[2026] FCA 356
General information, not legal advice.
Federal Court of Australia
2026-03-26
Bromwich J
Original judgment source is linked above.
Australian Building and Construction Commissioner v Pattinson [2022] HCA 13; 274 CLR 450
Australian Communications and Media Authority v Getaway Escapes Pty Ltd [2016] FCA 795
Australian Competition and Consumer Commission v BAJV Pty Ltd [2013] FCA 666; ATPR 42-446
Australian Competition and Consumer Commission v BAJV Pty Ltd [2014] FCAFC 52; ATPR 42-470
Australian Competition and Consumer Commission v BlueScope Steel Ltd (No 6) [2023] FCA 1029
Australian Competition and Consumer Commission v Cement Australia Pty Ltd [2017] FCAFC 159; 258 FCR 312
Australian Competition and Consumer Commission v Delta Building Automation Pty Ltd (No 2) [2024] FCA 580
;
Australian Competition and Consumer Commission v First Class State Roofing Pty Ltd [2022] FCA 1093
Australian Competition and Consumer Commission v High Adventure [2005] FCAFC 247; (2006) ATPR 42-091
Australian Competition and Consumer Commission v Leahy Petroleum Pty Ltd (No 3) [2005] FCA 265; 215 ALR 301
Australian Competition and Consumer Commission v Qteq Pty Ltd [2025] FCA 371
Australian Competition and Consumer Commission v Reckitt Benckiser (Australia) Pty Ltd [2016] FCAFC 181; 340 ALR 25
Australian Competition and Consumer Commission v Samsung Electronics Australia Pty Ltd [2022] FCA 875
Australian Competition and Consumer Commission v Swift Networks Pty Ltd [2023] FCA 1064
Australian Competition and Consumer Commission v TPG Internet Pty Ltd [2013] HCA 54; 250 CLR 640
Australian Competition and Consumer Commission v Uber B.V. [2022] FCA 1466
Australian Competition and Consumer Commission v Ultra Tune Australia Pty Ltd (No 3) [2024] FCA 156
Australian Competition and Consumer Commission v Woolworths [2016] FCA 44
Australian Securities and Investments Commission v GetSwift [2023] FCA 100; 167 ACSR 178
Australian Securities and Investments Commission v Hawkins [2025] FCA 121
Australian Securities and Investments Commission v Hobbs [2013] NSWSC 106; 93 ACSR 421
Australian Competition and Consumer Commission v Ashton Raggatt McDougall Pty Ltd [2023] FCA 351; 167 ACSR 376
BlueScope Steel Ltd v Australian Competition and Consumer Commission [2025] FCAFC 118; 312 FCR 348
Einfeld v R [2010] NSWCCA 87; 266 ALR 598
Electoral Commissioner of Australian Electoral Commission v Laming [2024] FCAFC 109; 304 FCR 561
Fair Work Ombudsman v Construction, Forestry, Mining, Manufacturing and Energy Union [2023] FCAFC 63; 297 FCR 338
Fair Work Ombudsman v Roach [2023] FCA 781
Melville v R [2023] NSWCCA 284
NW Frozen Foods Pty Ltd v Australian Competition and Consumer Commission [1996] FCA 1134; (1996) 71 FCR 285
Ostrowski v Palmer [2004] HCA 30; 218 CLR 493
R v Talia [2009] VSCA 260
Registered Organisations Commissioner v Australian Workers' Union [2019] FCA 1852
Singtel Optus Pty Ltd v Australian Competition and Consumer Commission [2012] FCAFC 20; 287 ALR 249
Trade Practices Commission v CSR Ltd [1990] FCA 762; [1991] ATPR 41-076
Ultra Tune Australia Pty Ltd v Australian Competition and Consumer Commission [2025] FCAFC 1; 307 FCR 13
Volkswagen Aktiengesellschaft v Australian Competition and Consumer Commission [2021] FCAFC 49; 284 FCR 24
(a) CCA means the Competition and Consumer Act 2010 (Cth);
(b) Declarations means the declarations made by the Court in these proceedings on 21 May 2025;
(c) FAOA means the applicant's Further Amended Originating Application filed on 15 September 2023;
(d) Qteq means the first respondent; and
(e) Mr Ashton means the second respondent.
Note: Entry of orders is dealt with in Rule 39.32 of the Federal Court Rules 2011.
(a) $50 million for Qteq, being $10 million per attempted contravention;
(b) $2.5 million for Mr Ashton, being $500,000 per attempted inducement of a contravention.
[4] All of the alleged cartel conduct took place in relation to the supply of upstream CSG services and related goods. Upstream oil and gas production concerns the discovery and extraction of CSG. This is described in general terms in the following uncontroversial introductory parts of the further amended concise statement, admitted to by the respondents (original emphasis):
The upstream production of oil and gas involves discovering and extracting raw materials from reservoirs beneath the surface of the earth. It is distinct from downstream production, which involves processing and refining the raw materials into usable oil and gas products for distribution to end customers.
Upstream activities include: exploration; drilling wells; well testing (including through a procedure known as drill stem testing); completions of wells after drilling (which involves securing, stabilising and managing the wells); monitoring and measurement or "data acquisition", and "workover" or maintenance of wells.
Oil and gas producers acquire equipment and services from third party suppliers for the purposes of upstream activities. Relevantly, they acquire permanent downhole gauges and related services (together, gauge works) for data acquisition purposes. Permanent downhole gauges are instruments installed in wells to monitor and measure pressure, temperature, fluid flows and other information. They can be used to control the extraction of water in the production of coal seam gas (CSG).
CSG, also known as coal bed methane, is a form of natural gas extracted from coal seams underground. CSG is described as an unconventional gas because, unlike other natural gases, which flow through the production well to the surface under high pressure, CSG is trapped in the coal seams underground by water pressure. To release the CSG, water must first be pumped out of the coal seam in a controlled fashion using permanent downhole gauges or alternative technologies to monitor water levels and pump rates.
[5] It is not in dispute that at all times relevant to this proceeding, Qteq was a supplier of gauge works to the operators of CSG wells, thereby providing subsurface fluid monitoring services, including by the use of permanent downhole gauges (PDHGs). However, there is a live dispute between the parties as to whether Qteq also had the capacity to supply drill stem testing (DST) of CSG wells to such operators, so as to be a likely competitor in relation to such services.
[6] The substance of the ACCC's case is that Qteq, as the incumbent supplier of gauge services to a Shell Plc joint venture business, QGC Pty Ltd, was facing a tender process for the replacement contract for that work. An adverse tender outcome to any marked degree therefore had the potential to affect a major source of Qteq's revenue. The ACCC alleges that on six occasions spread over the period leading up to, during and following that tender process, Qteq mainly via Mr Ashton attempted, or attempted to induce, the entry into CAUs with competitors or likely competitors containing proposed cartel provisions. The ACCC also alleges that Mr Ashton in his personal capacity attempted to induce the entry into those CAUs. The alleged attempts in general terms are characterised by the ACCC as being aimed to reduce or preclude competition by way of allocating customers (two attempts), structuring the tender bids (one attempt), sharing the market (one attempt) and non-compete agreements (two attempts). Three of those attempts involved a company called Pro-Test Pty Ltd, two of those attempts involved a business called Easternwell and specifically a company within it, Eastern Well Service No 2 Pty Ltd (Eastern Well No 2), and one of those attempts involved a company called Firetail Energy Services Pty Ltd.
[7] ...
Overview of the ACCC's case
[8] The ACCC's case is that Qteq was the incumbent contractor to QGC for gauge works, that work being the subject of one of the four tenders QGC released on 24 October 2017. Qteq was also a leading supplier of gauge works to the CSG industry. This work accounted for the majority of its revenue. It had also secured an exclusive supply of QGC's preferred gauges from Geo Pressure Systems International Inc (GeoPSI). Gauges are installed in CSG wells to monitor water levels and to adjust pump rates. The tender for gauge works gave rise to a concern on Qteq's part and on the part of Mr Ashton, to protect its market position. That much is not disputed. However, what is disputed is the next step.
[9] The ACCC alleges, and the respondents deny, that they had adopted a strategy to neutralise competitive threats posed by the tender process and its outcome by attempting to collude with current or prospective competitors for the supply of gauge works to QGC and other CSG customers, giving rise to the six alleged attempts. The attempts were directed towards three businesses, each of which is discussed further below. It is sufficient to note at this stage that each company operated, or sought to operate, in the CSG industry.
[10] As detailed at some length below, the respondents deny aspects of what is alleged to have taken place and characterise other aspects as benign.
[11] The six alleged attempts by Qteq, via and also by Mr Ashton, are said to have taken place as follows, each of which is designated with the definition used by the ACCC and given an attempt number for the purpose of these reasons:
(a) three attempted proscribed arrangements or understandings with Pro-Test:
(i) between about 27 June and October 2017: Pro-Test 2017 Customer Allocation Understanding (Attempt #1);
(ii) between about 27 October and 10 November 2017: Pro-Test 2017 QGC Tender Understanding (Attempt #2);
(iii) on about 24 June 2019: Pro-Test 2019 Market Sharing Understanding (Attempt #3),
also referred to together as the Pro-Test Attempts;
(b) two attempted proscribed contracts with Eastern Well No 2, an entity within the Easternwell business:
(i) between about 6 and 17 November 2017: Easternwell 2017 Non-Compete Agreement (Attempt #4);
(ii) between about 7 December 2018 and 11 February 2019: Easternwell 2018-2019 Non-Compete Agreement (Attempt #5),
also referred to together as the Easternwell Attempts;
(c) an attempted proscribed arrangement or understanding with Firetail between 19 and 20 September 2017: Firetail Understanding (Attempt #6), also referred to as the Firetail Attempt.
The first stage of the QGC tender and the context for Attempts #1 and #2
Pro-Test 2017 Customer Allocation Understanding (Attempt #1)
(a) Pro-Test would not compete with Qteq for the supply of gauge works to QGC; and
(b) Qteq would not compete with Pro-Test for the supply of gauge works and drill stem testing to Santos, being one of Pro-Test's customers.
Pro-Test 2017 QGC Tender Understanding (Attempt #2)
(a) Pro-Test would bid for the QGC gauge tender so as to win only around 15% of the work to be performed under the contract and would not seek to win the contract outright using either GeoPSI gauges or any other gauges; and
(b) Qteq would not compete with Pro-Test for the supply of gauge works or drill stem testing to Santos.
Pro-Test 2019 Market Sharing Understanding (Attempt #3)
(a) Pro-Test would not supply gauge works; and
(b) Qteq would not supply completions or drill stem testing.
Easternwell 2017 Non-Compete Agreement (Attempt #4)
Easternwell 2018-2019 Non-Compete Agreement (Attempt #5)
Easternwell will be required to sign a non-compete agreement with Qteq, whereby they will not offer gauge installation services to any other operators without prior agreement of Qteq. At present, Easternwell are not willing to sign this agreement and are therefore a competitor.
the revised Second Qteq NDA also included a liquidated damages term, cl 26(B), which specified that Eastern Well No 2 would compensate Qteq $5.5 million if a breach of cl 4(e) related to Origin, $800,000 if it related to "Arrow Energy", and $250,000 if it related to any other customer.
(a) two affidavits of Ms Karen Krisanski, Finance Manager at Qteq, sworn 27 August 2025 and 29 September 2025, deposing to various matters pertaining to Qteq's financial status; and
(b) two affidavits of Mr Gareth Ashton, Chief Commercial Officer and General Counsel at Qteq, sworn 28 August 2025 and 29 September 2025, deposing to Qteq's performance in the intervening period since the Liability Judgment and changes to its policies and procedures.
Developments since the penalty hearing: sale of Qteq's business
(a) an initial sum, the amount of which is confidential, but disclosed to the Court, less an adjustment for certain liabilities assumed by Geo PSI Pty Ltd as purchaser. The adjusted initial sum is described in the ASA as the Completion Cash Amount. While the respondents' legal representatives have advised that a certain sum disclosed to the Court has been paid and is currently held in a solicitor's trust account, the precise Completion Cash Amount is still not known;
(b) a further sum disclosed to the Court to be paid 24 months after completion; and
(c) certain additional amounts, subject to the purchaser's revenues or EBITDA exceeding specified thresholds within two years of completion.
(a) Attempt #1 and Attempt #2 in relation to Pro-Test; and
(b) Attempt #4 and Attempt #5 in relation to Easternwell.
the Court may order the person to pay to the Commonwealth such pecuniary penalty, in respect of each act or omission by the person to which this section applies, as the Court determines to be appropriate having regard to all relevant matters including the nature and extent of the act or omission and of any loss or damage suffered as a result of the act or omission, the circumstances in which the act or omission took place and whether the person has previously been found by the Court in proceedings under this Part or Part XIB to have engaged in any similar conduct.
(a) Under the CCA's civil penalties regime, the purpose of a penalty is principally deterrence of further contravention of the CCA: Pattinson at [9], [15], [40]-[41] (Kiefel CJ, Gageler, Keane, Gordon, Steward and Gleeson JJ).
(b) Deterrence, both specific (to the contravenor) and general (of others), is hence the primary objective to be taken into account in assessing the appropriate penalty: Australian Competition and Consumer Commission v BlueScope Steel Ltd (No 6) [2023] FCA 1029 (BlueScope (No 6)) at [25] (O'Bryan J).
(c) The penalty must not be so low that it may be regarded by the contravenor as "an acceptable cost of doing business": Singtel Optus Pty Ltd v Australian Competition and Consumer Commission [2012] FCAFC 20; 287 ALR 249 (Singtel Optus v ACCC) at [62]-[63] (Keane CJ, Finn and Gilmour JJ) cited in Australian Competition and Consumer Commission v TPG Internet Pty Ltd [2013] HCA 54; 250 CLR 640 (ACCC v TPG Internet Pty Ltd) at [65] (French CJ, Crennan, Bell and Keane JJ) and Pattinson at [17]. This is ultimately another facet of deterrence.
(d) The appropriate penalty "is one that strikes a reasonable balance between oppressive severity and the need for deterrence in respect of a particular case": Pattinson at [46]. Whether a penalty would be considered "oppressive" is not to be determined by whether or not the contravenor has the capacity to pay a certain penalty: BlueScope (No 6) at [143]. A company's financial circumstances will be relevant for the determination of an appropriate penalty. An oppressive penalty is one which went beyond what was necessary for the purposes of deterrence: Pattinson at [40] citing NW Frozen Foods Pty Ltd v Australian Competition and Consumer Commission [1996] FCA 1134; (1996) 71 FCR 285 at 293 (Burchett and Kiefel JJ).
(e) In determining a penalty, the Court should have regard to the statutory maximum penalty as one of the relevant factors. While this is not the sole factor to be considered, there should be "some reasonable relationship between the theoretical maximum and the final penalty imposed": Australian Competition and Consumer Commission v Reckitt Benckiser (Australia) Pty Ltd [2016] FCAFC 181; 340 ALR 25 at [55] and [155]-[156], cited in Pattinson at [53].
(f) The relevant factors for the determination of penalty include, but are not limited to, the "French factors", being those articulated by French J in Trade Practices Commission v CSR Ltd [1990] FCA 762; [1991] ATPR 41-076 at 52,152 (French J), quoted with approval in the joint judgment in Pattinson at [18] as informing the assessment of "a penalty of appropriate deterrent value", and noting at [19] that this list of possible relevant considerations is not a legal checklist:
- The nature and extent of the contravening conduct.
- The amount of loss or damage caused.
- The circumstances in which the conduct took place.
- The size of the contravening company.
- The degree of power it has, as evidenced by its market share and ease of entry into the market.
- The deliberateness of the contravention and the period over which it extended.
- Whether the contravention arose out of the conduct of senior management or at a lower level.
- Whether the company has a corporate culture conducive to compliance, as evidenced by educational programs and disciplinary or other corrective measures in response to an acknowledged contravention.
- Whether the company has shown a disposition to co-operate with the authorities responsible for enforcement of the Act in relation to contravention.
(g) Determination of an appropriate civil penalty requires a multi-factorial approach, "identifying and balancing all the factors relevant to the contravention, and where the result is arrived at by a process of 'instinctive synthesis' of the relevant factors": BlueScope (No 6) at [32], citing Reckitt Benckiser at [44].
(h) No discount will apply due to the contravention being in the nature of an attempt (including an attempt to induce), rather than a completed contravention. Such a discount is not contemplated by the CCA, with s 76(1)(b) and (d) indicating instead that the approach to assessing a penalty for, and the maximum penalty applicable to, an attempt is the same as that for a completed contravention.
(i) Where a pecuniary penalty is imposed as one part of penalty orders, the non-pecuniary orders are a relevant consideration for the Court's assessment of the level of penalty required to achieve general deterrence: see, e.g., Australian Competition and Consumer Commission v Ashton Raggatt McDougall Pty Ltd [2023] FCA 351; 167 ACSR 376 at [83] (Moshinsky J); Australian Competition and Consumer Commission v First Class State Roofing Pty Ltd [2022] FCA 1093 at [17] (Yates J). Thus, such orders as compliance programs and injunctions may affect the level of penalty having "appropriate deterrent value" in all the circumstances.
(j) While comparable cases may be used as a guide to assess the appropriateness of a pecuniary penalty, each case will turn on its own facts and there is no requirement for consistency in the size of penalties applied from case to case. Rather, there must be consistency in the legal principle applied to reach those penalties: see Australian Competition and Consumer Commission v Employsure Pty Ltd [2023] FCAFC 5; 407 ALR 302 (Rares, Stewart, Abraham JJ); Singtel Optus v ACCC at [60] (Keane CJ, Finn and Gilmour JJ) and Australian Competition and Consumer Commission v Woolworths [2016] FCA 44 at [129], [133].
(a) The structure and requirements of the QGC tenders gave Qteq a legitimate reason to engage with a range of other companies, including Pro-Test and Easternwell. In particular:
(i) The QGC gauge tender formed part of a package of four separate requests for tender, and tenderers were invited to bid for all or part of that package, including by partnering with other tenderers, indicating that some degree of collaboration was expected.
(ii) In relation to Attempts #1 and #2, Qteq's exclusive rights over GeoPSI's gauges gave it a legitimate reason to engage with Pro-Test, being to provide pricing for the provision of those gauges for their bid. Implicitly, this exclusivity perhaps may have provided some scope to limit the use of those gauges lawfully, subject to competition law itself: LJ [153]-[154].
(iii) In relation to Attempt #1, the Kingsley's dinner had been organised by Pro-Test for the additional legitimate purpose of discussing the potential sale to Qteq of its newly developed ADV system, potentially for use in Qteq's tender.
(iv) In relation to Attempts #4 and #5, Qteq and Easternwell were required to engage with one another to plan for the transitioning of certain gauge works from Qteq (as the gauge contractor) to Easternwell (as the rig contractor).
(b) There was no secrecy involved in the attempts, in that none of them were covert or otherwise deliberately hidden. To the contrary, the attempts were reflected in contemporaneous notes and communications and carried out in view of multiple people, and Qteq expressly involved QGC in its negotiations with Easternwell regarding the NDAs by which Attempts #4 and #5 took place.
(c) In relation to Attempts #4 and #5, the QGC tender structure placed Qteq in a very difficult position by effectively requiring it to facilitate its replacement by Easternwell through the unusual requirement that the gauge contractor assist in transitioning part of its scope of work to the rig contractor. In that context, I found in the Liability Judgment that Qteq had a commercially understandable motive of preventing its information and knowhow from being used against it: LJ [489]. The respondents also rely upon the inclusion of the exclusivity clause in the draft First Easternwell NDA, and my finding that this was liable to be of legitimate concern to the respondents: LJ [342].
(d) The conduct underpinning each of Attempts #1 to #3 was limited, involving only a small number of communications, primarily at the Kingsley's and Fantuzzo Hotel dinners and as outlined at LJ [300], and the conduct underpinning each of Attempts #4 and #5 was confined to the exchange of draft agreements and related communications.
Likely benefits if the attempted contraventions had succeeded as a measure of intended loss or damage
We would accept that to achieve deterrence, both specific and general, a penalty must be sufficient to render inutile "the cynical calculation involved in weighing up the risk of penalty against the profits to be made from contravention" (Singtel Optus Pty Ltd v Australian Competition and Consumer Commission [2012] FCAFC 20; (2012) 287 ALR 249 (Singtel Optus) at [63], cited with approval in Australian Competition and Consumer Commission v TPG Internet Pty Ltd [2013] HCA 54; (2013) 250 CLR 640 (TPG) at [66]). Moreover, we would also accept that the intention to profit from contravening conduct must be deterred even if it could be shown by the contravenor that no actual profit was made. Indeed, the higher the intended benefit (even if not actually received), the higher the penalty required to satisfy the objective of deterrence, all else being equal. Generally, we accept that "the sanction for the conduct [must be] substantial relative to the possible gain to be made from it" (our emphasis) (Reckitt Benckiser at [153]).
(Emphasis added.)
[52] ... proof of loss, damage or benefit turns on the evidence and arguments relied upon in the case at hand. None of this necessarily requires high levels of precision or certainty. There is room for inferences to be drawn and predictions to be made as to likely perceived benefits, going to the question of motivation and thus deterrence. As the Full Court in Cement Australia more generally pointed out in part of [509]:
Depending upon the context and the exercise, more or less precision in the assessment may be justified. At the end of the day the task is principally an evaluative exercise for the trial judge. And in any event it is only one input into a broader evaluative exercise being the setting of the pecuniary penalty itself, with any input only being weighed as part of an intuitive synthesis approach. Precision in the quantification of one of the inputs may be unrealistic given the broader nature and context of the task in setting a penalty. Of course, if probative evidence enabling greater precision is available, then more detailed quantification may be appropriate.
[53] What matters is that the penalty is not regarded as merely an acceptable cost of doing business: Pattinson at [17] referring to ACCC v TPG Internet Pty Ltd at [66] which in turn approved the statement by the Full Court in Singtel Optus v ACCC at [62]. That in turn may be influenced by the contravenor's likely or inferred perception of the benefits to be obtained from the conduct and the result sought to be obtained. Such benefits may not even necessarily be financial, even if that is not the most common, let alone immediate or short-term, benefit. The nature of the benefits accrued, or in the case of an attempt, that could accrue, may vary from case to case. As was pointed out in Reckitt Benckiser at [153], acknowledged and endorsed in Cement Australia at [467], and applied in BlueScope (No 6) at [28], the sanction for the conduct must be substantial relative to the benefit, including in the sense of possible gain, to be made from that conduct, even if that most commonly will be financial in nature. Non-financial benefits, including benefits with no immediately ascertainable dollar value, may properly be able to be taken into account in arriving at an appropriate deterrent penalty.
[54] An intention to profit will be most relevant in a case in which that is most likely the driving motivation, such as price fixing, but there may be other or different benefits that are relevant in another case where other objectives are in play. That may include such things as revenue, increasing market share, increasing operating scale, improving cashflow to cover fixed costs so that future contracts can be assessed by reference primarily to marginal costs, and so on. It may also extend to collateral benefits, such as those arising from obtaining a prestigious contract, which may be relied upon by the potential contravenor to characterise itself as a trusted supplier of services to certain customers, such as high profile or high-status customers or those belonging to a class of customers within a particular sector of the economy or a particular market. What matters is the range of the likely motivating benefits or perceived benefits that need to be outweighed by the penalty imposed so as to deter both the contravenor before the Court, and any would-be contravenor from engaging in like conduct.
[55] If motivating features are not taken into account, and as a result the penalty is lower, the deterrent effect may be less than is really required. That is because the penalty must exceed the benefit, or in the case of an attempt, the perceived benefit, both as to specific and general deterrence. Possible financial benefits will most easily justify a higher penalty, largely because of the greater ease of quantification in dollar terms, this being capable of being measured against risk of that penalty being imposed. However, that does not prevent the Court deciding upon a level of penalty that takes into account non-financial benefit motivations. If the risk of detection is low, the penalty will need to be correspondingly higher to account for that. Otherwise, it may remain worthwhile to take a chance that the conduct may be discovered and the penalty imposed to secure the full range of likely or anticipated benefits. After all, at the time of contemplating engaging in contravening conduct, which is when deterrence is most likely to be effective, the contemplated benefits may only be perceived or at least uncertain, even if sometimes they can be reliably predicted: Reckitt Benckiser at [153]. Contrary to the respondents' submission, this does not mean that only net benefit, in the sense of net or even gross profit, will be in contemplation.
[56] Any future potential contravenor may weigh up the chance of an uncertain benefit against the risk of a substantial but still uncertain penalty. If the risk of the latter is seen to be great enough, the chance of a benefit may not be great enough to encourage a contravening or attempted contravening action and, if so, the conduct is more likely to be deterred. Deterrence may be seen to be at its most effective when such contemplation is likely to be in play. Bid rigging, by its very nature, is planned at least to some degree, because it is directed to subverting a planned competitive process.
(a) any forward-looking assessment of anticipated benefit to be gained by the conduct would have accounted for the prospect that the attempt would fail, a submission that I can address immediately because I am simply unable to accept it either as to substance or as to weight as part of the penalty determination process;
(b) the attempts were directed only at Pro-Test, which was just one of the alternative bidders and unlikely to bid for the full scope of work regardless;
(c) Qteq was in a good position to secure the contract regardless of the attempts, as it did notwithstanding their failure; and
(d) profit, rather than revenue, is the more relevant measure of any anticipated benefit to be derived from the contract, particularly in a low margin business such as Qteq's.
(a) In his letter to QGC dated 15 January 2019 (referred to at [90] above), Mr Meldrum also indicated that if the gauge works services were transitioned to rig operators as QGC intended, this would result in the loss of about $5.5 million per annum in revenue to Qteq. The ACCC submits that this provides an indication of the revenue under the QGC contract which Qteq was attempting to retain by the impugned conduct.
(b) The liquidated damages clause in the revised Second Qteq NDA required payment of certain amounts in the event that Easternwell breached the (illegal) restraint clause in respect of particular customers, being $5.5 million for Origin, $800,000 for Arrow Energy and $250,000 for any other customer: LJ [442]. The ACCC submits that this provides an indication of the potential value of work for other clients which Qteq sought to protect from competition with Easternwell through the attempted contravention.
What matters is the range of the likely motivating benefits or perceived benefits that need to be outweighed by the penalty imposed so as to deter both the contravenor before the Court, and any would-be contravenor from engaging in like conduct.
Size and financial circumstances of Qteq and its capacity to pay the penalties imposed
The ACCC contends that difficulty in paying a given penalty is not a relevant consideration when it comes to general deterrence. I accept that is generally correct, and am prepared to allow the respondents to seek to pay the penalties imposed by way of instalments. However, I also give some weight to the respondents' submission to the effect that there is some scope for other would-be or might-be contravenors to scale the penalty imposed to their own circumstances. That is, that contravenors who are much larger than Delta should be taken to assume that they will be facing a larger penalty due to their greater size. However, it remains the case that the headline figure is the one most likely to be noticed by any would-be contravenor.
The size of a contravening company is not only relevant to the power it can wield, but also to the size of the penalty necessary to have an appropriate deterrent effect, not only on the company itself but also on companies which will pay attention to the penalties imposed on businesses of a similar size: Reckitt at [158(2)]; Coles Supermarkets at [92]; NW Frozen Foods Pty Ltd v Australian Competition and Consumer Commission [1996] FCA 1134; 71 FCR 285, 293 at [D] (Burchett and Kiefel JJ (as her Honour then was)); Australian Competition and Consumer Commission v Valve Corporation (No 7) [2016] FCA 1553 at [7] and [53] (Edelman J); Australian Competition and Consumer Commission v Leahy Petroleum Pty Ltd (No 2) [2005] FCA 254; 215 ALR 281 at [8]- [9] (Merkel J).
[42] Self-evidently, any consideration of deterrence in the context of the imposition of penalties is a forwardlooking exercise. With respect to specific deterrence, the appropriate penalty is one that will be sufficient to deter the contravener from engaging in the same or similar contravening conduct in the future. If the "size" of the contravener has changed since the contraventions occurred, it would, in our view, involve no error for the court to fix the penalty by reference to the circumstances which existed at the time of judgment and which, as a matter of reasonable apprehension, would exist into the future when the deterrent effect of the penalty would be having its appropriate impact on the behaviour of the contravener. This is the approach which the primary Judge took in the present case, and we do not think he could be criticised on that account.
[43] Counsel for the Commission emphasised, unsurprisingly, the importance of general deterrence in this area of the law. As the High Court has recently emphasised: "General and specific deterrence must play a primary role in assessing the appropriate penalty in cases of calculated contravention of legislation where commercial profit is the driver of the contravening conduct": Australian Competition and Consumer Commission v TPG Internet Pty Ltd [2013] HCA 54; (2013) 304 ALR 186, 199 [65]. We accept that, in giving effect to the objects of the TP Act and the ACL so far as they involve the conduct of trading corporations, the perception by the wider business community of the firmness with which the court will deal with established the contraventions must be regarded as of the utmost significance. However, an observer, from that community, of the outcome of the present case as reflected in the judgment of the primary Judge would note that a small to medium sized family company was subjected to a penalty appropriate to its then size and circumstances. He or she would have no basis to assume that the penalty which might be imposed on a larger company in otherwise similar circumstances would be of the same order. Indeed, the very point, made in CSR and subsequent cases, that size is relevant in the context of deterrence will, in this way, be achieved by taking into account a contravener's size at the time when the penalty comes to be imposed.
(Emphasis added.)
(a) the revenue, gross profit, EBITDA/EBIT and net asset figures outlined in the table at [96] above;
(b) the consolidated net asset position of the group of related companies containing Qteq (the Qteq Group), being $3.63 million as at 30 June 2024;
(c) the consolidated revenue of the group containing Qteq, which was around $30 million per year in each of the 2022 to 2024 financial years; and
(d) Qteq's own descriptions of its significance in the market for gauge works.
(a) he apparently has over $2.3 million in assets held in two superannuation funds; and
(b) he is apparently a joint or sole beneficiary of various other trusts which, as at 30 April 2025, held over $22 million in assets.
(a) the introduction of anti-competition and competition compliance policy in September 2021, which was updated on 2 August 2024 following the liability hearing;
(b) competition and consumer law compliance training by an external law firm at Qteq's offices in June 2025, with steps to put that in place being first taken in August 2024; and
(c) the introduction of a whistleblowing policy in January 2025.
(a) In June to July 2025, Mr Gareth Ashton was informed by representatives of Origin Energy Limited, as operator on behalf of Australian Pacific LNG Pty Ltd (APLNG), that Qteq would not be awarded a long-term contract for casing corrosion logging, after the APLNG board unanimously determined not to award Qteq the contract due to the findings of attempted contravention. This occurred after Origin had provisionally awarded the contract to Qteq subject to the APLNG board approving its recommendation, and entered into an interim contract with Qteq for the provision of those services in the meantime. Qteq expected to generate between around $35 million and $45 million of revenue under the long-term contract.
(b) In August 2025, a representative of QGC informed Mr Gareth Ashton that in light of the findings in the Liability Judgment, it would not be entering any further contracts with Qteq or issuing it with any new purchase orders. QGC has been Qteq's largest client since it was established and, and Ms Krisanski, in her first affidavit, estimated that the loss caused by QGC's decision would be around $10 million of revenue per annum, or more than 35% of Qteq's total revenue.
(a) After the penalty hearing, Santos (Qteq's largest remaining customer) had made regular enquiries regarding the status of these proceedings, in the context of Qteq's bid for a new contract which was under tender. As a result, Mr Gareth Ashton formed the view that Santos had concerns for Qteq's long term viability in light of the penalties sought by the ACCC, and that this may have impacted its preparedness to award Qteq substantial work.
(b) As a result of its inability to win new work and its continued monthly losses, Qteq's business had become unsustainable in the long term and risked becoming insolvent, which led to the decision to sell its business to Geo PSI Pty Ltd, with the preservation of the jobs of Qteq's employees being a "key driver" for that sale.
It has been accepted, at least in the context of sentencing for criminal offences, that the fact that an offender has already been the subject of extra-curial punishment - loss or damage suffered by the offender as a result of having committed the offence, outside or in addition to the court-imposed sanction - may in some circumstances be a relevant consideration in sentencing the offender: [criminal cases cited and discussion of administrative penalties omitted]. This principle has also been accepted in the context of civil penalties: see Australian Building and Construction Commissioner v Construction, Forestry, Mining and Energy Union [2017] FCAFC 113; (2017) 254 FCR 68 at [104]; Australian Securities and Investments Commission v Wooldridge [2019] FCAFC 172 at [56]- [58].
(a) As against Qteq, the ACCC seeks the imposition of an overall penalty of between $11 million and $13 million, whereas Qteq seeks an overall penalty of $1.5 million;
(b) As against Mr Ashton, the ACCC seeks the imposition of an overall penalty between $750,000 and $950,000, whereas the Mr Ashton seeks an overall penalty of $500,000.
(a) Attempt #1: $2 million
(b) Attempt #2: $3 million
(c) Attempt #3: $2.5 million
(d) Attempt #4: $2.5 million
(e) Attempt #5: $3 million
(a) Attempt #1: $150,000
(b) Attempt #2: $250,000
(c) Attempt #3: $175,000
(d) Attempt #4: $150,000
(e) Attempt #5: $225,000
(a) As a general proposition there is nothing about the attempts directed at Pro-Test which warrants a higher penalty than those directed at Easternwell;
(b) Attempt #2 warrants a higher penalty than Attempt #1 because it followed a previous unsuccessful attempt directed at Pro-Test, involved a more sophisticated and specific cartel provision, and was carried out by both Mr Ashton and Mr Meldrum, as opposed to Mr Meldrum alone;
(c) Attempt #3 warrants a penalty between Attempts #1 and #2, because it followed two earlier failed attempts, and involved a broader restraint encompassing the supply of gauge works generally (not just to QGC), but also involved a less specific and sophisticated cartel provision than Attempt #2; and
(d) Attempt #5 warrants a higher penalty than Attempt #4 because it was a further attempt directed at Easternwell which occurred after Attempt #4 had failed, and occurred over a longer period of conduct.
(a) Against Qteq:
(i) Attempt #1: $1 million
(ii) Attempt #2: $1.5 million
(iii) Attempt #3: $1.25 million
(iv) Attempt #4: $1.25 million
(v) Attempt #5: $1.5 million
(vi) Total: $5 million, reduced by totality from the tally of the above individual figures of $6.5 million.
(b) Against Mr Ashton:
(i) Attempt #1: $150,000
(ii) Attempt #2: $250,000
(iii) Attempt #3: $175,000
(iv) Attempt #4: $200,000
(v) Attempt #5: $225,000
(vi) Total: $1 million, being 20% of the final penalty imposed upon Qteq.
I certify that the preceding one hundred and eighty (180) numbered paragraphs are a true copy of the Reasons for Judgment of the Honourable Justice Bromwich.