Contract - Long term lease of industrial warehouse - Premises used by defendant lessee for storage of ammonium sulphate - Ammonium sulphate mildly acidic when exposed to moisture with corrosive effect on metals and concrete - Covenant in lease obliging defendant lessee to maintain and repair premises in good and substantial repair - Covenant subject to fair, wear and tear exception and provisos - Provision requiring plaintiff lessor to maintain and repair premises to prevent water ingress - Covenant requiring defendant lessee to surrender and yield up premises in good and substantial repair, subject to fair, wear and tear exception
Contract - Proper construction of covenants in lease - Infelicities in the drafting of lease - Application of maxim reddendo singula singulis - Whether fair, wear and tear exception engaged - Whether activities of the defendant lessee caused the damage to the warehouse - Whether defendant lessee repaired access holes made in the walls of the warehouse - State of repair of the premises upon being handed over to the plaintiff lessor
Contract - Claims by plaintiff lessor that defendant lessee breached s 56 of the Environmental Protection Act 1986 (WA) and was in breach of its contractual obligations to comply with the law - Whether warehouse established to be 'prescribed premises' under the legislation - Whether ammonium sulphate is material extracted from the ground - Whether production or design capacity of screening machine shown to exceed threshold - Whether emissions from the premises
Contract - Claims by plaintiff lessor that defendant lessee breached insurance obligations in the lease
Contract - Claims by plaintiff lessor against defendant lessee for rent not paid by the defendant during period of holding over - Proper construction of holding over provisions in the lease - Whether defendant entitled to abate rent under the lease
Damages - Proper basis for assessment of damages in context of covenant in lease to maintain and repair - Whether appropriate to assess damages by reference to rectification costs of the warehouse - Whether there is a basis to find that a unit in the warehouse should be demolished given extent of property damage - Whether conduct of plaintiff unreasonable such that a failure to mitigate might be found
Tort - Claim by plaintiff lessor that defendant lessee negligently caused damage to the warehouse - Whether defendant lessee liable for damage to the warehouse - Whether plaintiff lessor estopped from asserting claim - Whether plaintiff lessor concurrent wrongdoer - Whether plaintiff lessor contributorily negligent - Whether plaintiff lessor failed to mitigate its loss
Contract - Claims in contract by defendant lessee against plaintiff lessor by counterclaim - Claims for costs of the repairs to the warehouse - Claims for loss in value of the defendant's product - Claims for the costs of reconditioning the product once damages - Costs of relocating the product to other premises
Estoppel - Defendant pleads conventional estoppel in response to both contract and tortious claims - Whether pleaded assumption was mutual and bilateral
Limitation periods - Whether plaintiff lessor's claims subject to six year limitation in Limitation Act 2005 (WA) - Whether obligations of a continuing nature - Whether successive claims arose - Whether contract and tort claims statute barred in whole or in part
Evidence - Admissibility rulings under s 79C(2a) of the Evidence Act 1906 (WA)
Environmental Protection Regulations 1987 (WA), reg 5, sch 1
Evidence Act 1906 (WA), s 79C
Law Reform (Contributory Negligence and Tortfeasor Contribution) Act 1947 (WA), s 4(1)
Limitation Act 2005 (WA), s 13
Property Law Act 1969 (WA), s 71
Supreme Court Act 1935 (WA), s 32
Judgment to be entered for the plaintiff in the terms set out in Part XII of the reasons.
PART I - OVERVIEW A. A broad outline of the matter
When one is in a burning movie theatre, I expect that only a few would look at the fine print on the back of the ticket stub before acting.
... I would expect that all of my Australian friends over the last 40 years would clearly understand and respond properly respond to the outcry of "Fire" even with an American accent.
(a) breach of cl 3.9(a) of the Varied Lease, which incorporates a covenant to repair, causing permanent and serious structural damage to the Warehouse (see [11.1], [12], [13] and [14] of the SOC);
(b) breach of cl 3.23 of the Varied Lease, which obliged the defendant to yield up the Warehouse in good and substantial repair, being a breach directed at the failure to repair the damage to the Units (see 17A(b), [18] and [19] of the SOC);[10]
(c) breach of cl 3.23 of the Varied Lease, which is directed at the defendant's failure to repair the access holes in the walls to the Warehouse (see [14A], [17A(a)], [18] and [19] of the SOC);
(d) breach of cl 3.9(a) of the Varied Lease causing the non-renewal of insurance coverage of the Warehouse (see [11.2] and [12] of the SOC); and
(e) breaches of cl 3.10(a), cl 3.10(b), cl 3.15(a) and cl 5.23 of the Varied Lease, which obliged the defendant to comply with the law and with all relevant statutory obligations - the plaintiff specifically relies on alleged breaches of s 56 of the Environmental Protection Act 1986 (WA) (the EP Act) and the matters prescribed in the Environmental Protection Regulations 1987 (WA) (the EP Regulations) (see [12A] to [12G] of the SOC).
PART II - BACKGROUND MATTERS A. The parties and their personnel
Construction of the warehouses comprises reinforced concrete footings and floor slabs, heavy steel framing, concrete (to 2 metres) and Colorbond wall cladding, steel trusses supporting metal deck roof sheeting with clearlight panels, and metal gutters and downpipes. Truss height is 9 to l0 metres.
Access to Warehouse l is provided by two 7 metre wide sliding doors at the western end and to Warehouse 2 by two 7 metre sliding doors at the western and eastern ends.
Three toilet blocks are provided, each containing two WCs and hand basins. Construction is of concrete panel walls with a metal deck roof and concrete floors. Plasterboard ceilings are provided in two.
Along the southern side of Warehouse is a 60 tonne weighbridge with a small transportable office adjacent.
These images were taken by the bank's valuer, Mr Gordon Jeanes, and were included in his valuation report for Unit 1 dated July 2004 (Exhibit 10).
These images were taken by the bank's valuer and were included in his valuation report dated 20 December 2005 (Exhibit 47).
These images were taken by the bank's valuer and were included in his valuation report dated 20 December 2005 (Exhibit 261).
These images were taken by the bank's valuer, but were not included in his valuation report dated 28 May 2012, which is Exhibit 335 (Exhibit 326).
These images were taken by the same valuer and were included in his valuation report dated 2 July 2015 (Exhibit 548).
These are the photographs referred to in the evidence of Mr Goodwin, taken between 2008 and 2013 (Exhibit 168).
THARBY, MR: When they [the trucks] were coming through, were the doors open or closed?
O'NEILL, MR: Well, what - it depended on the - on the weather. If the weather was nice and there - it wasn't raining, typically, we would leave the door - we would open the doors. They would pull in. If it was raining, we would close the door to unit 3 and then - unless there was a truck right behind it. If there was a constant flow, we would leave the doors open while they were pulling through. Once they were in, we would open the door. When they - when they were full, if it was raining out and the door to unit 2 - the exterior door was closed, we would open it once they were - they were loaded - fully loaded. And then, once they departed - again, if there was no truck waiting to be loaded, we would close the doors. If it was raining, if it was - if the weather was nice and it wasn't raining, we would usually leave the doors open.
THARBY, MR: If it was windy, would you leave the doors open?
O'NEILL, MR: No, we would close the doors if it was windy. If the wind was blowing in such a way that it was coming into the building, we would close the doors - which, typically, it was. So, yes, if it was windy, we would close the doors.
THARBY, MR: If there were trucks coming through and it was windy, you would open the doors for the trucks?
O'NEILL, MR: Correct.
THARBY, MR: Would you - - -?---
O'NEILL, MR: And then we would close the doors.
THARBY, MR: Would you still close the doors if there were trucks waiting to come through after that?
O'NEILL, MR: Yes. If - if there - if there was - and - and we would only have one truck in - depending on what was going on - but for the most part, we would only have one truck in the two units at one time. So if the wind was - was really blowing hard, we would close the doors.
THARBY, MR: Yes?
O'NEILL, MR: When the truck pulled in, we would close the door to unit 3 and then - once the truck was clear and in the building. And then we would close the door to unit 2 until - the extra door until the truck was loaded. Then we would open it and let them exit.
Granular sulphate of ammonia with the following typical specification:
Nitrogen (N): 21%
Sulphur (S): 24%
Moisture (H2O): less than 0.5%
Size of 2-4mm (Note: the Contractor may be required to screen the product to conform to specifications).
Members will ensure that all fertilizer products are confined within dedicated storage perimeters, so as to minimize the uncontrolled loss of any products.
As discussed IRM is interested in an offer from you as follows:
STORAGE
We could be in position to commence the lease as early as January 2005 however this depends on many factors, not in the least negotiation of commercial terms and conditions for the lease. (underlining added)
(a) prepared by the defendant;
(b) initially sent by Mr Syminton to Mr Burns of the plaintiff on 18 January 2005;[35]
(c) revised by Mr Syminton on 21 January 2005 including to include the phrase 'value adding and' before the reference to 'storage of corrosive fertiliser';[36]
(d) executed by Mr Syminton on 4 February 2005; and
(e) then accepted by Mr Joseph Hawkins on 9 February 2005.
The Lessee shall use the Premises for the purposes of value adding and storage of corrosive fertiliser, and shall obtain all necessary approvals to comply with all laws, by-laws and regulations from all relevant authorities relating to the permitted use. (underlining added)
(a) 'concrete coming away from metal beam at top of retaining wall in corner' in the southwest corner of Unit 1;
(b) 'some metal supports from beam are missing and the corner concrete is badly chipped' in the southwest corner;
(c) 'many small hairline cracks in the wall' along the south wall;
(d) support beams were badly bent;
(e) 'the wall is separated/broken away from metal tab/beam supporting wall in corner' on the southeast corner; and
(f) 'large crack where floor has separated from remainder of floor in [northeast] corner' and 'foundation is slightly washed out'.
(x) Nothing in this lease shall mean that the lessee is liable to contribute to the cost of the repair of any inherent defect or any structural repairs or any repair or replacement which is of a capital nature.
(t) Any and all costs related to lifting the standard of the premises and land to an acceptable standard including site clean up and compliance to existing permits are entirely for the lessors account.
...
3.9 Maintain and Repair Premises
The Lessee must maintain and keep the Premises in good and substantial repair, order and condition except in the event of damage by explosion, earthquake, aircraft, riot, civil commotion, fire, flood, lightning, storm, tempest, act of God, war, fair wear and tear and any other risk insured against by the Lessor PROVIDED THAT this exception shall not apply if the damage is caused by the neglect, default or misconduct of the Lessee and the Lessor's insurances are invalidated by an act, neglect or default of the Lessee.
The Lessor must maintain and repair the Premises to prevent water ingress.
Any cleaning performed must be to a commercial standard.
The Lessee shall repair and make good any damage (regardless of how minor) which may be caused to the Premises at any time by the installation or removal by the Lessee of any fixtures, fittings, plant or equipment supplied and fitted by the Lessee or on behalf of the Lessor.
Not to use nor permit to be used the Premises for any purpose other than the use stated in Schedule 1 unless otherwise agreed in writing nor to permit nor suffer the use of the Premises for any residential purpose whether temporary or permanent and the use of the Premises shall conform to all laws and local authority laws, lay-laws, regulations or requirements and the Lessee shall obtain and maintain all necessary approval, consents, permits and licences from all relevant authorities for its use of the Premises that are not already in place. (underlining added)
3.17 Not to Invalidate Insurance
Not to do nor suffer to be done any act, matter or thing upon the Premises nor bring nor keep anything therein whereby the insurance on the Premises against damage by fire and other insured risks might be rendered void or voidable or whereby the rate of premium is or is liable to be increased and if the Lessor approves in writing any proposal of the Lessee to add to or increase any insured risk, to pay all additional premiums of insurance on the Premises required on account of the additional or increased risk caused by the use to which the Premises are put by the Lessee and the Lessor shall provide the Lessee with copies of all insurance policies to enable the Lessee to comply with this Clause 3.15 of this Lease.
3.23 Yielding Up
Upon the expiry or sooner determination of the Term the Lessee must:
(a) Peaceably to surrender and yield up to the Lessor the Premises subject to the other provisions of this Lease, clean and free from rubbish and in good and substantial repair and condition as nearly as possible in the same condition as at the commencement of the Term fair wear and tear excepted; and
(b) Surrender to the Lessor all keys belonging to the Premises including security access cards held by the Lessee whether provided by the Lessor or made or procured by the Lessee for his own use and not to permit these to come into the possession or control of any person other than responsible persons authorised by the Lessee and to use his best endeavours to protect and keep safe the Premises and any property contained therein and to keep all doors and windows securely fastened when not in use.
5.23 No Warranty by Lessor as To Use
The Lessor gives no warranty as to the use to which the Premises may be put other than the Premises may be lawfully used as commercial and medical offices and the Lessee accepts the Premises for the Term with full knowledge of and subject to any prohibition or restriction on the use thereof under or pursuant to any law or other statutory authority and if the business carried on by the Lessee at the Premises is permissible only with consent pursuant to any Act or other statutory authority the Lessee shall obtain that consent at his own expense.
In the FIRST TERM it has been agreed between the parties that the rental increase is to be phased in over four (4) years as follows:
(a) the delineation of the additional document as 'Schedule 3', noting the Original Lease incorporates a 'Schedule 1' and a 'Schedule 2';
(b) the premises were owned by the same entity (i.e. the plaintiff),
(c) the tenant was to be the same (i.e. the defendant),
(d) the same operations were being conducted by the defendant from each of the Units;
(e) the Units form part of the same Warehouse; and
(f) the lease for Unit 1 was continuing, with some years left to run.
When the parties to an existing contract enter into a further contract by which they vary the original contract, then, by hypothesis, they have made two contracts. For one reason or another, it may be material to determine whether the effect of the second contract is to bring an end to the first contract and replace it with the second, or whether the effect is to leave the first contract standing, subject to the alteration.
(a) an Industrial Special Risks policy issued by Zurich Australian Insurance Limited for the period 28 February 2012 to 28 February 2013, covering material loss and damage of the insured's property and consequential loss (Exhibit 328);
(b) an Industrial Special Risks policy issued by Zurich Australian Insurance Limited for the period 28 February 2013 to 28 February 2014, covering material loss and damage of the insured's property and consequential loss (Exhibit 367); and
(b) an Industrial Special Risks policy issued by Zurich Australian Insurance Limited for the period 28 February 2015 to 28 February 2016, covering material loss and damage of the insured's property and consequential loss (Exhibit 531).
PART III - EVIDENCE A. Approach to fact finding and inferences
... human memory of what was said in a conversation is fallible for a variety of reasons, and ordinarily the degree of fallibility increases with the passage of time, particularly where disputes or litigation intervene, and the processes of memory are overlaid, often subconsciously, by perceptions or self-interest as well as conscious consideration of what should have been said or could have been said. All too often what is actually remembered is little more than an impression from which plausible details are then, again often subconsciously, constructed. All this is a matter of ordinary human experience.
...the best approach for a judge to adopt in the trial of a commercial case is, in my view, to place little if any reliance at all on witnesses' recollections of what was said in meetings and conversations, and to base factual findings on inferences drawn from the documentary evidence and known or probable facts. This does not mean that oral testimony serves no useful purpose - though its utility is often disproportionate to its length. But its value lies largely, as I see it, in the opportunity which cross-examination affords to subject the documentary record to critical scrutiny and to gauge the personality, motivations and working practices of a witness, rather than in testimony of what the witness recalls of particular conversations and events. Above all, it is important to avoid the fallacy of supposing that, because a witness has confidence in his or her recollection and is honest, evidence based on that recollection provides any reliable guide to the truth.
[96] Two consequences may flow from the unexplained failure of a party to call a witness who that party may be expected to call. First, the court may infer that the evidence of the absent witness would not assist the case of the party. Second, the court may draw an inference unfavourable to the party with greater confidence. In the latter case the inference must already be available on the evidence. Also, the uncalled witness must be one who appears to be in a position to cast light on the facts relied on as the ground for the inference. However, the rule in Jones v Dunkel does not permit an adverse inference that the uncalled evidence would have been positively damaging to the party. The absence of the witness cannot be used to make up any deficiency of evidence.
[97] Accordingly, the rule in Jones v Dunkel is accepted to be an application of the maxim that evidence is to be weighed according to the proof which it was within the power of one side to have produced and in the power of the other to have contradicted. (citations and footnotes omitted)
THARBY, MR: Can the witness be shown exhibit 53, please. This is an email sent to Mr Ross Syminton at IRM copied to [Mr Joseph Hawkins], so it wasn't sent to you. Mr Burns writes:
Ross, so that we can assess the effect it is having on the concrete floor at the above site, would you please provide the chemical composition specifications of the fertiliser that is being stored there.
It continues. Do you recall seeing - - -?
D HAWKINS, MR: Well, I haven't seen - I haven't seen the email or didn't - it wasn't addressed to me, but I would - - -
THARBY, MR: No. Were you aware of - - -?
D HAWKINS, MR: I would assume by what they've written there is they're trying to protect the concrete, or make sure it's not going to be eaten away.
THARBY, MR: You weren't aware of this email at the time. Were you aware of the inquiry generally?
D HAWKINS, MR: No.
THARBY, MR: Were you aware of IRM's - - response?
D HAWKINS, MR: I understand that the - the fertiliser was eating the concrete and the steel away from my visits.
THARBY, MR: That's not what I asked, Mr Hawkins. Were you aware of any response from IRM?-
D HAWKINS, MR: No.
Hi Joe, I went to Butcher Street this morning and met Dave onsite and talked through the issues and looked around the building.
It seems that the current condition is from 20 years of use and that the deteriation [sic] has sped up in recent years as water has been getting inside more and more. I would not expect the building to survive another 20 years without massive expenditure and I would not think that would be sensible.
My recommendation is to replace like for like with a few low cost improvements. So my description of what to do on the North face (and progressively around the rest of the building) is
My estimation on pricing is between $7k and $10k per bay (plus GST) on the North face - 10 bays in total.
If you would like to discuss this further I would be happy to meet you at Butcher Street and work out a plan to suit everyone concerned. if you have any advice or previous experience that would improve the plan I would be happy to hear it.
Hi Joe, The pricing for repairs at 30 Butcher Street Kwinana is as follows
Remove all external cladding, gutters, flashings, girts, etc and replace with similar materials - $550k
Remove and replace all roof sheeting, support purlins, etc and replace with similar materials· $1.3 million
Sand blast core structure and repaint with appropriate paint $300k
Total $2,150,000 plus GST
This pricing comes with a large dose of qualification as the structure is almost certainly in a worse condition than is possible to evaluate until the claddings are removed so it would be sensible to budget for a 25 % increase to allow for and serious structural repairs that may be necessary.
...whilst you and Joe are adamant that there is no solution, it makes it hard to find an amicable outcome.
(a) the doors to the Warehouse were kept open while the premises were in operation;
(b) he attended at the Warehouse on occasions when it was raining and observed the wheels of the trucks would bring the water inside the Warehouse;
(c) if the rain was coming from the southwest, the rain would also come into the Warehouse around 2 to 3 feet inside, but not much more than that usually;
(d) the defendant had a contract with BHP, for BHP to deliver ammonium sulphate to the premises by trucks as a bulk product in crystal form (which was effectively a waste product from BHP);
(e) the trucks, which were 25 tonne tipping semitrailers, would dump the ammonium sulphate on the floor of the Warehouse upon delivery;
(f) the ammonium sulphate was often at an ambient temperature but could be delivered at a hotter temperature, up to 40 degrees Celsius;
(g) the product is quite fine, and would be crushed down further by the Caterpillar front-end loader moving across it in the Warehouse, and quite often the dust would move around the Warehouse behind the loader or as a result of the wind coming through the Warehouse, and he observed occasions on which the dust would exit the Warehouse and head to the nearby railway lines;
(h) the dust was not created through the dumping process on to the Warehouse floor, but rather from the process of being crushed when the loader was moving around, when the ammonium sulphate was being lifted or scooped off the floor by the loader, and through the use of the screening process;
(i) Mr Donkin described his recollection of the dust in the Warehouse in the following terms:[104]
Well, by the end of each day's activities, especially when it was high production, like the screener was going, trucks moving in and out constantly and product moving from Unit 1 to be processed, the level of dust could rise quite high. And you could end up with a film on top of the screener or the elevator or the loader up to two or three mils thick.
(j) at the end of the day, the workers in the Warehouse would sweep up the fines product to the extent they could, and within reach, which meant that the dust on certain areas was not swept at the end of the day, such as on top of the screeners or high up in the Warehouse;
(k) the Warehouse would be very busy from February through to the end of July each year, selling ammonium sulphate from the Warehouse, with there being low stock by the end of this period;
(l) the business would then begin building stock back up in August, September and October when the demand from farmers was fairly low;
(m) the defendant had imported a large gravity shaker table, which operated using electric motors and was used within the Warehouse to screen the ammonium sulphate, with the larger product staying above the screen, and the finer product falling below to the ground;
(n) he described the screening process as quite slow; and
(o) following the screening process, the granular product would be stored in one area of the Warehouse (usually at the end of Unit 3), with the finer product being stored elsewhere (usually in Unit 1 or Unit 2).
We had our second winter storm of the season on the weekend and we lost more sheets off the North wall. Pictures enclosed.
We had up to 4 inches of rain on Sat and Sun. The heavy rain twisted the gutter and a large amount of water was diverted into the shed.
Unit 2 was flooded with 2 inches of water standing in some parts of the shed. The screened WP has sustained some water damage. Luckily we had 400 mt of screened product in unit 3, so we were able to load out today. We had a vacuum truck in and sucked up about 6000 liters [sic] of water, so the shed is now drying up. Once the bottom of the pile has dried out we will decide how much needs to be conditioned or even rescreened. There will likely be upwards of 20 mt that has sustained water damage.
Unit 1 and 3 survived this storm ok as the wind was from the North West.
We have removed the damaged guttering and loose sheets, but now have an issue where water will be running off the roof and possibly inside the walls each time it rains as most of the wall near the T2 is now non-existent.
I'm not sure how long we can continue operating in these conditions before we have a major incident. It's getting to the point that we may have to stop load outs during rain events as product will get wet while filling trucks. Working on top of containers while it's raining will also become dangerous when the winds pick up through the opening in the wall and the tops of the containers are slippery.
Please advise on our plan to rectify this issue that has been dragging on too long.
(a) remove all external cladding, gutters, flashing, girts etc, and replace with similar materials;
(b) remove and replace all roof sheeting, support purlins etc and replace with similar materials; and
(c) sand blast core structure and repaint with appropriate paint.
We have conducted a high-level initial review of the current structure. Our initial calculations suggest that the current structure is on its limits for both strength and serviceability, we will further investigate this in our complete design review as per stage 1 above.
Based on the above initial high-level review, and observed deterioration of the major structural members, we anticipate that extensive remedial works will be required to bring the existing structure up to the strength and serviceability requirements of today's relevant codes.
Roof decking, guttering, purlins and framing all show signs of corrosion and are in need of some attention. Some of the roof sheeting needs replacing and is or will allow water ingress and in turn will corrode purlins. This is due to environment and normal wear and tear. Product stored in sheds is believed to be corrosive to metal and will have a bearing on life of steel as will a close proximity to water bodies such as the ocean. Recommendations and warranties for various coated steel products are available on Bluescope steels website. Standard zincalume is not recommended for this application. Colourbond Ultra steel deck would be more suitable, however all warranties are subject to environment. We have used this product in places such as Alcoa Kwinana with good results.
Scews [sic] and neo seals also show signs of corrosion, Skylight roof sheets are of a low quality 1800gsm and are worn by weather exposing fibres with splits to some screw fixings. A higher grade such as Fibrelite 2400gsm longlife sheets are recommended. These have a U.V. jell coat and are industrial grade with a full 25 year warranty. Please note aprox [sic] half of the skylights on the roof will require replacement in the near future. As they wear thin they become weak and are prone to lifting and breaking in high wind.
Gutter and internal box gutter are rusted and have had numerous patch jobs in the past. Some of these will require replacement also. We recommend Ultra .55 Heavy duty steel pressed to suit.
Please note prices for any of these jobs are available on request or if you require any further information please call ... or refer to Bluescope steel for tech advice.
(a) 'Butcher St Warehouse Costs incurred by IRM as of March 03, 2014', being Exhibit 490; and
(b) 'Butcher St Warehouse Costs incurred by IRM after 04 August 2015', being part of Exhibit 671.
PART IV - FACTUAL CHRONOLOGY
A. The creation of access holes and inspection of Units 2 & 3 in 2007
We agree to you removing or altering the dividing wall between units 2 & 3 provided that:
Any changes are made under the supervision of a civil engineer who has designed and certified that the changes are structurally sound and comply with all building and engineering codes required in Australia. At the expiration of the lease the walls are to be replaced so that they are in accordance with how they were when the lease of units 2 & 3 commenced. Any costs incurred in changing or removing the walls or replacing walls are to be at your cost.
The purpose of the inspection was to perform a visual examination of the storage facility for any existing damage, areas of concern and general commentary, and to catalogue the results of the examination with the owners of the facility.
(a) a rust line was apparent on the external sheets of Unit 2 although the sheets were stated to be 'generally okay' and the colour was in a reasonable condition;
(b) as to the internal walls and structure of Unit 2, they were described as being 'generally in reasonable condition with only product contamination being the main issue. Concrete has the occasional chip on the support walls and there is [sic] obvious hairline cracks in the surfaces of all concrete walls';
(c) a pole on the western wall of Unit 2 was noted as being bent, concrete was observed to be breaking away with a steel support slightly damaged and bent, and corrosion was evident on sheets on the western wall;
(d) as to Unit 3, it was described as being generally 'in reasonable condition except for the wetness of the floor for which we could see no obvious leaks to explain the condition' and there was 'still product contamination around all the walls and on the door that needs to be properly cleaned up', with the 'majority of the surrounding concrete walls had chips taken out ... and small hair-line fractures in most walls';
(e) as to the internal walls and structure of Unit 3, they were described as being in a 'similar condition to unit 2, however the floor was much wetter than expected for no apparent reason other than moisture absorption through remnants of product' and it was noted there were 'still obvious signs of product [from the previous tenant] that need to be removed and the reasons for the wet floor investigated';
(f) the report included a comment that there was 'obvious corrosion of steel supports as well as the support being bent from impact' in Unit 3; and
(g) the concrete walls in Unit 3 were described as being 'well chipped from general use' and being 'generally full of hair line cracks'.
We had the opportunity to witness the extent of leakage in the roof (as per attached) at 30 Butcher street today as it rained all day long. Can we please have the holes in the roof repaired as it is becoming very wet in some patches as shown.
Attached is a copy of the report on the extent of the roof leaks at the 30 Butcher street, Kwinana Beach which was sent approximately 2 months ago and to which we have received no official response. As such we have organized Alltype Roof Restorations to perform the necessary repairs (See attached quote - option1) to the roof and guttering which we will then on charge to JJ Hawkins Pty Ltd.
I acknowledge receipt of your email dated 3rd October 2008. Attached is a copy of a report prepared by Mr Wally Hughes of Beton Contractors as to the condition of the premises and the reason for the problem. Mr Hughes is a registered builder.
I have already referred the matter to our lawyers and am awaiting their advice.
I will not be responding to you by the 7th October 2008. I do not agree to have either my contractors or your own appointed to correct the problem and I do not accept any responsibility for the problem that has arisen.
I believe that the problem is of IRM's doing and as such is their responsibility under the normal "maintain and repair" conditions of a commercial lease.
I propose that a meeting be held on site so that the matter can be addressed and the responsibility for the damage that has occurred be identified. Then, and only then, can we proceed to having the problem rectified.
Regardless any assessment [by an independent third party assessor] will come up with the same answer. "The roof of unit 1 will require a reroof". This answer is a covering answer to protect the assessor from any liability. The answer is that the roof will require a re-roof in the near future. In fact that unless the present rust treatment includes the purlins and girts and the rust prevention program that has started is maintained, then the building will not only require a re-roof it will also require at the very least the replacement of all girts and purlins.
The ammonium sulphate is attacking the zinc coatings within and outside the building. This includes airborne ammonium sulphate dust and vapour. As the product is moved dust is caused and this is being deposited everywhere. Three main problems are presented.
(i) The dust settles on the gilts and the purlins where once the humidity exceeds 60% it attacks the zinc coating and leaves the steel exposed for further corrosion.
(ii) The dust settles onto the condensation on the metal sheeting.
(iii) The wind blowing over the building sucks the dust out through any openings. This is prevalent in the eastern side. As the wind blows over the building a vacuum results on the leeward side. This vacuum sucks out more dust. This dust is drawn to any moisture on the external face of the sheets. The external sheets display a patina of rust.
It appears that the dust mixed with moisture is rapidly accelerating the corrosion process. The area in the south eastern corner of unit one seems to be the worst affected by this accelerated corrosion. This area has held product the longest period. It is also where airflow meets the most resistance. To a lesser degree the roof above the load out area is badly affected.
...a serious question in the suitability of the property to store ammonium sulphate. In fact, the product should be stored in a site specific building. In such a building, corrosion control would be built in at construction. Sulphate resisting concretes would be used, the use of steel limited and where steel is used it would be coated to withstand the aggressive nature of ammonium sulphate. There would also be humidity reduction systems in place. In fact very few existing buildings in Perth, if any, would be suitable for the storage of ammonium sulphate.
Several actions are occurring simultaneously. The ammonium sulphate dust and vapour are settling on the metallic parts of the shed and is corroding the zinc coatings. This action is prevalent at normal temperatures, at normal pressures when the relative humidity exceeds 60%.
Ammonium Sulphate is hygroscopic, drawing moisture from the air. It is also highly water soluble. Both the ammonia and the sulphate dissolve in the presence of water. When the sulphate dissolves in water it becomes acidic. In the normal course of events the ammonium sulphate that has either been stored against the steelwork or is a result of dust settling or being sucked out of the building or from the vapour in the air, meets with the moisture and dissolves.
The acid that forms as the ammonium sulphate dissolves either stays where it formed or moves to the lowest point. It remains due to surface tension or by capillary action. Either way it remains in a position where it attacks the metal. Traces of the acid remain after it has evaporated to be reformed with the next formation of moisture. This is evident throughout the building.
In short the ammonium sulphate dissolves in water forming a sulphuric acid which eats firstly the protective coatings then the steel metal.
The purlins and girts must have their protective coating reinstated with a coating that will not be attacked by ammonium sulphate.
Units 2 and 3 should have all the steel work and sheeting coated with a protective coating.
Existing and future leaks must be fixed.
A decision whether to re-roof now and protect the new sheeting. Or protect the existing purlins and girts and sheeting now and re-roof in the future. Or maintain the implemented prevention system and see how long you can go without any remedial work. In the later case the purlins and the girts will definitely require replacing.
Once any remedial or replacement work is done it should be protected.
Or at the very least put some sort of coating over the current prevention system to prevent further corrosion.
Water ingress to be limited. Humidity to be reduced.
Clean down everything, patch as required then etch and protective coat all surfaces. After this a maintenance program is implemented to monitor and keep all coatings current. It will be impossible to coat everything properly however with periodical touch ups the accelerated corrosion can be controlled. This may be the most practical solution. In other situations this would get a 5 year guarantee. In this case no guarantee would be given.
While there is no immediate cause for concern however small leaks have appeared around new box gutter, probably lack of sealant between the old and new gutter. You would ask alltype [being the contractor] to patch when going past next.
Joe advised that he was prepared to replace the water pipe along the front of the building and that he would also look at replacing the fire water line at the same time. If necessary, he would replace the pipes along the south side of the building at a later date.
Joe advised that he had sampled the soil in the vicinity of the recent leaks and that the unqualified test result had shown that the soil was contaminated and highly acidic.
BJG advised that we had received quotes for the work and we offered to forward these to Joe. RJS suggested that a major part of the cost was the labour to dig the trenches and we offered the use of our operators to assist with this to help reduce the costs.
We advised that we were trying to arrange replacement of the door and frame, but Joe was not overly concerned about this and advised that he would be happy if we simply boarded it up from the inside. We could repair it at a later date if necessary.
Joe advised that he could provide the details of a supplier of plastic/fibreglass boxes, if we wished to replace any of them.
Joe advised that he would instruct his roof plumber visit the site and attempt to rectify to various leaks. There are some obvious areas of corrosion in the roof sheets and support steel. Joe suggested that he would need to start planning to replace some of the sheeting and he also suggested that he could look at replacing some of the steel purlins with timber. He made the comment that if we were to continue leasing the sheds for the long term, then it would be worth starting a program of replacing the damaged sheeting and steel work.
I hope business is good and you are doing well. The main purpose for this email is to update you on the status of the roof on shed 1. All Type Roof came out and patched the roof several weeks ago but unfortunately, the roof is in bad shape and it is nearly impossible to find, let alone repair all of the leaks. During the past week we had several days of heavy rainfall and there were leaks throughout shed 1 as well as on both sides of the wall that separates shed 1 from shed 2 and 3.
Please see the attached report, all of the photos in the presentation were taken on June 30, 2011 during a very heavy rainfall. The report shows many, though not all of the leaks in the roof and the damage that some of the leaks are causing to the concrete slab.
Concrete
There are two areas inside both exterior doors to Unit 1 at 30 Butcher street that are severely damaged and need to be repaired immediately. Each area is approximately 15 meters long x 10 meters wide. [Frank O'Neill] advised the damage is the result of water mixing with the ammonium sulphate and causing the concrete to erode and eventually crumble under the weight of heavy truck and loader operations. The erosion of both areas has been accelerated by the pooling of water in the lowest areas where the concrete is completely eroded. There are good pictures if you want them.
The concrete damage is the direct result of ongoing operations and not normal wear and tear. The area in front of both doors is heavily trafficked during inbound operations and when the shed is full. Furthermore, during normal operations, the loader blade will occasionally scrape the damaged area causing greater damage and contaminating the product with loose stones and concrete chips.
My view is that because the required repairs as not "normal" wear and tear therefore for IRM (NiW) account. If we all agree I would take this to NiW for them to decide how to process the cost, as a one off invoice being my preferred methodology. We would also need to advise Hawkins of the remedial work being done, seeking his approval of works (as per the lease) being especially careful with the language when advising him of the issue.
FTO [Frank O'Neill] then discussed the issue of the roof and the necessity of replacing the roof. The point was made to JH [Joseph Hawkins] that the roof has deteriorated to such an extent that IRM is no longer able to store product in shed 1.
JH acknowledged that the roof and the walls are in bad shape and need to be replaced. JH then spoke for 10 minutes about how corrosive our product is and how it is the cause of most, if not all of the damage to the roof and walls. JH claimed that he never would have agreed to the language in the lease that made the Landlord responsible for the total cost of repairing and replacing the roof if he knew how corrosive the product was. FTO made no comment other than to point out that the lease does state that the product is corrosive to which JH replied that it does not state HOW corrosive the product is. (emphasis added)
JH said that he is willing to pay a portion of the cost of the roof but he won't pay the full cost, IRM must share the cost. JH further added that if he has to pay the full cost, he will not do anything but continue to patch the roof and when IRM vacates, he will demolish shed 1 and rebuild it and never lease it to a tenant who will store corrosive products again. FTO asked JH to make a proposal to IRM. JH responded that he hadn't given it any thought but he would and get back to us (NOTE: This is the same thing JH told RJS during our meeting in March). FTO informed JH that we needed to move quickly on this because the busy season has recently ended and we have a 3 month window of opportunity to get all of the work completed.
In response to JH's comment about demolishing the building, FTO replied that IRM will not be willing to repair the concrete if JH chooses to demolish the building.
JH then made a comment that he wasn't sure when the lease for shed 1 was due to expire and he understood and appreciated our concern (the terminal operators at Kwinana and FTO in particular) to have the shed repaired so that we can conduct our business. FTO responded that he understood that the lease for shed 1 has expired and a new lease is currently being negotiated. JH said that he would get back to us with a proposal and that he would have his preferred contractor come in and look at what needs to be done to replace the roof and the walls in such a way so that there wouldn't be the same issue with corrosion in the future.
Cladding and structural steel of the Butcher Street buildings (4,800m2 covered floor space) are corroding, and quite quickly. BHPB NiW's ammonium sulphate is not at significant risk of contamination however should there be no building refurbishment the risk profile will change.
IRM has been in discussion with the landlord for years over this issue. The landlord is reluctant to spend anything on the property as in their view ammonium sulphate is so corrosive that any expenditure is a wasted investment. For reference in the lease the material to be stored and handled is stated to be "corrosive" and it is the landlord's responsibility to keep the buildings watertight. The reality is we have a reluctant landlord so IRM takes the lead in all cases to protect ammonium sulphate.
IRM and the landlord are trying to establish mutual grounds for moving forward refurbishment. One option was that over a long period (10 years) the Landlord funds 50% of the refurbishment. Refurbishment estimates are high. One estimate was $829,500 or around $5.00/mt over three years of throughput.
Several years back three concrete walls were cut to provide for FEL access without needing to go outside. Indirectly BHPB paid for this work, by rights when (if) IRM leaves the property the walls should be made good. Our estimate is that, if we were forced to make good the walls, the cost would be between $100-150,000 ($0.60-0.90/mt over three years throughput).
In both circumstances under the existing Distribution Services Agreement BHPB NiW is responsible for the cost. We consider liability rolls forward under that Agreement, as these issues arise from the period of that Agreement, but will be outside the new agreements. IRM will ensure BHPB NiW is consulted on any major works that will need to be carried out.
We will continue to monitor all trucks exiting the site to ensure that all product is contained on site and in the shed.
I have received another complaint regarding the dust (ammonium sulphate) coming from 30 Butcher St.
Specially [sic - specifically], the complainant alleges that the dust is coming from the warehouse itself as the doors are not closed and dust is being blown over to their property.
I was hoping to meet onsite this Thursday or Friday to discuss this matter further.
Hi Frank,
Thank you for meeting with me onsite yesterday morning to discuss about the dust complaint.
I support that your business install curtains in the front and back doors of the warehouse to minimise the release of dust outside the boundary of your property, while ensuring adequate ventilation is provided for the building.
I have provided your contact details to the complainant and I believe that the complainant may contact you directly.
Please keep me informed for any progress made towards resolving the complaint.
Thank you.
Given your client's failure to meet any of the Deadlines referred to in the Notice of Default dated 17 June 2015 I have advised my client to withhold the payment of Rent on the basis that:
Failure to remedy the Lessor's Contraventions in the Notice of Default may result in my client withholding a further months' rent or such further rent as reasonably required to remedy the Lessor's Contraventions identified by the Notice of Default.
I am instructed that my client is requesting quotes for the storm damage for submission with its insurer. I will keep you advised of all developments in that regard.
My client denies that it is responsible for the damage to the Premises and says that the damage to the Premises was caused by your client and the method in which it stored its fertiliser.
Pursuant to the terms of leases, you r client must pay all rent without any set off. My client reserves all of its rights should your client fail to pay the rent when it falls due.
...Lessor's ongoing failure to mitigate the Lessor's Contraventions means that the whole Premises is now dangerous and circa 70% of Unit 2 is unfit for purpose. Substantial losses are accruing daily for which my client continues to make account and will provide these to your client for reconciliation purposes.
Given that the use of the Premises under the Lease is value adding and storage of corrosive fertiliser ... and clause 3.9(a) of the Lease expressly provides that the Lessor must maintain and repair the Premises to prevent water ingress, the costs of curing the past and present dilapidation of the Premises is wholly and properly payable by the Lessor. (original emphasis)
As a consequence of the Lessor's Contraventions, the Lessee has incurred costs and expenses for the account of the Lessor maintaining and repairing the Premises to prevent water ingress and other structural repairs properly for the account of the Lessor under the Lease.
These costs and expenses were paid for by the Lessee in good faith and in reliance of the rights and obligations under the Lease that the Lessor would make good these sums. These sums are now outstanding beyond reasonable or acceptable trading terms.
As you are aware the condition of the facility is impaired and deteriorating due to its age and a lack of maintenance. In good faith we have made over AUD 200,000 in repairs, which are not required in our lease. There has been no recognition or acknowledgement of this. Because of the building's condition we have lost DAFF certification, and the large openings in the walls will expose our product to coming winter conditions.
This situation is unacceptable, so we are in the process of making other arrangements. We have been prepared to undertake contingent lease discussions with a new owner to possibly enhance the value of the property in a sale, but we have given up on possibility reaching a reasonable arrangement with Joe.
Thanks for the reply. I guess you know the product well, because of its highly corrosive manner the shed has sustained accelerated wear to the building.
I believe that with both yourself and Joe being ostriches with heads in the sand there won't be an outcome. Your product no doubt caused the problem with the building, but I think whilst you and Joe are adamant that there is no solution it makes it hard to find an amicable outcome.
The maintenance you mention, to me there is no such maintenance to a metal wall in normal circumstances, but the product being highly corrosive then precautions should have been taken to protect the building, during the normal coarse [sic] of business, you know what I mean as you are well converse with the product you are storing in the shed, therefore with your intimate knowledge, you are a lot better placed to know what damage can occur due to the product nature if nothing is done to prevent corrosion attacking the shed.
I guess I see both sides, but maybe both of you need to look at the other side to realize it's not such a huge problem and should have been sorted out by now.
I was actually chasing the rental payments that are now overdue.
At this point you owe money and that must be paid. Can you please advise when the payments will be made.
Thanks for the reply I appreciate your valuable time.
When one is in a burning movie theatre, I expect that only a few would look at the fine print on the back of the ticket stub before acting. Similar, I would expect that all of my Australian friends over the last 40 years would clearly understand and respond properly respond to the outcry of "Fire" even with an American accent.
The Lessor's Contraventions constitute breaches by the Lessor of fundamental terms under the Lease.
The Lessor has failed, despite written notice and reasonable time provided by the Lessee, to remedy the Lessor's Contraventions or pay the sums due to the Lessee by the Deadlines provided, in whole or in part.
The Lessor's failure to remedy the Lessor's Contraventions and unwillingness to remedy the Lessor's Contraventions constitutes (among other things) repudiation of the Lease.
As a result of the Lessor's failure to remedy the Lessor's Contraventions the Premises are no longer safe to occupy for the intended use and are a hazard to human life and the Lessee's business and property.
Accordingly:
TAKE NOTICE THAT the Lessee is lawfully entitled to terminate the Lease and by this notice the Lessee confirms its termination of the lease, Friday 18 November 2016. (original emphasis)
The Premises are now vacant and available for re-entry by the Lessor.
The buildings are in a dilapidated state is [sic] generally and there is clear evidence of corrosion and erosion due to the materials previously stored in the buildings.
Most of the wall cladding has been removed prior to our inspection. While there was a easterly breeze at the time of the inspection we noted no cladding that was adrift.
A detailed report is in Section 3.2, the dilapidation report. The buildings and grounds were found to be relatively clean of any stored product.
... structurally certify the buildings located at 30 Butcher Street, Kwinana Beach, with the modifications proposed in the above is valid [sic] for two years from the date of this report. RSA will need to reinspect the building in two years to extend this certification.
PART V- EXPERT EVIDENCE AS TO CORROSION A. Introduction
(a) their findings from the inspections which have been undertaken including the level of corrosion identified;
(b) whether the method or storage and handling of ammonium sulphate at the premises was an acceptable practice in the fertiliser industry;
(c) the connection between any material damage and the past storage of ammonium sulphate;
(d) the effects if any which water, humidity and moisture have on the corrosive nature of ammonium sulphate on building materials;
(e) the extent water ingress arising from damage caused by storms could increase the corrosive nature of ammonium sulphate and the damage to the building materials and units;
(f) the suitability of the premises for storage of ammonium sulphate; and
(g) maintenance and other steps which could mitigate the corrosive effects.
(a) Ammonium sulphate, which is also called diammonium sulfate or sulfuric acid diammonium salt, is a white crystalline solid with no smell. It contains 21% nitrogen in the form of ammonium ions and 24% sulphur as sulfate ions. The compound is slightly hygroscopic, absorbing water from the air at relative humidity above 81% (at about 20°C).
(b) The product dissolves easily in water and it readily absorbs water, so if it is exposed to moist air, it will 'crust' on damp surfaces.
(c) The primary use of ammonium sulphate is as a fertilizer for alkaline soils. In damp soil, the ammonium ion is released and forms a small amount of acid, lowering the pH balance of the soil, while providing nitrogen for plant growth.
(d) Ammonium sulphate in the presence of moisture is acidic and it is the acidic nature of the compound which makes it corrosive to metals (steel, zinc, aluminium etc) and concrete.
(e) Ammonium sulphate, when exposed to moisture or water will produce a mildly acidic solution which is corrosive to metals and whilst less so to mild steel than zinc coated or alloyed materials, corrosion will still occur in fertiliser storage circumstances, especially in the absence of appropriate protective coating protection.[221]
(a) the repair of the building envelope to minimise water ingress to storage areas;
(b) all metals should have been coated with a robust polymer coating as a minimum, and the coating systems used should comply with an AS2312 C5-I classification;[231]
(c) separators should have been installed between piles to corral the product in a logical and sequential manner for transport; and
(d) screening activities should be minimised and dust removal or ventilation facilities ought to have been installed within the Warehouse.
PART VI - KEY FACTUAL FINDINGS
SCHOOMBEE, DR: I have put to you before that you didn't cover the ammonium sulphate with tarpaulins and you said, 'No, we didn't do that'. And you say now that that's not best practice. Now, when you say it's not best practice, on what do you base that?
T O'NEILL, MR: The fact that we ship 600,000 tonnes a year of ammonium sulphate throughout the world to a number of different terminals and warehouses. And we don't cover and different environments to include the jungles of Madagascar. And we don't cover the product with tarpaulins because the product is not hydroscopic.
So that we can assess the effect it is having on the concrete floor at the above site, would you please provide the chemical composition specifications of the fertiliser that is being stored there.
We know that corrosive fertilisers are being stored but need to know how corrosive so that we can match against the data against the concrete floor specifications to determine whether or not there is or are going to be problems.
Store tightly sealed in cool, dry, well-ventilated area, removed from oxidising agents and foodstuffs...
THARBY, MR: Is it your evidence that you didn't take any steps to determine whether there are going to be problems?
J HAWKINS, MR: Well, there already was problems. That's why I asked for it.
LUNDBERG J: Mr Hawkins, I think I understand your answer, but you should listen to the question and just try and answer the precise question?
J HAWKINS, MR: Right.
LUNDBERG J: And if the question is capable of a yes or a no, you re able to just simply say a yes or a no rather than make a statement, but I think I understand what you're saying. Mr Tharby.
THARBY, MR: ... Mr Burns is requesting the chemical composition specifications of ammonium sulphate being stored in unit 1. He is asking on behalf of J.J. Hawkins and Co for that information so that J.J. Hawkins can determine whether or not there is or are going to be problems. Now, as I understand your evidence, there were at that time problems; is that correct?
J HAWKINS, MR: That's correct.
THARBY, MR: You wanted to know whether there were going to be problems in the future; is that correct?
J HAWKINS, MR: Well, I didn't write the email, so it's debatable.
THARBY, MR: So you didn't want to know if there were going to be problems in the future?
J HAWKINS, MR: Well, I assume once they fixed the problem, that that was the end of it, you know.
THARBY, MR: Thought that would be a one-off problem?
J HAWKINS, MR: Yes.
THARBY, MR: The corrosion caused by the products stored in unit 1 damaged the concrete once and once only. That's not correct, is it, Mr Hawkins?
J HAWKINS, MR: Well, there was just one spot where there was a problem.
THARBY, MR: Were there any other problems at this time?-
J HAWKINS, MR: Not that I know of, no.
2012 marked the onset of serious corrosion. The wall panels had begun to experience serious corrosion and were no longer securely fixed to the structure. Panels began to fall off the building in the wind. This corrosion continued to accelerate in 2013 and 2014. By May 2015, some of the girts, to which wall panels are fixed, had become so corroded that parts of them had broken and fallen down. Large sections of wall panels fell off in the wind. Significantly, those sections of wall panels were on the northern wall of the Premises, being the exterior of units 2 and 3, which were only 15 years old at this point. This was immediately adjacent to the area where trucks were loaded with ammonium sulphate and drove through the Premises, and where screening of product occurred in unit 3.
PART VII - THE CONTRACTUAL CLAIMS ARISING FROM DAMAGE TO THE WAREHOUSE A. Overview
B. Relevant principles as to contractual construction
The words of [the lease] must, of course, be construed in the whole of the context in which they are found. The lease embodies a commercial contract. It is well established that the terms of such a contract are to be understood objectively, according to what a reasonable businessperson would have understood them to mean; and that, in a practical sense, this requires that the reasonable businessperson be placed in the position of the parties, with the court considering, from that perspective, the circumstances surrounding the contract and the commercial purpose and objects to be achieved by it: Ecosse Property Holdings Pty Ltd v Gee Dee Nominees Pty Ltd [2017] HCA 12; (2017) 91 ALJR 486 (at [16]); Electricity Generation Corporation v Woodside Energy Ltd [2014] HCA 7; (2014) 251 CLR 640 (at [35]).
[T]he court must be careful before departing from the natural meaning of the provision in the contract merely because it may conflict with its notions of commercial common sense of what the parties may, must or should have thought or intended. Judges are not always the most commercially-minded, let alone the most commercially experienced, of people, and should, I think, avoid arrogating to themselves overconfidently the role of arbiter of commercial reasonableness or likelihood.
C. Relevant principles as to covenants to maintain, repair and yield up
Reasonable wear and tear means the reasonable use of the house by the tenant and the ordinary operation of natural forces. The exception of want of repair due to wear and tear must be construed as limited to what is directly due to wear and tear, reasonable conduct on the part of the tenant being assumed. It does not mean that if there is a defect originally proceeding from reasonable wear and tear the tenant is released from his obligation to keep in good repair and condition as to everything which it may be possible to trace ultimately to that defect. He is bound to do such repairs as may be required to prevent the consequences flowing originally from wear and tear from producing others which wear and tear would not directly produce.
[I]f a tile falls off the roof, the tenant is not liable for the immediate consequences; but, if he does nothing and in the result more and more water gets in, the roof and walls decay and ultimately the top floor, or the whole house, becomes uninhabitable, he cannot say that it is due to reasonable wear and tear, and that therefore he is not liable under his obligation to keep the house in good repair and condition. In such a case the want of repair is not in truth caused by wear and tear. Far the greater part of it is caused by the failure of the tenant to prevent what was originally caused by wear and tear from producing results altogether beyond what was so caused. On the other hand, take the gradual wearing away of a stone floor or staircase by ordinary use. This may in time produce a considerable defect in condition, but the whole of the defect is caused by reasonable wear and tear, and the tenant is not liable in respect of it.
In such cases, a tenant who has covenanted to maintain and repair, reasonable wear and tear excepted, will be required to carry out normal maintenance so as to prevent this kind of damage, even though the initial condition could fall within the term "reasonable wear and tear". I do not think the existence of surface cracking and a small amount of potholes which could in time lead to further deterioration meant that the existence of such features demonstrates either a failure to maintain or a condition that exceeds reasonable wear and tear so as to demonstrate error by the primary judge.
[118] In relation to areas 4-7, [Hodgson JA] has concluded that the damage involved no more than reasonable wear and tear, for which AWF was not liable: issue (1B).
[119] In relation to this issue, I am inclined to reach a different conclusion. The cracking of the concrete may well have constituted reasonable wear and tear, but the failure to repair the cracks led, according to the experts, to the intrusion of water into the sub-stratum, which resulted in further damage. On its face, the failure to rectify the initial problem before the greater damage resulted is closely analogous to the example of the tile, dislodged from the roof of a house, adverted to by Talbot J in Haskell v Marlow [1928] 2 KB 45. To say, as the primary judge did at [58], that cracking was to be expected in the ordinary course of events, is to say no more than might be said of the tile, namely that as a roof ages, the possibility that tiles will become dislodged will increase. The fact that the dislodgment of the tile may have an element of reasonable wear and tear does not mean that the tenant can stand by and allow the intrusion of water to inflict serious consequential damage inside the building. The requirement to repair the tile does not "set at nought the exception for reasonable wear and tear" (primary judge at [59]); nor does the imposition of responsibility on the lessee to ensure that cracking in the bitumen was rectified.
[163] [The landlord] knew and agreed that [the tenant] could use the leased premises to store and handle fertiliser. The corrosion damage was caused by [the tenant] when it acted reasonably.
[164] Having regard to the matters set out ... and the terms of the lease as a whole, the corrosion damage to the leased premises falls within the fair wear and tear exception to [the tenant's] covenant to repair contained in clause 2.5(a) of each of the sub-leases. [The tenant] is not obliged to repair the corrosion damage to the leased premises.
The key finding was a warranty by the landlord - it had 'covenanted that the sub-lease premises were in a fit condition for the storage and handling of non-hazardous fertiliser, including the blending and bagging of bulk fertiliser and ancillary use' [referring to AWH at [163]). So [the tenant in AWH] could move in and start using it without more. (Compare the evidence of Dr Zurhaar on facilities specially designed for [ammonium sulphate] application.) Importantly, there was no allegation in that case that there was any unreasonable use of the premises. See at [163] and [131]. In our present case, the Lease contains no such covenant or warranty and unreasonable use is the main issue. The only covenant given by [the plaintiff] in the Lease is the covenant of quiet enjoyment.
The Lessee must maintain and keep the Premises in good and substantial repair, order and condition except in the event of damage by explosion, earthquake, aircraft, riot, civil commotion, fire, flood, lightning, storm, tempest, act of God, war, fair wear and tear and any other risk insured against by the Lessor PROVIDED THAT this exception shall not apply if the damage is caused by the neglect, default or misconduct of the Lessee and the Lessor's insurances are invalidated by an act, neglect or default of the Lessee.
The Lessor must maintain and repair the Premises to prevent water ingress.
(a) the defendant failed and neglected to 'handle, store and/or process' the ammonium sulphate (including for the production and then storage of fertiliser containing that product) properly or in a reasonable manner in the Units, and
(b) neglected to take action to mitigate the risk of damage which could be caused by the defendant's method of delivering and storing ammonium sulphate in the Units.[319]
(a) First, it is pleaded that ammonium sulphate is a corrosive, hygroscopic substance which should and can be contained through proper handling and storage. Ammonium sulphate is pleaded to react when brought into contact with water, also in the form of moisture on steel beams or in the form of vapour, to form a corrosive substance. It is alleged that the corrosive effects of the ammonium sulphate caused the structural damage pleaded by the plaintiff. These matters have been established on the evidence.
(b) Next, it is asserted that delivery of ammonium sulphate was taken by dumping it from trucks on the floor of the Units and leaving it there open and uncovered for some time. This accords with the evidence.
(c) Further, it is asserted that the ammonium sulphate was not stored adequately to avoid contact with water in any form, including vapour. The defendant is alleged to have failed to keep the ammonium sulphate in containers which were securely sealed. While the use of 'containers' to store the product has not been demonstrated to be best practice or a reasonable step, the evidence supports the conclusion that the product was not stored adequately.
(d) Further, during operating hours, the defendant is alleged to have kept the access doors of the Units open, allowing wind and rain to enter the Units, causing the dispersal of ammonium sulphate within and out of the Units, and causing ammonium sulphate to come into contact with water. I have elsewhere explained the manner in which the doors were kept open. Certainly, it is apparent there was a dispersal of ammonium sulphate throughout the premises and regular contact with water.
(e) Further, the defendant is alleged to have processed the ammonium sulphate by screening it using a shaker table and gravity separation process, which caused dispersal of ammonium sulphate dust within and out of the Units. This accords with the evidence.
(f) Further, the defendant is alleged to have failed to store the ammonium sulphate in a cool, dry, well-ventilated area protected from environmental extremes and exposure to moisture, as required by industry standards. The lack of proper ventilation has been established.
(g) Further, the defendant is alleged to have failed to store the ammonium sulphate away from incompatible materials like exposed metal beams in the building on the property. This has largely been established on the evidence.
(h) Finally, the defendant is said to have failed to store the ammonium sulphate in bunded areas. On the evidence, such a step would likely have reduced the damaging effects of the product. That said, there is evidence that the defendant's personnel created a 'bung' on occasions, using the ammonium sulphate itself, being the sweepings in particular.[321] So, there is at least some evidence that a system was used to limit the further ingress of water into the Warehouse.
(a) applied a polymeric sealer/coating such as high build epoxy paints to the concrete floors, concrete walls and structural steel to form a barrier between the ammonium sulphate and the concrete and structural steel, for protection in the event of the ammonium sulphate becoming moist or wet;
(b) frequently cleaned the high level steel such as the roof trusses and roof purlins with a high-pressure air hose, to remove airborne deposits of ammonium sulphate dust;
(c) ensured (by modification if necessary) that the building was adequately ventilated to reduce humidity and airborne dust accumulation and deposition on surfaces;
(d) kept the height of the ammonium sulphate heaps in the building sufficiently low, to prevent contact with Colourbond wall sheeting and thereby prevent corrosion;
(e) used tarpaulins to cover the ammonium sulphate heaps and reduce airborne corrosive dust; and
(f) frequently washed down with fresh water (and dried off) the trucks and loading areas to reduce the spread of ammonium sulphate spills to susceptible surfaces.
(a) that the lessee shall use the premises for the purposes of value adding and storage of corrosive fertiliser (cl 2);
(b) that the lessor's solicitors shall prepare the lease incorporating all the details and agreements set out in the 'Offer to Lease' and such other further terms, conditions or covenants as the lessor's solicitors consider reasonable, adequate and necessary in the circumstances to protect the lessor having regard to the nature of the premises (cl 9); and
(c) that the lessor will ensure the external appearance of the premises is maintained to a high standard, fair wear and tear not excepted (cl 11.4).
(a) caused by fair wear and tear, in the proper permitted conduct of the business;
(b) alternatively, caused by the plaintiff's breaches in failing to maintain and repair the premises including, among other things:
(i) to prevent water ingress into the premises;
(ii) to prevent wind into the premises which moved the defendant's product around the premises off designated stacks;
(iii) to ensure that the external appearance of the premises was maintained to a high standard; and
(iv) to ensure that the standard of the premises and land was lifted to an acceptable standard.
(a) the lease permitted it to handle and store the ammonium sulphate in the premises in the manner it did;
(b) there was no express or implied obligation in the lease for the defendant to store the ammonium sulphate in the manner the plaintiff claims;
(c) any damage occasioned to the premises during occupation by the defendant was not caused by the conduct or neglect of the defendant, but was caused by the conduct of the plaintiff in failing to maintain and repair the Warehouse to prevent water ingress to the premises in breach of the lease, failing to ensure the external appearance of the premises was maintained to a high standard in breach of the lease, and failing to ensure that the standard of the premises and land was lifted to an acceptable standard in breach of the lease;
(d) alternatively, any damage to the premises was fair wear and tear; and
(e) at all times, it complied with the AFSA Code of Practice, of which it was a member, in relation to the handling and storage of ammonium sulphate. I have already addressed this point, and concluded that I do not regard the AFSA Code of Practice as relevant to the determination of the issues in this proceeding.
The Lessee must maintain and keep the Premises in good and substantial repair, order and condition except in the event of:
(1) damage by explosion, earthquake, aircraft, riot, civil commotion, fire, flood, lightning, storm, tempest, act of God, war, fair wear and tear, and
(2) any other risk insured against by the Lessor [eventuating].
PROVIDED THAT this exception shall not apply:
(3) if the damage is caused by the neglect, default or misconduct of the Lessee, and
(4) [where] the Lessor's insurances are invalidated by an act, neglect or default of the Lessee.
With respect to the physical suitability, the rule is clearly 'caveat emptor'. It is ultimately a matter for the lessee to be satisfied, through the employment of engineers or architects prior to execution of the lease, that the premises are physically fit for the purpose for which they are being let and for which the lessee desires to use them. This is so notwithstanding the absence of an express covenant as to fitness and, further, the fact that the lessor is aware of the exclusive purpose for which the lessee desires the premises.
It is the business of the lessee, if there is no express warranty by the lessor in the lease, to be satisfied that the premises are fit for the purpose for which the lessee wishes to use them, whether that fitness depends on the state of the structure, the state of the law or any other relevant circumstances.
(a) the defendant's storage of ammonium sulphate within the premises;
(b) the defendant's failure from the commencement of its tenancy to treat the exposed surfaces within the Warehouse with a protective coating, such as a robust polymeric coating;
(c) the defendant's screening of the ammonium sulphate within the premises, without implementing any measures to minimise the dispersal of dust from the product, including the absence of any ventilation system, which dust then came into contact with surfaces within the premises and adhered to those surfaces;
(d) the defendant's failure to implement regular and systematic cleaning practices;
(e) the defendant's operations allowed the ammonium sulphate to come into contact with the concrete floor as well as the concrete walls;
(f) the defendant's operations involved trucks bringing water into the premises during wet weather, with the ammonium sulphate being unloaded onto wet floors on occasions; and
(g) the absence of dust curtains, and the fact the main doors to the Units would be left open on occasions (in the particular manner I have earlier found) such that the ammonium sulphate dust would be blown through the premises and through gaps in the walls, settling on the roof and the steel structures under the roof.[350]
At the expiration of the lease the walls are to be replaced so that they are in accordance with how they were when the lease of units 2 & 3 commenced. Any costs incurred in changing or removing the walls or replacing walls are to be at your cost.
Several years back three concrete walls were cut to provide for FEL access without needing to go outside. Indirectly BHPB paid for this work, by rights when (if) IRM leaves the property the walls should be made good. Our estimate is that, if we were forced to make good the walls, the cost would be between $100-150,000 ($0.60-0.90/mt over three years throughput.
Peaceably to surrender and yield up to the Lessor the Premises, subject to the other provisions in the Lease, clean and free from rubbish and in good and substantial repair and condition as nearly as possible in the same condition as at the commencement of the Term [with fair wear and tear excepted].
...fire, storm, tempest, earthquake, civil commotion, extraneous risks including rain water and other water damage, flood, riots, strikes, malicious damage, explosion, impact by vehicles or aircraft, articles dropped from aircraft and all other risks reasonably required by the Lessor...
G. Alleged contravention of the EPA and the regulations
(1) Subject to this Act, the occupier of any prescribed premises who:
(a) causes or increases, or permits to be caused or increased, an emission; or
(b) alters or permits to be altered the nature of the waste, noise, odour or electromagnetic radiation emitted,
from the prescribed premises commits an offence unless he is the holder of a licence issued in respect of the prescribed premises and so causes, increases, permits or alters in accordance with any conditions to which that licence is subject.
(2) Subsection (1) does not apply if the emission is caused, increased or altered -
(a) as a result of anything done in accordance with a works approval; and
(b) while the works approval is in force.
Regulation 5 of the EP Regulations provides that the premises specified in sch 1 are prescribed premises for the purposes of pt V of the EP Act. Schedule 1 of the EP Regulations sets out numbered categories of premises. Each category is identified by reference to the activities carried out on the premises and, in some cases, by reference to the 'production or design capacity' of the premises. Having regard to the definitions in the EP Act and the EP Regulations, 'prescribed premises' means premises on or at which any prescribed activity (ie, one coming within the description and production/design capacity in sch 1 of the EP Regulations) is conducted.
Screening etc. of material: premises (other than premises within category 5 or 8) on which material extracted from the ground is screened, washed, crushed, ground, milled, sized or separated.[374]
Screening etc. of material: premises on which material extracted from the ground is screened, washed, crushed, ground, milled, sized or separated.
More than 5,000 but less than 50,000 tonnes per year
(a) that the screening of ammonium sulphate within the Warehouse constituted the screening, crushing, grinding, milling, sizing or separation of 'material extracted from the ground';
(b) that the production or design capacity of the screening apparatus used by the defendant at least exceeds 5,000 tonnes per annum (being the lower volume limit found in category 70);
(c) that the defendant was the occupier of the premises;
(d) that the defendant's activities caused an emission from the premises; and
(e) that the defendant did not hold a relevant licence or work approval as required under the EP Act.
We screen approximately ten percent of our total output through this unit per annum [referring to the screening machine].
(a) the defendant knew that the plaintiff was aware of the matters pleaded in [22A.1] of the Defence, which I have referred to above;
(b) by reason of the plaintiff's failures to maintain and repair the premises to prevent water ingress or rectify the storm damage, among other things, the defendant assumed that the plaintiff consented to the manner in which the defendant was operating its business including the storing and screening of ammonium sulphate, and not applying polymeric coating to the structure, among other matters;
(c) in reliance upon that assumption, the defendant did not take any of the steps pleaded in the SOC at [12(b)]; and
(d) the defendant would suffer detriment if the plaintiff were permitted to resile from the assumption to the extent the defendant would otherwise be liable to the plaintiff for the alleged loss and damage.
(a) the defendant has adopted an assumption as to the terms of its legal relationship with the plaintiff;
(b) the plaintiff has adopted the same assumption (the assumption must be mutual and bilateral);
(c) both parties have conducted their relationship on the basis of that mutual assumption;
(d) each party knows or intends that the other will act on that basis; and
(e) departure from the assumption will cause detriment to the defendant.
(a) the defendant's intended use of the premises for the value adding and storage of ammonium sulphate at the premises;
(b) the defendant's places and modes of storage of the ammonium sulphate at the premises;
(c) the defendant's use of a shaker table to sort ammonium sulphate at the Premises; and
(d) the ventilation of the premises and that the defendant often kept the access doors of the premises open during operating hours.
J. Limitation Act defence
(1) An action on any cause of action cannot be commenced if 6 years have elapsed since the cause of action accrued.
Moreover, one cause of action is rendered distinct from another, if there is any ingredient of the respective causes of action which is distinctive, though that ingredient be simply the repetition of a continuing breach by a negligent architect on successive days; Sheldon v McBeath (1993) ATPR 81-209 at 62,073. The mere fact that the ingredient comprising "damage" might be similar or that "each cause of action may be identical for practical purposes" does not preclude the inference that the causes of action are distinct (per Priestley JA).
Upon these facts, the first question for consideration is whether the covenants contained in clauses 12 and 15 operated to impose a continuing duty upon the respondent company so that a failure to fence involved new breaches for every day of default, thus including the period after 31st October 1939. If a covenantor undertakes that he will do a definite act and omits to do it within the time allowed for the purpose, he has broken his covenant finally and his continued failure to do the act is nothing but a failure to remedy his past breach and not the commission of any further breach of his covenant. His duty is not considered as persisting and, so to speak, being for ever renewed until he actually does that which he promised. On the other hand, if his covenant is to maintain a state or condition of affairs, as, for instance, maintaining a building in repair, keeping the insurance of a life on foot, or affording a particular kind of lateral or vertical support to a tenement, then a further breach arises in every successive moment of time during which the state or condition is not as promised, during which, to pursue the examples, the building is out of repair, the life uninsured, or the particular support unprovided.
The distinction may be difficult of application in a given case, but it must be regarded as one depending upon the meaning of the covenant.
PART VIII - ASSESSMENT OF DAMAGES IN RELATION TO THE PLAINTIFF'S CLAIMS IN CONTRACT A. Overview
(a) the cost of the rectification works required for the Units, in respect of which the plaintiff principally relied on the evidence of Mr Harrison, which totalled $3,815,826.27 (and which is further broken down at [755] below); and
(b) the loss of rent during the period that the rectification works were undertaken, in respect of which the plaintiff relied on the evidence of Mr Hagon, in the sum of $183,917.70;
(c) the loss of the payment of outgoings (being rates and land taxes) during the period that the rectification works were undertaken, in the sum of $48,628.67; and
(d) the urgent interim repair costs undertaken by the plaintiff following the termination of the Varied Lease by the defendant, in the sum of $25,540.96.
Estimated costs to rectify Unit 1 and the toilet block to Unit 1
If the benefit of the covenant in cl 2.13 were to be secured to the Landlord, it is necessary that reinstatement damages be paid, and it is not unreasonable for the Landlord to insist on their payment.
THARBY, MR: Now, after IRM moved out, you did nothing to repair or replace Unit 1 even to this day; is that correct?
J HAWKINS, MR: I did nothing to repair it because I had no money to repair it, and the insurance company my insurance had been cancelled, so I couldn't claim off insurance. So it just sat there.
LUNDBERG J: Mr Hawkins, I appreciate you want to tell your story, but if you just listen to the question?
J HAWKINS, MR: Right.
THARBY, MR: The question was ... you did nothing to repair unit 1 after they moved out even to this date?
J HAWKINS, MR: No, I haven't done anything in unit 1. No.
SCHOOMBEE, DR: Now, Unit 1, something is going to happen to that?
J HAWKINS, MR: Yes.
SCHOOMBEE, DR: What is your plan? Do you have a plan?
J HAWKINS, MR: I am going to refurbish it when I get some more money.
SCHOOMBEE, DR: Yes. So, that would then be part of the refurbishing of Unit 1?
J HAWKINS, MR: Yes. Well, I will start refurbishing that measurably next year.
SCHOOMBEE, DR: I understand. And just briefly while you say that, what do you mean by refurbishing?
J HAWKINS, MR: Getting all the steelwork inspected and digging around the footings where it is attached to the concrete blocks in the ground and seeing how badly rusted it is, or contaminated it is. And if it is, then work out whether we chop it off at a metre high or two metres or three metres high and put a new piece in and anchor it into the concrete.
SCHOOMBEE, DR: So that's really a decision that you ultimately take in the future, do you say?
J HAWKINS, MR: Yes.
...the reasonable market value of the necessary remedial works required to return the building and structures on the property to a state which is in good and substantial repair and condition taking into consideration the age of the materials, fair wear and tear and the damage caused by corrosion.
(a) Mr Harrison expressed a concern as to the structural integrity of the external concrete wall panels in each of the Units, but in particular in Unit 1. He expressed the view that the fixings to the full height concrete wall panels dividing Unit 1 from the other Units were either missing or displayed a high level of corrosion.
(b) In relation to Unit 1, Mr Harrison observed heavy deposits of residual chemical on the roof purlins, rafters and both horizontal and vertical surfaces of the concrete walls. His observations included the following:
(i) The external metal wall and roof cladding, including wall girts, roof purlins and associated gutters, cappings, sliding and exit doors were either non-existent or severely dilapidated. Mr Harrison regarded the roof cladding as being unsafe.
(ii) Further, he considered the structural capacity of the concrete floor had been severely diminished and there were large areas where the thickness of the floor has been reduced by up to 25mm, with large cracks having developed across the entire floor.
(iii) He described the concrete surface as 'pitted and friable [meaning easily crumbled] and no longer serviceable'.
(iv) He also described the finished surfaces of the concrete wall panels as 'friable' with lower sections having been 'severely eroded'. Mr Harrison explained that several of the lower external panels had been impacted and damaged beyond repair. The structural integrity of the panels has been compromised, in his view.
(v) He considered the full height panels which had been modified to provide access between the Units (i.e. the access holes) would need to be replaced to re-establish separation of the Units.
(vi) The structural steelwork (being the columns, rafters and braces) displayed varying degrees of deterioration in his assessment. He described this as 'delamination of [the] surface from chemical attack', with the lower sections of the steel columns being the most severely damaged.
(vii) Mr Harrison observed that the electrical installation in Unit 1 was largely non-existent (being the lighting, power and emergency lighting). Further, the fire services were inoperable and cabinets were rusted (referring to the hose reels and hydrants).
(viii) Mr Harrison's conclusion with respect to Unit 1 was as follows:
The extent and severity of damage to all building elements from chemical attack is such that in my opinion the extent of remedial work required to reasonably restore individual elements is neither practicable nor cost effective. Therefore total demolition and reconstruction of this warehouse [being Unit 1] is recommended.
(c) Mr Harrison estimated the probable cost of demolishing and then reconstructing Unit 1, including the toilet block, was $1,516,335 inclusive of GST.[438] This estimate included a contingency of 2.5% and a builders' markup of 25% which he assessed as being at the lower end of the range he thought would be reasonable. In addition, Mr Harrison estimated the preliminaries and other general costs associated with the primary work to be $336,863 inclusive of GST.[439] This estimate included the builders' markup of 25%.
(d) In relation to Units 2 and 3, Mr Harrison gave consideration to whether the treatment of existing steelwork, to achieve a reasonable level of protection, could be completed in situ or whether it would need to be treated off-site (which would involve deconstruction and then reconstruction). Alternatively, he considered the option of total demolition of the Units and reconstruction in the manner outlined for Unit 1.
(e) Mr Harrison expressed similar observations in relation to Units 2 and 3 to those he had made concerning Unit 1. Heavy deposits of residual chemical were observed on roof purlins, rafters and the horizontal and vertical surfaces of the concrete walls. He described the roof cladding as unsafe. The structural steelwork was rusted and pitted, and would need to be blasted and treated. He considered offsite treatment would be less expensive and so the cost of removal and reconstruction would need to be built in to his estimate. Steelwork around the exit door openings, the door frames, and in other locations, would need to be replaced.
(f) In Unit 3, the concrete floor surface was 'pitted and friable' and the structural capacity had been diminished and he regarded it as 'unserviceable'. Mr Harrison observed that the surface of the lower sections of the southern concrete full height wall panels dividing Units 1 and 3 were 'severely pitted and friable'. Further, the concrete panels to the west elevation were 'severely pitted and friable' with large sections around the exit door having been destroyed. Mr Harrison opined that the structural integrity of walls panels to both the south and west elevations had been 'severely diminished'.
(g) In order to determine the existence of the damage to steel columns where that was concealed (that is, embedded in the concrete floor or encased by concrete wall panels), Mr Harrison took steps to expose the steelwork in random locations in Unit 3. From this, Mr Harrison observed that there was some damage to columns below floor level and the 'damage was severe where chemical deposits are trapped and remain between concrete wall panels and web of steel columns on North and West elevations'.
(h) In relation to Unit 3, Mr Harrison concluded that 'the reinstatement of concrete floor surface via topping or screed is not considered to be viable', given the risk of delamination from vehicular traffic is high. Instead he recommend the installation of a 125mm concrete floor to specification over the existing floor. Among other matters, Mr Harrison concluded the external concrete wall panels to the west elevation were not repairable and he recommended replacement. He considered the extent of damage to both lower faces of the full height concrete dividing wall panels with Unit 1 (and the connections to the structure) were beyond reinstatement and he recommended they be replaced.
(i) Mr Harrison estimated the probable cost of remediating Units 2 and 3, including the toilet block, was $1,370,469 inclusive of GST.[440] This estimate included a contingency of 2.5% and a builders' markup of 25% which he assessed as being at the lower end of the range he thought would be reasonable. In addition, Mr Harrison estimated the preliminaries and other general costs associated with the primary work to be $336,863 inclusive of GST.[441] This estimate included the builders' markup of 25%.
(a) A quotation for structural engineering services was provided by Mr John Velios of Total Structural Consulting Pty Ltd.[445] Mr Velios is a director of that business, which is a multi-disciplinary engineering consultancy business. The quotation was provided in August 2019. Mr Velios stated that the costs of carrying out this work at a later date would need to be the subject of review and revision.
(b) A quotation for decontamination services was provided by Mr Luke Giffen of Cleanaway Waste Management Limited, which provides waste management services.[446] The quotation was provided in June 2019. Mr Giffen stated it was an accurate estimate of the cost of carrying out the work at that time.
(c) A quotation for professional steel fabrication and erection services was provided by Mr Colin Brown of Southern Steelworks (which is presently owned by Netgain Investments Pty Ltd).[447] The business specialises in fabrication and erection of structural steel for commercial and industrial buildings. Mr Brown provided the quotation in October 2023, based on structural drawings and a scope of works with which he was provided.[448]
(d) Quotations for professional plumbing services were provided by Mr Hartley Saggers of Austland Plumbing Pty Ltd.[449] Mr Saggers was an experienced plumber with some 42 years' experience in the industry. The initial quotations were provided in July 2019 and were then revised in November 2023.
(e) A quotation for professional land surveying services was provided by Mr Natalie Katona-Dyer of BE surveys in July 2023.[450]
...more often than not the technicalities of it and the economics of it preclude the sensibility of trying to cut off and replace half a steel column than it would be to bring in a new steel column and swap it out.
None of the Units need to be replaced in their entirety but all Units need to have significant maintenance and repair/replacement of components affected by the presence of AS.
I would not like the court to get the impression that I have ever suggested that total demolition was necessary, and I also hesitate in providing evidence of structural engineering adequacy.
Go2 Group Preconstruction Management Fee under Early Contractor Involvement Agreement
Go2 Group Forward Works under Early Contractor Involvement Agreement
...unquestionably contributed to what has been assessed as significantly higher replacement costs, if replacement was actually either proposed or required. This is shown by the difference in Mr Harrison's estimates from his report in 2019 and his report in 2023 due to the 'double whammy' of higher labour and materials costs. If the Premises had been repaired in 2017, this double whammy and the 4% per annum increases in costs to 2019 would have been avoided.
(a) The plaintiff was on notice of the corrosive effects of the ammonium sulphate from in or around mid-2006. Thereafter, the subject of the damage to the premises and the corrosive effects of the ammonium sulphate was a consistent and constant point of discussion between the representatives of the plaintiff and the defendant.
(b) Mr Joseph Hawkins and Mr David Hawkins attended the premises on several occasions over the course of the tenancy, and received updated reports from the defendant and from others about the state of the building.
(c) Mr Joseph Hawkins did not apply insurance proceeds to the repair of the Warehouse. He took no steps of any substance to ameliorate the effects of the storm damage in mid-2015.
(d) There is little doubt the plaintiff was aware of the deterioration of the building over time.
(e) On several occasions, the plaintiff engaged engineers or builders to examine the premises and provide reports as to the state of the structure.
(f) For example, Mr Hughes prepared a lengthy report for Mr Joseph Hawkins in August 2008. Mr Hughes detailed in his report the repair work he recommended, largely directed at Unit 1 with the other Units being protected and maintained through coating, among other things. The plaintiff took no steps in response to this report.
(g) Further, Mr Hughes prepared additional reports in early 2009 which included further recommendations. I have summarised the report earlier in these reasons. The cost of the remedial work was significant, although he outlined various options.
(h) Between around November 2010 through to September 2011, discussions occurred between the parties about the possible sharing of the cost of replacing the roof on the Warehouse, but no resolution was achieved in that regard. Mr Joseph Hawkins remained adamant at this point he would not bear the full cost of the work, and if that was the position maintained by the tenant, Mr Hawkins would rather simply maintain the approach of undertaking reactive work and then demolish Unit 1 when the defendant vacated the premises.
(i) Much later in the chronology, in August 2016, Marocchi Engineering prepared a detailed report for the plaintiff concerning the condition of the building, which provided recommendations for remedial work to be undertaken. I have referred to this report earlier in these reasons. The recommendations included replacing the entire roof cladding and roof purlins, replacing the wall girts and wall cladding, replacing the damaged roof and wall cladding to the ablution block, blast cleaning the structural steelwork, and blasting and cleaning all concrete dado walls.
(j) No significant remedial work was undertaken by either of the parties during the course of the defendant's tenancy. Mr Joseph Hawkins did not pursue any of the recommendations made to him about such work, with the endeavours in this regard hitting a brick wall given the inability of the parties to agree a cost sharing arrangement.
(k) Pursuant to cl 3.11(b) of the Varied Lease, at all times the plaintiff had a right to enter the premises, upon giving reasonable notice, although in cases of emergency, such notice was not required, in order to carry out 'repairs, renovations, maintenance, modifications, alterations or replacements to the Premises'.
Estimated costs to rectify Unit 1 and the toilet block to Unit 1
THARBY, MR So if in fact the lessor was able to find a tenant and lease out the premises for some rental amount, would that change your opinion that the rental value was nil?
HAGON, MR: Yes. I don't believe - I mean, it's possible they could have found a tenant willing to put up with the state of that building, but I don't believe it was habitable, as the local shire also, which I spoke to, deemed was uninhabitable. So I think - I still believe that it's - yes. They may have found a tenant, but I don't believe it was actually habitable.
THARBY, MR: If they found a tenant and a rental was paid, then your nil assessment - sorry. If a tenant was found and they were prepared to pay a rent, then the market rent would not be nil; is that correct?---
HAGON, MR: Not necessarily. It might have had some value to that particular tenant, but I think the overall market would not deem that building habitable as per the local shire deemed that it was dilapidated and not habitable. So it's possible that they could have found a tenant, but I believe the market rent, as I've stated there, was nil.
(a) the sum of $200,307.70;
(b) reduced by 5%; and
(c) less the further rent received by the plaintiff of $16,390.
Pristine Brick Cleaning - high pressure cleaning in required areas
Western Power - isolating power for work to be performed by Interlec
Elkon Pty Ltd - removing and securing damaged sheeting
Onsite Rental Group - rental of scissor lift to secure sheeting
PART IX - UNPAID RENT CLAIM A. The plaintiff's claim
3.1 Rent
The Lessee must pay the Rent (free from all deductions) at the times prescribed in Schedule 1 (subject to review pursuant to this Lease) to the Lessor.
F. Has plaintiff established its claim for unpaid rent?
G. Has defendant established an entitlement to an abatement?
PART X - THE PLAINTIFF'S CLAIM IN TORT A. The plaintiff's pleaded claim in negligence
(a) handle, store and/or process ammonium sulphate (including for the production and then storage of fertiliser containing the same) in such a manner so as to prevent any damage being caused to the Units and the building on the property;
(b) take action to mitigate the damage which could be caused by the defendant's method of delivering and storing the ammonium sulphate in the Units; and
(c) rectify any damage caused to the Units and the building on the property immediately, so as to keep them in good and substantial repair, order and condition and to prevent further or ongoing damage.
B. The defendant's pleaded defences to the negligence claim
(a) of the business of the defendant;
(b) the defendant intended to use and used the premises for the value adding and storage of ammonium sulphate;
(c) ammonium sulphate was a corrosive substance;
(d) the defendant's places and modes of storage of the ammonium sulphate at the premises;
(e) the defendant used a shaker table to sort ammonium sulphate at the premises;
(f) of the ventilation of the premises and that the defendant often kept the access doors of the premises open during operating hours;
(g) that neither the plaintiff nor the defendant had applied a polymeric sealer/coating to the concrete floors, concrete walls and structural steel; and
(h) it (i.e. the plaintiff) had an obligation to maintain and repair the premises to prevent water ingress.
...if anyone expected to store ammonium sulphate bulk fertiliser in a facility like that for a decade and not expect it to do that kind of damage that - without some preventative measures being installed, that would have been foolhardy or misguided.
(1) A person is not liable for harm caused by that person's fault in failing to take precautions against a risk of harm unless -
(a) the risk was foreseeable (that is, it is a risk of which the person knew or ought to have known); and
(b) the risk was not insignificant; and
(c) in the circumstances, a reasonable person in the person's position would have taken those precautions.
(2) In determining whether a reasonable person would have taken precautions against a risk of harm, the court is to consider the following (amongst other relevant things) -
(a) the probability that the harm would occur if care were not taken;
(b) the likely seriousness of the harm;
(c) the burden of taking precautions to avoid the risk of harm;
(d) the social utility of the activity that creates the risk of harm.
(a) I accept the plaintiff's submission that it was reasonably foreseeable the storage and screening of ammonium sulphate by the defendant would lead to a dispersal of ammonium sulphate through the premises, coming into contact with water, and leading to corrosion of the Warehouse. I accept that the representatives of the defendant were well aware of this risk, given the nature of the defendant's business and its awareness of the chemical properties of the fertiliser.[561]
(b) The risk in question was not insignificant, indeed it was a material risk with a high probability of eventuating.
(c) A reasonable person in the position of the lessee would have taken precautions against this risk, it being apparent there were recognised steps which could have been taken. Recommendations were received by the defendant about these steps, such as the report of Mr Hughes in August 2008 which was provided to the defendant,[562] and the recommendation from Modular Construction Services received by the defendant in July 2013.[563] The lessee was well placed to implement these precautions, and failed to do so (to the necessary extent) because of the insistence that its contractual position was correct.
(d) The defendant operated its valuable business from the Warehouse over a lengthy period. It formed part of its global fertiliser business. This was no 'two-dollar backyard operation'.[564] The reasonableness and burden of the precautions emphasised by the plaintiff should be seen in this context.
H. Proportionate liability and concurrent wrongdoer
concurrent wrongdoer, in relation to a claim, means a person who is one of 2 or more persons whose act or omission caused, independently of each other or jointly, the damage or loss that is the subject of the claim.
[128] There is a more fundamental problem concerning the contention that the contracting Respondents are "concurrent wrongdoers". On the proper construction of Part 4 Civil Liability Act as a whole, a plaintiff whose own acts or omissions have been a cause of his own loss or damage is not a "concurrent wrongdoer". This construction highlights the distinction between contributory negligence and proportionate liability.
[129] I accept that, on a literal reading of s 34(2) Civil Liability Act a plaintiff whose acts or omissions have been a cause of the damage or loss that is the subject of the claim fits within the definition of "concurrent wrongdoer". However, on its proper construction s 34(2) should not be read in that literal fashion. If there is a statutory definition of a term that has an ordinary English meaning, the ordinary English meaning can influence the operation of that definition...
[130] Reading s 34(2) with that principle in mind, it is not ordinary English for a person to be a "wrongdoer", of any kind, insofar as he causes harm to himself. In ordinary English, when there is a wrongdoer there is some other, different, person who has been wronged. That shade of meaning continues to apply in the definition of "concurrent wrongdoer". (authorities and citations omitted)
(1) Whenever in any claim for damages founded on an allegation of negligence the court is satisfied that the defendant was guilty of an act of negligence conducing to the happening of the event which caused the damage then notwithstanding that the plaintiff had the last opportunity of avoiding or could by the exercise of reasonable care, have avoided the consequences of the defendant's act or might otherwise be held guilty of contributory negligence, the defendant shall not for that reason be entitled to judgment, but the court shall reduce the damages which would be recoverable by the plaintiff if the happening of the event which caused the damage had been solely due to the negligence of the defendant to such extent as the court thinks just in accordance with the degree of negligence attributable to the plaintiff.
(1A) Subsection (1) shall not operate to defeat any defence arising under a contract.
(1) The principles that are applicable in determining whether a person is liable for harm caused by the fault of the person also apply in determining whether the person who suffered harm has been contributorily negligent in failing to take precautions against the risk of that harm.
(2) For that purpose -
(a) the standard of care required of the person who suffered harm is that of a reasonable person in the position of that person; and
(b) the matter is to be determined on the basis of what that person knew or ought to have known at the time.
K. Limitation Act defence
Presumably, however, it is a question of fact and degree whether damage is sufficiently distinct to result in a separate cause of action. On the evidence in the present case it seems to me that the damage suffered by the building was not truly continuous; and that between the slight damage during the McKays' ownership and the considerable damage after the Bowens bought there were a difference and an interval marked enough to justify treating the latter damage as distinct.
Both on principle and on authority (Maberley v Peabody & Co [1946] 2 All ER 192) it seems that when an act is actionable only on proof of actionable damage, successive actions will lie for each successive and distinct accrual of damage. But where the damage sued for in the second action is not in reality distinct from that sued for in the first, but it merely a part of it or consequential upon it, it cannot be recovered. In other words, compensation for the first damage includes compensation for all the ulterior consequences of that damage whether already accrued or not, but it does not include compensation for entirely distinct damage accruing from the defendant's act independent of the damage first sued for.
Merely because a substantial loss occurs (ex hypothesi) at a later point of time does not establish that there was no damage stemming from the same breach occurring at an earlier date being damage that occurred outside of the limitation period, thereby barring the whole claim (Wardley at 531, Segal at [26]).
PART XI - THE DEFENDANT'S COUNTERCLAIM A. Overview
Despite the matters pleaded in paragraphs 24 to 33, the plaintiff, in breach of clause 3.9(a) of the First Lease, failed to maintain and repair the Premises to prevent water ingress, failed to ensure the external appearance of the Premises is maintained to a high standard in breach of special term 8.3 to Schedule 1 of the First Lease and clause 11.4 of the Offer to Lease, and failed to ensure that the standard of the Premises and land is lifted to an acceptable standard pursuant to clause 1.1(t) of the First Lease.
Alltype Roof Repairs (incurred between January 2011 and December 2014)
The Lessor will ensure the external appearance of the Premises is maintained in a high standard (fair wear and tear always excepted).
PART XII - CONCLUSIONS AND RELIEF
(a) breaches of cl 3.9(a) of the Varied Lease in respect of the damage to the Warehouse;
(b) breach of cl 3.23 of the Varied Lease in respect of the failure to yield up the premises in good and substantial repair and condition; and
(c) breach of cl 3.23 of the Varied Lease in respect of the failure to repair the access holes made in the internal walls to the Units.
(a) as to the plaintiff's claim for damages quantified by reference to the rectification costs for Units 1, 2 and 3, this has been established on the balance of probabilities, after taking into account the plaintiff's failure to mitigate, in the sum of $2,662,894.39 (exclusive of GST);
(b) as to the plaintiff's claim for loss of rent under the Varied Lease during the rectification works, this has been established on the balance of probabilities, and the court quantifies the amount of the lost rent as $173,902.32 (exclusive of GST); and
(c) as to the plaintiff's claim for loss of the payment of outgoings during the rectification works, this has been established on the balance of probabilities, and the court quantifies the amount of the unpaid outgoings as $48,628.67 (exclusive of GST); and
(d) as to the plaintiff's claim for the cost of the urgent interim repair works undertaken by the plaintiff in 2018 and 2019, this has not been established on the balance of probabilities and is not allowed.
1.1 Definitions
In this Lease, unless the contrary intention appears:
...
(i) 'Outgoings' means all costs and charges assessed, assessable, charged, chargeable, paid, payable or otherwise incurred in respect of the Land or the Premises and without affecting the generality of the foregoing includes the cost of:
(i) Cleaning the Premises, the Land, all windows, glass, doors and similar items, including the cost of wages, all overheads paid to the cleaning, maintenance and supervisory staff, all materials used in cleaning, toilet requisites, towels, all equipment lease or hire charges, insurance premiums in relation to cleaning equipment, all repairs and maintenance related to cleaning equipment, compaction and removal of rubbish including any charge imposed by the local authority, the supply of storage equipment and removal of rubbish, hiring, leasing, repairing, maintaining, running and insuring, rubbish compactors or other removal equipment and pest control;
(ii) Gas, oil, electricity (metered and used only), light, power, fuel, telephone (excluding install costs), sewerage, stormwater drainage and other services or requirements supplied to the plant or equipment rooms, workshops including also the running, operating expense and maintenance of the Airconditioning Plant;
(iii) Ongoing maintenance of the Premises and including all gardening and landscaping expenses;
(iv) Insurance premiums and the excess on insurance paid by the Lessor on behalf of itself or the Lessee in respect of any risk relating to the Lessor's ownership or interest in the Premises and any equipment, plant or appliance therein and against damage by fire, explosion, earthquake, aircraft, riot, civil commotion, flood, lightning, storm, tempest, act of God, war damage, fusion, smoke, rainwater, impact by vehicles, machinery breakdown, demolition and removal of debris, architects' and other consultants' fees, public risk or liability, sprinkler leakage, water damage, workers' compensation, statutory liability in respect of employees of the Lessor working in or about the Premises;
(v) Running and maintaining all services from time to time and as agreed with Lessee provided by the Lessor for tenants, occupiers or visitors of the Land including but without limiting the generality of the foregoing the Airconditioning Plant, lavatories and sanitary conveniences and accessories, building maintenance units, building management services and communication services including the cost of all service and maintenance contracts associated therewith, fees and premiums paid to consultants or specialist contractors, the cost of purchase and installation of any materials or parts in association with the maintenance, servicing or repair of any service plant or equipment (but specifically excluding the capital cost of the replacement or upgrading of the whole or any part of such services);
(vi) Maintaining, testing and replacing all fire equipment including all stop-cocks, hydrants, alarms, drench curtains, fire sprinkler systems, hoses, extinguishers and other fire prevention equipment in the Premises and all charges rendered by the Fire and Emergency Services Authority of Western Australia and any telecommunications carrier in the supply, maintenance, servicing and monitoring of the fire alarm system, but specifically excluding the capital cost of the replacement or upgrading of the whole or any part of the systems;
(vii) Security, caretaking and management, including (but not limited to) wages and overheads paid and uniforms provided to security and caretaking staff, costs and charges rendered by contract security companies and the cost of leasing, maintaining, repairing and running security equipment including telecommunication charges and any fees paid to any managing agents in managing the Premises and any reasonable fees or costs paid to any accountant or auditor in relation to calculation or codification of the Outgoings;
(viii) Providing, maintaining, repairing and replacing all signs including the cost of lighting thereof; and
(ix) Any other expenditure reasonably and properly incurred by the Lessor in respect of the operation of the Premises and the Land.
(x) Nothing in this lease shall mean that the lessee is liable to contribute to the cost of the repair of any inherent defect of any structural repairs or any repair or replacement which is of a capital nature.
(r) 'Term' means the term specified in Schedule 1 and any Further Term;
(t) Any and all costs related to lifting the standard of the premises and land to an acceptable standard including site clean up and compliance to existing permits are entirely for the lessors account.
The Lessee must pay the Rent (free from all deductions) at the times prescribed in Schedule 1 (subject to review pursuant to this Lease) to the Lessor.
(a) Notice of Proposed Rent on each 1 March (starting on 1 March 2007)
(i) The Lessor shall not later than one (1) month prior to each of the Rent Review Dates set out in Schedule 1 give to the Lessee a notice in writing of the rate at which the Lessor proposes the Rent shall be payable from the Rent Review Date ("Proposed Rent") identifying all calculations which will be the lesser of the:
(A) Then Current Market Rent of the Premises; or
(B) Rent payable by the Lessee to the Lessor immediately preceding the relevant Rent Review Date increased by the Perth CPI according to the formula:
OR is the Rent payable immediately prior to the Rent Review Date;
A is the Perth CPI for the latest quarter concluding prior to the Rent Review Dale;
B is the Perth CPI for the latest quarter concluding one (1) year prior to the Rent Review Date;
and the amount so fixed will be the Rent payable from the Rent Review Date in respect of which notice has been given.
(ii) The Lessee shall, within thirty (30) days of receiving the notice ("Response Period") give to the Lessor notice that the Lessee agrees or does not agree to pay the Proposed Rent.
(iii) If the Lessee neglects to give the Lessor the notice within the Response Period the Lessee shall be deemed to have agreed to pay the Proposed Rent.
(iv) If the Lessee agrees to pay or is deemed to have agreed to pay the Proposed Rent then the Proposed Rent shall become the Rent and shall apply from that Rent Review Date.
(b) Reference to Valuer
(i) If the Lessor fixes the Rent payable from any Rent Review Date as the then Current Market Rent of the Premises and if within the Response Period, the Lessee gives to the Lessor notice that it does not agree to pay the Proposed Rent, then the Rent to be paid from that Rent Review Date shall be the then Current Market Rent of the Premises determined by a Valuer nominated by both parties, by whose decision each of the Lessee and the Lessor hereby agree to be bound.
(ii) If the Lessor and the Lessee do not agree upon the nomination of the Valuer within the period of twenty eight (28) days commencing upon the expiration of the Response Period then the Current Market Rent of the Premises shall be determined by a Valuer nominated, at the request of either party, by the President of the Australian Property Institute (Inc.) (Western Australian Division) ("President").
(iii) Any Valuer appointed under this sub clause shall be acting as an expert and his determination shall be final and binding.
(iv) Until the Rent from that Rent Review Date is determined, the Lessee shall pay Rent to the Lessor at the rate applicable immediately prior to that Rent Review Date and any adjustment which may be necessary in respect of the Rent shall be made within 14 days after a determination is made.
(v) The costs of determining the Rent shall be borne equally by the Lessee and the Lessor.
(c) Lessor's Failure to Give Notice
The Lessor shall not by reason of its failure to give notice of the Proposed Rent in accordance with sub-clause (a) within 6 months after the due date of the Rent Review forfeit its right to have the Rent from that Rent Review Date reviewed. The Reviewed Rent will only be payable from the date that the Lessee received that notice of the Proposed Rent. If, however, the Lessor fails to give notice of the Proposed Rent in accordance with sub-clause (a), the Lessor forfeits its right to that Rent Review.
(d) Valuer's Default
If any Valuer:
(i) Fails to accept the nomination to act; or
(ii) Fails to determine the Current Market Rent of the Premises within 28 days of accepting the nomination to act; or
(iii) Becomes incapacitated or dies; or
(iv) Resigns as the nominee, then either party may request the President to appoint another such Valuer the cost of which appointment shall be borne equally by the Lessor and the Lessee.
...
3.9 Maintain and Repair Premises
The Lessee must maintain and keep the Premises in good and substantial repair, order and condition except in the event of damage by explosion, earthquake, aircraft, riot, civil commotion, fire, flood, lightning, storm, tempest, act of God, war, fair wear and tear and any other risk insured against by the Lessor PROVIDED THAT this exception shall not apply if the damage is caused by the neglect, default or misconduct of the Lessee and the Lessor's insurances are invalidated by an act, neglect or default of the Lessee.
The Lessor must maintain and repair the Premises to prevent water ingress.
Any cleaning performed must be to a commercial standard.
The Lessee shall repair and make good any damage (regardless of how minor) which may be caused to the Premises at any time by the installation or removal by the Lessee of any fixtures, fittings, plant or equipment supplied and fitted by the Lessee or on behalf of the Lessor.
Not to use nor permit to be used the Premises for any purpose other than the use stated in Schedule 1 unless otherwise agreed in writing nor to permit nor suffer the use of the Premises for any residential purpose whether temporary or permanent and the use of the Premises shall conform to all laws and local authority laws, lay-laws, regulations or requirements and the Lessee shall obtain and maintain all necessary approvals, consents, permits and licences from all relevant authorities for its use of the Premises that are not already in place.
Not to do, exercise nor carry on nor permit nor suffer any person to do exercise or carry on in the Premises any noxious, noisome, offensive, illegal or immoral act, trade, business, damage or disturbance to the Lessor.
Notwithstanding anything to the contrary contained or implied in this Lease, to comply promptly with all acts relating to the Premises or the use thereof PROVIDED THAT the Lessee will not be under any liability in respect of any structural alteration required by any act other than those caused or contributed to by the Lessee's use or occupation of the Premises.
In the positioning of partitions upon or within the Premises to comply with all acts, regulations and ordinances relating to fire detection and alarm and to pay to the Lessor the cost of effecting any alteration to the thermal detectors or other fire alarm or extinguishment installations required or necessary to comply with any Act, regulation or ordinance or the requirements of the Insurance Council of Australia and the Fire and Emergency Services Authority of Western Australia.
(a) The Lessee must effect and maintain in respect of the Premises adequate public risk insurance which insurance policy is to include a cross liability clause to operate in the same manner (except as to the kind of liability) as if there were a separate policy covering insured persons in the names of the Lessor and the Lessee for their respective rights and interests for the time being in an amount not less than $10,000,000 in respect of any one claim or any higher amount reasonably required by the Lessor from time to time with an insurance company approved by the Lessor (which approval may not be unreasonably withheld) and to supply to the Lessor details thereof and to ensure that the insurance conforms with the reasonable requirements from time to time of the Lessor of which the Lessee is given notice.
(b) The Lessee must effect and maintain in respect of the Premises, in the names of the Lessor and the Lessee for their respective rights and interests, a plate and other glass policy against breakage covering all plate and other glass in the Premises including external glazed windows.
(c) If required by the Lessor to produce the policies in respect of public risk and plate glass insurance to the Lessor.
(d) The Lessee must deliver to the Lessor upon the request of the Lessor certificates of currency issued by the insurance company in respect of the public risk and plate glass insurance.
(e) Not to alter the terms or conditions of any policy without the written approval of the Lessor and to deliver promptly to the Lessor particulars of any change or variation of the terms and conditions in respect of the public risk and plate glass insurance policies.
3.17 Not to invalidate Insurance
Not to do nor suffer to be done any act, matter or thing upon the Premises nor bring nor keep anything therein whereby the insurance on the Premises against damage by fire and other insured risks might be rendered void or voidable or whereby the rate of premium is or is liable to be increased and if the Lessor approves in writing any proposal of the Lessee to add to or increase any insured risk, to pay all additional premiums of insurance on the Premises required on account of the additional or increased risk caused by the use to which the Premises are put by the Lessee and the Lessor shall provide the Lessee with copies of all insurance policies to enable the Lessee to comply with this Clause 3.15 of this Lease.
...
3.19 Insurance - Fixtures
(a) The Lessee must reimburse the Lessor within fourteen (14) days of receipt of an invoice from the Lessor for all premiums payable on a policy of insurance effected by the Lessor for the full insurable value on a replacement or reinstatement basis of the Lessor's fixtures, fittings, materials, goods, furniture and partitions in the Premises against fire, storm, tempest, earthquake, Civil commotion, extraneous risks including rain water and other water damage, flood, riots, strikes, malicious damage, explosion, impact by vehicles or aircraft, articles dropped from aircraft and all other risks reasonably required by the Lessor. If required in writing by the Lessee the Lessor will provide the Lessee with all information reasonably required by the Lessee to enable the Lessee to verify that the premiums the subject of the invoice relate only to the Premises;
(b) The Lessee must insure and keep insured to the full insurable value on a replacement or reinstatement basis the Lessee's fixtures, fittings, materials, goods, furniture and partitions in the Premises against fire, storm, tempest, earthquake, civil commotion, extraneous risks including rain water and other water damage, flood, riots, strikes, malicious damage, explosion, impact by vehicles or aircraft, articles dropped from aircraft and all other risks reasonably required by the Lessor with a public insurance company approved by the Lessor (which approval may not be unreasonably withheld) and to deliver a copy of the policy and all receipts for premiums to the Lessor upon demand.
Upon the expiry or sooner determination of the Term the Lessee must:
(a) Peaceably to surrender and yield up to the Lessor the Premises subject to the other provisions of this Lease, clean and free from rubbish and in good and substantial repair and condition as nearly as possible in the same condition as at the commencement of the Term fair wear and tear excepted; and
(b) Surrender to the Lessor all keys belonging to the Premises including security access cards held by the Lessee whether provided by the Lessor or made or procured by the Lessee for his own use and not to permit these to come into the possession or control of any person other than responsible persons authorised by the Lessee and to use his best endeavours to protect and keep safe the Premises and any property contained therein and to keep all doors and windows securely fastened when not in use.
Each of the covenants by the Lessee contained in each of the following clauses are deemed to be essential terms of this Lease:
(a) The covenant to pay the Rent as specified in Clause 3.1;
(b) The covenant to pay Rates and Taxes and Outgoings as specified in Clause 3.3 and Clause 3.4;
(c) The covenant relating to use of the Premises as specified in Clause 3.10;
(d) The covenant relating to assignment and sub-letting of the Premises as specified in Clause 3.14; and
(e) The covenant against voiding insurance as specified in Clause 3.16.
If the Lessee remains in possession of the Premises after the expiry of the Term with the consent of the Lessor the Lessee will be a monthly tenant of the Lessor at a monthly rent as determined by the Lessor together with the Outgoings and Outgoings which would be payable by the Lessee if an extension of the Term had been granted at the expiry of the Term but otherwise on the same terms and conditions as this Lease.
If the Premises or any part thereof is so destroyed or damaged as to render the Premises unfit for occupation or use (unless the damage or destruction was caused by or in consequence of any act or default of the Lessee) preventing the Lessor from claiming under the relevant policy of insurance the Rent, Rates and Taxes and Outgoings payable pursuant to this Lease or a fair and just proportion according to the nature and extent of the damage sustained will from the date of damage or destruction until the Premise as are reinstated and made fit for occupation and use abate and cease to be payable and any dispute concerning this provision is to be determined by a single arbitrator in accordance with the provisions of Commercial Arbitration Act 1985 WA and in any arbitration proceedings either party may be represented by his solicitor or other legal representative PROVIDED THAT the Lessee shall pay the Rent, Rates and Taxes and Outgoings without any abatement until the date of the award of the arbitrator or agreement between the Parties (whichever is the earlier) whereupon the Lessor shall refund to the Lessee any Rent Rates and Taxes and Outgoings overpaid by the Lessee within fourteen (14) days after the date of the award of the arbitrator.
...
5.22 No Warranty by Lessee as to Prior or Post use
The Lessee gives no warranty for the prior or Post Lease use to which the Premises may or may be put and the Lessor accepts the Premises for the Term with full knowledge of and subject to any prohibition or restriction on the use thereof under or pursuant to any law or other statutory authority and if the business was or will be carried on by the Lessor at the Premises is permissible only with consent pursuant to any Act or other statutory authority the Lessor shall obtain that consent at his own expense.
The Lessor gives no warranty as to the use to which the Premises may be put other than the Premises may be lawfully used as commercial and medical offices and the Lessee accepts the Premises for the Term with full knowledge of and subject to any prohibition or restriction on the use thereof under or pursuant to any law or other statutory authority and if the business carried on by the Lessee at the Premises is permissible only with consent pursuant to any Act or other statutory authority the Lessee shall obtain that consent at his own expense.
Lot 310 on Diagram 75968 being the land on Certificate of Title Volume 1857 Folio 370 and being 30 Butcher Street, Kwinana Beach, Western Australia
Unit 1, 30 Butcher Street, Kwinana Beach, Western Australia as set out on the plan in Schedule 2 having an area of 2,400m2
5.1 The Rent shall be paid monthly in advance on the first day of each month by equal consecutive monthly payments of $15,200 plus GST commencing on the Commencement Date.
5.2 The Rent payable by the Lessee to the Lessor for the Premises from the Commencement Date until 28 February 2007 shall be $182,400 plus GST per annum and as thereafter determined pursuant to Clause 3.2 and 3.3 of this Lease.
On 1 March 2007 and then annually on each 1 March thereafter during the Term (and during any Further Term)
First Further Term: 1 March 2008 - 28 February 2011 (both inclusive)
Second Further Term: 1 March 2011 - 28 February 2014 (both inclusive)
8.1 The Lessee is to have use of the certified weighbridge installed within the Premises for the Term of this Lease (and during any Further Term). The Lessor has agreed to have the weighbridge upgraded at the Lessor's cost in consideration of the Lessee entering into this Lease. The Lessor, at the Lessor's cost, will arrange for a telephone line to be installed at the weighbridge.
8.2 The Lessee is, subject to execution of this Lease. and provision of the Security Deposit, to have the right to commence moving equipment into the Premises prior to the Commencement Date.
8.3 The Lessor will ensure the external appearance of the Premises is maintained in a high standard (fair wear and tear always excepted).
Plaintiff's claim for unpaid rent[616]**
Less: Credit Council rates for 12 days being after 30 days from vacation
Land tax not invoiced 18.11.2016 plus 30 days' notice period
Oct, Nov, Dec 2016 portion of Land tax/Council rates after vacation
Less: 12 days credit from account allowing for notice period
(2a) Notwithstanding subsections (1) and (2), in any proceedings where direct oral evidence of a fact or opinion would be admissible, any statement in a document and tending to establish the fact or opinion shall, on production of the document, be admissible as evidence of that fact or opinion if -
(a) the statement is, or directly or indirectly reproduces, or is derived from, a business record; and
(b) the court is satisfied that the business record is a genuine business record.
business means any business, occupation, trade or calling and includes the business of any governmental body or instrumentality and of any local government;
business record means a book of account or other document prepared or used in the ordinary course of a business for the purpose of recording any matter relating to the business;
derived means derived, by the use of a computer or otherwise, by calculation, comparison, selection, sorting, consolidation or by accounting, statistical or logical procedures;
document means any record of information and includes, in addition to a document in writing -
(c) any disc, tape, sound track or other device in which sounds or other data (not being visual images) are embodied so as to be capable (with or without the aid of some other device) of being reproduced therefrom; and
(d) any film, negative, disc, tape or other device in which one or more visual images are embodied so as to be capable (with or without the aid of some other device) of being reproduced therefrom;
statement includes any representation of fact or opinion whether made in words or otherwise.
s 79C(2a) applies solely to 'business records' as that term is defined. Further, s 79C(2a) applies to statements made by a qualified person, including statements tendered for the truth of the contents recorded in a document by third party. Section 79C(2a) also applies to statements that are not made by a qualified person. 2. The term 'qualified person', in relation to a statement, is defined to mean a person who:[618]
(a) had, at the time of making of the statement, or may reasonably be supposed to have had at that time, personal knowledge of the matters dealt with by the statement; or
(b) where the statement is not admissible in evidence unless made by an expert on the subject of the statement, was at the time of making of the statement such an expert.
Given the poor condition at 30 Butcher Street, Kwinana which has been attributed to the combination of the type of fertiliser stored (Ammonium Sulfate) causing accelerated corrosion and a lack of general building maintenance, as discussed we are not in a position to insure this location going forward.
(a) evidence that a decision whether to continue to insure the plaintiff in respect of damage to the Warehouse was taken by the insurer (and Zurich Financial) in February 2016;
(b) evidence that the decision taken by the insurer (and Zurich Financial) was that it would not further insure the plaintiff;
(c) evidence that this decision was communicated to an agent of the plaintiff, namely Mr Noordewier, on 9 February 2016; and
(d) evidence as to the reasons or bases upon which the insurer (and Zurich Financial) made this decision, and the truth of those reasons.
To my knowledge, nobody actually referred to [the Code of Practice], but if anybody wants to refer to it now or say that they complied with handling codes of practice as a generalised, easy, glib statement to make, then [the plaintiff] can say, "Well, look at 368. You pleaded that document and you didn't even comply with it."
...building used for stockpiling of corrosive material (Sulphate of Ammonia) and the damage to the building. Officers previously investigated the corrosive dust causing a nuisance to adjacent properties.
I certify that the preceding paragraph(s) comprise the reasons for decision of the Supreme Court of Western Australia.
[1] To be referred to in these reasons as the product or ammonium sulphate.
[2] As will be apparent from these reasons, I do not accept that the lease for Units 2 and 3 was a separate, stand-alone lease arrangement (described by the plaintiff as the 'Second Lease'), but rather formed a variation to the Original Lease.
[3] Initially, the supplying entity was WMC Resources Ltd, which was subsequently acquired by BHP Billiton Ltd and became BHP Billiton Nickel West Pty Ltd. For convenience, I have referred to these entities as BHP in these reasons.
[5] The claims are pleaded in the second re-amended statement of claim dated 26 August 2022 (SOC). See also the plaintiff's second further re-amended reply to defence and defence to counterclaim dated 6 July 2023 (Plaintiff's Reply).
[6] See [12H] to [12M] of the SOC and ts 212.
[7] See the further re-amended defence and counterclaim dated 26 June 2023 (Defence). See also the defendant's amended reply to defence to counterclaim dated 4 November 2022 (Defendant's Reply).
[8] Norwich Union Life Insurance Society v British Railways Board [1987] 2 EGLR 137, 138 (Lord Hoffman).
[9] Plaintiff's opening submissions [30].
[11] SOC, prayer for relief B, C, E and I.
[13] SOC [20], prayer for relief D, F and I.
[16] Prayer for relief in the counterclaim at pars A to H, together with a claim for interest.
[17] Additionally, further particulars were supplied by the defendants: see Defendant's particulars dated 26 August 2019 and 1 September 2023.
[18] Amended Papers for the Judge dated 11 April 2024.
[19] The reference to a 'dado' wall indicates the bottom half of the walls were concrete, operating as a protective lower section, with metal sheeting above that.
[20] Exhibit 10 (valuation report prepared in July 2024).
[37] Exhibits 32 and 44 (draft leases).
[39] Exhibit 26 (being the invoice from Beton Contractors dated 28 June 2005).
[48] Exhibit 79 (Email exchanges between Mr Ross Syminton and Mr Joseph Hawkins in June and July 2007).
[62] Commissioner of Taxation (Cth) v Sara Lee Household & Body Care (Australia) Pty Limited [2000] HCA 35; (2000) 201 CLR 520 [22] (Gleeson CJ, Gaudron, McHugh and Hayne JJ) (Sara Lee Household).
[63] Sara Lee Household [23] - [24].
[64] See, for example, Exhibits 328, 367, 531, 775.
[66] As explained in Warner v Hung, in the matter of Bellpac Pty Ltd (Receivers and Managers Appointed) (In Liquidation) (No 2) [2011] FCA 1123; (2011) 297 ALR 56 [48] (Emmett J).
[67] Watson v Foxman [1995] NSWCA 497; (1995) 49 NSWLR 315, 318 - 319 (McLelland CJ in Eq, as his Honour then was).
[69] Fazio v Fazio [2010] WASC 263 (Martin CJ).
[70] Siah v Wong [2021] WASC 19 (Smith J).
[71] Gestmin SGPS SA v Credit Suisse (UK) Ltd [2013] EWHC (Comm) 3560 [22]. See also Bell P (with whom Bathurst CJ agreed) in ET-China.com International Holdings Ltd v Cheung [2021] NSWCA 24 [27] - [29].
[72] Jones v Dunkel [1959] HCA 8; (1959) 101 CLR 298.
[73] Plaintiff's closing submissions [49] - [50].
[74] Defendant's closing submissions [67] - [71].
[75] Kuhl v Zurich Financial Services Australia Ltd [2011] HCA 11; (2011) 243 CLR 361 [63].
[76] Knell v QAV Pty Ltd [2020] WASCA 23.
[77] Plaintiff's closing submissions [49].
[79] Trans-Tasman Proceedings Act 2010 (Cth), s 30 and s 31; RSC, O 39A r 3.
[80] Defendant's closing submissions [69].
[85] Plaintiff's closing submissions [31].
[86] Defendant's closing submissions [49].
[89] Exhibits P6 and P7 (less expenses of $409.09).
[90] Exhibits P8 (for Unit 3) and P9 (for Unit 2).
[141] Exhibit 82 (Email from Mr Peter Burns to Mr Ross Syminton dated 9 August 2007).
[143] Exhibit 108 (Letter from Mr Hughes, the registered builder, to the Town of Kwinana dated 13 March 2008).
[170] Exhibit 314 and ts 342, 496, 728.
[180] See Attachment E to these reasons.
[206] Exhibit 657, 658, 659, 661, 662.
[209] See, rather ominously, Exhibit 666.
[215] J.J. Hawkins and Co Pty Ltd v International Raw Materials Pty Ltd [2024] WASC 124 (Lundberg J).
[216] Exhibit 706 (filed 20 November 2019).
[217] Exhibit 712 (filed 27 October 2020).
[218] Defendant's closing submissions [83].
[220] Exhibit 713 (filed 30 September 2021).
[231] The Australian Standard is Exhibit P11.
[249] ts 536 - 537 (Mr Donkin) and ts 619 (Mr Tip O'Neill).
[254] The complete exchange with the witness is at ts 668 - 671.
[259] Defendant's closing submissions [16].
[266] Plaintiff's closing submissions [7].
[267] Plaintiff's closing submissions [11].
[268] Plaintiff's closing submissions [12].
[269] Plaintiff's closing submissions [95].
[270] Plaintiff's closing submissions [21].
[276] Defendant's closing submissions [135].
[277] Plaintiff's closing submissions [106].
[278] Willis Australia Ltd v AMP Capital Investors Ltd [2023] NSWCA 158; (2023) 113 NSWLR 1 [48] - [50] (Ward P, Beech-Jones JA and Griffiths AJA).
[279] Electricity Generation Corporation trading as Verve Energy v Woodside Energy Ltd [2014] HCA 7; (2014) 251 CLR 640 [35].
[280] Mount Bruce Mining Pty Ltd v Wright Prospecting Pty Ltd [2015] HCA 37; (2015) 256 CLR 104 [46] ‑ [52].
[281] Mineralogy Pty Ltd v The State of Western Australia [2005] WASCA 69 [15]. See also AIG Insurance Australia Ltd v McMurray [2023] WASCA 148 [135] - [140].
[282] Royal Botanic Gardens and Domain Trust v South Sydney City Council [2002] HCA 5; (2002) 240 CLR 45 [9] (Gleeson CJ, Gaudron, McHugh, Gummow and Hayne JJ). See also Willis Australia Ltd v AMP Capital Investors Ltd [2023] NSWCA 158; (2023) 113 NSWLR 1 [48]- [50] (Ward P, Beech-Jones JA and Griffiths AJA) and Saipan Holdings Pty Ltd v City Gym Sydney Pty Ltd [2023] NSWCA 55 [128] (Ward P, Gleeson JA and Simpson AJA agreeing).
[283] Papantoniou v Stonewall Hotel Pty Ltd [2018] NSWCA 85 [40].
[284] Miwa Pty Ltd v Siantan Properties Pte Ltd [2011] NSWCA 297 [13] (Basten JA, McColl and Campbell JJA agreeing).
[285] Miwa Pty Ltd v Siantan Properties Pte Ltd [18], citing Jireh International Pty Ltd t/as Gloria Jean's Coffee v Western Export Services Inc [2011] NSWCA 137 [55]- [56] (Macfarlan JA, Young JA and Tobias AJA agreeing) and Kooee Communications Pty Ltd v Primus Telecommunications Pty Ltd [2008] NSWCA 5 [27] - [31].
[286] Skanska Rashleigh Weatherfoil Ltd v Somerfield Stores Ltd [2006] EWCA Civ 1732 [22].
[287] The J & P Marlow (No 2) Pty Ltd v Hayes and McCabe [2023] NSWCA 117; (2023) 112 NSWLR 29 [76] (Bell CJ), [98] - [100] (Meagher and Kirk JJA) (J & P Marlow).
[288] Alcatel Australia Ltd v Scarcella [1998] NSWSC 483; (1998) 44 NSWLR 349 [354] (Sheller JA with whom Powell and Beazley JJA agreed) (Alcatel).
[290] Brown v Davies [1957] 3 WLR 818, 825 - 826.
[291] Haskell v Marlow [1928] 2 KB 45, 59 (Talbot J).
[292] Regis Property Co Ltd v Dudley [1959] AC 370, 394 (Viscount Simonds), 402 (Lord Tucker), and 410 (Lord Denning).
[293] Agtan Pty Ltd v Caltex Australia Petroleum Pty Ltd [2018] VSCA 169 (Agtan).
[295] Haskell v Marlow (59) (Talbot J).
[296] Alamdo Holdings Pty Ltd v Australian Window Furnishings (NSW) Pty Ltd [2006] NSWCA 224 (Hodgson JA, Basten JA and McLellan CJ at CL) (Alamdo Holdings).
[297] Alamdo Holdings [35] (Hodgson JA).
[298] Re Leisure Resort Holdings Pty Ltd (Unreported, Queensland Supreme Court, 14 January 1994) (Ryan J). That decision was not disturbed on appeal: Leisure Resort Holdings Pty Ltd v Leisure Resort Group Pty Ltd [1994] QCA 324.
[299] Alamdo Holdings [118] - [119] (Basten JA).
[300] Bunyip Buildings Pty Ltd v Gestetner Pty Ltd [1969] SASR 87, 91 (Mitchell J, upheld on appeal by Bray CJ, with Travers and Walters JJ agreeing).
[301] Advance Fitness Corporation Pty Ltd v Bondi Diggers Memorial & Sporting Club Ltd [1999] NSWSC 264 [93] (Austin J).
[302] AWH Pty Ltd v Impact Fertilisers Australia Pty Ltd [2015] VCC 346 (AWH).
[303] Defendant's closing submissions [106] - [108].
[304] Plaintiff's closing submissions [127].
[305] Dowse v Wynyard Holdings Ltd [1962] NSWR 252; (1961) 79 WN (NSW) 122 (Jacobs J).
[306] Waterways Authority of New South Wales v Coal and Allied Operations Pty Ltd [2005] NSWSC 1285 [22] (Barrett J, as his Honour then was) (Waterways Authority).
[307] Graham v Markets Hotel Pty Ltd [1943] HCA 8; (1943) 67 CLR 567, 585 (Starke J) (Graham v Markets Hotel).
[308] Graham v Markets Hotel (585) (Starke J). The covenant in the sub-lease read: 'And also will from time to time and at all times during the said term or any extension well and substantially repair cleanse maintain amend and keep all buildings and messuages at any time erected on the land hereby demised and all fixtures therein and all internal and external walls sewers drains and appurtenances thereof with all necessary reparations cleansings and amendments whatsoever and the same so well and substantially repaired cleansed maintained and amended will and shall at the end expiration or sooner determination of the term hereby granted or any extension thereof peaceably and quietly yield up unto the lessors its successors or assigns.'
[309] Alcatel Australia Ltd v Scarcella [1998] NSWSC 483; (1998) 44 NSWLR 349, 355 (Sheller JA, with whom Powell and Beazley JJA agreed).
[310] Welsh v Greenwich London Borough Council [2000] 3 EGLR 41, 43 (Robert Walker LJ) and 44 (Latham LJ), with Bell J agreeing.
[311] Waterways Authority [23] (Barrett J).
[312] Graham v Markets Hotel (582) (Latham CJ), endorsing the principle said to have been authoritatively stated by Lord Esher MR in Joyner v Weeks (1891) 2 QB 31, 43.
[313] Graham v Markets Hotel (586) (Starke J).
[314] Cugg Pty Ltd v Gibo Pty Ltd [2001] NSWSC 297 [99] (Hodgson CJ in Eq).
[315] Telecom & CPS Community Credit Cooperative Ltd v Heberg Pty Ltd [1993] ANZ ConvR 312 at 65,273 (Fullagar J).
[316] SOC [11]. As I have found the lease was varied, rather than finding there was a separate lease for Units 2 and 3, it is unnecessary to consider the alleged breach of the implied term pleaded by the plaintiff at [8.2] of the SOC.
[317] Exhibit 44, cl 1.1(l) and sch 1, item 2 and sch 2; and sch 3.
[318] Commissioner of Stamp Duties (NSW) v Atwill [1972] HCA 70; (1972) 126 CLR 655.
[330] Plaintiff's opening submissions [47] - [67] and Plaintiff's closing submissions [104] - [126] and [136] - [157].
[331] That is, by rendering each to each.
[332] AIB Group (UK) Plc v Martin [2001] EWCA Civ 1750; [2002] 1 WLR 94 [15] - [20] (Lord Millett).
[333] Plaintiff's closing submissions [108].
[334] Defendant's opening submissions [32] - [51] and Defendant's closing submissions [88] - [120].
[335] Relying on AWH Pty Ltd v Impact Fertilisers Australia Pty Ltd.
[336] See, for example, the notes which form part of Exhibit 35.
[337] WD Duncan & S Christensen, Commercial Leases in Australia (10th Edition, 2024), [10.5600].
[338] WD Duncan & S Christensen, Commercial Leases in Australia (10th Edition, 2024), [10.5550].
[339] WD Duncan & S Christensen, Commercial Leases in Australia (10th Edition, 2024), [10.5550], citing Hill v Harris [1965] 2 QB 601, 614 - 615 (Diplock LJ) and City of Subiaco v Heytesbury Properties Pty Ltd [2001] WASCA 140; (2001) 24 WAR 146 [33] - [42] (Ipp J).
[341] Plaintiff's closing submissions [116].
[342] Australian Broadcasting Commission v Australasian Performing Right Association Ltd [1973] HCA 36; (1973) 129 CLR 99, 109.
[343] Re Media, Entertainment and Arts Alliance; Ex parte Hoyts Corporation Pty Ltd [1993] HCA 40; (1993) 178 CLR 379, 386 - 387 (Mason CJ, Brennan, Dawson, Toohey, Gaudron and McHugh JJ).
[344] Tsolon Investments Pty Ltd v Waffle Pod Footing Systems NSW Pty Ltd [2002] NSWCA 302 [36] (Heydon JA, as his Honour then was, Meagher and Sheller JJA agreeing) (Tsolon Investments).
[345] Hume Steel Ltd v Attorney-General (Vic) [1927] HCA 24; (1927) 39 CLR 455, 465 - 466 (Higgins J, Gavan Duffy J agreeing).
[347] HDI Global Specialty SE v Wonkana No. 3 Pty Ltd [2020] NSWCA 296 [30] (Meagher JA and Ball J). see also Lewison & Hughes, The Interpretation of Contracts in Australia (2012) [7.08.2].
[348] Plaintiff's closing submission [145.3].
[349] Defendant's opening submissions [39].
[350] The absence of dust curtains was not expressly pleaded but I consider the issue was fairly raised at trial and the parties had an opportunity to address the issue on the facts.
[351] See particular B(2A) and B(2) to [12(a)] SOC; and particular B(5) to [12(b)] SOC.
[352] Plaintiff's closing submissions [13].
[353] Graham v Markets Hotel (579) (Latham CJ, citing Lurcott v Wakely & Wheeler [1911] 1 KB 905, 923 - 924).
[354] See, for example, ts 264 (defendant's counsel) and ts 1216 - 1217 (plaintiff's counsel).
[355] Defendant's opening submissions [45]; ts 272 - 273.
[359] ts 406 and Exhibit 732 (Contract between the plaintiff and Go2 Group dated 3 November 2022).
[360] SOC [4.6], [4.7(b)], and [11.2].
[369] Compare [7.2] of the SOC and [8.1] of the SOC. The clauses in question were pleaded to be material terms of the varied lease only.
[370] The reference to 'acts' in cl 3.15(a) should be construed as a reference to 'Acts', when read in context.
[372] EP Regulations, reg 5 and sch 1.
[373] Eclipse Resources Pty Ltd v The Minister for Environment [No 2] [2017] WASCA 90 [105] (Buss P, Newnes and Murphy JJA). See also Eclipse Resources Pty Ltd v Chief Executive Officer, Department of Environment and Conservation [2013] WASCA 152; (2013) 45 WAR 353 [63] (McLure P, with Murphy JA agreeing).
(2017) 91 ALJR 486
(2014) 251 CLR 640
(2023) 113 NSWLR 1
(2023) 112 NSWLR 29
(1998) 44 NSWLR 349
(1943) 67 CLR 567
(1973) 129 CLR 99
(1993) 178 CLR 379
(2000) 201 CLR 520
(2011) 297 ALR 56
(1959) 101 CLR 298
(2011) 243 CLR 361
(2001) 24 WAR 146
(1995) 49 NSWLR 315
(2015) 256 CLR 104
(2002) 240 CLR 45
(1972) 126 CLR 655
(1927) 39 CLR 455
(2013) 45 WAR 353