[2025] VSC 701
General information, not legal advice.
Supreme Court of Victoria
2025-10-30
Delany J
Original judgment source is linked above.
PRACTICE AND PROCEDURE - Summary judgment - Application uncontested ** - ** No real prospect of success ** - ** Civil Procedure Act 2010 (Vic) s 61 ** - ** Owners Corporation 1 Plan No PS 707553K v Shangri-La Construction Pty Ltd [2023] VCC 1473 applied ** - ** Owners Corporation No.1 of PS613436T v LU Simon Builders Pty Ltd (Building and Property) [2019] VCAT 286; Naqebullah v State of Victoria [2024] VSCA 307; State of Victoria v L.U. Simon Builders Pty Ltd ; (Unreported, Supreme Court of Victoria, Delany J, 24 September 2025) referred to.
PRACTICE AND PROCEDURE - Calculation of interest - Second defendant not joined to proceeding until after the sixty-fourth plaintiff - Civil Procedure Act 2010 (Vic) s 60(1) - Johnson Tiles Pty Ltd v Esso Australia (No 3) [2003] VSC 244; Shoard, v Palmer (1989) 98 FLR 402 referred to.
(1) This section applies if -
(a) after the commencement of this Division, the Authority pays an amount to an owner of a building (the payee) by way of financial assistance in relation to cladding rectification work on the building; or
(b) before the commencement of this Division, an amount was paid by or on behalf of the Crown in right of the State of Victoria to an owner of a building (the payee) by way of financial assistance in relation to cladding rectification work on the building.
(2) At the relevant time, the Crown is subrogated to all the rights and remedies of the payee against any person in relation to the installation or use of any non-compliant or non-conforming external wall cladding product, or other building work, that required the cladding rectification work to be undertaken.
(3) If a right or remedy to which the Crown is subrogated under this section is exercisable against an entity that is not an individual, it is enforceable jointly and severally against the entity and the people who were its officers at the time the act or omission that gave rise to the right or remedy occurred.
(4) If it is proved that an act or omission by an entity occurred without the knowledge or consent of an officer of the entity, a right or remedy is not enforceable as provided by subsection (3) against the officer in relation to the act or omission.
(5) The Crown may exercise its rights and remedies under this section in its own name or in the name of the payee.
...
(10) In this section -
officer -
(a) in relation to an entity that is a corporation - means an officer of the corporation within the meaning of section 9 of the Corporations Act; or
(b) in relation to an entity that is neither an individual nor a corporation - means an officer of the entity within the meaning of section 9 of the Corporations Act;
relevant time means -
(a) in the circumstances referred to in subsection (1)(a) - when the financial assistance is paid to the payee; or
(b) in the circumstances referred to in subsection (1)(b) - when this Division commences.
(a) Stephen Lindsay, in relation to the project management of rectification works completed by Hutchinsons Builders ('Hutchinsons');
(b) Samuel Hogg, in relation to the project management of rectification works completed by Carringvale Pty Ltd ('Carringvale');
(c) Jeff Beck, a domestic builder and building consultant, in relation to the non-compliance of expanded polystyrene cladding ('EPS Cladding');
(d) Stephen Kip, a fire engineer and building surveyor, in relation to the non-compliance of the EPS Cladding and the reasonableness of the scope of the rectification works by both Hutchinsons and Carringvale; and
(e) Christopher Daubney, a quantity surveyor, in relation to the reasonableness of the costs of the rectification works.
building includes any structure, temporary building or temporary structure and also includes any part of a building or structure;
...
domestic building work means any work referred to in section 5 that is not excluded from the operation of this Act by section 6;
...
home means any residential premises and includes any part of a commercial or industrial premises that is used as a residential premises ...
(1) This Act applies to the following work -
(a) the erection or construction of a home ...
(a) the construction of the Building was required to comply with the Building Code of Australia 2006 (the BCA), which was adopted by and formed part of the Building Regulations 2006 (Vic) made under the Building Act;
(b) pursuant to cl C1.1 of the BCA, the Building was required to be of Type A construction, being the most fire-resistant type of construction prescribed under the BCA;
(c) pursuant to cl 3.1 of Specification C1.1 of the BCA, the external walls of the Building, being a building required to be of Type A construction, were required to be non-combustible;
(a) all materials to be supplied by the Builder for use in the work carried out under the Contract would be good and suitable for the purpose for which they were used and that, unless otherwise stated in the Contract, those materials would be new (as provided in s 8(b) of the DBC Act); and
(b) the work under the Contract would be carried out in accordance with, and would comply with, all laws and legal requirements including, without limiting the generality of this warranty, the Building Act and the regulations made under that Act (as provided in s 8(c) of the DBC Act).
8 Implied warranties concerning all domestic building work
The following warranties about the work to be carried out under a domestic building contract are part of every domestic building contract -
...
(f) if the contract states the particular purpose for which the work is required, or the result which the building owner wishes the work to achieve, so as to show that the building owner relies on the builder's skill and judgement, the builder warrants that the work and any material used in carrying out the work will be reasonably fit for that purpose or will be of such a nature and quality that they might reasonably be expected to achieve that result.
The stamped and approved building permit design drawings state the lightweight external cladding to be installed at the property was 15mm Multi Board Lining (X-line), however 75mm expanded polystyrene foam cladding (EPS) cladding has been installed at the building.
The Building Code of Australia (BCA) does not consider EPS as a deemed-to-satisfy (DtS) cladding in relation to weather proofing of the building, further the cladding is combustible. The use of this cladding, particularly in a multi-story building was required to be assessed as an Alternate Solution by the relevant building surveyor prior to the issuing of a building permit.
EPS cladding has not been installed in accordance with most manufacturer's recommendations and one of the Victorian Building Authority (VBA) approved systems.
There is evidence of expanded polystyrene foam cladding (EPS) which has been extensively installed throughout the buildings. EPS cladding is not a deemed-to-satisfy (DtS) cladding in accordance with the Performance Provisions of the BCA...
It appears the EPS is a substituted cladding from the building permit documents and therefore the cladding and the 'construction system' should have been assessed by the relevant building surveyor prior to the issuing of a building permit via an Alternate Solution.
There is no record on the building permit that an Alternate Solution was approved by the relevant building surveyor (RBS). Further, I could not find any documentation in the permit documents provided as part of my brief as to any change from the approved cladding to the cladding installed on the buildings.
The system designed and shown on the architectural drawings is CSR911 with a 15 mm multiboard lining to the outside and this is generally consistent with the CSR 911 system which requires at least 6 mm thick CeminSeal™ cladding.
...
The system installed by the builder is instead 75 mm thick rendered expanded polystyrene cladding (see Photo No. 3.1). Polystyrene is a highly combustible material; not approved for multi-storey use in Australia and of concern to insurers14. It is also non-compliant with the CSR tested system, the building permit and breaches Clauses A2.2(a) & C2.4(b) of the BCA.
...
The external walls must therefore be re-clad with a CodeMark approved material complying with the BCA for this installation, and all penetrations treated as required by that tested and accredited system.
(a) the RAW Fire Engineering report dated 30 September 2011 required compliance with the Deemed to Satisfy Provisions of the BCA, and these provisions had not been achieved in:
(i) the fire resistance level of the external cladding; and
(ii) the protection of service penetrations; and
(b) therefore the following Alternative Solutions did not meet the performance requirements of the BCA:
(i) CP1 and C2: General reduction in the required fire resistance level from 90/90/90 to 60/60/60;
(ii) CP2: Lack of complying non-combustible spandrels between windows and other openings between apartments on different levels;
(iii) DP4: Extended travel distances to the nearest available exit, between alternative exists and to a point of choice; and
(iv) DP4: Discharge of a non-fire isolated stair more than 15 metres from a door leading to the outside.
(a) the external walls of the Building consist of combustible expanded polystyrene cladding or lining which may constitute an undue risk of fire spread;
(b) the Building contains windows within and adjacent to the combustible expanded polystyrene cladding or lining which may increase the risk of spread of fire to or from the cladding to the internal part of the Building in the event of fire; and
(c) the combustible expanded polystyrene cladding or lining is adjacent to potential ignition sources on balconies increasing the risk of fire spread.
(a) remove the combustible expanded polystyrene within 3 metres of the Murray Street exit door and egress path of travel to the street at ground level including the adjacent columns on the north east corner of the Building. Replace with cladding compliant with Part C1.9 of the National Construction Code 2019;
(b) remove the combustible expanded polystyrene within 3 metres of the Dixon Street exit door and egress path of travel to the street at ground level including from behind the fire indicator panel. Replace with cladding compliant with Part C1.9 of the National Construction Code 2019;
(c) install metal awning above both exit doors on Dixon Street to protect the egress path of travel; and
(d) remove all potential portable ignition sources on balconies until further notice. Remove combustible items on balconies until further notice.
1.1. The building is a danger to the life, safety or health of any member of the public or to any person using the building or to any property in that:
1.1.1. The building has combustible Expanded Polystyrene (EPS) cladding covering a large proportion of the external walls, which comprises the passive fire protection to the building and the means of egress for the occupants and/or the public or any person using the building.
2.1 Why entry, use, or occupation of the building should not be prohibited;
2.2. Why you should not be required to evacuate the building;
2.3 Why you should not carry out the following building work identified in this notice in relation to the building:
2.3.1 Remove all combustible Expanded Polystyrene (EPS) cladding installed on the external walls of the building and replace with cladding compliant with Part C1.9 of the National Construction Code 2019 - Volume One ('Building Code of Australia Volume 1'), pursuant to regulation 10 of the Building Regulations 2018.
Mr Naqebullah's liability to the State (if it exists) is derivative from the liability said to be owed to the State by Shangri-La as being subrogated to the rights of the owners and their owners corporation as the original applicants/plaintiffs in this proceeding. The first step in considering the alleged liability of Mr Naqebullah is to consider whether, subject to the statutory stay imposed by the Corporations Act, the State has a good claim against Shangri-La.
confirmed the principle that a builder's liability for design and construction was not merely an obligation to use reasonable care. In particular, the warranty of fitness for purpose was absolute.
Thus I accept the Owners' submission that the warranties are "not qualified or limited to an obligation to use reasonable care and skill."
61 Plaintiff may apply for summary judgment in proceeding
A plaintiff in a civil proceeding may apply to the court for summary judgment in the proceeding on the ground that a defendant's defence or part of that defence has no real prospect of success.
In addition to the building owner who was a party to a domestic building contract, any person who is the owner for the time being of the building or land in respect of which the domestic building work was carried out under the contract may take proceedings for a breach of any of the warranties listed in section 8 as if that person was a party to the contract.
60 Interest in proceedings for debt or damages
(1) The Court, on application in any proceeding for the recovery of debt or damages, must, unless good cause is shown to the contrary, give damages in the nature of interest at such rate not exceeding the rate for the time being fixed under section 2 of the Penalty Interest Rates Act 1983 as it thinks fit from the commencement of the proceeding to the date of the judgment over and above the debt or damages awarded.
MMD MAZOR CONSTRUCTION PTY LTD (A.C.N. 137 919 147)
HOUSING FIRST LTD (A.C.N. 116 093 004) (Formerly known as PORT PHILLIP HOUSING ASSOCIATION LTD)
ASHWINI BHARGAVA (withdrawn from proceeding 20/02/2020)
CLAYTON SUPER INVESTMENTS PTY LTD (A.C.N. 164 080 513)
SHANGRI-LA CONSTRUCTION PTY LTD (A.C.N. 130 534 244)
CERTAIN UNDERWRITERS AT LLOYD'S SUBSCRIBING TO POLICY NUMBER P0003310PI2017AU1
CERTAIN UNDERWRITERS AT LLOYD'S SUBSCRIBING TO POLICY NUMBER P0003310PI2018AU2
[2] Naqebullah v State of Victoria [2024] VSCA 307 (McLeish, Niall and Lyons JJA).
[3] Owners Corporation 1 Plan No PS 707553K v Shangri-La Construction Pty Ltd [2023] VCC 1473, [72] (Judge Macnamara).
[4] [2019] VCAT 286 ('Lacrosse').
[6] Owners Corporation No.1 of PS613436T v LU Simon Builders Pty Ltd [2019] VCAT 286, [285] (Judge Woodward).
[7] Owners Corporation No.1 of PS613436T v LU Simon Builders Pty Ltd [2019] VCAT 286, [286] (Judge Woodward).
[10] Owners Corporation 1 Plan No. PS 640567Y v Shangri-La Construction Pty Ltd (Unreported, Supreme Court of Victoria, Delany J, 24 September 2025).
[11] Owners Corporation No.1 of PS613436T v LU Simon Builders Pty Ltd [2019] VCAT 286, [287]-[288].
[12] Owners SP 92450 v JKN Para 1 Pty Limited [2023] NSWCA 114, [107] (Gleeson JA, White and Brereton JJA agreeing); Tanah Merah Vic Pty Ltd v Owners' Corporation No 1 of PS613436T (2021) 75 VR 1; [2021] VSCA 72, [209] (Beach and Osborn JJA, Stynes AJA).
[14] Johnson Tiles Pty Ltd v Esso Australia (No 3) [2003] VSC 244, [61] (Gillard J).
[15] (1989) 98 FLR 402, [34] (Kirby P).
Owners Corporation 1 Plan No. PS 640567Y
Shangri-La Construction Pty Ltd [2025] VSC 701
(1989) 98 FLR 402
(2021) 75 VR 1