statement in negotiations created a real dispute that would affect the claimants' bargaining power and the fairness of any registered agreement under the Native Title Act. That made it a genuine federal matter, not hypothetical. The claimants had standing because the outcome mattered to their negotiations. The summary dismissal was therefore wrong in law. The High Court quashed the lower court orders and, using its power to give complete relief, ordered the company and the State to pay all the claimants' costs in the Federal Court as well as the High Court. One judge dissented only on the power to make the costs order for the earlier proceedings.
AI-generated legal information, not legal advice. Zoe can make mistakes. Check the cited source, and for advice about your situation consult a qualified Australian lawyer.
7 cited instruments linked from this judgment.
3,169 words · generated 24/04/2026
The plaintiffs were the registered native title claimants under s 253 of the Native Title Act 1993 (Cth) ("NTA") for the Wongkumara People in respect of land in south-west Queensland and north-west New South Wales. In 1979 the State of Queensland had granted Authority to Prospect 259P ("ATP") to the first and third defendants (collectively the petroleum defendants) under the Petroleum Act 1923 (Qld). That authority was later varied, extended or renewed on several occasions, most recently in 2008 for a four-year term. Under s 40 of the Petroleum Act the holder of an ATP is entitled to apply for a petroleum lease over the area, becoming entitled to the grant upon satisfying certain conditions. The petroleum defendants had never suggested any doubt about their willingness or ability to satisfy those conditions.
In 2001 the plaintiffs (or their predecessors) and the petroleum defendants entered an Indigenous Land Use Agreement ("ILUA") under the NTA. That ILUA was not registered and expired in 2006, but it contained cl 2.4(a) requiring the parties to negotiate the terms of a new ILUA. Negotiations for the new ILUA commenced in late 2005. On 4 November 2005 the first defendant wrote to the Wongkumara representatives summarising its position. The letter refused a request that the petroleum defendants gift two pastoral leases valued at more than $20 million. One explicit reason given was that the ATP pre-dated the NTA, that extensions were valid, and that any production licences (leases) granted under s 40 would be "pre-existing rights based acts" ("PERBAs") under s 24IB of the NTA. As such they would not be subject to the right to negotiate provisions.
The plaintiffs responded by commencing proceeding QUD 86 of 2009 in the Federal Court. They sought, relevantly, two declarations: first, that any grant of a petroleum lease under s 40 in respect of the claimed land covered by the ATP would not be a PERBA within subdiv I of Div 3 of Pt 2 of the NTA; second, that any such grant would not be valid pursuant to s 24ID of the NTA unless the requirements of subdiv P (the right to negotiate provisions) had been satisfied. They also sought an injunction restraining the second defendant from making any such grant. The petroleum defendants and the State of Queensland applied for summary dismissal under s 31A(2) of the Federal Court of Australia Act 1976 (Cth) on the basis that the proceeding had no reasonable prospect of success and, in the petroleum defendants' case, that the Federal Court lacked jurisdiction. Logan J acceded to those applications on 18 December 2009, characterising the claim as "a paradigm example of an impermissible attempt to secure an advisory opinion" and holding that the plaintiffs' status as registered native title claimants did not give them standing. Costs were ordered against the plaintiffs on 17 March 2010. The plaintiffs sought leave to appeal. The petroleum defendants filed their own summary dismissal application in respect of the leave application. The Full Court (Stone, Greenwood and Jagot JJ) refused leave on 4 June 2010 without dealing separately with the defendants' strike-out motion.
Because s 33(4B)(a) of the Federal Court of Australia Act barred any appeal or application for special leave to this Court from the refusal of leave, the plaintiffs commenced the present proceeding in the original jurisdiction of the High Court under s 75(v) of the Constitution. They sought certiorari to quash the decisions of Logan J and the Full Court, mandamus directing the Federal Court to hear and determine their application, and costs. The Solicitor-General of the Commonwealth intervened. By majority (French CJ, Gummow, Hayne, Crennan, Kiefel and Bell JJ, with Heydon J delivering the principal reasons with which French CJ, Gummow, Crennan, Kiefel and Bell JJ expressly agreed on the substantive relief and costs), the Court held that the Federal Court had erred. Certiorari issued. Mandamus was refused as unnecessary. The first, second and third defendants were ordered to pay the plaintiffs' costs in this Court, in the Full Court, and of and incidental to the summary dismissal motions before Logan J. Hayne J dissented on the costs orders relating to the Federal Court proceedings.
The Court, through Heydon J (with majority concurrence), identified two independent bases on which the plaintiffs could have succeeded before Logan J. The first was to vindicate an enforceable right of their own; the second was to attack the petroleum defendants' claim of a right that interfered with the plaintiffs' interests. The primary judge had focused almost exclusively on the first, noting the absence of a native title determination and the lack of any right to force negotiations. He had not grappled with the second basis: that the plaintiffs could demonstrate the ATP extensions were void, thereby undermining the petroleum defendants' PERBA claim and improving the plaintiffs' negotiating position.
The 4 November 2005 letter supplied the necessary concreteness. It represented that grants under s 40 would be "automatic" and would constitute PERBAs. That assertion was maintained in argument. The letter was written in the course of negotiations the parties were contractually obliged to conduct under the 2001 ILUA. Those negotiations were themselves regulated by the NTA. Success in obtaining the declarations would have foreseeable consequences: it would remove one of the petroleum defendants' stated reasons for refusing the gift of pastoral leases worth more than $20 million and would strengthen the plaintiffs' position on the fairness of any new ILUA for the purposes of registration and objection rights under ss 24CD, 24DJ and related provisions.
Heydon J drew on the breadth of declaratory relief affirmed in The Commonwealth v Sterling Nicholas Duty Free Pty Ltd and the standing principles in Onus v Alcoa of Australia Ltd. The plaintiffs had a real commercial interest greater than that of the general public. The analogy with Aussie Airlines Pty Ltd v Australian Airlines Ltd was compelling: there a putative new entrant had standing to declare its status under airport head leases even though it could not enforce the sublease directly. Here, whether or not the plaintiffs could enforce rights against the petroleum defendants, the question of ATP validity and PERBA status was not hypothetical. It was of real practical importance, the petroleum defendants and the State were contradictors, and a real controversy existed.
On federal jurisdiction, Heydon J held that the controversy arose under the NTA because the petroleum defendants asserted an immunity from the right to negotiate provisions created by s 24IB. That defence, sourced in federal law, engaged federal jurisdiction in the same way a defence relying on federal immunity did in Felton v Mulligan and Agtrack. The NTA's detailed regulation of ILUA formation, identification of native title holders, government assistance, and objection rights on fairness grounds supplied the necessary federal character. The Solicitor-General's concession that a sufficiently concrete proposed grant would engage federal jurisdiction was accepted; the letter supplied that concreteness.
The primary judge's view that the claims under the NTA were "colourable" was rejected. The amended statement of claim clearly challenged the validity of the ATP extensions as an essential step in the reasoning for the first declaration. Criticisms of pleading deficiencies were not sufficient to justify summary termination; they could have been cured by amendment or addressed at trial. Section 31A(2) was not a substitute for ordinary interlocutory processes or a full hearing of real controversies.
On costs, the majority (Heydon J with French CJ, Gummow, Crennan, Kiefel and Bell JJ) held that s 32 of the Judiciary Act required the Court to grant all remedies necessary to determine completely and finally all matters in controversy connected with the cause of action on which the certiorari application rested. The quashed orders included costs orders against the plaintiffs. To leave the plaintiffs bearing the burden of costs they would not have incurred had the summary dismissal applications been correctly refused would be incomplete relief. The injustice and the precedent for wealthy litigants using summary processes to impose unrecoverable costs on less resourced opponents reinforced the need for a costs order that placed the plaintiffs in the position they would have occupied had the Federal Court litigation taken its ordinary course. Hayne J, while agreeing that certiorari should issue, considered that neither s 26 nor s 32 authorised the High Court, in original jurisdiction, to make orders in substitution for the Federal Court's costs orders. He relied on the distinction between original and appellate jurisdiction emphasised in Kirk v Industrial Court (NSW) and the absence of any equivalent to s 37 of the Judiciary Act in the supervisory jurisdiction.
Prior to Edwards v Santos Limited the law on standing for declaratory relief in public interest and commercial contexts was settled by Onus v Alcoa of Australia Ltd and Australian Conservation Foundation Inc v The Commonwealth. A plaintiff needed a special interest beyond that of the general public; a real and practical interest in the outcome sufficed. The decision in Aussie Airlines had extended that principle to contractual construction questions with commercial consequences even in the absence of directly enforceable rights. The law on when a matter arises under federal legislation, set out in LNC Industries Ltd v BMW (Australia) Ltd and Felton v Mulligan, treated a controversy as arising under federal law where the claim, defence or immunity depended on federal statute. Jurisdiction to grant declarations concerning future conduct that was not yet certain was confirmed in The Commonwealth v Sterling Nicholas Duty Free Pty Ltd and Forster v Jododex Australia Pty Ltd.
On summary dismissal, s 31A(2) had been construed to require the Court to be satisfied there was no reasonable prospect of success, but the section was not to be used to conduct a mini-trial or to dismiss claims raising real controversies on contested facts or law. The supervisory jurisdiction under s 75(v) and the ancillary powers conferred by ss 26 and 32 of the Judiciary Act had not previously been authoritatively applied to the precise question whether the High Court could, when quashing Federal Court costs orders, substitute its own costs order so as to achieve complete relief. Kirk v Industrial Court (NSW) had emphasised the limits on the powers of a superior court exercising supervisory jurisdiction to remake orders of an inferior court, but the majority in Edwards distinguished Kirk on the basis that s 32 supplied an express statutory power to grant complete relief in the High Court's original jurisdiction.
After the decision, the law is clearer that registered native title claimants engaged in ILUA negotiations regulated by the NTA have a sufficient interest to obtain declarations about the legal status of pre-existing titles that affect the fairness and registrability of any agreement. The threshold for concreteness in future-act disputes is met where a party has made an unequivocal assertion in negotiations that a grant will be automatic and will confer statutory immunity. Federal jurisdiction will be engaged where the characterisation of an act as a PERBA or otherwise determines the application of the right to negotiate provisions or the fairness criteria for ILUA registration. The decision also confirms that s 32 of the Judiciary Act confers power on the High Court in s 75(v) matters to make costs orders in respect of the underlying Federal Court controversy so as to avoid injustice and multiplicity of proceedings. The caution against using s 31A as a substitute for trial of genuine disputes has been reinforced.
Heydon J at [24]: "The jurisdiction to grant a declaration 'includes the power to declare that conduct which has not yet taken place will not be in breach of … a law.'"
Plain English: Courts can declare that something someone plans to do in the future would be legally invalid, provided there is a real dispute about it now. This passage directly answered the primary judge's view that no lease had yet been granted or was imminent.
Heydon J at [25]: "The plaintiffs have a sufficient interest to make those claims, because success in those claims would advance their interests in the negotiations which the parties were contractually obliged to conduct."
Plain English: The native title claimants cared about the outcome because it would strengthen their hand in the bargaining table talks they were legally required to have. Their registered status plus the contractual obligation gave them a stake that ordinary members of the public did not have. This is the core holding on standing.
Heydon J at [20] (criticising Logan J): "What is revealed is nothing more than a difference in contractual negotiating positions between the [plaintiffs] … and [the petroleum defendants] who may one day seek to obtain from the state a petroleum lease … It is not pleaded that any such lease has been granted or is even imminently to be granted."
Plain English: The trial judge thought the case was just commercial posturing about a possible future lease. The High Court said the 4 November 2005 letter made the dispute real and immediate because it used the PERBA argument to refuse $20 million worth of pastoral leases in current negotiations.
French CJ, Gummow, Crennan, Kiefel and Bell JJ at [5]: "The relief granted in this Court should include an order that the first, second and third defendants pay the costs of the plaintiffs of the Federal Court proceedings, including the Full Court proceedings."
Plain English: To fix the mistake fully, the High Court not only overturned the dismissal but also reversed the costs orders and required the defendants to pay the claimants' legal bills from the Federal Court stage as well. Anything less would have left the claimants worse off for having been right.
Heydon J at [13]: "A grant of the complete relief to the plaintiffs referred to in s 32 of the Judiciary Act requires as well that the plaintiffs be indemnified in relation to their own costs of the Federal Court proceedings which had the flaws leading to certiorari in this Court."
Plain English: Section 32 says the High Court must finish the whole argument. Simply quashing the orders was not enough; the claimants had to be put back in the position they would have been in if the lower courts had decided correctly from the start.
This precedent is triggered where registered native title claimants are engaged in negotiations for an ILUA under the NTA, a counterparty asserts that a pre-NTA title will produce future acts that are PERBAs exempt from the right to negotiate, and that assertion is used to resist benefits or alter bargaining positions in the negotiations. The future grant need not be imminent; an unequivocal statement in correspondence that the grant will be "automatic" and will confer statutory immunity is sufficient concreteness. The precedent applies whenever the legal characterisation of the title directly affects the fairness criteria for ILUA registration under ss 24CD–24DJ or the identification of persons who may object. It is engaged where a defendant seeks summary dismissal under s 31A(2) on the basis that no native title determination has yet been made, that no lease has been granted, or that the claim is merely advisory. It is also triggered in any s 75(v) application to the High Court where the Federal Court has declined jurisdiction on the ground that the controversy is hypothetical or that no federal matter exists, and the applicant seeks not only quashing but complete relief including costs orders below. Fact patterns lacking a contractual obligation to negotiate, or where the counterparty has not tied its negotiating stance to the PERBA characterisation, fall outside the ratio.
The judgment itself treats Onus v Alcoa of Australia Ltd and Aussie Airlines Pty Ltd v Australian Airlines Ltd as directly applicable to the ILUA negotiation context, extending the "real commercial interest" test to native title claimants who have not yet obtained a determination. It distinguishes Kirk v Industrial Court (NSW) on the basis that s 32 of the Judiciary Act supplies an express power to grant complete relief that was absent in the New South Wales supervisory context examined in Kirk. The decision cites LNC Industries Ltd v BMW (Australia) Ltd and Felton v Mulligan for the proposition that a State-law claim or defence that depends on the existence or non-existence of a federal immunity arises under federal law; those authorities are treated as controlling. The primary judge's reliance on the absence of pleadings that a lease was "imminently to be granted" is implicitly overruled by the emphasis on the 4 November 2005 letter as supplying the necessary concreteness. The judgment treats the Full Court's refusal of leave as infected by the same jurisdictional error as Logan J's orders. Subsequent reasoning in the judgment that criticisms of the amended statement of claim were not sufficient to justify summary dismissal under s 31A(2) has reinforced the principle that real controversies concerning the characterisation of future acts should proceed to trial. The Court's construction of s 32 as authorising costs orders in the underlying Federal Court matter where certiorari has issued is presented as consistent with the statutory text requiring "complete and final" determination of connected controversies and as avoiding the injustice that would otherwise flow from the statutory bar on appeal created by s 33(4B)(a) of the Federal Court of Australia Act.
The judgment leaves open the precise degree of concreteness required for a proposed future act to engage federal jurisdiction in the absence of an express assertion such as the "automatic" grant language used in the 4 November 2005 letter. It does not decide whether a mere application for a lease, without any linkage to current ILUA negotiations, would suffice. The interaction between the PERBA provisions and the specific power to grant leases under the Petroleum and Gas (Production and Safety) Act 2004 (Qld), which was raised but not resolved, remains undecided. The full scope of s 32 of the Judiciary Act in s 75(v) matters, particularly whether it extends to orders other than costs that a Federal Court could have made, is not exhaustively defined. The judgment notes but does not resolve the petroleum defendants' late argument that they would not in any event enter an ILUA dealing with the leases; that contention was abandoned but its legal consequences if maintained are left for another day. The correctness of the primary judge's view that mere status as a registered native title claimant is insufficient for standing on pure State-law questions unconnected to ILUA negotiations is not determined, because the Court found the questions were connected. Whether s 31A(2) could properly be used to dismiss a proceeding that pleads a reasonable but novel construction of the PERBA provisions is also not settled; the decision only holds that the present proceeding raised a real controversy that should not have been terminated summarily. These open questions will require further litigation to clarify the boundaries of federal jurisdiction and standing in the evolving ILUA landscape.
(a) the decisions of the Federal Court of Australia made on 18 December 2009 and 17 March 2010 in proceeding QUD 86 of 2009; and
(b) the decision of the Full Court of the Federal Court made on 4 June 2010 in proceeding QUD 28 of 2010.
(a) the Federal Court of and incidental to the first, second and third defendants' motions for summary dismissal;
J A McCarthy QC with J F Kildea and A L Tokley for the plaintiffs (instructed by Eddy Neumann Lawyers)
B W Walker SC with S B Lloyd SC and S R R Cooper for the first and third defendants (instructed by Blake Dawson Lawyers)
R J Webb QC with H P Bowskill and G J D del Villar for the second defendant (instructed by Crown Solicitor (Qld))
S J Gageler SC, Solicitor-General of the Commonwealth with R G Orr QC and B Lim intervening on behalf of the Attorney-General of the Commonwealth (instructed by Australian Government Solicitor)
Notice: This copy of the Court's Reasons for Judgment is subject to formal revision prior to publication in the Commonwealth Law Reports.
Practice and procedure - Federal Court of Australia - Summary judgment - Applications by defendants to dismiss proceedings summarily under s 31A(2) of Federal Court of Australia Act 1976 (Cth) - Plaintiffs "registered native title claimant" under s 253 of Native Title Act 1993 (Cth) ("NTA") in respect of certain land - Plaintiffs and first and third defendants negotiating Indigenous Land Use Agreement ("ILUA") under NTA that included land first and third defendants claimed was encumbered by "Authority to Prospect" ("ATP") granted by second defendant under Petroleum Act 1923 (Q) - ATP entitled first and third defendants to apply to Minister for grant of lease of encumbered land for purpose of petroleum exploration - Plaintiffs sought declarations that grant of lease to first and third defendants would not be valid and any lease granted would not be a "pre-existing right-based act" within meaning of s 24IB of NTA - Whether plaintiffs have sufficient interest for grant of declaratory and injunctive relief - Whether questions raised by plaintiffs hypothetical - Whether plaintiffs seeking advisory opinion.
Practice and procedure - Federal Court of Australia - Jurisdiction - Section 213(2) of NTA conferred jurisdiction on Federal Court with respect to "matters arising under" NTA - Where determination of whether lease would be valid and whether lease would be a pre-existing right-based act may affect ILUA negotiations - Whether negotiation of ILUA a matter arising under NTA.
Practice and procedure - High Court - Original jurisdiction - Costs - Application pursuant to s 75(v) of Constitution for writs directed to Federal Court to quash orders of that Court - Section 26 of Judiciary Act 1903 (Cth) empowers High Court to award costs in "all matters brought before the Court" - Section 32 empowers High Court in exercise of original jurisdiction to grant all such remedies as parties are entitled to "so that as far as possible all matters in controversy between the parties" may be "completely and finally determined" - Where High Court quashes orders of Federal Court - Whether High Court may make costs order in place of orders quashed.
Words and phrases - "advisory opinion", "certiorari", "completely and finally", "hypothetical", "matter", "reasonable prospects of success", "standing", "sufficient interest".
Federal Court of Australia Act 1976 (Cth), ss 31A(2), 33(4B)(a).
"The High Court in the exercise of its original jurisdiction in any cause or matter pending before it, whether originated in the High Court or removed into it from another Court, shall have power to grant, and shall grant, either absolutely or on such terms and conditions as are just, all such remedies whatsoever as any of the parties thereto are entitled to in respect of any legal or equitable claim properly brought forward by them respectively in the cause or matter; so that as far as possible all matters in controversy between the parties regarding the cause of action, or arising out of or connected with the cause of action, may be completely and finally determined, and all multiplicity of legal proceedings concerning any of such matters may be avoided."
"It is plain that certiorari will not issue as the cloak of an appeal in disguise. It does not lie in order to bring up an order or decision for rehearing of the issue raised in the proceedings. It exists to correct error of law where revealed on the face of an order or decision, or irregularity, or absence of, or excess of, jurisdiction where shown. The control is exercised by removing an order or decision, and then by quashing it."
Or, as the same point was put in Craig v South Australia[14], certiorari "is not an appellate procedure enabling either a general review of the order or decision of the inferior court or tribunal or a substitution of the order or decision which the superior court thinks should have been made" (emphasis added).
"The High Court in the exercise of its appellate jurisdiction may affirm reverse or modify the judgment appealed from, and may give such judgment as ought to have been given in the first instance, and if the cause is not pending in the High Court may in its discretion award execution from the High Court or remit the cause to the Court from which the appeal was brought for the execution of the judgment of the High Court; and in the latter case it shall be the duty of that Court to execute the judgment of the High Court in the same manner as if it were its own judgment."
It is under this section that the Court acts, in its appellate jurisdiction, when it modifies an order for costs made in an intermediate appeal court or gives that judgment for costs that ought to have been given in the first instance. And it is then the duty of those other courts to execute the High Court's judgment in the same manner as if it were a judgment of the intermediate or trial court concerned. The procedures and mechanisms of those other courts (for example, for taxing or fixing the amount to be allowed for costs) are thus engaged. No provision is made, whether in the Judiciary Act or otherwise, which enables this Court, on granting relief under s 75(v) or associated relief, to make such order for costs as should have been made by Logan J at first instance or by the Full Court of the Federal Court. No provision is made, whether in the Judiciary Act or otherwise, which would engage the procedures and mechanisms of the Federal Court for fixing, pursuant to the order of this Court, the amount to be allowed for the costs of proceedings in the Federal Court.
"over most of mainland Australia, governments and others seeking to use land do not know if native title exists, and if it does, who holds it. It is difficult in such circumstances to have agreements which provide the necessary level of legal certainty. These provisions [including what is now Pt 2 Div 3 subdiv C of the NTA] are designed to give security for agreements with native title holders, whether there has been an approved determination of native title or not, provided certain requirements are met."
Not only did the ILUA give security to the petroleum defendants in dealing with native title claimants who may become native title holders, but it gave the plaintiffs, as native title claimants, the opportunity to obtain immediate advantages which would otherwise be postponed until a perhaps distant day when their native title claim succeeds. Thus the recitals to the ILUA included the following account of the ILUA:
"The Joint Venture Parties [who included the petroleum defendants] receive certainty in [their] dealings with respect to native title and cultural heritage. The Native Title Parties [who included some of the plaintiffs] receive certainty in the involvement in cultural heritage management in the Joint Venture Parties [sic] dealings with the Project Area as well as compensation, employment and other benefits."
"This letter is to summarise the proposal Santos put to you on Sunday 11 September (and other meetings) in Charleville for the ILUA … we wish to reach with you in relation to our petroleum operations within the area of your Native Title Claim …, which documentation will supersede the ILUA and associated documentation executed on 16 January 2001."
After discussing various points, the letter then said:
"Over the term of the current ILUA the [Wongkumara] have made a series of requests for additional benefits. It has been Santos' view that these requests constituted [a] re-opening of negotiations in order to obtain greater benefits for the [Wongkumara]. To date we have viewed this as inappropriate.
As we are now negotiating a superseding ILUA …, we consider that it is now appropriate to address these requests.
The [Wongkumara] have requested that Santos gift to them the two Pastoral Leases over Nappa Merri and Kihee. Santos has considered this request and advises that it will not gift these Pastoral Leases.
(a) the request seeks a very significant benefit for the [Wongkumara] as the properties have an estimated value in excess of $20m. As Santos has previously explained, Santos' existing Authorities to Prospect pre-date the [NTA]. Accordingly, as a result of the 'automatic' production licence grant provisions of the [Petroleum Act], the grant of production licences which emanate from those Authorities to Prospect are [sic], in our view, 'pre-existing rights based acts' under the NTA (PERBAs) and, as such, are not subject to the right to negotiate provisions of the NTA. They are therefore similar to other titles granted prior to the NTA."
The letter then gave three other reasons for the first defendant's decision. The reference to "pre-existing rights based acts" was a reference to s 24IB of the NTA. The reference to "production licences" was a reference to what s 40 of the Petroleum Act calls "leases".
"3. A declaration that [the ATP] expired on 31 December 1982 and is no longer operative.
The claim for those orders, and a claim for a particular injunction, have been abandoned. The orders sought in the Amended Application are:
"1. A declaration that the grant of a petroleum lease to the first and/or third defendants under s 40 of the [Petroleum Act] in respect of any of the [Claimed Land] and covered by [the ATP] would not be a pre-existing rights based act within the meaning of Subdivision I of Division 3 of Part 2 of the [NTA].
The reasoning of the primary judge and the Full Court
"What is revealed is nothing more than a difference in contractual negotiating positions between the [plaintiffs], who claim in other proceedings, but have not yet been determined to hold, native title in respect of the claimed land and [the petroleum defendants] who may [one] day seek to obtain from the state a petroleum lease in respect [of] part of the claimed land on the strength of [the ATP]. It is not pleaded that any such lease has been granted or is even imminently to be granted."
"Their mere status as a registered native title claimant does not … give them standing to claim any of the relief sought, including any part which relies only on state law."
The primary judge saw the claims under the NTA as "obviously doomed to fail", and hence as "colourable" and "not genuine"[22].
Standing, hypothetical questions, advisory opinions, jurisdiction
"Any person claiming to hold native title in relation to any of the land or waters in the area covered by the agreement may make an application to the Registrar objecting against registration of the agreement on the ground that it would not be fair and reasonable to register the agreement."
Hence if the representatives of the Wongkumara People succeed in negotiating the new ILUA, other persons claiming to hold native title in the area covered by the new ILUA can object to its registration on the ground that it is not fair and reasonable because it failed to obtain the most favourable terms from the petroleum defendants. And if the new ILUA is not registered, many of its advantages under the NTA do not arise.
"[H]ad the petroleum lease been sufficiently concrete - because it had been granted, was imminently to be granted or, perhaps, was the subject of a valid application - the Commonwealth submits that there would have been a matter arising under the [NTA] and that there would have been accrued jurisdiction to determine the state law claim." (emphasis in original)
The letter of 4 November 2005 from the first defendant gave the petroleum lease question concreteness: the letter represented its grant as being "automatic", and the petroleum defendants maintained that position in oral argument.
"If the plaintiffs' argument that the ATP is invalid were correct …, there is nothing that an ILUA could do to remedy that defect. What follows is that, if the ATP is valid then the grant of a petroleum lease would be valid as a PERBA …; in such a case there is no need to include reference to it in any ILUA. Conversely, if the ATP were to be found to be invalid, then the petroleum defendants would have no capacity under State law to obtain petroleum leases pursuant to that ATP and therefore there would be no need to address that issue in any ILUA either. That is, whatever view were to be taken of the validity of [the ATP], there is no cause for it ever to be the subject of an ILUA, showing again the hypothetical nature of the present proceeding."
This submission does not undercut the proposition that the bargaining position of the plaintiffs could be much improved if they could demonstrate the invalidity of the ATP, because it would negate one of the reasons why the petroleum defendants refused to make a gift of the Pastoral Leases. The same proposition answers another argument of the petroleum defendants: that the plaintiffs identified as a "matter" the question of what can lawfully be the subject of the new ILUA, but that had not been pleaded.
(2010) 239 CLR 531 at 584 [110]‑[111]; [2010] HCA 1. ↑
Federal Court of Australia Act 1976 (Cth), s 33(4B)(a). ↑
See, for example, Victorian Stevedoring and General Contracting Co Pty Ltd and Meakes v Dignan (1931) 46 CLR 73; [1931] HCA 34; Mickelberg v The Queen (1989) 167 CLR 259; [1989] HCA 35; Eastman v The Queen (2000) 203 CLR 1; [2000] HCA 29. ↑
Garnett v Bradley (1878) 3 App Cas 944 at 962 per Lord Blackburn; Knight v FP Special Assets Ltd (1992) 174 CLR 178 at 182; [1992] HCA 28. ↑
(1997) 190 CLR 207 at 212 per Brennan CJ and Dawson J, 221 per Toohey, Gaudron, McHugh, Gummow and Kirby JJ; [1997] HCA 14. ↑
R v Murphy (1985) 158 CLR 596 at 614, 617‑618; [1985] HCA 50. See also Re Wakim; Ex parte McNally (1999) 198 CLR 511 at 585‑586 [138]‑[140]; [1999] HCA 27. ↑
(2002) 209 CLR 372 at 463‑465 [255]‑[260]; [2002] HCA 16. ↑
"The Court may give judgment for one party against another in relation to the whole or any part of a proceeding if:
(a) the first party is defending the proceeding or that part of the proceeding; and
(b) the Court is satisfied that the other party has no reasonable prospect of successfully prosecuting the proceeding or that part of the proceeding." ↑
Edwards v Santos Ltd (2009) 263 ALR 473 at 483 [43]. ↑
Edwards v Santos Ltd (2009) 263 ALR 473 at 485 [49]. ↑
Edwards v Santos Ltd (2009) 263 ALR 473 at 485 [53]. ↑
Edwards v Santos Ltd (2009) 263 ALR 473 at 483 [44]. ↑
The Commonwealth v Sterling Nicholas Duty Free Pty Ltd (1972) 126 CLR 297 at 305 per Barwick CJ; [1972] HCA 19. On the breadth of the jurisdiction to grant declarations, see also Forster v Jododex Australia Pty Ltd (1972) 127 CLR 421 at 437-438; [1972] HCA 61. ↑
Onus v Alcoa of Australia Ltd (1981) 149 CLR 27; [1981] HCA 50. ↑
"Subject to this Act, the Federal Court has jurisdiction in relation to matters arising under this Act." ↑
"The original jurisdiction of the Federal Court of Australia also includes jurisdiction in any matter:
(c) arising under any laws made by the Parliament …" ↑
Edwards
Santos Limited
[1931] HCA 34
[1972] HCA 61
[1981] HCA 50
(2010) 239 CLR 531
(1931) 46 CLR 73
(1989) 167 CLR 259
(2000) 203 CLR 1
(1992) 174 CLR 178
(1997) 190 CLR 207
(1985) 158 CLR 596
(1999) 198 CLR 511
(2002) 209 CLR 372
(1995) 184 CLR 163
(2009) 263 ALR 473
(2010) 185 FCR 280
(1972) 126 CLR 297
(1972) 127 CLR 421
(1981) 149 CLR 27
(1996) 68 FCR 406
(1921) 29 CLR 257
(1983) 151 CLR 575
(1971) 124 CLR 367
(2005) 223 CLR 251
(2000) 204 CLR 82
(2007) 228 CLR 651
(2001) 108 FCR 453
[2000] HCA 57
[2010] HCA 1
Writ of certiorari issued quashing the decisions of Logan J made on 18 December 2009 and 17 March 2010 and the Full Court decision of 4 June 2010; application for mandamus dismissed; first, second and third defendants ordered to pay the plaintiffs' costs of the summary dismissal motions, the Full Court proceedings and the High Court proceedings.