This plan defines the Condamine and Balonne plan area and which surface and underground waters it covers, sets measurable environmental-flow and allocation-security targets, and prescribes how water licences and allocations are converted, limited and traded. It mandates measurement, monitoring and reporting and creates rules for overland-flow and unallocated water.
It mainly affects water entitlement and licence holders, landowners with works, local governments and the Commonwealth Environmental Water Holder. Licence-holders carry measurement and record-keeping duties (s.23, s.81); the chief executive makes allocation, conversion and flow-management decisions (s.34, s.54, s.82).
This Plan, the Water Plan (Condamine and Balonne) 2019, sets the statutory framework for allocation, measurement, conversion and management of surface and certain underground water across the plan area shown in schedule 1 (s 6, s 5). Its express purposes are to define the water to which it applies, provide a sustainable management framework, identify priorities and mechanisms for future water needs, set out allocation arrangements and to provide a framework for reversing, where practicable, ecosystem degradation caused by taking or interference with the covered water (s 2).
Mechanically the Plan does the following, among other things: it specifies the categories of water covered, being surface water and underground water not covered by the Great Artesian Basin plan (s 4, s 5); divides the plan area into water supply schemes, water management areas and zones and an underground water management area with sub-areas, units and zones (ss 7 to 13); identifies nodes used in the hydrological modelling and requires use of particular model computer programs for actual node locations and consistency assessments (s 15, s 35). It sets explicit environmental flow objectives and performance indicators for surface and underground water in schedule 7 and prescribes how to calculate performance indicators, including the assumption that unallocated water reserved under the plan is being taken (ss 26 to 30, sch 7; s 30(1)).
On water management the Plan imposes measurement and reporting duties, including deadlines for metering: all water allocations must be measured by 31 December 2022 and specified underground water licences in identified units must be measured by 31 December 2025 (s 23). It restricts decision‑makers, chiefly the chief executive, by requiring that decisions do not increase average volumes or combined nominal entitlements, subject to defined exceptions (s 33). Decisions about allocation or management must be consistent with the Plan’s environmental flow and water allocation security objectives, with use of model simulations required for consistency assessments unless not practicable (ss 34 to 35).
Current sections
Direct links to the current provisions in Water Plan (Condamine and Balonne) 2019.
136
pt.1
Preliminary
Preliminary
sec.1
Short title
sec.1 Short title
This plan may be cited as the Water Plan (Condamine and Balonne) 2019 .
sec.2
Purposes of plan
sec.2 Purposes of plan
The purposes of this plan are to—
define the availability of water to which this plan applies; and
provide a framework for sustainably managing water to which this plan applies; and
identify priorities and mechanisms for dealing with the future water requirements in the plan area; and
provide a framework for managing water allocations; and
provide a framework for reversing, where practicable, the degradation of natural ecosystems caused by the taking of, or interference with, water to which this plan applies.
(a) define the availability of water to which this plan applies; and
(b) provide a framework for sustainably managing water to which this plan applies; and
(c) identify priorities and mechanisms for dealing with the future water requirements in the plan area; and
(d) provide a framework for managing water allocations; and
(e) provide a framework for reversing, where practicable, the degradation of natural ecosystems caused by the taking of, or interference with, water to which this plan applies.
sec.3
Definitions
sec.3 Definitions
The dictionary in schedule 14 defines particular words used in this plan.
sec.4
Meaning of surface water
sec.4 Meaning of surface water
Surface water is—
water in a watercourse or lake; or
water in a spring not connected to water to which the Water Plan (Great Artesian Basin and Other Regional Aquifers) 2017 applies; or
overland flow water, other than water in a spring connected to water to which the Water Plan (Great Artesian Basin and Other Regional Aquifers) 2017 applies.
(a) water in a watercourse or lake; or
(b) water in a spring not connected to water to which the Water Plan (Great Artesian Basin and Other Regional Aquifers) 2017 applies; or
(c) overland flow water, other than water in a spring connected to water to which the Water Plan (Great Artesian Basin and Other Regional Aquifers) 2017 applies.
pt.2
Plan area, water to which plan applies and other matters
Plan area, water to which plan applies and other matters
sec.5
Water to which plan applies— Act , s 43
sec.5 Water to which plan applies— Act , s 43
For section 43 (1) (a) of the Act , this plan applies to the following water in the plan area—
surface water;
underground water to which the Water Plan (Great Artesian Basin and Other Regional Aquifers) 2017 does not apply.
(a) surface water;
(b) underground water to which the Water Plan (Great Artesian Basin and Other Regional Aquifers) 2017 does not apply.
sec.6
Plan area
sec.6 Plan area
This plan applies to the area shown as the plan area on the map in schedule 1 , part 1 .
sec.7
Water supply schemes and water supply scheme zones
sec.7 Water supply schemes and water supply scheme zones
Each part of the plan area shown as a water supply scheme on the map in schedule 2 , part 1 is a water supply scheme for this plan.
A reference in this plan to a water supply scheme by name is a reference to the water supply scheme given that name on the map in schedule 2 , part 1 and in schedule 2 , part 2 , column 1.
Each part of the plan area named and described in schedule 2 , part 2 , columns 2 and 3, is a water supply scheme zone .
(sec.7-ssec.1) Each part of the plan area shown as a water supply scheme on the map in schedule 2 , part 1 is a water supply scheme for this plan.
(sec.7-ssec.2) A reference in this plan to a water supply scheme by name is a reference to the water supply scheme given that name on the map in schedule 2 , part 1 and in schedule 2 , part 2 , column 1.
(sec.7-ssec.3) Each part of the plan area named and described in schedule 2 , part 2 , columns 2 and 3, is a water supply scheme zone .
sec.8
Water management areas— Act , sch 4
sec.8 Water management areas— Act , sch 4
For schedule 4 of the Act , definition water management area , paragraph (b) , each part of the plan area shown as a water management area on the map in schedule 3 , part 1 is a water management area.
A reference in this plan to a water management area by name is a reference to the water management area given that name on a map in schedule 3 .
(sec.8-ssec.1) For schedule 4 of the Act , definition water management area , paragraph (b) , each part of the plan area shown as a water management area on the map in schedule 3 , part 1 is a water management area.
(sec.8-ssec.2) A reference in this plan to a water management area by name is a reference to the water management area given that name on a map in schedule 3 .
sec.9
Water management area zones
sec.9 Water management area zones
A water management area has 1 or more water management area zones.
A water management area zone , for a water management area, is—
for the Upper Condamine water management area—
shown on the map in schedule 3 , part 2 ; and
named and described in columns 1 and 2 of the table in schedule 3 , part 2 ; and
for the Condamine and Balonne water management area—
shown on the map in schedule 3 , part 3 ; and
named and described in columns 1 and 2 of the table in schedule 3 , part 3 ; and
for the Lower Balonne water management area—
shown on the map in schedule 3 , part 4 ; and
named and described in columns 1 and 2 of the table in schedule 3 , part 4 ; and
for the Condamine and Balonne Tributaries water management area—shown on the map in schedule 3 , part 5 ; and
for the Gowrie and Oakey Creek water management area—
shown on the map in schedule 3 , part 6 ; and
named and described in columns 1 and 2 of the table in schedule 3 , part 6 .
A reference in this plan to a water management area zone, in the Condamine and Balonne Tributaries water management area, by name is a reference to the water management area zone given that name on the map in schedule 3 , part 5 .
A reference in this plan to a water management area zone in another water management area by name is a reference to the water management area zone given that name on a map in schedule 3 , part 2 , 3 , 4 or 6 and in column 1 of a table in schedule 3 .
(sec.9-ssec.1) A water management area has 1 or more water management area zones.
(sec.9-ssec.2) A water management area zone , for a water management area, is— for the Upper Condamine water management area— shown on the map in schedule 3 , part 2 ; and named and described in columns 1 and 2 of the table in schedule 3 , part 2 ; and for the Condamine and Balonne water management area— shown on the map in schedule 3 , part 3 ; and named and described in columns 1 and 2 of the table in schedule 3 , part 3 ; and for the Lower Balonne water management area— shown on the map in schedule 3 , part 4 ; and named and described in columns 1 and 2 of the table in schedule 3 , part 4 ; and for the Condamine and Balonne Tributaries water management area—shown on the map in schedule 3 , part 5 ; and for the Gowrie and Oakey Creek water management area— shown on the map in schedule 3 , part 6 ; and named and described in columns 1 and 2 of the table in schedule 3 , part 6 .
(sec.9-ssec.3) A reference in this plan to a water management area zone, in the Condamine and Balonne Tributaries water management area, by name is a reference to the water management area zone given that name on the map in schedule 3 , part 5 .
(sec.9-ssec.4) A reference in this plan to a water management area zone in another water management area by name is a reference to the water management area zone given that name on a map in schedule 3 , part 2 , 3 , 4 or 6 and in column 1 of a table in schedule 3 .
(a) for the Upper Condamine water management area— (i) shown on the map in schedule 3 , part 2 ; and (ii) named and described in columns 1 and 2 of the table in schedule 3 , part 2 ; and
(i) shown on the map in schedule 3 , part 2 ; and
(ii) named and described in columns 1 and 2 of the table in schedule 3 , part 2 ; and
(b) for the Condamine and Balonne water management area— (i) shown on the map in schedule 3 , part 3 ; and (ii) named and described in columns 1 and 2 of the table in schedule 3 , part 3 ; and
(i) shown on the map in schedule 3 , part 3 ; and
(ii) named and described in columns 1 and 2 of the table in schedule 3 , part 3 ; and
(c) for the Lower Balonne water management area— (i) shown on the map in schedule 3 , part 4 ; and (ii) named and described in columns 1 and 2 of the table in schedule 3 , part 4 ; and
(i) shown on the map in schedule 3 , part 4 ; and
(ii) named and described in columns 1 and 2 of the table in schedule 3 , part 4 ; and
(d) for the Condamine and Balonne Tributaries water management area—shown on the map in schedule 3 , part 5 ; and
(e) for the Gowrie and Oakey Creek water management area— (i) shown on the map in schedule 3 , part 6 ; and (ii) named and described in columns 1 and 2 of the table in schedule 3 , part 6 .
(i) shown on the map in schedule 3 , part 6 ; and
(ii) named and described in columns 1 and 2 of the table in schedule 3 , part 6 .
(i) shown on the map in schedule 3 , part 2 ; and
(ii) named and described in columns 1 and 2 of the table in schedule 3 , part 2 ; and
(i) shown on the map in schedule 3 , part 3 ; and
(ii) named and described in columns 1 and 2 of the table in schedule 3 , part 3 ; and
(i) shown on the map in schedule 3 , part 4 ; and
(ii) named and described in columns 1 and 2 of the table in schedule 3 , part 4 ; and
(i) shown on the map in schedule 3 , part 6 ; and
(ii) named and described in columns 1 and 2 of the table in schedule 3 , part 6 .
sec.10
Underground water management area
sec.10 Underground water management area
The part of the plan area shown as the underground water management area on the map in schedule 4 is the underground water management area .
sec.11
Underground water sub-areas
sec.11 Underground water sub-areas
Certain parts of the underground water management area are divided into underground water sub-areas.
A part of the underground water management area shown on the map in schedule 5 as an underground water sub-area is an underground water sub-area .
A reference in this plan to an underground water sub-area by name is a reference to the underground water sub-area given that name in schedule 5 .
(sec.11-ssec.1) Certain parts of the underground water management area are divided into underground water sub-areas.
(sec.11-ssec.2) A part of the underground water management area shown on the map in schedule 5 as an underground water sub-area is an underground water sub-area .
(sec.11-ssec.3) A reference in this plan to an underground water sub-area by name is a reference to the underground water sub-area given that name in schedule 5 .
sec.12
Underground water units and underground water sub-units
sec.12 Underground water units and underground water sub-units
The underground water management area includes the following aquifers (each an underground water unit )—
the St George Alluvium (shallow);
the St George Alluvium (deep);
the sediments above the Great Artesian Basin;
the Upper Condamine Alluvium (Central Condamine Alluvium);
the Upper Condamine Alluvium (Tributaries);
the Upper Condamine Basalts;
the Condamine Fractured Rock;
the Queensland Murray-Darling Basin deep.
The Upper Condamine Basalts, in the Nobby Basalts underground water sub-area, is made up of the following aquifers (each an underground water sub-unit )—
for underground water to which this plan applies above the aquitard in the Upper Condamine Basalts—the Upper Condamine Basalts (Nobby Basalts shallow);
for underground water to which this plan applies below the aquitard in the Upper Condamine Basalts—the Upper Condamine Basalts (Nobby Basalts deep).
(sec.12-ssec.1) The underground water management area includes the following aquifers (each an underground water unit )— the St George Alluvium (shallow); the St George Alluvium (deep); the sediments above the Great Artesian Basin; the Upper Condamine Alluvium (Central Condamine Alluvium); the Upper Condamine Alluvium (Tributaries); the Upper Condamine Basalts; the Condamine Fractured Rock; the Queensland Murray-Darling Basin deep.
(sec.12-ssec.2) The Upper Condamine Basalts, in the Nobby Basalts underground water sub-area, is made up of the following aquifers (each an underground water sub-unit )— for underground water to which this plan applies above the aquitard in the Upper Condamine Basalts—the Upper Condamine Basalts (Nobby Basalts shallow); for underground water to which this plan applies below the aquitard in the Upper Condamine Basalts—the Upper Condamine Basalts (Nobby Basalts deep).
(a) the St George Alluvium (shallow);
(b) the St George Alluvium (deep);
(c) the sediments above the Great Artesian Basin;
(d) the Upper Condamine Alluvium (Central Condamine Alluvium);
(e) the Upper Condamine Alluvium (Tributaries);
(f) the Upper Condamine Basalts;
(g) the Condamine Fractured Rock;
(h) the Queensland Murray-Darling Basin deep.
(a) for underground water to which this plan applies above the aquitard in the Upper Condamine Basalts—the Upper Condamine Basalts (Nobby Basalts shallow);
(b) for underground water to which this plan applies below the aquitard in the Upper Condamine Basalts—the Upper Condamine Basalts (Nobby Basalts deep).
sec.13
Underground water zones
sec.13 Underground water zones
Certain underground water sub-areas are divided into underground water zones.
A part of an underground water sub-area, shown on a map in schedule 6 as an underground water zone, is an underground water zone .
(sec.13-ssec.1) Certain underground water sub-areas are divided into underground water zones.
(sec.13-ssec.2) A part of an underground water sub-area, shown on a map in schedule 6 as an underground water zone, is an underground water zone .
sec.14
Trading zones— Act , s 43
sec.14 Trading zones— Act , s 43
For section 43 (1) (e) (i) of the Act , the following zones are trading zones for water allocations to which this plan applies—
a water supply scheme zone;
a water management area zone;
an underground water zone.
(a) a water supply scheme zone;
(b) a water management area zone;
(c) an underground water zone.
sec.15
Nodes
sec.15 Nodes
A node is a point in the plan area.
The modelled location of each node is identified, by a letter, on the map in schedule 1 , part 1 and is described in schedule 1 , part 2 .
A node may be referred to in this plan by its letter.
The actual location of each node is set by—
for nodes A to L—the eWater Source computer program; or
for nodes M to O—the MODFLOW computer program.
(sec.15-ssec.1) A node is a point in the plan area.
(sec.15-ssec.2) The modelled location of each node is identified, by a letter, on the map in schedule 1 , part 1 and is described in schedule 1 , part 2 .
(sec.15-ssec.3) A node may be referred to in this plan by its letter.
(sec.15-ssec.4) The actual location of each node is set by— for nodes A to L—the eWater Source computer program; or for nodes M to O—the MODFLOW computer program.
(a) for nodes A to L—the eWater Source computer program; or
(b) for nodes M to O—the MODFLOW computer program.
sec.16
Information about areas
sec.16 Information about areas
The exact location of the boundaries of each of the following is held in digital electronic form by the department and may be accessed at each office of the department—
the plan area;
a water supply scheme;
a water supply scheme zone;
a water management area;
a water management area zone;
the underground water management area;
an underground water sub-area;
an underground water zone.
The location of each office of the department is available on the department’s website.
(a) the plan area;
(b) a water supply scheme;
(c) a water supply scheme zone;
(d) a water management area;
(e) a water management area zone;
(f) the underground water management area;
(g) an underground water sub-area;
(h) an underground water zone.
pt.3
Water plan outcomes
Water plan outcomes
sec.17
Purpose of part
sec.17 Purpose of part
This part states, for section 43 (1) (b) of the Act , the water plan outcomes for this plan.
sec.18
General water plan outcome
sec.18 General water plan outcome
A water plan outcome for this plan is that water to which this plan applies is to be allocated and managed in a way that—
recognises the natural state of watercourses, lakes, springs and aquifers has changed because of the taking of, or interference with, water; and
is consistent with the relevant version of the Basin Plan, including, for example, the sustainable diversion limits; and
is consistent with water sharing agreements and commitments between the State and New South Wales; and
seeks to achieve a balance between—
the economic water plan outcomes stated in section 19 ; and
the social water plan outcomes stated in section 20 ; and
the cultural water plan outcomes stated in section 21 ; and
the environmental water plan outcomes stated in section 22 ; and
promotes improved understanding of—
matters affecting the flow-related, and underground water dependent, health of ecosystems, including springs, in the plan area; and
the flow requirements of ecosystems in the plan area; and
the water required for social, spiritual, economic, environmental and cultural uses of water by Aboriginal people; and
the water required to deliver social and economic benefits to communities in the plan area; and
the impact of climate change on water availability; and
the actions required to reverse the degradation of natural ecosystems caused by the taking of, or interference with, water to which this plan applies.
(a) recognises the natural state of watercourses, lakes, springs and aquifers has changed because of the taking of, or interference with, water; and
(b) is consistent with the relevant version of the Basin Plan, including, for example, the sustainable diversion limits; and
(c) is consistent with water sharing agreements and commitments between the State and New South Wales; and
(d) seeks to achieve a balance between— (i) the economic water plan outcomes stated in section 19 ; and (ii) the social water plan outcomes stated in section 20 ; and (iii) the cultural water plan outcomes stated in section 21 ; and (iv) the environmental water plan outcomes stated in section 22 ; and
(i) the economic water plan outcomes stated in section 19 ; and
(ii) the social water plan outcomes stated in section 20 ; and
(iii) the cultural water plan outcomes stated in section 21 ; and
(iv) the environmental water plan outcomes stated in section 22 ; and
(e) promotes improved understanding of— (i) matters affecting the flow-related, and underground water dependent, health of ecosystems, including springs, in the plan area; and (ii) the flow requirements of ecosystems in the plan area; and (iii) the water required for social, spiritual, economic, environmental and cultural uses of water by Aboriginal people; and (iv) the water required to deliver social and economic benefits to communities in the plan area; and (v) the impact of climate change on water availability; and (vi) the actions required to reverse the degradation of natural ecosystems caused by the taking of, or interference with, water to which this plan applies.
(i) matters affecting the flow-related, and underground water dependent, health of ecosystems, including springs, in the plan area; and
(ii) the flow requirements of ecosystems in the plan area; and
(iii) the water required for social, spiritual, economic, environmental and cultural uses of water by Aboriginal people; and
(iv) the water required to deliver social and economic benefits to communities in the plan area; and
(v) the impact of climate change on water availability; and
(vi) the actions required to reverse the degradation of natural ecosystems caused by the taking of, or interference with, water to which this plan applies.
(i) the economic water plan outcomes stated in section 19 ; and
(ii) the social water plan outcomes stated in section 20 ; and
(iii) the cultural water plan outcomes stated in section 21 ; and
(iv) the environmental water plan outcomes stated in section 22 ; and
(i) matters affecting the flow-related, and underground water dependent, health of ecosystems, including springs, in the plan area; and
(ii) the flow requirements of ecosystems in the plan area; and
(iii) the water required for social, spiritual, economic, environmental and cultural uses of water by Aboriginal people; and
(iv) the water required to deliver social and economic benefits to communities in the plan area; and
(v) the impact of climate change on water availability; and
(vi) the actions required to reverse the degradation of natural ecosystems caused by the taking of, or interference with, water to which this plan applies.
sec.19
Water plan outcomes—economic
sec.19 Water plan outcomes—economic
The economic water plan outcomes for this plan are—
to maintain the probability of being able to take water to which this plan applies under a water entitlement; and
to maintain and, if possible, improve the productive base of underground water to which this plan applies; and
to improve and support the effective and efficient operation of the market in water allocations and relocatable water licences; and
to maintain the availability of water to which this plan applies for stock purposes and tourism in the plan area; and
to maintain the availability of water to which this plan applies for industries dependent on water resources in the plan area; and
to maintain and, if possible, improve flood flows to support grazing activities in the plan area and in the Lower Balonne distributary system; and
to make water to which this plan applies available to support the economic and social aspirations of Aboriginal people.
In this section—
relocatable water licence means a water licence that the water management protocol for this plan states may be relocated, in whole or in part, under section 126 (1) (a) of the Act .
(sec.19-ssec.1) The economic water plan outcomes for this plan are— to maintain the probability of being able to take water to which this plan applies under a water entitlement; and to maintain and, if possible, improve the productive base of underground water to which this plan applies; and to improve and support the effective and efficient operation of the market in water allocations and relocatable water licences; and to maintain the availability of water to which this plan applies for stock purposes and tourism in the plan area; and to maintain the availability of water to which this plan applies for industries dependent on water resources in the plan area; and to maintain and, if possible, improve flood flows to support grazing activities in the plan area and in the Lower Balonne distributary system; and to make water to which this plan applies available to support the economic and social aspirations of Aboriginal people.
(sec.19-ssec.2) In this section— relocatable water licence means a water licence that the water management protocol for this plan states may be relocated, in whole or in part, under section 126 (1) (a) of the Act .
(a) to maintain the probability of being able to take water to which this plan applies under a water entitlement; and
(b) to maintain and, if possible, improve the productive base of underground water to which this plan applies; and
(c) to improve and support the effective and efficient operation of the market in water allocations and relocatable water licences; and
(d) to maintain the availability of water to which this plan applies for stock purposes and tourism in the plan area; and
(e) to maintain the availability of water to which this plan applies for industries dependent on water resources in the plan area; and
(f) to maintain and, if possible, improve flood flows to support grazing activities in the plan area and in the Lower Balonne distributary system; and
(g) to make water to which this plan applies available to support the economic and social aspirations of Aboriginal people.
sec.20
Water plan outcomes—social
sec.20 Water plan outcomes—social
The social water plan outcomes for this plan are—
to maintain—
the availability of water to which this plan applies for the supply of urban water to towns and communities dependent on the water resources of the plan area; and
the flows of water to which this plan applies that support water-related aesthetic, cultural and recreational values; and
to provide water to which this plan applies for domestic purposes in the plan area.
(a) to maintain— (i) the availability of water to which this plan applies for the supply of urban water to towns and communities dependent on the water resources of the plan area; and (ii) the flows of water to which this plan applies that support water-related aesthetic, cultural and recreational values; and
(i) the availability of water to which this plan applies for the supply of urban water to towns and communities dependent on the water resources of the plan area; and
(ii) the flows of water to which this plan applies that support water-related aesthetic, cultural and recreational values; and
(b) to provide water to which this plan applies for domestic purposes in the plan area.
(i) the availability of water to which this plan applies for the supply of urban water to towns and communities dependent on the water resources of the plan area; and
(ii) the flows of water to which this plan applies that support water-related aesthetic, cultural and recreational values; and
sec.21
Water plan outcomes—cultural
sec.21 Water plan outcomes—cultural
The cultural water plan outcomes for this plan are to maintain flows of water to which this plan applies that support the water-related cultural, spiritual, social and environmental values of Aboriginal people.
sec.22
Water plan outcomes—environmental
sec.22 Water plan outcomes—environmental
The environmental water plan outcomes for this plan are—
to maintain the probability of being able to take surface water to which this plan applies under a water entitlement held only for providing benefit to the environment; and
a water entitlement held by CEWH
a water entitlement held only for protecting and restoring the health of Murray-Darling Basin ecosystems
to maintain and, if possible, improve flows of water to which this plan applies that support—
waterholes as refugia; and
river channels; and
river-forming processes; and
to maintain and, if possible, improve flows of water to which this plan applies that support bird breeding at Narran Lakes; and
to maintain and, if possible, improve flows of water to which this plan applies that support floodplain ecosystems within and downstream of the plan area, including—
the Balonne River floodplain; and
the Culgoa River floodplain; and
Narran Lakes; and
to minimise changes to flows of water in the plan area that support fish movement and fish recruitment; and
to minimise adverse environmental impacts, relating to water to which this plan applies, caused by the operation of infrastructure in the plan area; and
bank erosion, thermal alteration of waters, degradation of water quality
to minimise water quality degradation in relation to—
for surface water to which this plan applies—flow; and
for underground water to which this plan applies—flow and pressure; and
to maintain an underground water regime in the plan area that supports ecosystems dependent on underground water to which this plan applies.
In this section—
fish recruitment means the successful development and growth of a juvenile fish to a stage at which the fish has the ability to reproduce.
underground water regime means the profile of underground water levels, hydraulic head and direction of underground water flow as represented by water levels at nodes M, N and O.
waterhole means a part of a watercourse that contains water after the watercourse stops flowing, other than a part of the watercourse that is within the storage area of a dam or weir on the watercourse.
(sec.22-ssec.1) The environmental water plan outcomes for this plan are— to maintain the probability of being able to take surface water to which this plan applies under a water entitlement held only for providing benefit to the environment; and a water entitlement held by CEWH a water entitlement held only for protecting and restoring the health of Murray-Darling Basin ecosystems to maintain and, if possible, improve flows of water to which this plan applies that support— waterholes as refugia; and river channels; and river-forming processes; and to maintain and, if possible, improve flows of water to which this plan applies that support bird breeding at Narran Lakes; and to maintain and, if possible, improve flows of water to which this plan applies that support floodplain ecosystems within and downstream of the plan area, including— the Balonne River floodplain; and the Culgoa River floodplain; and Narran Lakes; and to minimise changes to flows of water in the plan area that support fish movement and fish recruitment; and to minimise adverse environmental impacts, relating to water to which this plan applies, caused by the operation of infrastructure in the plan area; and bank erosion, thermal alteration of waters, degradation of water quality to minimise water quality degradation in relation to— for surface water to which this plan applies—flow; and for underground water to which this plan applies—flow and pressure; and to maintain an underground water regime in the plan area that supports ecosystems dependent on underground water to which this plan applies.
(sec.22-ssec.2) In this section— fish recruitment means the successful development and growth of a juvenile fish to a stage at which the fish has the ability to reproduce. underground water regime means the profile of underground water levels, hydraulic head and direction of underground water flow as represented by water levels at nodes M, N and O. waterhole means a part of a watercourse that contains water after the watercourse stops flowing, other than a part of the watercourse that is within the storage area of a dam or weir on the watercourse.
(a) to maintain the probability of being able to take surface water to which this plan applies under a water entitlement held only for providing benefit to the environment; and Examples of a water entitlement held only for providing benefit to the environment— • a water entitlement held by CEWH • a water entitlement held only for protecting and restoring the health of Murray-Darling Basin ecosystems
• a water entitlement held by CEWH
• a water entitlement held only for protecting and restoring the health of Murray-Darling Basin ecosystems
(b) to maintain and, if possible, improve flows of water to which this plan applies that support— (i) waterholes as refugia; and (ii) river channels; and (iii) river-forming processes; and
(i) waterholes as refugia; and
(ii) river channels; and
(iii) river-forming processes; and
(c) to maintain and, if possible, improve flows of water to which this plan applies that support bird breeding at Narran Lakes; and
(d) to maintain and, if possible, improve flows of water to which this plan applies that support floodplain ecosystems within and downstream of the plan area, including— (i) the Balonne River floodplain; and (ii) the Culgoa River floodplain; and (iii) Narran Lakes; and
(i) the Balonne River floodplain; and
(ii) the Culgoa River floodplain; and
(iii) Narran Lakes; and
(e) to minimise changes to flows of water in the plan area that support fish movement and fish recruitment; and
(f) to minimise adverse environmental impacts, relating to water to which this plan applies, caused by the operation of infrastructure in the plan area; and Examples of adverse environmental impacts— bank erosion, thermal alteration of waters, degradation of water quality
(g) to minimise water quality degradation in relation to— (i) for surface water to which this plan applies—flow; and (ii) for underground water to which this plan applies—flow and pressure; and
(i) for surface water to which this plan applies—flow; and
(ii) for underground water to which this plan applies—flow and pressure; and
(h) to maintain an underground water regime in the plan area that supports ecosystems dependent on underground water to which this plan applies.
• a water entitlement held by CEWH
• a water entitlement held only for protecting and restoring the health of Murray-Darling Basin ecosystems
(i) waterholes as refugia; and
(ii) river channels; and
(iii) river-forming processes; and
(i) the Balonne River floodplain; and
(ii) the Culgoa River floodplain; and
(iii) Narran Lakes; and
(i) for surface water to which this plan applies—flow; and
(ii) for underground water to which this plan applies—flow and pressure; and
pt.4
Measures for achieving water plan outcomes
Measures for achieving water plan outcomes
sec.23
General measures that contribute to achieving water plan outcomes
sec.23 General measures that contribute to achieving water plan outcomes
Measures that contribute to achieving the water plan outcomes stated in sections 18 (b) , 19 (1) (a) and (b) , 21 and 22 (1) (a) to (e) and (g) and (h) are—
all water allocations are measured, as directed by the chief executive, by 31 December 2022; and
all water licences to take underground water to which this plan applies in the following underground water units are measured, as directed by the chief executive, by 31 December 2025—
St George Alluvium (deep);
the Upper Condamine Alluvium (Central Condamine Alluvium);
the Upper Condamine Alluvium (Tributaries);
the Upper Condamine Basalts;
the Condamine Fractured Rock.
A measure that contributes to achieving the water plan outcome stated in section 18 (b) is the annual publication by the chief executive of a water use report that includes information about compliance with the sustainable diversion limits.
A measure that contributes to achieving the water plan outcomes stated in sections 18 (b) , 19 (1) (f) , 21 and 22 (1) (b) to (e) is each decision by the chief executive to implement a flow management arrangement in the Lower Balonne is recorded and published by the chief executive at least annually.
A measure that contributes to achieving the water plan outcomes stated in sections 18 to 22 is that a monitoring, evaluation and reporting strategy, to support assessment of the effectiveness of this plan and its implementation, is developed by the chief executive by 1 July 2020.
(sec.23-ssec.1) Measures that contribute to achieving the water plan outcomes stated in sections 18 (b) , 19 (1) (a) and (b) , 21 and 22 (1) (a) to (e) and (g) and (h) are— all water allocations are measured, as directed by the chief executive, by 31 December 2022; and all water licences to take underground water to which this plan applies in the following underground water units are measured, as directed by the chief executive, by 31 December 2025— St George Alluvium (deep); the Upper Condamine Alluvium (Central Condamine Alluvium); the Upper Condamine Alluvium (Tributaries); the Upper Condamine Basalts; the Condamine Fractured Rock.
(sec.23-ssec.2) A measure that contributes to achieving the water plan outcome stated in section 18 (b) is the annual publication by the chief executive of a water use report that includes information about compliance with the sustainable diversion limits.
(sec.23-ssec.3) A measure that contributes to achieving the water plan outcomes stated in sections 18 (b) , 19 (1) (f) , 21 and 22 (1) (b) to (e) is each decision by the chief executive to implement a flow management arrangement in the Lower Balonne is recorded and published by the chief executive at least annually.
(sec.23-ssec.4) A measure that contributes to achieving the water plan outcomes stated in sections 18 to 22 is that a monitoring, evaluation and reporting strategy, to support assessment of the effectiveness of this plan and its implementation, is developed by the chief executive by 1 July 2020.
(a) all water allocations are measured, as directed by the chief executive, by 31 December 2022; and
(b) all water licences to take underground water to which this plan applies in the following underground water units are measured, as directed by the chief executive, by 31 December 2025— (i) St George Alluvium (deep); (ii) the Upper Condamine Alluvium (Central Condamine Alluvium); (iii) the Upper Condamine Alluvium (Tributaries); (iv) the Upper Condamine Basalts; (v) the Condamine Fractured Rock.
(i) St George Alluvium (deep);
(ii) the Upper Condamine Alluvium (Central Condamine Alluvium);
(iii) the Upper Condamine Alluvium (Tributaries);
(iv) the Upper Condamine Basalts;
(v) the Condamine Fractured Rock.
(i) St George Alluvium (deep);
(ii) the Upper Condamine Alluvium (Central Condamine Alluvium);
(iii) the Upper Condamine Alluvium (Tributaries);
(iv) the Upper Condamine Basalts;
(v) the Condamine Fractured Rock.
sec.24
Measures that contribute to achieving particular economic water plan outcomes
sec.24 Measures that contribute to achieving particular economic water plan outcomes
Measures that contribute to achieving the water plan outcome stated in section 19 (1) (c) are—
information about the number, value and volume of water entitlement trades is collected and analysed; and
opportunities to improve the effectiveness and efficiency of the market in tradeable water entitlements are analysed; and
the information and analysis mentioned in paragraphs (a) and (b) are published by the chief executive within 5 years of the commencement; and
the establishment by the chief executive, within 2 years of the commencement, of a process for the granting of water entitlements for the taking of unallocated water, reserved under this plan for the purpose of ‘any’, for achieving the water plan outcome mentioned in section 19 (1) (g) .
See section 41 for unallocated water reserved under this plan.
(a) information about the number, value and volume of water entitlement trades is collected and analysed; and
(b) opportunities to improve the effectiveness and efficiency of the market in tradeable water entitlements are analysed; and
(c) the information and analysis mentioned in paragraphs (a) and (b) are published by the chief executive within 5 years of the commencement; and
(d) the establishment by the chief executive, within 2 years of the commencement, of a process for the granting of water entitlements for the taking of unallocated water, reserved under this plan for the purpose of ‘any’, for achieving the water plan outcome mentioned in section 19 (1) (g) . Note— See section 41 for unallocated water reserved under this plan.
sec.25
Measure that contributes to achieving particular cultural water plan outcomes
sec.25 Measure that contributes to achieving particular cultural water plan outcomes
A measure that contributes to achieving the water plan outcomes stated in sections 18 (e) (iii) and 21 is the publishing by the chief executive, within 5 years of the commencement, of a report on the flow requirements to support cultural values and uses, informed by engagement with Aboriginal people.
pt.5
Objectives and performance indicators
Objectives and performance indicators
pt.5-div.1
Environmental flow objectives and performance indicators
Environmental flow objectives and performance indicators
sec.26
Environmental flow objectives and performance indicators for surface water— Act , s 43
sec.26 Environmental flow objectives and performance indicators for surface water— Act , s 43
For section 43 (1) (d) of the Act , the environmental flow objectives for surface water to which this plan applies are stated in schedule 7 , part 1 .
The performance indicators for the environmental flow objectives for surface water to which this plan applies are stated in schedule 7 , part 1 .
(sec.26-ssec.1) For section 43 (1) (d) of the Act , the environmental flow objectives for surface water to which this plan applies are stated in schedule 7 , part 1 .
(sec.26-ssec.2) The performance indicators for the environmental flow objectives for surface water to which this plan applies are stated in schedule 7 , part 1 .
sec.27
Environmental flow objectives and performance indicators for underground water— Act , s 43
sec.27 Environmental flow objectives and performance indicators for underground water— Act , s 43
For section 43 (1) (d) of the Act , the environmental flow objectives for underground water to which this plan applies are stated in schedule 7 , part 2 .
The performance indicators for the environmental flow objectives for underground water to which this plan applies are stated in schedule 7 , part 2 .
(sec.27-ssec.1) For section 43 (1) (d) of the Act , the environmental flow objectives for underground water to which this plan applies are stated in schedule 7 , part 2 .
(sec.27-ssec.2) The performance indicators for the environmental flow objectives for underground water to which this plan applies are stated in schedule 7 , part 2 .
pt.5-div.2
Water allocation security objectives and performance indicators
Water allocation security objectives and performance indicators
sec.28
Water allocation security objectives and performance indicators for surface water— Act , s 43
sec.28 Water allocation security objectives and performance indicators for surface water— Act , s 43
For section 43 (1) (e) (ii) of the Act , the water allocation security objectives for surface water to which this plan applies are that—
the performance ratio, for the group of water allocations that state they are in the ‘risk class A group’, is not less than 99% of what the performance ratio for the group was immediately before the commencement; and
the performance ratio, for each group of water allocations that state they are in the ‘risk class B group’, the ‘high class A group’, the ‘high class B group’, the ‘high priority group’ or the ‘medium priority group’, is not less than what the performance ratio for the group was immediately before the commencement; and
the performance ratio, for each group of water allocations not mentioned in paragraph (a) or (b) , is not less than 99% of what the performance ratio for the group was immediately before the commencement.
The performance indicators for the water allocation security objectives for surface water to which this plan applies are the performance ratios for each group of water allocations mentioned in subsection (1) .
(sec.28-ssec.1) For section 43 (1) (e) (ii) of the Act , the water allocation security objectives for surface water to which this plan applies are that— the performance ratio, for the group of water allocations that state they are in the ‘risk class A group’, is not less than 99% of what the performance ratio for the group was immediately before the commencement; and the performance ratio, for each group of water allocations that state they are in the ‘risk class B group’, the ‘high class A group’, the ‘high class B group’, the ‘high priority group’ or the ‘medium priority group’, is not less than what the performance ratio for the group was immediately before the commencement; and the performance ratio, for each group of water allocations not mentioned in paragraph (a) or (b) , is not less than 99% of what the performance ratio for the group was immediately before the commencement.
(sec.28-ssec.2) The performance indicators for the water allocation security objectives for surface water to which this plan applies are the performance ratios for each group of water allocations mentioned in subsection (1) .
(a) the performance ratio, for the group of water allocations that state they are in the ‘risk class A group’, is not less than 99% of what the performance ratio for the group was immediately before the commencement; and
(b) the performance ratio, for each group of water allocations that state they are in the ‘risk class B group’, the ‘high class A group’, the ‘high class B group’, the ‘high priority group’ or the ‘medium priority group’, is not less than what the performance ratio for the group was immediately before the commencement; and
(c) the performance ratio, for each group of water allocations not mentioned in paragraph (a) or (b) , is not less than 99% of what the performance ratio for the group was immediately before the commencement.
sec.29
Water allocation security objective and performance indicator for underground water— Act , s 43
sec.29 Water allocation security objective and performance indicator for underground water— Act , s 43
For section 43 (1) (e) (ii) of the Act , the water allocation security objective for underground water to which this plan applies is that the performance ratio for a water allocation group mentioned in schedule 8 , column 2, is—
for water allocation group UCA03, UCA06 or UCA09—the percentage stated for the group in schedule 8 , column 4; or
for another water allocation group—at least the percentage stated for the group in schedule 8 , column 4.
The performance indicator for the water allocation security objective for underground water to which this plan applies is the performance ratio for each water allocation group mentioned in schedule 8 , column 2.
(sec.29-ssec.1) For section 43 (1) (e) (ii) of the Act , the water allocation security objective for underground water to which this plan applies is that the performance ratio for a water allocation group mentioned in schedule 8 , column 2, is— for water allocation group UCA03, UCA06 or UCA09—the percentage stated for the group in schedule 8 , column 4; or for another water allocation group—at least the percentage stated for the group in schedule 8 , column 4.
(sec.29-ssec.2) The performance indicator for the water allocation security objective for underground water to which this plan applies is the performance ratio for each water allocation group mentioned in schedule 8 , column 2.
(a) for water allocation group UCA03, UCA06 or UCA09—the percentage stated for the group in schedule 8 , column 4; or
(b) for another water allocation group—at least the percentage stated for the group in schedule 8 , column 4.
pt.5-div.3
Calculation of performance indicators
Calculation of performance indicators
sec.30
Calculation of performance indicators
sec.30 Calculation of performance indicators
A performance indicator mentioned in section 26 to 29 must be calculated on the assumption that unallocated water reserved under this plan is being taken.
See section 41 for unallocated water reserved under this plan.
Subsection (3) applies in relation to a decision made by the chief executive under chapter 2 of the Act —
that will result in the addition of a water allocation to, or the omission of a water allocation from, a priority group or a water allocation group; or
to approve an application under section 159 of the Act to change a water allocation.
In assessing the consistency of the decision with the water allocation security objectives, the performance indicators must be calculated on the assumption the water allocation being added, omitted or changed is not part of a priority group or a water allocation group.
(sec.30-ssec.1) A performance indicator mentioned in section 26 to 29 must be calculated on the assumption that unallocated water reserved under this plan is being taken. See section 41 for unallocated water reserved under this plan.
(sec.30-ssec.2) Subsection (3) applies in relation to a decision made by the chief executive under chapter 2 of the Act — that will result in the addition of a water allocation to, or the omission of a water allocation from, a priority group or a water allocation group; or to approve an application under section 159 of the Act to change a water allocation.
(sec.30-ssec.3) In assessing the consistency of the decision with the water allocation security objectives, the performance indicators must be calculated on the assumption the water allocation being added, omitted or changed is not part of a priority group or a water allocation group.
(a) that will result in the addition of a water allocation to, or the omission of a water allocation from, a priority group or a water allocation group; or
(b) to approve an application under section 159 of the Act to change a water allocation.
pt.6
Garden size and volume of water for watering
Garden size and volume of water for watering
sec.31
Garden size and volume of water for watering— Act , s 6
sec.31 Garden size and volume of water for watering— Act , s 6
For section 6 (3) (a) of the Act , a combined garden size of 0.25ha is stated for this plan.
For section 6 (3) (b) of the Act , the volume of water that is sufficient to water a garden, with a combined size not exceeding 0.25ha, in the plan area is 2ML a year.
(sec.31-ssec.1) For section 6 (3) (a) of the Act , a combined garden size of 0.25ha is stated for this plan.
(sec.31-ssec.2) For section 6 (3) (b) of the Act , the volume of water that is sufficient to water a garden, with a combined size not exceeding 0.25ha, in the plan area is 2ML a year.
pt.7
Particular decisions about allocation or management of water
Particular decisions about allocation or management of water
sec.32
Definition for part
sec.32 Definition for part
In this part—
decision means a decision made by the chief executive under chapter 2 of the Act about the allocation or management of water to which this plan applies, other than a decision about a water permit.
sec.33
Decisions must not increase amount of water taken
sec.33 Decisions must not increase amount of water taken
A decision must not increase—
the average volume of surface water or underground water that may be taken under this plan; or
the combined total of each nominal entitlement for water licences to take underground water to which this plan applies, other than water licences to which water sharing rules apply.
Subsection (1) does not apply to a decision about—
the reinstatement of a water licence; or
taking unallocated water reserved under this plan; or
See section 41 for unallocated water reserved under this plan.
taking or interfering with underground water to which this plan applies that is not in an underground water unit.
(sec.33-ssec.1) A decision must not increase— the average volume of surface water or underground water that may be taken under this plan; or the combined total of each nominal entitlement for water licences to take underground water to which this plan applies, other than water licences to which water sharing rules apply.
(sec.33-ssec.2) Subsection (1) does not apply to a decision about— the reinstatement of a water licence; or taking unallocated water reserved under this plan; or See section 41 for unallocated water reserved under this plan. taking or interfering with underground water to which this plan applies that is not in an underground water unit.
(a) the average volume of surface water or underground water that may be taken under this plan; or
(b) the combined total of each nominal entitlement for water licences to take underground water to which this plan applies, other than water licences to which water sharing rules apply.
(a) the reinstatement of a water licence; or
(b) taking unallocated water reserved under this plan; or Note— See section 41 for unallocated water reserved under this plan.
(c) taking or interfering with underground water to which this plan applies that is not in an underground water unit.
sec.34
Particular decisions must be consistent with particular objectives
sec.34 Particular decisions must be consistent with particular objectives
A decision must be consistent with—
for a decision about the allocation or management of surface water to which this plan applies—
the environmental flow objectives stated in section 26 (1) ; and
the water allocation security objectives stated in section 28 (1) ; or
for a decision about the allocation or management of underground water to which this plan applies—
the environmental flow objectives stated in section 27 (1) ; and
the water allocation security objective stated in section 29 (1) .
This section does not apply to a decision to implement a flow management arrangement in the Lower Balonne.
(sec.34-ssec.1) A decision must be consistent with— for a decision about the allocation or management of surface water to which this plan applies— the environmental flow objectives stated in section 26 (1) ; and the water allocation security objectives stated in section 28 (1) ; or for a decision about the allocation or management of underground water to which this plan applies— the environmental flow objectives stated in section 27 (1) ; and the water allocation security objective stated in section 29 (1) .
(sec.34-ssec.2) This section does not apply to a decision to implement a flow management arrangement in the Lower Balonne.
(a) for a decision about the allocation or management of surface water to which this plan applies— (i) the environmental flow objectives stated in section 26 (1) ; and (ii) the water allocation security objectives stated in section 28 (1) ; or
(i) the environmental flow objectives stated in section 26 (1) ; and
(ii) the water allocation security objectives stated in section 28 (1) ; or
(b) for a decision about the allocation or management of underground water to which this plan applies— (i) the environmental flow objectives stated in section 27 (1) ; and (ii) the water allocation security objective stated in section 29 (1) .
(i) the environmental flow objectives stated in section 27 (1) ; and
(ii) the water allocation security objective stated in section 29 (1) .
(i) the environmental flow objectives stated in section 26 (1) ; and
(ii) the water allocation security objectives stated in section 28 (1) ; or
(i) the environmental flow objectives stated in section 27 (1) ; and
(ii) the water allocation security objective stated in section 29 (1) .
sec.35
Assessing consistency with particular objectives
sec.35 Assessing consistency with particular objectives
To assess the consistency of a decision with the environmental flow objectives and the water allocation security objectives, the model computer program’s simulation for the simulation period must be used.
If it is not practicable to use the model computer program’s simulation, another kind of assessment approved by the chief executive may be used.
In this section—
model computer program means—
the eWater Source computer program; or
the MODFLOW computer program; or
the statistical analysis and reporting programs associated with a computer program mentioned in paragraph (a) or (b) .
(sec.35-ssec.1) To assess the consistency of a decision with the environmental flow objectives and the water allocation security objectives, the model computer program’s simulation for the simulation period must be used.
(sec.35-ssec.2) If it is not practicable to use the model computer program’s simulation, another kind of assessment approved by the chief executive may be used.
(sec.35-ssec.3) In this section— model computer program means— the eWater Source computer program; or the MODFLOW computer program; or the statistical analysis and reporting programs associated with a computer program mentioned in paragraph (a) or (b) .
(a) the eWater Source computer program; or
(b) the MODFLOW computer program; or
(c) the statistical analysis and reporting programs associated with a computer program mentioned in paragraph (a) or (b) .
pt.8
Limitations on taking or interfering with water
Limitations on taking or interfering with water
sec.36
Limitations on taking water for particular activities— Act , s 101
sec.36 Limitations on taking water for particular activities— Act , s 101
For section 101 (1) of the Act —
the combined total amount of water to which this plan applies that may be taken for all activities prescribed under section 101 (1) (a) of the Act is 2ML a year; and
a person must not take water to which this plan applies for an activity prescribed under section 101 (1) (a) of the Act unless the water is taken using existing works.
Subsection (1) (b) does not apply to underground water to which this plan applies taken from the following underground water units—
the St George Alluvium (shallow);
the sediments above the Great Artesian Basin;
the Queensland Murray-Darling Basin deep.
In this section—
existing works means works—
that are used, or capable of being used, to take or interfere with water; and
to which 1 of the following applies—
the works were constructed before the commencement;
for works used, or capable of being used, to take or interfere with underground water to which this plan applies—the works are a replacement water bore that replaces works mentioned in subparagraph (i) ;
for works used, or capable of being used, to take or interfere with surface water—the works replace works mentioned in subparagraph (i) .
(sec.36-ssec.1) For section 101 (1) of the Act — the combined total amount of water to which this plan applies that may be taken for all activities prescribed under section 101 (1) (a) of the Act is 2ML a year; and a person must not take water to which this plan applies for an activity prescribed under section 101 (1) (a) of the Act unless the water is taken using existing works.
(sec.36-ssec.2) Subsection (1) (b) does not apply to underground water to which this plan applies taken from the following underground water units— the St George Alluvium (shallow); the sediments above the Great Artesian Basin; the Queensland Murray-Darling Basin deep.
(sec.36-ssec.3) In this section— existing works means works— that are used, or capable of being used, to take or interfere with water; and to which 1 of the following applies— the works were constructed before the commencement; for works used, or capable of being used, to take or interfere with underground water to which this plan applies—the works are a replacement water bore that replaces works mentioned in subparagraph (i) ; for works used, or capable of being used, to take or interfere with surface water—the works replace works mentioned in subparagraph (i) .
(a) the combined total amount of water to which this plan applies that may be taken for all activities prescribed under section 101 (1) (a) of the Act is 2ML a year; and
(b) a person must not take water to which this plan applies for an activity prescribed under section 101 (1) (a) of the Act unless the water is taken using existing works.
(a) the St George Alluvium (shallow);
(b) the sediments above the Great Artesian Basin;
(c) the Queensland Murray-Darling Basin deep.
(a) that are used, or capable of being used, to take or interfere with water; and
(b) to which 1 of the following applies— (i) the works were constructed before the commencement; (ii) for works used, or capable of being used, to take or interfere with underground water to which this plan applies—the works are a replacement water bore that replaces works mentioned in subparagraph (i) ; (iii) for works used, or capable of being used, to take or interfere with surface water—the works replace works mentioned in subparagraph (i) .
(i) the works were constructed before the commencement;
(ii) for works used, or capable of being used, to take or interfere with underground water to which this plan applies—the works are a replacement water bore that replaces works mentioned in subparagraph (i) ;
(iii) for works used, or capable of being used, to take or interfere with surface water—the works replace works mentioned in subparagraph (i) .
(i) the works were constructed before the commencement;
(ii) for works used, or capable of being used, to take or interfere with underground water to which this plan applies—the works are a replacement water bore that replaces works mentioned in subparagraph (i) ;
(iii) for works used, or capable of being used, to take or interfere with surface water—the works replace works mentioned in subparagraph (i) .
sec.37
Limitations on taking overland flow water— Act , s 101
sec.37 Limitations on taking overland flow water— Act , s 101
For section 101 (1) of the Act , a person must not, under section 101 (1) (b) of the Act , take overland flow water to which this plan applies unless the water—
is taken under a water entitlement or water permit; or
is taken for stock purposes or domestic purposes; or
is taken using notified existing overland flow works.
See also section 101 (3) of the Act for when a person cannot be prevented from taking overland flow water that is contaminated agricultural run-off.
However, subsection (1) (c) does not apply to the person if the person holds a water licence to take the overland flow water using the works.
(sec.37-ssec.1) For section 101 (1) of the Act , a person must not, under section 101 (1) (b) of the Act , take overland flow water to which this plan applies unless the water— is taken under a water entitlement or water permit; or is taken for stock purposes or domestic purposes; or is taken using notified existing overland flow works. See also section 101 (3) of the Act for when a person cannot be prevented from taking overland flow water that is contaminated agricultural run-off.
(sec.37-ssec.2) However, subsection (1) (c) does not apply to the person if the person holds a water licence to take the overland flow water using the works.
(a) is taken under a water entitlement or water permit; or
(b) is taken for stock purposes or domestic purposes; or
(c) is taken using notified existing overland flow works.
sec.38
Limitations on taking or interfering with underground water in underground water management area— Act , s 101
sec.38 Limitations on taking or interfering with underground water in underground water management area— Act , s 101
For section 101 (1) of the Act , a person must not, under section 101 (1) (c) of the Act , take or interfere with underground water to which this plan applies, from an underground water unit, unless the water is taken or interfered with—
under a water entitlement or water permit; or
under a seasonal water assignment notice; or
for stock purposes or domestic purposes; or
for underground water in the Queensland Murray-Darling Basin deep—using existing underground water works.
Subsection (1) (c) is subject to section 39 .
In this section—
existing underground water works means works that—
are used, or are capable of being used, to take or interfere with underground water to which this plan applies; and
either—
were constructed before the commencement; or
are a replacement water bore that replaces works mentioned in subparagraph (i) .
(sec.38-ssec.1) For section 101 (1) of the Act , a person must not, under section 101 (1) (c) of the Act , take or interfere with underground water to which this plan applies, from an underground water unit, unless the water is taken or interfered with— under a water entitlement or water permit; or under a seasonal water assignment notice; or for stock purposes or domestic purposes; or for underground water in the Queensland Murray-Darling Basin deep—using existing underground water works.
(sec.38-ssec.2) Subsection (1) (c) is subject to section 39 .
(sec.38-ssec.3) In this section— existing underground water works means works that— are used, or are capable of being used, to take or interfere with underground water to which this plan applies; and either— were constructed before the commencement; or are a replacement water bore that replaces works mentioned in subparagraph (i) .
(a) under a water entitlement or water permit; or
(b) under a seasonal water assignment notice; or
(c) for stock purposes or domestic purposes; or
(d) for underground water in the Queensland Murray-Darling Basin deep—using existing underground water works.
(a) are used, or are capable of being used, to take or interfere with underground water to which this plan applies; and
(b) either— (i) were constructed before the commencement; or (ii) are a replacement water bore that replaces works mentioned in subparagraph (i) .
(i) were constructed before the commencement; or
(ii) are a replacement water bore that replaces works mentioned in subparagraph (i) .
(i) were constructed before the commencement; or
(ii) are a replacement water bore that replaces works mentioned in subparagraph (i) .
sec.39
Taking or interfering with underground water from land in service area for stock purposes or domestic purposes
sec.39 Taking or interfering with underground water from land in service area for stock purposes or domestic purposes
This section applies to underground water to which this plan applies if the water is—
taken or interfered with, for stock purposes or domestic purposes, on land in a service area; and
taken from any of the following underground water units—
the St George Alluvium (deep);
the Upper Condamine Alluvium (Central Condamine Alluvium);
the Upper Condamine Alluvium (Tributaries);
the Upper Condamine Basalts;
the Condamine Fractured Rock.
The water may only be taken or interfered with using existing underground water works.
In this section—
existing underground water works means works used, or capable of being used, to take or interfere with underground water to which this plan applies if the works—
for underground water taken from an underground water unit mentioned in subsection (1) (b) (i) to (iv) —
were constructed before 19 December 2014; or
were constructed in accordance with an agreement, between the owner of the works and the chief executive, entered into on or between 19 December 2014 and 18 January 2015; or
are a replacement water bore that replaces works mentioned in subparagraph (i) or (ii) ; or
for underground water taken from the Condamine Fractured Rock underground water unit—
were constructed before the commencement; or
are a replacement water bore that replaces works mentioned in subparagraph (i) .
service area means a service area for a retail water service to customers under the Water Supply (Safety and Reliability) Act 2008 .
(sec.39-ssec.1) This section applies to underground water to which this plan applies if the water is— taken or interfered with, for stock purposes or domestic purposes, on land in a service area; and taken from any of the following underground water units— the St George Alluvium (deep); the Upper Condamine Alluvium (Central Condamine Alluvium); the Upper Condamine Alluvium (Tributaries); the Upper Condamine Basalts; the Condamine Fractured Rock.
(sec.39-ssec.2) The water may only be taken or interfered with using existing underground water works.
(sec.39-ssec.3) In this section— existing underground water works means works used, or capable of being used, to take or interfere with underground water to which this plan applies if the works— for underground water taken from an underground water unit mentioned in subsection (1) (b) (i) to (iv) — were constructed before 19 December 2014; or were constructed in accordance with an agreement, between the owner of the works and the chief executive, entered into on or between 19 December 2014 and 18 January 2015; or are a replacement water bore that replaces works mentioned in subparagraph (i) or (ii) ; or for underground water taken from the Condamine Fractured Rock underground water unit— were constructed before the commencement; or are a replacement water bore that replaces works mentioned in subparagraph (i) . service area means a service area for a retail water service to customers under the Water Supply (Safety and Reliability) Act 2008 .
(a) taken or interfered with, for stock purposes or domestic purposes, on land in a service area; and
(b) taken from any of the following underground water units— (i) the St George Alluvium (deep); (ii) the Upper Condamine Alluvium (Central Condamine Alluvium); (iii) the Upper Condamine Alluvium (Tributaries); (iv) the Upper Condamine Basalts; (v) the Condamine Fractured Rock.
(i) the St George Alluvium (deep);
(ii) the Upper Condamine Alluvium (Central Condamine Alluvium);
(iii) the Upper Condamine Alluvium (Tributaries);
(iv) the Upper Condamine Basalts;
(v) the Condamine Fractured Rock.
(i) the St George Alluvium (deep);
(ii) the Upper Condamine Alluvium (Central Condamine Alluvium);
(iii) the Upper Condamine Alluvium (Tributaries);
(iv) the Upper Condamine Basalts;
(v) the Condamine Fractured Rock.
(a) for underground water taken from an underground water unit mentioned in subsection (1) (b) (i) to (iv) — (i) were constructed before 19 December 2014; or (ii) were constructed in accordance with an agreement, between the owner of the works and the chief executive, entered into on or between 19 December 2014 and 18 January 2015; or (iii) are a replacement water bore that replaces works mentioned in subparagraph (i) or (ii) ; or
(i) were constructed before 19 December 2014; or
(ii) were constructed in accordance with an agreement, between the owner of the works and the chief executive, entered into on or between 19 December 2014 and 18 January 2015; or
(iii) are a replacement water bore that replaces works mentioned in subparagraph (i) or (ii) ; or
(b) for underground water taken from the Condamine Fractured Rock underground water unit— (i) were constructed before the commencement; or (ii) are a replacement water bore that replaces works mentioned in subparagraph (i) .
(i) were constructed before the commencement; or
(ii) are a replacement water bore that replaces works mentioned in subparagraph (i) .
(i) were constructed before 19 December 2014; or
(ii) were constructed in accordance with an agreement, between the owner of the works and the chief executive, entered into on or between 19 December 2014 and 18 January 2015; or
(iii) are a replacement water bore that replaces works mentioned in subparagraph (i) or (ii) ; or
(i) were constructed before the commencement; or
(ii) are a replacement water bore that replaces works mentioned in subparagraph (i) .
sec.40
Volume of limited capacity for contaminated agricultural run-off
sec.40 Volume of limited capacity for contaminated agricultural run-off
For State code 10 of the State development assessment provisions, the volume of the limited capacity of contaminated agricultural run-off to which this plan applies is 1ML.
In this section—
State development assessment provisions see the Planning Regulation 2017 , schedule 24 .
(sec.40-ssec.1) For State code 10 of the State development assessment provisions, the volume of the limited capacity of contaminated agricultural run-off to which this plan applies is 1ML.
(sec.40-ssec.2) In this section— State development assessment provisions see the Planning Regulation 2017 , schedule 24 .
pt.9
Unallocated water
Unallocated water
sec.41
Unallocated water reserved under this plan— Act , s 43
sec.41 Unallocated water reserved under this plan— Act , s 43
For section 43 (1) (c) of the Act , the volume of unallocated water reserved under this plan is, for underground water to which this plan applies in an underground water unit mentioned in schedule 9 , column 1, the annual volume of water stated in schedule 9 , column 2 for the underground water unit.
pt.10
Water licences
Water licences
pt.10-div.1
Applications that must not be accepted
Applications that must not be accepted
sec.42
Chief executive must not accept particular applications— Act , s 43
sec.42 Chief executive must not accept particular applications— Act , s 43
For section 43 (2) (j) of the Act , the chief executive must not accept an application for a water licence made under section 107 of the Act unless the chief executive is permitted to accept the application under section 43 or 44 .
sec.43
Particular applications made by local governments
sec.43 Particular applications made by local governments
This section applies in relation to an application made by a local government under section 107 of the Act for a water licence to interfere with the flow of water to which this plan applies.
The chief executive may accept the application if—
the purpose of the proposed interference is to impound water to enable the taking of water under a water allocation held by the local government to supply town water; and
either—
the local government has made a relevant change application to the chief executive; or
the chief executive has approved a relevant change application made by the local government and has given a certificate, for the dealing to which the application relates, to the local government under section 159 (4) of the Act .
If the chief executive grants the application mentioned in subsection (1) , the water licence must include the conditions stated in the water management protocol for the licence.
In this section—
relevant change application means an application, under section 159 (1) of the Act , to change the water allocation mentioned in subsection (2) (a) —
to prevent an increase, due to the proposed interference mentioned in subsection (1) , of the average volume of surface water or underground water that may be taken under this plan; and
to remove a condition stating a flow threshold for taking water; and
to ensure the water allocation is subject to a condition stating that only water impounded by the proposed interference may be taken.
(sec.43-ssec.1) This section applies in relation to an application made by a local government under section 107 of the Act for a water licence to interfere with the flow of water to which this plan applies.
(sec.43-ssec.2) The chief executive may accept the application if— the purpose of the proposed interference is to impound water to enable the taking of water under a water allocation held by the local government to supply town water; and either— the local government has made a relevant change application to the chief executive; or the chief executive has approved a relevant change application made by the local government and has given a certificate, for the dealing to which the application relates, to the local government under section 159 (4) of the Act .
(sec.43-ssec.3) If the chief executive grants the application mentioned in subsection (1) , the water licence must include the conditions stated in the water management protocol for the licence.
(sec.43-ssec.4) In this section— relevant change application means an application, under section 159 (1) of the Act , to change the water allocation mentioned in subsection (2) (a) — to prevent an increase, due to the proposed interference mentioned in subsection (1) , of the average volume of surface water or underground water that may be taken under this plan; and to remove a condition stating a flow threshold for taking water; and to ensure the water allocation is subject to a condition stating that only water impounded by the proposed interference may be taken.
(a) the purpose of the proposed interference is to impound water to enable the taking of water under a water allocation held by the local government to supply town water; and
(b) either— (i) the local government has made a relevant change application to the chief executive; or (ii) the chief executive has approved a relevant change application made by the local government and has given a certificate, for the dealing to which the application relates, to the local government under section 159 (4) of the Act .
(i) the local government has made a relevant change application to the chief executive; or
(ii) the chief executive has approved a relevant change application made by the local government and has given a certificate, for the dealing to which the application relates, to the local government under section 159 (4) of the Act .
(i) the local government has made a relevant change application to the chief executive; or
(ii) the chief executive has approved a relevant change application made by the local government and has given a certificate, for the dealing to which the application relates, to the local government under section 159 (4) of the Act .
(a) to prevent an increase, due to the proposed interference mentioned in subsection (1) , of the average volume of surface water or underground water that may be taken under this plan; and
(b) to remove a condition stating a flow threshold for taking water; and
(c) to ensure the water allocation is subject to a condition stating that only water impounded by the proposed interference may be taken.
sec.44
Applications for water licences to take overland flow water using particular existing overland flow works
sec.44 Applications for water licences to take overland flow water using particular existing overland flow works
This section applies if the owner of land, on which works used to take overland flow water are situated, applies under section 107 of the Act for a water licence to take overland flow water to which this plan applies using the works.
The chief executive may accept the application if the chief executive is reasonably satisfied—
the works are existing overland flow works; and
the works were used to take overland flow water, other than for stock purposes or domestic purposes, before 20 September 2000.
See also section 37 (1) (c) for when a person may take overland flow water using notified existing overland flow works.
(sec.44-ssec.1) This section applies if the owner of land, on which works used to take overland flow water are situated, applies under section 107 of the Act for a water licence to take overland flow water to which this plan applies using the works.
(sec.44-ssec.2) The chief executive may accept the application if the chief executive is reasonably satisfied— the works are existing overland flow works; and the works were used to take overland flow water, other than for stock purposes or domestic purposes, before 20 September 2000. See also section 37 (1) (c) for when a person may take overland flow water using notified existing overland flow works.
(a) the works are existing overland flow works; and
(b) the works were used to take overland flow water, other than for stock purposes or domestic purposes, before 20 September 2000.
pt.10-div.2
Applications inconsistent with this plan
Applications inconsistent with this plan
sec.45
Particular applications for dealing with water licences inconsistent with this plan
sec.45 Particular applications for dealing with water licences inconsistent with this plan
The granting of an application made under section 121 of the Act for a dealing with a water licence in relation to water to which this plan applies is inconsistent with this plan if the application is an application mentioned in section 130 (1) (a) of the Act .
See section 129 of the Act for the actions the chief executive must take if the granting of an application for a dealing with a water licence is inconsistent with a water plan.
However, subsection (1) does not apply to the application if—
the application is made by a local government to allow for increased interference with the flow of water to which this plan applies; and
the purpose of the proposed increased interference is to impound water to enable the taking of water under a water allocation, held by the local government, to supply town water; and
either—
the local government has made a relevant change application to the chief executive; or
the chief executive has approved a relevant change application made by the local government and has given a certificate, for the dealing to which the application relates, to the local government under section 159 (4) of the Act .
See section 130 of the Act for how an application mentioned in this subsection must be assessed.
Also, subsection (1) does not apply if the application is—
an application to amend a water licence to take underground water to change the location from which water may be taken under the licence; or
an application to amalgamate water licences to take underground water.
If the chief executive grants an application to which subsection (2) applies, the water licence to which the dealing relates must include the conditions stated in the water management protocol for the licence.
In this section—
relevant change application means an application, under section 159 (1) of the Act , to change the water allocation mentioned in subsection (2) (b) —
to prevent an increase, due to the proposed increased interference mentioned in subsection (2) (a) , of the average volume of surface water or underground water that may be taken under this plan; and
to remove a condition stating a flow threshold for taking water; and
to ensure the water allocation is subject to a condition stating that only water impounded by the proposed increased interference may be taken.
s 45 amd 2023 Act No. 24 s 75 s ch 1 pt 1
(sec.45-ssec.1) The granting of an application made under section 121 of the Act for a dealing with a water licence in relation to water to which this plan applies is inconsistent with this plan if the application is an application mentioned in section 130 (1) (a) of the Act . See section 129 of the Act for the actions the chief executive must take if the granting of an application for a dealing with a water licence is inconsistent with a water plan.
(sec.45-ssec.2) However, subsection (1) does not apply to the application if— the application is made by a local government to allow for increased interference with the flow of water to which this plan applies; and the purpose of the proposed increased interference is to impound water to enable the taking of water under a water allocation, held by the local government, to supply town water; and either— the local government has made a relevant change application to the chief executive; or the chief executive has approved a relevant change application made by the local government and has given a certificate, for the dealing to which the application relates, to the local government under section 159 (4) of the Act . See section 130 of the Act for how an application mentioned in this subsection must be assessed.
(sec.45-ssec.3) Also, subsection (1) does not apply if the application is— an application to amend a water licence to take underground water to change the location from which water may be taken under the licence; or an application to amalgamate water licences to take underground water.
(sec.45-ssec.4) If the chief executive grants an application to which subsection (2) applies, the water licence to which the dealing relates must include the conditions stated in the water management protocol for the licence.
(sec.45-ssec.5) In this section— relevant change application means an application, under section 159 (1) of the Act , to change the water allocation mentioned in subsection (2) (b) — to prevent an increase, due to the proposed increased interference mentioned in subsection (2) (a) , of the average volume of surface water or underground water that may be taken under this plan; and to remove a condition stating a flow threshold for taking water; and to ensure the water allocation is subject to a condition stating that only water impounded by the proposed increased interference may be taken.
(a) the application is made by a local government to allow for increased interference with the flow of water to which this plan applies; and
(b) the purpose of the proposed increased interference is to impound water to enable the taking of water under a water allocation, held by the local government, to supply town water; and
(c) either— (i) the local government has made a relevant change application to the chief executive; or (ii) the chief executive has approved a relevant change application made by the local government and has given a certificate, for the dealing to which the application relates, to the local government under section 159 (4) of the Act .
(i) the local government has made a relevant change application to the chief executive; or
(ii) the chief executive has approved a relevant change application made by the local government and has given a certificate, for the dealing to which the application relates, to the local government under section 159 (4) of the Act .
(i) the local government has made a relevant change application to the chief executive; or
(ii) the chief executive has approved a relevant change application made by the local government and has given a certificate, for the dealing to which the application relates, to the local government under section 159 (4) of the Act .
(a) an application to amend a water licence to take underground water to change the location from which water may be taken under the licence; or
(b) an application to amalgamate water licences to take underground water.
(a) to prevent an increase, due to the proposed increased interference mentioned in subsection (2) (a) , of the average volume of surface water or underground water that may be taken under this plan; and
(b) to remove a condition stating a flow threshold for taking water; and
(c) to ensure the water allocation is subject to a condition stating that only water impounded by the proposed increased interference may be taken.
pt.10-div.3
Granting particular water licences
Granting particular water licences
sec.46
Water licences granted to authorise particular existing activities— Act , s 116
sec.46 Water licences granted to authorise particular existing activities— Act , s 116
This section applies if a water entitlement notice for this plan provides for the granting of a water licence to interfere with the flow of water to which this plan applies for the purpose of impounding water using any of the following works—
Boodua Weir;
Connolly Dam;
Tipton Weir.
For section 116 (1) of the Act , the chief executive must decide to grant the water licence.
See also section 116 (2) of the Act for when the chief executive may grant a water licence without the need for an application to be made under section 107 of the Act .
(sec.46-ssec.1) This section applies if a water entitlement notice for this plan provides for the granting of a water licence to interfere with the flow of water to which this plan applies for the purpose of impounding water using any of the following works— Boodua Weir; Connolly Dam; Tipton Weir.
(sec.46-ssec.2) For section 116 (1) of the Act , the chief executive must decide to grant the water licence. See also section 116 (2) of the Act for when the chief executive may grant a water licence without the need for an application to be made under section 107 of the Act .
(a) Boodua Weir;
(b) Connolly Dam;
(c) Tipton Weir.
sec.47
Water licence granted to replace expired water licence— Act , s 116
sec.47 Water licence granted to replace expired water licence— Act , s 116
This section applies if a water entitlement notice for this plan provides for the granting of a water licence that replaces expired water licence number 19726R.
For section 116 (1) of the Act , the chief executive must decide to grant the water licence.
See also section 116 (2) of the Act for when the chief executive may grant a water licence without the need for an application to be made under section 107 of the Act .
(sec.47-ssec.1) This section applies if a water entitlement notice for this plan provides for the granting of a water licence that replaces expired water licence number 19726R.
(sec.47-ssec.2) For section 116 (1) of the Act , the chief executive must decide to grant the water licence. See also section 116 (2) of the Act for when the chief executive may grant a water licence without the need for an application to be made under section 107 of the Act .
pt.10-div.4
Water licences to take overland flow water
Water licences to take overland flow water
sec.48
Content and conditions of water licences to take overland flow water
sec.48 Content and conditions of water licences to take overland flow water
A water licence to take overland flow water to which this plan applies must—
state the purpose for which the water may be taken as ‘any’; and
include at least 1 of the following—
the maximum rate at which the water may be taken under the water licence;
the maximum storage capacity of works that may be used to store the water taken under the water licence;
the average annual volume of water that may be taken under the water licence;
the volumetric limit for the water licence.
The water licence may also include the following conditions—
a limit on the volume of the water that may be taken in a stated period;
a limit on the volume of the water that may be stored.
(sec.48-ssec.1) A water licence to take overland flow water to which this plan applies must— state the purpose for which the water may be taken as ‘any’; and include at least 1 of the following— the maximum rate at which the water may be taken under the water licence; the maximum storage capacity of works that may be used to store the water taken under the water licence; the average annual volume of water that may be taken under the water licence; the volumetric limit for the water licence.
(sec.48-ssec.2) The water licence may also include the following conditions— a limit on the volume of the water that may be taken in a stated period; a limit on the volume of the water that may be stored.
(a) state the purpose for which the water may be taken as ‘any’; and
(b) include at least 1 of the following— (i) the maximum rate at which the water may be taken under the water licence; (ii) the maximum storage capacity of works that may be used to store the water taken under the water licence; (iii) the average annual volume of water that may be taken under the water licence; (iv) the volumetric limit for the water licence.
(i) the maximum rate at which the water may be taken under the water licence;
(ii) the maximum storage capacity of works that may be used to store the water taken under the water licence;
(iii) the average annual volume of water that may be taken under the water licence;
(iv) the volumetric limit for the water licence.
(i) the maximum rate at which the water may be taken under the water licence;
(ii) the maximum storage capacity of works that may be used to store the water taken under the water licence;
(iii) the average annual volume of water that may be taken under the water licence;
(iv) the volumetric limit for the water licence.
(a) a limit on the volume of the water that may be taken in a stated period;
(b) a limit on the volume of the water that may be stored.
sec.49
Working out maximum rate
sec.49 Working out maximum rate
This section applies for working out, for section 48 (1) (b) (i) , the maximum rate at which overland flow water may be taken.
The chief executive—
if a certified report for the works that will be used to take the overland flow water has been requested under section 54 (4) (a) (iii) —must have regard to the certified report for the works given to the chief executive; and
may have regard to any other relevant information available to the chief executive.
If the chief executive works out the maximum rate having regard to the size of the pump that will be used to take the overland flow water, the maximum rate must not be greater than the rate stated in the Water Regulation 2016 , schedule 7 , column 3 for the pump size stated opposite in schedule 7 , column 1 of that regulation.
(sec.49-ssec.1) This section applies for working out, for section 48 (1) (b) (i) , the maximum rate at which overland flow water may be taken.
(sec.49-ssec.2) The chief executive— if a certified report for the works that will be used to take the overland flow water has been requested under section 54 (4) (a) (iii) —must have regard to the certified report for the works given to the chief executive; and may have regard to any other relevant information available to the chief executive.
(sec.49-ssec.3) If the chief executive works out the maximum rate having regard to the size of the pump that will be used to take the overland flow water, the maximum rate must not be greater than the rate stated in the Water Regulation 2016 , schedule 7 , column 3 for the pump size stated opposite in schedule 7 , column 1 of that regulation.
(a) if a certified report for the works that will be used to take the overland flow water has been requested under section 54 (4) (a) (iii) —must have regard to the certified report for the works given to the chief executive; and
(b) may have regard to any other relevant information available to the chief executive.
sec.50
Working out maximum storage capacity
sec.50 Working out maximum storage capacity
This section applies for working out, for section 48 (1) (b) (ii) , the maximum storage capacity of works that may be used to store overland flow water.
The chief executive—
if a certified report for the works has been requested under section 54 (4) (a) (iii) —must have regard to the certified report for the works given to the chief executive; and
may have regard to any other relevant information available to the chief executive.
However, the chief executive must disregard the storage capacity of—
bunded land; or
land used for irrigated or dryland agriculture; or
land surrounded by levees.
See section 37 (1) (c) for when a person may take overland flow water using notified existing overland flow works.
In this section—
bunded land means land on which a permanent or temporary levee is constructed to divert overland flow water away from land used for agricultural or horticultural production.
(sec.50-ssec.1) This section applies for working out, for section 48 (1) (b) (ii) , the maximum storage capacity of works that may be used to store overland flow water.
(sec.50-ssec.2) The chief executive— if a certified report for the works has been requested under section 54 (4) (a) (iii) —must have regard to the certified report for the works given to the chief executive; and may have regard to any other relevant information available to the chief executive.
(sec.50-ssec.3) However, the chief executive must disregard the storage capacity of— bunded land; or land used for irrigated or dryland agriculture; or land surrounded by levees. See section 37 (1) (c) for when a person may take overland flow water using notified existing overland flow works.
(sec.50-ssec.4) In this section— bunded land means land on which a permanent or temporary levee is constructed to divert overland flow water away from land used for agricultural or horticultural production.
(a) if a certified report for the works has been requested under section 54 (4) (a) (iii) —must have regard to the certified report for the works given to the chief executive; and
(b) may have regard to any other relevant information available to the chief executive.
(a) bunded land; or
(b) land used for irrigated or dryland agriculture; or
(c) land surrounded by levees.
sec.51
Working out average annual volume
sec.51 Working out average annual volume
This section applies for working out, for section 48 (1) (b) (iii) , the average annual volume of overland flow water that may be taken.
The chief executive must have regard to—
the catchment characteristics for the water’s catchment; and
the maximum rate, if any, worked out under section 49 , at which the overland flow water may be taken; and
the maximum storage capacity, if any, worked out under section 50 , of the works that may be used to store the water; and
if overland flow water taken under the water licence is to be used to irrigate crops—the pattern of usage demand for the storage for the water licence; and
the extent to which the storage for the water licence may also be used to store water taken under another authorisation; and
the other conditions applying to the water licence.
In this section—
catchment characteristics , for a catchment, means the characteristics of the catchment that affect the volume of overland flow water in the catchment, including, for example—
the area of the catchment; and
the slope of the catchment; and
the amount of rainfall that typically falls in the catchment; and
the amount and type of vegetation in the catchment.
IQQM computer program simulation means the department’s Integrated Quantity and Quality Model computer program simulation for the period 1 July 1922 to 30 June 1995.
pattern of usage demand , for a storage, means the pattern of usage from the storage worked out having regard to—
how water, stored in or by the storage, is used to grow crops; and
the planting rule for the trading zone in which the storage is located.
planting rule , for a trading zone, means the method used, in the IQQM computer program simulation, to work out the area under crops in the trading zone.
storage , for a water licence, means the works that will primarily be used to store the overland flow water taken under the water licence.
(sec.51-ssec.1) This section applies for working out, for section 48 (1) (b) (iii) , the average annual volume of overland flow water that may be taken.
(sec.51-ssec.2) The chief executive must have regard to— the catchment characteristics for the water’s catchment; and the maximum rate, if any, worked out under section 49 , at which the overland flow water may be taken; and the maximum storage capacity, if any, worked out under section 50 , of the works that may be used to store the water; and if overland flow water taken under the water licence is to be used to irrigate crops—the pattern of usage demand for the storage for the water licence; and the extent to which the storage for the water licence may also be used to store water taken under another authorisation; and the other conditions applying to the water licence.
(sec.51-ssec.3) In this section— catchment characteristics , for a catchment, means the characteristics of the catchment that affect the volume of overland flow water in the catchment, including, for example— the area of the catchment; and the slope of the catchment; and the amount of rainfall that typically falls in the catchment; and the amount and type of vegetation in the catchment. IQQM computer program simulation means the department’s Integrated Quantity and Quality Model computer program simulation for the period 1 July 1922 to 30 June 1995. pattern of usage demand , for a storage, means the pattern of usage from the storage worked out having regard to— how water, stored in or by the storage, is used to grow crops; and the planting rule for the trading zone in which the storage is located. planting rule , for a trading zone, means the method used, in the IQQM computer program simulation, to work out the area under crops in the trading zone. storage , for a water licence, means the works that will primarily be used to store the overland flow water taken under the water licence.
(a) the catchment characteristics for the water’s catchment; and
(b) the maximum rate, if any, worked out under section 49 , at which the overland flow water may be taken; and
(c) the maximum storage capacity, if any, worked out under section 50 , of the works that may be used to store the water; and
(d) if overland flow water taken under the water licence is to be used to irrigate crops—the pattern of usage demand for the storage for the water licence; and
(e) the extent to which the storage for the water licence may also be used to store water taken under another authorisation; and
(f) the other conditions applying to the water licence.
(a) the area of the catchment; and
(b) the slope of the catchment; and
(c) the amount of rainfall that typically falls in the catchment; and
(d) the amount and type of vegetation in the catchment.
(a) how water, stored in or by the storage, is used to grow crops; and
(b) the planting rule for the trading zone in which the storage is located.
sec.52
Working out volumetric limit
sec.52 Working out volumetric limit
This section applies for working out, for section 48 (1) (b) (iv) , the volumetric limit for the water licence.
If an average annual volume, worked out under section 51 , is a condition of the water licence, the chief executive must have regard to that average annual volume.
(sec.52-ssec.1) This section applies for working out, for section 48 (1) (b) (iv) , the volumetric limit for the water licence.
(sec.52-ssec.2) If an average annual volume, worked out under section 51 , is a condition of the water licence, the chief executive must have regard to that average annual volume.
sec.53
Criteria for deciding applications for water licences to take overland flow water using existing overland flow works— Act , s 43
sec.53 Criteria for deciding applications for water licences to take overland flow water using existing overland flow works— Act , s 43
This section states, for section 43 (2) (h) of the Act , the criteria for deciding an application for a water licence, to take overland flow water to which this plan applies using existing overland flow works, accepted by the chief executive under section 44 (2) .
The chief executive must decide to grant the application if the chief executive reasonably believes there has been, or may be, an increase in the average annual volume of overland flow water taken using the works above the average annual volume that could have been taken using the works under the relevant operating arrangements for the works.
Despite subsection (2) , the chief executive may refuse to grant the application if the chief executive considers the application should be refused having regard to the matters the chief executive must consider under section 113 of the Act .
(sec.53-ssec.1) This section states, for section 43 (2) (h) of the Act , the criteria for deciding an application for a water licence, to take overland flow water to which this plan applies using existing overland flow works, accepted by the chief executive under section 44 (2) .
(sec.53-ssec.2) The chief executive must decide to grant the application if the chief executive reasonably believes there has been, or may be, an increase in the average annual volume of overland flow water taken using the works above the average annual volume that could have been taken using the works under the relevant operating arrangements for the works.
(sec.53-ssec.3) Despite subsection (2) , the chief executive may refuse to grant the application if the chief executive considers the application should be refused having regard to the matters the chief executive must consider under section 113 of the Act .
sec.54
Process for allocation of overland flow water— Act , s 116
sec.54 Process for allocation of overland flow water— Act , s 116
This section states, for section 116 (1) of the Act , a process for the allocation of overland flow water to which this plan applies under a water licence.
See section 116 (2) of the Act for when the chief executive may grant a water licence without the need for an application to be made under section 107 of the Act .
A water licence to take the water using existing overland flow works may be granted to the owner of the land on which the works are situated.
Without limiting subsection (2) , a water licence to take the water using existing overland flow works must be granted to the owner of the land on which the works are situated if—
the works are notified existing overland flow works; and
the chief executive reasonably believes there has been, or may be, an increase in the average annual volume of overland flow water taken using the works above the average annual volume that could have been taken using the works under the relevant operating arrangements for the works.
The chief executive must, before granting the water licence under subsection (2) or (3) —
give the owner a notice—
identifying the works for which a water licence is proposed to be granted; and
stating that a water licence is proposed to be granted for the taking of overland flow water to which this plan applies using the works; and
if the chief executive requires further information about the works—requesting the owner give the chief executive, within a stated period, a certified report for the works; and
if a certified report for the works has been requested under paragraph (a) (iii) —have regard to a certified report for the works given to the chief executive.
(sec.54-ssec.1) This section states, for section 116 (1) of the Act , a process for the allocation of overland flow water to which this plan applies under a water licence. See section 116 (2) of the Act for when the chief executive may grant a water licence without the need for an application to be made under section 107 of the Act .
(sec.54-ssec.2) A water licence to take the water using existing overland flow works may be granted to the owner of the land on which the works are situated.
(sec.54-ssec.3) Without limiting subsection (2) , a water licence to take the water using existing overland flow works must be granted to the owner of the land on which the works are situated if— the works are notified existing overland flow works; and the chief executive reasonably believes there has been, or may be, an increase in the average annual volume of overland flow water taken using the works above the average annual volume that could have been taken using the works under the relevant operating arrangements for the works.
(sec.54-ssec.4) The chief executive must, before granting the water licence under subsection (2) or (3) — give the owner a notice— identifying the works for which a water licence is proposed to be granted; and stating that a water licence is proposed to be granted for the taking of overland flow water to which this plan applies using the works; and if the chief executive requires further information about the works—requesting the owner give the chief executive, within a stated period, a certified report for the works; and if a certified report for the works has been requested under paragraph (a) (iii) —have regard to a certified report for the works given to the chief executive.
(a) the works are notified existing overland flow works; and
(b) the chief executive reasonably believes there has been, or may be, an increase in the average annual volume of overland flow water taken using the works above the average annual volume that could have been taken using the works under the relevant operating arrangements for the works.
(a) give the owner a notice— (i) identifying the works for which a water licence is proposed to be granted; and (ii) stating that a water licence is proposed to be granted for the taking of overland flow water to which this plan applies using the works; and (iii) if the chief executive requires further information about the works—requesting the owner give the chief executive, within a stated period, a certified report for the works; and
(i) identifying the works for which a water licence is proposed to be granted; and
(ii) stating that a water licence is proposed to be granted for the taking of overland flow water to which this plan applies using the works; and
(iii) if the chief executive requires further information about the works—requesting the owner give the chief executive, within a stated period, a certified report for the works; and
(b) if a certified report for the works has been requested under paragraph (a) (iii) —have regard to a certified report for the works given to the chief executive.
(i) identifying the works for which a water licence is proposed to be granted; and
(ii) stating that a water licence is proposed to be granted for the taking of overland flow water to which this plan applies using the works; and
(iii) if the chief executive requires further information about the works—requesting the owner give the chief executive, within a stated period, a certified report for the works; and
sec.55
Water licences to include particular conditions
sec.55 Water licences to include particular conditions
This section applies to a water licence with an identifying number mentioned in schedule 10 .
If, under section 70 (1) (e) of the Act , a water entitlement notice for this plan provides for the water licence to be amended to be subject to a stated condition, the water licence is inconsistent with this plan unless the water licence is subject to the condition.
See section 133 (2) of the Act for the actions the chief executive must take if a water licence is inconsistent with a water plan.
For section 133 (2) of the Act , the stated time is 60 business days after the making of the water entitlement notice.
(sec.55-ssec.1) This section applies to a water licence with an identifying number mentioned in schedule 10 .
(sec.55-ssec.2) If, under section 70 (1) (e) of the Act , a water entitlement notice for this plan provides for the water licence to be amended to be subject to a stated condition, the water licence is inconsistent with this plan unless the water licence is subject to the condition. See section 133 (2) of the Act for the actions the chief executive must take if a water licence is inconsistent with a water plan.
(sec.55-ssec.3) For section 133 (2) of the Act , the stated time is 60 business days after the making of the water entitlement notice.
pt.10-div.5
Water licences to take underground water
Water licences to take underground water
sec.56
Water licences to take underground water to contain particular conditions
sec.56 Water licences to take underground water to contain particular conditions
This section applies to a water licence to take underground water to which this plan applies in the underground water management area.
If, under section 70 (1) (e) of the Act , a water entitlement notice for this plan provides for the water licence to be amended to state a relevant matter or to remove a relevant term or condition, the licence is inconsistent with this plan unless the relevant matter is stated in the licence or the relevant term or condition is removed from the licence.
See section 133 (2) of the Act for the actions the chief executive must take if a water licence is inconsistent with a water plan.
In this section—
relevant matter means any of the following matters—
a condition to which the water licence is subject;
a purpose for which water to which this plan applies may be taken under the water licence;
a nominal entitlement for the water licence;
the underground water sub-area or the underground water zone to which the water licence relates;
if the water taken under the water licence must be from a particular underground water sub-unit—the underground water sub-unit;
if the water licence relocation rules apply to the water licence—the latitude and longitude for the point at which water to which this plan applies may be taken under the water licence.
relevant term or condition means—
a term or condition stating the water licence belongs to ‘group S’; or
a term or condition permitting the taking of underground water to which this plan applies in excess of the nominal entitlement for the water licence.
water licence relocation rules means the rules, stated in the water management protocol for this plan, about a dealing with a water licence to which section 126 of the Act applies.
(sec.56-ssec.1) This section applies to a water licence to take underground water to which this plan applies in the underground water management area.
(sec.56-ssec.2) If, under section 70 (1) (e) of the Act , a water entitlement notice for this plan provides for the water licence to be amended to state a relevant matter or to remove a relevant term or condition, the licence is inconsistent with this plan unless the relevant matter is stated in the licence or the relevant term or condition is removed from the licence. See section 133 (2) of the Act for the actions the chief executive must take if a water licence is inconsistent with a water plan.
(sec.56-ssec.3) In this section— relevant matter means any of the following matters— a condition to which the water licence is subject; a purpose for which water to which this plan applies may be taken under the water licence; a nominal entitlement for the water licence; the underground water sub-area or the underground water zone to which the water licence relates; if the water taken under the water licence must be from a particular underground water sub-unit—the underground water sub-unit; if the water licence relocation rules apply to the water licence—the latitude and longitude for the point at which water to which this plan applies may be taken under the water licence. relevant term or condition means— a term or condition stating the water licence belongs to ‘group S’; or a term or condition permitting the taking of underground water to which this plan applies in excess of the nominal entitlement for the water licence. water licence relocation rules means the rules, stated in the water management protocol for this plan, about a dealing with a water licence to which section 126 of the Act applies.
(a) a condition to which the water licence is subject;
(b) a purpose for which water to which this plan applies may be taken under the water licence;
(c) a nominal entitlement for the water licence;
(d) the underground water sub-area or the underground water zone to which the water licence relates;
(e) if the water taken under the water licence must be from a particular underground water sub-unit—the underground water sub-unit;
(f) if the water licence relocation rules apply to the water licence—the latitude and longitude for the point at which water to which this plan applies may be taken under the water licence.
(a) a term or condition stating the water licence belongs to ‘group S’; or
(b) a term or condition permitting the taking of underground water to which this plan applies in excess of the nominal entitlement for the water licence.
pt.10-div.6
Provisions about Upper Condamine Alluvium (Central Condamine Alluvium) underground water unit
Provisions about Upper Condamine Alluvium (Central Condamine Alluvium) underground water unit
sec.57
Purpose of division
sec.57 Purpose of division
The purpose of this division is to amend or grant particular water licences to meet the sustainable diversion limits for the Upper Condamine Alluvium (Central Condamine Alluvium) underground water unit.
sec.58
Definitions for division
sec.58 Definitions for division
In this division—
group S water licence means a water licence with an identifying number mentioned in schedule 11 .
relevant water licence means a water licence to take underground water from the Upper Condamine Alluvium (Central Condamine Alluvium) underground water unit, other than a water licence—
for which the State, a local government or CEWH is the licensee; or
for which the nominal entitlement is 5ML or less; or
that is a group S water licence.
(a) for which the State, a local government or CEWH is the licensee; or
(b) for which the nominal entitlement is 5ML or less; or
(c) that is a group S water licence.
sec.59
Nominal entitlement for relevant water licences
sec.59 Nominal entitlement for relevant water licences
If, under section 70 (1) (e) of the Act , a water entitlement notice for this plan provides for a relevant water licence to be amended to state a nominal entitlement, the licence is inconsistent with this plan unless the licence states the nominal entitlement.
See section 133 (2) of the Act for the actions the chief executive must take if a water licence is inconsistent with a water plan.
In deciding the nominal entitlement for a relevant water licence to be stated in a water entitlement notice mentioned in subsection (1) , the chief executive—
must have regard to—
the sustainable diversion limit for the Upper Condamine Alluvium (Central Condamine Alluvium) underground water unit; and
the extent to which the licensee for the relevant water licence has taken part in the Commonwealth water use program in relation to the licence before the licence is amended in the way mentioned in subsection (1) ; and
must ensure—
the total volume of the nominal entitlements for all water licences to take underground water from the Upper Condamine Alluvium (Central Condamine Alluvium) underground water unit, other than licences held by CEWH, is not greater than 46,221ML; and
the volume is expressed in the relevant water licence in whole megalitres; and
the nominal entitlement would not be less than 5ML.
In this section—
Commonwealth water use program means the Sustainable Rural Water Use and Infrastructure Program.
Information about the Sustainable Rural Water Use and Infrastructure Program is available on the Commonwealth Department of Agriculture and Water Resources’ website.
(sec.59-ssec.1) If, under section 70 (1) (e) of the Act , a water entitlement notice for this plan provides for a relevant water licence to be amended to state a nominal entitlement, the licence is inconsistent with this plan unless the licence states the nominal entitlement. See section 133 (2) of the Act for the actions the chief executive must take if a water licence is inconsistent with a water plan.
(sec.59-ssec.2) In deciding the nominal entitlement for a relevant water licence to be stated in a water entitlement notice mentioned in subsection (1) , the chief executive— must have regard to— the sustainable diversion limit for the Upper Condamine Alluvium (Central Condamine Alluvium) underground water unit; and the extent to which the licensee for the relevant water licence has taken part in the Commonwealth water use program in relation to the licence before the licence is amended in the way mentioned in subsection (1) ; and must ensure— the total volume of the nominal entitlements for all water licences to take underground water from the Upper Condamine Alluvium (Central Condamine Alluvium) underground water unit, other than licences held by CEWH, is not greater than 46,221ML; and the volume is expressed in the relevant water licence in whole megalitres; and the nominal entitlement would not be less than 5ML.
(sec.59-ssec.3) In this section— Commonwealth water use program means the Sustainable Rural Water Use and Infrastructure Program. Information about the Sustainable Rural Water Use and Infrastructure Program is available on the Commonwealth Department of Agriculture and Water Resources’ website.
(a) must have regard to— (i) the sustainable diversion limit for the Upper Condamine Alluvium (Central Condamine Alluvium) underground water unit; and (ii) the extent to which the licensee for the relevant water licence has taken part in the Commonwealth water use program in relation to the licence before the licence is amended in the way mentioned in subsection (1) ; and
(i) the sustainable diversion limit for the Upper Condamine Alluvium (Central Condamine Alluvium) underground water unit; and
(ii) the extent to which the licensee for the relevant water licence has taken part in the Commonwealth water use program in relation to the licence before the licence is amended in the way mentioned in subsection (1) ; and
(b) must ensure— (i) the total volume of the nominal entitlements for all water licences to take underground water from the Upper Condamine Alluvium (Central Condamine Alluvium) underground water unit, other than licences held by CEWH, is not greater than 46,221ML; and (ii) the volume is expressed in the relevant water licence in whole megalitres; and (iii) the nominal entitlement would not be less than 5ML.
(i) the total volume of the nominal entitlements for all water licences to take underground water from the Upper Condamine Alluvium (Central Condamine Alluvium) underground water unit, other than licences held by CEWH, is not greater than 46,221ML; and
(ii) the volume is expressed in the relevant water licence in whole megalitres; and
(iii) the nominal entitlement would not be less than 5ML.
(i) the sustainable diversion limit for the Upper Condamine Alluvium (Central Condamine Alluvium) underground water unit; and
(ii) the extent to which the licensee for the relevant water licence has taken part in the Commonwealth water use program in relation to the licence before the licence is amended in the way mentioned in subsection (1) ; and
(i) the total volume of the nominal entitlements for all water licences to take underground water from the Upper Condamine Alluvium (Central Condamine Alluvium) underground water unit, other than licences held by CEWH, is not greater than 46,221ML; and
(ii) the volume is expressed in the relevant water licence in whole megalitres; and
(iii) the nominal entitlement would not be less than 5ML.
sec.60
Commonwealth Environmental Water Holder
sec.60 Commonwealth Environmental Water Holder
This section applies if each relevant water licence has been amended in the way mentioned in section 59 (1) .
For section 116 (1) of the Act , the chief executive must decide to grant a water licence to CEWH to take underground water from the Upper Condamine Alluvium (Central Condamine Alluvium) underground water unit if—
CEWH does not hold a water licence to take underground water from the Upper Condamine Alluvium (Central Condamine Alluvium) underground water unit in an underground water zone in the Central Condamine Alluvium underground water sub-area; and
a water entitlement notice for this plan provides for the granting of the water licence.
See also section 116 (2) of the Act for when the chief executive may grant a water licence without the need for an application to be made under section 107 of the Act .
If CEWH holds a water licence to take underground water from the Upper Condamine Alluvium (Central Condamine Alluvium) underground water unit in an underground water zone in the Central Condamine Alluvium underground water sub-area, a water entitlement notice, under section 70 (1) (e) of the Act , may implement this plan by providing for the amendment of the water licence.
See section 133 (2) of the Act for the actions the chief executive must take if a water licence is inconsistent with a water plan.
The chief executive must ensure—
the nominal entitlement for a water licence granted under subsection (2) is proportional to the reduction volume for the trading zone to which the water licence relates; and
the nominal entitlement for a water licence amended under subsection (3) is equal to the sum of—
the reduction volume for the trading zone to which the water licence relates; and
the volume of nominal entitlements held by CEWH for the trading zone to which the water licence relates before the water licence is amended; and
the purpose for taking water under a water licence granted under subsection (2) or amended under subsection (3) is ‘productive base’.
In this section—
reduction volume , for the trading zone to which a water licence relates, means the volume calculated by subtracting the total replacement volume from the total original volume.
total original volume means the total volume of nominal entitlements for all relevant water licences before the licences were amended in the way mentioned in section 59 (1) .
total replacement volume means the total volume of the nominal entitlements for all relevant water licences after the licences were amended in the way mentioned in section 59 (1) .
(sec.60-ssec.1) This section applies if each relevant water licence has been amended in the way mentioned in section 59 (1) .
(sec.60-ssec.2) For section 116 (1) of the Act , the chief executive must decide to grant a water licence to CEWH to take underground water from the Upper Condamine Alluvium (Central Condamine Alluvium) underground water unit if— CEWH does not hold a water licence to take underground water from the Upper Condamine Alluvium (Central Condamine Alluvium) underground water unit in an underground water zone in the Central Condamine Alluvium underground water sub-area; and a water entitlement notice for this plan provides for the granting of the water licence. See also section 116 (2) of the Act for when the chief executive may grant a water licence without the need for an application to be made under section 107 of the Act .
(sec.60-ssec.3) If CEWH holds a water licence to take underground water from the Upper Condamine Alluvium (Central Condamine Alluvium) underground water unit in an underground water zone in the Central Condamine Alluvium underground water sub-area, a water entitlement notice, under section 70 (1) (e) of the Act , may implement this plan by providing for the amendment of the water licence. See section 133 (2) of the Act for the actions the chief executive must take if a water licence is inconsistent with a water plan.
(sec.60-ssec.4) The chief executive must ensure— the nominal entitlement for a water licence granted under subsection (2) is proportional to the reduction volume for the trading zone to which the water licence relates; and the nominal entitlement for a water licence amended under subsection (3) is equal to the sum of— the reduction volume for the trading zone to which the water licence relates; and the volume of nominal entitlements held by CEWH for the trading zone to which the water licence relates before the water licence is amended; and the purpose for taking water under a water licence granted under subsection (2) or amended under subsection (3) is ‘productive base’.
(sec.60-ssec.5) In this section— reduction volume , for the trading zone to which a water licence relates, means the volume calculated by subtracting the total replacement volume from the total original volume. total original volume means the total volume of nominal entitlements for all relevant water licences before the licences were amended in the way mentioned in section 59 (1) . total replacement volume means the total volume of the nominal entitlements for all relevant water licences after the licences were amended in the way mentioned in section 59 (1) .
(a) CEWH does not hold a water licence to take underground water from the Upper Condamine Alluvium (Central Condamine Alluvium) underground water unit in an underground water zone in the Central Condamine Alluvium underground water sub-area; and
(b) a water entitlement notice for this plan provides for the granting of the water licence.
(a) the nominal entitlement for a water licence granted under subsection (2) is proportional to the reduction volume for the trading zone to which the water licence relates; and
(b) the nominal entitlement for a water licence amended under subsection (3) is equal to the sum of— (i) the reduction volume for the trading zone to which the water licence relates; and (ii) the volume of nominal entitlements held by CEWH for the trading zone to which the water licence relates before the water licence is amended; and
(i) the reduction volume for the trading zone to which the water licence relates; and
(ii) the volume of nominal entitlements held by CEWH for the trading zone to which the water licence relates before the water licence is amended; and
(c) the purpose for taking water under a water licence granted under subsection (2) or amended under subsection (3) is ‘productive base’.
(i) the reduction volume for the trading zone to which the water licence relates; and
(ii) the volume of nominal entitlements held by CEWH for the trading zone to which the water licence relates before the water licence is amended; and
pt.10-div.7
Miscellaneous
Miscellaneous
sec.61
Accounting period for water licences— Water Regulation 2016 , s 142
sec.61 Accounting period for water licences— Water Regulation 2016 , s 142
For the Water Regulation 2016 , section 142 (a) , the accounting period for a water licence to take water to which this plan applies is 1 July to 30 June in the following year.
pt.11
Water allocations
Water allocations
pt.11-div.1
Surface water
Surface water
sec.62
Water allocation groups— Act , sch 4
sec.62 Water allocation groups— Act , sch 4
For schedule 4 of the Act , definition water allocation group , a group of water allocations is a water allocation group, for unsupplemented surface water, if each water allocation in the group—
states the same water allocation group mentioned in schedule 12 , column 2 (the water allocation group identifier ); and
authorises the taking of unsupplemented surface water in the water management area zone mentioned in schedule 12 , column 1, opposite the water allocation group identifier.
(a) states the same water allocation group mentioned in schedule 12 , column 2 (the water allocation group identifier ); and
(b) authorises the taking of unsupplemented surface water in the water management area zone mentioned in schedule 12 , column 1, opposite the water allocation group identifier.
sec.63
Amending particular water allocations— Act , s 150
sec.63 Amending particular water allocations— Act , s 150
This section applies to a water allocation with an identifying number mentioned in schedule 13 , column 1.
For section 150 (1) (a) of the Act , the water allocation must be amended to ensure—
if schedule 13 , column 2 states a water management area zone for the water allocation—the water management area zone for the water allocation is the stated water management area zone; and
if schedule 13 , column 2 states a water allocation group for the water allocation—the water allocation group for the water allocation is the stated water allocation group; and
if schedule 13 , column 2 states a location from which water may be taken under the allocation—water may be taken under the water allocation from the stated location.
To remove any doubt, it is declared that if an existing detail of, or condition imposed on, the water allocation is inconsistent with an amendment required under subsection (2) , the existing detail or condition must be also amended or removed, but only to the extent necessary to avoid the inconsistency.
(sec.63-ssec.1) This section applies to a water allocation with an identifying number mentioned in schedule 13 , column 1.
(sec.63-ssec.2) For section 150 (1) (a) of the Act , the water allocation must be amended to ensure— if schedule 13 , column 2 states a water management area zone for the water allocation—the water management area zone for the water allocation is the stated water management area zone; and if schedule 13 , column 2 states a water allocation group for the water allocation—the water allocation group for the water allocation is the stated water allocation group; and if schedule 13 , column 2 states a location from which water may be taken under the allocation—water may be taken under the water allocation from the stated location.
(sec.63-ssec.3) To remove any doubt, it is declared that if an existing detail of, or condition imposed on, the water allocation is inconsistent with an amendment required under subsection (2) , the existing detail or condition must be also amended or removed, but only to the extent necessary to avoid the inconsistency.
(a) if schedule 13 , column 2 states a water management area zone for the water allocation—the water management area zone for the water allocation is the stated water management area zone; and
(b) if schedule 13 , column 2 states a water allocation group for the water allocation—the water allocation group for the water allocation is the stated water allocation group; and
(c) if schedule 13 , column 2 states a location from which water may be taken under the allocation—water may be taken under the water allocation from the stated location.
sec.64
Purpose of subdivision
sec.64 Purpose of subdivision
This subdivision states, for section 43 (2) (g) of the Act , arrangements and processes for converting, under a water entitlement notice for this plan, particular authorisations to water allocations to take unsupplemented surface water to which this plan applies.
sec.65
Authorisations may be converted to water allocations
sec.65 Authorisations may be converted to water allocations
A water entitlement notice may, under section 70 (1) (a) of the Act , implement this plan by providing for the conversion of an existing authorisation to a water allocation stated in the notice to take unsupplemented surface water from a watercourse, lake or spring above Leslie Dam in water management area zone CBT-08.
In this section—
existing authorisation means a water licence—
to take unsupplemented surface water from a watercourse, lake or spring above Leslie Dam in water management area zone CBT-08; and
with the stated purpose of irrigation.
(sec.65-ssec.1) A water entitlement notice may, under section 70 (1) (a) of the Act , implement this plan by providing for the conversion of an existing authorisation to a water allocation stated in the notice to take unsupplemented surface water from a watercourse, lake or spring above Leslie Dam in water management area zone CBT-08.
(sec.65-ssec.2) In this section— existing authorisation means a water licence— to take unsupplemented surface water from a watercourse, lake or spring above Leslie Dam in water management area zone CBT-08; and with the stated purpose of irrigation.
(a) to take unsupplemented surface water from a watercourse, lake or spring above Leslie Dam in water management area zone CBT-08; and
(b) with the stated purpose of irrigation.
sec.66
Purpose for taking water
sec.66 Purpose for taking water
The purpose for taking water under the water allocation must be ‘any’.
sec.67
Location for taking water
sec.67 Location for taking water
The location from which water may be taken under the water allocation must include the place from which water was permitted to be taken under the existing authorisation.
sec.68
Conditions for taking water
sec.68 Conditions for taking water
In deciding the conditions on which water may be taken under the water allocation, the chief executive must have regard to—
the terms or conditions stated in the existing authorisation; and
if there were water sharing rules for the existing authorisation—the water sharing rules.
(a) the terms or conditions stated in the existing authorisation; and
(b) if there were water sharing rules for the existing authorisation—the water sharing rules.
sec.69
Nominal volume
sec.69 Nominal volume
The nominal volume for the water allocation is the volume, in megalitres, calculated by multiplying the irrigated area for the existing authorisation, in hectares, by 6.
sec.70
Volumetric limit
sec.70 Volumetric limit
The volumetric limit for the water allocation is the volume, in megalitres, calculated by multiplying the irrigated area for the existing authorisation, in hectares, by 6.
sec.71
Maximum rate for taking water
sec.71 Maximum rate for taking water
The maximum rate for the water allocation must be—
if the existing authorisation stated a maximum rate at which water was able to be taken under the existing authorisation—based on that maximum rate; or
if a development permit for the existing authorisation stated a pump size—based on the pump size; or
otherwise—decided by the chief executive.
See also the Water Regulation 2016 , sections 50 to 52 .
However, if subsection (1) (a) and (b) both apply in relation to the water allocation, the maximum rate for the water allocation must be based on the matter mentioned in subsection (1) (a) or (b) that results in the lesser maximum rate.
For the Water Regulation 2016 , section 51 (2) , the maximum rate is to be in megalitres per day.
For the Water Regulation 2016 , section 52 (2) (c) , the other criteria are—
the terms or conditions under which water was able to be taken under the existing authorisation; and
a condition of any other water entitlement, or any other authorisation, that limited the total rate for taking water under the existing authorisation.
In this section—
development permit , for an existing authorisation, means a development permit under the Planning Act for works for taking water under the authorisation.
(sec.71-ssec.1) The maximum rate for the water allocation must be— if the existing authorisation stated a maximum rate at which water was able to be taken under the existing authorisation—based on that maximum rate; or if a development permit for the existing authorisation stated a pump size—based on the pump size; or otherwise—decided by the chief executive. See also the Water Regulation 2016 , sections 50 to 52 .
(sec.71-ssec.2) However, if subsection (1) (a) and (b) both apply in relation to the water allocation, the maximum rate for the water allocation must be based on the matter mentioned in subsection (1) (a) or (b) that results in the lesser maximum rate.
(sec.71-ssec.3) For the Water Regulation 2016 , section 51 (2) , the maximum rate is to be in megalitres per day.
(sec.71-ssec.4) For the Water Regulation 2016 , section 52 (2) (c) , the other criteria are— the terms or conditions under which water was able to be taken under the existing authorisation; and a condition of any other water entitlement, or any other authorisation, that limited the total rate for taking water under the existing authorisation.
(sec.71-ssec.5) In this section— development permit , for an existing authorisation, means a development permit under the Planning Act for works for taking water under the authorisation.
(a) if the existing authorisation stated a maximum rate at which water was able to be taken under the existing authorisation—based on that maximum rate; or
(b) if a development permit for the existing authorisation stated a pump size—based on the pump size; or
(c) otherwise—decided by the chief executive.
(a) the terms or conditions under which water was able to be taken under the existing authorisation; and
(b) a condition of any other water entitlement, or any other authorisation, that limited the total rate for taking water under the existing authorisation.
pt.11-div.2
Underground water
Underground water
sec.72
Water allocation groups— Act , sch 4
sec.72 Water allocation groups— Act , sch 4
For schedule 4 of the Act , definition water allocation group , a group of water allocations is a water allocation group, for underground water, if each water allocation—
states the same water allocation group mentioned in schedule 8 , column 2 (the water allocation group identifier ); and
permits underground water to which this plan applies to be taken for the purpose mentioned in schedule 8 , column 5 opposite the water allocation group identifier.
(a) states the same water allocation group mentioned in schedule 8 , column 2 (the water allocation group identifier ); and
(b) permits underground water to which this plan applies to be taken for the purpose mentioned in schedule 8 , column 5 opposite the water allocation group identifier.
sec.73
Amending water allocation held by CEWH— Act , s 150
sec.73 Amending water allocation held by CEWH— Act , s 150
This section applies to a water allocation for underground water to which this plan applies held by CEWH.
For section 150 (1) (a) of the Act , the water allocation must be amended to ensure the purpose for taking the underground water is ‘productive base’.
(sec.73-ssec.1) This section applies to a water allocation for underground water to which this plan applies held by CEWH.
(sec.73-ssec.2) For section 150 (1) (a) of the Act , the water allocation must be amended to ensure the purpose for taking the underground water is ‘productive base’.
sec.74
Purpose of subdivision
sec.74 Purpose of subdivision
This subdivision states, for section 43 (2) (g) of the Act , arrangements and processes for converting, under a water entitlement notice for this plan, particular authorisations to water allocations to take underground water to which this plan applies.
sec.75
Authorisations may be converted to water allocations
sec.75 Authorisations may be converted to water allocations
A water entitlement notice may, under section 70 (1) (a) of the Act , implement this plan by providing for the conversion of an existing authorisation, to take underground water to which this plan applies from an underground water sub-area, to a water allocation stated in the notice to take underground water to which this plan applies from the same underground water sub-area.
In this section—
existing authorisation means a water licence—
to take underground water from any of the following underground water sub-areas—
Oakey Creek Alluvium;
Dalrymple Creek Alluvium;
Cunningham Alluvium; and
under which water is taken for purposes other than stock purposes or domestic purposes; and
that does not have a nominal entitlement of 0ML.
(sec.75-ssec.1) A water entitlement notice may, under section 70 (1) (a) of the Act , implement this plan by providing for the conversion of an existing authorisation, to take underground water to which this plan applies from an underground water sub-area, to a water allocation stated in the notice to take underground water to which this plan applies from the same underground water sub-area.
(sec.75-ssec.2) In this section— existing authorisation means a water licence— to take underground water from any of the following underground water sub-areas— Oakey Creek Alluvium; Dalrymple Creek Alluvium; Cunningham Alluvium; and under which water is taken for purposes other than stock purposes or domestic purposes; and that does not have a nominal entitlement of 0ML.
(a) to take underground water from any of the following underground water sub-areas— (i) Oakey Creek Alluvium; (ii) Dalrymple Creek Alluvium; (iii) Cunningham Alluvium; and
(i) Oakey Creek Alluvium;
(ii) Dalrymple Creek Alluvium;
(iii) Cunningham Alluvium; and
(b) under which water is taken for purposes other than stock purposes or domestic purposes; and
(c) that does not have a nominal entitlement of 0ML.
(i) Oakey Creek Alluvium;
(ii) Dalrymple Creek Alluvium;
(iii) Cunningham Alluvium; and
sec.76
Purpose for taking water
sec.76 Purpose for taking water
The purpose for taking water under the water allocation must be ‘any’, ‘productive base’ or ‘urban’.
sec.77
Location for taking water
sec.77 Location for taking water
The chief executive must decide the location from which water may be taken under the water allocation having regard to—
the location of works used to take water under the existing authorisation; and
the centre of the land to which the existing authorisation attached.
The water allocation must state the latitude and longitude of the location from which water may be taken under the allocation.
Subsection (2) does not apply if the holder of the water allocation is CEWH.
(sec.77-ssec.1) The chief executive must decide the location from which water may be taken under the water allocation having regard to— the location of works used to take water under the existing authorisation; and the centre of the land to which the existing authorisation attached.
(sec.77-ssec.2) The water allocation must state the latitude and longitude of the location from which water may be taken under the allocation.
(sec.77-ssec.3) Subsection (2) does not apply if the holder of the water allocation is CEWH.
(a) the location of works used to take water under the existing authorisation; and
(b) the centre of the land to which the existing authorisation attached.
sec.78
Conditions for taking water
sec.78 Conditions for taking water
In deciding the conditions on which underground water may be taken under the water allocation, the chief executive must have regard to the conditions stated in the existing authorisation.
sec.79
Volumetric limit
sec.79 Volumetric limit
The volumetric limit for the water allocation must be equal to the nominal entitlement stated in the existing authorisation.
sec.80
Nominal volume
sec.80 Nominal volume
The nominal volume for the water allocation must be decided by the chief executive having regard to the available water ratio stated in schedule 8 , column 3 opposite the water allocation’s water allocation group.
pt.12
Miscellaneous
Miscellaneous
sec.81
Requirement to make and keep records of contaminated agricultural run-off taken
sec.81 Requirement to make and keep records of contaminated agricultural run-off taken
This section applies to a person who takes overland flow water to which this plan applies if—
the water is contaminated agricultural run-off; and
the person takes the contaminated agricultural run-off to comply with an obligation on the person under the Environmental Protection Act 1994 .
See section 101 of the Act .
The person must make a record of the following matters—
the volume of contaminated agricultural run-off taken;
the date and nature of the activity or event that caused the contaminated agricultural run-off;
rainfall, irrigation, spills
another matter stated for this section in the water management protocol for this plan.
The person must keep the record for 5 years.
See section 35 of the Act for when the chief executive may give a person authorised to take water under the Act a notice requiring information about the water taken under the person’s authority.
See section 760 of the Act for when an authorised officer may require a person to make available for inspection a document relating to the taking of water.
(sec.81-ssec.1) This section applies to a person who takes overland flow water to which this plan applies if— the water is contaminated agricultural run-off; and the person takes the contaminated agricultural run-off to comply with an obligation on the person under the Environmental Protection Act 1994 . See section 101 of the Act .
(sec.81-ssec.2) The person must make a record of the following matters— the volume of contaminated agricultural run-off taken; the date and nature of the activity or event that caused the contaminated agricultural run-off; rainfall, irrigation, spills another matter stated for this section in the water management protocol for this plan.
(sec.81-ssec.3) The person must keep the record for 5 years. See section 35 of the Act for when the chief executive may give a person authorised to take water under the Act a notice requiring information about the water taken under the person’s authority. See section 760 of the Act for when an authorised officer may require a person to make available for inspection a document relating to the taking of water.
(a) the water is contaminated agricultural run-off; and
(b) the person takes the contaminated agricultural run-off to comply with an obligation on the person under the Environmental Protection Act 1994 .
(a) the volume of contaminated agricultural run-off taken;
(b) the date and nature of the activity or event that caused the contaminated agricultural run-off; Examples of activities or events that may cause contaminated agricultural run-off— rainfall, irrigation, spills
(c) another matter stated for this section in the water management protocol for this plan.
1 See section 35 of the Act for when the chief executive may give a person authorised to take water under the Act a notice requiring information about the water taken under the person’s authority.
2 See section 760 of the Act for when an authorised officer may require a person to make available for inspection a document relating to the taking of water.
More sections below
Source text: opening excerpt
Sourced from Queensland Legislation (legislation.qld.gov.au), CC BY 4.0.
pt.1 Preliminary
Preliminary
sec.1 Short title
sec.1 Short title
This plan may be cited as the Water Plan (Condamine and Balonne) 2019 .
sec.2 Purposes of plan
sec.2 Purposes of plan
The purposes of this plan are to—
define the availability of water to which this plan applies; and
provide a framework for sustainably managing water to which this plan applies; and
identify priorities and mechanisms for dealing with the future water requirements in the plan area; and
provide a framework for managing water allocations; and
provide a framework for reversing, where practicable, the degradation of natural ecosystems caused by the taking of, or interference with, water to which this plan applies.
(a) define the availability of water to which this plan applies; and
(b) provide a framework for sustainably managing water to which this plan applies; and
(c) identify priorities and mechanisms for dealing with the future water requirements in the plan area; and
(d) provide a framework for managing water allocations; and
(e) provide a framework for reversing, where practicable, the degradation of natural ecosystems caused by the taking of, or interference with, water to which this plan applies.
sec.3 Definitions
sec.3 Definitions
The dictionary in schedule 14 defines particular words used in this plan.
sec.4 Meaning of surface water
sec.4 Meaning of surface water
Surface water is—
water in a watercourse or lake; or
water in a spring not connected to water to which the Water Plan (Great Artesian Basin and Other Regional Aquifers) 2017 applies; or
overland flow water, other than water in a spring connected to water to which the Water Plan (Great Artesian Basin and Other Regional Aquifers) 2017 applies.
(a) water in a watercourse or lake; or
(b) water in a spring not connected to water to which the Water Plan (Great Artesian Basin and Other Regional Aquifers) 2017 applies; or
(c) overland flow water, other than water in a spring connected to water to which the Water Plan (Great Artesian Basin and Other Regional Aquifers) 2017 applies.
pt.2 Plan area, water to which plan applies and other matters
Plan area, water to which plan applies and other matters
sec.5 Water to which plan applies— Act , s 43
sec.5 Water to which plan applies— Act , s 43
The Plan also sets substantive constraints and processes for licensing. It limits taking of water for certain activities to a combined total of 2 ML per year and confines taking for those activities to existing works unless specified exceptions apply (s 36). It restricts the taking of overland flow and prescribes conditions for existing works, processes for allocating overland flow by licence and criteria for deciding applications and working out rate, storage and volumetric limits for overland flow licences (ss 37, 44, 48 to 54). For underground water the Plan prescribes particular conversion, nominal entitlement and volumetric rules for some aquifers and trading zones, including a cap on total nominal entitlements in the Central Condamine Alluvium set at 46,221 ML, and provides for CEWH licences where required to meet sustainable diversion limits (ss 56, 57 to 60).
Administratively the Plan requires a water management protocol to be prepared and to state the allocation rules, seasonal assignment and dealing rules, monitoring requirements and arrangements for managing flows in the Lower Balonne among other matters (s 82). It also sets record keeping obligations for those taking contaminated agricultural run-off under an environmental obligation (s 81). The Plan contains provisions for conversion of existing authorisations to water allocations and transitional rules for applications made under the repealed 2004 Plan (ss 65, 75, 86 to 88).
The Plan therefore operates both as a set of substantive allocation rules for particular water categories and a procedural architecture that centralises a number of discretions with the chief executive while embedding specific performance metrics, modelling requirements and time‑bound measurement obligations.
Main concepts
The Plan’s architecture rests on several recurring legal and hydrological concepts. First, the Plan differentiates surface water and underground water, and excludes underground water to which the Water Plan (Great Artesian Basin and Other Regional Aquifers) 2017 applies (s 4, s 5). Those definitions determine which provisions apply to particular sources and where separate management applies.
Second, the Plan uses spatial partitioning as the operational unit. The plan area is divided into water supply schemes and zones, water management areas and zones, an underground water management area with sub-areas, units and sub-units, and underground water zones (ss 7 to 13). These spatial divisions feed directly into trading zones, allocation groups and the modelling nodes. Trading zones for allocations are explicitly defined as water supply scheme zones, water management area zones or underground water zones (s 14). Schedule 1 identifies nodes, which are modelled points used to calculate performance indicators and are located by reference to named modelling programs (s 15, sch 1).
Third, objectives are split by theme. The Plan specifies a general water plan outcome that balances economic, social, cultural and environmental water plan outcomes and promotes improved understanding and monitoring of ecosystem and climate impacts (s 18). Separate lists of economic, social, cultural and environmental water plan outcomes set targeted aims: economic outcomes include maintaining the probability of taking water under entitlements and supporting market operation; social outcomes focus on urban and domestic supply and aesthetic values; cultural outcomes prioritise flows that support Aboriginal values; environmental outcomes include maintaining entitlements held for environmental benefit and specific flow and groundwater level objectives for ecosystems such as Narran Lakes and floodplains (ss 19 to 22).
Fourth, the Plan operationalises these outcomes with objectives and performance indicators. Environmental flow objectives for surface and underground water and corresponding performance indicators are in schedule 7 (ss 26 to 27, sch 7). Water allocation security objectives for surface and underground water set performance ratio targets and link to defined water allocation groups and priority classes (ss 28 to 29, sch 8). Performance indicators must be calculated on the assumption that unallocated water reserved under the plan is being taken (s 30).
Fifth, the Plan prescribes rules governing licensing and conversion. It restricts acceptance of certain licence applications (s 42), sets criteria and processes for accepting historic overland flow works and for allocation of overland flow licences (ss 44, 53, 54), requires particular content or conditions in licences where schedules identify them (ss 48 to 56), and provides for conversion of specified existing authorisations to water allocations with formulae for nominal and volumetric limits (parts 11 and 12; ss 65 to 71; ss 75 to 80).
Sixth, measurement, monitoring and reporting recur as mechanisms to implement objectives. Mandatory metering deadlines are set, a water use report is to be published annually that includes compliance with sustainable diversion limits, and a monitoring, evaluation and reporting strategy was required by 1 July 2020 (s 23).
Finally, the Plan uses the chief executive as the central decision maker. Many discretions require the chief executive’s assessment, including acceptance of applications, use of alternative assessments when models are impracticable, publication of reports, and the content and execution of the water management protocol (s 23, s 35, s 54, s 82). Where the Plan requires the use of model computer program simulations for consistency assessments, it names those models (eWater Source, MODFLOW and related statistical programs) and ties outcomes to modelled performance (s 35, s 15).
These concepts form the technical and legal scaffolding through which the Plan translates its stated purposes into enforceable obligations, measurement regimes, and bounded administrative labour.
Who it affects
The Plan identifies and channels rights and obligations to defined categories of actors. Primary affected parties include holders of water entitlements and licences within the plan area, prospective applicants for licences or dealings, the Commonwealth Environmental Water Holder where CEWH holdings are implicated, local governments seeking licences for town water impoundment, persons taking overland flow or contaminated agricultural run-off, and the chief executive and departmental staff charged with implementation and monitoring (multiple sections: ss 5, 36 to 38, 39, 41, 43, 60, 81, 82).
Licensees and entitlement holders are affected in multiple ways. Existing water licences may be amended, converted or required to state nominal entitlements, and may be made subject to conditions specified by water entitlement notices implementing the Plan (ss 55 to 56, 59). Holders in particular underground water units face measurement obligations by set dates and may be subject to new nominal entitlements in conversion processes, notably in the Upper Condamine Alluvium (Central Condamine Alluvium) where the total of nominal entitlements, excluding CEWH, must not exceed 46,221 ML and where the chief executive must consider participation in Commonwealth programmes when setting nominal entitlements (ss 23, 59).
Landowners with existing overland flow works are addressed specifically. Owners may apply for water licences to take overland flow using existing works and the Plan provides criteria for acceptance and mandatory content for such licences, including that the purpose be stated as ‘any’ and that at least one of maximum rate, maximum storage capacity, average annual volume or volumetric limit be included (ss 44, 48). Those taking contaminated agricultural run-off under an environmental obligation must keep records of volume, causative activity and other matters for five years (s 81).
Prospective applicants are constrained in several ways. The chief executive must not accept applications for water licences unless permitted under sections 43 or 44, effectively conditioning acceptance on compliance with the Plan’s prerequisites (s 42). Decisions to grant dealings with licences must be assessed for consistency with the Plan and may be inconsistent where specified (s 45). Conversions and dealing rules differ between surface and underground allocations, and some authorisations may be converted to allocations under water entitlement notices implementing the Plan (ss 65, 75).
The Commonwealth Environmental Water Holder is a singled-out beneficiary in two senses: the Plan protects the ability to take surface water under entitlements held for environmental benefit and sets processes for granting or amending CEWH licences in the Upper Condamine where required to meet sustainable diversion limits (s 22, s 60). Local governments making applications to impound water for town supply are addressed by special acceptance and change application rules that require relevant change applications and certificates before acceptance or granting (s 43).
Finally, the chief executive and the department are central decision makers and data custodians. The Plan places duties on the chief executive to publish annual water use reports, to develop and publish monitoring strategies, to record and publish decisions on flow management arrangements in the Lower Balonne and to prepare the water management protocol describing seasonal assignment and dealing rules, monitoring requirements, interstate trading arrangements and other operational matters (s 23, s 82). The department also holds the exact digital boundaries for areas and makes them available at departmental offices (s 16).
In sum, the Plan affects water users across sectors, public holders of environmental water, local government service delivery, and departmental agencies charged with technical and regulatory implementation. The rules alter entitlement content and convert authorisations, prescribe measurement and reporting, and circumscribe the circumstances in which new or converted entitlements may be created or increased.
Key duties and rights
The Plan creates a framework of duties for administrators and duties and rights for water users. Key duties placed on the chief executive include publication and monitoring duties, decision rules and assessment standards. The chief executive must publish a water use report annually that includes information about compliance with sustainable diversion limits and must record and publish decisions to implement flow management arrangements in the Lower Balonne at least annually (s 23). The plan requires the chief executive to prepare a water management protocol that sets out unallocated water reserves, seasonal assignment and relocation criteria, allocation dealing rules, water sharing rules and monitoring requirements (s 82). The chief executive is obliged not to accept some licence applications unless permitted under ss 43 or 44 (s 42), and to decide to grant particular licences specified by water entitlement notices, such as licences for named weirs or replacements of expired licences (ss 46 to 47). Where CEWH licences are required under the Upper Condamine adjustments, the chief executive must decide to grant a licence to CEWH where the preconditions are met (s 60).
Decision makers are duty‑bound by non‑augmentation rules. A decision must not increase the average volume of surface or underground water that may be taken under the Plan or the combined total of nominal entitlements for underground licences, except for specified exceptions such as reinstatements, taking unallocated reserved water or taking or interfering with underground water not in an underground water unit (s 33). Decisions about allocation and management must be consistent with the Plan’s environmental flow objectives and water allocation security objectives; for surface water this entails consistency with ss 26 and 28, for underground water with ss 27 and 29, subject to an exception for flow management arrangements in the Lower Balonne (s 34).
Licence holders have express rights and constrained rights. They hold water entitlements that may be converted to water allocations under the Plan, subject to defined formulae for nominal volume, volumetric limits and maximum rates, especially where conversions are from historical authorisations (ss 65 to 71, 75 to 80). Holders of overland flow licences must have the licence state purpose ‘any’ and the licence must include at least one of specified numeric constraints such as maximum rate or volumetric limit (s 48). A licence to take underground water must, where a water entitlement notice requires it, be amended to state specified relevant matters or remove certain terms and conditions; otherwise it is inconsistent with the Plan and must be addressed under the Act (s 56). The Plan also provides for CEWH to hold entitlements with specified purposes, including productive base in particular Upper Condamine arrangements (s 60).
Measurement and record keeping duties fall on water users. All water allocations must be measured as directed by the chief executive by 31 December 2022, and specified underground water licences must be measured by 31 December 2025 (s 23). Persons who take contaminated agricultural run-off under an environmental obligation must record the volume, the date and nature of the event causing the run-off and other matters set out in the water management protocol, and keep records for five years (s 81).
Applicants and licensees face procedural duties when the chief executive requires additional information. For allocation of overland flow using existing works the chief executive must give notice to the owner and may request a certified report; if requested, the chief executive must have regard to the certified report when deciding on maximum rate and storage capacity and in some allocation decisions (ss 49 to 54).
Finally, rights to trade and relocate are structured rather than absolute. The Plan names trading zones and water allocation groups and requires the water management protocol to state the criteria and processes for seasonal assignments and relocation of water licences, as well as water allocation dealing rules (s 14, s 82). Performance indicators for water allocation security are expressed as performance ratios for grouped allocations and are to be used in assessing decisions that add, omit or change allocations (ss 28 to 30).
These duties and rights create a statutory canal through which allocation, measurement, monitoring and trade operate, with a high degree of administrative conditioning and technical specification embedded in the Plan.
Penalties and enforcement
The Plan itself is primarily an instrument of allocation and management and makes frequent cross references to enforcement powers and remedies provided by the Water Act and associated Statutes. The Plan imposes compliance obligations, measurement deadlines and record keeping duties that, under the Act, can trigger enforcement mechanisms such as information notices and authorised officer inspections. For example, where records are required, section 35 of the Act allows the chief executive to give a person authorised to take water a notice requiring information about the water taken; and section 760 of the Act allows an authorised officer to require production for inspection of documents relating to the taking of water (s 81). The Plan does not itself set out fines or criminal offences; enforcement and penalty provisions are those contained in the parent Act and regulations.
Several Plan provisions specify when licences or allocations are inconsistent with the Plan and direct administrative correction. If a water entitlement notice requires amendment of a licence and the licence is not so amended, the Plan declares the licence inconsistent and triggers section 133 of the Act, which requires the chief executive to take specified action within a stated time. For water licences identified in schedule 10 that require particular conditions, the licence is inconsistent with the Plan unless it carries the stated condition; the chief executive must act under s 133(2) within 60 business days after making the water entitlement notice (s 55). Where an application for a dealing with a water licence would be inconsistent with the Plan, s 45 cross references the Act’s provisions that dictate the actions the chief executive must take if granting a dealing would be inconsistent with a water plan (s 45 and note).
The Plan creates limiting rules that constrain administrative discretion and therefore shape enforcement. Section 33 forbids decisions that increase average volumes or combined nominal entitlements, subject to specific exceptions. Compliance with these decision constraints is checked against objectives and performance indicators using model simulations; the Plan requires use of the named model computer programs to assess consistency, and only where impracticable may the chief executive approve an alternative assessment approach (s 35). The use of prescribed modelling in adjudication creates an evidentiary pathway for enforcement, because model outputs inform whether a decision breaches the Plan’s objectives or allocation security objectives.
Administrative obligations also carry procedural enforcement hooks. The chief executive must not accept certain applications unless permitted under ss 43 or 44, and for specified conversions or grants the chief executive “must decide to grant” where a water entitlement notice provides for the grant (ss 42, 46, 47, 60). That formulation removes some discretionary refusal power and creates an administrative duty. Where the chief executive grants or amends licences to meet sustainable diversion limits, the Plan mandates the terms, such as ensuring CEWH licences are proportional to reduction volumes and that certain purposes be stated as ‘productive base’ (s 60). Failure to implement these mandated changes would create an inconsistency requiring remedial administrative steps under the Act.
In relation to contaminated agricultural run-off, the Plan imposes record keeping for five years. Non‑compliance with record keeping obligations may attract information notices from the chief executive or inspection orders by authorised officers under the Act (s 81).
Overall, penalties and enforcement are exercised through the statutory machinery of the Act, relying on administrative correction when licences or allocations are inconsistent with the Plan, information and inspection powers, and cross‑referenced penalty and offence provisions in the Act and regulations. The Plan prescribes substantive constraints and administrative duties that, if breached, engage the Act’s enforcement tools.
How it interacts with other laws
The Plan is embedded within and cross-references multiple other statutory instruments and decision frameworks. It is made under the Water Act and operates by reference to numerous provisions of that Act including sections that define water management areas, the chief executive’s decision powers, dealing rules and what constitutes inconsistency with a water plan (frequent cross references across parts, for example s 5 references Act s 43). The Plan also cross-references the Water Regulation 2016 for numeric constraints on pump rates and accounting periods, for example requiring any maximum rate based on pump size not to exceed the rate stated in the Water Regulation 2016 schedule 7, and specifying the accounting period for water licences consistent with Water Regulation 2016 s 142 (ss 49, 61).
It interacts with Commonwealth instruments and programs. The Plan expressly requires that its management be consistent with “the relevant version of the Basin Plan” and notes the sustainable diversion limits, along with water sharing agreements and commitments between the State and New South Wales (s 18). The Plan refers to the Commonwealth Sustainable Rural Water Use and Infrastructure Program, described as the Commonwealth water use program, as a relevant factor when determining nominal entitlements for relevant water licences in the Upper Condamine Alluvium (s 59). The Plan also creates routes for CEWH entitlements and rights, and gives CEWH a role in the Upper Condamine where licences are to be granted or amended to meet sustainable diversion limits (ss 22, 60).
The Plan interacts with environmental law. It requires record keeping by persons taking contaminated agricultural run-off done to comply with an obligation under the Environmental Protection Act 1994 (s 81). The Plan’s environmental outcomes and monitoring obligations will therefore normally be pursued alongside regulatory controls under the Environmental Protection Act where environmental obligations trigger authorised taking of run-off. The Plan also explicitly aims to reverse, where practicable, ecosystem degradation caused by water taking (s 2).
Planning and development law cross-over appears in conversions and determination of maximum rates where a development permit under the Planning Act and the Planning Regulation 2017 are relevant. For example, a development permit citing a pump size may be a basis for working out the maximum rate for a converted allocation and the Plan references the Planning Regulation 2017 schedule 24 as the source for State development assessment provisions when determining the limited capacity for contaminated agricultural run-off (ss 71, 40).
Interstate arrangements are anticipated. The water management protocol may state arrangements for interstate trading between the State and New South Wales, and the Plan requires that any such arrangements be consistent with the Plan’s outcomes, measures and objectives (ss 82, 84). Where water sharing agreements with New South Wales exist, the Plan requires consistency with them (s 18).
Regulatory interactions also occur with subordinate acts and administrative instruments. The Plan’s implementation steps frequently require water entitlement notices under the Water Act to convert authorisations or amend licences. Where a licence is inconsistent with a water plan the Act requires certain corrective actions, referenced in the Plan (for example s 133 actions attached to s 55 and s 56).
Finally, the Plan includes temporal transitional interactions. It replaces the Water Plan (Condamine and Balonne) 2004 and provides transitional rules for applications made under the repealed 2004 Plan that were pending at commencement, dictating whether they remain effective or are of no effect based on whether the chief executive could have accepted the application under the new s 42 (ss 86 to 88).
The Plan therefore functions as a specialised instrument that sits within a statutory ecosystem, relying on and constraining other laws, instruments and intergovernmental commitments. Implementation necessarily engages planning permits, environmental obligations, Commonwealth water programmes and interstate trading frameworks.
Amendment history
The Plan states that it replaces the Water Plan (Condamine and Balonne) 2004 (s 86). Within the text the Plan anticipates future amendments and specifies categories of amendment that may be made without public consultation, consistent with s 43(2)(m) of the Act (s 85). These non‑consultative amendments include adding or amending environmental flow objectives or water allocation security objectives or performance indicators where the amendment achieves an equivalent or improved environmental flow and water allocation security outcome, adding nodes, adjusting boundaries of defined areas if more accurate information on boundaries or hydrological characteristics becomes available, changing names of underground water units or sub-units if more accurate hydrological information becomes available and the removal of provisions that have no effect (s 85).
The Plan also contains embedded amendment mechanics for implementation via water entitlement notices made under the Water Act. Numerous provisions anticipate that the Plan will be implemented or operationalised by water entitlement notices that amend licences or convert authorisations (for example ss 59, 60, 65, 75, 55, 56). Where such notices are used, the Plan expects the chief executive to amend licences to include required conditions or to implement conversion formulas. The Plan also prescribes time frames for administrative action following the making of a water entitlement notice, for example a 60 business day stated time under s 133 of the Act where certain licence amendments are required (s 55).
Some provisions were amended by later Acts, as indicated by in-text amendment notes. For instance, s 45 contains an amendment notation: “s 45 amd 2023 Act No. 24 s 75 sch 1 pt 1”, signalling a 2023 amendment to that section. The Plan therefore has been subject to at least that later legislative change.
The Plan requires the chief executive to prepare a monitoring, evaluation and reporting strategy by 1 July 2020 to support assessment of the Plan’s effectiveness and implementation (s 23). That requirement creates a statutory path for data-driven amendment, because monitoring outcomes and the annual water use report, which must include compliance with sustainable diversion limits, can inform whether the Plan’s objectives and performance indicators require updating, and whether non-consultative amendments under s 85 are appropriate.
Finally, the Plan prescribes particular administrative processes that can effect change in licences and allocations: the chief executive’s acceptance or refusal of certain applications (s 42), processes for deciding on overland flow licences, and criteria for conversion to water allocations. Those processes create administrative levers for incremental change beyond formal amendments of the Plan text.
In sum, amendment history is twofold: the Plan replaces a prior Plan and contains a mechanism for future change via both (a) non‑consultative amendments in specified categories and (b) operational adjustment through water entitlement notices and administrative decisions. The in-text amendment note (s 45) also evidences at least one subsequent legislative amendment to the Plan.
Litigation history
The Plan itself does not list court cases or litigation decisions; it is an instrument framed to be applied under the decision framework of the Water Act. The text names no judicial authorities or prior litigation. Where procedural or substantive conflicts arise, the Plan points to the remedial architecture in the Water Act for resolving inconsistency between licences and the Plan, notably by directing the chief executive to take actions under sections 129 and 133 of the Act when a dealing or licence is inconsistent with a water plan (see s 45 and s 55 notes).
Because the Plan requires the use of specific model computer programs and model simulations for assessing consistency with environmental flow objectives and water allocation security objectives, litigation in practice could be expected to engage technical evidence about model inputs, the simulation period and model calibration, as the Plan prescribes node‑based performance indicators in schedule 7 and the use of the eWater Source and MODFLOW programs for consistency assessments (s 35, s 15, sch 7). The Plan also mandates that performance indicators be calculated on the assumption that unallocated water reserved under the plan is being taken, a modelling assumption that would be material in any contested assessment of consistency under ss 26 to 29 and s 30.
The Plan creates administrative decisions that are non‑discretionary in certain instances. For example, where a water entitlement notice provides for granting specified licences or amending licences in particular ways, the chief executive “must decide to grant” under ss 46 to 47 and in CEWH contexts (s 60), which could give rise to judicial review challenges if the administrative process did not comply with statutory requirements or procedural fairness obligations in the Act.
The Plan also prescribes destructive or restrictive measures such as conversion of authorisations to water allocations, imposition of nominal entitlements, and inclusion or removal of licence conditions. Disputes over such conversions and the Chief Executive’s exercise of discretion in determining nominal entitlements or locations from which water may be taken (for example ss 59, 77) could produce administrative law challenges around reasonableness, relevant considerations and procedural fairness, although the Plan itself delineates the matters the chief executive must have regard to.
No cases are named in the Plan, and there is no internal litigation annex. Any litigation history therefore must be sought in court or tribunal records and external materials. The Plan does, however, create technical and administrative decision points likely to be fertile for judicial review or merits review once decisions implementing the Plan are made.
Gotchas
The Plan contains a number of technical traps and implementation features that users and advisers must flag. First, modelling and the assumptions that underpin performance indicators are central. The Plan ties environmental flow objectives and allocation security objectives directly to modelled performance at defined nodes and requires that performance indicators be calculated on the assumption that unallocated water reserved under the Plan is being taken (ss 26 to 30). That modelling assumption will materially affect performance ratios and may reduce headroom for allocations. Users should document how models and the unallocated water assumption influence any administrative decision because the chief executive must rely on model simulations for consistency assessments unless it is impracticable to do so (s 35, s 30).
Second, the Plan sets absolute deadlines for measurement that create compliance risk. All water allocations are required to be measured by 31 December 2022 and specified underground licences by 31 December 2025, “as directed by the chief executive” (s 23). Failure to achieve measurement by these dates may affect entitlement holders’ ability to demonstrate compliance with conditions or to participate in assignments and dealings. The phrase “as directed by the chief executive” pivots implementation on directions that can impose further specification and timelines.
Third, conversion of historic authorisations to allocations carries formulaic limits and can alter rights. Conversions of irrigation licences above Leslie Dam to water allocations use irrigated area multiplied by six to derive nominal and volumetric limits (ss 65 to 70), and conversions for underground authorisations stipulate location rules, volumetric parity with existing nominal entitlements and chief executive discretion based on available water ratios in schedule 8 (ss 75 to 80). These formulae can reduce previously practised volumes or rates if historical operating arrangements had different metrics; users must check the Plan’s prescribed calculations against their existing authorisations.
Fourth, the Plan imposes a hard cap in the Central Condamine Alluvium. The chief executive must ensure that total nominal entitlements for licences, other than CEWH, in that unit do not exceed 46,221 ML and that nominal entitlements are whole megalitres and not less than 5 ML (s 59). That cap constrains future allocation or trading within that aquifer and makes participation in relevant Commonwealth programs a material factor the chief executive must consider when setting nominal entitlements.
Fifth, the Plan restricts the initiation of new take in ways that can catch applicants unawares. Section 33 forbids decisions that increase the average volume taken or combined total of nominal entitlements, subject to limited exceptions such as reinstatement, taking reserved unallocated water, or taking water not in an underground unit. Applicants must check whether their proposed dealing or change falls within an exception or may be inconsistent with the Plan (s 33).
Sixth, overland flow licensing contains specific content and evidentiary requirements. Licences to take overland flow must state purpose as ‘any’ and include at least one numeric control among maximum rate, storage capacity, average annual volume or volumetric limit, with the chief executive entitled to request and rely on certified reports for the works (ss 48 to 54). Pump size limits are tied to the Water Regulation 2016 schedule 7 and storage capacity must disregard bunded land, agricultural land used for irrigation and land surrounded by levees (ss 49, 50). Applicants reliant on existing operating arrangements may find the chief executive’s “reasonably believes there has been an increase in average annual volume” test material when deciding whether an owner must be granted a licence for notified existing works (ss 53 to 54).
Seventh, administrative implementation is highly centralised. Many powers and assessments are reserved to the chief executive, including acceptance, publication, granting and amendment decisions. Where the Plan uses the phrase “must decide to grant”, that reduces the scope for discretionary refusal but also ties compliance to correct administrative sequence and preconditions such as relevant change applications and certificates for local government impoundments (ss 43, 46, 60). Applicants should be prepared to meet the Plan’s data and process requirements before a recommended decision is made.
Eighth, the water management protocol is the operational detail book. The Plan delegates substantial operational rules to the water management protocol, including water allocation dealing and seasonal assignment rules, which may be created, updated or further specified without amending the Plan text (s 82). This means that substantive operational rules affecting trade and relocation may appear in the protocol and not in the Plan itself, so stakeholders must consult the protocol to understand the real operating rules.
Finally, schedule‑based numeric thresholds are precise and binding. Schedule 7 enumerates node thresholds and percentiles for flow and groundwater level objectives; the Plan ties performance to these numbers (sch 7). Those numeric triggers drive what decisions are consistent with the Plan. Parties should audit any proposed dealing, licence amendment or conversion against the node thresholds and model simulations before proceeding.
These “gotchas” show that technical modelling assumptions, prescribed calculation rules, conversion formulae, measurement deadlines and the water management protocol are the operational levers where implementation risk, compliance burden and contest can concentrate.
How to comply
Compliance requires an integrated approach covering measurement, record keeping, licence content, modelling engagement and procedural readiness. Below are concrete steps and focal points tied to specific Plan provisions.
Verify whether your water source and location fall inside the Plan’s scope. The Plan applies to surface water and underground water not covered by the Great Artesian Basin plan and uses mapped plan area boundaries held digitally by the department (ss 4, 5, 16). Obtain the department’s digital boundary files and confirm whether your works fall within the named water management area, zone or underground water management sub-area relevant to your licence or proposed application (ss 6 to 13, s 16).
Metering and measurement readiness. Ensure all water allocations are metered “as directed by the chief executive” by 31 December 2022 and that specified underground water licences in the listed units are measured by 31 December 2025 (s 23). If you hold a relevant underground water licence, check whether your underground water unit is listed in s 23(1)(b), and prepare to install, certify and maintain meter equipment to meet directions. Keep records of meter calibration and compliance with any prescribed metering standards.
Review licence content and anticipate required amendments. If your water licence is among those identified in schedule 10 or falls into categories the Plan addresses (for example underground licences in the underground water management area), check whether water entitlement notices implementing the Plan have required amendments and ensure your licence carries required terms and conditions (ss 55, 56). For overland flow licences, ensure the purpose is stated as ‘any’ and that at least one of the mandated numeric constraints is present, and be ready to provide certified reports of works if requested (ss 48 to 54).
Understand conversion formulae. If your existing authorisation might be converted to a water allocation under the Plan, identify which conversion rules apply. For irrigation authorisations above Leslie Dam conversion uses irrigated area times six to determine nominal and volumetric limits (ss 65 to 70). For underground authorisations in named sub-areas conversions will set nominal volumes by reference to available water ratios in schedule 8 and locations will be decided with reference to existing works and land centre points; CEWH rules also apply in the Upper Condamine (ss 75 to 80, s 59, s 60). Prepare documentation of irrigated area and development permits, and gather historic operating records that may bear on conversion decisions.
Check trading and relocation rules in the water management protocol. The Plan leaves seasonal assignment, relocation, and dealing rules to the water management protocol (s 82). Obtain and review the protocol for the Plan area to understand criteria, processes and potentially constrained trading zones. Ensure any intended trades, relocations or seasonal assignments conform to protocol rules and that you can supply required supporting information for any underground water impact assessments the protocol may require.
Prepare for modelled assessments. Many decisions are to be assessed using model computer program simulations, primarily eWater Source or MODFLOW, and the Plan requires performance indicators be calculated assuming unallocated water reserved is taken (s 35, s 30). If your proposed dealing could affect environmental flow objectives or allocation security objectives, commission or obtain model runs that allow the chief executive to assess consistency, and document assumptions, especially regarding unallocated water and simulation periods.
For overland flow owners, document historic use and works. Owners of existing overland flow works who wish to apply for licences must be able to demonstrate that works were used before 20 September 2000 if relying on that historical cutoff, and be prepared to provide certified reports of works when requested (s 44, s 54). For determinations of maximum rate and storage capacity, provide certified technical reports and pump specifications that align with the Water Regulation 2016 limits where pump size is used to derive maximum rate (ss 49 to 50).
Maintain records for contaminated agricultural run-off. If you take contaminated agricultural run-off under an environmental obligation, prepare to record volume, date and nature of the event causing the run-off and any other matters specified in the water management protocol, and retain records for five years (s 81).
Engage with the chief executive’s procedural requirements early. For local governments applying to interfere with flow to impound water for town supply, make any required “relevant change applications” under s 159 of the Act and ensure certificates are in place before expecting the chief executive to accept an s 107 application (s 43). For licence dealings that might be inconsistent with the Plan, consider whether the local government exception or change application pathways are available and use the Plan’s prescribed steps.
Monitor publications and reports. The chief executive must publish an annual water use report and record decisions to implement flow management arrangements in the Lower Balonne annually (s 23). Review those publications for information about compliance expectations, enforcement emphasis and changes to the water management protocol that might affect allocations, trade or measurement requirements.
Legal and technical cross-check. Before submitting applications or conducting dealings, coordinate legal review with hydrological or engineering advice to ensure compliance with numeric thresholds in schedule 7, water allocation security objectives in schedule 8 and the Plan’s calculation rules, and to anticipate any administrative or modelling queries the department may raise (ss 26 to 29, sch 7, sch 8).
Prepare for transition rules and potential retrospective effects. If you had an application lodged under the repealed 2004 Plan still undecided at commencement, check whether it remains effective or is of no effect depending on whether it would have been acceptable under s 42; where a dealing remains inconsistent on commencement it will be treated as inconsistent under s 88 (ss 87 to 88).
Following the steps above aligns operational practice with the Plan’s technical and administrative requirements. Effective compliance will typically require early technical modelling, timely metering installations certified to departmental standards, complete documentary evidence of historic works for overland flow and conversion applicants, and close procedural engagement with the department, particularly where CEWH entitlements, crossings between state and interstate arrangements, or conversion of high-value authorisations are concerned.
Part pt.2Plan area, water to which plan applies and other matters
For section 43 (1) (a) of the Act , this plan applies to the following water in the plan area—
surface water;
underground water to which the Water Plan (Great Artesian Basin and Other Regional Aquifers) 2017 does not apply.
(a) surface water;
(b) underground water to which the Water Plan (Great Artesian Basin and Other Regional Aquifers) 2017 does not apply.
sec.6 Plan area
sec.6 Plan area
This plan applies to the area shown as the plan area on the map in schedule 1 , part 1 .
sec.7 Water supply schemes and water supply scheme zones
sec.7 Water supply schemes and water supply scheme zones
Each part of the plan area shown as a water supply scheme on the map in schedule 2 , part 1 is a water supply scheme for this plan.
A reference in this plan to a water supply scheme by name is a reference to the water supply scheme given that name on the map in schedule 2 , part 1 and in schedule 2 , part 2 , column 1.
Each part of the plan area named and described in schedule 2 , part 2 , columns 2 and 3, is a water supply scheme zone .
(sec.7-ssec.1) Each part of the plan area shown as a water supply scheme on the map in schedule 2 , part 1 is a water supply scheme for this plan.
(sec.7-ssec.2) A reference in this plan to a water supply scheme by name is a reference to the water supply scheme given that name on the map in schedule 2 , part 1 and in schedule 2 , part 2 , column 1.
(sec.7-ssec.3) Each part of the plan area named and described in schedule 2 , part 2 , columns 2 and 3, is a water supply scheme zone .
sec.8 Water management areas— Act , sch 4
sec.8 Water management areas— Act , sch 4
For schedule 4 of the Act , definition water management area , paragraph (b) , each part of the plan area shown as a water management area on the map in schedule 3 , part 1 is a water management area.
A reference in this plan to a water management area by name is a reference to the water management area given that name on a map in schedule 3 .
(sec.8-ssec.1) For schedule 4 of the Act , definition water management area , paragraph (b) , each part of the plan area shown as a water management area on the map in schedule 3 , part 1 is a water management area.
(sec.8-ssec.2) A reference in this plan to a water management area by name is a reference to the water management area given that name on a map in schedule 3 .
sec.9 Water management area zones
sec.9 Water management area zones
A water management area has 1 or more water management area zones.
A water management area zone , for a water management area, is—
for the Upper Condamine water management area—
shown on the map in schedule 3 , part 2 ; and
named and described in columns 1 and 2 of the table in schedule 3 , part 2 ; and
for the Condamine and Balonne water management area—
shown on the map in schedule 3 , part 3 ; and
named and described in columns 1 and 2 of the table in schedule 3 , part 3 ; and
for the Lower Balonne water management area—
shown on the map in schedule 3 , part 4 ; and
named and described in columns 1 and 2 of the table in schedule 3 , part 4 ; and
for the Condamine and Balonne Tributaries water management area—shown on the map in schedule 3 , part 5 ; and
for the Gowrie and Oakey Creek water management area—
shown on the map in schedule 3 , part 6 ; and
named and described in columns 1 and 2 of the table in schedule 3 , part 6 .
A reference in this plan to a water management area zone, in the Condamine and Balonne Tributaries water management area, by name is a reference to the water management area zone given that name on the map in schedule 3 , part 5 .
A reference in this plan to a water management area zone in another water management area by name is a reference to the water management area zone given that name on a map in schedule 3 , part 2 , 3 , 4 or 6 and in column 1 of a table in schedule 3 .
(sec.9-ssec.1) A water management area has 1 or more water management area zones.
(sec.9-ssec.2) A water management area zone , for a water management area, is— for the Upper Condamine water management area— shown on the map in schedule 3 , part 2 ; and named and described in columns 1 and 2 of the table in schedule 3 , part 2 ; and for the Condamine and Balonne water management area— shown on the map in schedule 3 , part 3 ; and named and described in columns 1 and 2 of the table in schedule 3 , part 3 ; and for the Lower Balonne water management area— shown on the map in schedule 3 , part 4 ; and named and described in columns 1 and 2 of the table in schedule 3 , part 4 ; and for the Condamine and Balonne Tributaries water management area—shown on the map in schedule 3 , part 5 ; and for the Gowrie and Oakey Creek water management area— shown on the map in schedule 3 , part 6 ; and named and described in columns 1 and 2 of the table in schedule 3 , part 6 .
(sec.9-ssec.3) A reference in this plan to a water management area zone, in the Condamine and Balonne Tributaries water management area, by name is a reference to the water management area zone given that name on the map in schedule 3 , part 5 .
(sec.9-ssec.4) A reference in this plan to a water management area zone in another water management area by name is a reference to the water management area zone given that name on a map in schedule 3 , part 2 , 3 , 4 or 6 and in column 1 of a table in schedule 3 .
(a) for the Upper Condamine water management area— (i) shown on the map in schedule 3 , part 2 ; and (ii) named and described in columns 1 and 2 of the table in schedule 3 , part 2 ; and
(i) shown on the map in schedule 3 , part 2 ; and
(ii) named and described in columns 1 and 2 of the table in schedule 3 , part 2 ; and
(b) for the Condamine and Balonne water management area— (i) shown on the map in schedule 3 , part 3 ; and (ii) named and described in columns 1 and 2 of the table in schedule 3 , part 3 ; and
(i) shown on the map in schedule 3 , part 3 ; and
(ii) named and described in columns 1 and 2 of the table in schedule 3 , part 3 ; and
(c) for the Lower Balonne water management area— (i) shown on the map in schedule 3 , part 4 ; and (ii) named and described in columns 1 and 2 of the table in schedule 3 , part 4 ; and
(i) shown on the map in schedule 3 , part 4 ; and
(ii) named and described in columns 1 and 2 of the table in schedule 3 , part 4 ; and
(d) for the Condamine and Balonne Tributaries water management area—shown on the map in schedule 3 , part 5 ; and
(e) for the Gowrie and Oakey Creek water management area— (i) shown on the map in schedule 3 , part 6 ; and (ii) named and described in columns 1 and 2 of the table in schedule 3 , part 6 .
(i) shown on the map in schedule 3 , part 6 ; and
(ii) named and described in columns 1 and 2 of the table in schedule 3 , part 6 .
(i) shown on the map in schedule 3 , part 2 ; and
(ii) named and described in columns 1 and 2 of the table in schedule 3 , part 2 ; and
(i) shown on the map in schedule 3 , part 3 ; and
(ii) named and described in columns 1 and 2 of the table in schedule 3 , part 3 ; and
(i) shown on the map in schedule 3 , part 4 ; and
(ii) named and described in columns 1 and 2 of the table in schedule 3 , part 4 ; and
(i) shown on the map in schedule 3 , part 6 ; and
(ii) named and described in columns 1 and 2 of the table in schedule 3 , part 6 .
sec.10 Underground water management area
sec.10 Underground water management area
The part of the plan area shown as the underground water management area on the map in schedule 4 is the underground water management area .
sec.11 Underground water sub-areas
sec.11 Underground water sub-areas
Certain parts of the underground water management area are divided into underground water sub-areas.
A part of the underground water management area shown on the map in schedule 5 as an underground water sub-area is an underground water sub-area .
A reference in this plan to an underground water sub-area by name is a reference to the underground water sub-area given that name in schedule 5 .
(sec.11-ssec.1) Certain parts of the underground water management area are divided into underground water sub-areas.
(sec.11-ssec.2) A part of the underground water management area shown on the map in schedule 5 as an underground water sub-area is an underground water sub-area .
(sec.11-ssec.3) A reference in this plan to an underground water sub-area by name is a reference to the underground water sub-area given that name in schedule 5 .
sec.12 Underground water units and underground water sub-units
sec.12 Underground water units and underground water sub-units
The underground water management area includes the following aquifers (each an underground water unit )—
the St George Alluvium (shallow);
the St George Alluvium (deep);
the sediments above the Great Artesian Basin;
the Upper Condamine Alluvium (Central Condamine Alluvium);
the Upper Condamine Alluvium (Tributaries);
the Upper Condamine Basalts;
the Condamine Fractured Rock;
the Queensland Murray-Darling Basin deep.
The Upper Condamine Basalts, in the Nobby Basalts underground water sub-area, is made up of the following aquifers (each an underground water sub-unit )—
for underground water to which this plan applies above the aquitard in the Upper Condamine Basalts—the Upper Condamine Basalts (Nobby Basalts shallow);
for underground water to which this plan applies below the aquitard in the Upper Condamine Basalts—the Upper Condamine Basalts (Nobby Basalts deep).
(sec.12-ssec.1) The underground water management area includes the following aquifers (each an underground water unit )— the St George Alluvium (shallow); the St George Alluvium (deep); the sediments above the Great Artesian Basin; the Upper Condamine Alluvium (Central Condamine Alluvium); the Upper Condamine Alluvium (Tributaries); the Upper Condamine Basalts; the Condamine Fractured Rock; the Queensland Murray-Darling Basin deep.
(sec.12-ssec.2) The Upper Condamine Basalts, in the Nobby Basalts underground water sub-area, is made up of the following aquifers (each an underground water sub-unit )— for underground water to which this plan applies above the aquitard in the Upper Condamine Basalts—the Upper Condamine Basalts (Nobby Basalts shallow); for underground water to which this plan applies below the aquitard in the Upper Condamine Basalts—the Upper Condamine Basalts (Nobby Basalts deep).
(a) the St George Alluvium (shallow);
(b) the St George Alluvium (deep);
(c) the sediments above the Great Artesian Basin;
(d) the Upper Condamine Alluvium (Central Condamine Alluvium);
(e) the Upper Condamine Alluvium (Tributaries);
(f) the Upper Condamine Basalts;
(g) the Condamine Fractured Rock;
(h) the Queensland Murray-Darling Basin deep.
(a) for underground water to which this plan applies above the aquitard in the Upper Condamine Basalts—the Upper Condamine Basalts (Nobby Basalts shallow);
(b) for underground water to which this plan applies below the aquitard in the Upper Condamine Basalts—the Upper Condamine Basalts (Nobby Basalts deep).
sec.13 Underground water zones
sec.13 Underground water zones
Certain underground water sub-areas are divided into underground water zones.
A part of an underground water sub-area, shown on a map in schedule 6 as an underground water zone, is an underground water zone .
(sec.13-ssec.1) Certain underground water sub-areas are divided into underground water zones.
(sec.13-ssec.2) A part of an underground water sub-area, shown on a map in schedule 6 as an underground water zone, is an underground water zone .
sec.14 Trading zones— Act , s 43
sec.14 Trading zones— Act , s 43
For section 43 (1) (e) (i) of the Act , the following zones are trading zones for water allocations to which this plan applies—
a water supply scheme zone;
a water management area zone;
an underground water zone.
(a) a water supply scheme zone;
(b) a water management area zone;
(c) an underground water zone.
sec.15 Nodes
sec.15 Nodes
A node is a point in the plan area.
The modelled location of each node is identified, by a letter, on the map in schedule 1 , part 1 and is described in schedule 1 , part 2 .
A node may be referred to in this plan by its letter.
The actual location of each node is set by—
for nodes A to L—the eWater Source computer program; or
for nodes M to O—the MODFLOW computer program.
(sec.15-ssec.1) A node is a point in the plan area.
(sec.15-ssec.2) The modelled location of each node is identified, by a letter, on the map in schedule 1 , part 1 and is described in schedule 1 , part 2 .
(sec.15-ssec.3) A node may be referred to in this plan by its letter.
(sec.15-ssec.4) The actual location of each node is set by— for nodes A to L—the eWater Source computer program; or for nodes M to O—the MODFLOW computer program.
(a) for nodes A to L—the eWater Source computer program; o
This is an opening excerpt, not the complete document.