[2024] WASC 325
General information, not legal advice.
Supreme Court of WA
2024-09-10
Lundberg J
Original judgment source is linked above.
(a) as to [7J] of the QNI ASD, which concerns the onus arising under cl 9.1(e) of the FCD, see [48] of these reasons;
(b) as to [44(b)(v)], [44A(c)(i)], [50(g)] and [50A] of the QNI ASD, which concern the pleading as to 'Palmer's Own Decision', see [75] of these reasons; and
(c) as to [50C], [53A] and [53B] of the QNI ASD, which concern the allegation of failure to take reasonable steps, see [101] of these reasons.
... every pleading must contain, and contain only, a statement in a summary form of the material facts on which the party pleading relies for his claim or defence, as the case may be, but not the evidence by which those facts are to be proved, and the statement must be as brief as the nature of the case admits. (emphasis added)
(a) the failure of Sino Iron and Korean Steel to perform their obligations under the MRSLAs; or
(b) CITIC Ltd's failure to cause those entities to perform their obligations under the MRSLAs.
(a) is not direct loss or damage attributable to the breach of the MRSLAs (see [50A(a)] and the proper construction pleaded at [7C]);
(b) does not arise naturally from the breach of the MRSLAs (see [50A(b)] and the proper construction pleaded at [7D(a)]);
(c) cannot reasonably be supposed to have been contemplated by the parties, when they made the FCD in October 2008, as the probable result of the breach (see [50A(c)] and the proper construction pleaded at [7D(b)]);
(d) is not loss suffered, paid or incurred by Mr Palmer in relation to a failure of Sino Iron or Korean Steel (or both) to perform its obligations to Mr Palmer under the FCD or the Takeover Agreements or the failure of CITIC to cause Sino Iron or Korean Steel (or both) to perform its obligations to Mr Palmer under the FCD or the Takeover Agreements (see [50A(d)] and the proper construction pleaded at [7DB]); and
(e) was in relation to 'Palmer's Own Decision' (see [50(g)]), which is said to be supported by the matters at (i) to (x) thereof.
(a) Mr Palmer had 'previously provided material financial support' to QNI in 2013, but chose not to do so in late 2015;
(b) Mr Palmer could have, but chose not to, cause Mineralogy to repay the Mineralogy Debt;
(c) Mr Palmer could have, but chose not to, repay other debts that were owed by Mr Palmer to QNI;
(d) Mr Palmer could have, but chose not to, make available assets which QNI had previously disposed of to, or for the benefit of, Mr Palmer;
(e) Mr Palmer could have, but chose not to, cause QNI to realise available assets;
(f) Mr Palmer could have, but chose not to, issue call notices prior to the appointment of administrators;
(g) Mr Palmer could have, but chose not to, cause QNR or QNM to indemnify QNI in circumstances where QNI was and is entitled to an indemnity or right of exoneration against the QNI Joint Venturers jointly and severally;
(h) Mr Palmer could have, but chose not to, make assets owned by Mr Palmer available as security to enable QNI to obtain loans or other funding from financiers;
(i) Mr Palmer could have, but chose not to, make assets owned by entities directly or indirectly controlled by Mr Palmer (other than QNI, QNR, QNM and QNS) available as security to enable QNI to obtain loans or other funding from financiers;
(j) Mr Palmer could have, but chose not to, provide funds or other assets to QNI to enable QNI to avoid the appointment of administrators;
(k) Mr Palmer could have, but chose not to, provide funds to the administrators of QNI to meet projected cash shortfalls, after the administrators had made Mr Palmer aware that without the funds they would cause QNI and the Joint Venture business to cease trading;
(l) Mr Palmer chose to appoint QNS as general manager of the Joint Venture without QNS having attended to obtaining the necessary licenses and approvals for QNS to operate the Yabulu Refinery; and
(m) Mr Palmer did not re-open, or cause to be re-opened, the Yabulu Refinery after Mineralogy received the judgment sum in the RCB litigation (in the sum of US$1.914 billion) and payment of the royalty component A in the amount of A$171 million, and after one of Mineralogy's indirect wholly-owned subsidiaries received US$146.7 million.
Mr Palmer did suffer loss, CITIC Ltd is not required to indemnify him for that loss in accordance with cl 11.5(c) because of his failure to take all reasonable steps to minimise and, where possible, avoid any loss or damage suffered by him, which is said to be in breach of cl 9.1(e) of the FCD. This failure is pleaded to be constituted by the matters pleaded at [50A(b)] to [50A(k)], to which I have referred above. The CITIC Parties contend at [50C(b)] that these matters 'would have produced funds which could have been used to satisfy QNI's liabilities as and when they fell due to avoid QNI going into voluntary administration and to enable QNI to continue managing and operating the Joint Venture business'. 2. Fourth, there is a related plea at [52] of the QNI ASD, which is pleaded in the alternative, that if Mr Palmer has suffered loss in respect of which CITIC Ltd is required to indemnify him, that liability is excluded because of Mr Palmer's failure to take all reasonable steps to minimise and where possible avoid any loss or damage, in breach of cl 9.1(e) of the FCD. 3. Fifth, the CITIC Parties plead set-offs as further alternatives, at [53A] and [53B] of the QNI ASD.
(a) reiterates the core contention of the Mineralogy Parties that Mineralogy would have provided funds to QNI to enable it to continue to manage and operate the Joint Venture business ([1AA(a)]);
(b) reiterates that the loss which is alleged is in relation to the matters expressly identified and covered by cl 11.5(c) of the FCD ([1AA(b)]);
(c) asserts that it is the indemnifying party under the FCD who bears the onus of proving, for the purposes of cl 9.1(e) of the FCD, that the indemnified party has not taken all reasonable steps to minimise and, where possible, avoid any loss or damage suffered by the indemnified party ([1AA(c)]);
(d) asserts that to the extent the CITIC Parties rely on acts or omissions before about January 2013, such acts or omissions occurred before the Mineralogy Parties received notice that Sino, Korean and/or CITIC would refuse to pay Royalty Component B in accordance with their obligations in the MRSLAs and/or the FCD ([1AA(d)]);
(e) asserts that to the extent the CITIC Parties rely on the circumstance that the Mineralogy Parties were allegedly on notice from about January 2013 that the CITIC parties were refusing to pay RCB in accordance with their obligations in the MRSLAs and/or the FCD, on a proper construction of cl 9.1(e) of the FCD, the Mineralogy Parties are not required to restructure their affairs to accommodate the CITIC Parties' persistent breaches of contract and the CITIC Parties are purporting to take advantage of their own persistent breaches of contract ([1AA(e)]);
(f) asserts that to the extent the CITIC Parties rely on acts or omissions before about August 2015, such acts or omissions occurred before the Mineralogy Parties were aware of the downturn in the price of nickel ([1AA(f)]); and
(g) asserts that to the extent the CITIC Parties allege that Mr Palmer could have provided funds directly or indirectly to QNI to enable it to continue to manage and operate the Joint Venture business, this was not a reasonable step for him to take in the circumstances ([1AA(g)]).[26]
E. The pleas concerning the onus under cl 9.1(e) of the FCD Overview
Again, a plaintiff seeking to enforce an obligation qualified by a general exception which is applicable to all cases must negative the exception; but if the obligation is general and qualified only by particular exceptions, a person seeking to rely on an exception must prove himself within it...
It is, of course, well accepted that a court whose jurisdiction is regularly invoked in respect of a local defendant (most often by service of process on that defendant within the geographic limitations of the court's jurisdiction) should not decide the issues raised in those proceedings in a summary way except in the clearest of cases. Ordinarily, a party is not to be denied the opportunity to place his or her case before the court in the ordinary way, and after taking advantage of the usual interlocutory processes. The test to be applied has been expressed in various ways, but all of the verbal formulae which have been used are intended to describe a high degree of certainty about the ultimate outcome of the proceeding if it were allowed to go to trial in the ordinary way. (footnotes omitted)
Should the question of construction be decided on this application?
F. The pleas concerning 'Palmer's Own Decision'
(a) the failure of Sino Iron and Korean Steel to perform their obligations under the MRSLAs; or
(b) CITIC's failure to cause those entities to perform their obligations under the MRSLAs.
(a) the corporate relationship between Mineralogy, Mr Palmer and the Queensland entities;
(b) the significant influx of RCB payments which Mineralogy would have received in this scenario;
(c) the fact that (in 2015) Mineralogy brought an application to compel payment of the RCB payments and asserted in that application that the funds were required at least in part to fund the Queensland joint venture business; and
(d) the historical provision of funds by Mineralogy to QNI.
(a) is not direct loss or damage attributable to the breach of the MRSLAs;
(b) does not arise naturally from the breach of the MRSLAs;
(c) cannot reasonably be supposed to have been contemplated by the parties, when they made the FCD in October 2008, as the probable result of the breach;
(d) is not loss suffered, paid or incurred by Mr Palmer in relation to a failure of Sino Iron or Korean Steel (or both) to perform its obligations to Mr Palmer under the FCD or the Takeover Agreements or the failure of CITIC to cause Sino Iron or Korean Steel (or both) to perform its obligations to Mr Palmer under the FCD or the Takeover Agreements; and
(e) was in relation to 'Palmer's Own Decision' (which is pleaded in [50(g)] of the QNI ASD).
(a) the nature of the relationship between QNI and the joint venture companies, that is, whether the funds in QNI's bank accounts that were used in the operation of the refinery were held by QNI on an express trust for the benefit of those JV entities, as contended by the plaintiffs, or as the agent only of those entities under the JVA, so that QNI held the funds as a bare trustee, as contended by the corporate defendants;
(b) whether payments made from QNI's bank accounts to or at the request, or on behalf, of Mineralogy were loans by QNI to Mineralogy; and
(c) whether QNI was insolvent on 13 January 2016.
[248] The documentary evidence and the evidence from Mr Wolfe and Mr Park shows that Mr Palmer was closely involved in the discussions with FTI Consulting and others about the options open to QNI in early January 2016. As at 13 January 2016, QNI did not have the liquidity or access to funds (whether through Metals and Resources or otherwise) to pay the Aurizon debt on 18 January 2016. Metals and Resources as the owners of the refinery and associated joint venture property were asset rich, but there were no plans for realisation of assets prior to 13 January 2016 that would meet the ongoing cash shortfalls in January 2016 and going forward to at least May 2016. I find that Metals and Resources did not have the capacity to address the cash flow shortages that QNI was experiencing as at 13 January 2016. It is axiomatic that if Metals and Resources had that capacity, they would have addressed the liquidity problems of QNI. The fact that Mr Palmer did not pay, or would not procure any finance or loans for QNI to pay, the debts that were outstanding and either had fallen or were falling due as at 13 January 2016 means Mr Palmer and his related entities were not a source of support that precluded QNI's insolvency on and from 13 January 2016. The question of insolvency is being determined as at 13 January 2016 before QNI entered into the China First and Waratah Coal transactions, but when the arrangements were in place for QNI (together with Resources and Metals) to enter into those transactions. Even though Ms McCallum did not rely on the potential financial support from China First and Waratah Coal in determining solvency as at 13 January 2013, the corporate defendants assert that the potentiality of funding as a result of the transactions with China First and Waratah Coal that were in the process of being finalised has to be taken into account in assessing the solvency of QNI as at 13 January 2016. For the reasons that I have set out in the section of the judgment dealing with the China First and Waratah Coal transactions, there is a lack of evidence of any plans by QNI as at 13 January 2016 to pursue finance on the basis of the China First and Waratah Coal transactions, instead of entering voluntary administration. The potentiality of finance from the China First and Waratah Coal transactions is therefore not a matter that saves QNI from being found to be insolvent as at 13 January 2016.
...made a deliberate, voluntary and informed decision not to support QNI [and Palmer Petroleum insofar as the other proceedings are concerned] by providing funds and to allow them to go into voluntary administration and that, as a matter of common sense, his decision was the cause of any loss.
...over the course of several years, [Mr] Palmer had a practice of diverting funds away from QNI towards other ventures, including at times where QNI required financial assistance and also at times where [Mr] Palmer was on notice that the calculation of Royalty Component B was disputed [and proof] of Mr Palmer's practice historically of draining funds from QNI is a matter from which the Court can infer that Mr Palmer was more likely to have decided to allow QNI to enter voluntary administration, rather than to have decided to provide funds, including Royalty Component B.
(a) Mr Palmer used, or caused to be used, significant sums from the joint venture business to fund other Palmer-related investments, including during periods when the joint venture business was loss making and cash flow from operating activities was negative;[62] and
(b) there was a course of conduct by which Mr Palmer caused QNI to make significant payments that were not for the purposes of the joint venture business, including during periods when the joint venture business was loss making and when cash flow from operating activities was negative.[63]
G. The pleas concerning the failure to take reasonable steps
(a) plead the material facts relied on to contend at trial that a given step was reasonable for the indemnified party to take (and the failure to so plead would take the indemnified party, that is the Mineralogy Parties, by surprise); and
(b) plead, in a direct and unambiguous manner, in a sensible narrative fashion, the material facts which demonstrate that the failure to take the step, alone or with other matters, caused part or all of the loss (which is that the loss is either 'minimised' or 'avoided').
(a) repayment of the Mineralogy Debt;
(b) repayment of other debts that were owed by Mr Palmer to QNI;
(c) making available assets which QNI had previously disposed of to, or for the benefit of, Mr Palmer;
(d) causing QNI to realise available assets;
(e) issuing call notices prior to the appointment of administrators;
(f) causing QNR or QNM to indemnify QNI in circumstances where QNI was and is entitled to an indemnity or right of exoneration against the QNI Joint Venturers jointly and severally;
(g) making assets owned by Mr Palmer available as security to enable QNI to obtain loans or other funding from financiers;
(h) making assets owned by entities directly or indirectly controlled by Mr Palmer (other than QNI, QNR, QNM and QNS) available as security to enable QNI to obtain loans or other funding from financiers;
(i) providing funds or other assets to QNI to enable QNI to avoid the appointment of administrators; and
(j) providing funds to the administrators of QNI to meet projected cash shortfalls, after the administrators had made Mr Palmer aware that without the funds they would cause QNI and the Joint Venture business to cease trading.
In this Deed, unless the context otherwise requires:
Project Agreements means the following agreements (each as amended from time to time) between the Company and the Seller and which have been disclosed to CITIC:
(a) the Korean Facilities Deed;
(b) the Korean Mining Right Agreement;
(c) the Korean Sublease;
(d) the Korean Steel Takeover Agreement;
(e) the Consolidation Agreement;
(f) the Sino Iron Facilities Deed;
(g) the Sino iron Mining Right Agreement;
(h) the Sino iron Sublease;
(i) this Co-Ordination Deed; and
(j) the Sino Iron Takeover Agreement.
9.1 The following provisions will apply to each indemnity provided for under this Deed:
(a) Each indemnity will survive the expiry or any termination (for cause or otherwise) of this Deed.
(b) Each indemnity will be deemed to extend to and for the benefit of the directors, agents, representatives, advisers, consultants and employees of the indemnified party, subject to the express terms of the indemnity.
(c) No indemnity is waived by any provision of this Deed with regard to insurance or by approval of any insurance policy.
(d) If Sino Iron or Korean become aware of any incident likely to give rise to a claim under an indemnity contained in this Deed, they will notify Mineralogy and Clive F Palmer and will cooperate fully in investigating the incident. The indemnifying party has the obligation and right to handle and defend any claim under the indemnity and the indemnified party will give the indemnifying party notice of any such claim and will supply the indemnifying party with details and information it may have relating to the claim in an expeditious manner and will take no action to compromise the indemnifying party's legal position in relation to the claim.
(e) Each party claiming the benefit of an indemnity must take all reasonable steps to minimise and, where possible, avoid any loss or damage suffered by it.
(a) In consideration of Mineralogy granting the further rights to Sino Iron and Korean under this Deed and in further consideration of the sum of five thousand dollars ($5000.00) paid on the date hereof by CITIC to Mineralogy, CITIC unconditionally and irrevocably guarantees to Mineralogy the performance of Korean's or Sino Iron's obligations under this Deed and the Project Agreements.
(b) If Korean or Sino Iron fails to perform its obligations under this Deed or the Project Agreements when they are due, CITIC must immediately on demand from Mineralogy cause Sino Iron or Korean as the case may be to perform its obligations under this Deed or the Project Agreements as applicable. If Sino Iron or Korean fail to perform the obligation CITIC must itself perform the obligation within 7 days of a demand by Mineralogy to do so (which, for the avoidance of doubt, includes the payment of an amount which is due to be paid but which has not been paid by Sino Iron or Korean).
(c) CITIC indemnifies Clive F Palmer and Mineralogy against any loss suffered, paid, or incurred by it in relation to the failure of Sino Iron and/or Korean to perform its obligations under this Deed or the Project Agreements or the failure of CITIC to cause Sino Iron and/or Korean to perform its obligations under this Deed or the Project Agreements.
Further and better particulars requested in the QNI Proceeding**
[7J] Further or alternatively to paragraphs 7C to 7F above, on the proper construction of clauses 9.1(e) and 11.5(c) of the FCD, CITIC's obligation to indemnify Palmer and Mineralogy in accordance with clause 11.5(c):
(a) is subject to and conditional upon the indemnified party satisfying the obligations imposed by clause 9.1(e) by first taking all reasonable steps to minimise and, where possible, avoid any loss or damage suffered by it;
(b) only encompasses loss that the indemnified party establishes could not have been minimised or, where possible, avoided by the indemnified party taking all reasonable steps;
(c) only encompasses loss that the indemnified party establishes was in causal relation to the failure of Sino Iron or Korean Steel (or both) to perform its obligations under the MRSLAs, or CITIC to cause Sino Iron or Korean Steel (or both) to perform its obligations under the MRSLAs;
(d) does not encompass any loss that was caused by Mineralogy or Palmer.
(a) as to sub-paragraph (a), admit that Mineralogy did not provide funds to QNI equivalent to the amount of Royalty Component B payable by Sino Iron and Korean Steel under the MRSLAs for the period ended 30 September 2015 or 31 December 2015, or in the order of $28 million;
(b) otherwise deny paragraph 44 and say that:
(i) Mineralogy was on notice from at least January 2013 that there was a dispute between the parties regarding the calculation of Royalty Component B;
Letter from CITIC Pacific Mining Management Pty Ltd to Mineralogy dated 21 January 2013.
(ii) in respect of that dispute, Mineralogy commenced the RCB Proceeding on or about 18 March 2013 in the Supreme Court of New South Wales as SC 2013/82818, which was transferred to this Honourable Court on 30 April 2013 and became the RCB Proceeding;
(iii) during the course of the RCB Proceeding, Mineralogy made numerous and extensive changes to its pleading, including to: (A) admit in December 2013 that Royalty Component B was not capable of calculation; (B) allege in the Second Further Amended Statement of Claim filed on 10 December 2013 that the MRSLAs were terminated by frustration; and (C) claim in April 2016 that the MRSLAs, which contain the Royalty Component B payment obligation, had been terminated by Mineralogy in October 2014;
Further Amended Reply and Amended Defence to Amended Counterclaim filed on 2 December 2013 in the RCB Proceeding.
Second Further Amended Statement of Claim filed on 10 December 2013 in the RCB Proceeding.
Fourth Further Amended Statement of Claim filed on 1 April 2016 in the RCB Proceeding.
(iv) at any time prior to the appointment of administrators to QNI or QNI's liquidation or the Joint Venture business ceasing to operate, Mineralogy or Palmer could have provided funds to the manager of the Joint Venture business, QNI and later QNS, to enable the manager to continue managing and operating the Joint Venture business;
(v) at some time before 13 January 2016, Palmer decided not to provide funds for the continued operation of the Joint Venture business and, absent such funds, QNI should or would be placed into voluntary administration (Palmer's Own Decision); and
The defendants refer to the decision of the Supreme Court of Queensland in Parbery & Ors v QNI Metals Pty Ltd & Ors [2020] QSC 143 (Mullins J), in particular [248] as to the fact that Palmer and his related entities were not a source of support that precluded QNI's insolvency on and from 13 January 2016. The defendants refer to paragraph 46D below.
(a) as to sub-paragraph (a)(i), admit that if Sino Iron, Korean Steel and CITIC had paid Royalty Component B to Mineralogy in accordance with their obligations under the MRSLAs and the FCD, "Mineralogy would have received the funds alleged in paragraph 28 herein and by the dates alleged therein";
(b) as to sub-paragraph (a)(ii), do not admit that "Mineralogy would have expected to receive timeous payment of Royalty Component B thereafter, the quarterly amounts of which would be expected to increase as Sino and Korean's mining and production operations ramped up"; and
(c) otherwise deny the paragraph and say that if Royalty Component B had been paid as pleaded in paragraph 28 of the statement of claim:
(i) in the circumstances pleaded in paragraph 50(g)(i) to (x) below, Palmer would have still made Palmer's Own Decision and Mineralogy would not have provided funds, including Royalty Component B, for the continued operation of the Joint Venture business; and
(ii) the total amount of Royalty Component B payable by Sino Iron and Korean Steel to Mineralogy under the MRSLAs was not sufficient to enable Mineralogy to provide funds to both:
(A) QNI for its pleaded funding requirements for the period to JuneMarch 2016 as alleged in paragraph 44A of the statement of claim, which are denied; and
(B) Palmer Petroleum Pty Ltd for the debt which it owed to BGP Geoexplorer Pte Ltd as alleged in paragraph 39AA of the ThirdFourth Amended Statement of Claim filed 10 November 202323 April 2024 in CIV 1267/2018.
Particulars will be provided upon completion of interlocutory processes, including the exchange of expert reports.
...
[50] They deny paragraph 50 and say that if, which is denied, Palmer has suffered loss, his loss is not "in relation to" the failure of Sino Iron and Korean Steel to perform their obligations under the MRSLAs or CITIC's failure to cause Sino Iron and Korean Steel to perform their obligations under the MRSLAs within the meaning of clause 11.5(c) because his loss:
(a) is not direct loss or damage attributable to the breach of the MRSLAs;
(b) does not arise naturally from the breach of the MRSLAs;
(g) was in relation to Palmer's Own Decision in circumstances where:
(i) the Joint Venture business was loss making in each financial year from FY12;
The Joint Venture business incurred a $430m underlying EBIT loss over the period from FY12 to January 2016.
(ii) from FY12, there was a sustained decline in the Joint Venture business' net asset position when the effect of the internal asset revaluation as at 30 June 2015 is excluded;
From 1 July 2011 to 31 December 2015, there was a decline in the value of the Joint Venture business' net assets of approximately $600m or approximately 68%, excluding the effect of the internal asset revaluation as at 30 June 2015.
Further particulars may be provided upon completion of interlocutory processes, including the exchange of expert reports.
(iii) the trading performance of the Joint Venture business had materially deteriorated in the 6 months prior to the appointment of the administrators to QNI;
During FY16, QNI generated losses at a faster rate than in previous years, losing on average, $10m a month mainly due to rapid and sustained decline in nickel prices.
(iv) according to QNI's Monthly Report dated January 2016, the Joint Venture business was forecasting significant unbudgeted losses;
In the QNI Monthly Report dated January 2016 the Joint Venture business downgraded its full year FY16 forecast to an EBIT loss of $218 million against its original budgeted FY16 EBIT of a $72 million profit, a decline of $290 million.
(v) by at least 6 January 2016, QNI was aware of the September 2015 Wood Mackenzie Report and the December 2015 Wood Mackenzie Report, which provided the forecasts set out in paragraphs 37AA(a) and (b) above;
Email from Daren Wolfe to Clive Palmer and Clive Mensink, dated 28 September 2015, attaching the September 2015 Wood Mackenzie Report.
Email from Daren Wolfe to Clive Mensink dated 9 October 2015, attaching the September 2015 Wood Mackenzie Report.
Email from Daren Wolfe to Charmaine Crouch (QNI) dated 6 January 2016, attaching the December 2015 Wood Mackenzie Report.
Email from Daren Wolfe to Jovan Singh (Hall Chadwick) dated 6 January 2016, attaching the December 2015 Wood Mackenzie Report.
Further particulars may be provided following discovery, subpoenas and the issue of interrogatories.
(vi) based on the December 2015 Wood MacKenzie report, QNI would continue to incur significant losses during at least FY16 and FY17 and would have required significant and ongoing funding during at least FY16 and FY17 if QNI was to continue to manage and operate the Joint Venture business during that time;
Particulars will be provided upon completion of interlocutory processes, including discovery and the exchange of expert reports.
(vii) by the end of December 2015, in addition to the funding required to meet forecast losses, QNI would also have required substantial working capital to address creditor arrears, depleted inventory and deferred expenditure;
The QNI Monthly Report for December 2015 reported that QNI's closing ore inventory as at 31 December 2015 was $15 million against a budget of $48m (a shortfall of approximately $33m or 70%).
The QNI Monthly Report for December 2015 reported that QNI had placed $55m of capital expenditure on hold and had only spent approximately $85,000 of its FY16 capital expenditure budget of $23m.
QNI had a pattern of deferral of payment of trade creditors outside the usual terms that was discernible from September 2015 onwards. The defendants refer to the decision of the Supreme Court of Queensland in Parbery & Ors v QNI Metals Pty Ltd & Ors [2020] QSC 143, [249] (Mullins J).
(viii) Palmer used, or caused to be used, significant sums from the Joint Venture business to fund other Palmer-related investments, including during periods when the Joint Venture business was loss making and cash flow from operating activities was negative;
Investment expenditure as recorded in the QNI Monthly Reports from FY10 to January 2016. Special Purpose Financial Statements for QNR and QNM, FY13 and FY14.
(ix) there was a course of conduct of Palmer causing QNI to make significant payments that were not for the purposes of the Joint Venture business, including during periods when the Joint Venture business was loss making and cash flow from operating activities was negative.
Schedules 1A and 1B to this defence. Special Purpose Financial Statements for QNR and QNM, FY13 and FY14.
(x) by making Palmer's Own Decision, Palmer was likely to be in a position to avoid or mitigate liabilities associated with a solvent closure of the Yabulu Refinery.
Prior to 18 January 2016, QNI had employee liabilities of $74,031,845.17, as set out in Schedule 4 to this defence. Further particulars may be provided upon completion of interlocutory processes, including discovery and the exchange of expert reports.
[50A] Further to paragraph 50(g) above, Palmer's Own Decision is constituted by, or can be inferred from, the following:
(a) Palmer, through Mineralogy, had apparently previously provided material financial support to QNI in 2013 when QNI was experiencing financial difficulties due to fluctuations in the nickel price, yet in late 2015 Palmer chose not to do the same and confirmed that on oath in the public examinations conducted by the special purpose liquidators as pleaded in paragraphs 46C and 46D above;
The defendants refer to the affidavit Daren Bruce Wolfe affirmed 17 November 2015, paragraph 39 as to the financial support provided to QNI in 2013.
(b) Palmer could have, but chose not to, cause Mineralogy to repay the Mineralogy Debt;
The defendants refer to paragraph 4(c) above and that Palmer was the ultimate beneficial owner of all of the shares in Mineralogy.
Schedule 1A to this defence sets out the transactions comprising the Mineralogy Debt.
(c) Palmer could have, but chose not to, repay other debts that were owed by him to QNI, or cause his associates or companies controlled by him to do the same;
The defendants refer to the fact that Palmer was the ultimate beneficial owner of all of the shares or a majority shareholder in entities including: Cart Provider Pty Ltd, Fairway Coal Pty Ltd, Palmer Leisure Coolum Pty Ltd, and Palmer Leisure Australia Pty Ltd.
Schedule 1B to this defence sets out the transactions comprising debts that were owed to QNI other than the Mineralogy Debt.
(d) Palmer could have, but chose not to, make available to QNI assets which QNI had previously disposed of to, or for the benefit of, Palmer;
Schedule 1C to this defence sets out the assets which could have been available to QNI.
(e) Palmer could have, but chose not to, cause QNI to realise available assets;
The defendants refer to paragraph 4(e) above and that Palmer was the ultimate beneficial owner of all of the shares in QNI.
Prior to 18 January 2016, QNI failed to realise available real property, comprising Lot 1 on RP 7300220 (Title Reference 21019214), Lot 2 on RP 709243 (Title Reference 20314194), Lot 3 on RP 709243 (Title Reference 20314195) and Lot 277 on CP K124656 (Title Reference 21300136).
(f) Palmer could have caused QNI to make calls prior to the appointment of administrators, but chose not to;
The defendants refer to paragraph 4(e) above and that Palmer was the ultimate beneficial owner of all of the shares in QNI.
Prior to 18 January 2016, QNI failed to issue call notices to QNR and QNM pursuant to the JVA (as defined in paragraph 35 of the statement of claim) and the defendants refer to:
(A) clause 6.4(a) of the JVA which entitled QNI to make calls on the Joint Venturers for funds to meet all costs, liabilities and expenses of the Joint Venture properly incurred;
(B) QNI's failure to issue call notices to QNR and QNM; and
(C) Parbery & Ors v QNI Metals Pty Ltd & Ors [2020] QSC 143 [65] (Mullins J).
(g) Palmer could, and should, have caused QNR and QNM to indemnify QNI in circumstances where QNI was and is entitled to an indemnity or right of exoneration against the QNI Joint Venturers jointly and severally, but chose not to;
The defendants refer to the fact that Palmer was the ultimate beneficial owner of all of the shares in QNR and QNM.
QNR and QNM failed to indemnify or exonerate QNI in respect of liabilities incurred prior to 18 January 2016 in acting as General Manager of the Joint Venture as set out in Schedule 4 to this defence and, in circumstances where clauses 3.1 and 5.5(s) of the JVA and clause 6 of the Administration Agreement (referred to in paragraph 35 of the statement of claim) provided an express right of indemnity and exoneration in favour of QNI from the QNI Joint Venturers.
(h) Palmer could have, but chose not to, make assets owned by Palmer available as security to enable QNI to obtain loans or other funding from financiers;
Assets owned by Palmer at the relevant times which could have been made available as security are set out in Schedule 2 to this defence.
The defendants refer to the information given by Palmer, on affirmation, set out at paragraph 46D above.
Further particulars may be provided following discovery, subpoenas and the issue of interrogatories.
(i) Palmer could have, but chose not to, make assets owned by entities directly or indirectly controlled by Palmer (other than QNI, QNR, QNM and QNS) available as security to enable QNI to obtain loans or other funding from financiers;
The defendants refer to the fact that Palmer was the ultimate beneficial owner of all of the shares or a majority shareholder in entities including: Australasian Resources Ltd, Cart Provider Pty Ltd, Closeridge Pty Ltd, Coeur De Lion Investments Pty Ltd, Cold Mountain Stud Pty Ltd, Fairway Coal Pty Ltd, Mineralogy Canada Acquisition Corp Pty Ltd, Mineralogy Pty Ltd, Nickel Consolidated Pty Ltd, Nickel Processing Pty Ltd, Nickel House Pty Ltd, Palmer Coolum Resort Pty Ltd, Palmer Leisure Australia Pty Ltd, Palmer Leisure Coolum Pty Ltd, River Crescent Pty Ltd, and Waratah Coal Pty Ltd.
Assets owned by companies directly or indirectly controlled by Palmer (other than QNI, QNR, QNM and QNS) at the relevant times which could have been made available as security are set out in Schedule 3 to this defence.
The defendants refer to the information given by Palmer, on affirmation, set out at paragraph 46D above.
Further particulars may be provided following discovery, subpoenas and the issue of interrogatories.
(j) Palmer could have, but chose not to, provide funds or other assets to QNI to enable QNI to avoid the appointment of administrators;
The defendants refer to the fact that Palmer was the ultimate beneficial owner of all of the shares or a majority shareholder in the entities listed in the particulars to paragraph 50A(i) above.
Assets owned by Palmer and companies directly or indirectly controlled by Palmer (other than QNI, QNR, QNM and QNS) at the relevant times which could have been sold to provide funds to QNI are set out in Schedules 2 and 3 to this defence.
The defendants refer to the information given by Palmer, on affirmation, set out at paragraph 46D above and to Parbery & Ors v QNI Metals Pty Ltd & Ors [2020] QSC 143 [136] (Mullins J).
Mineralogy was entitled to and received from Sino Iron and Korean Steel payments of Royalty Component A, as set out in Schedule 5 to this defence.
Mineralogy received a tax refund of approximately $45 million from the Australian Taxation Office (ATO) during the financial year ended 30 June 2014 pursuant to a Deed of Settlement between Mineralogy and the ATO dated 3 September 2013.
Further particulars may be provided following discovery, subpoenas and the issue of interrogatories.
(k) Palmer could have, but chose not to, provide funds to the administrators of QNI to meet projected cash shortfalls, after the administrators had made Palmer aware that without the funds they would cause QNI and the Joint Venture business to cease trading;
(A) section 4.6 of the Report of the Administrators of QNI dated 11 April 2016;
(B) paragraphs 13 and 24 of the Affidavit of K Trenfield dated 19 April 2016 and filed in the now discontinued proceeding BS3849/16 commenced by QNR, QNM and QNS as plaintiffs against the Liquidators of QNI as defendants in the Supreme Court of Queensland; and
(C) paragraphs 12, 13, 29 and 30 of the Affidavit of John Park dated 6 February 2017 and filed in proceeding BS6150/16 commenced by Cart Provider Pty Ltd, China First Pty Ltd, Waratah Coal Pty Ltd, Palmer, QNR and QNM as applicants against the Liquidators of QNI and QNI as respondents in the Supreme Court of Queensland.
The defendants refer to the evidence given by Palmer, on oath, set out at paragraph 46I above.
(l) Palmer chose to, and procured QNM and QNR to, appoint QNS as General Manager of the Joint Venture without QNS having attended to obtaining the necessary licenses and approvals for QNS to operate the Yabulu Refinery;
Palmer did not himself, and did not procure QNM, QNR or QNS, to attend to:
(A) obtaining necessary government licenses and approvals, including key environmental approvals and the major hazard facility license;
(B) obtaining leases, licenses and permits with the Port of Townsville, which were critical to the transportation of nickel; and
(C) accepting the assignment of ore supply contracts from QNI to QNS, which were critical for production at the Yabulu Refinery.
(m) Palmer has not re-opened, or caused to be re-opened, the Yabulu Refinery in circumstances where:
(i) Mineralogy received the judgment sum in CIV 1808 of 2013 on 12 January 2018 and payment of Royalty Component B thereafter, with a total of US$1,856,641,704.58 US$1,914,107,918.58 of Royalty Component B paid to Mineralogy as at the date of this defence (excluding GST and interest).
(ii) Mineralogy has received a total of A$166,200,868.65 A$171,259,245.92 of Royalty Component A as at the date of this defence (excluding GST and interest).
(iii) Cape Preston Resource Holdings Pty Ltd, an indirect wholly- owned subsidiary of CITIC, paid Mineralogy a total of US$146,701,557.00 for the acquisition of Balmoral Iron Pty Ltd in instalments during 2021 and 2022.
Schedule 5 to this defence sets out the Royalty Component B and Royalty Component A payments as at the date of this defence.
...
[50C] Further or alternatively, if, which is denied, Palmer has suffered loss, CITIC is not required to indemnify Palmer for that loss in accordance with clause 11.5(c) because of Palmer's failure to take all reasonable steps to minimise and, where possible, avoid any loss or damage suffered by him in breach of clause 9.1(e) of the FCD:
(a) which failure is constituted by, or is to be inferred from the matters pleaded in paragraph 50A(b) to (k) above; and
(b) where the matters pleaded in paragraph 50A(b) to (k) above would have produced funds which could have been used to satisfy QNI's liabilities as and when they fell due to avoid QNI going into voluntary administration and to enable QNI to continue managing and operating the Joint Venture business.
...
[53A] Further or alternatively:
(a) in breach of clause 9.1(e) of the FCD, Palmer failed to take all reasonable steps to minimise and, where possible, avoid any loss and damage suffered by him;
The defendants repeat paragraphs 50A(b) to (k) above.
(b) by reason of such breach, if (which is denied) CITIC is obliged to indemnify Palmer against any loss claimed by Palmer in this proceeding, CITIC has suffered loss and damage.
CITIC's loss and damage is the amount, if any, claimed by Palmer in this proceeding in respect of which it is obliged to indemnify Palmer.
[53B] Further or alternatively, if contrary to the defendants' case, this Honourable Court finds that Palmer has suffered any loss in respect of which CITIC is obliged to indemnify him, then CITIC will seek to set off its claim against Palmer for loss and damage set out in paragraph 53A above against and in satisfaction of Palmer's claim against CITIC for indemnity.
(a) say that:
(i) the word 'which' appears after the words 'otherwise affected by anything' in clause 11.6(b); and
(ii) the word 'or' (not 'of') appears after the word 'payment' in clause 11.6(c); and
(b) otherwise admit paragraph 6, and say further as set out in paragraphs 6A to 6G below.
...
[6G] Further or alternatively to paragraphs 6C to 6D above, on the proper construction of clauses 9.1(e) and 11.5(c) of the FCD, CITIC's obligation to indemnify Mineralogy in accordance with clause 11.5(c):
(a) is subject to and conditional upon the indemnified party satisfying the obligations imposed by clause 9.1(e) by first taking all reasonable steps to minimise and, where possible, avoid any loss or damage suffered by it;
(b) only encompasses loss that the indemnified party establishes could not have been minimised or, where possible, avoided by the indemnified party taking all reasonable steps;
(c) only encompasses loss that the indemnified party establishes was in causal relation to the failure of Sino Iron or Korean Steel (or both) to perform its obligations under the MRSLAs or the failure of CITIC to cause Sino Iron or Korean Steel (or both) to perform its obligations under the MRSLAs;
(d) does not encompass any loss that was caused by Mineralogy or Palmer.
[7] They deny paragraph 7 and refer to paragraphs 6 to 6G above.
[8] They deny paragraph 8 and refer to paragraphs 6 to 6G above.
...
[39AA] They deny paragraph 39AA and say that:
(a) Mineralogy and/or Palmer could have provided or could have procured others to provide funds to Palmer Petroleum at the relevant times to:
(i) pay for the services rendered under the BGP Contract referred to in paragraphs 38A to 38C of the statement of claim (or could have satisfied its obligation to pay funds to BGP under the Guarantee);
(ii) pay the amount in the Statutory Demand by the due date for compliance (or could have satisfied its obligation to pay funds to BGP under the Guarantee); and
(iii) pay the amount in the Statutory Demand and/or any further amount owing to BGP (or could have satisfied its obligation to pay funds to BGP under the Guarantee),
before Palmer Petroleum was ordered to be wound up in insolvency.
(b) at some time before 8 January 2016, Mineralogy decided not to provide funds or procure others to provide funds to Palmer Petroleum (or to satisfy its obligation to pay funds to BGP under the Guarantee) for the purposes set out in paragraph 39AA(a) above (Mineralogy's Own Decision);
(c) Mineralogy's Own Decision is constituted by, or to be inferred from, the following:
(i) the defendants refer to the circumstances pleaded in paragraphs 38E(a), 38F and 38G above and paragraphs 39B(a), 43B(aa) and 43B(a) to (f) below;
(ii) the failure by Palmer Petroleum to borrow sufficient funds from financiers to enable it to pay its debt to BGP as and when it fell due or at any time prior to 8 January 2016;
(iii) on 5 April 2016, Mineralogy commenced proceedings against BGP in the Supreme Court of Queensland to set aside the Guarantee;
(iv) on or about 1 August 2017, Mineralogy sought leave to amend its pleading in those proceedings to include a claim against BGP alleging misleading or deceptive conduct and breach of contract resulting in Palmer Petroleum being prevented or delayed in selling or otherwise exploiting PPL380 and suffering loss in an amount of $2.674 billion. The Court dismissed Mineralogy's application for leave;
(v) on 9 October 2017, the Court ordered Mineralogy to pay US$17,629,673.68 to BGP in respect of outstanding amounts owed by Palmer Petroleum to BGP under the BGP Contract, relevantly finding that:
(A) the Guarantee was not discharged by Mineralogy having waived or released BGP from alleged breaches of the BGP Contract by it;
(B) recovery under the Guarantee was not barred by a clause of the BGP Contract which Mineralogy claimed allowed it to withhold payment for unsatisfactory performance by BGP and, in any event, Mineralogy had not proved unsatisfactory performance by BGP;
(C) BGP had made out its counterclaim for payment of unpaid invoices issued under the BGP Contract; and
The defendants refer to the decision of the Supreme Court of Queensland in Mineralogy Pty Ltd v BGP Geoexplorer Pte Ltd [2017] QSC 219.
(vi) on 20 November 2017, before judgment in the RCB Proceeding was handed down on 24 November 2017, Mineralogy paid US$17,629,673.68 to BGP's solicitors, to be held on trust pending the outcome of an appeal by Mineralogy against the Court's orders;
The defendants refer to the decision of the Queensland Court of Appeal in Mineralogy Pty Ltd v BGP Geoexplorer Pte Ltd [2017] QCA 275, the decisions of the Supreme Court of Queensland in Mineralogy Pty Ltd v BGP Geoexplorer Pte Ltd (No 2) [2018] QSC 42, and Parbery v QNI Metals Pty Ltd [2018] QSC 107 [281], the decision of the Queensland Court of Appeal in Mineralogy Pty Ltd v BGP Geoexplorer Pte Ltd [2018] QCA 256 and special leave refused in Mineralogy Pty Ltd v BGP Geoexplorer Pte Ltd [2019] HCASL 43.
(d) if Royalty Component B had been paid as pleaded in paragraph 25 of the statement of claim:
(i) in the circumstances pleaded in paragraphs 38E, 38F and 38G above, Mineralogy would have still made Mineralogy's Own Decision and would not have provided Palmer Petroleum funds for the purposes set out in paragraph 39AA(a) above; and
(ii) the total amount of Royalty Component B payable by Sino Iron and Korean Steel to Mineralogy under the MRSLAs was not sufficient to enable Mineralogy to provide funds to both Palmer Petroleum for its funding requirements as alleged in paragraph 39AA of the statement of claim and to Queensland Nickel Pty Ltd (QNI) for its funding requirements for the period to JuneMarch 2016 as alleged in paragraph 44A of the SixthSeventh Amended Statement of Claim filed 10 November 202323 April 2024 in CIV 2072 of 2017.
...
[43A] They say that if, which is denied, Mineralogy has suffered loss, its loss was "in relation to" Mineralogy's Own Decision in the circumstances pleaded in paragraphs 38D, 38E, 38F, 38G and 39AA above.
[43B] Further or alternatively, they say that if, which is denied, Mineralogy has suffered loss, CITIC is not required to indemnify Mineralogy for that loss in accordance with clause 11.5(c) because of Mineralogy's failure to take all reasonable steps to minimise and, where possible, avoid any loss or damage suffered by it in breach of clause 9.1(e) of the FCD, which failure is constituted by, or to be inferred from, the following:
(aa) if, which is not admitted, Mineralogy was granted the Option, failing to:
(i) exercise the Option in the circumstances set out in paragraph 39B(a) above;
(ii) take transfer of the PPLs; and
(iii) procure the registration of the PPLs in its name or the name of a nominee,
prior to Palmer Petroleum being placed into liquidation;
The defendants refer to Blaxcell Limited v Hon Dr Fabian Pok MP, Minister for Petroleum and Energy and Independent State of Papua New Guinea OS (JR) No. 888 of 2017 (Unreported, delivered on 15 December 2023), [6], [7], [9], [10], [12], [13].
(ab) failing to seek to have the substantive hearing of the Blaxcell Proceeding before the natural expiration of the PPLs;
(ac) failing, directly or indirectly, to maintain the PPLs in good order (including not liable to cancellation under section 138 of the Oil and Gas Act 1998 (PNG));
The defendants refer to Blaxcell Limited v Hon Dr Fabian Pok MP, Minister for Petroleum and Energy and Independent State of Papua New Guinea OS (JR) No. 888 of 2017 (Unreported, delivered on 15 December 2023), [6], [7], [9], [12], [13].
(a) failing, directly or indirectly, to make assets owned by Mineralogy available as security to enable Palmer Petroleum to obtain loans or other funding from financiers;
Assets owned by Mineralogy at the relevant times which could have been made available as security are set out in items 2.1 - 2.5 of Schedule 2 to this defence.
Further particulars may be provided following discovery, subpoenas and the issue of interrogatories.
(b) failing, directly or indirectly, to provide funds or other assets to Palmer Petroleum to enable Palmer Petroleum to avoid the appointment of liquidators;
Assets owned by Mineralogy which could have been sold to provide funds to Palmer Petroleum are set out in items 2.1 - 2.5 of Schedule 2 to this defence.
Further, Mineralogy was entitled to and received from Sino Iron and Korean Steel payments of Royalty Component A.
Further, Mineralogy received a tax refund of approximately $45 million from the Australian Taxation Office (ATO) during the financial year ended 30 June 2014 pursuant to a Deed of Settlement between Mineralogy and the ATO dated 3 September 2013.
Further particulars may be provided following discovery, subpoenas and the issue of interrogatories.
(c) failing to indemnify BGP in relation to the debt owed to it by Palmer Petroleum;
The defendants refer to the decision of the Supreme Court of Queensland in Mineralogy Pty Ltd v BGP Geoexplorer Pte Ltd [2017] QSC 219 and the decision of the Queensland Court of Appeal in Mineralogy Pty Ltd v BGP Geoexplorer Pte Ltd [2018] QCA 174.
(d) failing, directly or indirectly, to make assets owned by Palmer available as security to enable Palmer Petroleum to obtain loans or other funding from financiers;
Assets owned by Palmer at the relevant times which could have been made available as security are set out in Schedule 1 to this defence.
The defendants refer to the information given by Palmer, on affirmation, during his public examination before the Federal Court of Australia in QUD 580 of 2016 on 12 September 2016 regarding his capacity, and the capacity of entities controlled by him, to obtain funds to meet the liabilities of QNI (Transcript, 12 September 2016, T462.2-8; T646.12-T464.32; T464.40-T464.44; T465.19-T466.42; T477.24-T477.44; T479.38-T479.45; T480.1- T480.13; T494.20-T495.37; T496.23-T496.35).
Further particulars may be provided following discovery, subpoenas and the issue of interrogatories.
(e) failing, directly or indirectly, to make assets owned by entities directly or indirectly controlled by Palmer available as security to enable Palmer Petroleum to obtain loans or other funding from financiers;
The defendants refer to the fact that Palmer was the ultimate beneficial owner of all of the shares or a majority shareholder in entities including: Australasian Resources Ltd, Cart Provider Pty Ltd, Closeridge Pty Ltd, Coeur De Lion Investments Pty Ltd, Cold Mountain Stud Pty Ltd, Fairway Coal Pty Ltd, Mineralogy Canada Acquisition Corp Pty Ltd, Mineralogy Pty Ltd, Nickel Consolidated Pty Ltd, Nickel Processing Pty Ltd, Nickel House Pty Ltd, Palmer Coolum Resort Pty Ltd, Palmer Leisure Australia Pty Ltd, Palmer Leisure Coolum Pty Ltd, River Crescent Pty Ltd and Waratah Coal Pty Ltd.
Assets owned by companies directly or indirectly controlled by Palmer at the relevant times which could have been made available as security are set out in Schedule 2 to this defence.
The defendants refer to the information given by Palmer, on affirmation, during his public examination before the Federal Court of Australia in QUD 580 of 2016 on 12 September 2016 regarding his capacity, and the capacity of entities controlled by him, to obtain funds to meet the liabilities of QNI (Transcript, 12 September 2016, T462.2-8; T646.12-T464.32; T464.40-T464.44; T465.19-T466.42; T477.24-T477.44; T479.38-T479.45; T480.1- T480.13; T494.20-T495.37; T496.23-T496.35).
Further particulars may be provided following discovery, subpoenas and the issue of interrogatories.
(f) failing, directly or indirectly, to provide or procure an entity or entities directly or indirectly controlled by Palmer to provide funds or other assets to Palmer Petroleum to enable Palmer Petroleum to avoid the appointment of liquidators,
The defendants repeat the particulars to sub-paragraphs (d) and (e) above.
Assets owned by companies directly or indirectly controlled by Palmer at the relevant times which could have been sold to provide funds to Palmer Petroleum are set out in Schedule 2 to this defence.
in each case, in the circumstances set out in paragraphs 38D, 38E, 38F, 38G, 39AA and 43A above.
...
[44] They deny paragraph 44 and say that if, which is denied, Mineralogy has suffered loss:
(a) its loss is not "in relation to" the failure of Sino Iron and Korean Steel to perform their obligations under the MRSLAs or CITIC's failure to cause Sino Iron and Korean Steel to perform their obligations under the MRSLAs within the meaning of clause 11.5(c) because its loss:
(i) is not direct loss or damage attributable to the breach of the MRSLAs;
(ii) does not arise naturally from the breach of the MRSLAs;
(iii) cannot reasonably be supposed to have been contemplated by the parties, when they made the FCD in October 2008, as the probable result of the breach;
(iv) is not loss suffered, paid or incurred by Mineralogy in relation to a failure of Sino Iron or Korean Steel (or both) to perform its obligations to Mineralogy under the FCD or the Project Agreements or the failure of CITIC to cause Sino Iron or Korean Steel (or both) to perform its obligations to Mineralogy under the FCD or the Project Agreements;
(v) not used;
(vi) not used;
(vii) was "in relation to" Mineralogy's Own Decision as pleaded in paragraph 43A above;
(b) further or alternatively, as to the loss alleged in paragraph 42(c) of the statement of claim, such loss would be "in relation" the wrongful cancellation of the PPLs by the Minister for Petroleum and Energy of PNG and the Minister's failure to approve and register the transfer of the PPLs to Blaxcellnot used.
...
[46] Further or alternatively, if, contrary to the defendants' case, this Honourable Court finds or would otherwise find that Mineralogy has suffered any loss in respect of which CITIC is required to indemnify Mineralogy, then CITIC's liability is excluded because of Mineralogy's failure to take all reasonable steps to minimise and, where possible, avoid such loss or damage in breach of clause 9.1(e) of the FCD as pleaded in paragraph 43B above.
[46A] Further or alternatively:
(a) in breach of clause 9.1(e) of the FCD, Mineralogy failed to take all reasonable steps to minimise and, where possible, avoid any loss and damage suffered by it; and
PARTICULARS
The defendants repeat paragraph 43B above.
(b) by reason of such breach, if (which is denied) CITIC is obliged to indemnify Mineralogy against any loss claimed by it in this proceeding, CITIC has suffered loss and damage.
CITIC's loss and damage is the amount, if any, claimed by Mineralogy in this proceeding in respect of which it is obliged to indemnify it.
[46B] Further or alternatively, if contrary to the defendants' case, this Honourable Court finds that Mineralogy has suffered any loss in respect of which CITIC is obliged to indemnify it, then CITIC will seek to set off its claim against Mineralogy for loss and damage set out in paragraph 46A above against and in satisfaction of Mineralogy's claim against CITIC for indemnity.
I certify that the preceding paragraph(s) comprise the reasons for decision of the Supreme Court of Western Australia.
[1] For convenience, I note the actions are typically referred to by the parties as the QNI Proceeding and the Palmer Petroleum Proceeding, being CIV 2072 of 2017 and CIV 1267 of 2018 respectively. Together, the actions are referred to as the Indemnity Proceedings. Both actions are connected with the instrument known as the Fortescue Coordination Deed or the FCD. I will refer to the plaintiffs as Mr Palmer and Mineralogy (together, the Mineralogy Parties) and I will refer to the defendants as the CITIC Parties.
[2] Palmer v CITIC Ltd [No 12] [2024] WASC 322.
[3] There have been several interlocutory decisions published by this court in the Indemnity Proceedings since they were commenced in 2017 and 2018: Palmer v CITIC Ltd [2017] WASC 253 (Le Miere J) (Stay application); Palmer v CITIC [No 2] [2019] WASC 14 (Kenneth Martin J) (Preliminary questions application); Palmer v CITIC [No 3] [2019] WASC 424 (Kenneth Martin J) (Discovery categories); Sino Iron Pty Ltd v Mineralogy Pty Ltd [2022] WASC 151 (Quinlan CJ) (Costs application); Palmer v CITIC [No 4] [2022] WASC 292 (Kenneth Martin J) (Strategic conference and timetabling); Palmer v CITIC [No 5] [2023] WASC 44 (Kenneth Martin J) (Directions and timetabling); and Palmer v CITIC [No 6] [2023] WASC 188 (Lundberg J) (Application to set aside subpoenas); Palmer v CITIC Ltd [No 7] [2023] WASC 202 (Lundberg J) (Strike out applications); Palmer v CITIC Ltd [No 8] [2023] WASC 221 (Lundberg J) (Applications for leave to amend statements of claim); Palmer v CITIC Ltd [No 9] [2023] WASC 238 (Lundberg J) (Application to discharge discovery orders); Palmer v CITIC Ltd [No 10] [2023] WASC 417 (Lundberg J) (Further application to amend statement of claim); Palmer v CITIC Ltd [No 11] [2024] WASC 210 (Lundberg J) (Discovery applications); and Palmer v CITIC Ltd [No 12]. [2024] WASC 322 (Lundberg J) (Sequencing Application)
[4] In the QNI Proceeding, see the amended chamber summons dated 17 June 2024, [4] - [7] (Chamber Summons); Mineralogy submissions dated 2 July 2024; CITIC submissions dated 23 July 2024; and Mineralogy reply submissions dated 1 August 2024.
[7] Chambers summons [6] and [7]. Allied to this, the Mineralogy Parties seek an order that the Court dispense with the requirement in O 20 r 13(6) RSC.
[10] Vantage Holdings Group Pty Ltd v Donnelly [No 4] [2019] WASC 398 [60(d)] ‑ [60(j)], approved by the Court of Appeal in English v Vantage Holdings Group Pty Ltd [2021] WASCA 47 [56] (Murphy, Mitchell and Vaughan JJA) and in DFD Rhodes Pty Ltd v Hancock Prospecting Pty Ltd [2022] WASCA 97 [226] (Quinlan CJ, Beech and Vaughan JJA).
[11] Vantage Holdings Group [60(g)] (Smith J).
[12] Vantage Holdings Group [60(h)] (Smith J).
[13] Vantage Holdings Group [60(f)] (Smith J).
[14] Lampson (Australia) Pty Ltd v Fortescue Metals Group [No 3] [2014] WASC 162 [44] (Edelman J).
[15] Vantage Holdings Group [60(i)] (Smith J).
[16] Vantage Holdings Group [60(j)] (Smith J).
[17] Vantage Holdings Group [60(d)] (Smith J).
[18] Barclay Mowlem Construction Ltd v Dampier Port Authority [2006] WASC 281; (2006) 33 WAR 82 [5] ‑ [8] (Martin CJ).
[19] Trackem Pty Ltd v Revenue Partners (A Partnership) [2021] WASC 345 (Archer J).
[20] Trackem Pty Ltd v Revenue Partners (A Partnership) [25] - [30] (Archer J).
[21] National Australia Bank Limited v Rowe [2018] WASC 330 [4] ‑ [6] (Vaughan J).
[22] Rowe v National Australia Bank [2019] WASCA 140; (2019) 56 WAR 1 [15] and [165].
[24] QNI 7ASOC, [28], [28B], [38] and [44].
[25] QNI 7ASOC, [4], [4A] and [47A].
[26] The plea at [1AA(g)] is particularised in several respects, including that Mr Palmer alleges he acquired the shareholding with the expectation that the CITIC Parties would make the RCB payments, and he further alleges that nickel prices were yet to recover before QNI was placed into voluntary administration or liquidation.
[31] Mineralogy submissions [32] - [33].
[33] Mineralogy submissions [37] - [53]; and Mineralogy reply submissions [25] - [40].
[34] CITIC submissions [65] - [82].
[35] Kodak (Australasia) Pty Ltd v Retial Traders Mutual Indemnity Insurance Association [1942] NSWStRp 19; (1942) 42 SR (NSW) 231 (Kodak).
[37] General Steel Industries Inc v Cmr for Railways (NSW) [1964] HCA 69; (1964) 112 CLR 125 (General Steel).
[39] Agar v Hyde [2000] HCA 41; (2000) 201 CLR 552.
[40] Agar v Hyde [57]. See also Batistatos v Roads and Traffic Authority of NSW [2006] HCA 27; (2006) 226 CLR 256 [45] - [46].
[43] Lepcanfin Pty Ltd v Lepfin Pty Ltd [2020] NSWCA 155; (2020) 102 NSWLR 627 (Lepcanfin).
[44] Sino Iron Pty Ltd v Mineralogy Pty Ltd [2020] WASC 311 [222] (Kenneth Martin J).
[46] Mineralogy submissions [55] - [61].
[47] BGC Contracting Pty Ltd v Cliffs Asia Pacific Iron Ore Pty Ltd [2019] WASC 248 [77] (Smith J).
[48] NRW Contracting Pty Ltd v Cliffs Asia Pacific Iron Ore Pty Ltd [2020] WASC 107 [94] (Murphy JA) and [130] ‑ [132] (Beech and Vaughan JJA).
[49] Fremantle Port Authority v Cosco Shipping Bulk (South East Asia) Pte Ltd [2023] WASC 95 [19] (Lundberg J).
[50] Doyle's Farm Produce Pty Ltd v Murray Darling Basin Authority [2021] NSWSC 369 (Adamson J) at first instance, and on appeal in Murray Darling Basin Authority v Doyle's Farm Produce Pty Ltd [2021] NSWCA 191 and Doyle's Farm Produce Pty Ltd v Murray Darling Basin Authority (No 2) [2021] NSWCA 246; (2021) 395 ALR 131.
[51] Doyle's Farm Produce Pty Ltd v Murray Darling Basin Authority (No 2) [4] and [5].
[54] Palmer v CITIC Ltd [No 10] [63] - [70].
[55] English v Vantage Holdings Group Pty Ltd [2021] WASCA 47.
[56] Parbery & Ors v QNI Metals Pty Ltd & Ors [2020] QSC 143 (Mullins J) (Parbery).
[60] CITIC submissions [86] and [89].
[64] QNI ASD, [50A(b)] and [50A(c)], for example.
[65] Mineralogy submissions [77] - [79].
(2006) 33 WAR 82
(2019) 56 WAR 1
(1964) 112 CLR 125
(2000) 201 CLR 552
(2006) 226 CLR 256
(2020) 102 NSWLR 627
(2021) 395 ALR 131