[2023] WASC 221
Supreme Court of WA
2023-06-22
Lundberg J
Original judgment source is linked above.
(a) leave for the proposed amendments to the statement of claim in CIV 2072 of 2017 should be refused; and
>
> (b) leave for the proposed amendments to the statement of claim in CIV 1267 of 2018 should be allowed.
(a) the Fifth Amended Statement of Claim dated 2 September 2022 (filed in the QNI Proceeding), which I will refer to as the QNI 5ASOC; and
>
> (b) the Second Amended Statement of Claim dated 2 September 2022 (filed in the Palmer Petroleum Proceeding), which I will refer to as the PP 2ASOC.
(a) Order 18 rules 6, 7 and 8; and
(b) Order 20 rule 19(2) to (5).
(2) The Court may at any stage of the proceedings, without determining whether any relevant period of limitation has expired, allow the plaintiff to amend the plaintiff's writ, or any party to amend that party's pleading, on any terms as to costs or otherwise that may be just and in the manner (if any) that the Court may direct.
(a) Strike‑out applications, in a modern context, must be assessed in the context of case management techniques. Case management considerations are not, however, necessarily antithetical to the observance of pleading rules. The objects of O 1 r 4A and r 4B RSC are often promoted by a clear and precise statement of the issues for decision.[9]
>
> (b) Provided a pleading fulfils its basic functions of identifying the issues, disclosing an arguable cause of action (or defence), and apprising the parties of the case that has to be met, the court ought properly be reluctant to allow the time and resources of the parties and the limited resources of the court to be spent extensively debating the application of technical pleading rules that evolved in, and derive from, a very different case management environment.[10]
>
> (c) Moreover, the mere fact that a case appears weak is not of itself sufficient to strike‑out the action.[11] As a general rule, a party is entitled as of right to have his or her case heard, to have the facts found and then to argue the question of law as it arises before the trial judge upon the facts as found.
>
> (d) It is fundamental that, on a strike‑out application, not only must all the facts alleged in the pleading be accepted as true, but it must be taken for granted that on all other points the pleading is unassailable.[12]
>
> (e) Pleadings may be struck out on the ground that they may prejudice, embarrass or delay the fair trial of the action because they are evasive, they conceal or obscure the real questions in controversy, they are ambiguous or not reasonably intelligible, they raise immaterial or irrelevant issues, they fail to confine the issues or state the case of the party in question with reasonable particularity, or they raise a case in terms which are simply too general.[13]
>
> (f) Irrelevant or unnecessary pleas in a statement of claim will be struck out on the grounds that they will prejudice, embarrass or delay the fair trial of the action where the defendant must traverse the allegations and, thereby, raise false issues.[14]
[5] In my view, the contemporary role of pleadings has to be viewed in the context of contemporary case management techniques and pre‑trial directions. In this Court, those pre-trial directions will almost invariably include; firstly, a direction for the preparation of a trial bundle identifying the documents that are to be adduced in evidence in the course of the trial; secondly, the exchange well prior to trial of non-expert witness statements so that non-expert witnesses will customarily give their evidence-in-chief only by the adoption of that written statement; thirdly, the exchange of expert reports well in advance of trial and a direction that those experts confer prior to trial; fourthly, the exchange of chronologies; and fifthly the exchange of written submissions.
[6] Those processes leave very little opportunity for surprise or ambush at trial and, it is my view, that pleadings today can be approached in that context and therefore in a rather more robust manner, than was historically the case; confident in the knowledge that other systems of pre-trial case management will exist and be implemented to aid in defining the issues and apprising the parties to the proceedings of the case that has to be met.
[7] In my view, it follows that provided a pleading fulfils its basic functions of identifying the issues, disclosing an arguable cause of action or defence, as the case may be, and apprising the parties of the case that has to be met, the Court ought properly be reluctant to allow the time and resources of the parties and the limited resources of the Court to be spent extensively debating the application of technical pleadings rules that evolved in and derive from a very different case management environment.
[8] Most pleadings in complex cases, and this is a complex case, can be criticised from the perspective of technical pleading rules that evolved in a very different case management environment. In my view, the advent of contemporary case management techniques and the pre-trial directions, to which I have referred, should result in the Court adopting an approach to pleading disputes to the effect that only where the criticisms of a pleading significantly impact upon the proper preparation of the case and its presentation at trial should those criticisms be seriously entertained.
... every pleading must contain, and contain only, a statement in a summary form of the material facts on which the party pleading relies for his claim or defence, as the case may be, but not the evidence by which those facts are to be proved, and the statement must be as brief as the nature of the case admits. (emphasis added)
An application for leave to amend a pleading should not be approached on the basis that a party is entitled to raise an arguable claim, subject to payment of costs by way of compensation. There is no such entitlement. All matters relevant to the exercise of the power to permit amendment should be weighed. The fact of substantial delay and wasted costs, the concerns of case management, will assume importance on an application for leave to amend.[17]
[52] In Aon Risk Services Australia Ltd v Australian National University [2009] HCA 27; (2009) 239 CLR 175 the High Court made observations about the considerations relevant to the exercise of a discretionary power to allow or refuse amendment to a pleading in the Australian Capital Territory. Notwithstanding some differences in the language of the relevant rules, their Honours' observations are of valuable assistance in Western Australia and have been applied by courts in Western Australia. Those observations include the following:
(a) the effect of an amendment on the court and on other litigants is relevant;
(b) there is no right to amend to introduce an arguable case and it is wrong to say that only in extreme circumstances would a party be shut out from litigating an arguable case;
(c) justice requires that parties have a proper opportunity to plead their case, but limits may be placed on repleading when delay and cost are taken into account;
(d) a just resolution does not mean that a party will always be permitted to raise any arguable case at any point in the proceedings, on payment of costs, even indemnity costs;
(e) the inevitable strains of litigation must be taken into account in weighing the adverse consequences of delay ‑ this applies to natural persons and other litigants;
(f) the nature and importance of the amendment to the party amending must be taken into account;
(g) attention must be given to the extent of the delay, and the costs associated with it, the prejudice which might reasonably be assumed to follow from it and any prejudice that is shown;
(h) the point in the litigation relative to the trial may be an important consideration;
(i) where a discretion is sought to be exercised in favour of a party, an explanation will be called for;
(j) the point can be reached where a party has had a sufficient opportunity to put its case.
(a) that the point may be reached where a party has had a sufficient opportunity to plead his or her case such that it is too late for further amendment so as to do justice to the other party and other litigants;
>
> (b) much depends on the point the litigation has reached relative to the trial; and
>
> (c) it has been recognised that when an application is made late in the day, and requires that dates set down for trial be vacated, the applicant bears a heavy burden to show why leave should be granted. In such a case the public interest in the timely and efficient resolution of legal proceedings and the effective use of court resources is a relevant consideration.
[28] In:
(a) the period to 30 September 2015, the total amount of Royalty Component B payable by Sino and Korean under the MRSLAs was US$49,342,647.
(b) the period to 31 December 2015, the total amount of Royalty Component B payable by Sino and Korean under the MRSLAs was $US56,395,838.
Mineralogy and Palmer refer to paragraphs 434, 840, 841 and Table 7 at paragraph 775 of the reason of the Honourable Justice Martin J delivered in the RCB proceeding on 24 November 2017 Mineralogy Pty Ltd v Sino Iron Pty Ltd [No 16] [2017] WASC 340.[21]
[37] In 2015 there was a downturn in the price of nickel.
[37A] The decrease in the price of nickel adversely affected QNI's forecasted cashflow for the period to 30 June 2016.
The Plaintiffs refers to paragraphs 66 and 72 to 79 inclusive of the affidavit of Darren Bruce Wolfe affirmed on 17 November 2015 (Wolfe affidavit).
[38] In or about November 2015, QNI required funding of $28 million as working capital to enable it to continue managing and operating the Joint Venture business during the period in which its forecasted cashflow was adversely impacted.
Report by KPMG 'Cabinet in Confidence' Document dated 8 December 2015 page 7 under the heading 'KPMG Comments'. This document is in the possession of the Plaintiffs' solicitors and is confidential. A copy will be made available to the Defendants upon receipt of the usual undertaking to keep the document confidential.
The Plaintiffs also relyies upon the Wolfe affidavit
[39] In or about November 2015, if Sino, Korean and CITIC had paid Royalty Component B to Mineralogy in accordance with their obligations under the MRSLAs and the FCD, Mineralogy agreed and/or determined (subject to conditions which are not material), to provide $28 million to QNI for working capital funded from the payment of Royalty Component B and such further funds as it might require while Nickel prices remained low as working capital from the payment of Royalty Component B would have provided those funds to QNI to enable it to continue to manage and operate the Joint Venture business while nickel prices remained low.
The Plaintiff refers to the affidavit of Clive Theodore Mensink affirmed on 17 November 2015 (the Mensink affidavit) filed in the interlocutory mandatory injunction proceeding referred to below and in particular paragraph 15.
[44] As a result of Sino, Korean and Citic's failure to did not pay Mineralogy Royalty Component B, including the amount of Royalty Component B due and owing to Mineralogy for the period ended 30 September 2015 and/or 31 December 2015, Mineralogy did not, and/or was unable to, provide the funds to QNI, including the amount set out in paragraph 39 38 herein, to enable it to continue managing and operating the Joint Venture business.
[28] In the period to 31 March 2017, the amount of Royalty Component B payable by Sino and Korean under the MRSLAs was as follows:
(a) for the quarter ended 31 December 2013: US$559,770 (due by 14 January 2014);
(b) for the quarter ended 31 March 2014: US$4,164,000 (due by 14 April 2014);
(c) for the quarter ended 30 June 2014: US$5,670,996 (due by 14 July 2014);
(d) for the quarter ended 30 September 2014: US$8,823,397 (due by 14 October 2014);
(e) the quarter ended 31 December 2014: US$5,074,668 (due by 14 January 2015);
(f) for the quarter ended 31 March 2015: US$3,035,524 (due by 14 April 2015);
(g) for the quarter ended 30 June 2015: US$5,162,503 (due by 14 July 2015);
(h) for the quarter ended 30 September 2015: US$9,342,794 (due by 14 October 2015);
(i) for the quarter ending 31 December 2015: US$6,182,799 (due by 14 January 2016);
(j) for the quarter ending 31 March 2016: US$9,341,256 (due by 14 April 2016);
(k) for the quarter ending 30 June 2016: US$18,996,732 (due by 14 July 2016);
(l) for the quarter ending 30 September 2016: US$19,516,210 (due by 14 October 2016);
(m) for the quarter ending 31 December 2016: US$25,693,094 (due by 14 January 2017);
(n) for the quarter ending 31 March 2017: US$32,229,043 (due by 14 April 2017);
(o) by the end of the quarter ending 31 March 2017: a total of US$153,792,786.
(a) the period to 30 September 2015, the total amount of Royalty Component B payable by Sino and Korean under the MRSLAs was US$49,342,647.
(b) the period to 31 December 2015, the total amount of Royalty Component B payable by Sino and Korean under the MRSLAs was $US 56,395,838.
Mineralogy and Palmer refer to paragraphs 434, 840, 841 and Table 7 at paragraph 775 of Mineralogy Pty Ltd v Sino Iron Pty Ltd [No 16] [2017] WASC 340.
[37] In 2015 there was a downturn in the price of nickel.
[37A] The decrease in the price of nickel adversely affected QNI's forecast cashflow for the period to 30 June 2016.
(a) The Plaintiffs refer to paragraphs 66 and 72 to 79 inclusive of the affidavit of Darren Bruce Wolfe affirmed on 17 November 2015 (Wolfe affidavit).;
(b) Further particulars may be provided upon provided upon completion of interlocutory processes, including the exchange of expert reports.
[38] In or about November 2015 As a consequence of the matters alleged in paragraphs 37 and 37A herein, QNI required funding of $28 million as for working capital to enable it to continue managing and operating the Joint Venture business during the period in which its forecast cashflow was adversely impacted.
Report by KPMG 'Cabinet in Confidence' Document dated 8 December 2015 page 7 under the heading 'KPMG Comments'. This document is in the possession of the Plaintiffs' solicitors and is confidential. A copy will be made available to the Defendants upon receipt of the usual undertaking to keep the document confidential. The Plaintiffs also rely upon the Wolfe affidavit.
[39] In or about November 2015, iIf Sino, Korean and CITIC Citic had paid Royalty Component B to Mineralogy in accordance with their obligations under the MRSLAs and the FCD, Mineralogy would have provided those funds to QNI to enable it to continue to manage and operate the Joint Venture business while nickel prices remained low.
[44] As Sino, Korean and Citic's did not pay Mineralogy Royalty Component B, including the amount of Royalty Component B due and owing to Mineralogy for the period ended 30 September 2015 and/or 31 December 2015, Mineralogy did not provide the funds to QNI, including the amount set out in paragraph 38 herein, to enable it to continue managing and operating the Joint Venture business.
[18] This is because, for the purposes of demonstrating causation, the proper comparison is between the amount of outstanding Royalty Component B and the amount of funding that QNI actually required (or would have required were it not for its entry into external administration) to enable it to continue to manage and operate the Joint Venture business.
[19] Accordingly, [38] of the Proposed 6SOC excises the figure ($28 million) and time period (about November 2015) currently pleaded in that paragraph because they are based on a document prepared by KPMG in December 2015 (referred to in the to‑be‑excised particulars to [38]), which forecast QNI's funding requirements at that time.
[20] And further, given that the Proposed 6SOC no longer centres upon a one-off provision of funding to QNI in November 2015 (which was based on QNI's funding requirements as forecast in November 2015), paragraph [28] of the Proposed 6SOC pleads each outstanding Royalty Component B instalment that accrued prior to the commencement of the QNI Proceeding.
[2] As to paragraph 39:
(a) at all material times, Sino and Korean were required to pay Royalty Component B to Mineralogy under the MRSLAs as alleged herein:
(b) the amounts due and payable on account of Royalty Component B were:
(i) for the quarter ended 31 December 2013: US$559,770 (due by 14 January 2014);
(ii) for the quarter ended 31 March 2014: US$4,164,000 (due by 14 April 2014);
(iii) for the quarter ended 30 June 2014: US$5,670,996 (due by 14 July 2014);
(iv) for the quarter ended 30 September 2014: US$8,823,397 (due by 14 October 2014);
(v) the quarter ended 31 December 2014: US$5,074,668 (due by 14 January 2015);
(vi) for the quarter ended 31 March 2015: US$3,035,524 (due by 14 April 2015);
(vii) for the quarter ended 30 June 2015: US$5,162,503(due by 14 July 2015);
(viii) for the quarter ended 30 September 2015: US$9,342,794 (due by 14 October 2015);
(ix) for the quarter ending 31 December 2015: US$6,182,799 (due by 14 January 2016);
(x) for the quarter ending 31 March 2016: US$9,341,256 (due by 14 April 2016);
(xi) for the quarter ending 30 June 2016: US$18,996,732 (due by 14 July 2016);
(xii) for the quarter ending 30 September 2016: US$19,516,210 (due by 14 October 2016);
(xiii) for the quarter ending 31 December 2016: US$25,693,094 (due by 14 January 2017);
(xiv) for the quarter ending 31 March 2017: US$32,229,043 (due by 14 April 2017);
(c) over the period between about the first quarter of 2016 and the third quarter of 2017, QNI would have required funding of approximately AU$36,000,000 as working capital to enable it to continue to manage and operate the Joint Venture business;
(d) to enable QNI to continue managing and operating the Joint Venture business while nickel prices remained low, Mineralogy would have provided to QNI the funding referred to in subparagraph (c) out of payments made on account of Royalty Component B;
(e) further particulars may be provided upon completion of interlocutory processes, including the exchange of expert reports;
(f) the funds it is alleged that Mineralogy would have provided to QNI are that portion of Royalty Component B payable to Mineralogy that was necessary to enable QNI to continue to manage and operate the Joint Venture business while nickel prices remained low.
[3] As to paragraph 44:
(a) the funds it is alleged that Mineralogy did not provide to QNI are that portion of Royalty Component B payable to Mineralogy that was necessary to enable QNI to continue managing and operating the Joint Venture business.
And one can understand why, even though it's a human act later on, our learned friends don't really challenge that. You have got a group of companies ultimately controlled by one human actor. One should be getting in the tens of millions of dollars at least a quarter. Another is enterprises, because of a drop in commodities prices, needs some short‑term funding. He would have. It's not like, as you might have had in another case, where you said, look, this company here had facilities with its bank. And it would have used those facilities with the bank. In that case, you really would need a much more detailed account.
But here, what is the material fact? The material fact is, would Palmer - the actual person who controlled all of them - have chosen to use the money for this purpose or not? That's the material fact. So the real battleground ordinarily in a case such as this is, was there going to be $36 million? Because ordinarily, the argument is, look, sure we mightn't have paid you on time. But that wasn't the only reason the venture failed. Even if we had paid you on time, you would have failed. That's not really this case. But that's a case that is open to my learned friends to run.
So when one looks at that analysis in 32A and B and then 37, and we go back then to the statement of claim, the real battleground in truth is simply, as I said earlier, changing a forecast of $28 million to an ex-post facto known requirement of the 35. It doesn't cause our learned friends any embarrassment. It doesn't delay the trial. In fact, it should reduce the sorts of arguments you would expect in the interlocutory stages of the trial.
[25] In the period from the fourth quarter of 2013 to the second quarter of 30 June 2016 (the latter quarter being the quarter immediately preceding the liquidation of Palmer Petroleum as referred to in paragraph 40 herein), the total amount of Royalty Component B payable by Sino and Korean under the MRSLAs was US$73,349,207 as follows.:
(a) for the quarter ended 31 December 2013: US$559,770 (due by 14 January 2014);
(b) for the quarter ended 31 March 2014: US$4,164,000 (due by 14 April 2014);
(c) for the quarter ended 30 June 2014: US$5,670,996 (due by 14 July 2014);
(d) for the quarter ended 30 September 2014: US$8,823,397 (due by 14 October 2014);
(e) the quarter ended 31 December 2014: US$5,074,668 (due by 14 January 2015);
(f) for the quarter ended 31 March 2015: US$3,035,524 (due by 14 April 2015);
(g) for the quarter ended 30 June 2015: US$5,162,503 (due by 14 July 2015);
(h) for the quarter ended 30 September 2015: US$9,342,794 (due by 14 October 2015);
(i) for the quarter ending 31 December 2015: US$6,182,799 (due by 14 January 2016);
(j) for the quarter ending 31 March 2016: US$9,341,256 (due by 14 April 2016);
(k) for the quarter ending 30 June 2016: US$18,996,732 (due by 14 July 2016);
(l) by the quarter ending 30 June 2016: US$76,354,439.
Mineralogy Pty Ltd v Sino Iron Pty Ltd [No 16] [2017] WASC 340, Table 7 at paragraph 775.
[39AA] If Sino, Korean and CITIC had paid Royalty Component B to Mineralogy in accordance with their obligations under the MRSLAs and the FCD, Mineralogy would have provided such of those funds to Palmer Petroleum and:
(a) Palmer Petroleum would have paid for the services rendered under the BGP Contract referred to in paragraphs 38A to 38C above and BGP would not have had a basis to issue the Statutory Demand (or any other demand);
(b) further or alternatively to subparagraph (a) above, Palmer Petroleum would have paid the amount in the Statutory Demand by the due date for compliance;
(ba) further or alternatively to subparagraphs (a) and (b) above, Palmer Petroleum would have paid the amount in the Statutory Demand and/or any further amount owing to BGP on or before 22 July 2016 (being the date when Palmer Petroleum was ordered to be wound up in insolvency as alleged herein at paragraph 40 below);
(c) further or alternatively to subparagraphs (a) and to (ba) above, Palmer Petroleum would have had sufficient funding to:
(i) meet its working capital requirements;
(ii) operate the Business;
(iii) pursue the Business Purpose.
The plaintiffs' case is based on a 'counterfactual' purporting to link the CITIC parties' failure to pay Royalty Component B and the insolvency of Queensland Nickel Pty Ltd (QNI) and Palmer Petroleum Pty Ltd (Palmer Petroleum). In the Proposed 6ASOC, the new alleged sequence of events is devoid of the material facts necessary to formulate a complete cause of action for indemnity or, alternatively, to allow an impartial and uninformed reader to know what the case is about. The nature of the proposed amendments in Proposed 6ASOC are such that, if leave is granted, Mineralogy's case in the PP Proceeding will suffer from the same uncertainty.
[37] Putting that issue to one side, following the amendments, the plaintiffs' case remained tolerably clear (subject to paragraph 38 below). They contended that Mineralogy 'would have' provided funding to QNI if Royalty Component B had been paid (and 'did not' because the CITIC parties did not pay Royalty Component B). What that meant in the circumstances of the case and how the allegation would be proved remained unclear - especially because of the deletion of the previous plea that Mineralogy had 'agreed and/or determined' to provide QNI funding from Royalty Component B. But it was still alleged that the consequences for QNI arose out of a $28 million funding gap in or around November 2015.
[38] The plaintiffs apparently contended that this assertion, that Mineralogy 'would have' provided $28 million of funding to QNI from Royalty Component B, was still sufficient to render CITIC liable for the $1.8 billion in alleged losses arising out of the circumstances described above. The then extant particulars remained in place to clarify the relevant pleas, and the CITIC parties requested further and better particulars of key aspects of the new pleadings (addressed below).
(a) QNI required unspecified amounts of funding at unspecified times;
>
> (b) the Mineralogy Parties would have provided that funding at unspecified times if RCB had been paid; and
>
> (c) the Mineralogy Parties would have provided the funding out of unspecified payments of RCB.
(a) the meaning of the phrase 'in relation to' within cl 11.5(c) of the FCD;
>
> (b) the proper construction of cl 11.5(c) within the FCD as a whole; and
>
> (c) the requisite causal factor that must be satisfied in this case.[40]
... hopelessly general causal proposition that if Mineralogy had received the Royalty Component B payments on time, Mineralogy 'would have' provided funds to QNI to enable it to continue to manage and operate the Joint Venture business.[46]
(a) the CITIC Parties were obliged to make RCB payments to the Mineralogy Parties on certain dates between December 2013 and March 2017;[52]
>
> (b) from around 2015,[53] QNI required funding for working capital to enable it to continue managing and operating the Joint Venture business;[54] and
>
> (c) if the CITIC Parties had paid the RCB payments in accordance with their obligations, Mineralogy 'would have' provided those funds to QNI to enable it to continue to manage and operate the business.[55]
[102] Sometimes a causal link between a breach or contravention and a particular head of damage may be obvious. In such a case an expressly pleaded causal link may be unnecessary. A general plea, such as that found at par 21AL, may suffice. If, however, the alleged causal link is not obvious, a claimant should plead the material facts relied on to establish the causal link between the breach (or contravention) and the claimed loss - and the alleged causal link must at least arguably establish the necessary causal connection between the breach (or contravention) and the alleged suffering of such a loss.
[103] In short, as French J (as his Honour then was) said in a misleading conduct case, 'the material facts establishing the necessary causal link should be pleaded'. Moreover, it is necessary to plead material facts which give rise to a 'reasonable inference' that the breach or contravention and the alleged loss stand to each other 'in the relation of cause and effect': Bond Corporation Pty Ltd v Thiess Contractors Pty Ltd & Ors [1987] FCA 84; (1987) 14 FCR 215, 221 - 222 (referring to Dow Hager Lawrance v Lord Norreys [1890] UKLawRpAC 14; (1890) 15 App Cas 210, 221). A number of similar authorities are collected by Bond J in Sanrus Pty Ltd v Monto Coal 2 Pty Ltd (No 7) [2019] QSC 241 [17] - [21].
[104] A cause of action should only be struck out as not being reasonable due to the absence of the requisite causal link where the allegation of causation is clearly untenable on the pleading. In this context the term 'reasonable' means reasonable according to law. The question of law stands independently of the facts giving rise to it. The court must proceed on the basis that the facts alleged in the pleading are established. The question is whether, on the facts as pleaded, there is a sufficient causative relationship alleged between the alleged breach (or contravention) and the alleged loss. Any question of causation is quintessentially a question of fact and degree. The question is fact sensitive and will be affected by the evidence. This accentuates the need to take a cautious approach in assessing whether a pleaded claim is untenable. Nevertheless, the basal requirement remains: the material facts as pleaded must be capable of being regarded as sufficient to establish that the required causal connection between a breach (or a contravention) and the loss exists.
The defendants are entitled to have the plaintiff pinned down to a causation hypothesis which is not characterised by imprecision and ambiguity and which, at least arguably, establishes the requisite causal connection between the implementation of the conspiracy and the suffering of loss. If there is more than one causation hypothesis, then the statement just made must apply to each one. The pleading device of merely cross-referring back to events alleged to have happened is unlikely to be a satisfactory way of addressing a proper plea of causation. There must be a direct and unambiguous identification of the material facts relied on to establish the causal link which the law requires. And it must be something which makes narrative sense. The defendants should not be required to cherry pick through the pleading to work out what the case is that they have to meet in this regard.
[21] The result is that where a party's causation hypothesis depends on establishing a particular counterfactual scenario to establish the alleged causal link between breaches of contract and the loss which it is said would have eventuated if the conduct which the party impugns had not occurred, that counterfactual scenario must be pleaded and particularised in accordance with the rules of pleading. This should be done with the degree of clarity referred to in Oztech Pty Ltd v Public Trustee of Queensland. The pleading so framed must at least arguably establish a reasonable inference that the impugned conduct and the claimed loss stand to each other in the relation of cause and effect.
In this Deed, unless the context otherwise requires:
Project Agreements means the following agreements (each as amended from time to time) between the Company and the Seller and which have been disclosed to CITIC:
(a) the Korean Facilities Deed;
(b) the Korean Mining Right Agreement;
(c) the Korean Sublease;
(d) the Korean Steel Takeover Agreement;
(e) the Consolidation Agreement;
(f) the Sino Iron Facilities Deed;
(g) the Sino iron Mining Right Agreement;
(h) the Sino iron Sublease;
(i) this Co-Ordination Deed; and
(j) the Sino Iron Takeover Agreement.
9.1 The following provisions will apply to each indemnity provided for under this Deed:
(e) Each party claiming the benefit of an indemnity must take all reasonable steps to minimise and, where possible, avoid any loss or damage suffered by it.
(a) In consideration of Mineralogy granting the further rights to Sino Iron and Korean under this Deed and in further consideration of the sum of five thousand dollars ($5000.00) paid on the date hereof by CITIC to Mineralogy, CITIC unconditionally and irrevocably guarantees to Mineralogy the performance of Korean's or Sino Iron's obligations under this Deed and the Project Agreements.
(b) If Korean or Sino Iron fails to perform its obligations under this Deed or the Project Agreements when they are due, CITIC must immediately on demand from Mineralogy cause Sino Iron or Korean as the case may be to perform its obligations under this Deed or the Project Agreements as applicable. If Sino Iron or Korean fail to perform the obligation CITIC must itself perform the obligation within 7 days of a demand by Mineralogy to do so (which, for the avoidance of doubt, includes the payment of an amount which is due to be paid but which has not been paid by Sino Iron or Korean).
(c) CITIC indemnifies Clive F Palmer and Mineralogy against any loss suffered, paid, or incurred by it in relation to the failure of Sino Iron and/or Korean to perform its obligations under this Deed or the Project Agreements or the failure of CITIC to cause Sino Iron and/or Korean to perform its obligations under this Deed or the Project Agreements.
Amended Statement of Claim dated 22 December 2017 (QNI ASOC)
Second Amended Statement of Claim dated 16 January 2018 (QNI 2ASOC)
Third Amended Statement of Claim dated 19 March 2018 (QNI 3ASOC)
Fourth Amended Statement of Claim dated 17 July 2018 (QNI 4ASOC)
First Amended Statement of Claim dated 28 March 2018 (PP ASOC)
Fifth Amended Statement of Claim dated 2 September 2022 (QNI 5ASOC)
Further and Better Particulars dated 8 December 2022 (QNI FABP)
Second Amended Statement of Claim dated 2 September 2022 (PP 2ASOC)
Further and Better Particulars dated 8 December 2022 (PP FABP)
Minute of the Sixth Amended Statement of Claim dated 23 January 2023 (QNI 6ASOC)
Minute of the Third Amended Statement of Claim dated 23 January 2023 (PP 3ASOC)
I certify that the preceding paragraph(s) comprise the reasons for decision of the Supreme Court of Western Australia.
[1] I refer to the plaintiffs' chamber summonses for leave to amend and other orders dated 23 January 2023 filed in CIV 2072 of 2017 and in CIV 1267 of 2018. Both applications were filed with the memoranda required by O 59 r 9 RSC, which demonstrated that extensive conferral had occurred between the parties. Not all of the matters the subject of these chamber summonses were brought on for hearing at the same time.
[3] See Schedule A and Schedule B to the reasons of the court in Palmer v CITIC Ltd [No 2] [2019] WASC 14, which set out the various questions which were proposed for preliminary determination.
[4] Palmer v CITIC Ltd [2017] WASC 253 (Le Miere J) (Stay application); Palmer v CITIC Ltd [No 2] [2019] WASC 14 (Kenneth Martin J) (Preliminary questions application); Palmer v CITIC Ltd [No 3] [2019] WASC 424 (Kenneth Martin J) (Discovery categories); Sino Iron Pty Ltd v Mineralogy Pty Ltd [2022] WASC 151 (Quinlan CJ) (Costs application); Palmer v CITIC Ltd [No 4] [2022] WASC 292 (Kenneth Martin J) (Strategic conference and timetabling); Palmer v CITIC Ltd [No 5] [2023] WASC 44 (Kenneth Martin J) (Directions and timetabling); Palmer v CITIC Ltd [No 6] [2023] WASC 188 (Lundberg J) (Application to set aside subpoenas); and Palmer v CITIC Ltd [No 7] [2023] WASC 202 (Lundberg J) (Strike‑out applications).
[5] The table in Attachment B to these reasons summarises the history of the statements of claim in both actions.
[7] Hooker Corporation Ltd v Commonwealth (1986) 65 ACTR 32, 38 (Kelly J); and Nyoni v Patterson [2012] WASCA 171 [38] (Pullin JA, with whom Buss JA (as his Honour then was) and Murphy JA agreed).
[8] Approved by the Court of Appeal in English v Vantage Holdings Group Pty Ltd [2021] WASCA 47 [56] (Murphy, Mitchell and Vaughan JJA) and in DFD Rhodes Pty Ltd v Hancock Prospecting Pty Ltd [2022] WASCA 97 [226] (Quinlan CJ, Beech and Vaughan JJA).
[9] Vantage Holdings Group [60(g)] (Smith J).
[10] Vantage Holdings Group [60(h)] (Smith J).
[11] Vantage Holdings Group [60(f)] (Smith J).
[12] Lampson (Australia) Pty Ltd v Fortescue Metals Group [No 3] [2014] WASC 162 [44] (Edelman J).
[13] Vantage Holdings Group [60(i)] (Smith J).
[14] Vantage Holdings Group [60(j)] (Smith J).
[15] See also Goldsmith v Sandilands [2002] HCA 31; (2002) 76 ALJR 1024 [2] ‑ [3] (Gleeson CJ) and Wheelahan v City of Casey (No 12) [2013] VSC 316 [25] (Dixon J).
[16] Trackem Pty Ltd v Revenue Partners (A Partnership) [2021] WASC 345 [25] - [30] (Archer J).
[18] Mineralogy Reply Submissions, [5].
[20] I will set out the form of the QNI 5ASOC to show the course of the developments in the pleading.
[21] In each extract of the pleadings in these reasons, the underlining and strike though notations reflect the pleading as filed or the proposed minute as filed.
[22] Mineralogy Submissions, [18] - [20].
[24] Mineralogy Reply Submissions, [2], [3], and [7] - [27].
[25] Mineralogy Reply Submissions, [4].
[26] Mineralogy Reply Submissions, [5].
[27] Mineralogy Reply Submissions, [6].
[29] Mineralogy Submissions, [30] - [34]; Mineralogy Reply Submissions [28] - [31].
[33] CITIC Submissions, [54] ‑ [59]
[35] CITIC Submissions, [66] ‑ [92].
[36] CITIC Submissions, [93] ‑ [102].
[37] CITIC Submissions, [103] ‑ [112].
[38] CITIC Submissions, [8] ‑ [53] and especially [15]. The CITIC Parties also filed an aide-memoire summarising the relevant changes to the plaintiffs' pleadings over the past six or so years.
[39] CITIC Submissions, [40] - [44].
[43] CITIC Submissions, [100] - [102].
[45] CITIC Submissions, [73]. See [40] - [43] of the QNI 4ASOC.
[49] CITIC Submissions, [77] - [88].
[53] I refer to 2015 given the allegation in [37] of the QNI 6ASOC that the downturn in the nickel price occurred in 2015, and this downturn adversely affected QNI's cashflow (as alleged in [37A]), and both [37] and [37A] form the basis of the allegation in [38].
[56] Such a claim necessitates consideration as to whether damage suffered for which the corporation seeks compensation is damage that resulted from the contravention. This requires a causal connection between the alleged damage and the contravening conduct, and only damage which is caused by the contravention can be the subject of an order for compensation (as explained at [99] in English v Vantage Holdings Group Pty Ltd).
[57] Bond Corporation Pty Ltd v Thiess Contractors Pty Ltd [1987] FCA 84; (1987) 14 FCR 215, 221 ‑ 222.
[60] Sanrus [23], [25] and [56] ‑ [82] (Bond J).
[61] QNI 6ASOC, [4], [4A] and [5].
[63] See the observations of Archer J in this regard in Avwest Aircraft Pty Ltd v Bombardier Inc [No 2] [2020] WASC 392 [22] (Archer J).
[65] See, for example, Hampton Transport Services Pty Ltd v Crushing Services International Pty Ltd [2018] WASC 54 [27] (Allanson J).
(1943) 68 CLR 55
(2002) 76 ALJR 1024
(2006) 33 WAR 82
(2009) 239 CLR 175
(1987) 14 FCR 215