This Plan replaces earlier local environmental plans and sets the zoning, permitted/prohibited uses, consent rules, maps and development standards for land in the Snowy River area. It tells landowners, developers and Snowy Monaro Council what uses need consent, what is exempt or complying, and which environmental, heritage, flood and infrastructure controls apply. It matters because it changes development costs, timing and options, concentrates decision‑making with the Council and Minister (through masterplans), and creates map‑based constraints and exceptions that affect private land use.
This instrument is a local environmental plan (the Snowy River Local Environmental Plan 2013) that replaces earlier local planning instruments for the area identified on the Land Application Map (cl 1.1AA; cl 1.3; cl 1.8). It sets the statutory zoning framework, the Land Use Table, mapped development standards (minimum lot sizes, height of buildings, floor space ratios) and a range of site‑ and use‑specific additional controls and prohibitions for the Snowy River part of the Snowy Monaro Regional local government area.
Mechanically, the Plan:
Commences on publication on the NSW legislation website (cl 1.1AA).
Repeals earlier local environmental plans and deemed environmental planning instruments that applied only to the land to which the Plan applies (cl 1.8), and specifically repeals the Kosciuszko Regional Environmental Plan 1998 (Snowy River) (cl 1.8B).
Declares the consent authority for the Plan as the Council, subject to the Environmental Planning and Assessment Act (cl 1.6).
Establishes the zoning framework (Part 2, cl 2.1-2.3 and the Land Zoning Map) and the Land Use Table, which sets for each zone: objectives, development that may be carried out without consent, development permissible only with consent, and prohibited development (cl 2.3).
Requires development consent for subdivision and demolition in general (cl 2.6-2.7), identifies limited temporary use permissions (cl 2.8), and expressly prohibits canal estate development with a statutory definition (cl 2.9).
Specifies exempt development (Schedule 2) and complying development (Schedule 3 and cross‑reference to the State SEPP) and excludes environmentally sensitive areas from exempt/compliant pathways (cl 3.1-3.3).
Current sections
Direct links to the current provisions in Snowy River Local Environmental Plan 2013.
State Environmental Planning Policy (Transport and Infrastructure) 2021, Chapter 2—relating to infrastructure facilities, including air transport, correction, education, electricity generating works and solar energy systems, health services, ports, railways, roads, waste management and water supply systems
Agritourism; Air transport facilities; Airstrips; Animal boarding or training establishments; Aquaculture; Bed and breakfast accommodation; Boat launching ramps; Boat sheds; Building identification signs; Business identification signs; Camping grounds; Caravan parks; Cellar door premises; Cemeteries; Charter and tourism boating facilities; Centre-based child care facilities; Community facilities; Crematoria; Depots; Dual occupancies; Dwelling houses; Eco-tourist facilities; Educational establishments; Environmental facilities; Extractive industries; Farm buildings; Farm stay accommodation; Flood mitigation works; Forestry; Funeral homes; Garden centres; Helipads; Home-based child care; Home businesses; Home industries; Industrial training facilities; Information and education facilities; Intensive livestock agriculture; Intensive plant agriculture; Jetties; Landscaping material supplies; Mooring pens; Moorings; Open cut mining; Places of public worship; Plant nurseries; Recreation areas; Recreation facilities (outdoor); Respite day care centres; Roads; Roadside stalls; Rural industries; Rural supplies; Rural workers’ dwellings; Secondary dwellings; Timber yards; Transport depots; Truck depots; Veterinary hospitals; Water recreation structures; Wharf or boating facilities
4
Prohibited
4 Prohibited
4 Prohibited
Any development not specified in item 2 or 3
Part 3
Exempt and complying development
Part 3 Exempt and complying development
Part 3 Exempt and complying development
Part 4
Principal development standards
Part 4 Principal development standards
Part 4 Principal development standards
Part 5
Miscellaneous provisions
Part 5 Miscellaneous provisions
Part 5 Miscellaneous provisions
5
Relevant acquisition authority
5 Relevant acquisition authority
5.1 Relevant acquisition authority
(1) The objective of this clause is to identify, for the purposes of section 3.15 of the Act, the authority of the State that will be the relevant authority to acquire land reserved for certain public purposes if the land is required to be acquired under Division 3 of Part 2 of the Land Acquisition (Just Terms Compensation) Act 1991 (the owner-initiated acquisition provisions).
Note.
If the landholder will suffer hardship if there is any delay in the land being acquired by the relevant authority, section 23 of the Land Acquisition (Just Terms Compensation) Act 1991 requires the authority to acquire the land.
(2) The authority of the State that will be the relevant authority to acquire land, if the land is required to be acquired under the owner-initiated acquisition provisions, is the authority of the State specified below in relation to the land shown on the Land Reservation Acquisition Map (or, if an authority of the State is not specified in relation to land required to be so acquired, the authority designated or determined under those provisions).
| Type of land shown on Map | Authority of the State |
| Zone RE1 Public Recreation and marked “Local open space” | Council |
| Zone RE1 Public Recreation and marked “Regional open space” | The corporation constituted under section 2.5 of the Act |
| Zone SP2 Infrastructure and marked “Classified road” | Transport for NSW |
| Zone C1 National Parks and Nature Reserves and marked “National Park” | Minister administering the National Parks and Wildlife Act 1974 |
(3) Development on land acquired by an authority of the State under the owner-initiated acquisition provisions may, before it is used for the purpose for which it is reserved, be carried out, with development consent, for any purpose.
Note 1.
When this Plan was made no land in the zones listed in the table to subclause (2) was included on the Land Reservation Acquisition Map.
Note 2.
If land, other than land specified in the table to subclause (2), is required to be acquired under the owner-initiated acquisition provisions, the Minister for Planning and Infrastructure is required to take action to enable the designation of the acquiring authority under this clause. Pending the designation of the acquiring authority for the land, the acquiring authority is to be the authority determined by order of the Minister for Planning and Infrastructure (see section 21 of the Land Acquisition (Just Terms Compensation) Act 1991).
Part 6
Land release areas
Part 6 Land release areas
Part 6 Land release areas
6
Public utility infrastructure
6 Public utility infrastructure
6.1 Public utility infrastructure
(1) Development consent must not be granted for development on land in a land release area unless the Council is satisfied that any public utility infrastructure that is essential for the proposed development is available or that adequate arrangements have been made to make that infrastructure available when it is required.
(2) This clause does not apply to development for the purpose of providing, extending, augmenting, maintaining or repairing any public utility infrastructure.
Part 7
Additional local provisions
Part 7 Additional local provisions
Part 7 Additional local provisions
7
7
7.1 (Repealed)
Part 8
Growth areas
Part 8 Growth areas
Part 8 Growth areas
pt 8: Ins 2022 (350), Sch 2[3].
8
Definitions
8 Definitions
8.1 Definitions
In this Part—
growth area means land identified as a growth area on the Growth Areas Map.
Exempt development may be carried out without the need for development consent under the Act. Such development is not exempt from any approval, licence, permit or authority that is required under any other Act and adjoining owners’ property rights and the common law still apply.
sch.2-sec
Advertisements—general requirements
sch.2-sec Advertisements—general requirements
Advertisements—general requirements
(1) Must be designed and installed in a manner unlikely to cause danger or injury to persons, structures or vehicles.
(2) Must be designed, located and installed to maintain normal and expected sightlines for vehicular traffic and pedestrian movements.
(3) Must use vandal-resistant materials and surfaces.
sch.2-sec-oc.2
Business identification signs
sch.2-sec-oc.2 Business identification signs
Business identification signs
(1) Does not apply to land under the care or control of the Council (for example, road reserves and public reserves).
(2) Does not include business identification signs for shops.
(3) Must be located wholly within the property it identifies.
(4) Maximum 1 awning sign per business, property or lease.
(5) Maximum size—2m2.
(6) Maximum height of a freestanding sign above ground level—1.8m.
(7) If on a commercial building with no awning—must not extend to more than 4.6m above ground level or the first floor, whichever is lower.
(8) Must not exceed 50% of frontage.
(9) Maximum 1 suspended under-awning sign or projecting wall sign with maximum dimensions 2.5m long × 0.5m high located between 2.7m and 4.6m above ground level.
(10) Must not alter the size of the awning.
(11) Contents, design, size and location of signs must provide equitable opportunities for similar businesses in close proximity.
(12) Must not create signage and advertising clutter and individual message dilution or confusion.
(13) Must use minimal wording, and innovative and recognisable symbols and colours.
sch.2-sec-oc.3
Motor vehicle signs
sch.2-sec-oc.3 Motor vehicle signs
Motor vehicle signs
(1) Must meet the general requirements for advertisements.
(2) Must not be in or on a motor vehicle parked specifically for the purposes of advertising or promotion.
sch.2-sec-oc.4
Non-commercial events or commemorations
sch.2-sec-oc.4 Non-commercial events or commemorations
Non-commercial events or commemorations
(1) Must be a single event or ceremony (not including music concerts, dance parties or special entertainment not related to a specific fundraising event) at a temporary location.
(2) Must be located on a public reserve, sports ground, showground or on Crown land, community land, church ground, car parks or the like.
Must be installed on land under the care or control of the Council.
sch.2-sec-oc.6
Public notice signs
sch.2-sec-oc.6 Public notice signs
Public notice signs
(1) Must be displayed by a public authority.
(2) Must clearly communicate information or direction about services provided.
sch.2-sec-oc.7
Real estate signs
sch.2-sec-oc.7 Real estate signs
Real estate signs
(1) Must only indicate that premises, land or business is for sale or lease.
(2) Must be erected on the property or land for sale or lease.
(3) Must be structurally sound for the specific location and instalment method.
(4) Must not be displayed for more than 10 days after sale, lease or auction.
(5) Maximum size for properties being sold or let by private treaty—1.25m long × 1m high.
(6) Maximum size for properties being sold or let by auction and containing only the word “Auction” on the returns—1.85m long × 1.25m high with returns of 180mm.
(7) Maximum size for properties being sold or let as commercial or industrial premises—2.45m long × 1.85m high.
sch.2-sec-oc.8
Signs within a site or building
sch.2-sec-oc.8 Signs within a site or building
Signs within a site or building
Must be a sign not visible from the public domain.
sch.2-sec-oc.9
Temporary signs
sch.2-sec-oc.9 Temporary signs
Temporary signs
(1) Must be for public or community events, festivals, announcements, celebrations.
(2) Must be attached to structures that are adequate for the specific location and instalment method.
(3) Must not be located on a road verge or other public land.
(4) Must not include commercial advertising other than the names of the event sponsors.
(5) Must not be displayed earlier than 28 days before, or later than 14 days after, the event.
(6) Must not be used in relation to recurring events.
Species of fish or marine vegetation cultivated or kept must be consistent with the relevant aquaculture industry development plan (within the meaning of clause 5.19).
10
Pond design
10 Pond design
10 Pond design
(1) Must not require the construction of new ponds, water storages, dams or buildings.
(2) Must not be located on permanent watercourses, creeks, billabongs or isolated outreaches of creeks or rivers.
(3) Must be capable of preventing the escape of stock into natural waterbodies or wetlands.
11
Culture water
11 Culture water
11 Culture water
Must use freshwater.
Source text: opening excerpt
Sourced from legislation.nsw.gov.au, CC BY 4.0.
Part 1 Preliminary
Part 1 Preliminary
Part 1 Preliminary
1 Name of Plan
1 Name of Plan
1.1 Name of Plan
This Plan is Snowy River Local Environmental Plan 2013.
1 Commencement
1 Commencement
1.1AA Commencement
This Plan commences on the day on which it is published on the NSW legislation website.
1 Aims of Plan
1 Aims of Plan
1.2 Aims of Plan
(1) This Plan aims to make local environmental planning provisions for land in that part of Snowy Monaro Regional local government area to which this Plan applies (in this Plan referred to as Snowy River) in accordance with the relevant standard environmental planning instrument under section 3.20 of the Act.
(2) The particular aims of this Plan are as follows—
(aa) to protect and promote the use and development of land for arts and cultural activity, including music and other performance arts,
(a) to protect and enhance, for current and future generations, the ecological integrity, natural resources and environmental significance of Snowy River,
(b) to protect agricultural land resources by—
(i) minimising the fragmentation of rural land, and
(ii) encouraging agricultural land uses on prime agricultural land, and
(iii) providing for a range of agricultural activities in locations and at a scale to avoid conflict with settlements and tourist activities,
(c) to help reduce the negative effects of an ageing and declining rural population by supporting restructuring and succession through flexible subdivision controls,
(d) to plan and provide for settlement where it provides a diverse range of living opportunities and housing choices without compromising the environmental values of Snowy River, including its natural resources such as water, biodiversity and agricultural land,
(e) to locate new urban development adjacent to existing urban areas to increase the accessibility and efficient use of infrastructure, facilities and services, public transport and employment opportunities,
Sets principal development standards including minimum lot sizes and a complex set of exceptions and special rules for rural, village and conservation zones, community title schemes, lot averaging, dual occupancies and strata subdivisions (Part 4, cl 4.1-4.6; cl 4.1AA-4.2E).
Fixes mapped height limits and maximum floor space ratios by reference to the Height of Buildings Map and the Floor Space Ratio Map (cl 4.3-4.4), and prescribes rules for calculating site area and FSR including exclusions and anti‑“double dipping” covenant mechanisms (cl 4.5).
Introduces a range of local and subject‑matter‑specific controls and decision criteria in Part 5 and Part 7: heritage consent triggers and processes (cl 5.10; Schedule 5); intensive livestock and aquaculture thresholds and operating requirements (cl 5.18; cl 5.19 and Schedule 6); eco‑tourist facility criteria (cl 5.13); noise and music constraints on refusing consent in respect of licensed premises (cl 5.20); flood planning and special flood considerations with required matters to be satisfied (cl 5.21-5.22); bush fire hazard reduction exemption (cl 5.11); and essential services availability tests (cl 7.9).
Creates land release and growth area gates: land in land‑release areas must show availability or arrangements for essential public utility infrastructure and be subject to a development control plan with specified content (cl 6.1-6.2). Growth areas are subject to Minister‑approved master plans; development consent in a growth area is contingent on consistency with the master plan or additional considerations where no master plan exists (Part 8, cl 8.1-8.4).
Provides for suspension of private covenants that would otherwise restrain development to the extent necessary for development under the Plan, with enumerated exceptions (cl 1.9A).
Identifies the relevant State acquisition authorities for certain land types if owner‑initiated acquisition is sought (cl 5.1) and classifies/reclassifies certain parcels of public land for Local Government Act purposes (cl 5.2; Schedule 4).
The document therefore converts policy aims (explicitly listed at cl 1.2) into mapped and rule‑based planning controls that determine what uses and works are permitted, require consent or are prohibited, and the tests the consent authority must apply. The Plan operates alongside, and is subject to, State environmental planning policies where those SEPPs prevail (cl 1.9(1)). Where maps and numerical standards are invoked (lot size, height, FSR, heritage, biodiversity, riparian, scenic protection), the Plan requires consent decision‑makers to apply those maps and the specified decision criteria.
Main concepts
This Plan rests on a conventional local environmental planning architecture: zoning + Land Use Table + mapped development standards + schedules setting exempt/compliant development + local clauses imposing site and subject‑matter tests. Key concepts and their statutory mechanics are:
Zoning and the Land Use Table (cl 2.1-2.3). The Plan identifies 18 named zones (cl 2.1) and places land into them via the Land Zoning Map (cl 2.2). The Land Use Table inverts policy into permissions: permitted without consent, permitted with consent, and prohibited uses for each zone. The consent authority must “have regard to” zone objectives when determining applications (cl 2.3(2)). The table is the primary device linking land use categories to consent pathways.
Maps as operative instruments (cl 1.7; cl 4.3-4.4; cl 4.1(2)-(3)). The Plan relies extensively on maps: Land Zoning Map, Lot Size Map, Height of Buildings Map, Floor Space Ratio Map, Terrestrial Biodiversity Map, Riparian Lands and Watercourses Map, Scenic Protection Area Map, Active Street Frontages Map, Growth Areas Map, Land Reservation Acquisition Map, Heritage Map, and others. These maps fix spatially varying standards that bind consent outcomes and calculation rules (for example the minimum lot size rules in cl 4.1(3)).
Development consent gatekeeping and exemptions. Subdivision, demolition and many works are consented activities (cl 2.6-2.7). Schedule 2 lists exempt development that may proceed without consent if it meets the schedule standards and other Part 3 tests (cl 3.1). Complying development accords an alternative approval pathway if the specific standards in Schedule 3 and the State SEPP are met (cl 3.2).
Principal development standards and exceptions. Minimum lot sizes and lot size exceptions (cl 4.1, cl 4.1AA, cl 4.1A-4.1C, cl 4.2-4.2E) are central to rural and residential land use control. The Plan expressly provides limited flexibility to contravene standards where environmental planning grounds exist and the consent authority is satisfied (cl 4.6). Height and FSR are mapped (cl 4.3-4.4), and the Plan provides detailed FSR/site area calculation rules and covenant options to prevent “double dipping” of floor area (cl 4.5).
Localised protections for heritage and environmental values. Part 5 and Part 7 set statutory decision criteria for heritage items and heritage conservation areas (cl 5.10; Schedule 5 lists items), terrestrial biodiversity (cl 7.2; Terrestrial Biodiversity Map), riparian areas and watercourses (cl 7.3; Riparian Lands and Watercourses Map), wetlands (cl 7.4; Wetlands Map), scenic protection areas (cl 7.6), and the eastern approaches to Kosciuszko National Park (cl 7.7). These clauses require consent authorities to consider specific impacts and to refuse consent unless satisfied particular design, siting and management outcomes are met.
Sectoral use‑specific controls. The Plan contains thresholds and locational controls for intensive livestock (cl 5.18), pond/tank/oyster aquaculture (cl 5.19 and Schedule 6), and eco‑tourist facilities (cl 5.13). Those clauses steer site selection (for example conservation exclusion zones in Schedule 6) and require management strategies for operations.
Infrastructure, land release and growth area sequencing. Land release areas must have DCPs and public utility availability arrangements before consent (cl 6.1-6.2). Growth areas are managed through Minister‑approved master plans that set the strategic framework and must be published (Part 8, cl 8.2-8.3). Development in growth areas is tied to consistency with the applicable master plan (cl 8.4).
Interaction with State instruments and other Acts. The Plan is subject to State environmental planning policies where these prevail (cl 1.9(1)). It cross‑references many other Acts and instruments for specialised regulation: Heritage Act 1977 (heritage), Rural Fires Act 1997 (bush fire), Fisheries and Biodiversity statutes (aquaculture and biodiversity), Local Government Act 1993 (public land classification), Land Acquisition (Just Terms Compensation) Act 1991 (relevant acquisition authority), Crown Land Management Act 2016 (cl 1.9A exceptions), and various SEPPs (numerous cross‑references throughout).
Those concepts convert the Plan’s stated aims (cl 1.2) into operational, map‑based, and clause‑based constraints and decision criteria that the Council applies when exercising consent functions. The Plan’s architecture therefore creates binary and discretionary decision points tied to mapped attributes and numerically expressed standards.
Who it affects
The Plan allocates decision rights and compliance obligations, and these translate into identifiable affected parties and their roles:
Landowners and prospective purchasers within the mapped Plan area. The Plan determines permitted uses on each parcel (Land Zoning Map; Land Use Table cl 2.3) and sets minimum lot sizes (cl 4.1) and other standards that constrain subdivision, erection of dwellings and changes in land use. Owners proposing subdivision, dwellings, dual occupancies, strata schemes, or commercial uses must meet the mapped lot size, height and FSR, or demonstrate compliance with exception clauses (cl 4.1-4.6).
Developers and builders. Project proponents must design projects to satisfy the Plan’s standards and the consent triggers. For developments in land‑release or growth areas, developers must work within DCP and master plan frameworks (cl 6.2; cl 8.2-8.4) and demonstrate infrastructure staging and service availability (cl 6.1; cl 7.9). Those building in heritage areas must prepare heritage management documents or conservation management plans when required (cl 5.10(5)-(6)).
The Council as consent authority and local regulator. The Plan names the consent authority as the Council, subject to the Act (cl 1.6). The Council must apply zone objectives when determining applications (cl 2.3(2)), maintain records of assessments where exceptions to development standards are used (cl 4.6(4)), and administer DCP and land reclassification processes (cl 5.2; cl 6.2). The Council is also the responsible authority for certain acquisition and public land classification actions (cl 5.1; Schedule 4).
State agencies and the Minister. The Minister has roles in approvals and publication of maps and master plans (cl 1.7; cl 8.3(5)-(6)), and the Plan designates the relevant State authority for land acquisition purposes (cl 5.1). State SEPPs may prevail over local provisions (cl 1.9(1)), and certain State decisions and approvals (for example SEPP consistency, reserved Crown land instruments) will interact with the Plan.
Primary producers and agribusinesses. The Plan foregrounds protection of agricultural land resources in its aims (cl 1.2(2)(b)) and sets tight controls on rural subdivision and dwelling creation on rural lots (cl 4.2, cl 4.2D, cl 4.2C). Intensive livestock and aquaculture operators are subject to site and distance thresholds and operational conditions (cl 5.18; cl 5.19 and Schedule 6).
Tourism and hospitality operators. The Plan provides specific zones and uses for tourist and visitor accommodation (SP3 Tourist, cl 2.1 and Land Use Table), sets eco‑tourist facility criteria (cl 5.13), and introduces noise/music protections for licensed premises (cl 5.20), all of which affect operators and investors.
Aboriginal communities and heritage stakeholders. Development affecting Aboriginal places of heritage significance requires specified consultation and assessment steps (cl 5.10(8)). Heritage owners are affected by consent requirements to alter, demolish or excavate items listed in Schedule 5 or within Heritage Map areas (cl 5.10(2)-(4)).
Emergency services and utility providers. The Plan requires consent authorities to consider protection of emergency response facilities and evacuation routes in flood and special flood areas (cl 5.21-5.22) and to be satisfied essential services are, or will be, available for development (cl 7.9; cl 6.1).
Adjoining landowners and the public. Many clauses require the consent authority to consider amenity impacts, odour, visual effects, riparian stability and public access concerns (for example cl 3.3, cl 7.3, cl 7.6). Temporary use limits (cl 2.8) and signage/exempt development rules in Schedule 2 constrain public and private event signage and advertising practices.
Some provisions create direct winners and losers in economic terms: mapped minimum lot sizes and strata and community title rules (cl 4.1AA, cl 4.2B) affect the number of dwelling entitlements; additional permitted uses (Schedule 1) create site‑specific development opportunities; and the suspension of private covenants (cl 1.9A) removes some private constraints on development in most cases while preserving certain conservation and Crown instruments (cl 1.9A(2)). Those who must adapt behaviour therefore include landholders, developers, the Council and State agencies whose approvals and infrastructure timing determine project viability.
Key duties and rights
The Plan assigns substantive duties to consent authorities, duties for applicants, and rights for proponents and landowners. The clearest statutory duties and entitlements in the Plan include:
Duty of the consent authority to have regard to zone objectives. When determining a development application for land within a zone, the consent authority must have regard to the objectives for development in that zone (cl 2.3(2)). This is the principal interpretive duty when assessing whether a proposed use is consistent with the planning intent.
Duty to apply mapped standards. The Plan requires compliance with mapped minimum lot sizes, heights and FSRs (cl 4.1(3); cl 4.3; cl 4.4). Development that would result in lots smaller than the minimum lot size shown on the Lot Size Map cannot be approved except where specific exception clauses apply (see cl 4.1AA, cl 4.1B, cl 4.1C, cl 4.2-4.2E).
Duty to ensure essential services. For land in land release areas and in general, development consent must not be granted unless the consent authority is satisfied essential public utility infrastructure is available or adequate arrangements exist to make it available (cl 6.1; cl 7.9).
Duty to apply special environmental and heritage tests. The Plan imposes mandatory consideration criteria and, at times, preconditions for granting consent:
Terrestrial biodiversity: consent must not be granted unless the consent authority is satisfied the development will avoid, minimise or mitigate significant adverse impacts (cl 7.2(4)).
Riparian land and watercourses: consent must not be granted unless the consent authority is satisfied the development is designed, sited and managed to avoid, minimise or mitigate significant adverse impacts (cl 7.3(4)).
Wetlands: similar tests in cl 7.4(4).
Flood planning and special flood considerations: consent must not be granted unless the consent authority is satisfied specific flood‑compatibility and life‑safety measures are addressed (cl 5.21(2); cl 5.22(3)).
Heritage: consent is required for demolition, alteration or works affecting heritage items, Aboriginal objects and archaeological sites unless minor maintenance, exempt development or written advice from the consent authority says otherwise (cl 5.10(2)-(3)).
Right to exempt and complying development avenues. Applicants may access exempt development if Schedule 2 standards and Part 3 tests are met (cl 3.1). Complying development for items in Schedule 3 and the State SEPP provides an alternative approval pathway where the numerical and prescriptive standards are met (cl 3.2).
Right to apply for consent that contravenes a development standard. The Plan permits development consent to be granted to development that contravenes a development standard where the applicant demonstrates compliance is unreasonable or unnecessary and there are sufficient environmental planning grounds to justify the contravention, and the consent authority keeps a record of its assessment (cl 4.6(2)-(4)). The clause excludes certain standards from this flexibility (cl 4.6(8)) and imposes specific constraints on subdivisions in particular zones (cl 4.6(6)).
Right to rely on savings provisions. Development applications lodged before the Plan’s commencement are to be determined as if the Plan had not commenced (cl 1.8A(1)), and specified transitional savings apply for certain SEPP amendments (cl 1.8A(2)-(3)).
Right to exemption from private covenant constraints. Clause 1.9A suspends private covenants that would otherwise restrict carrying out development in accordance with the Plan, subject to expressly listed exceptions (cl 1.9A(1)-(2)). The suspension does not affect public authority registered interests (cl 1.9A(3)).
Duty to consult and notify certain bodies. For archaeological sites the consent authority must notify the Heritage Council and consider any response within 28 days before granting consent (cl 5.10(7)). For Aboriginal places of heritage significance, a written notice to local Aboriginal communities and consideration of any response within 28 days is required (cl 5.10(8)). For demolition of nominated State heritage items, the Heritage Council must be notified and any response considered (cl 5.10(9)).
Duty to ensure compliance with other Acts and SEPPs. The Plan explicitly preserves the operation of other statutory instruments (cl 1.9(1); cl 5.12(1)-(2)), so consent authorities must ensure development complies with SEPPs where they prevail and with licensing and approvals under other Acts where relevant (see cross‑references throughout).
These duties allocate considerable discretionary assessment and judgment to the consent authority, but they are structured by mapped standards, clear lists of required considerations and, in some cases, explicit preconditions for consent.
Penalties and enforcement
The Plan itself prescribes permissions, consent requirements and prohibitions; it does not set out a standalone schedule of fines or criminal offences in the text provided. Instead, enforcement of the Plan’s requirements is exercised through the statutory regime established by the Environmental Planning and Assessment Act and associated regulations, as reflected in various cross‑references (for example the Plan repeatedly refers to development consent and the Act in cl 1.6, cl 3.1(3), cl 3.2(3), cl 4.6).
From the Plan’s structure the enforcement and compliance implications that arise are:
Unauthorised development is development carried out without required development consent, or development inconsistent with conditions of consent or mapped standards. The Plan identifies many activities that "may be carried out only with development consent" (see Land Use Table, cl 2.3) and others that are "prohibited" (Land Use Table). Enforcement of unauthorised development will follow the enforcement mechanisms in the Environmental Planning and Assessment Act (the Act), including orders and penalties available under that Act and its regulations. The Plan repeatedly locates the Council as the consent authority (cl 1.6) and, therefore, the Council is the local enforcing authority for consent conditions and unauthorised works insofar as the Act gives it those powers.
Condition and covenant enforcement. The Plan contemplates the imposition of conditions and the registration of covenants as conditions of consent (for example cl 4.5(9) contemplates a covenant to prevent creation of floor area on a restricted lot). Breach of a condition or a registered covenant would again be subject to enforcement under the Act and the Land Titles or covenant registration regime.
Procedural compliance and records. Clause 4.6(4) requires the consent authority to keep a record of assessments under the exceptions to development standards. That recordkeeping duty supports transparency and evidentiary needs if a decision is challenged, and failure to make or retain required records could be material in any administrative review or judicial review under the Act.
Interaction with other enforcement regimes. Several Plan provisions reference other statutes that carry their own compliance and enforcement frameworks: e.g. the Heritage Act 1977 (heritage protections cl 5.10), the Rural Fires Act 1997 (cl 5.11), the Fisheries Management and Biodiversity Acts in aquaculture and conservation provisions (cl 5.19 and Schedule 6), and the Land Acquisition (Just Terms Compensation) Act for acquisition processes (cl 5.1). Non‑compliance with those regimes triggers their enforcement pathways.
Avoidance of refusal on certain grounds. Clause 5.20 prevents refusal of consent for licensed premises on certain grounds related to playing and performing music (genre, live/amplified, dancing, direction of stage, decorations), and prevents refusal on noise grounds where the consent authority is satisfied noise may be managed to an acceptable level. That clause constrains the grounds on which enforcement or refusal may be based for licensed premises.
Practically, those seeking to implement development should assume the full enforcement apparatus of the Act applies: development without required consent, breaches of consent conditions, or excavation/demolition contrary to the heritage clauses will expose proponents to statutory enforcement measures available under the Act and any other applicable statute. The Plan itself does not specify penalty quantum or the specific statutory enforcement proceedings; those reside in the Act and complementary legislation.
How it interacts with other laws
The Plan is deliberately cross‑referenced and nested within the broader NSW statutory planning and environmental law ecosystem. The principal interaction mechanics in the instrument are:
State environmental planning policies (SEPPs). Clause 1.9(1) states the Plan is subject to any State environmental planning policy that prevails over the Plan as provided by s 3.28 of the Act. The Plan also flags a number of SEPPs in the Land Use Table notes (for example SEPP (Housing) 2021 and SEPPs on Transport and Infrastructure, Resources and Energy, Resilience and Hazards, Industry and Employment, Primary Production). Where a SEPP contains a provision that prevails, that SEPP will displace the local provision under the Act’s hierarchy (cl 1.9(1)).
The Environmental Planning and Assessment Act (referred to throughout). The Plan’s consent pathways, saving provisions (cl 1.8A), the role of the consent authority (cl 1.6), exceptions to standards (cl 4.6) and the requirement that the Minister approve provisions (cl 1.9A(4)) all presuppose operation under the Act. Administrative review, enforcement, and appeal rights under the Act (not set out in the Plan text here) will determine judicial and merits review outcomes for decisions under this Plan.
Heritage Act 1977. Clause 5.10 cross‑references the Heritage Act by requiring consent authority notification to, and consideration of responses from, the Heritage Council in relation to archaeological sites and nominated State heritage items (cf. cl 5.10(7) and (9)). Works on items listed in Schedule 5 therefore implicate the Heritage Act regime for State heritage significance.
Local Government Act 1993. The Plan enables the Council to classify or reclassify public land under Part 2 of Chapter 6 of that Act and notes the Plan’s effect on reserves and trusts (cl 5.2). Classification changes may be subject to Governor approval (cl 5.2(5) note).
Crown land, National Parks and related Acts. Clause 1.9A suspends private covenants for Plan‑consistent development but explicitly excludes relevant instruments under the Crown Land Management Act 2016 (cl 1.9A(2)(b)) and conservation agreements under National Parks and Wildlife Act 1974 (cl 1.9A(2)(c)). Clause 5.12 preserves the Crown’s ability to carry out infrastructure development under the State SEPP for Transport and Infrastructure (cl 5.12(1)) and does not restrict the use of existing Crown buildings (cl 5.12(2)). These provisions delimit the Plan’s power in respect of Crown or national park land.
Biodiversity, Fisheries and Marine laws. The Plan’s biodiversity and aquaculture provisions reference the Biodiversity Conservation Act 2016, Fisheries Management Act 1994 and Marine Estate Management Act 2014. For aquaculture, Schedule 6 imposes conservation exclusion zones and operational requirements, and cl 5.19 requires compliance with aquaculture industry development plans and the NSW Oyster Industry Strategy. Those operating in aquaculture must therefore satisfy both Plan standards and statutory licencing and environmental obligations under the relevant fisheries and biodiversity regimes.
Rural Fires Act 1997 and flood risk manuals. Clause 5.11 permits bush fire hazard reduction works as authorised by the Rural Fires Act. Flood planning clauses (5.21-5.22) require consent authorities to consider the Considering Flooding in Land Use Planning Guideline and the Flood Risk Management Manual (references and defined meanings in cl 5.21(4)-(5) and cl 5.22(4)-(5)), binding Plan decisions to the standards in those technical State guidance documents.
Land acquisition and classification legislation. Clause 5.1 identifies the State authority that will be the relevant acquisition authority for owner‑initiated acquisitions under the Land Acquisition (Just Terms Compensation) Act 1991; the Plan also contains notes on Ministerial designation where the acquiring authority is not specified (cl 5.1(2) and notes).
Planning codes and building law. Exempt and complying development pathways require compliance with the Building Code of Australia and in some cases BASIX commitments (cl 3.1(3)(a); cl 4.6(8)(b)). Strata and community title subdivisions are regulated via the Strata Schemes Development Act and Community Land Development Act as cross‑referenced in the Plan (see cl 4.1(4), cl 4.1AA).
In short, the Plan is intentionally interwoven with State planning instruments, sectoral environmental and heritage laws and technical guidelines. Decision‑makers must apply the Plan in a multi‑instrument environment: where a SEPP prevails it displaces the local rule; where other Acts impose licences or prohibitions those operate in addition to the Plan’s consent regime; and where technical State guidelines are referenced, they form part of the matters a consent authority must take into account (for example flood planning clauses).
Amendment history
The Plan text itself contains logged amendment notations. The instrument has been amended on multiple occasions since its original making. The textual amendment markers recorded in the provided copy include the following (as expressed in the Plan):
2016 amendments: cl 1.2 amended (Am 2016 (455), Sch 1[1]); clause 4.2D also amended 2016 (cl 4.2D: Am 2016 (455), Sch 1[2]; and 4.2E inserted Ins 2016 (455), Sch 1[3]); Schedule 5 amended 2016 (sch 5: Am 2016 (455), Sch 1[4][5]).
2017-2019 amendments: Land Use Table amended 2017 (Land Use tbl: Am 2017 (493)); cl 1.8A (savings) inserted/updated by 2019 (cl 1.8A: Am 2019 (621), Sch 5[1]); cl 1.9A also amended 2019 (cl 1.9A: Am 2019 (621), Sch 5[2]-[4]); Land Use Table further amended 2018 and 2019 (see Land Use tbl notes).
2021 amendments: cl 3.2 and other parts reference 2021 SEPPs; cl 4.6 note of repeal 2021 (cl 7.1 repealed 2021 (225), Sch 1). Land Use Table references Am 2021 (714), Sch 10.17.
2022 amendments: substantive mapping and zone updates occurred in 2022: cl 2.1 amended (Am 2022 (832), Sch 1.20[1]); multiple clauses and schedules show 2022 amendments: cl 4.1AA inserted 2022 (cl 4.1AA: Am 2022 (832), Sch 1.20[3]); cl 4.1A amended 2022 (cl 4.1A: Am 2022 (350), Sch 2[2]); cl 4.5 and other mapping notes amended (Land Use tbl Am 2022 (314), Sch 1; cl 7.5 amended 2022 (cl 7.5: Am 2022 (832), Sch 1.20[5]); Schedule 1 and Schedule 4 also list 2022 amends (sch 1: Am 2022 (350), Sch 2[4]; sch 4 Am 2018 and 2021 and 2022 entries). Part 8 (Growth areas) and related clauses were inserted or amended in 2022 (pt 8 Ins 2022 (350), Sch 2[3]; cl 8.1 amended 2022 (cl 8.1: Ins 2022 (350), Sch 2[3]; Am 2022 (516), Sch 1[1][2]).
2023 and 2025 amendments: cl 1.8A further amended in 2023 and 2025 with specific transitional savings for SEPP Amendment (Flood Planning) 2023 and State Environmental Planning Policy (Precincts,Regional) Amendment (Snowy Mountains) 2025 (cl 1.8A: Am 2023 (609), Sch 1.1[1]; 2025 (513), Sch 2[1]). Clause 5.22 (Special flood considerations) was substituted in 2023 (cl 5.22: Subst 2023 (609), Sch 1.22). Clause 7.6 (Lake Eucumbene and Lake Jindabyne scenic protection) records a 2025 insertion/amendment (cl 7.6: Am 2025 (513), Sch 2[2]-[5]).
These amendment notations are the Plan’s own record of changes and identify the years and amending instruments in abbreviated form. They show that the Plan has been kept under active amendment with changes to mapping, growth area and lot size rules, flood planning, and other subject areas. For precise legislative history, or to see the full texts of the amending instruments, the cited amending schedules and years in the Plan (for example “Am 2022 (832), Sch 1.20[1]”) should be followed up on the NSW legislation website where each amending regulation or instrument is published.
Litigation history
The Plan as presented does not record any judicial or administrative decisions, and it names no cases. The instrument contains no internal schedule or footnote summarising litigation outcomes. Consequently, there is no litigation history contained in this text for the Snowy River LEP itself.
That absence in the instrument does not mean that decisions made under the Plan have not been subject to review or challenge under the Environmental Planning and Assessment Act or judicial review. It simply means the Plan text does not catalogue those matters. Practitioners should therefore:
Search administrative tribunal and court databases for merits review and judicial review decisions concerning development consents in the Snowy River area, parties to which included the Council or the Minister, or appeals to the Land and Environment Court that reference the Snowy River LEP or specific clauses (e.g. exceptions to development standards cl 4.6 or heritage decisions cl 5.10).
Pay close attention to decision pathways in the Plan that are commonly litigated: use of cl 4.6 exceptions to development standards, interpretation of mapped lot sizes, application of heritage triggers (cl 5.10 and Schedule 5), biodiversity and riparian impact assessments (cl 7.2-7.3), and flood planning tests (cl 5.21-5.22). Those are the clauses that create discretionary judgment and therefore are frequent subjects of merits review or judicial review claims in planning litigation (the Plan itself identifies these clauses as hooks for assessment).
Note recordkeeping and procedural requirements, such as the consent authority keeping a record of assessments under cl 4.6(4), and the required notifications to the Heritage Council and Aboriginal communities (cl 5.10(7)-(9)), which are procedural steps that can be material in any review of a decision under the Act.
If a litigator or researcher needs a catalogue of decisions interpreting the Plan, a jurisdictional case search (Land and Environment Court and relevant tribunal decisions) is necessary; none of those decisions are enumerated in this instrument.
Gotchas
Several provisions in the Plan operate in ways that commonly surprise practitioners because they materially affect rights, timing and conditionality:
Savings and transitional application for pending applications (cl 1.8A). Development applications lodged before the Plan’s commencement must be determined as if the Plan had not commenced (cl 1.8A(1)). There are additional schedule‑specific savings for particular SEPP amendments (cl 1.8A(2)-(3)). Practitioners should not assume a newly realised local rule applies to an application lodged pre‑commencement; check cl 1.8A and any specific amending policy references.
Suspension of private covenants (cl 1.9A). The Plan suspends private agreements, covenants and similar instruments to the extent necessary to enable development under the Plan, but with specific exceptions (cl 1.9A(1)-(3)). This is a powerful tool in practice: it allows plan‑consistent development despite private restrictions, subject to exceptions (Council‑imposed covenants, Crown Land Management Act instruments, conservation agreements, trust agreements, property vegetation plans, biobanking agreements and planning agreements). Practitioners must check cl 1.9A(2) for instruments that remain operative.
Mapped minimum lot sizes with multiple exceptions. Minimum lot size is mapped (cl 4.1(3)), but there are multiple, overlapping exceptions and special rules: community title subdivisions (cl 4.1AA), exceptions for multi dwelling and dual occupancy minimum lot areas (cl 4.1A), lot averaging in R5 (cl 4.1C), rural subdivision flexibility (cl 4.2), subdivision in C3 (cl 4.2A), strata plan minima (cl 4.2B), and exceptions allowing certain small‑lot subdivisions for non‑dwelling uses (cl 4.2C). Correct application requires careful sequencing: identify the zone, check lot servicing (sewage reticulation affects some minima in cl 4.1(4A) and cl 4.1A(3)), then check whether any special exception applies. Misreading can result in an invalid subdivision design.
“Double‑dipping” floor space and covenants (cl 4.5(9)-(10)). When a consent creates floor area across a multi‑lot site, the consent authority may require a covenant that prevents an equivalent quantity of floor area being created elsewhere to prevent an effective circumvention of mapped FSR. Practitioners must be prepared for covenant drafting and registration requirements as part of consent conditions and for consequent reductions in allowable floor area on consolidated sites.
Exempt and complying development exclusions for environmentally sensitive areas (cl 3.3). Exempt or complying development cannot be carried out in environmentally sensitive areas as defined (cl 3.3(1)-(2)). The definition includes coastal waters, Ramsar and World Heritage areas, land within 100 metres of coastal wetlands, areas identified as high Aboriginal cultural significance or high biodiversity significance, reserve lands, areas of outstanding biodiversity value and specifically “Lake Eucumbene and Lake Jindabyne” as defined on the Scenic Protection Area Map (cl 3.3(2)(ja)). A development that appears to meet schedule standards may still require consent because of location.
Music‑related refusal limitations (cl 5.20). The Plan prevents refusal of consent for licensed premises on a list of music‑ and performance‑related grounds (genre, live/amplified, number of acts, dance floors and stage orientation) and prevents refusal on noise grounds if the consent authority is satisfied the noise can be managed and minimised to an acceptable level. This narrows the grounds for refusal and can affect how councils condition licensed premises. Applicants and opponents should be aware the clause constrains local noise‑based refusals relating to music.
Canal estate prohibition (cl 2.9). The Plan expressly prohibits canal estate development and provides a detailed statutory definition that captures earthworks that create canals or use fill to elevate residential land in flood planning areas (cl 2.9). Projects involving excavation and artificial waterways must be checked against this definition to ensure they are not captured by the prohibition.
Conflicting instrument priority and SEPP prevalence (cl 1.9(1)). State SEPPs may prevail over local rules. A local consent pathway that appears available under this Plan can be overridden where a SEPP applies. Practitioners must check SEPPs that specifically affect the subject land.
Growth area/master plan gatekeeping (Part 8). Land designated as a growth area requires an approved master plan and a DCP with specified content for consent to be granted (cl 8.2-8.4). Where master plans apply, the Minister prepares and approves them and they must be published before taking effect (cl 8.3). Applicants in growth areas should not assume standard local consent processes apply until master plans and DCPs are in place.
Heritage consultation timeframes (cl 5.10(7)-(9)). The consent authority must notify the Heritage Council and Aboriginal communities and consider any response within 28 days before granting consent for archaeological sites, Aboriginal places and nominated State heritage items. These statutory timeframes are procedural preconditions and can create unavoidable delays.
Essential service and infrastructure preconditions (cl 6.1; cl 7.9). The Plan prevents consent where essential services are not available or arrangements to provide them are inadequate. For subdivisions and staged releases, infrastructure timing is a gating issue.
Each of these “gotchas” converts map and clause detail into practical timing, cost, and structure consequences for projects. The Plan’s heavy reliance on maps and cross‑references to other Acts means careful due diligence across spatial datasets and statutory instruments is required before lodging or defending an application.
How to comply
Below is a practical, clause‑linked compliance checklist and drafting guidance for applicants, advisers and regulators dealing with development under the Snowy River LEP.
Confirm the site and operative maps
Identify the parcel on the Land Zoning Map and confirm its zone (cl 2.2; cl 2.1).
Check the Lot Size Map for minimum lot size requirements (cl 4.1(2)-(3)).
Check the Height of Buildings Map and Floor Space Ratio Map for any limits that apply to the site (cl 4.3-4.4).
Review the Terrestrial Biodiversity Map, Riparian Lands and Watercourses Map, Wetlands Map, Scenic Protection Area Map, Active Street Frontages Map, and Growth Areas Map to see if special clauses will apply (cl 7.2-7.6; Part 8).
Identify use permissibility
Consult the Land Use Table for the zone to determine whether the proposed use is: permitted without consent, permitted with consent, or prohibited (cl 2.3).
If not listed, it is prohibited (Land Use Table format: “Any development not specified in item 2 or 3” appears repeatedly).
Determine consent pathway
If the use is “permitted without consent”, verify that it meets Schedule 2 exempt development standards and Part 3 tests (cl 3.1; Schedule 2).
If the use is designated as complying development in State SEPPs or Schedule 3, ensure all deemed‑to‑satisfy requirements and relevant conditions are met (cl 3.2; Schedule 3).
If consent is required, prepare a development application addressing the Plan’s mandatory matters to be considered (eg heritage, biodiversity, riparian, flood planning).
Check minimum lot size, subdivision and dwelling eligibility
If proposing subdivision, apply cl 4.1 minimum lot size rules and check whether any special exceptions apply: community title schemes (cl 4.1AA), dual occupancy minimums (cl 4.1A), exceptions for small infill subdivisions (cl 4.1B), lot averaging in R5 (cl 4.1C), rural subdivision flexibility (cl 4.2), and strata plan minima (cl 4.2B).
For erection of dwellings on rural or conservation land, ensure compliance with cl 4.2D’s restricted circumstances for new dwellings.
Prepare environmental assessments
For land identified as biodiversity, riparian, or wetland, prepare targeted assessments addressing cl 7.2-7.4 matters: impacts on condition and ecological value, habitat connectivity, water quality, bank stability, and proposed avoidance/minimisation/mitigation measures.
For intensive livestock or aquaculture proposals, follow cl 5.18 and cl 5.19 and the detailed site and operational requirements in Schedule 6 (including conservation exclusion zones and species selection and discharge restrictions).
Heritage and Aboriginal cultural heritage
If the site contains a heritage item or is in a heritage conservation area (Schedule 5 or Heritage Map), prepare a heritage management document or conservation management plan if requested (cl 5.10(5)-(6)).
If the site is an archaeological site or Aboriginal place of heritage significance, notify Heritage Council or local Aboriginal communities per cl 5.10(7)-(8) and allow the 28‑day response period before consent is finalised.
Flood and bush fire risk
For land in the flood planning area or between flood planning area and probable maximum flood, lodge flood risk assessments and evacuation/ life safety measures demonstrating compliance with cl 5.21 and cl 5.22, and reference the Considering Flooding in Land Use Planning Guideline and Flood Risk Management Manual (cl 5.21(4)-(5); cl 5.22(4)-(5)).
For bush fire prone land, align with Rural Fires Act provisions and ensure that hazard reduction work authorised by that Act is documented (cl 5.11).
Infrastructure and services
For land release and growth areas, prepare or ensure a DCP with the enumerated matters is in place and demonstrate availability or arrangements for essential public utility infrastructure and transport links (cl 6.1-6.2; cl 8.2).
For any development, the consent authority must be satisfied essential services are available or will be available (cl 7.9). Prepare service statements, connection agreements or staged servicing plans.
Address procedural and special requirements
If seeking an exception to a development standard under cl 4.6, prepare the document required by the Environmental Planning and Assessment Regulation that sets out the grounds demonstrating that compliance is unreasonable or unnecessary and that sufficient environmental planning grounds exist (cl 4.6(3) note).
If a covenant is required to prevent FSR “double‑dipping” (cl 4.5(9)), agree a form of covenant and be prepared for registration conditions.
For development involving licensed premises and music, anticipate that refusal cannot be based on the enumerated music‑related grounds under cl 5.20; prepare noise management plans showing how noise will be managed to an acceptable level if relevant.
Check overlapping statutory regimes
Confirm whether a SEPP prevails over the local provision (cl 1.9(1)). If so, align proposal with the SEPP requirements (noting that some SEPPs impose State criteria that differ from local controls).
Verify licensing, permits and authorisations under other Acts for the proposed activity (Heritage Act, Fisheries Management Act for aquaculture, Local Government Act for on‑site works and approvals, Crown land instruments where relevant) as the Plan does not negate other statutory obligations (cl 3.1(3)(d) note; cl 5.12).
Time and notification management
Factor in mandatory notification periods and consultation steps that are preconditions to consent (Heritage Council and Aboriginal community 28‑day periods in cl 5.10).
For master plans and DCP processes in growth areas, note the Ministerial publication requirement before master plan effect (cl 8.3(5)-(6)) and time project sequencing accordingly.
Record keeping and appeals
If the consent uses cl 4.6 exceptions, ensure the consent authority keeps the statutory assessment record (cl 4.6(4)). Maintain robust documentation of environmental planning grounds and technical assessments.
Expect decisions under the Act to be reviewable through statutory review and the Land and Environment Court processes; design decision packages so they provide the factual and legal bases that will withstand scrutiny.
Summary checklist references: zoning and land maps (cl 2.2; cl 1.7), Land Use Table objectives and permissions (cl 2.3), lot sizes (cl 4.1 and related), heritage (cl 5.10; Schedule 5), biodiversity/riparian/wetlands (cl 7.2-7.4), flood planning (cl 5.21-5.22), exemptions/complying dev (cl 3.1-3.2; Schedule 2-3), aquaculture and livestock rules (cl 5.18-5.19; Schedule 6), infrastructure and growth areas (cl 6.1-6.2; Part 8).
Following that sequence, and documenting how each statutory test and map is satisfied in technical reports, heritage assessments and service statements, will align project proposals with the Plan’s decision framework and reduce the risk of refusal or later enforcement action.
(f) to strengthen and support a year-round economy by encouraging a range of development and land uses, including tourism and agriculture, that respond to lifestyle choices, emerging markets and changes in technology in a socially and environmentally responsible manner,
(g) to provide for small-scale tourism development in areas with access to appropriate tourist activities, services and amenity, such as adjacent to Kosciuszko National Park, Lake Jindabyne and Lake Eucumbene,
(h) to protect, preserve and enhance areas of high scenic landscape value and the open rural landscape, including maintaining separation between towns and villages,
(i) to value, protect and promote the natural, cultural and archaeological heritage of Snowy River by careful management,
(j) to ensure good management of public assets and to promote opportunities for social, cultural and community activities,
(k) to retain, and where possible, extend public access to foreshore areas and link existing open space areas for environmental benefits, health benefits and public enjoyment,
(l) to provide safe and healthy public spaces, attractive neighbourhoods and centres and to ensure development embraces the principles of quality urban design.
The Dictionary at the end of this Plan defines words and expressions for the purposes of this Plan.
1 Notes
1 Notes
1.5 Notes
Notes in this Plan are provided for guidance and do not form part of this Plan.
1 Consent authority
1 Consent authority
1.6 Consent authority
The consent authority for the purposes of this Plan is (subject to the Act) the Council.
1 Maps
1 Maps
1.7 Maps
(1) A reference in this Plan to a named map adopted by this Plan is a reference to a map by that name—
(a) approved by the local plan-making authority when the map is adopted, and
(b) as amended or replaced from time to time by maps declared by environmental planning instruments to amend or replace that map, and approved by the local plan-making authority when the instruments are made.
(1AA) (Repealed)
(2) Any 2 or more named maps may be combined into a single map. In that case, a reference in this Plan to any such named map is a reference to the relevant part or aspect of the single map.
(3) Any such maps are to be kept and made available for public access in accordance with arrangements approved by the Minister.
(4) For the purposes of this Plan, a map may be in, and may be kept and made available in, electronic or paper form, or both.
Note.
The maps adopted by this Plan are to be made available on the NSW Planning Portal. Requirements relating to the maps are set out in the documents entitled Standard technical requirements for LEP maps and Standard requirements for LEP GIS data which are available on the website of the Department of Planning and Environment.
1 Repeal of planning instruments applying to land
1 Repeal of planning instruments applying to land
1.8 Repeal of planning instruments applying to land
(1) All local environmental plans and deemed environmental planning instruments applying only to the land to which this Plan applies are repealed.
Note.
The following environmental planning instruments are repealed under this provision—
Snowy River Local Environmental Plan 1997
Snowy River Rural Local Environmental Plan 2007
(2) All local environmental plans and deemed environmental planning instruments applying to the land to which this Plan applies and to other land cease to apply to the land to which this Plan applies.
1 Savings provision relating to development applications
1 Savings provision relating to development applications
1.8A Savings provision relating to development applications
(1) If a development application has been made before the commencement of this Plan in relation to land to which this Plan applies and the application has not been finally determined before that commencement, the application must be determined as if this Plan had not commenced.
Note.
However, under Division 3.5 of the Act, a development application may be made for consent to carry out development that may only be carried out if the environmental planning instrument applying to the relevant development is appropriately amended or if a new instrument, including an appropriate principal environmental planning instrument, is made, and the consent authority may consider the application. The Division requires public notice of the development application and the draft environmental planning instrument allowing the development at the same time, or as closely together as is practicable.
(2) A development application made, but not finally determined, before the commencement of State Environmental Planning Policy Amendment (Flood Planning) 2023 must be determined as if that policy had not commenced.
(3) A development application or an application for a complying development certificate made, but not finally determined, before the commencement of the State Environmental Planning Policy (Precincts—Regional) Amendment (Snowy Mountains) 2025 must be determined as if the policy had not commenced.
Kosciuszko Regional Environmental Plan 1998—(Snowy River) is repealed.
1 Application of SEPPs
1 Application of SEPPs
1.9 Application of SEPPs
(1) This Plan is subject to the provisions of any State environmental planning policy that prevails over this Plan as provided by section 3.28 of the Act.
(2) The following State environmental planning policies (or provisions) do not apply to the land to which this Plan applies—
1 Suspension of covenants, agreements and instruments
1 Suspension of covenants, agreements and instruments
1.9A Suspension of covenants, agreements and instruments
(1) For the purpose of enabling development on land in any zone to be carried out in accordance with this Plan or with a consent granted under the Act, any agreement, covenant or other similar instrument that restricts the carrying out of that development does not apply to the extent necessary to serve that purpose.
(2) This clause does not apply—
(a) to a covenant imposed by the Council or that the Council requires to be imposed, or
(b) to any relevant instrument within the meaning of section 13.4 of the Crown Land Management Act 2016, or
(c) to any conservation agreement within the meaning of the National Parks and Wildlife Act 1974, or
(d) to any Trust agreement within the meaning of the Nature Conservation Trust Act 2001, or
(e) to any property vegetation plan within the meaning of the Native Vegetation Act 2003, or
(f) to any biobanking agreement within the meaning of Part 7A of the Threatened Species Conservation Act 1995, or
(g) to any planning agreement within the meaning of Subdivision 2 of Division 7.1 of the Act.
(3) This clause does not affect the rights or interests of any public authority under any registered instrument.
(4) Under section 3.16 of the Act, the Governor, before the making of this clause, approved of subclauses (1)–(3).
cl 1.9A: Am 2019 (621), Sch 5[2]–[4].
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
2 Land use zones
2 Land use zones
2.1 Land use zones
The land use zones under this Plan are as follows—
Rural Zones
RU1 Primary Production
RU3 Forestry
RU5 Village
Residential Zones
R1 General Residential
R2 Low Density Residential
R5 Large Lot Residential
Employment Zones
E1 Local Centre
E4 General Industrial
Special Purpose Zones
SP1 Special Activities
SP2 Infrastructure
SP3 Tourist
Recreation Zones
RE1 Public Recreation
RE2 Private Recreation
Conservation Zones
C1 National Parks and Nature Reserves
C2 Environmental Conservation
C3 Environmental Management
cl 2.1: Am 2022 (832), Sch 1.20[1].
2 Zoning of land to which Plan applies
2 Zoning of land to which Plan applies
2.2 Zoning of land to which Plan applies
For the purposes of this Plan, land is within the zones shown on the Land Zoning Map.
2 Zone objectives and Land Use Table
2 Zone objectives and Land Use Table
2.3 Zone objectives and Land Use Table
(1) The Land Use Table at the end of this Part specifies for each zone—
(a) the objectives for development, and
(b) development that may be carried out without development consent, and
(c) development that may be carried out only with development consent, and
(d) development that is prohibited.
(2) The consent authority must have regard to the objectives for development in a zone when determining a development application in respect of land within the zone.
(3) In the Land Use Table at the end of this Part—
(a) a reference to a type of building or other thing is a reference to development for the purposes of that type of building or other thing, and
(b) a reference to a type of building or other thing does not include (despite any definition in this Plan) a reference to a type of building or other thing referred to separately in the Land Use Table in relation to the same zone.
(4) This clause is subject to the other provisions of this Plan.
Notes.
2
1
Schedule 1 sets out additional permitted uses for particular land.
2
2
Schedule 2 sets out exempt development (which is generally exempt from both Parts 4 and 5 of the Act). Development in the land use table that may be carried out without consent is nevertheless subject to the environmental assessment and approval requirements of Part 5 of the Act.
2
3
Schedule 3 sets out complying development (for which a complying development certificate may be issued as an alternative to obtaining development consent).
2
4
Clause 2.6 requires consent for subdivision of land.
2
5
Part 5 contains other provisions which require consent for particular development.
2 Unzoned land
2 Unzoned land
2.4 Unzoned land
(1) Development may be carried out on unzoned land only with development consent.
(2) In deciding whether to grant development consent, the consent authority—
(a) must consider whether the development will impact on adjoining zoned land and, if so, consider the objectives for development in the zones of the adjoining land, and
(b) must be satisfied that the development is appropriate and is compatible with permissible land uses in any such adjoining land.
2 Additional permitted uses for particular land
2 Additional permitted uses for particular land
2.5 Additional permitted uses for particular land
(1) Development on particular land that is described or referred to in Schedule 1 may be carried out—
(a) with development consent, or
(b) if the Schedule so provides—without development consent,
in accordance with the conditions (if any) specified in that Schedule in relation to that development.
(2) This clause has effect despite anything to the contrary in the Land Use Table or other provision of this Plan.
2 Subdivision—consent requirements
2 Subdivision—consent requirements
2.6 Subdivision—consent requirements
(1) Land to which this Plan applies may be subdivided, but only with development consent.
Notes.
(2) Development consent must not be granted for the subdivision of land on which a secondary dwelling is situated if the subdivision would result in the principal dwelling and the secondary dwelling being situated on separate lots, unless the resulting lots are not less than the minimum size shown on the Lot Size Map in relation to that land.
Note.
The definition of secondary dwelling in the Dictionary requires the dwelling to be on the same lot of land as the principal dwelling.
2
1
If a subdivision is specified as exempt development in an applicable environmental planning instrument, such as this Plan or [State Environmental Planning Policy (Exempt and Complying Development Codes) 2008](/view/html/inforce/c
This is an opening excerpt, not the complete document.