[2020] WASC 28
Supreme Court of WA
2020-05-06
Archer J
Original judgment source is linked above.
Atlas Tiles Ltd v Briers [1978] HCA 37; (1978) 144 CLR 202
Australis Media Holdings v Telstra Corp Ltd (1998) 43 NSWLR 104
Black Box Control Pty Ltd v Terravision Pty Ltd [2016] WASCA 219
British Transport Commission v Gourley [1955] UKHL 4; [1956] AC 185
Byrne v Australian Airlines Ltd [1995] HCA 24; (1995) 185 CLR 410
Civic Video Pty Ltd v Paterson [2016] WASCA 69
Concut Pty Ltd v Worrell [2000] HCA 64; (2000) 75 ALJR 312
CSR Ltd v Adecco (Australia) Pty Ltd [2017] NSWCA 121
Cullen v Trappell [1980] HCA 10; (1980) 146 CLR 1
Daebo Shipping Co Ltd v Ship Go Star [2012] FCAFC 156; (2012) 294 ALR 635
EDWF Holdings 1 Pty Ltd v EDWF Holdings 2 Pty Ltd [2010] WASCA 78; (2010) 41 WAR 23
Electricity Corporation v Woodside Energy Ltd [2014] HCA 7; (2014) 251 CLR 640
Georgiou Building Pty Ltd v Perrinepod Pty Ltd [2102] WASC 72 (S)
Gold City Developments Pty Ltd v Portpride Pty Ltd [2010] WASC 148
Grainger v Williams [2009] WASCA 60
Gray v Motor Accident Commission [1998] HCA 70; (1998) 196 CLR 1
Idameneo (No 123) Pty Ltd v Gross [2012] NSWCA 423; (2012) 83 NSWLR 643
Koompahtoo Local Aboriginal Land Council v Sanpine Pty Ltd [2007] HCA 61; (2007) 233 CLR 115
Marmax Investments Pty Ltd v RPR Maintenance Pty Ltd [2015] FCAFC 127; (2015) 237 FCR 534
Noye v Robbins [2010] WASCA 83
Paciocco v Australia and New Zealand Banking Group Ltd [2015] FCAFC 50; (2015) 236 FCR 199
Probuild Constructions (Aust) Pty Ltd v DDI Group Pty Ltd [2017] NSWCA 151; (2017) NSWLR 82
Ruthol Pty Ltd v Tricon (Australia) Pty Ltd [2005] NSWCA 443; (2005) 12 BPR 23
Sellars v Adelaide Petroleum NL [1994] HCA 4; (1994) 179 CLR 332
Servcorp WA Pty Ltd v Perron Investments Pty Ltd [2016] WASCA 79
Shevill v Builders Licensing Board [1982] HCA 47; (1982) 149 CLR 620
Sino Iron Pty Ltd v Mineralogy Pty Ltd [2019] WASCA 80
Spiers Earthworks Pty Ltd v Landtec Projects Corporation Pty Ltd (No 2) [2012] WASCA 53; (2012) 287 ALR 360
Spotlight Pty Ltd v NCON Australia Ltd [2012] VSCA 232
The Commonwealth of Australia v Amann Aviation Pty Ltd [1991] HCA 54; (1991) 174 CLR 64
The Eastern Extension, Australasia and China Telegraph Company Ltd v Federal Commissioner of Taxation [1923] HCA 62; (1923) 33 CLR 426
Uren v John Fairfax & Sons Pty Ltd [1966] HCA 40; (1966) 117 CLR 118
Watts v Turpin [1999] WASCA 216; (1999) 21 WAR 402
Woodside Petroleum Development Pty Ltd v H & R - E & W Pty Ltd (1999) 20 WAR 380
Zaps Transport (Aust) Pty Ltd v PJG Warehousing & Distribution Pty Ltd [2016] NSWCA 97
(1) the good faith obligation in cl 3 (Good Faith Obligation);
(2) the obligation in cl 6.2 to 'perform the Services and procure Completion of the Project in accordance with all Approvals, and in a proper, timely, professional and workmanlike manner' (Procure Completion Obligation); and
(1) to use deadlock provisions in the Services Agreement to terminate the Services Agreement if Binningup did not agree to vary the Services Agreement; and
(2) in the meantime, to delay carrying out the Project until the Initial Advance became repayable under cl 5.6 of the Loan Agreement, so as to create pressure on Binningup to either agree to terminate the Services Agreement or to vary the Services Agreement favourably to Mirvac WA.
(1) negotiating to vary the Services Agreement; and
(1) Binningup asserted that the effect of Mr Draffen's statements was, among other things, that Mirvac's Board was unlikely to decide to carry out the Project but, if Stage 1 was carried out, the Board may possibly decide to proceed.[29]
(2) Binningup asserted that the effect of Mr Lawrance's statements was that, in addition to PCG approval, Mirvac would need internal Mirvac approval prior to commencing Stage 1.[30]
(1) Did Mirvac WA breach the Services Agreement? This question raises numerous factual and construction issues.
(a) The factual issues include determining whether Mirvac WA engaged in the Alleged Conduct.
(i) Did Mirvac WA have the right to disapprove a budget under the Services Agreement?
(ii) Was it a contractual benefit that the Project would be completed? That is, was Mirvac WA obliged to ensure that the Project was completed?
(iii) What is the proper construction of the Three Obligations? In particular, did those obligations require Mirvac WA to endeavour to ensure that Binningup's obligation to repay the Initial Advance by a particular date[43] would be wholly, or at least substantially, satisfied from proceeds from the sale of lots before that date?
(iv) Was Mirvac WA obliged to construct built form lots under the Services Agreement?
(a) Does the 'prevention principle' mean that Mirvac WA cannot rely on cl 5.5(b) of the Loan Agreement that would otherwise require Binningup to repay the OLA a year after the termination?
(b) Is Mirvac Ltd liable under the Performance Undertaking?
(c) Did Mirvac Ltd commit the tort of unlawful interference?
(d) What is the appropriate quantification of Binningup's damage?
(e) Does the principle of circuity mean that Mirvac WA is not entitled to the OLA?
(f) Is the whole of the OLA to be set off against Binningup's damages, or only what Mirvac WA could recover against the Project Assets? In other words, do the limitations on Mirvac WA's rights of enforcement under the Services Agreement and Loan Agreement also limit Binningup's liability?
(3) If Mirvac WA did not repudiate the Services Agreement, was Binningup's Termination Notice an 'Event of Default' under the Loan Agreement such that Mirvac WA was entitled to demand immediate repayment of the OLA under cl 7.2 of the Loan Agreement?
(1) the local authority responsible for Binningup, being the Shire of Harvey;
(2) the Western Australian Environmental Protection Authority (EPA);
(3) the Commonwealth Department of Environment, Heritage, Water and the Arts, which later became the Department of Sustainability, Environment, Water, Population and Communities. I will refer to both as the 'Commonwealth Department'; and
(4) the Western Australian Planning Commission (WAPC).
The evidence has established that Mirvac (WA) sought to avoid the imposition of a condition of a planning approval for the carrying out of the Project requiring immediate construction of a second access road in order to avoid expenditure by Mirvac (WA) unless and until the carrying out of the Project had been internally approved by Mirvac Ltd ...
Mirvac (WA) attempted to cause the Coast Pastoral Company, the owner of the required land for the second access road, to not sell that land, which had the purpose and effect of delaying and impeding implementation of the Project.
Did Mirvac WA try to avoid the imposition of a condition to avoid expenditure unless or until there was internal approval?
I wouldn't say that I had twigged at that point in time, or any of my time at Mirvac, really, that it was a near certainty that we would have to build that road. I think there were points along the journey where it became more likely and less likely that we would have to build the road. We looked at a range of alternate - and discussed with Geoff [Geoff Lush of TME] a range of alternate kind of potential emergency access means.
No, I don't agree with that. The - the issue of a second access road for the purposes of traffic and the issue of fire access, we've tried very clearly to keep separate so the two wouldn't stack on top of each other and make it absolute that you would need a second access road.
... There were always options in regard to delivering safe fire access to the site. The discussions I had had with Geoff [Geoff Lush of TME] at around the time of that report - because we were concerned about the potential that it would lock in a second access road - were actually around formalising an emergency access. So literally having a gate at the southern end of the site with a paper road[89] that vehicles and fire vehicles could drive on to get across to Buffalo or Springhill Road. We also - the main problem with access to the town site for fire and emergency vehicles on Binningup Road was that it was a single lane in either direction. One alternative to fix that problem was to duplicate Binningup Road, which would possibly have been a part of our proposal anyway and might have been a preferred outcome because you could turn right out of Binningup Road intersection, whereas the intersections further to the south, that would be a different sort of upgrade to enable turning right out of that intersection. So we needed to keep the fire access issue and the second road access issue quite separate, and I felt that it wasn't quite as crystal yet as to whether the second access road would be triggered purely on fire access concerns. There were a range of other means and measures we could look at first.
There were many, many available options at that point in time and we were playing a game of whack-a-mole on the environmental approval. We did not want to have to readvertise the environmental approval, which is what I felt could have happened if the EPA had a sniff that for some reason a second road was absolutely required at that point in time.
One, we didn't absolutely know it was required. There were two different reasons why it could be required, traffic‑related and fire‑related. But, also, it would have been a change to the proposal, and that would have required a readvertising, and that would have caused a substantial delay, and we felt that it wasn't worth delaying where we were getting quite close to a potential outcome, on the basis of something that may or may not be required at that point in time.
I knew that we needed to resolve fire access to the site. A second access road was one means of resolving that fire access issue. A second access road may or may not have been required, based on the number of dwellings built. We were sitting on a traffic report that suggested that Mirvac's development alone would not trigger the need for a second access road.
We wanted them to focus on the environmental approval that was in front of them and not get caught up in what we felt could have been secondary issues at the time and may or may not have been required at that point in time.
[O]ur key concern at that point in time was not having the EPA readvertise the proposal. We had been on the - the treadmill for a couple of years and we felt that if it was readvertised at that point in time there could be increasing stacks on by other authorities on a range of other issues and members of the public.
intended to act as [a] trigger point for review of the need for a second access road and addresses the issue - which is maintain acceptable levels of service - rather than the possible solutions, one of which is a second access to the site.
We were very keen to avoid the environmental review being re‑advertised, which we felt could have led to a bunch of other complications and reassessment and inevitable further delays of years and years.
... We were also in a situation where, you know, the EPA had, at that point in time - roughly at that point in time, suggested it would like to knock the southern half of the development out. And so we were trying not to bolster the arguments for that to occur. We didn't want another factor to come into the assessment, especially one that we felt, on balance, might not be required in any event. And if it was required, could be dealt with through a subsequent approval.
Again, I don't quite agree with that. We were very keen to tackle the issue separately. We didn't want to have them conflate each other and therefore go, 'Look, you sort of look like you need it there. You sort of look like you need it there, let's just do it'. We wanted to tackle the, 'sort of look like you need it for traffic', and then tackle the, 'sort of look like you need it for emergency access'. On emergency access in particular, at least at that point in time, I felt that there were a range of other options available which were more likely to be the outcome.
We understand from our discussion yesterday that the Draft [Plan] does not require further amendment prior to advertising. The Shire will instead require that the triggers for commencement of approvals and construction (probably separated) for the second access road to the site in the [Plan] will require amendment prior to adoption of the [Plan].
It's probably more fair to say that I knew that the triggers for construction - for assessment and construction of the second access road would need to be included in the [Plan], rather than the second access road itself would need to be included in the [Plan].
The need for a second access has been considered and Staff have sought independent specialist advice on this matter. As a result, it has been recognised that a second access will be required for the development based on expected traffic generation and provision of an emergency access. The timing of this second access is currently being discussed with the proponent, although it is expected a staged approach will be used, tied to development milestones. This matter will be resolved prior to final consideration.
DP [Dan Pearce] - draft words for us to supply to Jake [Jake Davidson of the Shire] for him to pass back to the EPA - for when you get a chance to give me a call (today please!).
Kristen [Kristen Bennetts of RPS] / Mark [Mark Wallis of Cossill & Webley] - any feedback on this would be welcome:
'Amendment 63 to Shire of Harvey District Planning Scheme No 1 and the development envisaged by the amendment can proceed without the provision of a secondary access to the town site.
Whether a second access road to the town site is ultimately required is dependent on a range of factors including the number of dwellings constructed within the site and elsewhere within the existing town and other development areas, household occupancies, and the frequency of vehicle movements (and their direction) that result. Many of these factors, particularly those relating to other development sites within Binningup and the development of housing and occupancy patterns within the existing town are unrelated to this amendment.
A second access road therefore does not form a part of the current proposal.
However, Council and the developer consider it appropriate to include provisions with the proposed amendment to provide for further traffic investigations at the appropriate time, and the commencement of planning and approvals, and construction of a second access road, should it eventually be necessary. This does not mean that the amendment is contingent on construction of a second access road. It simply means that if and when a second access road is required (on the basis of growth within the amendment area, and elsewhere within Binningup), that any further development beyond that point will be conditional on development of that road. Development of the road will be subject to all appropriate approvals at that time.'
Do we need more? Any more powerful arguments we can make?
We need to be very careful not to end up encouraging approval for the northern half only, but at the same time inclusion of the second access road within the current approvals process could cause delays of the type significant enough for Mirvac to walk away from this project. (so focus hard as the above is very serious for all us).
Again, I think the use of 'second access road for emergency access' is misleading. We needed to provide access for emergency access rather than a second access road. The access - the secondary emergency access questions and answers [were] quite separate to a secondary road to the township.
... that arrangement to deal with emergency access was quite different to construction of a secondary access road in the format being discussed in regard to the traffic triggers. The traffic triggers would have required construction of ... a dual lane road designed for vehicles to operate on, on a daily basis. Emergency access could have consisted of a track ... to the south, crossing a small portion of land; a much smaller and simpler affair. The exact route and alignment of any potential emergency access to the south, the timing was a little unclear and I think, in TMEs report, they hadn't been totally clear about when it would be required relative to what number of dwellings; it would need to be assessed on a continuing basis.
The EPA probably had no interest in a secondary access road being constructed. It was assessing the proposal that was put in front of it. It was our decision as to whether we included the secondary access road in that proposal or not.
So I was ... aware of the financial implications of both the delay and the potential construction cost of a second access road but my focus was actually on the delay. The delay was what would have been a result of including the second access road at that time because it would have required readvertising of the amendment.
The delay would have been very significant because it's not just readvertising. There would have been full design of that road, collecting the information about it. It would have taken us a long time to negotiate an exact route, to prepare the exact design detail, to have those design details endorsed, then to submit that back to the EPA, then have the whole thing readvertised. Meanwhile, other issues would have kept on cropping up and it could have caused a snowball of issues when we were so close to the end of obtaining an approval for the site overall.
We are preparing (hope you are okay with that) draft content for a Shire response to this letter from the EPA.
The most critical issue raised is the second access road - the EPA and the Shire's approach to that item is critical to the development proceeding in the near term as envisaged.
I have prepared draft commentary on this issue first (for inclusion in the overall letter from the Shire to the EPA) - we will come through with material for the other issues shortly also. I think that this commentary (attached) is aligned with our joint current position (read the whole rather than getting caught just in the first paragraph), but would like to discuss with you as soon as possible as the outcome here could have very serious implications in terms of how the process unfolds.
Our primary goal was not to cause further delays at that point in time, and not to lock in the absolute requirement for - not to conflate emergency access and traffic access, and to try and keep options open as to what would happen in the future based on various yield outcomes, given that the thing only needed to lose 300 dwellings for the secondary access road not to be required at all.
Amendment 63 to Shire of Harvey District Planning Scheme No 1 is not contingent on the provision of a second access road to the town site and as such the second access road does not form a part of the proposal.
Council has granted consent to advertise the proposed Binningup Beach Local Structure Plan whilst noting that several modifications are required prior to final consideration. One of these modifications relates to the inclusion of provisions addressing secondary road access to Binningup.
The Shire of Harvey and Mirvac jointly commissioned a further study into the provision of secondary access to Binningup to clarify the likely need for such an access. The results of that study indicate that, although development of the area addressed by Amendment 63 alone (to the maximum yield likely to be possible under the proposed Local Structure Plan) would be unlikely to trigger a requirement of a second access road, a second access road may be required when the potential for new homes on vacant land in the existing town site and other development sites in Binningup are taken into account.
The Shire has therefore indicated that provisions addressing the need for a secondary access road be included in the proposed Binningup Beach Local Structure Plan. The provisions are to provide for planning, approvals and ultimately construction of secondary access to Binningup in a timely and coordinated fashion based on the point at which a particular number of lots are constructed (if at all). Should the trigger points (in terms of number of lots) be reached and the necessary approvals not be obtained, then further development would be precluded.
The investigations, approvals and timing for the provision of a second public access road to the site will be undertaken in accordance with the following development milestones:
No further subdivision will be permitted beyond each of the stipulated milestones until such time as the relevant actions have been undertaken to the satisfaction of the Shire of Harvey.
Key contact is Jake Davidson (Planning Manager). CEO, Michael Parker, is familiar with the plan and several presentations have been delivered to the whole of the council (see: I: Binningup Beach 4. Project Management 4.3 Presentations Binno Beach Shire of Harvey 14.07.09.ppt for most recent full presentation).
Key issues going forward include: repeal of Scheme 12 (relates specifically to this site, and includes a second nine holes and community open space provisions), funding management costs for all conservation/POS areas (probably through a special area rate), and resolving path forward on the second access road to Binningup (refer provisions on the proposed local structure plan for current agreement: I: Binningup Beach 4. Project Management 4.5 Miscellaneous Bin Secondary access (ammend [sic] 63) 09.09.09.Shire Approved.doc)
I think I had focused on and meant to communicate the - the fact that we had an agreed outcome in regard to provisions between ourselves and the officers, and thought that would be the agreed outcome, to be honest. The reason it still needed a little bit of work on the second access road is the agreed outcome - you don't just go from structure plan provisions to building a road. There's a lot of work to be done across the course of that journey in between. You know, the - the agreed outcome in the - I look at the structure plan. In there it specifically refers to funding arrangements, and that's a reference to the fact that the yield triggers alone wouldn't have triggered 100 per cent of the construction cost to go onto Mirvac. Some of the existing dwellings and the existing capacity in the existing town site were in fact actually driving the need for the road, and that therefore there should be an ultimate costs sharing arrangement, and that that's probably what was most sensitive in future negotiations, I felt, with the council.
I think I was referring to the fact that we had had a - a series of discussions over a course of a long period. The council had commissioned a study, and we had received back that study, and we had worked closely with the engineer, and this is a council that only has about five or six staff. We had worked with pretty much half the council to come to an agreed outcome. Not the councillors, admittedly, but the councillors, I would have thought, were pretty close to the staff and would have been aware of those discussions in any event. We met with the councillors quite regularly also.
I think it was my belief, at the time, that we either had or it was very unlikely that the outcome would change. I thought that we, at least, had a - outcome with the officers and that it was very likely that that outcome would be upheld by council at the time.
I guess in dealing with council officers, and particularly senior ones, you assume that they understand the limits of their own authority and operate within those.
Is it the case, Mr Davidson, that you told Mr Aleksovski at the handover session, that you had with him, that although there was no agreed outcome with the Shire in the terms that are quoted in page 4239,[127] that you would refer to an agreed outcome in handover notes and create an internal Mirvac document which Mr Aleksovski could use, if the need arose, to suggest to the Shire that before he took over from you there had been an agreed outcome? Is that what you agreed with him? - Absolutely not. And it's almost an offensive suggestion.
My understanding is that a negotiated position was agreed with your predecessor Jake and other council departments concerned as requested by council.
... the triggers obviously would have been something he negotiated during the structure plan process. The structure plan was draft; it was never completed and endorsed. So these would have been based on negotiations between the Shire of Harvey and Mirvac during the advertising of - or during the consideration of the structure plan - during the process. It would have been negotiated and it would have reflected what council was requiring to be mentioned in the structure plan and the agreement is dated back in 2009.
Did Mirvac WA attempt to cause Coast Pastoral Company not to sell the land?
I note the comprehensive Fire Management Plan which has been submitted however there has been no representation by Mirvac in regard to the Second Access timing. As you recall from our previous meetings, I have requested at the least, and upfront, an easement over the land and a legal agreement which includes the adjoining neighbour and all weather gravel/limestone construction with appropriate fire access gates. Plus a timing/program to be agreed upon for its upgrading to a full roadway phases [sic]. This is a separate requirement from the FMP and is required to be resolved. I notice reference to 500 lots in your response to the submissions - however this figure has not been discussed or agreed upon by Council.
The Coast Pastoral Company has confirmed that it is willing to enter into the necessary arrangements to cede the required land to facilitate construction of the required temporary and permanent road access on the chosen alignment.
I just raised with ... Mr Payton that he needed to confirm his ... tax status and whether the sale would trigger any CGT issues amongst that, whether it was under the margin scheme, not under the margin scheme, whether it was GST inclusive, GST exclusive. These are the sorts of things that I raised with him that needed to be - these things needed to be confirmed back to us in order to then be able to structure up the deal accordingly.
Sometimes when vendors do have a capital gains tax issue, they seek other structures to try and either avoid or minimise that particular gain. It could be selling one portion for a higher value than another portion and so forth. It's complicated but it ... can arise.
Mirvac's instruction from the landowner is to proceed to formally requesting a deemed refusal on the [Plan] if a decision is not forthcoming.
However, depending on Council's position, there may be an opportunity for further discussion to resolve the issue, but either way we need to be moving towards some form of determination.
The proposed extension (the Extension) is located on land held by a third party, namely the Coast Pastoral Company (CPC). The CPC has previously indicated that it was willing to enter into the necessary arrangements to provide the required land.
However, further investigation by CPC has revealed that provision of the required land via subdivision and private sale will trigger a significant tax implication for CPC. The provisional sum of this liability far exceeds the capital value of the land required for the Extension and is beyond the scope of Binningup Nominees to provide compensation.
It may remain open to Council to enter into separate negotiations with CPC to compulsorily acquire the required land. CPC has not advised Binningup Nominees whether this will trigger similar tax implications.
Based on the new information detailed above the proposal for the provision of the SAR dated 17th December 2012 is no longer feasible. In lieu of this agreement, Binningup Nominees now proposes to provide the SAR for emergency purposes only, rather than as a gazetted road. As an act [of] good faith that recognises its previous undertakings, Binningup Nominees is still prepared to make a per lot contribution to the construction of a gazetted road in the event that the required land can be provided.
The approvals and timing for the provision of secondary access to the site will be undertaken in accordance with the following development milestones.
4. Binningup Nominees will pay the Shire of Harvey the sum of $4,000 per lot for the first 500 lots. ...
5. Upon the issue of titles to facilitate the development of 500 lots (aggregate), the Shire of Harvey will construct the Extension of Springhill Road to the relevant standard for use as a public road using the funds dedicated for this purpose. ...
Previous discussions regarding a staged approach to this road have been that [Binningup] would upgrade a firebreak to a roadway after trigger points have been reached. In this scenario - the emphasis is on Council not [Binningup] to have the roadway gazetted and constructed. Why the change in approach? The revised strategy recognises that the financial implications of purchasing the land no longer make it feasible to be dealt with through a private sale. The suggested process is rather for the Shire to acquire the land by resumption under the DPS/Public Works Act (as applicable) to avoid the tax liability. [Binningup] will make appropriate contributions to the construction of the road as per 3 above.
Please refer to email response from Richard Payton below.
He is not willing to provide the tax advice as requested in order for Mirvac to satisfy itself that there will be no tax implications in the future and is suggesting that Mirvac rely upon his opinion based upon him achieving his recent qualifications and learning's [sic] - suffice to say this will not suit.
Our group tax manager was in Perth today and I discussed this with him at length and the basic answer is that like any acquisition Mirvac conducts, no matter how large or small, we need to understand the tax position of the entity we purchase from in order to structure the deal accordingly to meet Mirvac's and in this case Binningup Nominees tax requirements.
Suffice to say, this is the exact reason why planning procedures do not and should not be incumbent and reliant on a third parties involvement in issues and matters that clearly can be resolved by the responsible local authority within the planning parameters and context set out by WAPC and DoP.
Unless the Shire of Harvey are willing to change their stance on the second access road, Mirvac and Binningup Nominees have no option but to deem the [Plan] refused by the Shire of Harvey and immediately move on with the [Plan] process that has been ongoing since 2009 at a significant expense, to the point now where the project is at a rather precarious financial position - the impact of interest alone over the last 4 years is in the order of $8.4m.
Mirvac have always indicated that they would be happy to construct firstly an emergency access road into the site and then finally a sealed second road into Binningup and we are still committed to this occurring however there are various mechanisms for the Shire of Harvey to acquire the land with the current planning framework and this should be the case and not subject to Mirvac engaging a third party, and subsequently be held [to] ransom to do so.
I trust this clearly outlines our position on this matter and look forward to progressing the [Plan].
As Council is not prepared to accept the terms of the Draft Second Access Road Strategy dated 27th May 2013 ... we have now reached a stalemate on this issue and we are obliged to trigger the deemed refusal provisions ...
The reasons for requesting a deemed refusal was because of the impasse in negotiations and discussions with the Shire of Harvey with regards to how the second access road would be implemented. That was the reason for it. Then - because, effectively, what the shire was saying to us, 'Unless this is resolved to our satisfaction, this structure plan is not going anywhere'. So we saw this as a step to effectively - and I used words to the effect - bulldoze - pardon the pun - the - the structure plan through to a point where it would get approved, and the shire would have to come to the negotiation table, and the Planning Commission would end up being effectively the mediator, the umpire of this particular matter. That was the reason why we went for this deemed refusal, and Mr Waller was aware of this deemed refusal. That we were going down this path.
Mirvac advised the PCG that it had formally advised the Shire of Harvey via correspondence dated 20th June 2012 [sic: 2013] that as per the provisions set out in the District Planning Scheme, the [Plan] was deemed refused due to the stalemate reached with the Shire in regards to the second access road and the [Plan] was now with WAPC for consideration.
Mirvac advised the PCG that it had drafted a strategy (as per the requirement of the Scheme Amendment) in regards to the preferred location, construction standard and timing of the second access road to the project. The preferred location, construction standard and timing of the second access road was agreed with the Shire of Harvey at a meeting in August 2012 to be funded by depositing in a trust account $4000/lot from the sale proceeds of the first 500 lots being sold and settled, such than an amount of $2m will be available to the Shire of Harvey to construct the road. The Shire of Harvey was advised by Mirvac that the land required for the second access road will need to be negotiated with Coast Pastoral Company and acquired by the Shire within the limitations of the existing planning framework as it allowed for the compulsory acquisition of land for public roads. The Shire of Harvey has since decided that the second access road is a priority and has refused to assess the [Plan].
There was obviously a time between when that meeting occurred and then the memo prepared in 2012. So I'm assuming that we would have had some negotiations. It would have been some email chains and I think in previous evidence I referred - there was an email there. There was a response from Dan Pearce that referred to a few things. So while it technically refers to that particular meeting, what I'm saying is that what was prepared in the memo would have been based on discussions either at that meeting or after that meeting, because we were - we were exchanging emails. We were toing and froing and trying to get the strategy right that would work for both parties. So - so to answer your question, no, it doesn't reflect exactly what was there at the August '12 meeting, but there were subsequent discussions that led to that memo.
That - no. They didn't refuse to assess the [Plan], that's correct, but they refused to advertise and endorse that council - the advertising of the [Plan] and I guess, your Honour, for context, when I say 'assess', it means getting it, reviewing it, putting it out for advertising and then dealing with the council.
17 October 2013 meeting with the Shire and 18 October 2013 email from Mr Waller
Yesterday myself, Linton and Mike met with Michael Parker and Simon Hall at the Shire of Harvey's offices in Harvey.
Our main discussion was the current impediment delaying the Binningup approvals from the Harvey Shire.
We had a very cordial and open discussion with both Michael and Simon. Simon did mention that his dealings with both you and Dan have been very good.
The Shires position is that there must be agreement with the Shire of Harvey by Binningup Nominees that it agrees to construct the 2nd access road at the same time as the 1st stage of development is undertaken as planned in the submissions to council.
We have been assured this is the only matter now outstanding with the Shire. When this commitment is dealt with the Shire will be pleased to have the planning matters put to the next earliest meeting to have the matter dealt with. (There may [be] some other small issues but would not hold up the approval process.)
On behalf of Binningup Nominees Pty Ltd we committed to Michael and Simon we would agree to their request for the 2nd access road construction and immediately make arrangements to acquire the land in question.
Tony, I am aware you have discussed the price with the vendor, we now need to arrange the purchase of this land for the price discussed. Can you and or Dan please arrange to meet with the vendors and make the necessary arrangements.
Simon has agreed to supply us with a note which will cover the Shires expectation for inclusion in our official commitment letter.
Could you or Dan contact Simon to discuss the details.
I just highlighted to him that, look, you know, we were heading down a certain path. We were close to getting the structure plan approved, because previous to that I had - I had submitted a deemed refusal to - to the Shire of Harvey, because they hadn't dealt with the structure plan in - in - in accordance with the provisions of the scheme in a timely manner. And I just highlighted concerns that, look, the - the adjoining neighbours, being the [Paytons] or Coast Pastoral Company, now knew that we needed this - this road as part of stage 1. So, you know, my concerns that I raised with Mr Waller was, 'What if these guys turn around and say, 'Well, we want one, two, three million dollars for this,' for this piece of land that's now deemed to be pretty strategic? Because without it we can't commence development'. You know, well, we could potentially be - be held to ransom by - by them, which is effectively what - what the Shire of Harvey were doing to us at the time. They were trying to hold us to ransom with this particular - particular road. And I remember Mr Waller saying to me, 'Look, I've dealt with the [Paytons] over the time. I know them pretty well. They're good people. Don't worry about it. I will handle the acquisition of the land for the road'.
(1) In June 2012, Mr Pearce, on behalf of Mirvac, was pressing the Shire.
(2) The June 2012 Strategy was provided promptly and addressed Mr Hall's requests.
(3) After the meeting on 13 August 2012, Mr Aleksovski promptly sought to meet with Mr Waller, and a further meeting was held with the Shire at which Mr Waller was present. In that meeting, the trigger point for the construction of the road, left open by the 13 August meeting, was agreed.
(4) In May 2013, Mr Aleksovski wanted to press the Shire to respond. The email sent to the Shire on 10 May 2013 foreshadowed that Mirvac WA would rely on a deemed refusal if a decision was not forthcoming. However, it also advised that further discussion may resolve the issue. Its aim was clearly to prompt a response from the Shire and to encourage the Shire to be willing to negotiate.
(5) In numerous documents, including the Deemed Refusal Notice itself, Mirvac Ltd reiterated its commitment to make a contribution per lot for the construction of the road.[236]
(6) Mr Pearce responded to Mr Hall's email of 27 May 2013, on 30 May 2013. In that email, Mr Pearce was pressing for 'the June spot' at the Planning Committee.
The report had been commissioned to get a better understanding of the state of the market at the time. As a result of the report, we started to be concerned about the revenue that the project might generate. It was at about this point that we realised that constructing built form lots would not generate sufficient returns to justify the costs of construction. The assumption in the original approval to purchase document was that we would be selling land and house and land packages. After we received this report, we felt that it did not make financial sense to construct homes, but this was a position that could have easily been revisited if the economic conditions improved.
Barry [Waller] ... believed that you wouldn't have to amend ... the structure plan initially. And Tony [Aleksovski] was of the view you would have to amend the structure plan. ... Tony said if you started it, they would stop the works until you put in the amended structure plan.
The issue would be that ... if we did stage 1 without having ... an amended structure plan put in place, and you then went and decided to close the golf course, those buyers from stage 1, if they were let into ... buying a lot in ... Binningup based on the golf course being there, and now you're going to remove the golf course, that would cause an issue.
Barry was always of the view if you started stage 1 and you decided to close the golf course at a later date, it would be all right, but Tony was always of the view that you could not do that.
I did say to Mr Aleksovski that, 'Don't talk about whether we're going to develop the golf course or not. Just be - just stay with it. We're going to - the golf course will close, no question about that - because of the water'. Well, when that happens because of the water - fine. All bets are off. Then you can do whatever you like. But while it was - while there was enough water to maintain it, we will keep maintaining it. ...
I didn't talk to him about - specifically as minutes. I had a meeting with him one day and I said, 'Don't put it in the minutes. Let's work out what we're doing and how we're doing it'.
[I]n Mr Waller's view, he - he suggested that we could potentially start developing stage 1, which consisted of lots fronting onto the golf course, and then halfway through that stage close the golf course down and - and - and start the amendment of the structure plan, and we had concerns about that because there's significant misrepresentation issues then. We're - we're selling lots fronting onto a golf course and then, halfway through selling those lots, we are all of a sudden going to - going to close it down and convert them into residential lots. So ... Mr Lawrance [of Mirvac WA] ... was strong in raising his concerns with regards to ... the misrepresentation issues. To go - add onto that ... Lakewood Shores stage 6 consisted of some pretty significant lots that backed onto the golf course. So I raised the concerns with Mr Waller with regards to, 'Well, what about those purchasers? They've bought a block of land, built a home backing onto the golf course. Now, all of a sudden, we're ripping it up, ... [t]hey're going to have concerns as well. They're going to raise issues'. And he simply responded by saying, 'Well, I will just buy all those houses back off the buyers and the lots'. That was his answer to it.
Internal Mirvac documents - feasibilities, assumptions and decisions
(1) It had become clear to Mirvac that Binningup would not agree to vary the Services Agreement, so in February 2013 Mirvac made a provision for the loss it would suffer on the assumption that the parties would negotiate an exit from the Services Agreement;
(2) In those circumstances, there was an obvious risk that a further loss provision would be required and 'therefore' there was no possibility of an ACC being issued to carry out the Project;
(3) By September 2013, Mirvac knew it was going to make a loss if the Services Agreement was not varied, even if the golf course was developed;
(4) 'Accordingly', there was no possibility that Mirvac Ltd would ever issue an ACC.
Early feasibility analyses, assumptions and negotiations
Final approval was received on the Federal Environmental referral and the Binningup structure plan was lodged in June. Detailed design of the subdivision is currently being finalised for application lodgement in September. A new feasibility is currently being undertaken as part of Q1 update. Given the reduced yield as a result of the environmental approval, it's likely that a review of the agreement with the current landowner will be undertaken to unsure [sic: ensure] returns to both parties are acceptable prior to commencement on site.
Yield decreased due to Federal Environmental issues. Three year delay due to Federal environmental issues. Discussing with the owner of the land a restructure of the [Services Agreement] to improve Mirvac returns.
A variety of deal restructure scenarios are being considered prior to re‑entering negotiations with the landowner. Redesign incorporating new yield is realistic while seeking to optimise return on capital.
Mirvac has met with the land owner Binningup Nominees to discuss restructuring the agreement to provide a better return for Mirvac and we have agreed a target date of December 2011 to have an in principle agreement to revised terms.
Mr Waller used words to the effect that he understood what we were saying to him and what we were telling him. He also used words to the effect that, 'I know that we have to make this work for both parties and I will go away and consider what you're asking of me'.
Mirvac met with the land owner Binningup Nominees in December 2011 and there is an acknowledgement from the landowner that the project will be restructured. The land owner requested we meet in January along with his Trustee to workshop the project structure to seek an agreed outcome.
Barry advised me they are not agreeable at this point to any of the options discussed to date with respect Mirvac's approaches to date to renegotiate elements of the [Services Agreement]. Barry would like to have the issue escalated to the decision makers of Mirvac by which he means Brett Draffen and probably Matt Wallace and wishes to meet with them.
It was evident during the conversation that Barry's views on the immediate and long term future of the project are polarised from Mirvacs position. As you are aware the position at project level is to progress to structure plan approval to protect our position and this was all endorsed in principle at the PCG - bringing with it an expectation on the face of it that the PCG would be presenting an ACC for subdivision works shortly thereafter - this being late July/August. It seems clear to me that at this point Mirvac DAM[300] would not give this approval and the shareholders PCG will then be at a potential deadlock.
Barry requested another PCG at the end of June and he is expecting a timely response from Mirvac with respect [to] his stated position on the [Services Agreement] framework and the commitments there under from Mirvac.
Can we discuss this please at your best opportunity? It would appear the time has come to brief Matt and Brett on this and determine a course of action for Mirvac.
That's incorrect. We - the position - we had never taken a position not to proceed with the project. Sure that it was - absolutely the project was - was financially challenging and we were attempting to find a pathway to at least come up with a viable stage 1 to at least allow the project to proceed in some shape or form. Now, to proceed further, you know, our view at the time was that some form of renegotiation would be required for that to happen. But, no, we hadn't made we had absolutely not made a decision not to proceed.
Negotiations are underway with [Binningup] to attempt to mitigate the impact of the timing delay and yield loss arising from [the process involving the Commonwealth Department] by way of amendment to the current Development Services Agreement.
Current assumptions are predicated on a satisfactory renegotiation of pertinent elements of the [Services Agreement] ...
A variety of deal restructure scenarios were considered, however, negotiations with the landowner indicate that there is unwillingness to change. Therefore, continue to be modelled according to current [Services Agreement] in the Q1 FY13 forecast.
The team still remained confident of the potential for a negotiation. Again remember at this time there was still no structure plan approval, so it was very hard to advance the project until we actually got through all the required approvals to actually form up something that could be considered.
The settlements over the next five years have been reviewed to take into consideration current market conditions and the delay in environmental and planning approvals. Binningup Nominees have also indicated that they are no longer willing to renegotiate the [Services Agreement]. Subsequently, settlement timeframes have been pushed out a further 12 months which leads to a decreased loan balance with deferred development expenditures. In addition, the recognition of interest income has been taken out from FY14 onwards in order to limit the exposure to the PDA loan.
There are risks around the recoverability of the PDA loan due to the underlying land value and the viability of future development. ... The feasibility has been updated based on the [Services Agreement] and the reduced yield (as a result of the environmental approval).
Project partner is aware of the issue and has expressed a willingness to work with Mirvac to achieve a suitable outcome for both parties however has indicated that certain terms and parameters of the original agreement are not negotiable. The impact amount is based on the current WIP of the project is [sic: if] an agreement cannot be reached.
Further to the environmental approval process, the project yield has been reduced. However, there has been an unwillingness from [Binningup] to review the [Services Agreement]. Therefore, putting the viability of the project at threat. This may trigger an impairment to the loan balance currently carried.
The recoverability of the [Services Agreement] loan does not appear to be supported by the value of the land. ... The loan is secured against the development site but based on current assumed englobo valuation the security value is not sufficient to pay out the loan.
There's no real way Barry [Waller] could stop the deadlock provisions being invoked. There is however scope to delay the provisions. There was no time limit placed on the preparation of a briefing paper[346] outlining the dispute. So technically this could be said to being prepared for an extended time as a stalling tactic. We need to receive detailed legal advice in relation to how best to enact the deadlock provisions to ensure our actions are fully we [sic] are fully supported by the agreement.
Previous forecasts have maintained a position whereby Mirvac develop out the site in line with the [Services Agreement]. Based on escalated settlement assumptions the [Services Agreement] was considered marginally profitable for Mirvac.
The assumption being adopted involves recouping the initial land advance of $25m. This requires the land owner agreeing to release Mirvac from its obligations under the [Services Agreement] and refund the initial $25m Land costs.
Currently, this is considered the most likely scenario as the land owner is unlikely to proceed through the deadlock provision (further explored below) as this would result in them losing control of the land which is considered the crown jewel of their holdings. The land owner would receive all the planning and other associated intellectual property for free and would be simply returning the initial land advance.
There are risks associated with this scenario as the land owner is considered litigious and may be willing to defend his rights in the courts. If this negotiation is handled correctly, an outcome that benefits both parties could be reached. The alternative course of action could be laid out as Mirvac following the deadlock provisions which would result in the land being sold for an amount well below the land owner's view of its worth.
There is no real way the land owner could avoid the deadlock provisions being invoked. There is however scope to delay the provisions. There was no time limit placed on the preparation of a briefing paper outlining the dispute, so technically this could be used as a stalling tactic. We will need to receive further detailed legal advice in relation to how best to enact the deadlock provisions to ensure our actions are fully supported by the agreement.
The deadlock provision sets out a procedure for dispute resolution which eventuates in the land being sold for an agreed sum if the disagreement cannot be resolved. The funds are then used to pay down the loan balance.
Based on discussions with the land owner and based on our knowledge of their intentions, it is not envisaged that the land owner would allow the deadlock to escalate to this level.
This is considered the least desirable situation. This scenario would involve outlaying approx. $210m in development costs over a 22 year period and results in a shortfall in the loan repayment of $18m based on revised assumptions.
This scenario takes into account a lot settlement profile in line with independent market advice and knowledge of the current and forecast Binningup sales environment and is represented in the preceding chart.
to renegotiate the agreement to be more balanced between the parties given the revised assumptions. It is difficult to model this scenario as it will be based on a negotiation between the parties, however the position would see some improvement on the $18m shortfall. The Revised Assumption position is still favoured even under this option to maximise any potential negotiations.
There have been recent developments on how the [Services Agreement] is structured and how Mirvac intends to proceed with the [Services Agreement]. Based on recent advice from Mirvac legal it has been determined that there is no scope for Mirvac to exit the [Services Agreement] as a result of the agreement not being financially viable.
Negotiations with the Land Owner are in the early stages only and will be expected to be escalated over coming months.
Management as at 31 December 2012 have revised their assumptions around the future growth prospects of the Binningup region, and now consider that the current slump in demand will be protracted for a prolonged period. A decision has therefore been made to now exit the [Services Agreement] via the deadlock provisions included in the [Services Agreement].
The revised assumptions for this project include the following:
The revised assumptions have led to a need for a provision against this loan receivable of $18.0m.
Our own assessment is that Mirvac should recognise a provision of $28.0m. The additional $10.0m provision is the difference between the best and worst outcome of negotiating an exit. This is considered prudent given that legal advice is yet to be received on how to utilise the deadlock.
We have raised our own assessment with management. We note that management's view of the provision is based on their assessment of the strength of their future negotiating position and an understanding of the landowners' future intentions. We accept management's position however have included our judgemental additional provision on our [Summary of Unadjusted Misstatements].
My role as project manager was to ensure the project got delivered. It was not my role to conduct any negotiations with Mr Waller directly about how we should structure the project. All I could do was try to find a solution to the issue of the loan shortfall, while also progressing the project to get the Plan approved and start subdividing the land for development.
Although I was asked to look at the dispute and deadlock provisions of the Services Agreement, as far as I am aware, there was never a decision made at Mirvac to drive the Binningup project to a deadlock, nor was I ever asked to do that.
The assumption adopted for Q2 involved the recouping of the initial $25m land advance. This requires the land owner agreeing to release Mirvac from its obligations under the [Services Agreement] and refund the initial $25m Land costs.
Currently, this is considered the most likely scenario as the land owner is unlikely to proceed through the deadlock provisions as this would result in the loss of control of the land which is considered the crown jewel of their holdings.
In this scenario the land owner would receive all the planning and other associated intellectual property for free and would simply return the initial land advance.
There are risks associated with this scenario as the land owner is considered litigious and may be willing to defend his rights in the courts. If this negotiation is handled correctly, an outcome that benefits both parties could be reached. The alternative course of action would involve Mirvac following the deadlock provisions resulting in the land being sold for an amount well below the land owner's view of its worth.
Discussions have commenced with the land owner in order to facilitate this process. The first step is to determine how a budget deadlock can be initiated. The current intention is to agree project parameters and to have them agreed by external parties. Once this has been carried out it is proposed that an ACC will be submitted with the view of it being knocked back. Once the ACC has been knocked backed it is assumed budget deadlock will be reached which raises the potential for the deadlock provisions to be enacted.
This is the point at which negotiations with the land owner will commence. Once in Deadlock the two parties will be presented with 2 scenarios:
This process is contingent upon many factors and a reliable timeframe is hard to define. Based on the current assessment the process is assumed to be finalised by Dec 2013.
... At Q3 FY13 Mirvac took an $18m provision on the loan balance to reflect the risk associated with the recoverability of the loan. [sic] and to reflect the current intention to exit the [Services Agreement].[367]
The settlements over the next five years have been reviewed to take into consideration current market conditions and the delay in environmental and planning approvals. Binningup Nominees have also indicated that they are no longer willing to re-negotiate the [Services Agreement]. In addition, the recognition of interest income has been taken out from FY14 onwards in order to limit the exposure to the [Services Agreement] loan. Mirvac's strategic decision is to work towards a deadlock by Jun‑13 which has resulted in an impairment to the loan amount being taken up and a recovery of the initial loan of 25m from the [Services Agreement] partner by Jun-14.
I think this is a forecast that reflects the fact that we've taken the impairment as at 31 December 2012 and for the purposes of financial projections going forward from an earning perspective and because of everything that was unknown related to the project at the time, that the forecast was just assuming the - effectively the same logic as the provision.
There are risks around the recoverability of the [Services Agreement] loan due to the underlying land value and the viability of future development. The FY13 Q3 forecast is based on the deadlock position by Jun‑13 with a settlement outcome by Jun‑14.
[N]egotiations between Mirvac and Binningup Nominees in respect to the [Services Agreement] could in fact be held and completed between both parties outside of the current agreement framework. It was suggested by Mirvac Legal that this be the preferred option, subject to Mirvac having a preferred outcome that it wished to achieve.
consistent with our approach that we wanted to try and find a way, with Mr Waller, to agree a way to move forward and part of that would have been to continue those negotiations. Equally, it was focused on trying to agree a logical way to move forward with stage 1 of the project. ... what we were hopeful of is that we could agree to - a pathway to move forward with a logical stage 1 and that may or may not have, at the time, depending on the negotiations, resulted in certain amendments to the [Services Agreement] but it was subject to a negotiation.
[I]t was trying to land on options to move forward. Those options may or may not have involved variation to the [Services Agreement]. That was something that would have needed to be negotiated. The focus of my input post that was, really, trying to work with the team to find a solution to advance the project with a logical stage 1.
(1) Option 1 involved undertaking a feasibility analysis to consider the existing development commencing on the foreshore.
(2) Option 2 proposed a feasibility analysis based on the development commencing on the foreshore, but also incorporating the existing golf course into the development. It was noted that this option would require a further 18 months of statutory planning as an amendment to the Plan and environmental approvals would be required.
(3) Option 3 proposed undertaking and completing negotiations and discussions outside of the current Services Agreement framework, which may be to renegotiate the current Services Agreement or negotiate Mirvac's exit from the Project.
Alleged statements in 2014 and proposed location of Stage 1
[T]here's references in there to comments that I made around the Mirvac board approval process which I don't agree are correct. Certainly, from a Mirvac perspective, we would have gone through an internal approval process to be in a position at the formal PCG to approve - or our - or, you know, basically in - in a position for our attendees at the PCG to vote appropriately. That is a process that would have been an internal process that may or may not have required Mirvac board approval, depending on the size of - the scope of the approval sought. ... Certainly we would have gone through a process prior to any formal consideration, for example, of a budget or program at the PCG to get the necessary approvals that we would need.
We agreed in that meeting that the team needed to go away and do some more work around the potential for a stage 1. We were very keen to try and find a pathway whereby we could present a stage 1 option that I guess presented the project in its best light and that would mean that we would get down close to the foreshore, we would come up with an option that, you know, presented enough size and scale to the project that, you know, purchasers could get a clear picture around what the project could be. So we agreed that the team needed to do some more work around what that potential option would look like, what the revenue and sales rate would be, what the construction costs would be and that was work that the team still needed to do.
I know the team had run some scenarios around that at the time but to be quite frank, I wasn't that focused around the additional yield. This was a very long-dated project, you know, most likely in excess of 30 years and you know, we were - my focus at the time was more focused on how do we start a viable stage 1 as opposed to, ultimately, what the total yield would be. So it was something that could have been addressed at in time but obviously, to delete the golf course would have involved change to the structure plan, there may have been misrepresentation-type issues with the - some of the existing purchasers, so it would have taken a lot more work to work out whether that is a viable option or not.
Clearly, the returns were suboptimal from a Mirvac perspective. We were trying to find options where we could, you know, start with a viable stage 1. From our perspective, ... we were of the view that ... the structure of the documents was such that we weren't committed to just develop the project out, you know, irrespective of financial outcome but we were looking for a stage 1 option ... which most probably would have required some renegotiation of aspects of the [Services Agreement] but we were looking for an option to try and find a pathway to do so. At the time, I did think there was really only three options from a Mirvac perspective. You know, one option would be that the project didn't proceed and Mr Waller would buy Mirvac out; that was not something Mr Waller would - said he would consider. The second option was to come up with a viable plan to progress stage 1 and then flow through the project and ideally, renegotiate some aspects of the [Services Agreement] to make it more equitable for both parties or the third option was to sell the site; Mr Waller was not keen on the third option either. We finished the meeting with - agreeing, sort of broadly, what the team needed to do ... to prepare for a subsequent meeting and then also, you know, Mr Waller didn't commit to the option of - to the - the position around renegotiation of stage 2, but certainly left the options open to further consider that once we had the detail of a potential stage 1.
if we were able to agree on a pathway for - for stage 1 - there may, as a result, have been some amendments to the [Services Agreement]. Important thing out of that was there was really further work required to form that view.
But you left open the possibility of renegotiation once you had the detail of a potential stage 1; you agree with that? ‑ I would doubt that very much. I would doubt that.
So what did you say with respect to the second option, renegotiate the deal to make it more equitable for both parties? ‑ Well, if you want to know, I will tell you. In all my life I've never seen such a mess of a program to bring this land on for a development. I have seen incompetence, stupidity, the dumbest things that have ever happened on this - on this project. I just cannot believe how anybody could make this project take this long without actually getting a shovel in the ground. First up, why? It was announced as $1 billion project all over the newspapers, and with that comes the people that don't want it to happen. So without even trying, Mirvac had this army of people desperate to stop the project without even knowing what it was. That was the first - I thought that was just a huge mistake, and then that taints everything that you go on to do with that project, and it's very hard to make people see really what the position is once they get a picture in their mind of $1 billion. So we were fighting uphill from day 1, and we - and - and I - I appreciate that some of the guys in Mirvac are really - some of the people in Mirvac are really smart. I - I know that, and they've got money behind them and they can do these things, but it just seems that we - we had a team of people that could get approvals through easily, could do the engineering easily. We could do all these things but, no, they aren't good enough for Mirvac, so they tipped all these people out, brought in a new team who had to start off from square one, so we delayed - we - we - it caused - it caused enormous grief in the first - well, it caused enormous grief which is still going through today, instead of, you know, quietly, quietly. You go - there was a problem with aligning the entry road. It was - it was going to require - it wasn't a big issue. It wasn't a big - big mistake, but it was going to require that the EPA agree to this realignment, which meant an application. Preparing an application, putting it in. It would probably end up in Sydney or - or in the eastern states. I don't know. And Tony will - Tony Aleksovski will tell you, it - it was a problem. It was going to delay us. I said to the at the meeting, 'Tell me exactly what the problem is and - and I know somebody that I can take with me to talk to - to the EPA people in Bunbury'. And the person I could take was the guy that was doing all of our planning work, who Mirvac thought wasn't good enough for them. We drove down to Bunbury one day. We met with the senior people - the EPA people in Bunbury. We talked to this man, said, 'Look, this is what we need to do. We've only got to move this road so far. We don't want to go through the process of making an application to the EPA because it's going to delay us. Can you help us?' And he looked at it and he said, 'Yes. Well, you're not moving the road that far. Yes. Yes. Yes, I - I can do that. So, yes, that's okay. Go away'. He approved that EPA thing without any trouble at all. We had the - we had the respect of the people we were dealing with. We had been dealing with them for 20, 30 years. They knew all of the people they had to know, but they weren't good enough for Mirvac. They just got tossed out, and here we are, we're still there trying to get more approvals from the EPA. Goes on forever. That's why I - I am really anti on all of a sudden somebody says to me, 'Well, here's three options. We will do this, this or this'. And I'm thinking, 'I don't believe this'. This is a beautiful land, and here we are making a mess of it, and - and because - because it hasn't gone quite like you wanted - they wanted it to go, 'Well, you better buy us out'. I mean, we - we stood by - we have stood by this whole deal - Binningup Nominees has stood by this deal and we have gone out of our way to help. We - we - we respect the people that are - we respect the people that are doing this deal or doing the work but it's so frustrating. It's just unbelievable, and I've been around a long time, and I've never seen anything so convoluted and complicated when it is so easy.
So focusing on your meeting with Mr Draffen ‑ ‑ ‑? ‑ Yes.
‑ ‑ ‑ on 3 April 2014, can I suggest to you that you left open the possibility of renegotiation once you had the detail of a potential stage 1? ‑ Well, we still haven't got the detail on stage 1.
No. I'm asking you whether during that meeting you left open the possibility of renegotiating with Mirvac once you had the detail of a potential stage 1? ‑ It - potential - stage 1 never happened.
That's not what - I will ask the question another way. You recall the meeting on 3 April 2014; correct? ‑ I do.
And I'm saying that Mr Draffen put forward three options that we've discussed, and one of the options was renegotiation, and during the course of that meeting you left open the possibility of such a renegotiation once Mr Draffen had progressed things and provided details of a potential stage 1 development? ‑ That never happened.
That's not what I'm asking you. I'm asking you did you in the course of your discussions leave it on the basis that, 'Come up with a stage 1 plan and then let's talk about it'? ‑ I will always listen to people if they've got a plan. Always. And - and I will always follow through on it, yes or no, whatever it may be, but I am not aware that we actually have got a stage 1 able to be built yet. What's the point? We haven't done anything. He hasn't given us a plan. We don't know what's going on. He hasn't come back to us. But I am always, always ready to talk, providing we are dealing with the people who have got the authority and who actually want to talk about realistically doing something.
So you were ready to talk once they came up with something that could be talked about? ‑ Well, there's nothing to talk about yet.
No, but you - what I'm saying is ‑ ‑ ‑? ‑ Well, if they do come up with something to talk about, sure, we will talk about a deal.
(1) First, that the 'feasibility and other reviews' documents refer to negotiations that were inconsistent with the testimony of Mirvac witnesses (by which I assume[402] that Binningup meant that the documents asserted that the negotiations were more advanced and more promising than the witnesses gave evidence about). Therefore, those documents show that Mr Draffen knew that the Board would not grant an ACC if it was fully informed. Therefore, Mr Waller's purported minutes as to what was said by Mr Draffen concerning the Board was accurate;
(2) Second, that '[o]ther documents and evidence' show that Mirvac's position as at 3 April 2014 was to not carry out the Project to completion and, instead, to drive the Project into deadlock and use that process to negotiate an agreement with Mr Waller to repay the Initial Advance, consistently with Mr Waller's purported minutes; and
(3) Third, that Mr Waller's purported minutes as to what was said by Mr Draffen was also consistent with 'Mirvac's policy concerning the Project, adopted by the Board in February 2013'.
[W]e were of the view that ... the structure of the documents was such that we weren't committed to just develop the project out, you know, irrespective of financial outcome but we were looking for a stage 1 option ... - which most probably would have required some renegotiation of aspects of the [Services Agreement] ...
I did think there was really only three options from a Mirvac perspective. ... The second option was to come up with a viable plan to progress stage 1 and then flow through the project and ideally, renegotiate some aspects of the [Services Agreement] to make it more equitable for both parties ...
[W]e had never taken a position not to proceed with the project. Sure that it was - absolutely the project was - was financially challenging and we were attempting to find a pathway to at least come up with a viable stage 1 to at least allow the project to proceed in some shape or form. Now, to proceed further, you know, our view at the time was that some form of renegotiation would be required for that to happen. But, no, we hadn't made we had absolutely not made a decision not to proceed.
The numbers and the cash flow were certainly getting close to the point at which, you know, a project would be under pressure to find an alternative, which was what I would have thought would have happened. It would have found some separate way to get it going at a smaller scale that, perhaps, didn't need the second access road and then shelved the second half for a period of time. One outcome of that could have been, you know, renegotiating parts of the agreement to defer payments or change waterfalls or any of those sorts of things ...
My role as project manager was to ensure the project got delivered. It was not my role to conduct any negotiations with Mr Waller directly about how we should structure the project. All I could do was try to find a solution to the issue of the loan shortfall, while also progressing the project to get the Plan approved and start subdividing the land for development.
Although I was asked to look at the dispute and deadlock provisions of the Services Agreement, as far as I am aware, there was never a decision made at Mirvac to drive the Binningup project to a deadlock, nor was I ever asked to do that.
The AAC document referred to an IRR of 21% based on September 2006 original feasibility, when the AP of 9 May 2007 had an IRR of 32.4%. Mr Davidson explained this on the basis of updated feasibilities in 2008, but that explanation was contradicted by Mr Draffen who said the first revised feasibility after the Approval to Purchase ('AP') was that in the AAC. Mr Draffen approved the AAC without seeing the AP. That the AAC feasibility remained the only revised feasibility up until 2012 when Mr Aleksovski did the analysis included in the MPC report [f]urther contradicted Mr Davidson's explanation. That explanation should be rejected. Clearly, the AAC concealed from Mr Draffen the extent of the fall in the IRR since the AP was prepared.
I don't think it was a serious - you know, it was the - the - the facts were we were in an existing project, so it wasn't whether we wanted to proceed or not.
(2) the alleged events of and following the 3 April 2014 meeting, being, in summary form:[487]
(a) that Mirvac WA was going to provide a program and budget for Stage 1, but instead provided a proposed program and budget which would cause further delay, being the budget that contemplated the development of the golf course;
(b) when Binningup said it would record future PCG meetings, Mirvac WA refused to attend if the meetings were recorded, thereby ending the process of approving programs and budgets.
What I was asking you was you didn't raise any concern with Mirvac when you got that email about this idea of deferring the construction of the second access road as was suggested in number 3?‑‑‑It's not possible to not do it straightaway. It was imperative that it goes in straightaway.
No, answer - please focus on my question. I am asking you whether at that time, in August 2012, after you received the email, you raised any concern with Mirvac about the idea mentioned in number 3?‑‑‑Well, I'm not sure that - I'm not sure I actually agree with you there. I don't agree with you there.
But you raised concerns, did you?‑‑‑I just know that the idea of getting it built on a - on gravel and not sealing it, I just knew in my heart that that would not run.
That's not what I'm asking you. I'm not asking you what you knew in your heart. I'm asking you whether you raised concerns with Mirvac about that strategy, and I am suggesting to you that you did not at that time?‑‑‑Well, I think that you're wrong because I believed, and so did our engineers and our planners, not Mirvac's, that that road couldn't be built. It had to be a straight road.
No. I'm not asking about where the road was to be, but I'm asking about connecting the building of the road with construction and I'm suggesting to you that you did not raise any concern about that after you received this email?‑‑‑Well, you might say that, but I don't believe that - that that's right because I - Binningup had an issue where it had to where it had to agree to everything that was under the rules that we got ourselves into. So we couldn't disagree and so that would be agreeing under duress.
And your evidence to her Honour is that you didn't - you were concerned about it, but you didn't say anything because you were under duress. Is that what you're saying?‑‑‑I was obliged to agree to it.
But I'm not suggesting you did. I'm suggesting to you you read the email, you saw what it said and you didn't raise any concerns with Mirvac. Yes or no?‑‑‑I can't. I'm not allowed to raise concerns with them. I can't disagree with them.
So is the answer to my question you didn't raise any concerns?‑‑‑Well, that's what your interpretation is, not mine.
But it's whether you communicated a concern or not. That's what I'm asking?‑‑‑Well - all right. I - I - I - I will answer your question and say I didn't raise concerns, but I can tell you now that that - what is there is not going to go - is not going to happen on the ground.
Were you happy with the result of the appeal? ‑ No.
You were happy with the efforts Mirvac had made to progress the appeal and achieve a positive outcome; do you agree with that? ‑ Offset by the - by the announcement of the deal was what caused the whole problem when we first did this.
No, can you focus on my question? ‑ Well, it's an offset, isn't it?
No. I'm asking you this question. You were happy with Mirvac's efforts to progress the appeal and achieve a positive outcome; do you agree? ‑ I was happy that we got a positive outcome.
And were you happy with Mirvac's efforts? ‑ Well, it's the - it's all of these consultants that did the work. It's not - it wasn't Mirvac that did the work.
So were you happy with Mirvac engaging those consultants to do the work? ‑ Well, I wasn't actually. I - I thought there were much better consultants out there than what we - that Mirvac used.
That's not what I'm asking. I understand that you think there were better consultants? ‑ Yes, I do.
What I was asking you was whether you were happy with the consultants Mirvac had engaged to achieve the positive outcome? ‑ Well, I would say that that's what they're there for.
Could you please answer my question? Whether you're happy or not? ‑ Well, no because - it's not happy or not. They did a job, that's good. That's what they're paid to do.
(1) The process of construction is objective. The meaning of the terms of an instrument is to be determined by what a reasonable person would have understood the terms to mean.
(2) The construction of a contract involves determination of the meaning of the words of the contract by reference to its text, context and purpose.
(3) The commercial purpose or objects sought to be secured by the contract will often be apparent from a consideration of the provisions of the contract read as a whole. Extrinsic evidence may nevertheless assist in identifying the commercial purpose or objects of the contract where that task is facilitated by an understanding of the genesis of the transaction, its background, the context and the market in which the parties are operating.
(4) Extrinsic evidence may also assist in determining the proper construction where there is a constructional choice, although it is not necessary in this case to determine the question of whether matters external to a contract can be resorted to in order to identify the existence of the constructional choice.
(5) If an expression in a contract is unambiguous and susceptible of only one meaning, evidence of surrounding circumstances cannot be adduced to contradict its plain meaning.
(6) To the extent that a contract, document or statutory provision is referred to, expressly or impliedly, in an instrument, that contract, document or statutory provision can be considered in construing the instrument, without any need for ambiguity or uncertainty of meaning.
(7) There are important limits on the extent to which evidence of surrounding circumstances (when admissible) can influence the proper construction of an instrument. Reliance on surrounding circumstances must be tempered by loyalty to the text of the instrument. Reference to background facts is not a licence to ignore or rewrite the text. The search is for the meaning of what the parties said in the instrument, not what the parties meant to say.
(8) There are also limits on the kind of evidence which is admissible as background to the construction of a contract, and the purposes for which it is admissible. Insofar as such evidence establishes objective background facts known to the parties or the genesis, purpose or objective of the relevant transaction, it is admissible. Insofar as it consists of statements and actions of the parties reflecting their actual intentions and expectations it is inadmissible. Such statements reveal the terms of the contract which the parties intended or hoped to make, and which are superseded by, or merged into, the contract.
(9) An instrument should be construed so as to avoid it making commercial nonsense or giving rise to commercial inconvenience. However, it must be borne in mind that business common sense may be a topic on which minds may differ.
(10) An instrument should be construed as a whole. A construction that makes the various parts of an instrument harmonious is preferable. If possible, each part of an instrument should be construed so as to have some operation.
(11) Definitions do not have substantive effect. A definition is not to be construed in isolation from the operative provision(s) in which the defined term is used. Rather, the operative provision is ordinarily to be read by inserting the definition into it.
The meaning of the terms of a commercial contract is to be determined by what a reasonable businessperson would have understood those terms to mean. That approach is not unfamiliar. As reaffirmed, it will require consideration of the language used by the parties, the surrounding circumstances known to them and the commercial purpose or objects to be secured by the contract. Appreciation of the commercial purpose or objects is facilitated by an understanding 'of the genesis of the transaction, the background, the context [and] the market in which the parties are operating'. ... [U]nless a contrary intention is indicated, a court is entitled to approach the task of giving a commercial contract a businesslike interpretation on the assumption 'that the parties ... intended to produce a commercial result'. A commercial contract is to be construed so as to avoid it 'making commercial nonsense or working commercial inconvenience'.
(a) The Principal proposes to implement the Project.
(b) The Principal appoints the Contractor to carry out the Services and the Contractor agrees to provide the Services on the terms and conditions in this document.
Did Mirvac WA have the right to disapprove a budget?
(i) provide a forum for consultation and information with regard to the Project including:
(A) reviewing and discussing any matters of concern to the Principal or the Contractor arising in respect of the Project; and
(B) generally reporting on the progress of the Project;
(ii) following submission of a Budget and/or a Programme to the Project Control Group by the Contractor for:
(C) if relevant, the Construction Works for a proposed Stage,
approve or disapprove that Budget and/or Programme.
If there is a dispute between the parties, and that dispute is not resolved within ten Business Days of one party notifying the other party in writing that a dispute has arisen the dispute must be determined pursuant to this clause 15.
will be final and binding on the parties subject to the following:
(A) if the determination relates to any matter other than a decision to disapprove a Budget or Program under clause 5.2(a)(ii), the Expert's decision will, in the absence of manifest error, be final and binding on the Principal and the Contractor and not subject to review;
(B) if the determination relates to a dispute which arose [sic: in relation] to a decision of the Project Control Group to disapprove a Budget and/or a Program under clause 5.2(a)(ii) the Expert's determination may be accepted on the election of the Contractor and the Principal but will not be final and binding. In that respect the Contractor and the Principal must notify each other within ten Business Days of receipt of the Expert's determination whether they accept the Expert's determination. If the Contractor or the Principal does not accept the Expert's determination the provisions of clause 15.5 will apply; ...
If either the Contractor or the Principal does not accept the Expert's decision under clause 15.4 the parties agree that:
(a) the Principal must offer the Project Assets for sale to the public at a price and on terms agreed by the Project Control Group;
(b) if the Project Control Group cannot agree on any matter or thing in relation to the sale of the Project Assets then that matter or thing must be determined by an Expert under clause 15.4;
(c) without affecting any accrued rights or liabilities of the parties under any Transaction Document, this document is terminated from the date on which completion of the sale of the Project Assets occurs as contemplated by this clause 15.5 (Termination Date); and
(d) in addition to any other monies owing to the Contractor under this document the Principal must pay to the Contractor the Termination Fee on the Termination Date.
Was completion of the Project a contractual benefit?
(1) whether the development would proceed was always dependent on Mirvac WA and Binningup approving budgets for such development;
(2) Binningup and Mirvac WA contracted precisely for the eventuality that they might disagree about progressing the Project with a budget that was regarded as inappropriate (by either one of them), in which case a deadlock would occur and the land would be sold; and
(3) therefore, Binningup's contractual benefits under the Services Agreement cannot be assumed to be the full development and sale of the land. Binningup did not contract for a benefit that the Project would always be developed, regardless of viability.
(a) The Principal proposes to implement the Project.
(b) The Principal appoints the Contractor to carry out the Services and the Contractor agrees to provide the Services on the terms and conditions in this document.
Services means, subject to any approvals required under clause 6.6, clause 6.7 and clause 6.8, all services which the Contractor determines are necessary or desirable for the carrying out of the Project.
The Contractor must perform the Services and procure Completion of the Project:
(b) in a proper, timely, professional and workmanlike manner.
Subject to any approvals required under clause 6.6, clause 6.7 and clause 6.8, the Contractor may, in its absolute discretion, do all things necessary or desirable to implement the Project including:
(a) apply for an Approval (even if an Approval in respect of the subject matter of that application has already been granted);
(c) determine the size, location and number of Sale Lots;
(d) determine which parts of the Land will be Dedicated and Dedicate those parts of the Land;
(e) determine the nature and extent of the Services and procure the carrying out of the Services;
(f) determine the nature and extent of the marketing and sale of the Sale Lots; and
(g) subject to clause 6.12, the prices at which the Sale Lots will be offered for sale.
Clause 5.5(b) of the Loan Agreement (the First Pathway)
The prevention principle applies to delays in practical completion caused by variations resulting from the act or default of the principal. Ordering variations after the due date which must substantially delay completion will, unless the contract provides otherwise, and in the absence of an applicable extension of time clause, disable the proprietor from recovering or retaining liquidated damages which might otherwise have accrued after the giving of the order. In the context of delaying variations, whether ordered before or after the due date for completion, the prevention principle 'is grounded upon considerations of fairness and reasonableness'.
The prevention principle may preclude an owner recovering liquidated damages for delay in the completion of works by the contractor where that delay has been caused by an act or omission of the owner in breach of the contract. This is because, if it applies, the contractual date for practical completion ceases to be the proper date for the completion of the works and, if there is no contractual mechanism for the substitution of a new date in the events which have occurred, then there is no date from which liquidated damages can run and the right to liquidated damages will be lost. In other words, the time for performance is 'at large', although it should be undertaken within a reasonable time.
The operation of the prevention principle can be modified or excluded by contract. The manner in which this can be done, as relevant to the present case, is by extension of time provisions such as cll 41.5 ‑ 41.6. Those clauses established a procedure by which, in the event of an actual or likely delay caused as provided in cl 41.6(b)(i), DDI could advise Probuild of the matters set out in cl 41.5, including whether it sought an extension of time to the Date for Practical Completion.
Was the principle excluded by the Transaction Documents?
Subject to clauses 7.2 and clause 5.6, the Borrower must repay the Outstanding Loan Amount to the Financier at the times, in the amounts and otherwise in the manner specified in the Development Services Agreement.
(1) Clause 7.2 makes the OLA immediately due for payment in certain circumstances. Mirvac WA did not seek to rely on this clause if I found that it repudiated the Services Agreement. It only relied on it if I found that Binningup repudiated the Services Agreement - this is Mirvac's Second Pathway, discussed later. In short, cl 7 relevantly makes the OLA immediately due for payment if Binningup repudiated the Services Agreement, the Services Agreement was terminated, and Mirvac WA gave notice requiring the immediate repayment of the OLA.
(2) Clause 5.6 requires Binningup to repay any outstanding part of an advance to Mirvac WA no later than the tenth anniversary of the date on which that advance was made or taken to be made by Mirvac WA.[552] I will refer to this date as the 'Anniversary Date'.
Despite any other provision of this document, the Borrower must repay the Outstanding Loan Amount to the Financier on the earlier of:
(a) five Business Days after the date of Completion; or
(b) if a Trigger Event occurs, the date which is one year after the date on which that Trigger Event occurs.
[T]he [Services Agreement] is rescinded, terminated, expires or ceases to be of any force or effect for any reason (irrespective of whether caused by anything outside the control of any party).
(2) If the Project was completed, Binningup had to repay the OLA (which would be, in effect, whatever had not been repaid by proceeds of sales) five business days later.[555]
(3) If the Services Agreement was terminated for any reason, Binningup had to repay the OLA within one year of the termination.[556]
(4) However, if the Services Agreement was terminated following a repudiation by Binningup, and if notice was given requiring immediate repayment, Binningup had to repay the OLA immediately.[557]
The Three Obligations and clause 5.6(a) of the Loan Agreement
Procure Completion Obligation - cl 6.2(b) Services Agreement
The usual content of the obligation of good faith that can be extracted from cases ... is an obligation to act honestly and with a fidelity to the bargain; an obligation not to act dishonestly and not to act to undermine the bargain entered or the substance of the contractual benefit bargained for; and an obligation to act reasonably and with fair dealing having regard to the interests of the parties (which will, inevitably, at times conflict) and to the provisions, aims and purposes of the contract, objectively ascertained.
None of these obligations requires the interests of a contracting party to be subordinated to those of the other. It is good faith or fair dealing between the parties by reference to the bargain and its terms that is called for, be they both commercial parties or business dealing with consumers. As Posner J said in Market Street Associates Limited Partnership v Frey [1991] USCA7 746; 941 F.2d 588 (1991) the contractual notion of good faith varies in what is required for its satisfaction by reference to the nature of the contract. But the notion is rooted in the bargain and requires behaviour to support it, not undermine it, and not to take advantage of oversight, slips and the like in it. ...
The standard of fair dealing or reasonableness that is to be expected in any given case must recognise the nature of the contract or relationship, the different interests of the parties and the lack of necessity for parties to subordinate their own interests to those of the counterparty. That a normative standard is introduced by good faith is clear. It will, however, not call for the same acts from all contracting parties in all cases. The legal norm should not be confused with the factual question of its satisfaction. The contractual and factual context (including the nature of the contract or contextual relationship) is vital to understand what, in any case, is required to be done or not done to satisfy the normative standard.
Good faith does not import an equitable notion of the fiduciary that is rooted in loyalty to another in the service of her or his interests ... Rather, it is rooted in honest and reasonable fair dealing ...
Subject to clauses 7.2 and clause 5.6, the Borrower must repay the Outstanding Loan Amount to the Financier at the times, in the amounts and otherwise in the manner specified in the Development Services Agreement.
Despite any other provision of this document, the Borrower must repay any unrepaid part of an Advance to the Financier no later than the tenth anniversary of the date on which that Advance was made or taken to be made by the Financier.
Built Form Lot means a Sale Lot upon which the Contractor has procured the construction of a dwelling or other building prior to the sale of that Sale Lot.
Subdivision Lot means a Sale Lot which is sold without a dwelling or other building constructed on it.
(a) the obtaining or desirable Approvals for the subdivision of the Land;
(b) the procurement of the carrying out of works both on and off the Land;
(d) the procurement of the promotion, marketing, sale and management of the conveyancing of the Sale Lots; and
(e) the development, operation and maintenance of the Golf Course.
(C) if relevant, the Construction Works for a proposed Stage.
(a) Subject to clause 1.5(b), clause 1.5(c) and clause 1.5(d):
(i) the right of the Contractor to recover amounts owing by the Principal to the Contractor under this document is limited to the Contractor taking action to enforce:
(A) a judgment against the Principal against the Project Assets; and/or
(A) enforce a judgment against the Principal other than:
(C) enforce a judgment or order or take any other action against the Principal's property other than permitted under this clause 1.5.
(b) The Principal remains liable to pay all amounts which may from time to time be payable by it under this document.
(i) prevents the Contractor from bringing proceedings against the Principal to prevent any amount owing by the Principal to the Contractor under this document becoming statute‑barred;
(ii) prevents the Contractor from applying to make the Principal Insolvent or taking any other action in the Insolvency of the Principal if another creditor has taken action to have the Principal made Insolvent; or
(iii) prevents the Contractor from seeking or obtaining equitable relief (including a declaration) in connection with this document or a Security other than an order requiring payment of money by the Principal to the Contractor otherwise than in accordance with this clause 1.5.
The OLA was repayable as there was a Trigger Event (the First Pathway)
Was the OLA repayable because Binningup committed an Event of Default (the Second Pathway)?
If a Trigger Event has occurred, each of the following is an Event of Default (whether or not caused by anything outside the control of a party and irrespective of whether the Event of Default has occurred before or after the Trigger Event):
(c) default under Transaction Document: a default or event occurs which is, is deemed to be or is defined to be, a default or an event of default by or in relation to the Borrower under a Transaction Document;
(a) If an Event of Default subsists the Financier may at any time by notice to the Borrower do either or both of the following:
(i) cancel the Facility or any part of it specified in the notice;
(ii) make the Outstanding Loan Amount or fees and any other money owing by the Borrower to the Financier in relation to the Transaction Documents either:
(b) On receipt of a notice under clause 7.2(a)(ii)(B), the Borrower must immediately pay in full the amounts referred to in that notice.
Was Binningup entitled to terminate the Services Agreement?
Conclusion - Binningup was not entitled to terminate
Did Mirvac give notice that the OLA was immediately payable?
if we were able to agree on a pathway for - for stage 1 - there may, as a result, have been some amendments to the [Services Agreement]. Important thing out of that was there was really further work required to form that view.
(1) it provided for less lots than the Plan;[644]
(3) it provided for less lots than Mirvac WA's internal documents.[647]
If there is a benefit it should not go to a defendant who deliberately breaks his contract and who must be taken to be aware of the consequences of that breach. And, if such a defendant should be taken to have regard to a consequence of the breach that he will be relieved of paying the whole [amount otherwise payable] all the more reason for the law not offering a financial inducement to breach of contract.
I can appreciate the approach in Gourley that rather a defendant than a plaintiff should have the benefit of a tax saving which reduces the effective loss. But in the case of breach of contract I cannot see that the same considerations of justice and fairness apply. If there is a benefit it should not go to a defendant who deliberately breaks his contract and who must be taken to be aware of the consequences of that breach. And, if such a defendant should be taken to have regard to a consequence of the breach being that he will be relieved of paying the whole remuneration or other contract price to the extent of the tax saving, all the more reason for the law not offering such a financial inducement to breach of contract.
The argument is also advanced that the principle in Gourley's case wrongly transfers to the defendant a benefit which the taxation laws have given to the plaintiff. With all respect, this is fallacious. The question is what damages will compensate the plaintiff for his loss. It is not to the point that by reason of the circumstances of the case the damages are lower than they would have been if those circumstances did not exist.
The principle that damages are to compensate the plaintiff for what he has lost, and not to provide him with any additional benefit, is applicable to the assessment of damages for lost earnings in actions for wrongful dismissal as well as in actions for damages for personal injuries. It has been said that it would be contrary to public policy to apply the principle of Gourley's case to actions for wrongful dismissal, because an employer would have to pay less for breaking the contract with his employee than for carrying it out. There is a fallacy here: if the employer does not dismiss the employee, and pays him the gross wage, he has the benefit of the services for which he pays. In any case the damages are to compensate the dismissed employee for his actual loss, and not to punish the employer.
Ruthol revisited: limitations on avoided loss principle
(1) Mr Maiorana was not asked to, and did not, take into account that Stage 1 would commence near the foreshore;
(2) Mr Maiorana's timeline is based on inaccurate assumptions about Commonwealth environmental approval; and
(3) Mr Maiorana's estimate did not take into account that the Project might have been delayed by various factors.
A plaintiff has the onus of establishing both the fact and the amount of the loss suffered: Commonwealth of Australia v Amann Aviation Pty Ltd [1991] HCA 54; (1991) 174 CLR 64, 80. Generally, mere difficulty does not relieve a court from estimating damages as best it can (see the review of authorities in JLW (Vic) Pty Ltd v Tsiloglou [1994] VicRp 16; [1994] 1 VR 237, 241 ‑ 242).
However, a plaintiff must prove the amount of the loss it sustained on the balance of probabilities and with as much precision as the subject matter reasonably permits: Placer (Granny Smith) Pty Ltd v Thiess Contractors Pty Ltd (2003) 196 ALR 257 [37]. Hayne J said:
'It may be that, in at least some cases, it is necessary or desirable to distinguish between a case where a plaintiff cannot adduce precise evidence of what has been lost and a case where, although apparently able to do so, the plaintiff has not adduced such evidence. In the former kind of case it may be that estimation, if not guesswork, may be necessary in assessing the damages to be allowed. References to mere difficulty in estimating damages not relieving a court from the responsibility of estimating them as best it can may find their most apt application in cases of the former rather than the latter kind [38].'
Where damages are uncertain for lack of evidence, difficulties of assessment are in general resolved against the party who could or should have provided the evidence: LMI Australasia Pty Ltd v Baulderstone Hornibrook Pty Ltd [2003] NSWCA 74 [12].
Damages claim against Mirvac Ltd (Issues 21 and 22)
In further answer to the whole of the SOC, if the defendant is indebted to the plaintiff as alleged or in any amount (which is denied), the defendant says that, because its counterclaim includes the entire amount in which it is indebted to the plaintiff, the defendant relies on the defence of circuity, further or alternatively, sets off the moneys claimed in its counterclaim against the plaintiff in extinction or reduction of the plaintiff's claim.
If the defendant is indebted to the plaintiff as alleged or in any amount, does the defendant's counterclaim include the entire amount in which it is indebted to the plaintiff and, if so:
18.1 is the defence of circuity available to the defendant;
18.2 can the defendant set off the moneys claimed in the counterclaim against the plaintiff in extinction or reduction of the plaintiff's claim?
Binningup Nominees does not pursue its defence of circuity because the amount of the Counterclaim is now less than the claim in the Original Action.
[B]ecause of the effect of clause 1.5 of the Varied Services Agreement and cognate provisions in Other Transaction Documents, the Outstanding Loan Amount judgment cannot be set‑off by Mirvac (WA) against the claim made in the Counterclaim and judgment in the Counterclaim against Mirvac Ltd cannot be the subject of set‑off by Mirvac (WA) in the Original Action.
2009 Trigger Provisions: draft Plan provisions settled by Jake Davidson of the Shire, exhibit 13.434 page 5356
2014 Statements: the statements alleged to have been made by Mr Draffen and Mr Lawrance (or, in the alternative, Mr Aleksovski) in 2014
Alleged Conduct: the conduct Binningup alleged had been committed by Mirvac WA in breach of three terms of the Services Agreement, being the 'Three Obligations'
Alleged Decision: an allegation that Mirvac WA had decided not to proceed with the Project unless it could negotiate amendments to the Services Agreement that were more commercially favourable to it
Commonwealth Department: Commonwealth Department of Environment, Heritage, Water and the Arts, which later became the Department of Sustainability, Environment, Water, Population and Communities
First Pathway: the first of two pathways which Mirvac submitted lead to the conclusion that Binningup must pay the OLA. Mirvac submitted that, by cl 5.5(b) of the Loan Agreement, the OLA became payable in October 2015
Good Faith Obligation: the obligation in cl 3 of the Services Agreement that the 'Principal and the Contractor must perform their respective obligations to each other under this document in good faith'
Initial Advance: the initial advance, of $25 million, made by Mirvac WA under the Loan Agreement to Binningup
No Hindering Obligation: an implied obligation which obliged Mirvac WA to provide, or co-operate in providing, the benefits it promised to Binningup
OLA: outstanding loan amount, owed by Binningup to Mirvac WA
Procure Completion Obligation: the obligation in cl 6.2(b) of the Services Agreement, which required Mirvac WA to perform the Services and procure completion of the Project in a proper, timely, professional and workmanlike manner
Scheme Amendment: Amendment 63 to the Shire of Harvey's Town Planning Scheme to rezone Binningup South to a 'Residential Development Zone' from 'Residential', 'General Farming' and 'Recreation'
Second Pathway: the Second Pathway which Mirvac submitted leads to the conclusion that Binningup must pay the OLA. It is based on Mirvac's allegations that an Event of Default and a Trigger Event occurred, making the OLA payable by Binningup to Mirvac WA immediately on notice being given, and that that notice was given
The Three Obligations: the three obligations Binningup alleged that Mirvac had breached - the Good Faith Obligation, the Procure Completion Obligation and the No Hindering Obligation
I certify that the preceding paragraph(s) comprise the reasons for decision of the Supreme Court of Western Australia.
CITATION : MIRVAC (WA) PTY LTD -v- BINNINGUP NOMINEES PTY LTD [2020] WASC 28 (S)
Costs - Application for indemnity costs - Was the rejection of a Calderbank offer unreasonable - Application for special costs order - Whether limit inadequate because of the unusual difficulty, complexity or importance of the matter
Atwell v Roberts [2013] WASCA 37 (S)
Blatchford v Laine [2018] WASC 207 (S)
Cape Lambert Resources Ltd v MCC Australia Sanjin Mining Pty Ltd [2013] WASCA 66 (S)
Duro Felguera Australia Pty Ltd v Samsung C&T Corporation [2017] WASC 348 (S)
Eclipse Resources Pty Ltd v The State of Western Australia [No 2] [2015] WASC 137
Electricity Generation and Retail Corporation trading as Synergy v Woodside Energy Ltd [2014] WASC 469 (S)
Heartlink Ltd v Jones as Liquidator of HL Diagnostics Pty Ltd (in liq) [2007] WASC 254 (S)
Insurance Commission of Western Australia v Antony Leslie John Woodings as Liquidator of the Bell Group Ltd (in liq) [No 3] [2018] WASC 44 (S)
Kidd v The State of Western Australia [2015] WASCA 62 (S)
Mentha as Receiver and Manager of Westgem Investments Pty Ltd (in liq) v Hughes as Liquidator of Westgem Investments Pty Ltd (in liq) [2014] WASC 478 (S)
Mirvac (WA) Pty Ltd v Binningup Nominees Pty Ltd [2020] WASC 28
Sino Iron Pty Ltd v Mineralogy Pty Ltd [No 2] [2017] WASCA 76 (S)
Strzelecki Holdings Pty Ltd v Jorgensen [2019] WASCA 96; (2019) 54 WAR 388
The Hancock Family Memorial Foundation Ltd v Fieldhouse [No 5] [2013] WASC 121 (S)
(This judgment was delivered extemporaneously and has been edited from the transcript and references added.)
(3) without regard to the limits on costs fixed in any relevant legal costs determination, including any limits on maximum hourly rates, pursuant to s 280(2) of the Legal Profession Act 2008 (WA).
There must be some special or unusual feature of a case to warrant an award of indemnity costs. One well-recognised basis for an award of indemnity costs is that the unsuccessful party unreasonably rejected a Calderbank offer. The party who makes a Calderbank offer that is rejected bears the onus of satisfying the court that it should make an award of indemnity costs in their favour.
The mere fact that the recipient of a Calderbank offer is ultimately worse off than they would have been had the offer been accepted, does not mean that its rejection was unreasonable. Instead, in determining whether the rejection of the offer was unreasonable, all relevant facts and circumstances must be considered. Ordinarily, regard should be had to at least the stage of the proceeding at which the offer was received; the time allowed to the offeree to consider the offer; the extent of the compromise offered; the offeree's prospects of success, assessed as at the date of the offer (and not with the benefit of hindsight as to the result of the proceedings); the clarity with which the terms of the offer were expressed; and whether the offer foreshadowed an application for indemnity costs in the event of the offeree's rejection of it.
The stage of the proceeding at which the offer was received
The time allowed to the offeree to consider the offer
The clarity with which the terms of the offer were expressed
Whether the offer foreshadowed an application for indemnity costs in the event of the offeree's rejection of it
Although recovery is limited, there is full liability
Before such a power will be exercised, the court must form an opinion that has two components. First, the court must form the view that the maximum amount allowable under the relevant scale item is inadequate in the sense that there is a fairly arguable case that the bill to be presented to the taxing officer may properly tax at an amount which is greater than the limit which would be imposed by the relevant cost determination. Secondly, the court must also form the opinion that the inadequacy of the costs allowable under a costs determination arises because of the 'unusual difficulty, complexity or importance of the matter'. Issues of the kind which arise are addressed as matters of impression, rather than as matters of detailed evaluation, precision or science.
For the purposes of exercising the powers conferred by s 280(2) of the Act, it will not ordinarily be necessary for the court to determine what amount should be allowed on taxation, but only whether there is a fairly arguable case that a greater amount should be allowed than that which is allowable under the relevant determination ...
A fairly arguable case to that effect will not be established merely because a party incurred greater costs than those allowable under the relevant determination. However, depending on the particular case and all the circumstances, the fact that a party has applied significantly greater legal resources to each step in the litigation than those for which allowance is made under items of the relevant determinations, when viewed in the context of the difficulty, complexity or importance of the matter, may sustain the conclusion that there is a fairly arguable case that each of the items identified is inadequate (and thereby the amount of costs allowable in respect of the matter is inadequate) because of the unusual difficulty, complexity or importance of the matter.
The word 'unusual' in s 280(2) of the Act qualifies only the 'difficulty' of the matter, and not its 'complexity' or 'importance'. The word 'unusual' in this context means unusual having regard to what one might describe as the usual run of civil cases determined in the court. That essentially involves the making of a value judgment by the court, having regard to the court's experience of the particular case when compared with the usual run of cases: ... Also, the reference to 'importance' in this context allows the court to have regard to the significance of the issues that arose in the litigation. Significance can arise either because of the significance of the issues to the parties, or because of the significance of the issues to other prospective parties, or to the public or community generally ...
... the question of unusual difficulty, complexity or importance arises in respect of the proceedings as a whole and not in respect of each individual item in the relevant costs determination.
Other capped items - items 4, 6, 7, 18 and 21(a) and (b)
Binningup is to pay the Mirvac parties' costs of the action and counterclaim, including any reserved costs, in an amount to be taxed if not agreed on a party‑party basis without regard to the limits on costs fixed in any relevant legal costs determination, including the limits on maximum hourly rates, under s 280(2) of the Legal Profession Act.
I certify that the preceding paragraph(s) comprise the reasons for decision of the Supreme Court of Western Australia.
[1] Initially, Mirvac relied on three independent pathways, but it abandoned the third pathway in its closing submissions as it did not materially improve its position.
[6] Binningup pleaded in its Amended Further Re‑Amended Defence and Counterclaim filed 26 September 2017 (Defence) [11.3.3] that, in the alternative, the contract had been abandoned. However, as Binningup did not dispute that a Trigger Event occurred when the Services Agreement was terminated (see The Plaintiff by Counterclaim/Defendant's Outline of Closing Submissions filed 20 May 2019 (Binningup Closing Submissions) [116]), the pleading does not raise a relevant issue (see also Binningup Closing Submissions [113]).
[7] Spiers Earthworks Pty Ltd v Landtec Projects Corporation Pty Ltd (No 2) [2012] WASCA 53; (2012) 287 ALR 360 [47].
[9] It was also alleged to be a 'Non‑Monetary Event of Default' within the meaning of the Services Agreement, and therefore a default under a Transaction Document, and therefore an Event of Default within the meaning of the Loan Agreement. However, Mirvac conceded it would succeed on both or fail on both. Accordingly, it is unnecessary to deal with this second basis.
[10] Defence [26] ‑ [30B] and [32].
[18] ts 1452 ‑ 1453. See also ts 1454, 1456 ‑ 1457 and 1466 and Binningup Closing Submissions [46] ‑ [49].
[19] Defence [30B opening line and 30B.2] as modified and developed in Binningup Closing Submissions [2.2], without objection. Binningup also explained, at ts 1464 ‑ 1465, that the pleading in Defence [30B.2] was intended to assert that the Project would terminate only if it was unable to repay the advances when they were due.
[20] See under the heading 'Did Mirvac WA have the right to reject a budget?'
[21] Discussed later under the heading 'The Three Obligations and clause 5.6(a) of the Loan Agreement'.
[23] See ts 1455 ‑ 1456 and 1465 ‑ 1466 at which Binningup confirmed it did not rely on any more general allegations of delay and confirmed that the allegation of delay in relation to the Local Structure Plan was limited to the allegation that Mirvac held that up 'on spurious grounds' about the second access road. Binningup also did not address in closing any other allegations of delay.
[24] This is because, under the Services Agreement, 'Project' is relevantly defined as the obtaining of necessary or desirable approvals for the subdivision of the land, the procurement of the carrying out of work on the land and the sale of the land, and the development, operation and maintenance of the golf course.
[26] Binningup Closing Submissions [3]. See also ts 1452 ‑ 1459.
[27] Binningup Closing Submissions [3.1] and [3.3].
[28] In particulars 29.1 and 29.2 of the Defence [29], Binningup alleged that the statements were to the effect pleaded in Defence [29]. Defence [29] alleged that the reason Mirvac WA did not submit to the PCG for approval a program and budget in relation to subdivision works or construction works was because Mirvac Ltd's directors had not approved the Project being implemented by carrying out subdivision works or construction works and creating Sale Lots, even though Mirvac WA was obliged to carry out those works.
[29] Binningup Closing Submissions [3.1].
[30] Binningup Closing Submissions [3.3].
[31] Binningup Closing Submissions [3.2].
[32] Binningup Closing Submissions [3.4]. See also ts 1457 ‑ 1459.
[34] Binningup Closing Submissions [3.6] ‑ [3.7]. See also Defence [27].
[35] AAC means approval for additional costs. The AAC document is exhibit 7.256.
[36] Binningup Closing Submissions [3.8]. See also ts 1436 ‑ 1439.
[37] At ts 1454 ‑ 1455, Binningup submitted this manifested the intention to delay carrying out the Project until the Initial Advance became repayable under cl 5.6 of the Loan Agreement in January 2018.
[38] Binningup Closing Submissions [3.5] and [3.9] ‑ [3.13]. See also Defence [30B.3 particular B] and Defence [30A.2].
[39] Binningup Closing Submissions [3.14]. See also Defence [30B.3 particular C] and [29.3.3] and ts 1455 ‑ 1456.
[40] Binningup Closing Submissions [3.15]. This was not pleaded as a particular of the implementation of the Alleged Decision, but was pleaded as a particular of Mirvac WA's alleged failure to submit a proper budget - see Defence [29].
[43] Clause 5.6 required Binningup to repay any unrepaid part of an advance to Mirvac WA no later than the tenth anniversary of the date on which that advance was made or taken to be made by Mirvac WA.
[44] Most of what follows comes from the agreed chronologies and statements of facts helpfully filed by the parties prior to the trial. The balance comes from the witness statements, in particular the statement of Mr Adam Davidson.
[45] On 30 October 2008, the Service Unit of the EPA made a recommendation that the Scheme Amendment be assessed via the environmental review process. On 2 February 2009, the EPA determined that the Scheme Amendment should be assessed under pt 4 div 3 of the Environmental Protection Act.
[46] Exhibit 28 (Mr Davidson's witness statement) [59] ‑ [63].
[47] Mr Davidson's witness statement [67], [71] and [73].
[48] See, for example, Mr Davidson's witness statement [76] ‑ [81] and [83] ‑ [84].
[49] Under s 100 of the Environmental Protection Act.
[50] On 17 December 2009, 28 January 2010 and 17 March 2010. See Mr Davidson's witness statement [111] ‑ [112] and [114].
[51] RPS were Mirvac WA's environmental consultants.
[52] Mr Davidson's witness statement [115] ‑ [116].
[56] Exhibit 30 (Mr Aleksovski's witness statement) [47] ‑ [48], [54] ‑ [55], [59] ‑ [61], [72], [85] ‑ [86] and [97]. See also [106] ‑ [107] and [115].
[57] Mr Aleksovski's witness statement [65] ‑ [66] and [73] ‑ [75].
[58] Mr Aleksovski's witness statement [90] and [93].
[59] See Mr Aleksovski's witness statement from [99].
[60] Mr Aleksovski's witness statement [106] ‑ [107] and [115] ‑ [116].
[61] Mr Aleksovski's witness statement [117] ‑ [118], [122] ‑ [124] and [130] ‑ [132].
[62] Exhibit 12.417. See also Mr Aleksovski's witness statement [134] ‑ [135] and [137].
[63] This was a reference to the conditions set out in the ministerial statement of September 2010.
[64] Exhibit 17.649. See also Mr Aleksovski's witness statement [292] ‑ [298].
[66] See Mr Aleksovski's witness statement [335] ‑ [345] and [347] ‑ [353].
[68] Mr Aleksovski's witness statement [351] ‑ [352].
[69] See under the heading 'Refusal to attend recorded PCG meeting'.
[70] See Binningup Closing Submissions [2.2], [3], [3.5], [3.9] ‑ [3.13], [50] ‑ [55], ts 1452 ‑ 1456 and Defence [30A.2].
[71] Binningup Closing Submissions [51].
[72] Binningup Closing Submissions [52]. See also [55].
[73] Binningup provided a detailed chronology of evidence during the hearing titled 'Defendant and Plaintiff by Counterclaim Expanded Chronology After Evidence' (Chronology). The Chronology sets out both the content of documents and oral evidence. The rows of the Chronology cited by Binningup in support of its first contention were rows 5, 15, 18, 19, 20, 31, 35, 37, 42, 43, 44, 48, 49, 50 and 57.
[74] See under the heading 'Evaluation of witnesses'.
[75] Some examples are extracted below, but see ts 465, 474, 504, 532, 545 and 549 ‑ 510.
[81] Exhibit 6.236. In May 2011, Mirvac WA received a further report from Riley Consulting. Similarly to its previous report, Riley Consulting indicated that acceptable operation of the existing single access road could be expected with the full development of the town and 1,063 additional lots, but it was recommended that an assessment of the intersection operation be undertaken when approximately 750 dwellings in the subject land had been developed - see exhibit 12.394 pages 4932 and 4947 ‑ 4948.
[83] Exhibit 6.224 page 2334. See also page 2335.
[86] Exhibit 7.250. See also ts 502 ‑ 503.
[89] From the overall context, I infer that, by 'paper road', Mr Davidson was referring to a path that was identified on a map or a plan but that was not a physically formed road.
[92] ts 473 ‑ 474. See also ts 474 ‑ 475, 508 and 540.
[99] See exhibits 7.260, 7.261, 7.267, 7.271, 7.273, 7.276 and ts 510 ‑ 511, 522 and 524 ‑ 526.
[103] Minutes of the Shire's Development Services Committee on 7 February 2012 set out what the Council had apparently resolved at the meeting on 14 July 2009 - see exhibit 14.461 pages 6754 ‑ 6755.
[105] Exhibit 8.286 and see Mr Davidson's witness statement [86].
[114] Exhibits 8.288 and 13.434 page 5355.
[127] Page 4239 contained the text under the heading 'Second Access Road', reproduced under the heading 'Did Mirvac WA try to avoid the imposition of a condition to avoid expenditure unless or until there was internal approval?'
[128] See the Chronology. The Shire's EPA Letter is row 52. The handover notes are row 57.
[130] Exhibit 13.433 page 5352 and see ts 823.
[137] Binningup Closing Submissions [3.9].
[139] Binningup Closing Submissions [3.9]. See also ts 1439 ‑ 1440.
[142] Binningup Closing Submissions [3.4.7] and [3.5].
[144] See under the heading 'Evaluation of witnesses'.
[145] Chronology rows 88, 113, 118, 121, 123, 124, 125, 126, 129 and 130.
[146] The first event relied on by Binningup, row 88 of the Chronology, related to 16 August 2012.
[152] Mr Scott was a director of Binningup until his death in December 2013.
[153] Mr Aleksovski's witness statement [195] and see also exhibit 15.487 page 7153.
[158] Exhibit 15.505 pages 7274 ‑ 7275.
[161] ts 872, 875 ‑ 876 and 981 ‑ 982.
[165] This appears to be so from exhibit 16.554.
[166] See the summary of the process in exhibit 16.567.
[172] Plaintiff's (MWA's) and Mirvac's Closing Submissions dated 21 May 2019 (Mirvac Closing Submissions) [282]. See also ts 1512 ‑ 1513.
[174] It was not suggested that the December 2012 Strategy, or a version of it, had not been sent to the Shire ‑ see, for example, Mr Aleksovski's witness statement [225] and ts 857. It is also referred to in the May 2013 Strategy, in terms suggesting it had been provided to the Shire.
[185] Mr Aleksovski's witness statement [230] ‑ [231].
[187] Binningup Closing Submissions [3.10].
[188] See ts 561 ‑ 562 and the Shire's EPA Letter exhibit 9.291.
[189] Exhibit 16.576, pages 8203 ‑ 8205.
[191] See under the heading 'August 2012 meetings with the Shire'.
[192] Reproduced earlier under the heading 'Did Mirvac WA attempt to cause Coast Pastoral Company not to sell the land?'
[196] Mr Aleksovski's witness statement [195]. See also the report to the PCG for September 2012, exhibit 15.487 page 7153, which recorded that it had been agreed that 'the second access road into Binningup would be provided upon on [sic] the sale and settlement of 500 lots, and to the amount of $2,000,000'. See also the December 2012 Strategy, exhibit 15.499, which referred to payments of $4,000 per lot.
[200] Binningup Closing Submissions [3.11].
[202] Binningup Closing Submissions [3.11].
[203] ts 1310. See also Mr Waller's evidence at ts 1233, 1241 ‑ 1242, 1244 ‑ 1245 and 1247.9 ‑ 1248.3 and Mr Doyle's evidence at ts 1381.
[206] See under the heading 'Evaluation of witnesses'.
[207] In relation to the Shire's initial position, see under the heading 'Did Mirvac WA try to avoid the imposition of a condition to avoid expenditure unless or until there was internal approval?' and in particular under the subheading 'The Shire's EPA Letter (August 2009)'. See also Mr Aleksovski's evidence at ts 839 ‑ 840 about the Shire's change of position.
[208] In the conclusion, I provide a longer list of evidence that is inconsistent with a desire to delay.
[211] See exhibit 16.575 page 8196 (and 16.556 page 7986). The relevant passages were extracted earlier.
[217] Binningup Closing Submissions [3.13].
[226] ts 1311 ‑ 1312. See also ts 1195 ‑ 1197, 1258, 1296 ‑ 1298 and 1317.
[228] ts 1197. See also ts 1258, 1297 ‑ 1298, 1312 and 1329.
[229] See under the heading 'Evaluation of witnesses'.
[230] See under the heading 'Internal Mirvac documents - feasibilities, assumptions and decisions'.
[234] See under the heading 'Internal Mirvac documents - feasibilities, assumptions and decisions'.
[235] Including exhibit 16.570, dated four days after the Deemed Refusal Notice.
[236] See exhibits 16.556, 16.560 and 16.567.
[238] ts 852. It will be recalled that the 2009 Trigger Provisions provided that the route for the road would not even be identified until after titles had been issued to facilitate the development of 750 dwellings.
[239] Including the evidence discussed in the subsequent sections.
[240] This is discussed under the heading 'Internal Mirvac documents - feasibilities, assumptions and decisions'.
[242] Binningup Closing Submissions [3.6] ‑ [3.7].
[243] See under the heading 'Was Mirvac WA obliged to develop Built Form Lots?' in the section titled 'Particular construction issues'.
[244] Mr Aleksovski's witness statement [128].
[245] See Binningup Closing Submissions [3.6] ‑ [3.7] and [59] for the matters relied on in relation to built form.
[246] Binningup Closing Submissions [3.14] and [60].
[248] Under the Services Agreement, 'Project' is relevantly defined as the obtaining of necessary or desirable approvals for the subdivision of the land, the procurement of the carrying out of work on the land, the sale of the land, and the development, operation and maintenance of the golf course.
[249] Exhibit 22.749 pages 11162 and 11165.
[250] As discussed later, cl 5.6 of the Loan Agreement required Binningup to repay advances 10 years after each advance was made. The Initial Advance of $25 million was made in January 2008.
[251] Exhibit 16.576 page 8201 and exhibit 16.577 page 8208. See also ts 778 ‑ 779 and 1023.
[254] Exhibit 16.592 page 8807. Although there was a discussion between Mr Aleksovski and Mr Waller about the October minutes (see Mr Aleksovski at ts 779 and Mr Waller at ts 1282), the minutes were confirmed at the 31 March 2014 PCG meeting - see exhibit 17.636 page 9207. See also Mr Aleksovski's evidence at ts 778 and Mr Doyle's evidence at ts 1387.
[257] ts 782. See also Mr Doyle's evidence at ts 1388.
[263] This is discussed later under the heading 'Mr Draffen's alleged statements'.
[265] Exhibit 21.669 pages 10789 ‑ 10790.
[266] Exhibit 21.673 pages 10805 ‑ 10806.
[268] See, for example, Mirvac WA's minutes of the 13 June 2014 PCG meeting (exhibit 22.692 page 10878), Binningup's marked up minutes of 15 July 2014 (exhibit 22.712 page 11011) and a further draft by Mirvac WA (exhibit 22.722 page 11056).
[270] Exhibit 22.749 page 11178. See also Mr Waller's evidence at ts 1336 ‑ 1337.
[272] See ts 1194 and 1282. It appears that it was thought that it would not be possible to continue to access the water required to maintain the golf course.
[273] See under the heading 'Mr Draffen's alleged statements', citing ts 1173, 1235, 1250, 1301 and 1339.
[274] See, in particular, the evidence discussed under the headings 'Second Access Road' and 'Internal Mirvac documents - feasibilities, assumptions and decisions'.
[275] Exhibit 1.08, annexure A, cl 1.1 (definition of 'Project Assets').
[276] Binningup Closing Submissions [37] and [109].
[277] An ACC is an approval to commence construction.
[278] Binningup Closing Submissions [3.4].
[279] Coloured blue on the Chronology, and distinguished from alleged repudiatory conduct relating to the second access road and built form.
[280] It is also later discussed in detail under the heading 'Did Mirvac WA have the right to reject a budget?'
[281] See, for example, the evidence under the heading 'Did Mirvac WA attempt to cause Coast Pastoral Company not to sell the land?'
[285] The person with the day‑to‑day responsibility for the Project, Mr Aleksovski, was not even aware that a review of the agreement was likely - ts 903.
[290] From Mr Waller's evidence, it is clear that there were many more discussions than were in evidence directly. See ts 1173.5-6, 1250.5 and 1339.5.
[297] See ts 1235, 1250, 1301 and 1339.
[298] Exhibit 15.474. Mr Lawrance was the Development Director of Mirvac Ltd between 2012 and 2014.
[299] He attended the PCG meeting on 20 December 2012 on behalf of Binningup ‑ see Mr Aleksovski's witness statement [200]. See also exhibit 31.2 (Mr Waller's witness statement in reply) [34].
[300] 'DAM' stood for Development Approval Meeting - ts 922.
[305] See, in particular, ts 1235, 1250, 1301 and 1339.
[306] See for example exhibit 16.583 page 8440.
[312] Mr Aleksovski's witness statement [241].
[321] See ts 1235, 1250, 1301 and 1339.
[326] Exhibit 15.493, said to have this title and date by the Chronology (see also the agreed Exhibit List).
[327] Exhibits 15.503 and 15.504, said to bear this date by the Chronology.
[329] Exhibits 15.503 page 7262 and 15.504 page 7267.
[330] Exhibit 29 (Mr Draffen's witness statement) [53] ‑ [54].
[331] See under the heading 'Evaluation of witnesses'.
[332] Exhibit 15.478, discussed earlier in this section.
[333] See under the heading 'Mirvac Board Paper February 2013'. See also Mr Draffen's witness statement [31] ‑ [37], [48] ‑ [51] and ts 759.
[334] Mr Draffen's witness statement [53] ‑ [54]. See also at [31] ‑ [37], [48] ‑ [51], ts 701 and 759.
[335] Mr Draffen's witness statement [50] ‑ [51] and [54]. See also ts 609 ‑ 610, 618.1, 668 ‑ 669 and 759.2.
[336] In the August spreadsheet, exhibit 15.489: the 'land owner has not been willing to re-negotiate, therefore, the Q1 forecast is anticipated to be based on the current Services Agreement'. In the December spreadsheets, exhibits 15.503 and 15.504: 'The feasibility has been updated based on the [Services Agreement] and the reduced yield (as a result of the environmental approval)'.
[339] See under the headings 'Did Mirvac WA have the right to reject a budget?' and 'Was completion of the Project a contractual benefit?'
[340] See, in particular, exhibit 15.493 pages 7183 and 7187 and the statement that appears in both of the December spreadsheets extracted earlier.
[345] Exhibit 15.508. See also 15.511.
[346] As will be seen, a step in the process of resolving a deadlock of the PCG was that each side was to prepare a briefing paper. See under the heading 'Did Mirvac WA have the right to reject a budget?'
[348] As Mirvac WA would receive, in addition to the land sale funds, $0.75 million by way of a bonus payment.
[349] As alleged in Binningup Closing Submissions [3.4.4].
[350] Mr Draffen's witness statement [48] ‑ [49]. See also at [32] ‑ [37] and ts 759.
[353] Mr Aleksovski's witness statement [241].
[354] Mr Draffen's witness statement [50] ‑ [51] and [54]. See also ts 609 ‑ 610, 618.1, 668 ‑ 669 and 758.
[355] See under the heading 'Did Mirvac WA attempt to cause Coast Pastoral Company not to sell the land?'
[357] ts 774 ‑ 775. See also ts 1376 (Mr Doyle).
[359] Mr Aleksovski's witness statement [209].
[360] Mr Aleksovski's witness statement [207] ‑ [208].
[363] See, for example, Mr Draffen's witness statement [53] ‑ [54].
[364] It is possible that Mr Wiese meant that a budget would be submitted for the sole purpose of being knocked back, rather than an ACC, but this would not affect the analysis. There is no suggestion that Mirvac submitted a budget for that purpose, or voted against any budget, and Mr Cooper's evidence was implicitly to the effect that Mirvac was going to approve the budget at the September 2014 PCG meeting - see ts 374.
[365] No witness was cross‑examined about this, Binningup's Chronology entry for this document (row 112) did not reproduce this statement, and Binningup did not reproduce the statement in closing submissions (see Binningup Closing Submissions [282] where the document is referred to).
[367] The original document referred to a 'PDA'. A 'PDA' was a 'project delivery agreement', and included an agreement like the Services Agreement - see ts 634.
[371] See the Mirvac Board Paper exhibit 15.518.
[377] Binningup Closing Submissions [3.4.6].
[378] Binningup Closing Submissions [3.1] ‑ [3.3] and [180].
[379] Binningup Closing Submissions [3.2].
[380] Binningup Closing Submissions [3.1].
[383] Mr Waller's witness statement [150].
[385] See under the heading 'Evaluation of witnesses'.
[395] ts 600. Compare Mr Waller's evidence at ts 1302.
[401] Binningup Closing Submissions [180].
[402] See Binningup Closing Submissions [3.4.3] (and [180]).
[408] See, to contrary effect, in exhibit 17.637, the last four bullet points on page 9213, the fifth and sixth bullet points and the third last paragraph on page 9214 and all of page 9215. While these entries purport to show reluctance, doubt and the potential that Mirvac may decide not to proceed, they do not show a decision had been made not to proceed.
[409] Alleged in Binningup Closing Submissions [3.1].
[410] See, to contrary effect, in exhibit 17.637, the last four bullet points on page 9213, the fifth and sixth bullet points and the third last paragraph on page 9214 and all of page 9215. While these entries purport to show reluctance, doubt and the potential that Mirvac may decide not to proceed, they do not show a decision had been made not to proceed.
[411] Alleged in Binningup Closing Submissions [3.2].
[412] See also Mr Aleksovski's witness statement [290].
[415] Exhibit 16.577. As at this date, Mr Crockett no longer worked for Mirvac - see ts 990.5.
[417] Binningup Closing Submissions [3.3].
[418] Binningup Closing Submissions [3.3].
[425] Binningup Closing Submissions [46] ‑ [48].
[426] Binningup Closing Submissions [46].
[428] See ts 601, 668 ‑ 669, 751 ‑ 752, 753 and 757 ‑ 758.
[429] ts 669, but compare to 757 ‑ 758.
[435] Mr Draffen's witness statement [53] ‑ [54]. See also at [31] ‑ [37], [48] ‑ [51], ts 701 and 759.
[438] ts 518 ‑ 519 and ts 589. See also ts 520.
[439] Mr Aleksovski's witness statement [207] ‑ [208].
[440] See, for example, ts 859.3 and 986.5.
[450] See under the heading 'Refusal to attend recorded PCG meeting'.
[451] Mr Draffen's witness statement [50] ‑ [51] and [54]. See also ts 609 ‑ 610, 618.1, 668 ‑ 669 and 759.2.
[452] Mr Draffen's witness statement [52].
[453] including the evidence discussed in other sections, in particular under the headings 'Second Access Road' and 'Golf course'.
[454] See under the heading 'Evaluation of witnesses'.
[455] See, for example, ts 600 ‑ 601, 1301 and 1303.
[456] See the extracts above from ts 751 ‑ 753 and 601. See also ts 757 ‑ 758.
[457] This is discussed further under the heading 'Failure to prepare program and budget'.
[460] See ts 1235, 1250, 1301 and 1339.
[461] AAC means approval for additional costs.
[462] Binningup Closing Submissions [3.8]. See also ts 1436 ‑ 1439.
[463] ts 438 ‑ 444 and exhibit 7.256 page 2693.
[468] Binningup Closing Submissions [3.15]. See also Defence particulars [29.3.4].
[474] Exhibit 23.783. See also exhibit 27.1 (Mr Cooper's first witness statement) [17] ‑ [46] and [55] ‑ [59].
[475] Mr Cooper's first witness statement [19].
[476] Exhibit 23.783 and Mr Cooper's first witness statement [40] ‑ [41].
[477] See ts 347 ‑ 348 and exhibits 23.787 ‑ 23.789.
[480] Surveillance Devices Act 1998 (WA) s 5(3)(d), Georgiou Building Pty Ltd v Perrinepod Pty Ltd [2102] WASC 72 (S) [16.5].
[481] ts 1447 ‑ 1448 and Binningup Closing Submissions [3.15] and [49].
[482] Clause 15 of the Services Agreement.
[485] Or, in the alternative, Mr Aleksovski.
[486] Defence particulars 29.1 and 29.2 (modified in Binningup Closing Submissions [3.1] and [3.3]).
[488] See under the heading 'Internal Mirvac documents - feasibilities, assumptions and decisions'.
[489] See under the heading 'Gold course'.
[490] See under the heading 'Refusal to attend recorded PCG meeting'.
[491] See under the heading 'Was completion of the Project a contractual benefit?'
[492] Aleksovski's witness statement [2] ‑ [3].
[494] See for example ts 929, in which he agreed that Mr Crockett's email (exhibit 15.474) had said that Mr Waller had said he was not interested in varying the Services Agreement. This was not what Mr Crockett's email said. The email only asserted that Mr Waller was not, at that point, agreeable to any of the options discussed to date, and wanted the issue escalated to the decision‑makers at Mirvac.
[495] I have not addressed aspects of the cross‑examination that were of lesser significance, particularly if they were not referred to by Binningup in its closing submissions or in its Chronology. For example, the cross‑examination of Mr Aleksovski based on the minutes of the PCG meeting on 20 December 2012 (exhibit 15.505). Although the minutes were identified in the Chronology (row 98), there was no reference to any evidence about it and the row was not colour coded to indicate it was of any relevance. This may have been because there were questions as to the accuracy of the minutes (see Mirvac Closing Submissions [276] ‑ [277]).
[496] Mr Cooper's first witness statement [1] ‑ [4], [7], [9] ‑ [11] and [22] ‑ [23].
[497] See under the heading 'Internal Mirvac documents - feasibilities, assumptions and decisions'.
[498] See under the subheading 'Mr Draffen's alleged statements'.
[500] See, for example, ts 1222.6, 1269.6, 1287.6 ‑ 1288.8, 1297.8 ‑ 1298.2 and 1328.3.
[502] ts 1223 ‑ 1224. See, for another example, ts 1227 ‑ 1229.
[507] Exhibit 16.577 and ts 1270 ‑ 1271.
[510] Exhibit 33 (Mr Doyle's witness statement) [3] and [10].
[511] Mr Doyle's witness statement [12].
[512] See Binningup Closing Submissions [3.11] (inaccurately stating the effect of his evidence), [3.12] and [3.13] in relation to the meeting with the Shire in October 2013, and [3.14] to the effect that Mr Waller was pressing Mirvac WA to proceed with the Project and that Mr Waller did not agree to the Project being deferred until the golf course was rezoned.
[514] See Mr Doyle at ts 1383 and Mr Waller at ts 1322.
[515] Black Box Control Pty Ltd v Terravision Pty Ltd [2016] WASCA 219 [42].
[516] Electricity Corporation v Woodside Energy Ltd [2014] HCA 7; (2014) 251 CLR 640 [35].
[517] Sino Iron Pty Ltd v Mineralogy Pty Ltd [2019] WASCA 80 [296].
[518] EDWF Holdings 1 Pty Ltd v EDWF Holdings 2 Pty Ltd [2010] WASCA 78; (2010) 41 WAR 23 [104] (Buss JA, Owen & Newnes JJA agreeing).
[519] Recitals B and C on page 1 of the Services Agreement.
[520] See, for example, cl 5 and cl 15.5.
[521] See under the heading 'Was completion of the Project a contractual benefit?'
[522] Clauses 6.6, 6.7 and 6.8 of the Services Agreement.
[523] Clause 5.3 of the Services Agreement. See also cl 5.2(a)(ii).
[524] Amendment No 63 to Shire of Harvey District Planning Scheme No 1.
[525] In addition to the references above, cl 6.5(b) and cl 6.6 also refer to the PCG approving a budget.
[526] See in particular under the next subheading 'Binningup's submissions' and the heading 'Was completion of the Project a contractual benefit?'
[528] Binningup Closing Submissions [36.1].
[530] Binningup Closing Submissions [36.2].
[531] Binningup Closing Submissions [36.3].
[532] Binningup Closing Submissions [36.3].
[533] Binningup Closing Submissions [34].
[534] See, in particular, Binningup Closing Submissions [33] and [35].
[535] Mirvac Closing Submissions [148] ‑ [152].
[536] Definition in Services Agreement cl 1.1.
[537] Definition in Services Agreement cl 1.1.
[538] Provisions in the Loan Agreement also demonstrate that the parties clearly contemplated that the Project may fail to reach completion. As will later be seen, the Loan Agreement provides for, among other things, the repayment of the OLA if the Services Agreement is terminated before the Project is completed - see, in particular, under the heading 'Clause 5.5(b) of the Loan Agreement (the First Pathway)'.
[539] See under the heading 'The Three Obligations and clause 5.6(a) of the Loan Agreement'.
[540] See under the heading 'Did Mirvac WA repudiate the Services Agreement?'
[542] Probuild Constructions (Aust) Pty Ltd v DDI Group Pty Ltd [2017] NSWCA 151; (2017) NSWLR 82 [115] ‑ [117]. See also Gold City Developments Pty Ltd v Portpride Pty Ltd [2010] WASC 148 [55] ‑ [58].
[543] Binningup Closing Submissions [117], Mirvac Closing Submissions [388].
[544] This was also implicitly the view of McLure P, with whom Newnes JA agreed on this ground, in Spiers - see [61]. See also Murphy JA at [163] ‑ [164].
[545] Binningup Closing Submissions [117].
[546] Concut Pty Ltd v Worrell [2000] HCA 64; (2000) 75 ALJR 312.
[547] Byrne v Australian Airlines Ltd [1995] HCA 24; (1995) 185 CLR 410.
[548] Mirvac Closing Submissions [410].
[549] Binningup Closing Submissions [118].
[550] See the example provided in Binningup Closing Submissions at [118] in relation to Spiers. Numerous cases illustrate that the principle may be excluded by substantive inconsistency - for example, Probuild Constructions [117] ‑ [118]. See also more generally Servcorp WA Pty Ltd v Perron Investments Pty Ltd [2016] WASCA 79.
[551] As it appeared to contend in Binningup Closing Submissions [118].
[552] Clause 5.6 is discussed under the heading 'The Three Obligations and clause 5.6(a) of the Loan Agreement'.
[553] of 'Original Sale Lots' or 'Stage 6 Sale Lots'. Stage 5 Sale Lots were treated differently. See cl 11.2, cl 11.2A and cl 11.2B of the Services Agreement.
[554] Clause 5.6(a) of the Loan Agreement.
[555] Clause 5.5(a) of the Loan Agreement.
[556] Clause 5.5(b) of the Loan Agreement.
[557] Clause 7.2 of the Loan Agreement.
[558] Binningup contended it should be entitled to both - see Binningup Closing Submissions [125].
[559] Binningup Closing Submissions [125].
[560] See under the heading 'Did Mirvac WA have the right to reject a budget?'
[562] Ruthol Pty Ltd v Tricon (Australia) Pty Ltd [2005] NSWCA 443; (2005) 12 BPR 23, 923 (Giles, Santow JJA & Hunt AJA).
[563] Giles JA, with whom Santow JA and Hunt AJA agreed.
[565] Ruthol [21] (in particular, the last sentence of the quote) and [22]. See also [23] (in particular, the last paragraph of the quote).
[568] Mirvac Closing Submissions [423].
[569] Binningup Closing Submissions [24]. Note that, in these proceedings, Mirvac is not seeking to rely on cl 5.6(a) as, when these proceedings were commenced, none of the Anniversary Dates had occurred.
[570] Binningup Closing Submissions [44].
[571] See under the headings 'Did Mirvac WA have the right to disapprove a budget?' and 'Was completion of the Project a contractual benefit?'
[572] Paciocco v Australia and New Zealand Banking Group Ltd [2015] FCAFC 50; (2015) 236 FCR 199, 273 [288] ‑ [290] and [292] (Allsop CJ, with whom Besanko J [371] and Middleton J [398] agreed).
[574] Binningup Closing Submissions [43].
[575] Mirvac Closing Submissions [64]. And see Australis Media Holdings v Telstra Corp Ltd (1998) 43 NSWLR 104, 124 ‑ 125 and Marmax Investments Pty Ltd v RPR Maintenance Pty Ltd [2015] FCAFC 127; (2015) 237 FCR 534, 559 ‑ 561 [130] ‑ [141].
[576] See under the heading 'Clause 5.5(b) of the Loan Agreement (the First Pathway)'.
[577] Clause 7.2 is not relevant to this analysis. It is relevant to Mirvac WA's Second Pathway and is discussed under the heading 'Was the OLA repayable because Binningup committed an Event of Default (the Second Pathway)?'
[578] See under the heading 'Was completion of the Project a contractual benefit?'
[579] See under the heading 'Was completion of the Project a contractual benefit?'
[580] See under the heading 'Built form'.
[581] Binningup Closing Submissions [3.6] ‑ [3.7].
[582] Binningup Closing Submissions [56] ‑ [58].
[585] Black Box [42]. See also CSR Ltd v Adecco (Australia) Pty Ltd [2017] NSWCA 121 [164].
[589] See under the heading 'Clause 5.5(b) of the Loan Agreement (the First Pathway)'.
[590] Clauses 1.1 and 7.1(c) of the Loan Agreement.
[591] Clause 7.2(a)(ii)(B) of the Loan Agreement.
[593] Koompahtoo Local Aboriginal Land Council v Sanpine Pty Ltd [2007] HCA 61; (2007) 233 CLR 115 [44].
[594] Shevill v Builders Licensing Board [1982] HCA 47; (1982) 149 CLR 620, 626.
[595] See under the heading 'Factual background and findings', in particular the conclusion to the section headed 'Internal Mirvac documents - feasibilities, assumptions and decisions'.
[596] Definition in cl 1 of the Services Agreement.
[598] The only relevant reference to cl 7.2 was in Binningup Closing Submissions [121] which only made the point that no Event of Default occurs unless a Trigger Event has occurred.
[600] Clause 7.1 of the Loan Agreement.
[601] Clause 7.2 of the Loan Agreement.
[603] See under the heading 'Clause 5.5(b) of the Loan Agreement (the First Pathway)'.
[605] Exhibit 1.7 (Performance Undertaking) cl 3.1.
[607] Binningup Closing Submissions [128].
[608] Mirvac Closing Submissions [483].
[610] By Defence [39], these were pleaded to be the breaches alleged in Defence [27] (built form), [29] (failure to submit a proper budget), [30A] (delay) and [30B] (the Alleged Decision).
[611] As to which, see Civic Video Pty Ltd v Paterson [2016] WASCA 69 [30] and [51].
[612] See Daebo Shipping Co Ltd v Ship Go Star [2012] FCAFC 156; (2012) 294 ALR 635 [89], cited in Civic [30]. See also Civic [51].
[613] Binningup Closing Submissions [131].
[614] Binningup Closing Submissions [132].
[615] An approval to commence construction.
[616] Binningup Closing Submissions [132].
[617] See under the heading 'Factual background and findings'.
[618] Binningup Closing Submissions [133].
[619] See under the heading 'Factual background and findings'.
[621] Binningup Closing Submissions [133].
[624] Binningup Closing Submissions [134].
[625] See under the heading 'Factual background and findings'.
[626] The Commonwealth of Australia v Amann Aviation Pty Ltd [1991] HCA 54; (1991) 174 CLR 64.
[627] See under the heading 'Particular construction issues'.
[628] See, for example, exhibit 13.443.
[629] with one estimate putting the total at approximately $210 million - see exhibit 15.518 page 7518.
[630] Although counsel for Binningup relied upon Sellars v Adelaide Petroleum NL [1994] HCA 4; (1994) 179 CLR 332, this was expressly not in relation to whether the Project would be completed - see, for example, ts 1555.1 (see also the sole citation of Sellars in Binningup Closing Submissions at [269]). Rather, Sellars was said to be applicable because it was not known precisely how the Project would be completed because, for example, it was not known precisely what the design would be, or what the lot sizes would be. In oral submissions at ts 1485 ‑ 1486, Sellars was also said to potentially be applicable if it was found that there was a chance that the Initial Advance would not have been repaid by the proceeds of sales, such that Binningup would have to repay it to keep the Services Agreement on foot, which would give rise to Binningup's alternative damages scenario. (See also Binningup Closing Submissions section 16 and ts 1492 ‑ 493).
[631] See, for example, Mirvac Closing Submissions [44], [70], [150] ‑ [154], [373] and [435] ‑ [437].
[633] Binningup Closing Submissions [197] and [204].
[634] Letter from Solomon Brothers dated 26 April 2019.
[635] Binningup Closing Submissions [210].
[638] Letter dated 26 April 2019 from Solomon Brothers.
[639] Binningup Closing Submissions [217] ‑ [219].
[640] Binningup Closing Submissions [150].
[641] See Binningup Closing Submissions [147] and [220] ‑ [223].
[643] Exhibit 32.1 (Joint Memorandum) page 8 in the column 'Conferral Meeting Outcome'. See also exhibit 32.2 (the report of Binningup's expert valuer) at 1.4.20.
[645] Exhibit 32.2 at [1.4.34] and exhibit 32.3 at [1.4].
[646] Binningup Closing Submissions [151] ‑ [156].
[647] Binningup Closing Submissions [157].
[648] Binningup's expert said this would be 'generally true' - see exhibit 32.2 [1.4.34].
[649] Exhibit 32.2 at [1.4.34] and exhibit 32.3 at [1.4].
[650] Footnote 212 to Binningup Closing Submissions [157].
[652] Binningup Closing Submissions [270]. See also at [198].
[653] Binningup Closing Submissions [229] ‑ [233], [241] and [266].
[654] Mirvac Closing Submissions [461].
[655] See Binningup Closing Submissions [271] ‑ [272] and ts 1495.
[657] Binningup Closing Submissions [190] ‑ [194].
[658] Discussed earlier under the heading 'Clause 5.5(b) of the Loan Agreement (the First Pathway)'.
[659] Discussed later under the heading 'Circuity and set-off'.
[660] Binningup Closing Submissions [192].
[661] Atlas Tiles Ltd v Briers [1978] HCA 37; (1978) 144 CLR 202, 244 (Jacobs J).
[662] Cullen v Trappell [1980] HCA 10; (1980) 146 CLR 1.
[663] British Transport Commission v Gourley [1955] UKHL 4; [1956] AC 185.
[666] Atlas Tiles (222 ‑ 224). See also Stephen J at 231 ‑ 232.
[668] Wilson J also agreed with the reasoning of Stephen J in Atlas Tiles - see Cullen (39).
[669] Cullen (11). See also Watts v Turpin [1999] WASCA 216; (1999) 21 WAR 402 [50].
[673] See exhibit 15.507 page 7284, the Mirvac Board Paper exhibit 15.518 page 7518, exhibit 15.531 page 7674, exhibit 16.583 page 8440, exhibit 17.606 and exhibit 23.833 page 11538, noting that some of these exhibits appear to be different drafts of the same document. See also exhibit 15.524 page 7641.
[675] Binningup Closing Submissions [226].
[676] See under the heading 'Procure Completion Obligation - cl 6.2(b) Services Agreement'.
[677] Binningup Closing Submissions [227].
[678] See under the heading 'Enforcement v liability'.
[679] Binningup Closing Submissions [230] ‑ [238].
[680] Binningup Closing Submissions [239] ‑ [243].
[681] Binningup Closing Submissions [245].
[682] See, for example, Mirvac Closing Submissions [458] in relation to the calculation of the 'Margin Scheme GST'.
[683] See Binningup Closing Submissions [266].
[684] Mirvac Closing Submissions [362] ‑ [370] and [466] ‑ [468].
[685] See under the heading 'Mr Draffen's alleged statements'.
[688] ts 1405. Although see Binningup Closing Submissions [250] in relation to Mirvac WA's expressed desire to use Valentine Hill for sand.
[691] Mirvac Closing Submissions [466] ‑ [468].
[693] See Binningup Closing Submissions [251] ‑ [264], although I would disregard the example referred to in [253] ‑ [256] due to the time at which it was made (2008) and give limited weight to the example referred to in [257] ‑ [258] for the same reason (2011). See also ts 1493, where counsel for Binningup summarised Mr Maiorana's evidence as 'largely consistent and probably more conservative' than the Mirvac WA estimates.
[694] Binningup Closing Submissions [246].
[696] See exhibit 36. Before this calculation could be done, it would be necessary to know the 'Interest Rate', which depends upon the 'Base Rate'. The Base Rate is determined by reference to the 'buying rates published ... on the first Business Day of the Interest Period on the Reuters Screen'. See Loan Agreement cl 4 and the definitions of 'Interest Rate' and 'Base Rate' in cl 1.1.
[697] Grainger v Williams [2009] WASCA 60 [168] ‑ [170]. See also Martin CJ at [74]. See also Spotlight Pty Ltd v NCON Australia Ltd [2012] VSCA 232 [16] and Zaps Transport (Aust) Pty Ltd v PJG Warehousing & Distribution Pty Ltd [2016] NSWCA 97 [102].
[698] Uren v John Fairfax & Sons Pty Ltd [1966] HCA 40; (1966) 117 CLR 118, 149, cited in Gray v Motor Accident Commission [1998] HCA 70; (1998) 196 CLR 1 [6].
[701] Noye v Robbins [2010] WASCA 83 [251].
[703] See Annexure 1 to Binningup Closing Submissions.
[704] Binningup Closing Submissions Annexure 1 page 97.
[705] Binningup cited [188] ‑ [191] of its Closing Submissions.
[706] The Eastern Extension, Australasia and China Telegraph Company Ltd v Federal Commissioner of Taxation [1923] HCA 62; (1923) 33 CLR 426, 441 (Isaacs & Rich JJ); Woodside Petroleum Development Pty Ltd v H & R‑E & W Pty Ltd (1999) 20 WAR 380, 402 (Ipp J); Idameneo (No 123) Pty Ltd v Gross [2012] NSWCA 423; (2012) 83 NSWLR 643 [159].
[707] Binningup Closing Submissions Annexure 1 page 97.
[708] See under the heading 'Enforcement v liability'.
[709] Binningup Closing Submissions [129], [188] and [194].
[710] Defence [11.9.5.2] and Binningup Closing Submissions [129].
[711] Binningup Closing Submissions [129].
[713] See under the heading 'Clause 5.5(b) of the Loan Agreement (the First Pathway)'.
[714] See under the heading 'Clause 5.5(b) of the Loan Agreement (the First Pathway)'.
[715] See under the heading 'Circuity'.
[717] Mirvac (WA) Pty Ltd v Binningup Nominees Pty Ltd [2020] WASC 28 (judgment).
[718] These reasons use the same defined terms as the judgment. 'Mirvac' refers to both the plaintiff, which is also the first defendant by counterclaim, and the second defendant by counterclaim.
[720] Calderbank v Calderbank [1975] All ER 333.
[721] Affidavit of Michael Geoffrey Hales sworn 6 April 2020 (Hales Affidavit) MGH‑6.
[722] Strzelecki Holdings Pty Ltd v Jorgensen [2019] WASCA 96; (2019) 54 WAR 388 [82] ‑ [83].
[724] Subsequently, the parties agreed that their respective objections in relation to all of the expert witnesses should be treated as submissions as to weight, rather than admissibility.
[726] Defendant and Plaintiff by Counterclaim's Responsive Submissions Regarding Orders as to Costs filed 17 April 2020 [4].
[727] Mirvac's Submissions on Interest and Costs filed 6 April 2020 (Mirvac's Submissions) [13].
[728] Sino Iron Pty Ltd v Mineralogy Pty Ltd [No 2] [2017] WASCA 76 (S) [12] ‑ [16].
[729] Defendant and Plaintiff by Counterclaim's Submissions Regarding Orders as to Costs filed 6 April 2020 [16] ‑ [17].
[730] Atwell v Roberts [2013] WASCA 37 (S) [23].
[731] See Eclipse Resources Pty Ltd v The State of Western Australia [No 2] [2015] WASC 137 [33] (Beech J), citing Martin CJ in Mentha as Receiver and Manager of Westgem Investments Pty Ltd (in liq) v Hughes as Liquidator of Westgem Investments Pty Ltd (in liq) [2014] WASC 478 (S).
[732] Sino No 2 [12]; Blatchford v Laine [2018] WASC 207 (S) [43].
[733] And see Heartlink Ltd v Jones as Liquidator of HL Diagnostics Pty Ltd (in liq) [2007] WASC 254 (S) [20] (Martin CJ) and Electricity Generation and Retail Corporation trading as Synergy v Woodside Energy Ltd [2014] WASC 469 (S) [4] (Martin CJ).
[735] The 'OLA' is the outstanding loan amount that Binningup owes Mirvac.
[736] Hales Affidavit [16] ‑ [20].
[738] Kidd v The State of Western Australia [2015] WASCA 62 (S) [13].
[739] See, for example, The Hancock Family Memorial Foundation Ltd v Fieldhouse [No 5] [2013] WASC 121 (S) [20] (Le Miere J); Duro Felguera Australia Pty Ltd v Samsung C&T Corporation [2017] WASC 348 (S) [10]; Insurance Commission of Western Australia v Antony Leslie John Woodings as Liquidator of the Bell Group Ltd (in liq) [No 3] [2018] WASC 44 (S) [55] (Pritchard J, as her Honour then was).
[740] See, for example, Cape Lambert Resources Ltd v MCC Australia Sanjin Mining Pty Ltd [2013] WASCA 66 (S).
Atlas Tiles Ltd
Briers
(2010) 41 WAR 23
(2014) 251 CLR 640
(1991) 174 CLR 64
(2000) 75 ALJR 312
(2012) 83 NSWLR 643
(2007) 233 CLR 115
(2015) 236 FCR 199
(1994) 179 CLR 332
(1982) 149 CLR 620
(2012) 287 ALR 360
(1966) 117 CLR 118
(1999) 21 WAR 402
(1978) 144 CLR 202
(1998) 43 NSWLR 104
(1995) 185 CLR 410
(1980) 146 CLR 1
(2012) 294 ALR 635
(1998) 196 CLR 1
(2015) 237 FCR 534
(1923) 33 CLR 426
(1999) 20 WAR 380
(2003) 196 ALR 257
(2019) 54 WAR 388