{"id":"qld:sl-2019-0011","name":"Water Plan (Condamine and Balonne) 2019","slug":"water-plan-condamine-and-balonne-2019","collection":"regulation","jurisdiction":"qld","status":"in_force","isInForce":true,"actNumber":"11 of 2019","makingDate":null,"administeringDepartment":null,"currentVersion":{"id":174030,"registerId":"qld-sl-2019-0011-current","compilationNumber":null,"startDate":"2026-04-05","status":"InForce","reasons":null,"registeredAt":null},"sections":[{"sectionNumber":"pt.1","sectionType":"part","heading":"Preliminary","content":"# Preliminary","sortOrder":0},{"sectionNumber":"sec.1","sectionType":"section","heading":"Short title","content":"### sec.1 Short title\n\nThis plan may be cited as the Water Plan (Condamine and Balonne) 2019 .","sortOrder":1},{"sectionNumber":"sec.2","sectionType":"section","heading":"Purposes of plan","content":"### sec.2 Purposes of plan\n\nThe purposes of this plan are to—\ndefine the availability of water to which this plan applies; and\nprovide a framework for sustainably managing water to which this plan applies; and\nidentify priorities and mechanisms for dealing with the future water requirements in the plan area; and\nprovide a framework for managing water allocations; and\nprovide a framework for reversing, where practicable, the degradation of natural ecosystems caused by the taking of, or interference with, water to which this plan applies.\n- (a) define the availability of water to which this plan applies; and\n- (b) provide a framework for sustainably managing water to which this plan applies; and\n- (c) identify priorities and mechanisms for dealing with the future water requirements in the plan area; and\n- (d) provide a framework for managing water allocations; and\n- (e) provide a framework for reversing, where practicable, the degradation of natural ecosystems caused by the taking of, or interference with, water to which this plan applies.","sortOrder":2},{"sectionNumber":"sec.3","sectionType":"section","heading":"Definitions","content":"### sec.3 Definitions\n\nThe dictionary in schedule&#160;14 defines particular words used in this plan.","sortOrder":3},{"sectionNumber":"sec.4","sectionType":"section","heading":"Meaning of surface water","content":"### sec.4 Meaning of surface water\n\nSurface water is—\nwater in a watercourse or lake; or\nwater in a spring not connected to water to which the Water Plan (Great Artesian Basin and Other Regional Aquifers) 2017 applies; or\noverland flow water, other than water in a spring connected to water to which the Water Plan (Great Artesian Basin and Other Regional Aquifers) 2017 applies.\n- (a) water in a watercourse or lake; or\n- (b) water in a spring not connected to water to which the Water Plan (Great Artesian Basin and Other Regional Aquifers) 2017 applies; or\n- (c) overland flow water, other than water in a spring connected to water to which the Water Plan (Great Artesian Basin and Other Regional Aquifers) 2017 applies.","sortOrder":4},{"sectionNumber":"pt.2","sectionType":"part","heading":"Plan area, water to which plan applies and other matters","content":"# Plan area, water to which plan applies and other matters","sortOrder":5},{"sectionNumber":"sec.5","sectionType":"section","heading":"Water to which plan applies— Act , s&#160;43","content":"### sec.5 Water to which plan applies— Act , s&#160;43\n\nFor section&#160;43 (1) (a) of the Act , this plan applies to the following water in the plan area—\nsurface water;\nunderground water to which the Water Plan (Great Artesian Basin and Other Regional Aquifers) 2017 does not apply.\n- (a) surface water;\n- (b) underground water to which the Water Plan (Great Artesian Basin and Other Regional Aquifers) 2017 does not apply.","sortOrder":6},{"sectionNumber":"sec.6","sectionType":"section","heading":"Plan area","content":"### sec.6 Plan area\n\nThis plan applies to the area shown as the plan area on the map in schedule&#160;1 , part&#160;1 .","sortOrder":7},{"sectionNumber":"sec.7","sectionType":"section","heading":"Water supply schemes and water supply scheme zones","content":"### sec.7 Water supply schemes and water supply scheme zones\n\nEach part of the plan area shown as a water supply scheme on the map in schedule&#160;2 , part&#160;1 is a water supply scheme for this plan.\nA reference in this plan to a water supply scheme by name is a reference to the water supply scheme given that name on the map in schedule&#160;2 , part&#160;1 and in schedule&#160;2 , part&#160;2 , column 1.\nEach part of the plan area named and described in schedule&#160;2 , part&#160;2 , columns 2 and 3, is a water supply scheme zone .\n(sec.7-ssec.1) Each part of the plan area shown as a water supply scheme on the map in schedule&#160;2 , part&#160;1 is a water supply scheme for this plan.\n(sec.7-ssec.2) A reference in this plan to a water supply scheme by name is a reference to the water supply scheme given that name on the map in schedule&#160;2 , part&#160;1 and in schedule&#160;2 , part&#160;2 , column 1.\n(sec.7-ssec.3) Each part of the plan area named and described in schedule&#160;2 , part&#160;2 , columns 2 and 3, is a water supply scheme zone .","sortOrder":8},{"sectionNumber":"sec.8","sectionType":"section","heading":"Water management areas— Act , sch&#160;4","content":"### sec.8 Water management areas— Act , sch&#160;4\n\nFor schedule&#160;4 of the Act , definition water management area , paragraph&#160;(b) , each part of the plan area shown as a water management area on the map in schedule&#160;3 , part&#160;1 is a water management area.\nA reference in this plan to a water management area by name is a reference to the water management area given that name on a map in schedule&#160;3 .\n(sec.8-ssec.1) For schedule&#160;4 of the Act , definition water management area , paragraph&#160;(b) , each part of the plan area shown as a water management area on the map in schedule&#160;3 , part&#160;1 is a water management area.\n(sec.8-ssec.2) A reference in this plan to a water management area by name is a reference to the water management area given that name on a map in schedule&#160;3 .","sortOrder":9},{"sectionNumber":"sec.9","sectionType":"section","heading":"Water management area zones","content":"### sec.9 Water management area zones\n\nA water management area has 1 or more water management area zones.\nA water management area zone , for a water management area, is—\nfor the Upper Condamine water management area—\nshown on the map in schedule&#160;3 , part&#160;2 ; and\nnamed and described in columns 1 and 2 of the table in schedule&#160;3 , part&#160;2 ; and\nfor the Condamine and Balonne water management area—\nshown on the map in schedule&#160;3 , part&#160;3 ; and\nnamed and described in columns 1 and 2 of the table in schedule&#160;3 , part&#160;3 ; and\nfor the Lower Balonne water management area—\nshown on the map in schedule&#160;3 , part&#160;4 ; and\nnamed and described in columns 1 and 2 of the table in schedule&#160;3 , part&#160;4 ; and\nfor the Condamine and Balonne Tributaries water management area—shown on the map in schedule&#160;3 , part&#160;5 ; and\nfor the Gowrie and Oakey Creek water management area—\nshown on the map in schedule&#160;3 , part&#160;6 ; and\nnamed and described in columns 1 and 2 of the table in schedule&#160;3 , part&#160;6 .\nA reference in this plan to a water management area zone, in the Condamine and Balonne Tributaries water management area, by name is a reference to the water management area zone given that name on the map in schedule&#160;3 , part&#160;5 .\nA reference in this plan to a water management area zone in another water management area by name is a reference to the water management area zone given that name on a map in schedule&#160;3 , part&#160;2 , 3 , 4 or 6 and in column 1 of a table in schedule&#160;3 .\n(sec.9-ssec.1) A water management area has 1 or more water management area zones.\n(sec.9-ssec.2) A water management area zone , for a water management area, is— for the Upper Condamine water management area— shown on the map in schedule&#160;3 , part&#160;2 ; and named and described in columns 1 and 2 of the table in schedule&#160;3 , part&#160;2 ; and for the Condamine and Balonne water management area— shown on the map in schedule&#160;3 , part&#160;3 ; and named and described in columns 1 and 2 of the table in schedule&#160;3 , part&#160;3 ; and for the Lower Balonne water management area— shown on the map in schedule&#160;3 , part&#160;4 ; and named and described in columns 1 and 2 of the table in schedule&#160;3 , part&#160;4 ; and for the Condamine and Balonne Tributaries water management area—shown on the map in schedule&#160;3 , part&#160;5 ; and for the Gowrie and Oakey Creek water management area— shown on the map in schedule&#160;3 , part&#160;6 ; and named and described in columns 1 and 2 of the table in schedule&#160;3 , part&#160;6 .\n(sec.9-ssec.3) A reference in this plan to a water management area zone, in the Condamine and Balonne Tributaries water management area, by name is a reference to the water management area zone given that name on the map in schedule&#160;3 , part&#160;5 .\n(sec.9-ssec.4) A reference in this plan to a water management area zone in another water management area by name is a reference to the water management area zone given that name on a map in schedule&#160;3 , part&#160;2 , 3 , 4 or 6 and in column 1 of a table in schedule&#160;3 .\n- (a) for the Upper Condamine water management area— (i) shown on the map in schedule&#160;3 , part&#160;2 ; and (ii) named and described in columns 1 and 2 of the table in schedule&#160;3 , part&#160;2 ; and\n- (i) shown on the map in schedule&#160;3 , part&#160;2 ; and\n- (ii) named and described in columns 1 and 2 of the table in schedule&#160;3 , part&#160;2 ; and\n- (b) for the Condamine and Balonne water management area— (i) shown on the map in schedule&#160;3 , part&#160;3 ; and (ii) named and described in columns 1 and 2 of the table in schedule&#160;3 , part&#160;3 ; and\n- (i) shown on the map in schedule&#160;3 , part&#160;3 ; and\n- (ii) named and described in columns 1 and 2 of the table in schedule&#160;3 , part&#160;3 ; and\n- (c) for the Lower Balonne water management area— (i) shown on the map in schedule&#160;3 , part&#160;4 ; and (ii) named and described in columns 1 and 2 of the table in schedule&#160;3 , part&#160;4 ; and\n- (i) shown on the map in schedule&#160;3 , part&#160;4 ; and\n- (ii) named and described in columns 1 and 2 of the table in schedule&#160;3 , part&#160;4 ; and\n- (d) for the Condamine and Balonne Tributaries water management area—shown on the map in schedule&#160;3 , part&#160;5 ; and\n- (e) for the Gowrie and Oakey Creek water management area— (i) shown on the map in schedule&#160;3 , part&#160;6 ; and (ii) named and described in columns 1 and 2 of the table in schedule&#160;3 , part&#160;6 .\n- (i) shown on the map in schedule&#160;3 , part&#160;6 ; and\n- (ii) named and described in columns 1 and 2 of the table in schedule&#160;3 , part&#160;6 .\n- (i) shown on the map in schedule&#160;3 , part&#160;2 ; and\n- (ii) named and described in columns 1 and 2 of the table in schedule&#160;3 , part&#160;2 ; and\n- (i) shown on the map in schedule&#160;3 , part&#160;3 ; and\n- (ii) named and described in columns 1 and 2 of the table in schedule&#160;3 , part&#160;3 ; and\n- (i) shown on the map in schedule&#160;3 , part&#160;4 ; and\n- (ii) named and described in columns 1 and 2 of the table in schedule&#160;3 , part&#160;4 ; and\n- (i) shown on the map in schedule&#160;3 , part&#160;6 ; and\n- (ii) named and described in columns 1 and 2 of the table in schedule&#160;3 , part&#160;6 .","sortOrder":10},{"sectionNumber":"sec.10","sectionType":"section","heading":"Underground water management area","content":"### sec.10 Underground water management area\n\nThe part of the plan area shown as the underground water management area on the map in schedule&#160;4 is the underground water management area .","sortOrder":11},{"sectionNumber":"sec.11","sectionType":"section","heading":"Underground water sub-areas","content":"### sec.11 Underground water sub-areas\n\nCertain parts of the underground water management area are divided into underground water sub-areas.\nA part of the underground water management area shown on the map in schedule&#160;5 as an underground water sub-area is an underground water sub-area .\nA reference in this plan to an underground water sub-area by name is a reference to the underground water sub-area given that name in schedule&#160;5 .\n(sec.11-ssec.1) Certain parts of the underground water management area are divided into underground water sub-areas.\n(sec.11-ssec.2) A part of the underground water management area shown on the map in schedule&#160;5 as an underground water sub-area is an underground water sub-area .\n(sec.11-ssec.3) A reference in this plan to an underground water sub-area by name is a reference to the underground water sub-area given that name in schedule&#160;5 .","sortOrder":12},{"sectionNumber":"sec.12","sectionType":"section","heading":"Underground water units and underground water sub-units","content":"### sec.12 Underground water units and underground water sub-units\n\nThe underground water management area includes the following aquifers (each an underground water unit )—\nthe St George Alluvium (shallow);\nthe St George Alluvium (deep);\nthe sediments above the Great Artesian Basin;\nthe Upper Condamine Alluvium (Central Condamine Alluvium);\nthe Upper Condamine Alluvium (Tributaries);\nthe Upper Condamine Basalts;\nthe Condamine Fractured Rock;\nthe Queensland Murray-Darling Basin deep.\nThe Upper Condamine Basalts, in the Nobby Basalts underground water sub-area, is made up of the following aquifers (each an underground water sub-unit )—\nfor underground water to which this plan applies above the aquitard in the Upper Condamine Basalts—the Upper Condamine Basalts (Nobby Basalts shallow);\nfor underground water to which this plan applies below the aquitard in the Upper Condamine Basalts—the Upper Condamine Basalts (Nobby Basalts deep).\n(sec.12-ssec.1) The underground water management area includes the following aquifers (each an underground water unit )— the St George Alluvium (shallow); the St George Alluvium (deep); the sediments above the Great Artesian Basin; the Upper Condamine Alluvium (Central Condamine Alluvium); the Upper Condamine Alluvium (Tributaries); the Upper Condamine Basalts; the Condamine Fractured Rock; the Queensland Murray-Darling Basin deep.\n(sec.12-ssec.2) The Upper Condamine Basalts, in the Nobby Basalts underground water sub-area, is made up of the following aquifers (each an underground water sub-unit )— for underground water to which this plan applies above the aquitard in the Upper Condamine Basalts—the Upper Condamine Basalts (Nobby Basalts shallow); for underground water to which this plan applies below the aquitard in the Upper Condamine Basalts—the Upper Condamine Basalts (Nobby Basalts deep).\n- (a) the St George Alluvium (shallow);\n- (b) the St George Alluvium (deep);\n- (c) the sediments above the Great Artesian Basin;\n- (d) the Upper Condamine Alluvium (Central Condamine Alluvium);\n- (e) the Upper Condamine Alluvium (Tributaries);\n- (f) the Upper Condamine Basalts;\n- (g) the Condamine Fractured Rock;\n- (h) the Queensland Murray-Darling Basin deep.\n- (a) for underground water to which this plan applies above the aquitard in the Upper Condamine Basalts—the Upper Condamine Basalts (Nobby Basalts shallow);\n- (b) for underground water to which this plan applies below the aquitard in the Upper Condamine Basalts—the Upper Condamine Basalts (Nobby Basalts deep).","sortOrder":13},{"sectionNumber":"sec.13","sectionType":"section","heading":"Underground water zones","content":"### sec.13 Underground water zones\n\nCertain underground water sub-areas are divided into underground water zones.\nA part of an underground water sub-area, shown on a map in schedule&#160;6 as an underground water zone, is an underground water zone .\n(sec.13-ssec.1) Certain underground water sub-areas are divided into underground water zones.\n(sec.13-ssec.2) A part of an underground water sub-area, shown on a map in schedule&#160;6 as an underground water zone, is an underground water zone .","sortOrder":14},{"sectionNumber":"sec.14","sectionType":"section","heading":"Trading zones— Act , s&#160;43","content":"### sec.14 Trading zones— Act , s&#160;43\n\nFor section&#160;43 (1) (e) (i) of the Act , the following zones are trading zones for water allocations to which this plan applies—\na water supply scheme zone;\na water management area zone;\nan underground water zone.\n- (a) a water supply scheme zone;\n- (b) a water management area zone;\n- (c) an underground water zone.","sortOrder":15},{"sectionNumber":"sec.15","sectionType":"section","heading":"Nodes","content":"### sec.15 Nodes\n\nA node is a point in the plan area.\nThe modelled location of each node is identified, by a letter, on the map in schedule&#160;1 , part&#160;1 and is described in schedule&#160;1 , part&#160;2 .\nA node may be referred to in this plan by its letter.\nThe actual location of each node is set by—\nfor nodes A to L—the eWater Source computer program; or\nfor nodes M to O—the MODFLOW computer program.\n(sec.15-ssec.1) A node is a point in the plan area.\n(sec.15-ssec.2) The modelled location of each node is identified, by a letter, on the map in schedule&#160;1 , part&#160;1 and is described in schedule&#160;1 , part&#160;2 .\n(sec.15-ssec.3) A node may be referred to in this plan by its letter.\n(sec.15-ssec.4) The actual location of each node is set by— for nodes A to L—the eWater Source computer program; or for nodes M to O—the MODFLOW computer program.\n- (a) for nodes A to L—the eWater Source computer program; or\n- (b) for nodes M to O—the MODFLOW computer program.","sortOrder":16},{"sectionNumber":"sec.16","sectionType":"section","heading":"Information about areas","content":"### sec.16 Information about areas\n\nThe exact location of the boundaries of each of the following is held in digital electronic form by the department and may be accessed at each office of the department—\nthe plan area;\na water supply scheme;\na water supply scheme zone;\na water management area;\na water management area zone;\nthe underground water management area;\nan underground water sub-area;\nan underground water zone.\nThe location of each office of the department is available on the department’s website.\n- (a) the plan area;\n- (b) a water supply scheme;\n- (c) a water supply scheme zone;\n- (d) a water management area;\n- (e) a water management area zone;\n- (f) the underground water management area;\n- (g) an underground water sub-area;\n- (h) an underground water zone.","sortOrder":17},{"sectionNumber":"pt.3","sectionType":"part","heading":"Water plan outcomes","content":"# Water plan outcomes","sortOrder":18},{"sectionNumber":"sec.17","sectionType":"section","heading":"Purpose of part","content":"### sec.17 Purpose of part\n\nThis part states, for section&#160;43 (1) (b) of the Act , the water plan outcomes for this plan.","sortOrder":19},{"sectionNumber":"sec.18","sectionType":"section","heading":"General water plan outcome","content":"### sec.18 General water plan outcome\n\nA water plan outcome for this plan is that water to which this plan applies is to be allocated and managed in a way that—\nrecognises the natural state of watercourses, lakes, springs and aquifers has changed because of the taking of, or interference with, water; and\nis consistent with the relevant version of the Basin Plan, including, for example, the sustainable diversion limits; and\nis consistent with water sharing agreements and commitments between the State and New South Wales; and\nseeks to achieve a balance between—\nthe economic water plan outcomes stated in section&#160;19 ; and\nthe social water plan outcomes stated in section&#160;20 ; and\nthe cultural water plan outcomes stated in section&#160;21 ; and\nthe environmental water plan outcomes stated in section&#160;22 ; and\npromotes improved understanding of—\nmatters affecting the flow-related, and underground water dependent, health of ecosystems, including springs, in the plan area; and\nthe flow requirements of ecosystems in the plan area; and\nthe water required for social, spiritual, economic, environmental and cultural uses of water by Aboriginal people; and\nthe water required to deliver social and economic benefits to communities in the plan area; and\nthe impact of climate change on water availability; and\nthe actions required to reverse the degradation of natural ecosystems caused by the taking of, or interference with, water to which this plan applies.\n- (a) recognises the natural state of watercourses, lakes, springs and aquifers has changed because of the taking of, or interference with, water; and\n- (b) is consistent with the relevant version of the Basin Plan, including, for example, the sustainable diversion limits; and\n- (c) is consistent with water sharing agreements and commitments between the State and New South Wales; and\n- (d) seeks to achieve a balance between— (i) the economic water plan outcomes stated in section&#160;19 ; and (ii) the social water plan outcomes stated in section&#160;20 ; and (iii) the cultural water plan outcomes stated in section&#160;21 ; and (iv) the environmental water plan outcomes stated in section&#160;22 ; and\n- (i) the economic water plan outcomes stated in section&#160;19 ; and\n- (ii) the social water plan outcomes stated in section&#160;20 ; and\n- (iii) the cultural water plan outcomes stated in section&#160;21 ; and\n- (iv) the environmental water plan outcomes stated in section&#160;22 ; and\n- (e) promotes improved understanding of— (i) matters affecting the flow-related, and underground water dependent, health of ecosystems, including springs, in the plan area; and (ii) the flow requirements of ecosystems in the plan area; and (iii) the water required for social, spiritual, economic, environmental and cultural uses of water by Aboriginal people; and (iv) the water required to deliver social and economic benefits to communities in the plan area; and (v) the impact of climate change on water availability; and (vi) the actions required to reverse the degradation of natural ecosystems caused by the taking of, or interference with, water to which this plan applies.\n- (i) matters affecting the flow-related, and underground water dependent, health of ecosystems, including springs, in the plan area; and\n- (ii) the flow requirements of ecosystems in the plan area; and\n- (iii) the water required for social, spiritual, economic, environmental and cultural uses of water by Aboriginal people; and\n- (iv) the water required to deliver social and economic benefits to communities in the plan area; and\n- (v) the impact of climate change on water availability; and\n- (vi) the actions required to reverse the degradation of natural ecosystems caused by the taking of, or interference with, water to which this plan applies.\n- (i) the economic water plan outcomes stated in section&#160;19 ; and\n- (ii) the social water plan outcomes stated in section&#160;20 ; and\n- (iii) the cultural water plan outcomes stated in section&#160;21 ; and\n- (iv) the environmental water plan outcomes stated in section&#160;22 ; and\n- (i) matters affecting the flow-related, and underground water dependent, health of ecosystems, including springs, in the plan area; and\n- (ii) the flow requirements of ecosystems in the plan area; and\n- (iii) the water required for social, spiritual, economic, environmental and cultural uses of water by Aboriginal people; and\n- (iv) the water required to deliver social and economic benefits to communities in the plan area; and\n- (v) the impact of climate change on water availability; and\n- (vi) the actions required to reverse the degradation of natural ecosystems caused by the taking of, or interference with, water to which this plan applies.","sortOrder":20},{"sectionNumber":"sec.19","sectionType":"section","heading":"Water plan outcomes—economic","content":"### sec.19 Water plan outcomes—economic\n\nThe economic water plan outcomes for this plan are—\nto maintain the probability of being able to take water to which this plan applies under a water entitlement; and\nto maintain and, if possible, improve the productive base of underground water to which this plan applies; and\nto improve and support the effective and efficient operation of the market in water allocations and relocatable water licences; and\nto maintain the availability of water to which this plan applies for stock purposes and tourism in the plan area; and\nto maintain the availability of water to which this plan applies for industries dependent on water resources in the plan area; and\nto maintain and, if possible, improve flood flows to support grazing activities in the plan area and in the Lower Balonne distributary system; and\nto make water to which this plan applies available to support the economic and social aspirations of Aboriginal people.\nIn this section—\nrelocatable water licence means a water licence that the water management protocol for this plan states may be relocated, in whole or in part, under section&#160;126 (1) (a) of the Act .\n(sec.19-ssec.1) The economic water plan outcomes for this plan are— to maintain the probability of being able to take water to which this plan applies under a water entitlement; and to maintain and, if possible, improve the productive base of underground water to which this plan applies; and to improve and support the effective and efficient operation of the market in water allocations and relocatable water licences; and to maintain the availability of water to which this plan applies for stock purposes and tourism in the plan area; and to maintain the availability of water to which this plan applies for industries dependent on water resources in the plan area; and to maintain and, if possible, improve flood flows to support grazing activities in the plan area and in the Lower Balonne distributary system; and to make water to which this plan applies available to support the economic and social aspirations of Aboriginal people.\n(sec.19-ssec.2) In this section— relocatable water licence means a water licence that the water management protocol for this plan states may be relocated, in whole or in part, under section&#160;126 (1) (a) of the Act .\n- (a) to maintain the probability of being able to take water to which this plan applies under a water entitlement; and\n- (b) to maintain and, if possible, improve the productive base of underground water to which this plan applies; and\n- (c) to improve and support the effective and efficient operation of the market in water allocations and relocatable water licences; and\n- (d) to maintain the availability of water to which this plan applies for stock purposes and tourism in the plan area; and\n- (e) to maintain the availability of water to which this plan applies for industries dependent on water resources in the plan area; and\n- (f) to maintain and, if possible, improve flood flows to support grazing activities in the plan area and in the Lower Balonne distributary system; and\n- (g) to make water to which this plan applies available to support the economic and social aspirations of Aboriginal people.","sortOrder":21},{"sectionNumber":"sec.20","sectionType":"section","heading":"Water plan outcomes—social","content":"### sec.20 Water plan outcomes—social\n\nThe social water plan outcomes for this plan are—\nto maintain—\nthe availability of water to which this plan applies for the supply of urban water to towns and communities dependent on the water resources of the plan area; and\nthe flows of water to which this plan applies that support water-related aesthetic, cultural and recreational values; and\nto provide water to which this plan applies for domestic purposes in the plan area.\n- (a) to maintain— (i) the availability of water to which this plan applies for the supply of urban water to towns and communities dependent on the water resources of the plan area; and (ii) the flows of water to which this plan applies that support water-related aesthetic, cultural and recreational values; and\n- (i) the availability of water to which this plan applies for the supply of urban water to towns and communities dependent on the water resources of the plan area; and\n- (ii) the flows of water to which this plan applies that support water-related aesthetic, cultural and recreational values; and\n- (b) to provide water to which this plan applies for domestic purposes in the plan area.\n- (i) the availability of water to which this plan applies for the supply of urban water to towns and communities dependent on the water resources of the plan area; and\n- (ii) the flows of water to which this plan applies that support water-related aesthetic, cultural and recreational values; and","sortOrder":22},{"sectionNumber":"sec.21","sectionType":"section","heading":"Water plan outcomes—cultural","content":"### sec.21 Water plan outcomes—cultural\n\nThe cultural water plan outcomes for this plan are to maintain flows of water to which this plan applies that support the water-related cultural, spiritual, social and environmental values of Aboriginal people.","sortOrder":23},{"sectionNumber":"sec.22","sectionType":"section","heading":"Water plan outcomes—environmental","content":"### sec.22 Water plan outcomes—environmental\n\nThe environmental water plan outcomes for this plan are—\nto maintain the probability of being able to take surface water to which this plan applies under a water entitlement held only for providing benefit to the environment; and\na water entitlement held by CEWH\na water entitlement held only for protecting and restoring the health of Murray-Darling Basin ecosystems\nto maintain and, if possible, improve flows of water to which this plan applies that support—\nwaterholes as refugia; and\nriver channels; and\nriver-forming processes; and\nto maintain and, if possible, improve flows of water to which this plan applies that support bird breeding at Narran Lakes; and\nto maintain and, if possible, improve flows of water to which this plan applies that support floodplain ecosystems within and downstream of the plan area, including—\nthe Balonne River floodplain; and\nthe Culgoa River floodplain; and\nNarran Lakes; and\nto minimise changes to flows of water in the plan area that support fish movement and fish recruitment; and\nto minimise adverse environmental impacts, relating to water to which this plan applies, caused by the operation of infrastructure in the plan area; and\nbank erosion, thermal alteration of waters, degradation of water quality\nto minimise water quality degradation in relation to—\nfor surface water to which this plan applies—flow; and\nfor underground water to which this plan applies—flow and pressure; and\nto maintain an underground water regime in the plan area that supports ecosystems dependent on underground water to which this plan applies.\nIn this section—\nfish recruitment means the successful development and growth of a juvenile fish to a stage at which the fish has the ability to reproduce.\nunderground water regime means the profile of underground water levels, hydraulic head and direction of underground water flow as represented by water levels at nodes M, N and O.\nwaterhole means a part of a watercourse that contains water after the watercourse stops flowing, other than a part of the watercourse that is within the storage area of a dam or weir on the watercourse.\n(sec.22-ssec.1) The environmental water plan outcomes for this plan are— to maintain the probability of being able to take surface water to which this plan applies under a water entitlement held only for providing benefit to the environment; and a water entitlement held by CEWH a water entitlement held only for protecting and restoring the health of Murray-Darling Basin ecosystems to maintain and, if possible, improve flows of water to which this plan applies that support— waterholes as refugia; and river channels; and river-forming processes; and to maintain and, if possible, improve flows of water to which this plan applies that support bird breeding at Narran Lakes; and to maintain and, if possible, improve flows of water to which this plan applies that support floodplain ecosystems within and downstream of the plan area, including— the Balonne River floodplain; and the Culgoa River floodplain; and Narran Lakes; and to minimise changes to flows of water in the plan area that support fish movement and fish recruitment; and to minimise adverse environmental impacts, relating to water to which this plan applies, caused by the operation of infrastructure in the plan area; and bank erosion, thermal alteration of waters, degradation of water quality to minimise water quality degradation in relation to— for surface water to which this plan applies—flow; and for underground water to which this plan applies—flow and pressure; and to maintain an underground water regime in the plan area that supports ecosystems dependent on underground water to which this plan applies.\n(sec.22-ssec.2) In this section— fish recruitment means the successful development and growth of a juvenile fish to a stage at which the fish has the ability to reproduce. underground water regime means the profile of underground water levels, hydraulic head and direction of underground water flow as represented by water levels at nodes M, N and O. waterhole means a part of a watercourse that contains water after the watercourse stops flowing, other than a part of the watercourse that is within the storage area of a dam or weir on the watercourse.\n- (a) to maintain the probability of being able to take surface water to which this plan applies under a water entitlement held only for providing benefit to the environment; and Examples of a water entitlement held only for providing benefit to the environment— • a water entitlement held by CEWH • a water entitlement held only for protecting and restoring the health of Murray-Darling Basin ecosystems\n- • a water entitlement held by CEWH\n- • a water entitlement held only for protecting and restoring the health of Murray-Darling Basin ecosystems\n- (b) to maintain and, if possible, improve flows of water to which this plan applies that support— (i) waterholes as refugia; and (ii) river channels; and (iii) river-forming processes; and\n- (i) waterholes as refugia; and\n- (ii) river channels; and\n- (iii) river-forming processes; and\n- (c) to maintain and, if possible, improve flows of water to which this plan applies that support bird breeding at Narran Lakes; and\n- (d) to maintain and, if possible, improve flows of water to which this plan applies that support floodplain ecosystems within and downstream of the plan area, including— (i) the Balonne River floodplain; and (ii) the Culgoa River floodplain; and (iii) Narran Lakes; and\n- (i) the Balonne River floodplain; and\n- (ii) the Culgoa River floodplain; and\n- (iii) Narran Lakes; and\n- (e) to minimise changes to flows of water in the plan area that support fish movement and fish recruitment; and\n- (f) to minimise adverse environmental impacts, relating to water to which this plan applies, caused by the operation of infrastructure in the plan area; and Examples of adverse environmental impacts— bank erosion, thermal alteration of waters, degradation of water quality\n- (g) to minimise water quality degradation in relation to— (i) for surface water to which this plan applies—flow; and (ii) for underground water to which this plan applies—flow and pressure; and\n- (i) for surface water to which this plan applies—flow; and\n- (ii) for underground water to which this plan applies—flow and pressure; and\n- (h) to maintain an underground water regime in the plan area that supports ecosystems dependent on underground water to which this plan applies.\n- • a water entitlement held by CEWH\n- • a water entitlement held only for protecting and restoring the health of Murray-Darling Basin ecosystems\n- (i) waterholes as refugia; and\n- (ii) river channels; and\n- (iii) river-forming processes; and\n- (i) the Balonne River floodplain; and\n- (ii) the Culgoa River floodplain; and\n- (iii) Narran Lakes; and\n- (i) for surface water to which this plan applies—flow; and\n- (ii) for underground water to which this plan applies—flow and pressure; and","sortOrder":24},{"sectionNumber":"pt.4","sectionType":"part","heading":"Measures for achieving water plan outcomes","content":"# Measures for achieving water plan outcomes","sortOrder":25},{"sectionNumber":"sec.23","sectionType":"section","heading":"General measures that contribute to achieving water plan outcomes","content":"### sec.23 General measures that contribute to achieving water plan outcomes\n\nMeasures that contribute to achieving the water plan outcomes stated in sections&#160;18 (b) , 19 (1) (a) and (b) , 21 and 22 (1) (a) to (e) and (g) and (h) are—\nall water allocations are measured, as directed by the chief executive, by 31 December 2022; and\nall water licences to take underground water to which this plan applies in the following underground water units are measured, as directed by the chief executive, by 31 December 2025—\nSt George Alluvium (deep);\nthe Upper Condamine Alluvium (Central Condamine Alluvium);\nthe Upper Condamine Alluvium (Tributaries);\nthe Upper Condamine Basalts;\nthe Condamine Fractured Rock.\nA measure that contributes to achieving the water plan outcome stated in section&#160;18 (b) is the annual publication by the chief executive of a water use report that includes information about compliance with the sustainable diversion limits.\nA measure that contributes to achieving the water plan outcomes stated in sections&#160;18 (b) , 19 (1) (f) , 21 and 22 (1) (b) to (e) is each decision by the chief executive to implement a flow management arrangement in the Lower Balonne is recorded and published by the chief executive at least annually.\nA measure that contributes to achieving the water plan outcomes stated in sections&#160;18 to 22 is that a monitoring, evaluation and reporting strategy, to support assessment of the effectiveness of this plan and its implementation, is developed by the chief executive by 1 July 2020.\n(sec.23-ssec.1) Measures that contribute to achieving the water plan outcomes stated in sections&#160;18 (b) , 19 (1) (a) and (b) , 21 and 22 (1) (a) to (e) and (g) and (h) are— all water allocations are measured, as directed by the chief executive, by 31 December 2022; and all water licences to take underground water to which this plan applies in the following underground water units are measured, as directed by the chief executive, by 31 December 2025— St George Alluvium (deep); the Upper Condamine Alluvium (Central Condamine Alluvium); the Upper Condamine Alluvium (Tributaries); the Upper Condamine Basalts; the Condamine Fractured Rock.\n(sec.23-ssec.2) A measure that contributes to achieving the water plan outcome stated in section&#160;18 (b) is the annual publication by the chief executive of a water use report that includes information about compliance with the sustainable diversion limits.\n(sec.23-ssec.3) A measure that contributes to achieving the water plan outcomes stated in sections&#160;18 (b) , 19 (1) (f) , 21 and 22 (1) (b) to (e) is each decision by the chief executive to implement a flow management arrangement in the Lower Balonne is recorded and published by the chief executive at least annually.\n(sec.23-ssec.4) A measure that contributes to achieving the water plan outcomes stated in sections&#160;18 to 22 is that a monitoring, evaluation and reporting strategy, to support assessment of the effectiveness of this plan and its implementation, is developed by the chief executive by 1 July 2020.\n- (a) all water allocations are measured, as directed by the chief executive, by 31 December 2022; and\n- (b) all water licences to take underground water to which this plan applies in the following underground water units are measured, as directed by the chief executive, by 31 December 2025— (i) St George Alluvium (deep); (ii) the Upper Condamine Alluvium (Central Condamine Alluvium); (iii) the Upper Condamine Alluvium (Tributaries); (iv) the Upper Condamine Basalts; (v) the Condamine Fractured Rock.\n- (i) St George Alluvium (deep);\n- (ii) the Upper Condamine Alluvium (Central Condamine Alluvium);\n- (iii) the Upper Condamine Alluvium (Tributaries);\n- (iv) the Upper Condamine Basalts;\n- (v) the Condamine Fractured Rock.\n- (i) St George Alluvium (deep);\n- (ii) the Upper Condamine Alluvium (Central Condamine Alluvium);\n- (iii) the Upper Condamine Alluvium (Tributaries);\n- (iv) the Upper Condamine Basalts;\n- (v) the Condamine Fractured Rock.","sortOrder":26},{"sectionNumber":"sec.24","sectionType":"section","heading":"Measures that contribute to achieving particular economic water plan outcomes","content":"### sec.24 Measures that contribute to achieving particular economic water plan outcomes\n\nMeasures that contribute to achieving the water plan outcome stated in section&#160;19 (1) (c) are—\ninformation about the number, value and volume of water entitlement trades is collected and analysed; and\nopportunities to improve the effectiveness and efficiency of the market in tradeable water entitlements are analysed; and\nthe information and analysis mentioned in paragraphs&#160;(a) and (b) are published by the chief executive within 5 years of the commencement; and\nthe establishment by the chief executive, within 2 years of the commencement, of a process for the granting of water entitlements for the taking of unallocated water, reserved under this plan for the purpose of ‘any’, for achieving the water plan outcome mentioned in section&#160;19 (1) (g) .\nSee section&#160;41 for unallocated water reserved under this plan.\n- (a) information about the number, value and volume of water entitlement trades is collected and analysed; and\n- (b) opportunities to improve the effectiveness and efficiency of the market in tradeable water entitlements are analysed; and\n- (c) the information and analysis mentioned in paragraphs&#160;(a) and (b) are published by the chief executive within 5 years of the commencement; and\n- (d) the establishment by the chief executive, within 2 years of the commencement, of a process for the granting of water entitlements for the taking of unallocated water, reserved under this plan for the purpose of ‘any’, for achieving the water plan outcome mentioned in section&#160;19 (1) (g) . Note— See section&#160;41 for unallocated water reserved under this plan.","sortOrder":27},{"sectionNumber":"sec.25","sectionType":"section","heading":"Measure that contributes to achieving particular cultural water plan outcomes","content":"### sec.25 Measure that contributes to achieving particular cultural water plan outcomes\n\nA measure that contributes to achieving the water plan outcomes stated in sections&#160;18 (e) (iii) and 21 is the publishing by the chief executive, within 5 years of the commencement, of a report on the flow requirements to support cultural values and uses, informed by engagement with Aboriginal people.","sortOrder":28},{"sectionNumber":"pt.5","sectionType":"part","heading":"Objectives and performance indicators","content":"# Objectives and performance indicators","sortOrder":29},{"sectionNumber":"pt.5-div.1","sectionType":"division","heading":"Environmental flow objectives and performance indicators","content":"## Environmental flow objectives and performance indicators","sortOrder":30},{"sectionNumber":"sec.26","sectionType":"section","heading":"Environmental flow objectives and performance indicators for surface water— Act , s&#160;43","content":"### sec.26 Environmental flow objectives and performance indicators for surface water— Act , s&#160;43\n\nFor section&#160;43 (1) (d) of the Act , the environmental flow objectives for surface water to which this plan applies are stated in schedule&#160;7 , part&#160;1 .\nThe performance indicators for the environmental flow objectives for surface water to which this plan applies are stated in schedule&#160;7 , part&#160;1 .\n(sec.26-ssec.1) For section&#160;43 (1) (d) of the Act , the environmental flow objectives for surface water to which this plan applies are stated in schedule&#160;7 , part&#160;1 .\n(sec.26-ssec.2) The performance indicators for the environmental flow objectives for surface water to which this plan applies are stated in schedule&#160;7 , part&#160;1 .","sortOrder":31},{"sectionNumber":"sec.27","sectionType":"section","heading":"Environmental flow objectives and performance indicators for underground water— Act , s&#160;43","content":"### sec.27 Environmental flow objectives and performance indicators for underground water— Act , s&#160;43\n\nFor section&#160;43 (1) (d) of the Act , the environmental flow objectives for underground water to which this plan applies are stated in schedule&#160;7 , part&#160;2 .\nThe performance indicators for the environmental flow objectives for underground water to which this plan applies are stated in schedule&#160;7 , part&#160;2 .\n(sec.27-ssec.1) For section&#160;43 (1) (d) of the Act , the environmental flow objectives for underground water to which this plan applies are stated in schedule&#160;7 , part&#160;2 .\n(sec.27-ssec.2) The performance indicators for the environmental flow objectives for underground water to which this plan applies are stated in schedule&#160;7 , part&#160;2 .","sortOrder":32},{"sectionNumber":"pt.5-div.2","sectionType":"division","heading":"Water allocation security objectives and performance indicators","content":"## Water allocation security objectives and performance indicators","sortOrder":33},{"sectionNumber":"sec.28","sectionType":"section","heading":"Water allocation security objectives and performance indicators for surface water— Act , s&#160;43","content":"### sec.28 Water allocation security objectives and performance indicators for surface water— Act , s&#160;43\n\nFor section&#160;43 (1) (e) (ii) of the Act , the water allocation security objectives for surface water to which this plan applies are that—\nthe performance ratio, for the group of water allocations that state they are in the ‘risk class A group’, is not less than 99% of what the performance ratio for the group was immediately before the commencement; and\nthe performance ratio, for each group of water allocations that state they are in the ‘risk class B group’, the ‘high class A group’, the ‘high class B group’, the ‘high priority group’ or the ‘medium priority group’, is not less than what the performance ratio for the group was immediately before the commencement; and\nthe performance ratio, for each group of water allocations not mentioned in paragraph&#160;(a) or (b) , is not less than 99% of what the performance ratio for the group was immediately before the commencement.\nThe performance indicators for the water allocation security objectives for surface water to which this plan applies are the performance ratios for each group of water allocations mentioned in subsection&#160;(1) .\n(sec.28-ssec.1) For section&#160;43 (1) (e) (ii) of the Act , the water allocation security objectives for surface water to which this plan applies are that— the performance ratio, for the group of water allocations that state they are in the ‘risk class A group’, is not less than 99% of what the performance ratio for the group was immediately before the commencement; and the performance ratio, for each group of water allocations that state they are in the ‘risk class B group’, the ‘high class A group’, the ‘high class B group’, the ‘high priority group’ or the ‘medium priority group’, is not less than what the performance ratio for the group was immediately before the commencement; and the performance ratio, for each group of water allocations not mentioned in paragraph&#160;(a) or (b) , is not less than 99% of what the performance ratio for the group was immediately before the commencement.\n(sec.28-ssec.2) The performance indicators for the water allocation security objectives for surface water to which this plan applies are the performance ratios for each group of water allocations mentioned in subsection&#160;(1) .\n- (a) the performance ratio, for the group of water allocations that state they are in the ‘risk class A group’, is not less than 99% of what the performance ratio for the group was immediately before the commencement; and\n- (b) the performance ratio, for each group of water allocations that state they are in the ‘risk class B group’, the ‘high class A group’, the ‘high class B group’, the ‘high priority group’ or the ‘medium priority group’, is not less than what the performance ratio for the group was immediately before the commencement; and\n- (c) the performance ratio, for each group of water allocations not mentioned in paragraph&#160;(a) or (b) , is not less than 99% of what the performance ratio for the group was immediately before the commencement.","sortOrder":34},{"sectionNumber":"sec.29","sectionType":"section","heading":"Water allocation security objective and performance indicator for underground water— Act , s&#160;43","content":"### sec.29 Water allocation security objective and performance indicator for underground water— Act , s&#160;43\n\nFor section&#160;43 (1) (e) (ii) of the Act , the water allocation security objective for underground water to which this plan applies is that the performance ratio for a water allocation group mentioned in schedule&#160;8 , column 2, is—\nfor water allocation group UCA03, UCA06 or UCA09—the percentage stated for the group in schedule&#160;8 , column 4; or\nfor another water allocation group—at least the percentage stated for the group in schedule&#160;8 , column 4.\nThe performance indicator for the water allocation security objective for underground water to which this plan applies is the performance ratio for each water allocation group mentioned in schedule&#160;8 , column 2.\n(sec.29-ssec.1) For section&#160;43 (1) (e) (ii) of the Act , the water allocation security objective for underground water to which this plan applies is that the performance ratio for a water allocation group mentioned in schedule&#160;8 , column 2, is— for water allocation group UCA03, UCA06 or UCA09—the percentage stated for the group in schedule&#160;8 , column 4; or for another water allocation group—at least the percentage stated for the group in schedule&#160;8 , column 4.\n(sec.29-ssec.2) The performance indicator for the water allocation security objective for underground water to which this plan applies is the performance ratio for each water allocation group mentioned in schedule&#160;8 , column 2.\n- (a) for water allocation group UCA03, UCA06 or UCA09—the percentage stated for the group in schedule&#160;8 , column 4; or\n- (b) for another water allocation group—at least the percentage stated for the group in schedule&#160;8 , column 4.","sortOrder":35},{"sectionNumber":"pt.5-div.3","sectionType":"division","heading":"Calculation of performance indicators","content":"## Calculation of performance indicators","sortOrder":36},{"sectionNumber":"sec.30","sectionType":"section","heading":"Calculation of performance indicators","content":"### sec.30 Calculation of performance indicators\n\nA performance indicator mentioned in section&#160;26 to 29 must be calculated on the assumption that unallocated water reserved under this plan is being taken.\nSee section&#160;41 for unallocated water reserved under this plan.\nSubsection&#160;(3) applies in relation to a decision made by the chief executive under chapter&#160;2 of the Act —\nthat will result in the addition of a water allocation to, or the omission of a water allocation from, a priority group or a water allocation group; or\nto approve an application under section&#160;159 of the Act to change a water allocation.\nIn assessing the consistency of the decision with the water allocation security objectives, the performance indicators must be calculated on the assumption the water allocation being added, omitted or changed is not part of a priority group or a water allocation group.\n(sec.30-ssec.1) A performance indicator mentioned in section&#160;26 to 29 must be calculated on the assumption that unallocated water reserved under this plan is being taken. See section&#160;41 for unallocated water reserved under this plan.\n(sec.30-ssec.2) Subsection&#160;(3) applies in relation to a decision made by the chief executive under chapter&#160;2 of the Act — that will result in the addition of a water allocation to, or the omission of a water allocation from, a priority group or a water allocation group; or to approve an application under section&#160;159 of the Act to change a water allocation.\n(sec.30-ssec.3) In assessing the consistency of the decision with the water allocation security objectives, the performance indicators must be calculated on the assumption the water allocation being added, omitted or changed is not part of a priority group or a water allocation group.\n- (a) that will result in the addition of a water allocation to, or the omission of a water allocation from, a priority group or a water allocation group; or\n- (b) to approve an application under section&#160;159 of the Act to change a water allocation.","sortOrder":37},{"sectionNumber":"pt.6","sectionType":"part","heading":"Garden size and volume of water for watering","content":"# Garden size and volume of water for watering","sortOrder":38},{"sectionNumber":"sec.31","sectionType":"section","heading":"Garden size and volume of water for watering— Act , s&#160;6","content":"### sec.31 Garden size and volume of water for watering— Act , s&#160;6\n\nFor section&#160;6 (3) (a) of the Act , a combined garden size of 0.25ha is stated for this plan.\nFor section&#160;6 (3) (b) of the Act , the volume of water that is sufficient to water a garden, with a combined size not exceeding 0.25ha, in the plan area is 2ML a year.\n(sec.31-ssec.1) For section&#160;6 (3) (a) of the Act , a combined garden size of 0.25ha is stated for this plan.\n(sec.31-ssec.2) For section&#160;6 (3) (b) of the Act , the volume of water that is sufficient to water a garden, with a combined size not exceeding 0.25ha, in the plan area is 2ML a year.","sortOrder":39},{"sectionNumber":"pt.7","sectionType":"part","heading":"Particular decisions about allocation or management of water","content":"# Particular decisions about allocation or management of water","sortOrder":40},{"sectionNumber":"sec.32","sectionType":"section","heading":"Definition for part","content":"### sec.32 Definition for part\n\nIn this part—\ndecision means a decision made by the chief executive under chapter&#160;2 of the Act about the allocation or management of water to which this plan applies, other than a decision about a water permit.","sortOrder":41},{"sectionNumber":"sec.33","sectionType":"section","heading":"Decisions must not increase amount of water taken","content":"### sec.33 Decisions must not increase amount of water taken\n\nA decision must not increase—\nthe average volume of surface water or underground water that may be taken under this plan; or\nthe combined total of each nominal entitlement for water licences to take underground water to which this plan applies, other than water licences to which water sharing rules apply.\nSubsection&#160;(1) does not apply to a decision about—\nthe reinstatement of a water licence; or\ntaking unallocated water reserved under this plan; or\nSee section&#160;41 for unallocated water reserved under this plan.\ntaking or interfering with underground water to which this plan applies that is not in an underground water unit.\n(sec.33-ssec.1) A decision must not increase— the average volume of surface water or underground water that may be taken under this plan; or the combined total of each nominal entitlement for water licences to take underground water to which this plan applies, other than water licences to which water sharing rules apply.\n(sec.33-ssec.2) Subsection&#160;(1) does not apply to a decision about— the reinstatement of a water licence; or taking unallocated water reserved under this plan; or See section&#160;41 for unallocated water reserved under this plan. taking or interfering with underground water to which this plan applies that is not in an underground water unit.\n- (a) the average volume of surface water or underground water that may be taken under this plan; or\n- (b) the combined total of each nominal entitlement for water licences to take underground water to which this plan applies, other than water licences to which water sharing rules apply.\n- (a) the reinstatement of a water licence; or\n- (b) taking unallocated water reserved under this plan; or Note— See section&#160;41 for unallocated water reserved under this plan.\n- (c) taking or interfering with underground water to which this plan applies that is not in an underground water unit.","sortOrder":42},{"sectionNumber":"sec.34","sectionType":"section","heading":"Particular decisions must be consistent with particular objectives","content":"### sec.34 Particular decisions must be consistent with particular objectives\n\nA decision must be consistent with—\nfor a decision about the allocation or management of surface water to which this plan applies—\nthe environmental flow objectives stated in section&#160;26 (1) ; and\nthe water allocation security objectives stated in section&#160;28 (1) ; or\nfor a decision about the allocation or management of underground water to which this plan applies—\nthe environmental flow objectives stated in section&#160;27 (1) ; and\nthe water allocation security objective stated in section&#160;29 (1) .\nThis section does not apply to a decision to implement a flow management arrangement in the Lower Balonne.\n(sec.34-ssec.1) A decision must be consistent with— for a decision about the allocation or management of surface water to which this plan applies— the environmental flow objectives stated in section&#160;26 (1) ; and the water allocation security objectives stated in section&#160;28 (1) ; or for a decision about the allocation or management of underground water to which this plan applies— the environmental flow objectives stated in section&#160;27 (1) ; and the water allocation security objective stated in section&#160;29 (1) .\n(sec.34-ssec.2) This section does not apply to a decision to implement a flow management arrangement in the Lower Balonne.\n- (a) for a decision about the allocation or management of surface water to which this plan applies— (i) the environmental flow objectives stated in section&#160;26 (1) ; and (ii) the water allocation security objectives stated in section&#160;28 (1) ; or\n- (i) the environmental flow objectives stated in section&#160;26 (1) ; and\n- (ii) the water allocation security objectives stated in section&#160;28 (1) ; or\n- (b) for a decision about the allocation or management of underground water to which this plan applies— (i) the environmental flow objectives stated in section&#160;27 (1) ; and (ii) the water allocation security objective stated in section&#160;29 (1) .\n- (i) the environmental flow objectives stated in section&#160;27 (1) ; and\n- (ii) the water allocation security objective stated in section&#160;29 (1) .\n- (i) the environmental flow objectives stated in section&#160;26 (1) ; and\n- (ii) the water allocation security objectives stated in section&#160;28 (1) ; or\n- (i) the environmental flow objectives stated in section&#160;27 (1) ; and\n- (ii) the water allocation security objective stated in section&#160;29 (1) .","sortOrder":43},{"sectionNumber":"sec.35","sectionType":"section","heading":"Assessing consistency with particular objectives","content":"### sec.35 Assessing consistency with particular objectives\n\nTo assess the consistency of a decision with the environmental flow objectives and the water allocation security objectives, the model computer program’s simulation for the simulation period must be used.\nIf it is not practicable to use the model computer program’s simulation, another kind of assessment approved by the chief executive may be used.\nIn this section—\nmodel computer program means—\nthe eWater Source computer program; or\nthe MODFLOW computer program; or\nthe statistical analysis and reporting programs associated with a computer program mentioned in paragraph&#160;(a) or (b) .\n(sec.35-ssec.1) To assess the consistency of a decision with the environmental flow objectives and the water allocation security objectives, the model computer program’s simulation for the simulation period must be used.\n(sec.35-ssec.2) If it is not practicable to use the model computer program’s simulation, another kind of assessment approved by the chief executive may be used.\n(sec.35-ssec.3) In this section— model computer program means— the eWater Source computer program; or the MODFLOW computer program; or the statistical analysis and reporting programs associated with a computer program mentioned in paragraph&#160;(a) or (b) .\n- (a) the eWater Source computer program; or\n- (b) the MODFLOW computer program; or\n- (c) the statistical analysis and reporting programs associated with a computer program mentioned in paragraph&#160;(a) or (b) .","sortOrder":44},{"sectionNumber":"pt.8","sectionType":"part","heading":"Limitations on taking or interfering with water","content":"# Limitations on taking or interfering with water","sortOrder":45},{"sectionNumber":"sec.36","sectionType":"section","heading":"Limitations on taking water for particular activities— Act , s&#160;101","content":"### sec.36 Limitations on taking water for particular activities— Act , s&#160;101\n\nFor section&#160;101 (1) of the Act —\nthe combined total amount of water to which this plan applies that may be taken for all activities prescribed under section&#160;101 (1) (a) of the Act is 2ML a year; and\na person must not take water to which this plan applies for an activity prescribed under section&#160;101 (1) (a) of the Act unless the water is taken using existing works.\nSubsection&#160;(1) (b) does not apply to underground water to which this plan applies taken from the following underground water units—\nthe St George Alluvium (shallow);\nthe sediments above the Great Artesian Basin;\nthe Queensland Murray-Darling Basin deep.\nIn this section—\nexisting works means works—\nthat are used, or capable of being used, to take or interfere with water; and\nto which 1 of the following applies—\nthe works were constructed before the commencement;\nfor works used, or capable of being used, to take or interfere with underground water to which this plan applies—the works are a replacement water bore that replaces works mentioned in subparagraph&#160;(i) ;\nfor works used, or capable of being used, to take or interfere with surface water—the works replace works mentioned in subparagraph&#160;(i) .\n(sec.36-ssec.1) For section&#160;101 (1) of the Act — the combined total amount of water to which this plan applies that may be taken for all activities prescribed under section&#160;101 (1) (a) of the Act is 2ML a year; and a person must not take water to which this plan applies for an activity prescribed under section&#160;101 (1) (a) of the Act unless the water is taken using existing works.\n(sec.36-ssec.2) Subsection&#160;(1) (b) does not apply to underground water to which this plan applies taken from the following underground water units— the St George Alluvium (shallow); the sediments above the Great Artesian Basin; the Queensland Murray-Darling Basin deep.\n(sec.36-ssec.3) In this section— existing works means works— that are used, or capable of being used, to take or interfere with water; and to which 1 of the following applies— the works were constructed before the commencement; for works used, or capable of being used, to take or interfere with underground water to which this plan applies—the works are a replacement water bore that replaces works mentioned in subparagraph&#160;(i) ; for works used, or capable of being used, to take or interfere with surface water—the works replace works mentioned in subparagraph&#160;(i) .\n- (a) the combined total amount of water to which this plan applies that may be taken for all activities prescribed under section&#160;101 (1) (a) of the Act is 2ML a year; and\n- (b) a person must not take water to which this plan applies for an activity prescribed under section&#160;101 (1) (a) of the Act unless the water is taken using existing works.\n- (a) the St George Alluvium (shallow);\n- (b) the sediments above the Great Artesian Basin;\n- (c) the Queensland Murray-Darling Basin deep.\n- (a) that are used, or capable of being used, to take or interfere with water; and\n- (b) to which 1 of the following applies— (i) the works were constructed before the commencement; (ii) for works used, or capable of being used, to take or interfere with underground water to which this plan applies—the works are a replacement water bore that replaces works mentioned in subparagraph&#160;(i) ; (iii) for works used, or capable of being used, to take or interfere with surface water—the works replace works mentioned in subparagraph&#160;(i) .\n- (i) the works were constructed before the commencement;\n- (ii) for works used, or capable of being used, to take or interfere with underground water to which this plan applies—the works are a replacement water bore that replaces works mentioned in subparagraph&#160;(i) ;\n- (iii) for works used, or capable of being used, to take or interfere with surface water—the works replace works mentioned in subparagraph&#160;(i) .\n- (i) the works were constructed before the commencement;\n- (ii) for works used, or capable of being used, to take or interfere with underground water to which this plan applies—the works are a replacement water bore that replaces works mentioned in subparagraph&#160;(i) ;\n- (iii) for works used, or capable of being used, to take or interfere with surface water—the works replace works mentioned in subparagraph&#160;(i) .","sortOrder":46},{"sectionNumber":"sec.37","sectionType":"section","heading":"Limitations on taking overland flow water— Act , s&#160;101","content":"### sec.37 Limitations on taking overland flow water— Act , s&#160;101\n\nFor section&#160;101 (1) of the Act , a person must not, under section&#160;101 (1) (b) of the Act , take overland flow water to which this plan applies unless the water—\nis taken under a water entitlement or water permit; or\nis taken for stock purposes or domestic purposes; or\nis taken using notified existing overland flow works.\nSee also section&#160;101 (3) of the Act for when a person cannot be prevented from taking overland flow water that is contaminated agricultural run-off.\nHowever, subsection&#160;(1) (c) does not apply to the person if the person holds a water licence to take the overland flow water using the works.\n(sec.37-ssec.1) For section&#160;101 (1) of the Act , a person must not, under section&#160;101 (1) (b) of the Act , take overland flow water to which this plan applies unless the water— is taken under a water entitlement or water permit; or is taken for stock purposes or domestic purposes; or is taken using notified existing overland flow works. See also section&#160;101 (3) of the Act for when a person cannot be prevented from taking overland flow water that is contaminated agricultural run-off.\n(sec.37-ssec.2) However, subsection&#160;(1) (c) does not apply to the person if the person holds a water licence to take the overland flow water using the works.\n- (a) is taken under a water entitlement or water permit; or\n- (b) is taken for stock purposes or domestic purposes; or\n- (c) is taken using notified existing overland flow works.","sortOrder":47},{"sectionNumber":"sec.38","sectionType":"section","heading":"Limitations on taking or interfering with underground water in underground water management area— Act , s&#160;101","content":"### sec.38 Limitations on taking or interfering with underground water in underground water management area— Act , s&#160;101\n\nFor section&#160;101 (1) of the Act , a person must not, under section&#160;101 (1) (c) of the Act , take or interfere with underground water to which this plan applies, from an underground water unit, unless the water is taken or interfered with—\nunder a water entitlement or water permit; or\nunder a seasonal water assignment notice; or\nfor stock purposes or domestic purposes; or\nfor underground water in the Queensland Murray-Darling Basin deep—using existing underground water works.\nSubsection&#160;(1) (c) is subject to section&#160;39 .\nIn this section—\nexisting underground water works means works that—\nare used, or are capable of being used, to take or interfere with underground water to which this plan applies; and\neither—\nwere constructed before the commencement; or\nare a replacement water bore that replaces works mentioned in subparagraph&#160;(i) .\n(sec.38-ssec.1) For section&#160;101 (1) of the Act , a person must not, under section&#160;101 (1) (c) of the Act , take or interfere with underground water to which this plan applies, from an underground water unit, unless the water is taken or interfered with— under a water entitlement or water permit; or under a seasonal water assignment notice; or for stock purposes or domestic purposes; or for underground water in the Queensland Murray-Darling Basin deep—using existing underground water works.\n(sec.38-ssec.2) Subsection&#160;(1) (c) is subject to section&#160;39 .\n(sec.38-ssec.3) In this section— existing underground water works means works that— are used, or are capable of being used, to take or interfere with underground water to which this plan applies; and either— were constructed before the commencement; or are a replacement water bore that replaces works mentioned in subparagraph&#160;(i) .\n- (a) under a water entitlement or water permit; or\n- (b) under a seasonal water assignment notice; or\n- (c) for stock purposes or domestic purposes; or\n- (d) for underground water in the Queensland Murray-Darling Basin deep—using existing underground water works.\n- (a) are used, or are capable of being used, to take or interfere with underground water to which this plan applies; and\n- (b) either— (i) were constructed before the commencement; or (ii) are a replacement water bore that replaces works mentioned in subparagraph&#160;(i) .\n- (i) were constructed before the commencement; or\n- (ii) are a replacement water bore that replaces works mentioned in subparagraph&#160;(i) .\n- (i) were constructed before the commencement; or\n- (ii) are a replacement water bore that replaces works mentioned in subparagraph&#160;(i) .","sortOrder":48},{"sectionNumber":"sec.39","sectionType":"section","heading":"Taking or interfering with underground water from land in service area for stock purposes or domestic purposes","content":"### sec.39 Taking or interfering with underground water from land in service area for stock purposes or domestic purposes\n\nThis section applies to underground water to which this plan applies if the water is—\ntaken or interfered with, for stock purposes or domestic purposes, on land in a service area; and\ntaken from any of the following underground water units—\nthe St George Alluvium (deep);\nthe Upper Condamine Alluvium (Central Condamine Alluvium);\nthe Upper Condamine Alluvium (Tributaries);\nthe Upper Condamine Basalts;\nthe Condamine Fractured Rock.\nThe water may only be taken or interfered with using existing underground water works.\nIn this section—\nexisting underground water works means works used, or capable of being used, to take or interfere with underground water to which this plan applies if the works—\nfor underground water taken from an underground water unit mentioned in subsection&#160;(1) (b) (i) to (iv) —\nwere constructed before 19 December 2014; or\nwere constructed in accordance with an agreement, between the owner of the works and the chief executive, entered into on or between 19 December 2014 and 18 January 2015; or\nare a replacement water bore that replaces works mentioned in subparagraph&#160;(i) or (ii) ; or\nfor underground water taken from the Condamine Fractured Rock underground water unit—\nwere constructed before the commencement; or\nare a replacement water bore that replaces works mentioned in subparagraph&#160;(i) .\nservice area means a service area for a retail water service to customers under the Water Supply (Safety and Reliability) Act 2008 .\n(sec.39-ssec.1) This section applies to underground water to which this plan applies if the water is— taken or interfered with, for stock purposes or domestic purposes, on land in a service area; and taken from any of the following underground water units— the St George Alluvium (deep); the Upper Condamine Alluvium (Central Condamine Alluvium); the Upper Condamine Alluvium (Tributaries); the Upper Condamine Basalts; the Condamine Fractured Rock.\n(sec.39-ssec.2) The water may only be taken or interfered with using existing underground water works.\n(sec.39-ssec.3) In this section— existing underground water works means works used, or capable of being used, to take or interfere with underground water to which this plan applies if the works— for underground water taken from an underground water unit mentioned in subsection&#160;(1) (b) (i) to (iv) — were constructed before 19 December 2014; or were constructed in accordance with an agreement, between the owner of the works and the chief executive, entered into on or between 19 December 2014 and 18 January 2015; or are a replacement water bore that replaces works mentioned in subparagraph&#160;(i) or (ii) ; or for underground water taken from the Condamine Fractured Rock underground water unit— were constructed before the commencement; or are a replacement water bore that replaces works mentioned in subparagraph&#160;(i) . service area means a service area for a retail water service to customers under the Water Supply (Safety and Reliability) Act 2008 .\n- (a) taken or interfered with, for stock purposes or domestic purposes, on land in a service area; and\n- (b) taken from any of the following underground water units— (i) the St George Alluvium (deep); (ii) the Upper Condamine Alluvium (Central Condamine Alluvium); (iii) the Upper Condamine Alluvium (Tributaries); (iv) the Upper Condamine Basalts; (v) the Condamine Fractured Rock.\n- (i) the St George Alluvium (deep);\n- (ii) the Upper Condamine Alluvium (Central Condamine Alluvium);\n- (iii) the Upper Condamine Alluvium (Tributaries);\n- (iv) the Upper Condamine Basalts;\n- (v) the Condamine Fractured Rock.\n- (i) the St George Alluvium (deep);\n- (ii) the Upper Condamine Alluvium (Central Condamine Alluvium);\n- (iii) the Upper Condamine Alluvium (Tributaries);\n- (iv) the Upper Condamine Basalts;\n- (v) the Condamine Fractured Rock.\n- (a) for underground water taken from an underground water unit mentioned in subsection&#160;(1) (b) (i) to (iv) — (i) were constructed before 19 December 2014; or (ii) were constructed in accordance with an agreement, between the owner of the works and the chief executive, entered into on or between 19 December 2014 and 18 January 2015; or (iii) are a replacement water bore that replaces works mentioned in subparagraph&#160;(i) or (ii) ; or\n- (i) were constructed before 19 December 2014; or\n- (ii) were constructed in accordance with an agreement, between the owner of the works and the chief executive, entered into on or between 19 December 2014 and 18 January 2015; or\n- (iii) are a replacement water bore that replaces works mentioned in subparagraph&#160;(i) or (ii) ; or\n- (b) for underground water taken from the Condamine Fractured Rock underground water unit— (i) were constructed before the commencement; or (ii) are a replacement water bore that replaces works mentioned in subparagraph&#160;(i) .\n- (i) were constructed before the commencement; or\n- (ii) are a replacement water bore that replaces works mentioned in subparagraph&#160;(i) .\n- (i) were constructed before 19 December 2014; or\n- (ii) were constructed in accordance with an agreement, between the owner of the works and the chief executive, entered into on or between 19 December 2014 and 18 January 2015; or\n- (iii) are a replacement water bore that replaces works mentioned in subparagraph&#160;(i) or (ii) ; or\n- (i) were constructed before the commencement; or\n- (ii) are a replacement water bore that replaces works mentioned in subparagraph&#160;(i) .","sortOrder":49},{"sectionNumber":"sec.40","sectionType":"section","heading":"Volume of limited capacity for contaminated agricultural run-off","content":"### sec.40 Volume of limited capacity for contaminated agricultural run-off\n\nFor State code 10 of the State development assessment provisions, the volume of the limited capacity of contaminated agricultural run-off to which this plan applies is 1ML.\nIn this section—\nState development assessment provisions see the Planning Regulation 2017 , schedule&#160;24 .\n(sec.40-ssec.1) For State code 10 of the State development assessment provisions, the volume of the limited capacity of contaminated agricultural run-off to which this plan applies is 1ML.\n(sec.40-ssec.2) In this section— State development assessment provisions see the Planning Regulation 2017 , schedule&#160;24 .","sortOrder":50},{"sectionNumber":"pt.9","sectionType":"part","heading":"Unallocated water","content":"# Unallocated water","sortOrder":51},{"sectionNumber":"sec.41","sectionType":"section","heading":"Unallocated water reserved under this plan— Act , s&#160;43","content":"### sec.41 Unallocated water reserved under this plan— Act , s&#160;43\n\nFor section&#160;43 (1) (c) of the Act , the volume of unallocated water reserved under this plan is, for underground water to which this plan applies in an underground water unit mentioned in schedule&#160;9 , column 1, the annual volume of water stated in schedule&#160;9 , column 2 for the underground water unit.","sortOrder":52},{"sectionNumber":"pt.10","sectionType":"part","heading":"Water licences","content":"# Water licences","sortOrder":53},{"sectionNumber":"pt.10-div.1","sectionType":"division","heading":"Applications that must not be accepted","content":"## Applications that must not be accepted","sortOrder":54},{"sectionNumber":"sec.42","sectionType":"section","heading":"Chief executive must not accept particular applications— Act , s&#160;43","content":"### sec.42 Chief executive must not accept particular applications— Act , s&#160;43\n\nFor section&#160;43 (2) (j) of the Act , the chief executive must not accept an application for a water licence made under section&#160;107 of the Act unless the chief executive is permitted to accept the application under section&#160;43 or 44 .","sortOrder":55},{"sectionNumber":"sec.43","sectionType":"section","heading":"Particular applications made by local governments","content":"### sec.43 Particular applications made by local governments\n\nThis section applies in relation to an application made by a local government under section&#160;107 of the Act for a water licence to interfere with the flow of water to which this plan applies.\nThe chief executive may accept the application if—\nthe purpose of the proposed interference is to impound water to enable the taking of water under a water allocation held by the local government to supply town water; and\neither—\nthe local government has made a relevant change application to the chief executive; or\nthe chief executive has approved a relevant change application made by the local government and has given a certificate, for the dealing to which the application relates, to the local government under section&#160;159 (4) of the Act .\nIf the chief executive grants the application mentioned in subsection&#160;(1) , the water licence must include the conditions stated in the water management protocol for the licence.\nIn this section—\nrelevant change application means an application, under section&#160;159 (1) of the Act , to change the water allocation mentioned in subsection&#160;(2) (a) —\nto prevent an increase, due to the proposed interference mentioned in subsection&#160;(1) , of the average volume of surface water or underground water that may be taken under this plan; and\nto remove a condition stating a flow threshold for taking water; and\nto ensure the water allocation is subject to a condition stating that only water impounded by the proposed interference may be taken.\n(sec.43-ssec.1) This section applies in relation to an application made by a local government under section&#160;107 of the Act for a water licence to interfere with the flow of water to which this plan applies.\n(sec.43-ssec.2) The chief executive may accept the application if— the purpose of the proposed interference is to impound water to enable the taking of water under a water allocation held by the local government to supply town water; and either— the local government has made a relevant change application to the chief executive; or the chief executive has approved a relevant change application made by the local government and has given a certificate, for the dealing to which the application relates, to the local government under section&#160;159 (4) of the Act .\n(sec.43-ssec.3) If the chief executive grants the application mentioned in subsection&#160;(1) , the water licence must include the conditions stated in the water management protocol for the licence.\n(sec.43-ssec.4) In this section— relevant change application means an application, under section&#160;159 (1) of the Act , to change the water allocation mentioned in subsection&#160;(2) (a) — to prevent an increase, due to the proposed interference mentioned in subsection&#160;(1) , of the average volume of surface water or underground water that may be taken under this plan; and to remove a condition stating a flow threshold for taking water; and to ensure the water allocation is subject to a condition stating that only water impounded by the proposed interference may be taken.\n- (a) the purpose of the proposed interference is to impound water to enable the taking of water under a water allocation held by the local government to supply town water; and\n- (b) either— (i) the local government has made a relevant change application to the chief executive; or (ii) the chief executive has approved a relevant change application made by the local government and has given a certificate, for the dealing to which the application relates, to the local government under section&#160;159 (4) of the Act .\n- (i) the local government has made a relevant change application to the chief executive; or\n- (ii) the chief executive has approved a relevant change application made by the local government and has given a certificate, for the dealing to which the application relates, to the local government under section&#160;159 (4) of the Act .\n- (i) the local government has made a relevant change application to the chief executive; or\n- (ii) the chief executive has approved a relevant change application made by the local government and has given a certificate, for the dealing to which the application relates, to the local government under section&#160;159 (4) of the Act .\n- (a) to prevent an increase, due to the proposed interference mentioned in subsection&#160;(1) , of the average volume of surface water or underground water that may be taken under this plan; and\n- (b) to remove a condition stating a flow threshold for taking water; and\n- (c) to ensure the water allocation is subject to a condition stating that only water impounded by the proposed interference may be taken.","sortOrder":56},{"sectionNumber":"sec.44","sectionType":"section","heading":"Applications for water licences to take overland flow water using particular existing overland flow works","content":"### sec.44 Applications for water licences to take overland flow water using particular existing overland flow works\n\nThis section applies if the owner of land, on which works used to take overland flow water are situated, applies under section&#160;107 of the Act for a water licence to take overland flow water to which this plan applies using the works.\nThe chief executive may accept the application if the chief executive is reasonably satisfied—\nthe works are existing overland flow works; and\nthe works were used to take overland flow water, other than for stock purposes or domestic purposes, before 20 September 2000.\nSee also section&#160;37 (1) (c) for when a person may take overland flow water using notified existing overland flow works.\n(sec.44-ssec.1) This section applies if the owner of land, on which works used to take overland flow water are situated, applies under section&#160;107 of the Act for a water licence to take overland flow water to which this plan applies using the works.\n(sec.44-ssec.2) The chief executive may accept the application if the chief executive is reasonably satisfied— the works are existing overland flow works; and the works were used to take overland flow water, other than for stock purposes or domestic purposes, before 20 September 2000. See also section&#160;37 (1) (c) for when a person may take overland flow water using notified existing overland flow works.\n- (a) the works are existing overland flow works; and\n- (b) the works were used to take overland flow water, other than for stock purposes or domestic purposes, before 20 September 2000.","sortOrder":57},{"sectionNumber":"pt.10-div.2","sectionType":"division","heading":"Applications inconsistent with this plan","content":"## Applications inconsistent with this plan","sortOrder":58},{"sectionNumber":"sec.45","sectionType":"section","heading":"Particular applications for dealing with water licences inconsistent with this plan","content":"### sec.45 Particular applications for dealing with water licences inconsistent with this plan\n\nThe granting of an application made under section&#160;121 of the Act for a dealing with a water licence in relation to water to which this plan applies is inconsistent with this plan if the application is an application mentioned in section&#160;130 (1) (a) of the Act .\nSee section&#160;129 of the Act for the actions the chief executive must take if the granting of an application for a dealing with a water licence is inconsistent with a water plan.\nHowever, subsection&#160;(1) does not apply to the application if—\nthe application is made by a local government to allow for increased interference with the flow of water to which this plan applies; and\nthe purpose of the proposed increased interference is to impound water to enable the taking of water under a water allocation, held by the local government, to supply town water; and\neither—\nthe local government has made a relevant change application to the chief executive; or\nthe chief executive has approved a relevant change application made by the local government and has given a certificate, for the dealing to which the application relates, to the local government under section&#160;159 (4) of the Act .\nSee section&#160;130 of the Act for how an application mentioned in this subsection must be assessed.\nAlso, subsection&#160;(1) does not apply if the application is—\nan application to amend a water licence to take underground water to change the location from which water may be taken under the licence; or\nan application to amalgamate water licences to take underground water.\nIf the chief executive grants an application to which subsection&#160;(2) applies, the water licence to which the dealing relates must include the conditions stated in the water management protocol for the licence.\nIn this section—\nrelevant change application means an application, under section&#160;159 (1) of the Act , to change the water allocation mentioned in subsection&#160;(2) (b) —\nto prevent an increase, due to the proposed increased interference mentioned in subsection&#160;(2) (a) , of the average volume of surface water or underground water that may be taken under this plan; and\nto remove a condition stating a flow threshold for taking water; and\nto ensure the water allocation is subject to a condition stating that only water impounded by the proposed increased interference may be taken.\ns&#160;45 amd 2023 Act&#160;No.&#160;24 s&#160;75 s ch&#160;1 pt&#160;1\n(sec.45-ssec.1) The granting of an application made under section&#160;121 of the Act for a dealing with a water licence in relation to water to which this plan applies is inconsistent with this plan if the application is an application mentioned in section&#160;130 (1) (a) of the Act . See section&#160;129 of the Act for the actions the chief executive must take if the granting of an application for a dealing with a water licence is inconsistent with a water plan.\n(sec.45-ssec.2) However, subsection&#160;(1) does not apply to the application if— the application is made by a local government to allow for increased interference with the flow of water to which this plan applies; and the purpose of the proposed increased interference is to impound water to enable the taking of water under a water allocation, held by the local government, to supply town water; and either— the local government has made a relevant change application to the chief executive; or the chief executive has approved a relevant change application made by the local government and has given a certificate, for the dealing to which the application relates, to the local government under section&#160;159 (4) of the Act . See section&#160;130 of the Act for how an application mentioned in this subsection must be assessed.\n(sec.45-ssec.3) Also, subsection&#160;(1) does not apply if the application is— an application to amend a water licence to take underground water to change the location from which water may be taken under the licence; or an application to amalgamate water licences to take underground water.\n(sec.45-ssec.4) If the chief executive grants an application to which subsection&#160;(2) applies, the water licence to which the dealing relates must include the conditions stated in the water management protocol for the licence.\n(sec.45-ssec.5) In this section— relevant change application means an application, under section&#160;159 (1) of the Act , to change the water allocation mentioned in subsection&#160;(2) (b) — to prevent an increase, due to the proposed increased interference mentioned in subsection&#160;(2) (a) , of the average volume of surface water or underground water that may be taken under this plan; and to remove a condition stating a flow threshold for taking water; and to ensure the water allocation is subject to a condition stating that only water impounded by the proposed increased interference may be taken.\n- (a) the application is made by a local government to allow for increased interference with the flow of water to which this plan applies; and\n- (b) the purpose of the proposed increased interference is to impound water to enable the taking of water under a water allocation, held by the local government, to supply town water; and\n- (c) either— (i) the local government has made a relevant change application to the chief executive; or (ii) the chief executive has approved a relevant change application made by the local government and has given a certificate, for the dealing to which the application relates, to the local government under section&#160;159 (4) of the Act .\n- (i) the local government has made a relevant change application to the chief executive; or\n- (ii) the chief executive has approved a relevant change application made by the local government and has given a certificate, for the dealing to which the application relates, to the local government under section&#160;159 (4) of the Act .\n- (i) the local government has made a relevant change application to the chief executive; or\n- (ii) the chief executive has approved a relevant change application made by the local government and has given a certificate, for the dealing to which the application relates, to the local government under section&#160;159 (4) of the Act .\n- (a) an application to amend a water licence to take underground water to change the location from which water may be taken under the licence; or\n- (b) an application to amalgamate water licences to take underground water.\n- (a) to prevent an increase, due to the proposed increased interference mentioned in subsection&#160;(2) (a) , of the average volume of surface water or underground water that may be taken under this plan; and\n- (b) to remove a condition stating a flow threshold for taking water; and\n- (c) to ensure the water allocation is subject to a condition stating that only water impounded by the proposed increased interference may be taken.","sortOrder":59},{"sectionNumber":"pt.10-div.3","sectionType":"division","heading":"Granting particular water licences","content":"## Granting particular water licences","sortOrder":60},{"sectionNumber":"sec.46","sectionType":"section","heading":"Water licences granted to authorise particular existing activities— Act , s&#160;116","content":"### sec.46 Water licences granted to authorise particular existing activities— Act , s&#160;116\n\nThis section applies if a water entitlement notice for this plan provides for the granting of a water licence to interfere with the flow of water to which this plan applies for the purpose of impounding water using any of the following works—\nBoodua Weir;\nConnolly Dam;\nTipton Weir.\nFor section&#160;116 (1) of the Act , the chief executive must decide to grant the water licence.\nSee also section&#160;116 (2) of the Act for when the chief executive may grant a water licence without the need for an application to be made under section&#160;107 of the Act .\n(sec.46-ssec.1) This section applies if a water entitlement notice for this plan provides for the granting of a water licence to interfere with the flow of water to which this plan applies for the purpose of impounding water using any of the following works— Boodua Weir; Connolly Dam; Tipton Weir.\n(sec.46-ssec.2) For section&#160;116 (1) of the Act , the chief executive must decide to grant the water licence. See also section&#160;116 (2) of the Act for when the chief executive may grant a water licence without the need for an application to be made under section&#160;107 of the Act .\n- (a) Boodua Weir;\n- (b) Connolly Dam;\n- (c) Tipton Weir.","sortOrder":61},{"sectionNumber":"sec.47","sectionType":"section","heading":"Water licence granted to replace expired water licence— Act , s&#160;116","content":"### sec.47 Water licence granted to replace expired water licence— Act , s&#160;116\n\nThis section applies if a water entitlement notice for this plan provides for the granting of a water licence that replaces expired water licence number 19726R.\nFor section&#160;116 (1) of the Act , the chief executive must decide to grant the water licence.\nSee also section&#160;116 (2) of the Act for when the chief executive may grant a water licence without the need for an application to be made under section&#160;107 of the Act .\n(sec.47-ssec.1) This section applies if a water entitlement notice for this plan provides for the granting of a water licence that replaces expired water licence number 19726R.\n(sec.47-ssec.2) For section&#160;116 (1) of the Act , the chief executive must decide to grant the water licence. See also section&#160;116 (2) of the Act for when the chief executive may grant a water licence without the need for an application to be made under section&#160;107 of the Act .","sortOrder":62},{"sectionNumber":"pt.10-div.4","sectionType":"division","heading":"Water licences to take overland flow water","content":"## Water licences to take overland flow water","sortOrder":63},{"sectionNumber":"sec.48","sectionType":"section","heading":"Content and conditions of water licences to take overland flow water","content":"### sec.48 Content and conditions of water licences to take overland flow water\n\nA water licence to take overland flow water to which this plan applies must—\nstate the purpose for which the water may be taken as ‘any’; and\ninclude at least 1 of the following—\nthe maximum rate at which the water may be taken under the water licence;\nthe maximum storage capacity of works that may be used to store the water taken under the water licence;\nthe average annual volume of water that may be taken under the water licence;\nthe volumetric limit for the water licence.\nThe water licence may also include the following conditions—\na limit on the volume of the water that may be taken in a stated period;\na limit on the volume of the water that may be stored.\n(sec.48-ssec.1) A water licence to take overland flow water to which this plan applies must— state the purpose for which the water may be taken as ‘any’; and include at least 1 of the following— the maximum rate at which the water may be taken under the water licence; the maximum storage capacity of works that may be used to store the water taken under the water licence; the average annual volume of water that may be taken under the water licence; the volumetric limit for the water licence.\n(sec.48-ssec.2) The water licence may also include the following conditions— a limit on the volume of the water that may be taken in a stated period; a limit on the volume of the water that may be stored.\n- (a) state the purpose for which the water may be taken as ‘any’; and\n- (b) include at least 1 of the following— (i) the maximum rate at which the water may be taken under the water licence; (ii) the maximum storage capacity of works that may be used to store the water taken under the water licence; (iii) the average annual volume of water that may be taken under the water licence; (iv) the volumetric limit for the water licence.\n- (i) the maximum rate at which the water may be taken under the water licence;\n- (ii) the maximum storage capacity of works that may be used to store the water taken under the water licence;\n- (iii) the average annual volume of water that may be taken under the water licence;\n- (iv) the volumetric limit for the water licence.\n- (i) the maximum rate at which the water may be taken under the water licence;\n- (ii) the maximum storage capacity of works that may be used to store the water taken under the water licence;\n- (iii) the average annual volume of water that may be taken under the water licence;\n- (iv) the volumetric limit for the water licence.\n- (a) a limit on the volume of the water that may be taken in a stated period;\n- (b) a limit on the volume of the water that may be stored.","sortOrder":64},{"sectionNumber":"sec.49","sectionType":"section","heading":"Working out maximum rate","content":"### sec.49 Working out maximum rate\n\nThis section applies for working out, for section&#160;48 (1) (b) (i) , the maximum rate at which overland flow water may be taken.\nThe chief executive—\nif a certified report for the works that will be used to take the overland flow water has been requested under section&#160;54 (4) (a) (iii) —must have regard to the certified report for the works given to the chief executive; and\nmay have regard to any other relevant information available to the chief executive.\nIf the chief executive works out the maximum rate having regard to the size of the pump that will be used to take the overland flow water, the maximum rate must not be greater than the rate stated in the Water Regulation 2016 , schedule&#160;7 , column 3 for the pump size stated opposite in schedule&#160;7 , column 1 of that regulation.\n(sec.49-ssec.1) This section applies for working out, for section&#160;48 (1) (b) (i) , the maximum rate at which overland flow water may be taken.\n(sec.49-ssec.2) The chief executive— if a certified report for the works that will be used to take the overland flow water has been requested under section&#160;54 (4) (a) (iii) —must have regard to the certified report for the works given to the chief executive; and may have regard to any other relevant information available to the chief executive.\n(sec.49-ssec.3) If the chief executive works out the maximum rate having regard to the size of the pump that will be used to take the overland flow water, the maximum rate must not be greater than the rate stated in the Water Regulation 2016 , schedule&#160;7 , column 3 for the pump size stated opposite in schedule&#160;7 , column 1 of that regulation.\n- (a) if a certified report for the works that will be used to take the overland flow water has been requested under section&#160;54 (4) (a) (iii) —must have regard to the certified report for the works given to the chief executive; and\n- (b) may have regard to any other relevant information available to the chief executive.","sortOrder":65},{"sectionNumber":"sec.50","sectionType":"section","heading":"Working out maximum storage capacity","content":"### sec.50 Working out maximum storage capacity\n\nThis section applies for working out, for section&#160;48 (1) (b) (ii) , the maximum storage capacity of works that may be used to store overland flow water.\nThe chief executive—\nif a certified report for the works has been requested under section&#160;54 (4) (a) (iii) —must have regard to the certified report for the works given to the chief executive; and\nmay have regard to any other relevant information available to the chief executive.\nHowever, the chief executive must disregard the storage capacity of—\nbunded land; or\nland used for irrigated or dryland agriculture; or\nland surrounded by levees.\nSee section&#160;37 (1) (c) for when a person may take overland flow water using notified existing overland flow works.\nIn this section—\nbunded land means land on which a permanent or temporary levee is constructed to divert overland flow water away from land used for agricultural or horticultural production.\n(sec.50-ssec.1) This section applies for working out, for section&#160;48 (1) (b) (ii) , the maximum storage capacity of works that may be used to store overland flow water.\n(sec.50-ssec.2) The chief executive— if a certified report for the works has been requested under section&#160;54 (4) (a) (iii) —must have regard to the certified report for the works given to the chief executive; and may have regard to any other relevant information available to the chief executive.\n(sec.50-ssec.3) However, the chief executive must disregard the storage capacity of— bunded land; or land used for irrigated or dryland agriculture; or land surrounded by levees. See section&#160;37 (1) (c) for when a person may take overland flow water using notified existing overland flow works.\n(sec.50-ssec.4) In this section— bunded land means land on which a permanent or temporary levee is constructed to divert overland flow water away from land used for agricultural or horticultural production.\n- (a) if a certified report for the works has been requested under section&#160;54 (4) (a) (iii) —must have regard to the certified report for the works given to the chief executive; and\n- (b) may have regard to any other relevant information available to the chief executive.\n- (a) bunded land; or\n- (b) land used for irrigated or dryland agriculture; or\n- (c) land surrounded by levees.","sortOrder":66},{"sectionNumber":"sec.51","sectionType":"section","heading":"Working out average annual volume","content":"### sec.51 Working out average annual volume\n\nThis section applies for working out, for section&#160;48 (1) (b) (iii) , the average annual volume of overland flow water that may be taken.\nThe chief executive must have regard to—\nthe catchment characteristics for the water’s catchment; and\nthe maximum rate, if any, worked out under section&#160;49 , at which the overland flow water may be taken; and\nthe maximum storage capacity, if any, worked out under section&#160;50 , of the works that may be used to store the water; and\nif overland flow water taken under the water licence is to be used to irrigate crops—the pattern of usage demand for the storage for the water licence; and\nthe extent to which the storage for the water licence may also be used to store water taken under another authorisation; and\nthe other conditions applying to the water licence.\nIn this section—\ncatchment characteristics , for a catchment, means the characteristics of the catchment that affect the volume of overland flow water in the catchment, including, for example—\nthe area of the catchment; and\nthe slope of the catchment; and\nthe amount of rainfall that typically falls in the catchment; and\nthe amount and type of vegetation in the catchment.\nIQQM computer program simulation means the department’s Integrated Quantity and Quality Model computer program simulation for the period 1 July 1922 to 30 June 1995.\npattern of usage demand , for a storage, means the pattern of usage from the storage worked out having regard to—\nhow water, stored in or by the storage, is used to grow crops; and\nthe planting rule for the trading zone in which the storage is located.\nplanting rule , for a trading zone, means the method used, in the IQQM computer program simulation, to work out the area under crops in the trading zone.\nstorage , for a water licence, means the works that will primarily be used to store the overland flow water taken under the water licence.\n(sec.51-ssec.1) This section applies for working out, for section&#160;48 (1) (b) (iii) , the average annual volume of overland flow water that may be taken.\n(sec.51-ssec.2) The chief executive must have regard to— the catchment characteristics for the water’s catchment; and the maximum rate, if any, worked out under section&#160;49 , at which the overland flow water may be taken; and the maximum storage capacity, if any, worked out under section&#160;50 , of the works that may be used to store the water; and if overland flow water taken under the water licence is to be used to irrigate crops—the pattern of usage demand for the storage for the water licence; and the extent to which the storage for the water licence may also be used to store water taken under another authorisation; and the other conditions applying to the water licence.\n(sec.51-ssec.3) In this section— catchment characteristics , for a catchment, means the characteristics of the catchment that affect the volume of overland flow water in the catchment, including, for example— the area of the catchment; and the slope of the catchment; and the amount of rainfall that typically falls in the catchment; and the amount and type of vegetation in the catchment. IQQM computer program simulation means the department’s Integrated Quantity and Quality Model computer program simulation for the period 1 July 1922 to 30 June 1995. pattern of usage demand , for a storage, means the pattern of usage from the storage worked out having regard to— how water, stored in or by the storage, is used to grow crops; and the planting rule for the trading zone in which the storage is located. planting rule , for a trading zone, means the method used, in the IQQM computer program simulation, to work out the area under crops in the trading zone. storage , for a water licence, means the works that will primarily be used to store the overland flow water taken under the water licence.\n- (a) the catchment characteristics for the water’s catchment; and\n- (b) the maximum rate, if any, worked out under section&#160;49 , at which the overland flow water may be taken; and\n- (c) the maximum storage capacity, if any, worked out under section&#160;50 , of the works that may be used to store the water; and\n- (d) if overland flow water taken under the water licence is to be used to irrigate crops—the pattern of usage demand for the storage for the water licence; and\n- (e) the extent to which the storage for the water licence may also be used to store water taken under another authorisation; and\n- (f) the other conditions applying to the water licence.\n- (a) the area of the catchment; and\n- (b) the slope of the catchment; and\n- (c) the amount of rainfall that typically falls in the catchment; and\n- (d) the amount and type of vegetation in the catchment.\n- (a) how water, stored in or by the storage, is used to grow crops; and\n- (b) the planting rule for the trading zone in which the storage is located.","sortOrder":67},{"sectionNumber":"sec.52","sectionType":"section","heading":"Working out volumetric limit","content":"### sec.52 Working out volumetric limit\n\nThis section applies for working out, for section&#160;48 (1) (b) (iv) , the volumetric limit for the water licence.\nIf an average annual volume, worked out under section&#160;51 , is a condition of the water licence, the chief executive must have regard to that average annual volume.\n(sec.52-ssec.1) This section applies for working out, for section&#160;48 (1) (b) (iv) , the volumetric limit for the water licence.\n(sec.52-ssec.2) If an average annual volume, worked out under section&#160;51 , is a condition of the water licence, the chief executive must have regard to that average annual volume.","sortOrder":68},{"sectionNumber":"sec.53","sectionType":"section","heading":"Criteria for deciding applications for water licences to take overland flow water using existing overland flow works— Act , s&#160;43","content":"### sec.53 Criteria for deciding applications for water licences to take overland flow water using existing overland flow works— Act , s&#160;43\n\nThis section states, for section&#160;43 (2) (h) of the Act , the criteria for deciding an application for a water licence, to take overland flow water to which this plan applies using existing overland flow works, accepted by the chief executive under section&#160;44 (2) .\nThe chief executive must decide to grant the application if the chief executive reasonably believes there has been, or may be, an increase in the average annual volume of overland flow water taken using the works above the average annual volume that could have been taken using the works under the relevant operating arrangements for the works.\nDespite subsection&#160;(2) , the chief executive may refuse to grant the application if the chief executive considers the application should be refused having regard to the matters the chief executive must consider under section&#160;113 of the Act .\n(sec.53-ssec.1) This section states, for section&#160;43 (2) (h) of the Act , the criteria for deciding an application for a water licence, to take overland flow water to which this plan applies using existing overland flow works, accepted by the chief executive under section&#160;44 (2) .\n(sec.53-ssec.2) The chief executive must decide to grant the application if the chief executive reasonably believes there has been, or may be, an increase in the average annual volume of overland flow water taken using the works above the average annual volume that could have been taken using the works under the relevant operating arrangements for the works.\n(sec.53-ssec.3) Despite subsection&#160;(2) , the chief executive may refuse to grant the application if the chief executive considers the application should be refused having regard to the matters the chief executive must consider under section&#160;113 of the Act .","sortOrder":69},{"sectionNumber":"sec.54","sectionType":"section","heading":"Process for allocation of overland flow water— Act , s&#160;116","content":"### sec.54 Process for allocation of overland flow water— Act , s&#160;116\n\nThis section states, for section&#160;116 (1) of the Act , a process for the allocation of overland flow water to which this plan applies under a water licence.\nSee section&#160;116 (2) of the Act for when the chief executive may grant a water licence without the need for an application to be made under section&#160;107 of the Act .\nA water licence to take the water using existing overland flow works may be granted to the owner of the land on which the works are situated.\nWithout limiting subsection&#160;(2) , a water licence to take the water using existing overland flow works must be granted to the owner of the land on which the works are situated if—\nthe works are notified existing overland flow works; and\nthe chief executive reasonably believes there has been, or may be, an increase in the average annual volume of overland flow water taken using the works above the average annual volume that could have been taken using the works under the relevant operating arrangements for the works.\nThe chief executive must, before granting the water licence under subsection&#160;(2) or (3) —\ngive the owner a notice—\nidentifying the works for which a water licence is proposed to be granted; and\nstating that a water licence is proposed to be granted for the taking of overland flow water to which this plan applies using the works; and\nif the chief executive requires further information about the works—requesting the owner give the chief executive, within a stated period, a certified report for the works; and\nif a certified report for the works has been requested under paragraph&#160;(a) (iii) —have regard to a certified report for the works given to the chief executive.\n(sec.54-ssec.1) This section states, for section&#160;116 (1) of the Act , a process for the allocation of overland flow water to which this plan applies under a water licence. See section&#160;116 (2) of the Act for when the chief executive may grant a water licence without the need for an application to be made under section&#160;107 of the Act .\n(sec.54-ssec.2) A water licence to take the water using existing overland flow works may be granted to the owner of the land on which the works are situated.\n(sec.54-ssec.3) Without limiting subsection&#160;(2) , a water licence to take the water using existing overland flow works must be granted to the owner of the land on which the works are situated if— the works are notified existing overland flow works; and the chief executive reasonably believes there has been, or may be, an increase in the average annual volume of overland flow water taken using the works above the average annual volume that could have been taken using the works under the relevant operating arrangements for the works.\n(sec.54-ssec.4) The chief executive must, before granting the water licence under subsection&#160;(2) or (3) — give the owner a notice— identifying the works for which a water licence is proposed to be granted; and stating that a water licence is proposed to be granted for the taking of overland flow water to which this plan applies using the works; and if the chief executive requires further information about the works—requesting the owner give the chief executive, within a stated period, a certified report for the works; and if a certified report for the works has been requested under paragraph&#160;(a) (iii) —have regard to a certified report for the works given to the chief executive.\n- (a) the works are notified existing overland flow works; and\n- (b) the chief executive reasonably believes there has been, or may be, an increase in the average annual volume of overland flow water taken using the works above the average annual volume that could have been taken using the works under the relevant operating arrangements for the works.\n- (a) give the owner a notice— (i) identifying the works for which a water licence is proposed to be granted; and (ii) stating that a water licence is proposed to be granted for the taking of overland flow water to which this plan applies using the works; and (iii) if the chief executive requires further information about the works—requesting the owner give the chief executive, within a stated period, a certified report for the works; and\n- (i) identifying the works for which a water licence is proposed to be granted; and\n- (ii) stating that a water licence is proposed to be granted for the taking of overland flow water to which this plan applies using the works; and\n- (iii) if the chief executive requires further information about the works—requesting the owner give the chief executive, within a stated period, a certified report for the works; and\n- (b) if a certified report for the works has been requested under paragraph&#160;(a) (iii) —have regard to a certified report for the works given to the chief executive.\n- (i) identifying the works for which a water licence is proposed to be granted; and\n- (ii) stating that a water licence is proposed to be granted for the taking of overland flow water to which this plan applies using the works; and\n- (iii) if the chief executive requires further information about the works—requesting the owner give the chief executive, within a stated period, a certified report for the works; and","sortOrder":70},{"sectionNumber":"sec.55","sectionType":"section","heading":"Water licences to include particular conditions","content":"### sec.55 Water licences to include particular conditions\n\nThis section applies to a water licence with an identifying number mentioned in schedule&#160;10 .\nIf, under section&#160;70 (1) (e) of the Act , a water entitlement notice for this plan provides for the water licence to be amended to be subject to a stated condition, the water licence is inconsistent with this plan unless the water licence is subject to the condition.\nSee section&#160;133 (2) of the Act for the actions the chief executive must take if a water licence is inconsistent with a water plan.\nFor section&#160;133 (2) of the Act , the stated time is 60 business days after the making of the water entitlement notice.\n(sec.55-ssec.1) This section applies to a water licence with an identifying number mentioned in schedule&#160;10 .\n(sec.55-ssec.2) If, under section&#160;70 (1) (e) of the Act , a water entitlement notice for this plan provides for the water licence to be amended to be subject to a stated condition, the water licence is inconsistent with this plan unless the water licence is subject to the condition. See section&#160;133 (2) of the Act for the actions the chief executive must take if a water licence is inconsistent with a water plan.\n(sec.55-ssec.3) For section&#160;133 (2) of the Act , the stated time is 60 business days after the making of the water entitlement notice.","sortOrder":71},{"sectionNumber":"pt.10-div.5","sectionType":"division","heading":"Water licences to take underground water","content":"## Water licences to take underground water","sortOrder":72},{"sectionNumber":"sec.56","sectionType":"section","heading":"Water licences to take underground water to contain particular conditions","content":"### sec.56 Water licences to take underground water to contain particular conditions\n\nThis section applies to a water licence to take underground water to which this plan applies in the underground water management area.\nIf, under section&#160;70 (1) (e) of the Act , a water entitlement notice for this plan provides for the water licence to be amended to state a relevant matter or to remove a relevant term or condition, the licence is inconsistent with this plan unless the relevant matter is stated in the licence or the relevant term or condition is removed from the licence.\nSee section&#160;133 (2) of the Act for the actions the chief executive must take if a water licence is inconsistent with a water plan.\nIn this section—\nrelevant matter means any of the following matters—\na condition to which the water licence is subject;\na purpose for which water to which this plan applies may be taken under the water licence;\na nominal entitlement for the water licence;\nthe underground water sub-area or the underground water zone to which the water licence relates;\nif the water taken under the water licence must be from a particular underground water sub-unit—the underground water sub-unit;\nif the water licence relocation rules apply to the water licence—the latitude and longitude for the point at which water to which this plan applies may be taken under the water licence.\nrelevant term or condition means—\na term or condition stating the water licence belongs to ‘group S’; or\na term or condition permitting the taking of underground water to which this plan applies in excess of the nominal entitlement for the water licence.\nwater licence relocation rules means the rules, stated in the water management protocol for this plan, about a dealing with a water licence to which section&#160;126 of the Act applies.\n(sec.56-ssec.1) This section applies to a water licence to take underground water to which this plan applies in the underground water management area.\n(sec.56-ssec.2) If, under section&#160;70 (1) (e) of the Act , a water entitlement notice for this plan provides for the water licence to be amended to state a relevant matter or to remove a relevant term or condition, the licence is inconsistent with this plan unless the relevant matter is stated in the licence or the relevant term or condition is removed from the licence. See section&#160;133 (2) of the Act for the actions the chief executive must take if a water licence is inconsistent with a water plan.\n(sec.56-ssec.3) In this section— relevant matter means any of the following matters— a condition to which the water licence is subject; a purpose for which water to which this plan applies may be taken under the water licence; a nominal entitlement for the water licence; the underground water sub-area or the underground water zone to which the water licence relates; if the water taken under the water licence must be from a particular underground water sub-unit—the underground water sub-unit; if the water licence relocation rules apply to the water licence—the latitude and longitude for the point at which water to which this plan applies may be taken under the water licence. relevant term or condition means— a term or condition stating the water licence belongs to ‘group S’; or a term or condition permitting the taking of underground water to which this plan applies in excess of the nominal entitlement for the water licence. water licence relocation rules means the rules, stated in the water management protocol for this plan, about a dealing with a water licence to which section&#160;126 of the Act applies.\n- (a) a condition to which the water licence is subject;\n- (b) a purpose for which water to which this plan applies may be taken under the water licence;\n- (c) a nominal entitlement for the water licence;\n- (d) the underground water sub-area or the underground water zone to which the water licence relates;\n- (e) if the water taken under the water licence must be from a particular underground water sub-unit—the underground water sub-unit;\n- (f) if the water licence relocation rules apply to the water licence—the latitude and longitude for the point at which water to which this plan applies may be taken under the water licence.\n- (a) a term or condition stating the water licence belongs to ‘group S’; or\n- (b) a term or condition permitting the taking of underground water to which this plan applies in excess of the nominal entitlement for the water licence.","sortOrder":73},{"sectionNumber":"pt.10-div.6","sectionType":"division","heading":"Provisions about Upper Condamine Alluvium (Central Condamine Alluvium) underground water unit","content":"## Provisions about Upper Condamine Alluvium (Central Condamine Alluvium) underground water unit","sortOrder":74},{"sectionNumber":"sec.57","sectionType":"section","heading":"Purpose of division","content":"### sec.57 Purpose of division\n\nThe purpose of this division is to amend or grant particular water licences to meet the sustainable diversion limits for the Upper Condamine Alluvium (Central Condamine Alluvium) underground water unit.","sortOrder":75},{"sectionNumber":"sec.58","sectionType":"section","heading":"Definitions for division","content":"### sec.58 Definitions for division\n\nIn this division—\ngroup S water licence means a water licence with an identifying number mentioned in schedule&#160;11 .\nrelevant water licence means a water licence to take underground water from the Upper Condamine Alluvium (Central Condamine Alluvium) underground water unit, other than a water licence—\nfor which the State, a local government or CEWH is the licensee; or\nfor which the nominal entitlement is 5ML or less; or\nthat is a group S water licence.\n- (a) for which the State, a local government or CEWH is the licensee; or\n- (b) for which the nominal entitlement is 5ML or less; or\n- (c) that is a group S water licence.","sortOrder":76},{"sectionNumber":"sec.59","sectionType":"section","heading":"Nominal entitlement for relevant water licences","content":"### sec.59 Nominal entitlement for relevant water licences\n\nIf, under section&#160;70 (1) (e) of the Act , a water entitlement notice for this plan provides for a relevant water licence to be amended to state a nominal entitlement, the licence is inconsistent with this plan unless the licence states the nominal entitlement.\nSee section&#160;133 (2) of the Act for the actions the chief executive must take if a water licence is inconsistent with a water plan.\nIn deciding the nominal entitlement for a relevant water licence to be stated in a water entitlement notice mentioned in subsection&#160;(1) , the chief executive—\nmust have regard to—\nthe sustainable diversion limit for the Upper Condamine Alluvium (Central Condamine Alluvium) underground water unit; and\nthe extent to which the licensee for the relevant water licence has taken part in the Commonwealth water use program in relation to the licence before the licence is amended in the way mentioned in subsection&#160;(1) ; and\nmust ensure—\nthe total volume of the nominal entitlements for all water licences to take underground water from the Upper Condamine Alluvium (Central Condamine Alluvium) underground water unit, other than licences held by CEWH, is not greater than 46,221ML; and\nthe volume is expressed in the relevant water licence in whole megalitres; and\nthe nominal entitlement would not be less than 5ML.\nIn this section—\nCommonwealth water use program means the Sustainable Rural Water Use and Infrastructure Program.\nInformation about the Sustainable Rural Water Use and Infrastructure Program is available on the Commonwealth Department of Agriculture and Water Resources’ website.\n(sec.59-ssec.1) If, under section&#160;70 (1) (e) of the Act , a water entitlement notice for this plan provides for a relevant water licence to be amended to state a nominal entitlement, the licence is inconsistent with this plan unless the licence states the nominal entitlement. See section&#160;133 (2) of the Act for the actions the chief executive must take if a water licence is inconsistent with a water plan.\n(sec.59-ssec.2) In deciding the nominal entitlement for a relevant water licence to be stated in a water entitlement notice mentioned in subsection&#160;(1) , the chief executive— must have regard to— the sustainable diversion limit for the Upper Condamine Alluvium (Central Condamine Alluvium) underground water unit; and the extent to which the licensee for the relevant water licence has taken part in the Commonwealth water use program in relation to the licence before the licence is amended in the way mentioned in subsection&#160;(1) ; and must ensure— the total volume of the nominal entitlements for all water licences to take underground water from the Upper Condamine Alluvium (Central Condamine Alluvium) underground water unit, other than licences held by CEWH, is not greater than 46,221ML; and the volume is expressed in the relevant water licence in whole megalitres; and the nominal entitlement would not be less than 5ML.\n(sec.59-ssec.3) In this section— Commonwealth water use program means the Sustainable Rural Water Use and Infrastructure Program. Information about the Sustainable Rural Water Use and Infrastructure Program is available on the Commonwealth Department of Agriculture and Water Resources’ website.\n- (a) must have regard to— (i) the sustainable diversion limit for the Upper Condamine Alluvium (Central Condamine Alluvium) underground water unit; and (ii) the extent to which the licensee for the relevant water licence has taken part in the Commonwealth water use program in relation to the licence before the licence is amended in the way mentioned in subsection&#160;(1) ; and\n- (i) the sustainable diversion limit for the Upper Condamine Alluvium (Central Condamine Alluvium) underground water unit; and\n- (ii) the extent to which the licensee for the relevant water licence has taken part in the Commonwealth water use program in relation to the licence before the licence is amended in the way mentioned in subsection&#160;(1) ; and\n- (b) must ensure— (i) the total volume of the nominal entitlements for all water licences to take underground water from the Upper Condamine Alluvium (Central Condamine Alluvium) underground water unit, other than licences held by CEWH, is not greater than 46,221ML; and (ii) the volume is expressed in the relevant water licence in whole megalitres; and (iii) the nominal entitlement would not be less than 5ML.\n- (i) the total volume of the nominal entitlements for all water licences to take underground water from the Upper Condamine Alluvium (Central Condamine Alluvium) underground water unit, other than licences held by CEWH, is not greater than 46,221ML; and\n- (ii) the volume is expressed in the relevant water licence in whole megalitres; and\n- (iii) the nominal entitlement would not be less than 5ML.\n- (i) the sustainable diversion limit for the Upper Condamine Alluvium (Central Condamine Alluvium) underground water unit; and\n- (ii) the extent to which the licensee for the relevant water licence has taken part in the Commonwealth water use program in relation to the licence before the licence is amended in the way mentioned in subsection&#160;(1) ; and\n- (i) the total volume of the nominal entitlements for all water licences to take underground water from the Upper Condamine Alluvium (Central Condamine Alluvium) underground water unit, other than licences held by CEWH, is not greater than 46,221ML; and\n- (ii) the volume is expressed in the relevant water licence in whole megalitres; and\n- (iii) the nominal entitlement would not be less than 5ML.","sortOrder":77},{"sectionNumber":"sec.60","sectionType":"section","heading":"Commonwealth Environmental Water Holder","content":"### sec.60 Commonwealth Environmental Water Holder\n\nThis section applies if each relevant water licence has been amended in the way mentioned in section&#160;59 (1) .\nFor section&#160;116 (1) of the Act , the chief executive must decide to grant a water licence to CEWH to take underground water from the Upper Condamine Alluvium (Central Condamine Alluvium) underground water unit if—\nCEWH does not hold a water licence to take underground water from the Upper Condamine Alluvium (Central Condamine Alluvium) underground water unit in an underground water zone in the Central Condamine Alluvium underground water sub-area; and\na water entitlement notice for this plan provides for the granting of the water licence.\nSee also section&#160;116 (2) of the Act for when the chief executive may grant a water licence without the need for an application to be made under section&#160;107 of the Act .\nIf CEWH holds a water licence to take underground water from the Upper Condamine Alluvium (Central Condamine Alluvium) underground water unit in an underground water zone in the Central Condamine Alluvium underground water sub-area, a water entitlement notice, under section&#160;70 (1) (e) of the Act , may implement this plan by providing for the amendment of the water licence.\nSee section&#160;133 (2) of the Act for the actions the chief executive must take if a water licence is inconsistent with a water plan.\nThe chief executive must ensure—\nthe nominal entitlement for a water licence granted under subsection&#160;(2) is proportional to the reduction volume for the trading zone to which the water licence relates; and\nthe nominal entitlement for a water licence amended under subsection&#160;(3) is equal to the sum of—\nthe reduction volume for the trading zone to which the water licence relates; and\nthe volume of nominal entitlements held by CEWH for the trading zone to which the water licence relates before the water licence is amended; and\nthe purpose for taking water under a water licence granted under subsection&#160;(2) or amended under subsection&#160;(3) is ‘productive base’.\nIn this section—\nreduction volume , for the trading zone to which a water licence relates, means the volume calculated by subtracting the total replacement volume from the total original volume.\ntotal original volume means the total volume of nominal entitlements for all relevant water licences before the licences were amended in the way mentioned in section&#160;59 (1) .\ntotal replacement volume means the total volume of the nominal entitlements for all relevant water licences after the licences were amended in the way mentioned in section&#160;59 (1) .\n(sec.60-ssec.1) This section applies if each relevant water licence has been amended in the way mentioned in section&#160;59 (1) .\n(sec.60-ssec.2) For section&#160;116 (1) of the Act , the chief executive must decide to grant a water licence to CEWH to take underground water from the Upper Condamine Alluvium (Central Condamine Alluvium) underground water unit if— CEWH does not hold a water licence to take underground water from the Upper Condamine Alluvium (Central Condamine Alluvium) underground water unit in an underground water zone in the Central Condamine Alluvium underground water sub-area; and a water entitlement notice for this plan provides for the granting of the water licence. See also section&#160;116 (2) of the Act for when the chief executive may grant a water licence without the need for an application to be made under section&#160;107 of the Act .\n(sec.60-ssec.3) If CEWH holds a water licence to take underground water from the Upper Condamine Alluvium (Central Condamine Alluvium) underground water unit in an underground water zone in the Central Condamine Alluvium underground water sub-area, a water entitlement notice, under section&#160;70 (1) (e) of the Act , may implement this plan by providing for the amendment of the water licence. See section&#160;133 (2) of the Act for the actions the chief executive must take if a water licence is inconsistent with a water plan.\n(sec.60-ssec.4) The chief executive must ensure— the nominal entitlement for a water licence granted under subsection&#160;(2) is proportional to the reduction volume for the trading zone to which the water licence relates; and the nominal entitlement for a water licence amended under subsection&#160;(3) is equal to the sum of— the reduction volume for the trading zone to which the water licence relates; and the volume of nominal entitlements held by CEWH for the trading zone to which the water licence relates before the water licence is amended; and the purpose for taking water under a water licence granted under subsection&#160;(2) or amended under subsection&#160;(3) is ‘productive base’.\n(sec.60-ssec.5) In this section— reduction volume , for the trading zone to which a water licence relates, means the volume calculated by subtracting the total replacement volume from the total original volume. total original volume means the total volume of nominal entitlements for all relevant water licences before the licences were amended in the way mentioned in section&#160;59 (1) . total replacement volume means the total volume of the nominal entitlements for all relevant water licences after the licences were amended in the way mentioned in section&#160;59 (1) .\n- (a) CEWH does not hold a water licence to take underground water from the Upper Condamine Alluvium (Central Condamine Alluvium) underground water unit in an underground water zone in the Central Condamine Alluvium underground water sub-area; and\n- (b) a water entitlement notice for this plan provides for the granting of the water licence.\n- (a) the nominal entitlement for a water licence granted under subsection&#160;(2) is proportional to the reduction volume for the trading zone to which the water licence relates; and\n- (b) the nominal entitlement for a water licence amended under subsection&#160;(3) is equal to the sum of— (i) the reduction volume for the trading zone to which the water licence relates; and (ii) the volume of nominal entitlements held by CEWH for the trading zone to which the water licence relates before the water licence is amended; and\n- (i) the reduction volume for the trading zone to which the water licence relates; and\n- (ii) the volume of nominal entitlements held by CEWH for the trading zone to which the water licence relates before the water licence is amended; and\n- (c) the purpose for taking water under a water licence granted under subsection&#160;(2) or amended under subsection&#160;(3) is ‘productive base’.\n- (i) the reduction volume for the trading zone to which the water licence relates; and\n- (ii) the volume of nominal entitlements held by CEWH for the trading zone to which the water licence relates before the water licence is amended; and","sortOrder":78},{"sectionNumber":"pt.10-div.7","sectionType":"division","heading":"Miscellaneous","content":"## Miscellaneous","sortOrder":79},{"sectionNumber":"sec.61","sectionType":"section","heading":"Accounting period for water licences— Water Regulation 2016 , s&#160;142","content":"### sec.61 Accounting period for water licences— Water Regulation 2016 , s&#160;142\n\nFor the Water Regulation 2016 , section&#160;142 (a) , the accounting period for a water licence to take water to which this plan applies is 1 July to 30 June in the following year.","sortOrder":80},{"sectionNumber":"pt.11","sectionType":"part","heading":"Water allocations","content":"# Water allocations","sortOrder":81},{"sectionNumber":"pt.11-div.1","sectionType":"division","heading":"Surface water","content":"## Surface water","sortOrder":82},{"sectionNumber":"sec.62","sectionType":"section","heading":"Water allocation groups— Act , sch&#160;4","content":"### sec.62 Water allocation groups— Act , sch&#160;4\n\nFor schedule&#160;4 of the Act , definition water allocation group , a group of water allocations is a water allocation group, for unsupplemented surface water, if each water allocation in the group—\nstates the same water allocation group mentioned in schedule&#160;12 , column 2 (the water allocation group identifier ); and\nauthorises the taking of unsupplemented surface water in the water management area zone mentioned in schedule&#160;12 , column 1, opposite the water allocation group identifier.\n- (a) states the same water allocation group mentioned in schedule&#160;12 , column 2 (the water allocation group identifier ); and\n- (b) authorises the taking of unsupplemented surface water in the water management area zone mentioned in schedule&#160;12 , column 1, opposite the water allocation group identifier.","sortOrder":83},{"sectionNumber":"sec.63","sectionType":"section","heading":"Amending particular water allocations— Act , s&#160;150","content":"### sec.63 Amending particular water allocations— Act , s&#160;150\n\nThis section applies to a water allocation with an identifying number mentioned in schedule&#160;13 , column 1.\nFor section&#160;150 (1) (a) of the Act , the water allocation must be amended to ensure—\nif schedule&#160;13 , column 2 states a water management area zone for the water allocation—the water management area zone for the water allocation is the stated water management area zone; and\nif schedule&#160;13 , column 2 states a water allocation group for the water allocation—the water allocation group for the water allocation is the stated water allocation group; and\nif schedule&#160;13 , column 2 states a location from which water may be taken under the allocation—water may be taken under the water allocation from the stated location.\nTo remove any doubt, it is declared that if an existing detail of, or condition imposed on, the water allocation is inconsistent with an amendment required under subsection&#160;(2) , the existing detail or condition must be also amended or removed, but only to the extent necessary to avoid the inconsistency.\n(sec.63-ssec.1) This section applies to a water allocation with an identifying number mentioned in schedule&#160;13 , column 1.\n(sec.63-ssec.2) For section&#160;150 (1) (a) of the Act , the water allocation must be amended to ensure— if schedule&#160;13 , column 2 states a water management area zone for the water allocation—the water management area zone for the water allocation is the stated water management area zone; and if schedule&#160;13 , column 2 states a water allocation group for the water allocation—the water allocation group for the water allocation is the stated water allocation group; and if schedule&#160;13 , column 2 states a location from which water may be taken under the allocation—water may be taken under the water allocation from the stated location.\n(sec.63-ssec.3) To remove any doubt, it is declared that if an existing detail of, or condition imposed on, the water allocation is inconsistent with an amendment required under subsection&#160;(2) , the existing detail or condition must be also amended or removed, but only to the extent necessary to avoid the inconsistency.\n- (a) if schedule&#160;13 , column 2 states a water management area zone for the water allocation—the water management area zone for the water allocation is the stated water management area zone; and\n- (b) if schedule&#160;13 , column 2 states a water allocation group for the water allocation—the water allocation group for the water allocation is the stated water allocation group; and\n- (c) if schedule&#160;13 , column 2 states a location from which water may be taken under the allocation—water may be taken under the water allocation from the stated location.","sortOrder":84},{"sectionNumber":"sec.64","sectionType":"section","heading":"Purpose of subdivision","content":"### sec.64 Purpose of subdivision\n\nThis subdivision states, for section&#160;43 (2) (g) of the Act , arrangements and processes for converting, under a water entitlement notice for this plan, particular authorisations to water allocations to take unsupplemented surface water to which this plan applies.","sortOrder":85},{"sectionNumber":"sec.65","sectionType":"section","heading":"Authorisations may be converted to water allocations","content":"### sec.65 Authorisations may be converted to water allocations\n\nA water entitlement notice may, under section&#160;70 (1) (a) of the Act , implement this plan by providing for the conversion of an existing authorisation to a water allocation stated in the notice to take unsupplemented surface water from a watercourse, lake or spring above Leslie Dam in water management area zone CBT-08.\nIn this section—\nexisting authorisation means a water licence—\nto take unsupplemented surface water from a watercourse, lake or spring above Leslie Dam in water management area zone CBT-08; and\nwith the stated purpose of irrigation.\n(sec.65-ssec.1) A water entitlement notice may, under section&#160;70 (1) (a) of the Act , implement this plan by providing for the conversion of an existing authorisation to a water allocation stated in the notice to take unsupplemented surface water from a watercourse, lake or spring above Leslie Dam in water management area zone CBT-08.\n(sec.65-ssec.2) In this section— existing authorisation means a water licence— to take unsupplemented surface water from a watercourse, lake or spring above Leslie Dam in water management area zone CBT-08; and with the stated purpose of irrigation.\n- (a) to take unsupplemented surface water from a watercourse, lake or spring above Leslie Dam in water management area zone CBT-08; and\n- (b) with the stated purpose of irrigation.","sortOrder":86},{"sectionNumber":"sec.66","sectionType":"section","heading":"Purpose for taking water","content":"### sec.66 Purpose for taking water\n\nThe purpose for taking water under the water allocation must be ‘any’.","sortOrder":87},{"sectionNumber":"sec.67","sectionType":"section","heading":"Location for taking water","content":"### sec.67 Location for taking water\n\nThe location from which water may be taken under the water allocation must include the place from which water was permitted to be taken under the existing authorisation.","sortOrder":88},{"sectionNumber":"sec.68","sectionType":"section","heading":"Conditions for taking water","content":"### sec.68 Conditions for taking water\n\nIn deciding the conditions on which water may be taken under the water allocation, the chief executive must have regard to—\nthe terms or conditions stated in the existing authorisation; and\nif there were water sharing rules for the existing authorisation—the water sharing rules.\n- (a) the terms or conditions stated in the existing authorisation; and\n- (b) if there were water sharing rules for the existing authorisation—the water sharing rules.","sortOrder":89},{"sectionNumber":"sec.69","sectionType":"section","heading":"Nominal volume","content":"### sec.69 Nominal volume\n\nThe nominal volume for the water allocation is the volume, in megalitres, calculated by multiplying the irrigated area for the existing authorisation, in hectares, by 6.","sortOrder":90},{"sectionNumber":"sec.70","sectionType":"section","heading":"Volumetric limit","content":"### sec.70 Volumetric limit\n\nThe volumetric limit for the water allocation is the volume, in megalitres, calculated by multiplying the irrigated area for the existing authorisation, in hectares, by 6.","sortOrder":91},{"sectionNumber":"sec.71","sectionType":"section","heading":"Maximum rate for taking water","content":"### sec.71 Maximum rate for taking water\n\nThe maximum rate for the water allocation must be—\nif the existing authorisation stated a maximum rate at which water was able to be taken under the existing authorisation—based on that maximum rate; or\nif a development permit for the existing authorisation stated a pump size—based on the pump size; or\notherwise—decided by the chief executive.\nSee also the Water Regulation 2016 , sections&#160;50 to 52 .\nHowever, if subsection&#160;(1) (a) and (b) both apply in relation to the water allocation, the maximum rate for the water allocation must be based on the matter mentioned in subsection&#160;(1) (a) or (b) that results in the lesser maximum rate.\nFor the Water Regulation 2016 , section&#160;51 (2) , the maximum rate is to be in megalitres per day.\nFor the Water Regulation 2016 , section&#160;52 (2) (c) , the other criteria are—\nthe terms or conditions under which water was able to be taken under the existing authorisation; and\na condition of any other water entitlement, or any other authorisation, that limited the total rate for taking water under the existing authorisation.\nIn this section—\ndevelopment permit , for an existing authorisation, means a development permit under the Planning Act for works for taking water under the authorisation.\n(sec.71-ssec.1) The maximum rate for the water allocation must be— if the existing authorisation stated a maximum rate at which water was able to be taken under the existing authorisation—based on that maximum rate; or if a development permit for the existing authorisation stated a pump size—based on the pump size; or otherwise—decided by the chief executive. See also the Water Regulation 2016 , sections&#160;50 to 52 .\n(sec.71-ssec.2) However, if subsection&#160;(1) (a) and (b) both apply in relation to the water allocation, the maximum rate for the water allocation must be based on the matter mentioned in subsection&#160;(1) (a) or (b) that results in the lesser maximum rate.\n(sec.71-ssec.3) For the Water Regulation 2016 , section&#160;51 (2) , the maximum rate is to be in megalitres per day.\n(sec.71-ssec.4) For the Water Regulation 2016 , section&#160;52 (2) (c) , the other criteria are— the terms or conditions under which water was able to be taken under the existing authorisation; and a condition of any other water entitlement, or any other authorisation, that limited the total rate for taking water under the existing authorisation.\n(sec.71-ssec.5) In this section— development permit , for an existing authorisation, means a development permit under the Planning Act for works for taking water under the authorisation.\n- (a) if the existing authorisation stated a maximum rate at which water was able to be taken under the existing authorisation—based on that maximum rate; or\n- (b) if a development permit for the existing authorisation stated a pump size—based on the pump size; or\n- (c) otherwise—decided by the chief executive.\n- (a) the terms or conditions under which water was able to be taken under the existing authorisation; and\n- (b) a condition of any other water entitlement, or any other authorisation, that limited the total rate for taking water under the existing authorisation.","sortOrder":92},{"sectionNumber":"pt.11-div.2","sectionType":"division","heading":"Underground water","content":"## Underground water","sortOrder":93},{"sectionNumber":"sec.72","sectionType":"section","heading":"Water allocation groups— Act , sch&#160;4","content":"### sec.72 Water allocation groups— Act , sch&#160;4\n\nFor schedule&#160;4 of the Act , definition water allocation group , a group of water allocations is a water allocation group, for underground water, if each water allocation—\nstates the same water allocation group mentioned in schedule&#160;8 , column 2 (the water allocation group identifier ); and\npermits underground water to which this plan applies to be taken for the purpose mentioned in schedule&#160;8 , column 5 opposite the water allocation group identifier.\n- (a) states the same water allocation group mentioned in schedule&#160;8 , column 2 (the water allocation group identifier ); and\n- (b) permits underground water to which this plan applies to be taken for the purpose mentioned in schedule&#160;8 , column 5 opposite the water allocation group identifier.","sortOrder":94},{"sectionNumber":"sec.73","sectionType":"section","heading":"Amending water allocation held by CEWH— Act , s&#160;150","content":"### sec.73 Amending water allocation held by CEWH— Act , s&#160;150\n\nThis section applies to a water allocation for underground water to which this plan applies held by CEWH.\nFor section&#160;150 (1) (a) of the Act , the water allocation must be amended to ensure the purpose for taking the underground water is ‘productive base’.\n(sec.73-ssec.1) This section applies to a water allocation for underground water to which this plan applies held by CEWH.\n(sec.73-ssec.2) For section&#160;150 (1) (a) of the Act , the water allocation must be amended to ensure the purpose for taking the underground water is ‘productive base’.","sortOrder":95},{"sectionNumber":"sec.74","sectionType":"section","heading":"Purpose of subdivision","content":"### sec.74 Purpose of subdivision\n\nThis subdivision states, for section&#160;43 (2) (g) of the Act , arrangements and processes for converting, under a water entitlement notice for this plan, particular authorisations to water allocations to take underground water to which this plan applies.","sortOrder":96},{"sectionNumber":"sec.75","sectionType":"section","heading":"Authorisations may be converted to water allocations","content":"### sec.75 Authorisations may be converted to water allocations\n\nA water entitlement notice may, under section&#160;70 (1) (a) of the Act , implement this plan by providing for the conversion of an existing authorisation, to take underground water to which this plan applies from an underground water sub-area, to a water allocation stated in the notice to take underground water to which this plan applies from the same underground water sub-area.\nIn this section—\nexisting authorisation means a water licence—\nto take underground water from any of the following underground water sub-areas—\nOakey Creek Alluvium;\nDalrymple Creek Alluvium;\nCunningham Alluvium; and\nunder which water is taken for purposes other than stock purposes or domestic purposes; and\nthat does not have a nominal entitlement of 0ML.\n(sec.75-ssec.1) A water entitlement notice may, under section&#160;70 (1) (a) of the Act , implement this plan by providing for the conversion of an existing authorisation, to take underground water to which this plan applies from an underground water sub-area, to a water allocation stated in the notice to take underground water to which this plan applies from the same underground water sub-area.\n(sec.75-ssec.2) In this section— existing authorisation means a water licence— to take underground water from any of the following underground water sub-areas— Oakey Creek Alluvium; Dalrymple Creek Alluvium; Cunningham Alluvium; and under which water is taken for purposes other than stock purposes or domestic purposes; and that does not have a nominal entitlement of 0ML.\n- (a) to take underground water from any of the following underground water sub-areas— (i) Oakey Creek Alluvium; (ii) Dalrymple Creek Alluvium; (iii) Cunningham Alluvium; and\n- (i) Oakey Creek Alluvium;\n- (ii) Dalrymple Creek Alluvium;\n- (iii) Cunningham Alluvium; and\n- (b) under which water is taken for purposes other than stock purposes or domestic purposes; and\n- (c) that does not have a nominal entitlement of 0ML.\n- (i) Oakey Creek Alluvium;\n- (ii) Dalrymple Creek Alluvium;\n- (iii) Cunningham Alluvium; and","sortOrder":97},{"sectionNumber":"sec.76","sectionType":"section","heading":"Purpose for taking water","content":"### sec.76 Purpose for taking water\n\nThe purpose for taking water under the water allocation must be ‘any’, ‘productive base’ or ‘urban’.","sortOrder":98},{"sectionNumber":"sec.77","sectionType":"section","heading":"Location for taking water","content":"### sec.77 Location for taking water\n\nThe chief executive must decide the location from which water may be taken under the water allocation having regard to—\nthe location of works used to take water under the existing authorisation; and\nthe centre of the land to which the existing authorisation attached.\nThe water allocation must state the latitude and longitude of the location from which water may be taken under the allocation.\nSubsection&#160;(2) does not apply if the holder of the water allocation is CEWH.\n(sec.77-ssec.1) The chief executive must decide the location from which water may be taken under the water allocation having regard to— the location of works used to take water under the existing authorisation; and the centre of the land to which the existing authorisation attached.\n(sec.77-ssec.2) The water allocation must state the latitude and longitude of the location from which water may be taken under the allocation.\n(sec.77-ssec.3) Subsection&#160;(2) does not apply if the holder of the water allocation is CEWH.\n- (a) the location of works used to take water under the existing authorisation; and\n- (b) the centre of the land to which the existing authorisation attached.","sortOrder":99},{"sectionNumber":"sec.78","sectionType":"section","heading":"Conditions for taking water","content":"### sec.78 Conditions for taking water\n\nIn deciding the conditions on which underground water may be taken under the water allocation, the chief executive must have regard to the conditions stated in the existing authorisation.","sortOrder":100},{"sectionNumber":"sec.79","sectionType":"section","heading":"Volumetric limit","content":"### sec.79 Volumetric limit\n\nThe volumetric limit for the water allocation must be equal to the nominal entitlement stated in the existing authorisation.","sortOrder":101},{"sectionNumber":"sec.80","sectionType":"section","heading":"Nominal volume","content":"### sec.80 Nominal volume\n\nThe nominal volume for the water allocation must be decided by the chief executive having regard to the available water ratio stated in schedule&#160;8 , column 3 opposite the water allocation’s water allocation group.","sortOrder":102},{"sectionNumber":"pt.12","sectionType":"part","heading":"Miscellaneous","content":"# Miscellaneous","sortOrder":103},{"sectionNumber":"sec.81","sectionType":"section","heading":"Requirement to make and keep records of contaminated agricultural run-off taken","content":"### sec.81 Requirement to make and keep records of contaminated agricultural run-off taken\n\nThis section applies to a person who takes overland flow water to which this plan applies if—\nthe water is contaminated agricultural run-off; and\nthe person takes the contaminated agricultural run-off to comply with an obligation on the person under the Environmental Protection Act 1994 .\nSee section&#160;101 of the Act .\nThe person must make a record of the following matters—\nthe volume of contaminated agricultural run-off taken;\nthe date and nature of the activity or event that caused the contaminated agricultural run-off;\nrainfall, irrigation, spills\nanother matter stated for this section in the water management protocol for this plan.\nThe person must keep the record for 5 years.\nSee section&#160;35 of the Act for when the chief executive may give a person authorised to take water under the Act a notice requiring information about the water taken under the person’s authority.\nSee section&#160;760 of the Act for when an authorised officer may require a person to make available for inspection a document relating to the taking of water.\n(sec.81-ssec.1) This section applies to a person who takes overland flow water to which this plan applies if— the water is contaminated agricultural run-off; and the person takes the contaminated agricultural run-off to comply with an obligation on the person under the Environmental Protection Act 1994 . See section&#160;101 of the Act .\n(sec.81-ssec.2) The person must make a record of the following matters— the volume of contaminated agricultural run-off taken; the date and nature of the activity or event that caused the contaminated agricultural run-off; rainfall, irrigation, spills another matter stated for this section in the water management protocol for this plan.\n(sec.81-ssec.3) The person must keep the record for 5 years. See section&#160;35 of the Act for when the chief executive may give a person authorised to take water under the Act a notice requiring information about the water taken under the person’s authority. See section&#160;760 of the Act for when an authorised officer may require a person to make available for inspection a document relating to the taking of water.\n- (a) the water is contaminated agricultural run-off; and\n- (b) the person takes the contaminated agricultural run-off to comply with an obligation on the person under the Environmental Protection Act 1994 .\n- (a) the volume of contaminated agricultural run-off taken;\n- (b) the date and nature of the activity or event that caused the contaminated agricultural run-off; Examples of activities or events that may cause contaminated agricultural run-off— rainfall, irrigation, spills\n- (c) another matter stated for this section in the water management protocol for this plan.\n- 1 See section&#160;35 of the Act for when the chief executive may give a person authorised to take water under the Act a notice requiring information about the water taken under the person’s authority.\n- 2 See section&#160;760 of the Act for when an authorised officer may require a person to make available for inspection a document relating to the taking of water.","sortOrder":104},{"sectionNumber":"sec.82","sectionType":"section","heading":"Water management protocol— Act , s&#160;43","content":"### sec.82 Water management protocol— Act , s&#160;43\n\nFor section&#160;43 (2) (l) of the Act , a water management protocol must be prepared for the plan area.\nThe water management protocol must state the following matters for the plan area—\nthe volumes of unallocated water reserved for stated purposes or stated locations;\nthe criteria and process for deciding applications for a seasonal water assignment or for relocation of a water licence;\nfor water allocations managed under a resource operations licence—the water allocation dealing rules;\nfor water allocations not managed under a resource operations licence—\nthe seasonal water assignment rules; and\nthe water allocation dealing rules; and\nthe water sharing rules;\nwater sharing rules for water licences to take water in the Upper Condamine Alluvium (Central Condamine Alluvium) underground water unit;\nmonitoring requirements for water and natural ecosystems;\narrangements for managing flows in the Lower Balonne to enhance the environmental water plan outcomes for this plan stated in section&#160;22 ;\nif practicable, arrangements for the protection of held environmental water passing through the Lower Balonne water management area.\nThe water management protocol may state the following matters for the plan area—\nthe arrangements for interstate trading between the State and New South Wales;\na process for conducting an underground water impact assessment in relation to—\na proposed dealing with a water licence; or\na proposed water allocation dealing;\na matter for which a record must be made and kept under section&#160;81 .\nSubsections&#160;(1) to (3) do not limit the matters that may be stated in the water management protocol.\nIn this section—\nheld environmental water means water authorised to be taken under a water entitlement held only to provide environmental benefit.\na water entitlement held by CEWH\na water entitlement held only for protecting and restoring the health of Murray-Darling Basin ecosystems\nunderground water impact assessment , in relation to a proposed dealing mentioned in subsection&#160;(3) (b) (i) or (ii) , means an impact assessment carried out to work out whether the impact of approving the proposed dealing on holders of other water entitlements is unacceptable.\n(sec.82-ssec.1) For section&#160;43 (2) (l) of the Act , a water management protocol must be prepared for the plan area.\n(sec.82-ssec.2) The water management protocol must state the following matters for the plan area— the volumes of unallocated water reserved for stated purposes or stated locations; the criteria and process for deciding applications for a seasonal water assignment or for relocation of a water licence; for water allocations managed under a resource operations licence—the water allocation dealing rules; for water allocations not managed under a resource operations licence— the seasonal water assignment rules; and the water allocation dealing rules; and the water sharing rules; water sharing rules for water licences to take water in the Upper Condamine Alluvium (Central Condamine Alluvium) underground water unit; monitoring requirements for water and natural ecosystems; arrangements for managing flows in the Lower Balonne to enhance the environmental water plan outcomes for this plan stated in section&#160;22 ; if practicable, arrangements for the protection of held environmental water passing through the Lower Balonne water management area.\n(sec.82-ssec.3) The water management protocol may state the following matters for the plan area— the arrangements for interstate trading between the State and New South Wales; a process for conducting an underground water impact assessment in relation to— a proposed dealing with a water licence; or a proposed water allocation dealing; a matter for which a record must be made and kept under section&#160;81 .\n(sec.82-ssec.4) Subsections&#160;(1) to (3) do not limit the matters that may be stated in the water management protocol.\n(sec.82-ssec.5) In this section— held environmental water means water authorised to be taken under a water entitlement held only to provide environmental benefit. a water entitlement held by CEWH a water entitlement held only for protecting and restoring the health of Murray-Darling Basin ecosystems underground water impact assessment , in relation to a proposed dealing mentioned in subsection&#160;(3) (b) (i) or (ii) , means an impact assessment carried out to work out whether the impact of approving the proposed dealing on holders of other water entitlements is unacceptable.\n- (a) the volumes of unallocated water reserved for stated purposes or stated locations;\n- (b) the criteria and process for deciding applications for a seasonal water assignment or for relocation of a water licence;\n- (c) for water allocations managed under a resource operations licence—the water allocation dealing rules;\n- (d) for water allocations not managed under a resource operations licence— (i) the seasonal water assignment rules; and (ii) the water allocation dealing rules; and (iii) the water sharing rules;\n- (i) the seasonal water assignment rules; and\n- (ii) the water allocation dealing rules; and\n- (iii) the water sharing rules;\n- (e) water sharing rules for water licences to take water in the Upper Condamine Alluvium (Central Condamine Alluvium) underground water unit;\n- (f) monitoring requirements for water and natural ecosystems;\n- (g) arrangements for managing flows in the Lower Balonne to enhance the environmental water plan outcomes for this plan stated in section&#160;22 ;\n- (h) if practicable, arrangements for the protection of held environmental water passing through the Lower Balonne water management area.\n- (i) the seasonal water assignment rules; and\n- (ii) the water allocation dealing rules; and\n- (iii) the water sharing rules;\n- (a) the arrangements for interstate trading between the State and New South Wales;\n- (b) a process for conducting an underground water impact assessment in relation to— (i) a proposed dealing with a water licence; or (ii) a proposed water allocation dealing;\n- (i) a proposed dealing with a water licence; or\n- (ii) a proposed water allocation dealing;\n- (c) a matter for which a record must be made and kept under section&#160;81 .\n- (i) a proposed dealing with a water licence; or\n- (ii) a proposed water allocation dealing;\n- • a water entitlement held by CEWH\n- • a water entitlement held only for protecting and restoring the health of Murray-Darling Basin ecosystems","sortOrder":105},{"sectionNumber":"sec.83","sectionType":"section","heading":"Managing flows in Lower Balonne","content":"### sec.83 Managing flows in Lower Balonne\n\nIn deciding the arrangements for section&#160;82 (2) (h) , the chief executive must have regard to the following—\nmaximising environmental benefits and the reliability of supply of water for stock purposes and domestic purposes;\nimproving flows that mimic the natural variability of the river system and floodplains;\nimproving water availability for bird breeding at the Narran Lake Ramsar site.\n- (a) maximising environmental benefits and the reliability of supply of water for stock purposes and domestic purposes;\n- (b) improving flows that mimic the natural variability of the river system and floodplains;\n- (c) improving water availability for bird breeding at the Narran Lake Ramsar site.","sortOrder":106},{"sectionNumber":"sec.84","sectionType":"section","heading":"Arrangements for interstate trading","content":"### sec.84 Arrangements for interstate trading\n\nIn deciding the arrangements for interstate trading between the State and New South Wales mentioned in section&#160;82 (3) (a) , the chief executive must ensure the arrangements are consistent with—\nthe water plan outcomes stated in part&#160;3 ; and\nthe measures for achieving the water plan outcomes stated in part&#160;4 ; and\nthe environmental flow objectives and water allocation security objectives stated in part&#160;5 .\n- (a) the water plan outcomes stated in part&#160;3 ; and\n- (b) the measures for achieving the water plan outcomes stated in part&#160;4 ; and\n- (c) the environmental flow objectives and water allocation security objectives stated in part&#160;5 .","sortOrder":107},{"sectionNumber":"sec.85","sectionType":"section","heading":"Amendments to plan that may be made without consultation— Act , s&#160;43","content":"### sec.85 Amendments to plan that may be made without consultation— Act , s&#160;43\n\nFor section&#160;43 (2) (m) of the Act , the following amendments may be made to this plan without public consultation—\nan amendment or addition of an environmental flow objective or a water allocation security objective, or a performance indicator for an objective, if the amendment or addition achieves an equivalent or improved environmental flow and water allocation security outcome;\nan amendment or addition of a node;\nan amendment to adjust the boundaries of the following areas if more accurate information about the boundaries, or hydrological characteristics, of the plan area becomes available—\na water management area;\nthe underground water management area;\nan underground water sub-area;\nthe plan area;\nan amendment to change the name of an underground water unit, or to change an underground water sub-unit within an underground water unit, if more accurate information about the hydrological characteristics of the underground water unit or the underground water sub-unit becomes available;\nan amendment to remove a provision of this plan that no longer has effect.\n- (a) an amendment or addition of an environmental flow objective or a water allocation security objective, or a performance indicator for an objective, if the amendment or addition achieves an equivalent or improved environmental flow and water allocation security outcome;\n- (b) an amendment or addition of a node;\n- (c) an amendment to adjust the boundaries of the following areas if more accurate information about the boundaries, or hydrological characteristics, of the plan area becomes available— (i) a water management area; (ii) the underground water management area; (iii) an underground water sub-area; (iv) the plan area;\n- (i) a water management area;\n- (ii) the underground water management area;\n- (iii) an underground water sub-area;\n- (iv) the plan area;\n- (d) an amendment to change the name of an underground water unit, or to change an underground water sub-unit within an underground water unit, if more accurate information about the hydrological characteristics of the underground water unit or the underground water sub-unit becomes available;\n- (e) an amendment to remove a provision of this plan that no longer has effect.\n- (i) a water management area;\n- (ii) the underground water management area;\n- (iii) an underground water sub-area;\n- (iv) the plan area;","sortOrder":108},{"sectionNumber":"pt.13","sectionType":"part","heading":"Expiry and transitional provisions","content":"# Expiry and transitional provisions","sortOrder":109},{"sectionNumber":"pt.13-div.1","sectionType":"division","heading":"Expiry of water plan","content":"## Expiry of water plan","sortOrder":110},{"sectionNumber":"sec.86","sectionType":"section","heading":"Declaration of replacement of water plan— Act , s&#160;1236","content":"### sec.86 Declaration of replacement of water plan— Act , s&#160;1236\n\nFor section&#160;1236 (3) of the Act , this plan replaces the Water Plan (Condamine and Balonne) 2004 .","sortOrder":111},{"sectionNumber":"pt.13-div.2","sectionType":"division","heading":"Transitional provisions","content":"## Transitional provisions","sortOrder":112},{"sectionNumber":"sec.87","sectionType":"section","heading":"Applications for water licences made before commencement","content":"### sec.87 Applications for water licences made before commencement\n\nThis section applies to an application for a water licence, to take or interfere with water to which the repealed Water Plan (Condamine and Balonne) 2004 applied, that was made, but not decided, before the commencement.\nIf the chief executive would not, under section&#160;42, be able to accept the application had it been made after the commencement, the application is of no effect and is taken not to have been made.\nIf the chief executive would be permitted, under section&#160;42, to accept the application had it been made after the commencement, the application is to be decided under this plan.\n(sec.87-ssec.1) This section applies to an application for a water licence, to take or interfere with water to which the repealed Water Plan (Condamine and Balonne) 2004 applied, that was made, but not decided, before the commencement.\n(sec.87-ssec.2) If the chief executive would not, under section&#160;42, be able to accept the application had it been made after the commencement, the application is of no effect and is taken not to have been made.\n(sec.87-ssec.3) If the chief executive would be permitted, under section&#160;42, to accept the application had it been made after the commencement, the application is to be decided under this plan.","sortOrder":113},{"sectionNumber":"sec.88","sectionType":"section","heading":"Applications for dealing with water licences made before commencement","content":"### sec.88 Applications for dealing with water licences made before commencement\n\nThis section applies to an application for a dealing with a water licence, to take or interfere with water to which the repealed Water Plan (Condamine and Balonne) 2004 applied, if the application was made, but not decided, before the commencement.\nIf the granting of the application would be inconsistent with this plan had it been made after the commencement, the application is inconsistent with this plan.\nSee section&#160;129 of the Act for the actions the chief executive must take if granting an application for a dealing with a water licence would be inconsistent with a water plan.\nIf the granting of the application would not be inconsistent with this plan had it been made after the commencement, the application is to be decided under this plan.\n(sec.88-ssec.1) This section applies to an application for a dealing with a water licence, to take or interfere with water to which the repealed Water Plan (Condamine and Balonne) 2004 applied, if the application was made, but not decided, before the commencement.\n(sec.88-ssec.2) If the granting of the application would be inconsistent with this plan had it been made after the commencement, the application is inconsistent with this plan. See section&#160;129 of the Act for the actions the chief executive must take if granting an application for a dealing with a water licence would be inconsistent with a water plan.\n(sec.88-ssec.3) If the granting of the application would not be inconsistent with this plan had it been made after the commencement, the application is to be decided under this plan.","sortOrder":114},{"sectionNumber":"sch.1-pt.1","sectionType":"part","heading":"Plan area and nodes","content":"# Plan area and nodes","sortOrder":115},{"sectionNumber":"sch.1-pt.2","sectionType":"part","heading":"Modelled locations of nodes","content":"# Modelled locations of nodes","sortOrder":116},{"sectionNumber":"sch.2-pt.1","sectionType":"part","heading":"Map of water supply schemes","content":"# Map of water supply schemes","sortOrder":117},{"sectionNumber":"sch.2-pt.2","sectionType":"part","heading":"Description of water supply scheme zones","content":"# Description of water supply scheme zones","sortOrder":118},{"sectionNumber":"sch.3-pt.1","sectionType":"part","heading":"Water management areas","content":"# Water management areas","sortOrder":119},{"sectionNumber":"sch.3-pt.2","sectionType":"part","heading":"Upper Condamine water management area—water management area zones","content":"# Upper Condamine water management area—water management area zones","sortOrder":120},{"sectionNumber":"sch.3-pt.3","sectionType":"part","heading":"Condamine and Balonne water management area—water management area zones","content":"# Condamine and Balonne water management area—water management area zones","sortOrder":121},{"sectionNumber":"sch.3-pt.4","sectionType":"part","heading":"Lower Balonne water management area—water management area zones","content":"# Lower Balonne water management area—water management area zones","sortOrder":122},{"sectionNumber":"sch.3-pt.5","sectionType":"part","heading":"Condamine and Balonne Tributaries water management area—water management area zones","content":"# Condamine and Balonne Tributaries water management area—water management area zones","sortOrder":123},{"sectionNumber":"sch.3-pt.6","sectionType":"part","heading":"Gowrie and Oakey Creek water management area—water management area zones","content":"# Gowrie and Oakey Creek water management area—water management area zones","sortOrder":124},{"sectionNumber":"sch.6-pt.1","sectionType":"part","heading":"Central Condamine Alluvium","content":"# Central Condamine Alluvium","sortOrder":125},{"sectionNumber":"sch.6-pt.2","sectionType":"part","heading":"Cunningham Alluvium, Dalrymple Creek Alluvium, Oakey Creek Alluvium and Upper Hodgson Creek Basalts","content":"# Cunningham Alluvium, Dalrymple Creek Alluvium, Oakey Creek Alluvium and Upper Hodgson Creek Basalts","sortOrder":126},{"sectionNumber":"sch.7-pt.1","sectionType":"part","heading":"Surface water","content":"# Surface water","sortOrder":127},{"sectionNumber":"sch.7-sec.1","sectionType":"section","heading":"Mean annual flow","content":"### sch.7-sec.1 Mean annual flow\n\nAn environmental flow objective for surface water to which this plan applies is that the performance indicator mentioned in subsection&#160;(2) is not less than what the performance indicator was immediately before the commencement.\nThe performance indicator, for nodes A, B, C, D, E and L, is the mean annual flow at each node as a percentage of the pre-development flow for the node.\nIn this section—\nmean annual flow , at a node, means the total volume of flow of water at the node in the simulation period, divided by the number of years in the simulation period.\npre-development flow , for a node, means the mean annual flow at the node simulated as if—\nthere were no dams or other water infrastructure in the plan area; and\nno water had been taken under authorisations in the plan area.\n(sch.7-sec.1-ssec.1) An environmental flow objective for surface water to which this plan applies is that the performance indicator mentioned in subsection&#160;(2) is not less than what the performance indicator was immediately before the commencement.\n(sch.7-sec.1-ssec.2) The performance indicator, for nodes A, B, C, D, E and L, is the mean annual flow at each node as a percentage of the pre-development flow for the node.\n(sch.7-sec.1-ssec.3) In this section— mean annual flow , at a node, means the total volume of flow of water at the node in the simulation period, divided by the number of years in the simulation period. pre-development flow , for a node, means the mean annual flow at the node simulated as if— there were no dams or other water infrastructure in the plan area; and no water had been taken under authorisations in the plan area.\n- (a) there were no dams or other water infrastructure in the plan area; and\n- (b) no water had been taken under authorisations in the plan area.","sortOrder":128},{"sectionNumber":"sch.7-sec.2","sectionType":"section","heading":"Days in no-flow periods to support waterhole persistence","content":"### sch.7-sec.2 Days in no-flow periods to support waterhole persistence\n\nAn environmental flow objective for surface water to which this plan applies is that the performance indicator mentioned in subsection&#160;(2) is not more than what the performance indicator was immediately before the commencement.\nThe performance indicator, for nodes A to L, is the total number of days in all no-flow periods at each node as a percentage of the total number of days in the simulation period.\nIn this section—\nno-flow period means a continuous period—\nthat is greater than—\nfor nodes A to F and H—1.5 years; or\nfor node G—1.1 years; or\nfor nodes I and J—1.4 years; or\nfor node K—0.9 years; or\nfor node L—0.5 years; and\nthat is during the simulation period; and\nduring which daily water flows at the node are no more than 5ML.\n(sch.7-sec.2-ssec.1) An environmental flow objective for surface water to which this plan applies is that the performance indicator mentioned in subsection&#160;(2) is not more than what the performance indicator was immediately before the commencement.\n(sch.7-sec.2-ssec.2) The performance indicator, for nodes A to L, is the total number of days in all no-flow periods at each node as a percentage of the total number of days in the simulation period.\n(sch.7-sec.2-ssec.3) In this section— no-flow period means a continuous period— that is greater than— for nodes A to F and H—1.5 years; or for node G—1.1 years; or for nodes I and J—1.4 years; or for node K—0.9 years; or for node L—0.5 years; and that is during the simulation period; and during which daily water flows at the node are no more than 5ML.\n- (a) that is greater than— (i) for nodes A to F and H—1.5 years; or (ii) for node G—1.1 years; or (iii) for nodes I and J—1.4 years; or (iv) for node K—0.9 years; or (v) for node L—0.5 years; and\n- (i) for nodes A to F and H—1.5 years; or\n- (ii) for node G—1.1 years; or\n- (iii) for nodes I and J—1.4 years; or\n- (iv) for node K—0.9 years; or\n- (v) for node L—0.5 years; and\n- (b) that is during the simulation period; and\n- (c) during which daily water flows at the node are no more than 5ML.\n- (i) for nodes A to F and H—1.5 years; or\n- (ii) for node G—1.1 years; or\n- (iii) for nodes I and J—1.4 years; or\n- (iv) for node K—0.9 years; or\n- (v) for node L—0.5 years; and","sortOrder":129},{"sectionNumber":"sch.7-sec.3","sectionType":"section","heading":"Days between fish migration flow events","content":"### sch.7-sec.3 Days between fish migration flow events\n\nAn environmental flow objective for surface water to which this plan applies is that the performance indicator mentioned in subsection&#160;(2) is not more than what the performance indicator was immediately before the commencement.\nThe performance indicator, for nodes A to L, is the total number of days in all intervening periods for each node as a percentage of the total number of days in the simulation period.\nIn this section—\nfish migration flow event , for a node, means a continuous period of 1 or more days, between 1 September of a year and 31 May of the next year—\nstarting when the daily water flow at the node is more than the fish movement threshold stated for the node in the following table; and\nending when the daily water flow at the node is less than the fish movement threshold stated for the node in the following table.\nintervening period , for a node, means a period between fish migration flow events for the node that is—\ngreater than the number of years stated for the node in the following table; and\nduring the simulation period.\nNode\nYears\nFish movement threshold (ML/day)\nA\n1.5\n1,500\nB\n1.5\n690\nC\n1.5\n320\nD\n1.5\n1,000\nE\n1.5\n2,100\nF\n1.5\n7,800\nG\n1.1\n2,100\nH\n1.5\n21,000\nI\n1.4\n6,500\nJ\n1.4\n8,000\nK\n0.9\n5,300\nL\n0.5\n2,400\n(sch.7-sec.3-ssec.1) An environmental flow objective for surface water to which this plan applies is that the performance indicator mentioned in subsection&#160;(2) is not more than what the performance indicator was immediately before the commencement.\n(sch.7-sec.3-ssec.2) The performance indicator, for nodes A to L, is the total number of days in all intervening periods for each node as a percentage of the total number of days in the simulation period.\n(sch.7-sec.3-ssec.3) In this section— fish migration flow event , for a node, means a continuous period of 1 or more days, between 1 September of a year and 31 May of the next year— starting when the daily water flow at the node is more than the fish movement threshold stated for the node in the following table; and ending when the daily water flow at the node is less than the fish movement threshold stated for the node in the following table. intervening period , for a node, means a period between fish migration flow events for the node that is— greater than the number of years stated for the node in the following table; and during the simulation period. Node Years Fish movement threshold (ML/day) A 1.5 1,500 B 1.5 690 C 1.5 320 D 1.5 1,000 E 1.5 2,100 F 1.5 7,800 G 1.1 2,100 H 1.5 21,000 I 1.4 6,500 J 1.4 8,000 K 0.9 5,300 L 0.5 2,400\n- (a) starting when the daily water flow at the node is more than the fish movement threshold stated for the node in the following table; and\n- (b) ending when the daily water flow at the node is less than the fish movement threshold stated for the node in the following table.\n- (a) greater than the number of years stated for the node in the following table; and\n- (b) during the simulation period.","sortOrder":130},{"sectionNumber":"sch.7-sec.4","sectionType":"section","heading":"Days between floodplain inundation events","content":"### sch.7-sec.4 Days between floodplain inundation events\n\nAn environmental flow objective for surface water to which this plan applies is that the performance indicator mentioned in subsection&#160;(2) is not more than what the performance indicator was immediately before the commencement.\nThe performance indicator, for nodes A to L, is the total number of days in all intervening periods for each node as a percentage of the total number of days in the simulation period.\nIn this section—\nfloodplain inundation event , for a node, means a daily water flow at the node that is equal to or more than the flow rate at which the floodplain starts to fill, as stated for the node in the following table.\nintervening period , for a node, means a continuous period of more than 4 years and 7 months, during the simulation period, between floodplain inundation events for the node.\nNode\nFill commencement threshold (ML/day)\nA\n8,400\nB\n6,100\nC\n10,000\nD\n7,100\nE\n17,000\nF\n82,000\nG\n2,300\nH\n47,000\nI\n22,000\nJ\n19,000\nK\n52,000\nL\n23,000\n(sch.7-sec.4-ssec.1) An environmental flow objective for surface water to which this plan applies is that the performance indicator mentioned in subsection&#160;(2) is not more than what the performance indicator was immediately before the commencement.\n(sch.7-sec.4-ssec.2) The performance indicator, for nodes A to L, is the total number of days in all intervening periods for each node as a percentage of the total number of days in the simulation period.\n(sch.7-sec.4-ssec.3) In this section— floodplain inundation event , for a node, means a daily water flow at the node that is equal to or more than the flow rate at which the floodplain starts to fill, as stated for the node in the following table. intervening period , for a node, means a continuous period of more than 4 years and 7 months, during the simulation period, between floodplain inundation events for the node. Node Fill commencement threshold (ML/day) A 8,400 B 6,100 C 10,000 D 7,100 E 17,000 F 82,000 G 2,300 H 47,000 I 22,000 J 19,000 K 52,000 L 23,000","sortOrder":131},{"sectionNumber":"sch.7-sec.5","sectionType":"section","heading":"Days with river-forming flow","content":"### sch.7-sec.5 Days with river-forming flow\n\nAn environmental flow objective for surface water to which this plan applies is that the performance indicator mentioned in subsection&#160;(2) is not less than what the performance indicator was immediately before the commencement.\nThe performance indicator, for nodes A to L, is the total number of days with a river-forming flow at each node as a percentage of the total number of days in the simulation period.\nIn this section—\nriver-forming flow , at a node, means a daily water flow at the node that is more than the flow threshold stated for the node in the following table.\nNode\nFlow threshold (ML/day)\nA\n8,400\nB\n6,100\nC\n610\nD\n2,600\nE\n6,000\nF\n34,000\nG\n2,300\nH\n43,000\nI\n22,000\nJ\n19,000\nK\n52,000\nL\n23,000\n(sch.7-sec.5-ssec.1) An environmental flow objective for surface water to which this plan applies is that the performance indicator mentioned in subsection&#160;(2) is not less than what the performance indicator was immediately before the commencement.\n(sch.7-sec.5-ssec.2) The performance indicator, for nodes A to L, is the total number of days with a river-forming flow at each node as a percentage of the total number of days in the simulation period.\n(sch.7-sec.5-ssec.3) In this section— river-forming flow , at a node, means a daily water flow at the node that is more than the flow threshold stated for the node in the following table. Node Flow threshold (ML/day) A 8,400 B 6,100 C 610 D 2,600 E 6,000 F 34,000 G 2,300 H 43,000 I 22,000 J 19,000 K 52,000 L 23,000","sortOrder":132},{"sectionNumber":"sch.7-pt.2","sectionType":"part","heading":"Underground water","content":"# Underground water","sortOrder":133},{"sectionNumber":"sch.7-sec.6","sectionType":"section","heading":"Productive base","content":"### sch.7-sec.6 Productive base\n\nAn environmental flow objective for underground water to which this plan applies is that, at nodes M, N and O, the performance indicator mentioned in subsection&#160;(2) is at least the water level stated for each node in the following table.\nNode\n10th percentile water level (mAHD)\nM\n467\nN\n423.8\nO\n374.8\nThe performance indicator, for nodes M, N and O, is the 10 th percentile water level during the simulation period.\n(sch.7-sec.6-ssec.1) An environmental flow objective for underground water to which this plan applies is that, at nodes M, N and O, the performance indicator mentioned in subsection&#160;(2) is at least the water level stated for each node in the following table. Node 10th percentile water level (mAHD) M 467 N 423.8 O 374.8\n(sch.7-sec.6-ssec.2) The performance indicator, for nodes M, N and O, is the 10 th percentile water level during the simulation period.","sortOrder":134},{"sectionNumber":"sch.7-sec.7","sectionType":"section","heading":"Base flow","content":"### sch.7-sec.7 Base flow\n\nAn environmental flow objective for underground water to which this plan applies is that, at nodes M, N and O, the performance indicator mentioned in subsection&#160;(2) is at least the water level stated for each node in the following table.\nNode\n90th percentile water level (mAHD)\nM\n467.9\nN\n425.3\nO\n379.1\nThe performance indicator, for nodes M, N and O, is the 90 th percentile water level during the simulation period.\n(sch.7-sec.7-ssec.1) An environmental flow objective for underground water to which this plan applies is that, at nodes M, N and O, the performance indicator mentioned in subsection&#160;(2) is at least the water level stated for each node in the following table. Node 90th percentile water level (mAHD) M 467.9 N 425.3 O 379.1\n(sch.7-sec.7-ssec.2) The performance indicator, for nodes M, N and O, is the 90 th percentile water level during the simulation period.","sortOrder":135}],"analysis":{"kimi_summary":{"_metrics":{"completionTokens":704},"content_quality":"ok","complexity_score":8,"scope_assessment":{"changed":false,"description":"The legislation appears consistent with its original purpose as a water resource plan under the Water Act 2000. It covers surface water and groundwater management, environmental flows, water trading, and allocation security — all standard elements for this type of instrument. The detailed provisions for the Upper Condamine Alluvium (Central Condamine Alluvium) reflect specific Basin Plan compliance requirements rather than scope creep."},"complexity_factors":["Extensive cross-referencing to schedules (14 schedules referenced throughout)","Multiple nested hierarchies of water management zones: water supply schemes → water management areas → zones → underground water sub-areas → underground water units → sub-units","Conditional logic with multiple exceptions (e.g., section 33 prohibitions with 3 exceptions in subsection 2)","Performance indicators requiring computer model simulations (eWater Source, MODFLOW, IQQM programs)","Detailed mathematical calculations for water entitlements involving catchment characteristics, planting rules, and usage patterns","12 distinct nodes (A–L) with individual thresholds for fish movement, floodplain inundation, and river-forming flows","8 underground water units with different rules for each, plus sub-units in the Nobby Basalts","Transition provisions dealing with applications made under the repealed 2004 plan","Definitions deferred to Schedule 14 dictionary not shown in the extract"],"plain_english_summary":"This is a **Queensland water resource plan** that manages how water is shared between farmers, towns, industries, and the environment in the **Condamine and Balonne river catchments** (part of the Murray-Darling Basin).\n\n**What it does:**\n- **Sets the rules** for who can take water from rivers, creeks, lakes, springs, and underground aquifers in the area\n- **Balances competing needs** — irrigation, town water supplies, Aboriginal cultural values, and keeping rivers healthy for fish, birds, and floodplains\n- **Creates a trading system** so water users can buy and sell water entitlements (water allocations)\n- **Protects the environment** by setting minimum flow targets at 12 different monitoring points (nodes A–L) to ensure waterholes don't dry up too long, fish can migrate, and floodplains get enough water\n- **Manages groundwater** through eight different underground water units, with special rules for the Upper Condamine Alluvium to meet federal sustainable diversion limits\n- **Limits new water take** — generally no new licences that increase total water use, with some exceptions for town water supplies and existing overland flow works\n\n**Who it affects:**\n- Farmers with irrigation licences or water allocations\n- Local governments running town water supplies\n- The **Commonwealth Environmental Water Holder** (CEWH), which gets water for environmental flows\n- Aboriginal communities with cultural and spiritual connections to water\n- Anyone taking overland flow water or groundwater from the specified aquifers\n\n**Key features:**\n- **Performance ratios** ensure water allocation security doesn't drop below historical levels\n- **Mandatory metering** for all water allocations by December 2022, and for most groundwater licences by December 2025\n- **Special provisions** for converting old licences to new water allocations in specific zones\n- **Flow management arrangements** for the Lower Balonne to support bird breeding at Narran Lakes (a Ramsar wetland)"},"issue_detection":{"absurdities":[],"contradictions":[]},"flash_summary_failed":{"failed":true,"reason":"Unauthenticated. Configure AI_GATEWAY_API_KEY or use a provider module. Learn more: https://ai-sdk.dev/unauthenticated-ai-gateway","source":"analysis-cron"},"flash_summary":{"complexity_score":8,"scope_assessment":{"changed":false,"description":"This 2019 plan replaces the 2004 Condamine and Balonne plan (sec 86). The instrument stays within the original statutory purpose—defining the plan area, allocating water, and setting environmental and allocation security objectives—but adds detailed operational and implementation mechanics to align with Basin Plan requirements and modern management practices. Additions include explicit metering deadlines, node‑based modelled performance indicators, conversion formulas for authorisations to allocations, and specific mechanics for CEWH entitlements in the Central Condamine (secs 23, 26–29, 59–60, 82). Those are operational updates rather than a material expansion beyond the plan’s core scope as a regional water‑management instrument."},"complexity_factors":["Multiple cross‑references to the Water Act and Water Regulation (frequent external dependencies)","Extensive schedules (at least 11 schedules referenced including hydrological node tables)","Defined model reliance and node‑specific thresholds (nodes A–L and M–O with numeric flow/level thresholds in sch 7)","Conditional and exception‑laden provisions (e.g. local government carve‑outs, Lower Balonne exceptions, existing works exceptions in secs 33, 36, 37, 43, 45)","Several time‑bound obligations and staged deadlines (metering by 2022/2025; monitoring strategy by 1 July 2020)","Specific, numerically bounded caps and formulas (Upper Condamine cap 46,221 ML; nominal volume calculations multiplying area by 6 ML/ha)","Multiple distinct water categories and spatial layers to track (water supply schemes, management areas, zones, underground sub‑areas and units)","Technical assessment requirement using two different modelling programs (eWater Source and MODFLOW) and allowance for approved alternatives (sec 35)","Nested administrative processes (water entitlement notices, water management protocol, conversion/amendment mechanics across parts 10–11)","Detailed licence content and conversion rules (overland flow licence content rules, volumetric limits, relocation rules, CEWH licence grant/amendment mechanics)"],"plain_english_summary":"**What this plan does (mechanics first)**\n\n- Defines the geographic area and the types of water the plan controls (surface water, most groundwater) and breaks the area into named water management areas, zones and trading zones, and into nodes used in hydrological modelling (secs 4–16, schs 1–6).\n- States explicit outcomes the plan must achieve: general, economic, social, cultural and environmental water-plan outcomes (secs 17–22). These include maintaining water availability for entitlements, supporting markets, protecting urban/domestic/stock supplies, supporting Aboriginal cultural uses, and maintaining flows and groundwater levels that support ecosystems (secs 19–22).\n- Sets measurable environmental and security objectives and the performance indicators used to check them. Those indicators are defined largely by model simulations at specified nodes and threshold values (secs 26–29; sch 7 parts 1–2).\n- Requires most water allocations and specified groundwater licences to be metered by fixed dates (all allocations by 31 Dec 2022; certain groundwater units by 31 Dec 2025) and requires the chief executive to publish a water‑use report and to prepare monitoring/evaluation arrangements (sec 23).\n- Limits on new or increased take: decisions under the Act must not increase the average volume of water that may be taken under the plan (sec 33). Specific constraints apply to overland flow, contaminated run‑off, and taking/interfering with groundwater in the underground management area (secs 36–39).\n- Establishes detailed rules for overland flow licences (purpose ‘any’, must include at least one measurable limit such as pump rate, storage or annual volume), criteria for granting them, and a process for allocation where existing works have been used historically (secs 48–54).\n- Provides processes to convert certain existing authorisations (water licences) to water allocations (surface or groundwater) with specified calculation rules for nominal volumes, volumetric limits and conditions (secs 64–71, 74–80).\n- Contains special implementation steps for the Upper Condamine Alluvium (Central Condamine Alluvium): chief executive must amend relevant licences so total nominal entitlements do not exceed a specified cap (46,221 ML) and make provision for the Commonwealth Environmental Water Holder (CEWH) to hold a licence proportional to any reduction volume (secs 57–60).\n- Requires a water management protocol for the plan area to set operational rules: unallocated water volumes, dealing/assignment rules, water‑sharing rules, monitoring requirements, and Lower Balonne flow management arrangements (sec 82). The chief executive must use specified hydrological models (eWater Source, MODFLOW) when assessing consistency with objectives (sec 35).\n- Sets a small domestic/garden allowance (0.25 ha combined; 2 ML/year) and record‑keeping rules for taking contaminated agricultural run‑off (secs 31, 81).\n\n**Who this affects**\n\n- Existing water licence and allocation holders across surface and groundwater zones — their licences may be amended, measured, limited or converted (many provisions: e.g. secs 23, 33, 56, 59–60, 75–80).\n- Prospective applicants for new licences or dealings — some applications must not be accepted unless they meet specific conditions (secs 42–45, 53–54).\n- Landowners with existing overland flow works who may be entitled to licences if historic use or notified works criteria are met (secs 44, 54).\n- The Commonwealth Environmental Water Holder (CEWH) — the plan requires provision for CEWH holdings in the Upper Condamine under certain conditions (sec 60).\n- Aboriginal communities, towns and industries — the plan identifies outcomes that preserve cultural, urban, stock/domestic and industry water needs (secs 19–21).\n- The State department and chief executive — they must publish reports, run monitoring, maintain digital boundary data, decide licence applications against modelled objectives, and prepare the water management protocol (secs 16, 23, 35, 82).\n\n**Why it matters (official claim and practical tests)**\n\n- Official claim: the plan implements a framework for sustainably managing specified surface and groundwater in the Condamine–Balonne area, aligning with the Basin Plan and interstate commitments, and balancing economic, social, cultural and environmental outcomes (sec 2; sec 18).\n\n- Practical implications, trade‑offs and implementation considerations:\n  - Measurement and reporting: the plan imposes mandatory metering deadlines (sec 23). Who pays — licence holders will incur installation, operation and compliance costs; the department bears reporting and monitoring implementation costs (secs 23, 82).\n  - Limits on expansion of take: decisions must not increase average take under the plan (sec 33). This preserves aggregate resource limits but can reduce the scope for new development and may lower values of some existing licences if nominal entitlements are adjusted (secs 59–60). The plan explicitly requires reductions in the Upper Condamine to meet the sustainable diversion limits (secs 57–59).\n  - Redistribution to environmental water: the plan mandates creating or amending licences for CEWH in the Central Condamine Alluvium proportional to reductions (sec 60). That is a concentrated benefit to held environmental water (explicit in the text) funded by reductions or reallocations from other licence holders; the plan does not specify purchase price mechanisms within these clauses — it sets allocation/amendment mechanics.\n  - Reliance on hydrological modelling and departmental discretion: assessment of consistency with objectives is model‑based (eWater Source, MODFLOW) and the chief executive can approve alternative assessments only if modelling is impracticable (sec 35). This centralises technical decision‑making and creates execution risk if models, assumptions or inputs are contested.\n  - Water‑market and administrative effects: the plan requires collecting and publishing trade information and reviewing market improvements (sec 24). Converting authorisations to standard water allocations with defined nominal volumes (secs 65–71, 75–80) will change the administrative and commercial characteristics of some entitlements — affecting tradeability, relocation rules and investment incentives.\n  - Local government exceptions: the plan permits certain local government dealings (impoundments for town water) subject to specified procedural steps and change applications (secs 43, 45). Those carve‑outs are narrowly defined and conditional.\n  - Compliance and enforcement: record keeping for contaminated agricultural run‑off (sec 81) and many licence conditions create ongoing administrative burdens; authorised officers may inspect records under the Act (sec 81 cross‑refs).\n\n**Who decides and how behaviour must change (plain terms)**\n\n- The chief executive of the responsible department makes the formal decisions: accepts or refuses licence applications, sets meter requirements, publishes reports, approves models/assessments, and prepares the water management protocol (secs 23, 35, 42, 54, 82).\n- Licence holders must install meters where required, comply with new volumetric and rate limits, keep records for contaminated run‑off, and may see their entitlements converted or nominal volumes adjusted (secs 23, 48–52, 56, 59, 81).\n- Owners of pre‑existing overland flow works can apply for licences under rules that recognise historic use (secs 44, 53–54).\n\n**Key risks, burdens and trade‑offs the text creates**\n\n- Compliance cost and administrative burden are concentrated across many licence holders (metering, certification, record‑keeping) (sec 23, sec 54(4)(a)(iii), sec 81).\n- Environmental and held‑water objectives are enforced by redistributing or capping licence nominal entitlements (Upper Condamine cap at 46,221 ML; secs 59–60). That imposes opportunity costs on water users in exchange for achieving Basin Plan/SDL outcomes.\n- Central reliance on model simulations for objective assessment concentrates technical authority in the department; disputes will likely centre on model inputs, scenario assumptions and whether the modelled simulation is ‘practicable’ (sec 35, sec 30).\n- The plan carves out narrowly framed exceptions (e.g. local government town‑water impoundments) but otherwise restricts increases in take (secs 33, 43, 45).\n\nOverall, the instrument converts high‑level sustainability and Basin Plan commitments into specific allocation limits, metering and conversion mechanics, model‑based performance checks, and operational rules that will change licence administration, create meter‑installation and compliance costs for water users, and provide a mechanism for CEWH‑held water in one aquifer (secs 23, 59–60, 82)."},"summary":{"complexity_score":9,"scope_assessment":{"changed":false,"description":"The plan appears to implement its stated purposes consistently. It defines water availability, provides sustainable management frameworks, identifies future water priorities, manages water allocations, and addresses ecosystem degradation — all as stated in section 2. There is no evidence of material scope creep from the stated purposes, though the plan's integration of Aboriginal cultural water outcomes and detailed water market regulation represents a broader modern approach to water planning than older plans in this region."},"complexity_factors":["Extensive spatial complexity: multiple overlapping geographic zones (water supply scheme zones, water management area zones, underground water sub-areas, underground water zones, nodes) each defined by reference to separate map schedules","Multiple water types governed simultaneously: surface water, overland flow water, and several distinct underground water aquifer units, each with different rules","Nested regulatory hierarchy: the plan operates under the Water Act 2000 (Qld) AND must comply with the national Murray-Darling Basin Plan, creating a two-tier compliance framework","Highly technical performance indicators: 'performance ratios' for water allocation security calculated using computer simulation programs (eWater Source and MODFLOW), with different percentage thresholds for different priority groups","Complex priority class system: multiple named priority groups (risk class A, risk class B, high class A, high class B, high priority, medium priority) with different security guarantees","Technical hydrological and hydrogeological concepts: aquitards, hydraulic head, sediment layers, alluvium, fractured rock aquifers, basalts — requiring specialist scientific knowledge to fully understand","Numerous cross-references: the plan repeatedly references other legislation (Water Act 2000, Water Regulation 2016, Planning Regulation 2017, Water Supply (Safety and Reliability) Act 2008), other water plans (Great Artesian Basin plan), and 14+ internal schedules","Granular date-specific rules: different commencement dates for different underground water metering requirements and different cut-off dates for 'existing works' depending on which aquifer is involved","Exception-upon-exception drafting: major provisions are routinely subject to multiple layers of exceptions and carve-outs, requiring careful reading to understand what actually applies","Aboriginal cultural water outcomes integrated throughout: adds policy complexity requiring engagement with communities and publication of separate reports","Water market regulation embedded within: trading zones, market analysis requirements, and market improvement mechanisms are built into the plan alongside physical water management rules","Lengthy schedules not reproduced here: 14 schedules contain critical operative content (maps, tables, volumes, performance ratios) without which the plan cannot be fully understood or applied"],"plain_english_summary":"This plan sets legally binding rules for how water in the Condamine–Balonne catchments is shared, used, monitored and traded, balancing economic, social, cultural and environmental needs. It affects irrigators, landowners, towns, Aboriginal groups, miners, water traders and conservation interests by defining who may take water, how much, and the security of their entitlements, while ensuring flows and monitoring meet national Murray‑Darling Basin limits."}},"importantCases":[],"_links":{"self":"/api/acts/water-plan-condamine-and-balonne-2019","history":"/api/acts/water-plan-condamine-and-balonne-2019/history","analysis":"/api/acts/water-plan-condamine-and-balonne-2019/analysis","conflicts":"/api/acts/water-plan-condamine-and-balonne-2019/conflicts","importantCases":"/api/acts/water-plan-condamine-and-balonne-2019/important-cases","documents":"/api/acts/water-plan-condamine-and-balonne-2019/documents"}}