Water Plan (Condamine and Balonne) 2019
sch.7-sec.6Productive base
Start here
Get a plain-English read of sch.7-sec.6
Turn the raw legal text into a practical explanation grounded in Water Plan (Condamine and Balonne) 2019.
sch.7-sec.6 Productive base
An environmental flow objective for underground water to which this plan applies is that, at nodes M, N and O, the performance indicator mentioned in subsection (2) is at least the water level stated for each node in the following table. Node 10th percentile water level (mAHD) M 467 N 423.8 O 374.8 The performance indicator, for nodes M, N and O, is the 10 th percentile water level during the simulation period. (sch.7-sec.6-ssec.1) An environmental flow objective for underground water to which this plan applies is that, at nodes M, N and O, the performance indicator mentioned in subsection (2) is at least the water level stated for each node in the following table. Node 10th percentile water level (mAHD) M 467 N 423.8 O 374.8 (sch.7-sec.6-ssec.2) The performance indicator, for nodes M, N and O, is the 10 th percentile water level during the simulation period.