[2023] VCC 1473
General information, not legal advice.
County Court of Victoria
2023-08-24
Original judgment source is linked above.
epealed_act/taa1986153/)_ 1986 (NSW); Competition and Consumer Act 2010 (Cth); Trade Practices Act 1974 (Cth); Fair Work Act 2009 (Cth)
Cases Cited: Tanah Merah Vic Pty Ltd (ACN 098 935 490) v Owners Corporation No 1 of PS613436T and Ors [2021] VSCA 72; Owners Corporation 1 Plan No. PS707553K v Shangri-La Construction Pty Ltd (No 3) (Building and Property) [2022] VCAT 1385; Maxwell v Murphy [1957] HCA 7; (1957) 96 CLR 261; Australian Education Union v General Manager of Fair Work Australia [2012] HCA 19; (2012) 246 CLR 117; Commissioner of Taxation v Consolidated Media Holdings Ltd [2012] HCA 55; (2012) 250 CLR 503; R S Howard & Sons Limited v Brunton [1916] HCA 21; (1916) 21 CLR 366; ADCO Constructions Pty Ltd v Goudappel (2014) 254 CLR 1; Nicholas v Commissioner for Corporate Affairs [1988] VicRp 40; [1988] VR 289; Rich v The Australian Securities & Investments Commission [2003] NSWCA 342; Natural Forests Pty Ltd v Turner [2004] TASSC 34; Doro v Victorian Railways Commissioners [1960] VicRp 12; [1960] VR 84; Jacobs v London County Council [1950] AC 361; Wilde v Australian Trade Equipment Co Pty Ltd [1981] HCA 13; (1981) 145 CLR 590; Pelechowski v Registrar, Court of Appeal (NSW) [1999] HCA 19; (1999) 198 CLR 435; Travel Compensation Fund v Dunn (2 December 1992, BC9203833); Yorke v Lucas (1985) 158 CLR 661; Australian Building and Construction Commissioner v Parker [2017] FCA 564; Parker v Australian Building and Construction Commissioner [2019] FCAFC 56; Spotlight Pty Ltd v NCON Australia Ltd [2012] VSCA 232; (2012) 46 VR 1; Keys Consulting Pty Ltd and Anor v CAT Enterprises Pty Ltd and Ors [2019] VSCA 136; Jones v Dunkel [1959] HCA 8; (1959) 101 CLR 298
Judgment: 1. Within 28 days the parties must bring in short minutes to give effect to these reasons
"Shortly before 2:23 am on 24 November 2014, a fire broke out on the balcony of apartment 805 of the 21 storey Lacrosse apartment tower in Latrobe Street, Docklands. The source of the ignition of the fire was an incompletely extinguished cigarette butt left in a plastic container by a person staying in the apartment, Jean-François Gubitta. The plastic container was sitting on a table with a timber top on the balcony of the apartment. The fire spread from the plastic container to the table and then to the nearby external cladding of the building." (Tanah Merah Vic Pty Ltd v Owners Corporation No 1 of PS613436T and Ors [2021] VSCA 72, [1])
"The Victorian Government is committed to removing the scourge of combustible cladding from our communities. The safety of building occupants is our top priority.
As the Victorian Cladding Taskforce detailed in its final report in July 2019, rectification of combustible cladding on buildings is complex and difficult. Different solutions will be required for different buildings. It will also take time - in large part due to the size and number of affected buildings and the nature of the building works to be carried out.
In the years that followed Melbourne's Lacrosse Fire in 2014 and the tragic Grenfell fire in the United Kingdom, it's become clear that often owners corporations are not adequately governed and resourced to deal with complex, large-scale building matters like cladding rectification.
Taking note of the advice of the Cladding Taskforce, the Government decided it needed to intervene to support owners of buildings assessed as higher-risk to rectify their combustible cladding. This support includes funding, but also a critical role for the Government in helping to advise and guide owners and owners corporations through the process of rectification. This is why the Government has established Cladding Safety Victoria." (Hansard Legislative Assembly, 4 September 2020, 2124)
"The Cladding Safety Victoria Bill is a Bill to make our community safer.
For the owners who are concerned about a cladding fire that might put their families at risk. For the young couple renting an apartment who now feel afraid because they were told they couldn't have a barbecue on their balcony. For the elderly couple who fear a fire evacuation in their high-risk building because they are not stable on their feet." (Ibid, 2126)
(1) This section applies if, after the commencement of section 54 of the Cladding Safety Victoria Act 2020, Cladding Safety Victoria pays an amount to an owner of a building (the payee) by way of a grant of financial assistance in relation to cladding rectification work on the building.
(2) When the financial assistance is paid to the payee, the Crown is subrogated to all the rights and remedies of the payee against any person in relation to the installation or use of any non compliant or non-conforming external wall cladding product, or other building work, that required the cladding rectification work to be undertaken.
(3) If a right or remedy to which the Crown is subrogated under this section is exercisable against an entity that is not an individual, it is enforceable jointly and severally against the entity and the people who were its officers at the time the act or omission that gave rise to the right or remedy occurred.
(4) If it is proved that an act or omission by an entity occurred without the knowledge or consent of an officer of the entity, a right or remedy is not enforceable as provided by subsection (3) against the officer in relation to the act or omission.
(5) The Crown may exercise its rights and remedies under this section in its own name or in the name of the payee.
(6) If the Crown brings proceedings under this section in the name of the payee, the Crown must indemnify the payee against any costs awarded against the payee in the proceedings.
(7) If, in exercising its rights and remedies under this section, the Crown recovers more money than the amount of financial assistance paid to the payee, the Crown must pay the difference to the payee after deducting costs incurred to recover the money.
(8) The payment of an amount referred to in subsection (1) in relation to cladding rectification work does not affect any right or remedy of the Crown by virtue of subsection (2) to recover from a person in relation to the installation or use of any non compliant or non-conforming external wall cladding product, or other building work, that required the cladding rectification work to be undertaken.
(9) A reference in this section to the rights of a payee includes any right the payee may have under section 86 of the Sentencing Act 1991.
(9A) Despite the amendment of this section by section 54 of the Cladding Safety Victoria Act 2020, any right of subrogation conferred on the Crown under this section as in force immediately before its amendment continues to have effect.
(a) in relation to an entity that is a corporation - means an officer of the corporation within the meaning of section 9 of the Corporations Act; or
(b) in relation to an entity that is neither an individual nor a corporation - means an officer of the entity within the meaning of section 9 of the Corporations Act."
"They [the developer company and Mr Frid] had a set of documentation, drawings and specification [sic], when they came to me. So a developer always has a few information. They have 3D renders of the project, what they would like the building to look like. They already have chosen certain materials in the contract of sale because they [viz, the apartments] are sold off the plan." (Transcript ("T") 506, Line/s "L" 5−10)
"Once we sign contract, we've got specifications. Everything before that we throw away, we don't use." (T507, L14−16)
"Since then [2011] further VBA [viz Victorian Building Authority] documents have described the status and properties of EPS products." (CB 443)
"The Minister for Planning announced a prohibition on the use of EPS as external wall cladding for any building work in connection with Class 2-9 buildings of Type A and Type B construction. This prohibition took effect from 1 February 2021."
"The provision for external walls and other critical building elements to be of non-combustible construction or concrete or masonry has been a fundamental part of building regulations in Australia, and elsewhere in the world, for many hundreds of years and remains in the BCA [Building Code of Australia] as a requirement for external walls to be non-combustible. The requirement for non-combustible material instead of combustible materials (traditionally timber) on multi-storey buildings can be traced back to the proclamation of King Charles II after the Great Fire of London in 1666 and is repeated in early building regulations in Australia, including the now revoked original Sydney Building Act of 1837". (CB 956-957)
"every external wall ... of every building of the first second third fourth or fifth rate ... shall be of brick stone artificial stone lead copper tin slate tile or iron or of brick stone ..." (CB 957)
"Clerk of work services are generally in the nature of independent quality assurance and inspection services, separate from project management of the building rectification works, ..." (CB 1162−3, paragraphs 17 and 23)
"(a) Undertake a desktop review of provided documents and drawings.
(b) Site inspection, including the identification of material types, installation details, build quality and workmanship and associated existing conditions for accessible areas.
(c) Prepare and facilitate material testing of samples.
(d) Prepare a report based on the above.
(e) Conduct a follow up site inspection to close out defects." (CB 1175)
"that the builder [viz Shangri-La] constructed the apartments in a defective manner. The primary issues of defective work relate[d] to the ingress of water due to inadequate waterproofing and non-compliant cladding, and fire isolation. The applicants claim damages for the cost of rectification works and dislocation costs in excess of $2 million." [2022] VCAT 400 [6]
"were at all material times the owners of lots in the Plan of Subdivision [affecting the property at 290 Hawthorn Road, Caulfield] ... which lots included certain portions of the external façade of and attachments to the Building". (CB 22)
"a reasonable building company director's lack of knowledge in 2014 that any non-compliant or non-conforming external wall cladding product would be installed or used ... [meant] that any remedy or right of the plaintiffs under Sec 137F is not enforceable against [him]." (Closing submissions, paragraph [65](h))
"violates that provision insofar as it discriminates without proper basis between people who were officers at relevant times of an entity engaged in the installation or use of non-compliant or non-conforming external wall cladding product on one hand, and others on the other hand". (CB 10375)
"(a) the builder warrants that the work will be carried out in a proper and workmanlike manner and in accordance with the plans and specifications set out in the contract;
(b) the builder warrants that all materials to be supplied by the builder for use in the work will be good and suitable for the purpose for which they are used and that, unless otherwise stated in the contract, those materials will be new;
(f) if the contract states the particular purpose for which the work is required, or the result which the building owner wishes the work to achieve, so as to show that the building owner relies on the builder's skill and judgement, the builder warrants that the work and any material used in carrying out the work will be reasonably fit for that purpose or will be of such a nature and quality that they might reasonably be expected to achieve that result." (Section 8, Domestic Building Contracts Act 1995)
"I have at no times between 2010 and 2016 known that the use of EWCC [that is, external wall combustible cladding] when part of stamped permit documentation was not permitted."
"This Building Permit (Stage 2) [Stage 1 covered the construction of the basement] has been assessed and issued in conjunction with a Fire Engineering Report prepared certified by Paul Veheijdan EF-15977 and independently certified permitting the following BCA DTS variations [Building Code of Australia and Deemed-to-Satisfy]:
"I confirm that Shangri La Construction Pty Ltd has met all of the Fire-Rated Construction requirements at the abovementioned Property." (CB 7700)
"Please note that Shangri_La Construction Pty Ltd has met all Fire Engineering requirements as per the BCA and consultants design at the above-mentioned address." (CB 7701)
Fire engineering briefs and fire engineering report
"is a document that is putting forward to the designer and the stakeholders, for want of a term, what the solution proposed is. It's like a summary document but it then describes a methodology that that designer is going to use to provide an outcome or an expected outcome and the process that he's going to follow, and then the stakeholders all agree to that, and that can include the fire brigade where they are consulted or need to be consulted, but it also may not." (T339, L21−30)
"Once there's agreement reached that the brief is correct and the analysis proposed is acceptable, then the engineer would do that report and then it would be independently reviewed." (T320, L12−16)
A building must have elements which will, to the degree necessary, maintain structural stability during a fire appropriate to -
(a) the function or use of the building; and
(b) the fire load; and
(c) the potential fire intensity; and
(d) the fire hazard; and
(e) the height of the building; and
(f) its proximity to other property; and
(g) any active fire safety systems installed in the building; and
(h) the size of any fire compartment; and
(i) fire brigade intervention; and
(j) other elements they support; and
(k) the evacuation time.
(a) A building must have elements which will, to the degree necessary, avoid the spread of fire -
(i) to exits; and
(ii) to sole-occupancy units and public corridors; and
CP2(a)(ii) only applies to a Class 2 or 3 building or Class 4 part.
(iii) between buildings; and
(iv) in a building.
(b) Avoidance of the spread of fire referred to in (a) must be appropriate to -
(i) the function or use of the building; and
(ii) the fire load; and
(iii) the potential fire intensity; and
(iv) the fire hazard; and
(v) the number of storeys in the building; and
(vi) its proximity to other property; and
(vii) any active fire safety systems installed in the building; and
(viii) the size of any fire compartment; and
(ix) fire brigade intervention; and
(x) other elements they support; and
(xi) the evacuation time." (CB 11711−11712)
53 I asked Mr Salomonsson, a fire engineer who gave evidence on behalf of Mr Naqebullah:
"Are you able to point me to the passage or passages in either the fire engineering report or the fire engineering brief which encapsulate the grounds on which this fire engineer took the opposite view from the one that you take, namely, that the performance requirements in the Building Code can be met by the use of this [EPS] cladding?" (T370, L27-T371, L2)
"So it's in the wording how he tried to justify, partly being compared to a class 1 residential house where it permits this material, and trying to compare that to this building that is multi storeys where you have different people living on different levels, where the Building Code has a higher requirement in CP2, performance requirement of section C, to limit fire spread between people who have living in different dwellings. In that argument, I don't agree with him that he demonstrates that." (T371, L10−19)
"Sir, the Building Code deem to satisfy provisions prohibit combustibility but the performance requirements don't. So as Mr Salomonsson said, the performance requirements say you have to adequately avoid the spread of fire, so that's how the fire engineer works in that space." (T372, L17−22)
"In short, I don't believe the report does do the analysis. It talks about how the analysis should be done and in fact, section 13.4.2 of the FEB lists all the materials that are used as a reference benchmark. The actual analysis is (indistinct) in my view." (T373, L16−20)
"External wall cladding may be combustible if attached to the outside of a fire rated barrier and:
"Combustible cladding materials used on the external wall.
Not located directly over the exit from the building.
Still maintains the required fire resistance level of external walls." (CB 7126)
"Analysis of the design fire scenario is to be undertaken using the following assessment method and acceptance criteria (refer to 8.2 Assessment Methodology for information)" (CB 6693)
"The potential fire intensity does not exceed the following radiation heat flux on the outer face of the external wall:
"So all it tells you really ... Mr Naqebullah [is], that it's Bushfire Attack Level 29 compliant"? (T524, L24−26)
"the fire engineer, if you read his report, he uses 20 as a benchmark from BCA to justify how RMAX Orange Board is quantitatively and qualitatively and deterministically he justifies the alternative solution." (T525, L16−19)
"The independent peer review didn't cover the cladding." (T320, L16−17)
"That one relates to a reduction in a FRL in a wall. The cladding is a separate matter. The cladding on the wall would be a separate matter." (T365, L13−15)
"It's not mentioned here, other than that it refers to, 'The design documents below', which refer to the brief and the report, which still mention combustible cladding as an option, but following from our previous discussion, yes, it didn't include RMAX in the description, but it did definitely mention combustible cladding in the brief and the report." (T364, L9−15)
That is, the text at the foot of the certificate under the heading "Design documents" refers to the fire engineering report and the fire engineering brief Issue 5.
"The role of the fire safety engineer at the time of design and construction was to address identified Building Code of Australia Deemed-to-Satisfy departures. During the design of the development, it appears that the fire safety engineer promoted the use of combustible cladding as part of an Alternative Solution, to reduce construction cost.
It is my opinion that the Alternative Solution prepared by the fire safety engineer did not achieve compliance with the relevant Performance Requirements of the Building Code of Australia.
It is further my opinion that it is reasonable for the builder to rely on the stamped documentation, although it is also my opinion that the builder should be aware that any inconsistency in the building permit documentation should be confirmed with the Relevant Building Surveyor, as only they can determine compliance." (CB 1146)
"Statutory construction begins with the text, read in its context, and with appropriate reference to legislative history and extrinsic materials to the extent that they assist in fixing the meaning of the text: Commissioner of Taxation v Consolidated Media Holdings Ltd [2012] HCA 55; (2012) 250 CLR 503 at [39]." (Closing submissions, paragraph [23])
"refer to unfitness by virtue of past conduct but create[d] a liability. It arguably imposes penalties for conduct antecedent to its enactment, if the creation of a liability can be considered a penalty. It is not a statute the object of which is to protect the public interest by disqualification based on conduct antecedent to the enactment." (Closing submissions, paragraph [34])
"It is not that part of the requisites for its action is drawn from a time antecedent to its passing. It is the fact that a liability was created where before none existed." (Closing submissions, paragraph [36])
"In the case before us, a palpable injustice would result if the Second Defendant [viz Mr Naqebullah] was held liable in 2023 for conduct in 2014 for which he had no liability then. The presumption against retrospectivity should be given its fullest weight." (Closing submissions, paragraph [38])
"This is not an instance of merely creating an unfavourable status by reference to past events. In the analogy, these past events were well known at the time of their occurrence to be rights and liabilities, or perhaps criminal offences. A further consequence of already prohibited behaviour came into effect, but that is not unusual." (Closing submissions, paragraph [57])
"In the interpretation of a provision of an Act or subordinate instrument -
(a) a construction that would promote the purpose or object underlying the Act or subordinate instrument (whether or not that purpose or object is expressly stated in the Act or subordinate instrument) shall be preferred to a construction that would not promote that purpose or object; ..."
"The common law rule of construction concerning retrospectivity is subject to a qualification that "a statute is not retrospective merely because it affects existing rights; nor is it retrospective because a part of the requisites for its action is drawn from a time antecedent to its passing"." ([1988] VR 289, 296)
"Moreover, a line of authority establishes that a statute, the object of which is to protect the public interest by disqualification based on conduct antecedent to the enactment, does not fall within the principle of retrospectivity." ([1988] VR 289, 297)
"(2) A person must not carry out building work unless the work is carried out in accordance with this Act, the building regulations and the building permit issued in relation to that work.
Penalty: 500 penalty units, in the case of a natural person;
2500 penalty units, in the case of a body corporate."
"It ended up not being on the building and the reason why it's not on the building is, as we have heard, because he's [viz Mr Naqebullah] taking it off after the Lacrosse fire." (T653, L6−9)
"The Second Defendant no longer relies on his defence that Sec 137F is in violation of the Charter of Human Rights and Responsibilities Act 2006 (Vic) ("the Charter") but reserves the right to raise such defences anew in any further proceeding."
"Where it is proved that an act or omission by a body corporate occurred without the knowledge or consent of a director of the body corporate, rights are not enforceable as provided by subsection (4) against the director in relation to the act or omission."
(a) building work in connection with, or otherwise related to, a product or material that is, or could be, a non-compliant or non-conforming external wall cladding product; or
(b) work of a type specified in a notice under section 185I of the Local Government Act 1989".
"he [Mr Lucas] was insufficiently aware of the relevant facts for him to be involved in the contravention within the meaning of ss75B and 82 of the Act." ((1985) 158 CLR 661, 665)
"A contravention of s.52 involves conduct which is misleading or deceptive or likely to mislead or deceive and the conduct relied upon in this case consisted of the making of false representations. Whilst Lucas was aware of the representations - indeed they were made by him - he had no knowledge of their falsity and could not for that reason be said to have intentionally participated in the contravention." ((1985) 158 CLR 661, 667−8)
"There can be no question that a person cannot be knowingly concerned in a contravention unless he has knowledge of the essential facts constituting the contravention." ((1985) 158 CLR 661, 670)
"When the conduct constituting the contravention [of s52] is the making of a false representation, it is immaterial that the corporation did not know that the representation was false when it was made. The essential facts to be established in sheeting home liability to a corporation under s.52 include the making of the representation and the falsity of the representation but not the corporation's knowledge of the falsity." ((1985) 158 CLR 661, 675−6)
"The operation of s.75B(a) in conjunction with s.52 may be incongruous, for s.52 throws a strict liability on a corporation, but s.75B(a) does not extend liability for a s.52 contravention to a person who procures the corporation to engage in contravening conduct if that person is honestly ignorant of the circumstances that give that conduct a contravening character." ((1985) 158 CLR 661, 677)
"I have not gone through all of them, but when you read them, you always see a reluctance by the various judicial authorities to accept something that didn't have some factual basis." (T663, L26−30)
"For a person to contravene s 50, it is sufficient to prove that conduct took place which was in fact a contravention of a term of an enterprise agreement. For the purposes of accessorial liability, all that need be proved is that the accessory had knowledge of the conduct." [2017] FCA 564 at [128]
"A person must not contravene a term of an enterprise agreement."
"(1) A person who is involved in a contravention of a civil remedy provision is taken to have contravened that provision.
(2) A person is involved in a contravention of a civil remedy provision if, and only if, the person:
(a) has aided, abetted, counselled or procured the contravention; or
(b) has induced the contravention, whether by threats or promises or otherwise; or
(c) has been in any way, by act or omission, directly or indirectly, knowingly concerned in or party to the contravention; or
(d) has conspired with others to effect the contravention."
"There can be no question that a person cannot be knowingly concerned in a contravention unless he has knowledge of the essential facts constituting the contravention."
"Actual knowledge is required - mere constructive or imputed knowledge is not sufficient. But actual knowledge may be inferred from "exposure to the obvious"."
"For the purposes of accessorial liability, all that needed to be proved [relative to alleged breach of s50 of the Fair Work Act 2009] is that the accessory had knowledge of the conduct." ((2017) 266 IR 340, 383)
"313. It is common knowledge that the Second Defendant is the first person against which the state has proceeded under Sec 137F(3). It remains unknown to the Court why he has been chosen, and it is perhaps irrelevant.
a) The number of sites inspected by the VBA is 2,657; > > b) The number of sites inspected which have been the subject of an Advisory Reference Panel is 1,399; > > c) The number of sites identified as being of extreme or high risk is 616.
a) The number of building surveyors is 136; > > b) The number of builders is 369; > > c) The number of fire engineers is 76.
(a) non-executive directors such as a building company's solicitor or accountant who sit on the board to bring their legal or accounting expertise to the table;
(b) company secretaries who devote their time to office administration, keeping or supervising accounts or accounting systems, payroll issues and so forth;
(c) executive directors or non-director executives involved in non-building aspects of a company's operations: for instance, a marketing manager or someone devoted entirely to the raising of finance;
(d) executive directors or senior executives tasked to manage or supervise particular projects which are not affected by the cladding issue.
"Yet CTC was removed from the property, and the State paid for that removal." (Closing submissions, paragraph [336])
"The building was included in the CSV Cladding Rectification Program due to external façade areas of:
which, he said, indicated that different areas of the building were covered by different forms of cladding.
"I have concluded that the scope of work undertaken to rectify the EPS cladding was reasonable." (CB 925)
"[Y]ou must understand though that my position is not to prove the State's case." (T681, L22−23)
Owners Corporation 1 Plan No PS 707553K and Ors
Shangri-La Construction Pty Ltd
(2012) 246 CLR 117
(1959) 101 CLR 298
(2017) 266 IR 340
(1957) 96 CLR 261
(2012) 250 CLR 503
(2014) 254 CLR 1
(1999) 198 CLR 435
(1985) 158 CLR 661
(2012) 46 VR 1
(1916) 21 CLR 366
(1981) 145 CLR 590