[2021] VSCA 72
Court of Appeal (Vic)
2021-03-26
Original judgment source is linked above.
BUILDING AND CONSTRUCTION - Applications for leave to appeal on questions of law from a decision of the Victorian Civil and Administrative Tribunal (VCAT) with respect to a domestic building dispute - Claims in respect of property damage and economic loss arising from fire at a multi-level residential building - Use of aluminium composite panels ('ACPs') on facades of building a cause of the damage suffered by the owners - Owners' claims against builder pursuant to statutory warranties concerning the suitability of materials, compliance with the law and fitness for purpose arising under Domestic Building Contracts Act 1995 s-subs 8(b), (c) and (f).
BUILDING AND CONSTRUCTION - Builder's claim against building surveyor, architect and fire engineer for failure to exercise reasonable care in accordance with consultancy agreements - Whether owners' claim before VCAT apportionable under Wrongs Act 1958 pt IVAA - Whether builder a concurrent wrongdoer in respect of the consultants for purposes of proportionate liability - Whether builder failed to take reasonable care in selecting and installing cladding - Whether Tribunal failed to consider aspects of the case against the builder alleging failure to take reasonable care - Whether open to contend on application for leave to appeal that Building Act 1993 s 16 imposed a non-delegable duty of care upon the builder with respect to property damage and economic loss - Whether owners' claim against builder was one 'arising from a failure to take reasonable care' - Whether owners' claim properly characterised as one apportionable claim against all the respondents to the primary proceeding.
BUILDING AND CONSTRUCTION - Whether on the proper construction of the relevant specification the builder was permitted or directed to select and install ACPs which did not comply with the Building Act 1993 and the Building Code of Australia ('BCA') - Use of ACP 'indicative to Alucobond' - Whether Tribunal erred in finding architect negligent in respect of its inspection and approval of ACP sample - Whether reasonably open to Tribunal to find owners' loss included an increase in insurance premiums - Whether Tribunal erred in its construction of BCA cl C1.12(f) - Meaning of 'laminate' in relevant provision of the BCA.
PROFESSIONAL NEGLIGENCE - Whether building surveyor acted as a member of a profession and in accordance with peer professional opinion - Whether the Tribunal erred in its conclusions with respect to the relevant peer professional opinion having regard to Wrongs Act 1958 s 59(2) - Whether by issuing the stage 7 building permit the building surveyor made a representation to the builder that was misleading and deceptive.
CAUSATION - Whether the building surveyor's failure to identify and remedy omissions in the description of proposed cladding in the fifth fire engineering report was causative of loss - Whether counter-factual hypothesised to establish causation of loss as a result of building surveyor's negligence with respect to the fifth fire engineering report was inconsistent with findings of Tribunal as a whole.
APPORTIONMENT - Allocation of responsibility between building surveyor, architect, fire engineer and smoker who started fire - Whether Tribunal failed to consider the degree of departure by the building surveyor from the relevant standard of care in making apportionment findings.
BUILDING AND CONSTRUCTION - Leave to appeal refused with respect to proposed grounds of appeal advanced on behalf of the fire engineer and architect - Leave to appeal granted with respect to proposed ground 3 of the building surveyor's proposed grounds of appeal concerning the Tribunal's findings with respect to causation of loss consequent upon negligence with respect to the fifth fire engineering report - Leave to appeal otherwise refused with respect to the further grounds advanced by the building surveyor - Appeal allowed with respect to proposed ground 3 of the building surveyor's proposed grounds of appeal - Domestic Building Contracts Act 1995 s 8 - Building Act 1993 s 16 - Building Code of Australia cl C1.12(f) - Victorian Civil and Administrative Tribunal Act 1998 s 148 - Wrongs Act 1958 pt IV AA, ss 24AE-24AI, 59 - Toomey v Scolaro's Concrete Constructions Pty Ltd [No 2] [2001] VSC 279 considered - Selig v Wealthsure Pty Ltd [2015] HCA 18; (2015) 255 CLR 661 applied - Hunt & Hunt v Mitchell Morgan Nominees Pty Ltd [2013] HCA 10; (2013) 247 CLR 613 applied - Brookfield Multiplex Ltd v Owners - Strata Plan No 61288 [2014] HCA 36; (2014) 254 CLR 185 considered - Reinhold v NSW Lotteries Corporation [No 2] [2008] NSWSC 187; (2008) 82 NSWLR 762 considered - Dartberg Pty Ltd v Wealthcare Financial Planning Pty Ltd [2007] FCA 1216; (2007) 164 FCR 450 considered - Godfrey Spowers (Vic) Pty Ltd v Lincolne Scott Australia Pty Ltd [2008] VSCA 208; (2008) 21 VR 84 considered - Perpetual Trustee Company Limited v CTC Group Pty Ltd [No 2] [2013] NSWCA 58 considered - Permanent Custodians Ltd v Geagea (No 4) [2016] NSWSC 934 considered - Bolitho v City and Hackney Health Authority [1997] UKHL 46; [1998] AC 232 considered - Jones v South Tyneside Health Authority [2001] EWCA Civ 1701 considered.
1 Shortly before 2:23 am on 24 November 2014, a fire broke out on the balcony of apartment 805 of the 21 storey Lacrosse apartment tower in Latrobe Street, Docklands. The source of the ignition of the fire was an incompletely extinguished cigarette butt left in a plastic container by a person staying in the apartment, Jean-François Gubitta. The plastic container was sitting on a table with a timber top on the balcony of the apartment. The fire spread from the plastic container to the table and then to the nearby external cladding of the building.
2 The cladding to which the fire spread was constructed with an aluminium composite panel ('ACP') known as Alucobest, which contained a polyethylene core. Alucobest ACPs had been installed as the external panel cladding on the eastern and western facades of the building.
3 At 2:23 am, a smoke detector in the hallway just outside the front door of the apartment activated and generated an automatic alarm to the Metropolitan Fire Brigade ('MFB'). When the first fire crew arrived on the scene at 2:29 am, the fire was travelling rapidly up the cladding and spreading onto the balcony on each level. Six minutes later, the fire had reached the roof of the building.
4 The damage to the Lacrosse building, caused by the fire, was extensive. Additionally, there was substantial internal property damage. The claimed losses from the fire exceeded $12 million.
5 In March 2016, proceedings were commenced in the Victorian Civil and Administrative Tribunal ('VCAT') in relation to the damage caused by the fire. As ultimately constituted, the proceeding involved 211 applicants, comprising owners' corporations and the owners of individual apartments in the building ('the Owners'). At issue in the proceeding was the attribution of responsibility to, and among, eight respondents in the proceeding for the damage caused by the fire and for the replacement cost of cladding which had not been damaged but was now recognised to constitute a significant fire hazard. The eight respondents were:
6 The proceeding was heard over five weeks in September and October 2019, by Judge Woodward, sitting in VCAT as a Vice President of the Tribunal. Only the first five respondents took part in the hearing. They were each separately represented, except for the second and third respondents who were jointly represented.
7 The claims at trial were divided into the Owners' claims against LU Simon and the other respondents ('the Owners' claim'), and LU Simon's claims against the other respondents ('LU Simon's claim').
8 On 28 February 2019, the Tribunal delivered reasons for judgment on the Owners' claim and LU Simon's claim.[1] In broad terms, the Tribunal upheld the Owners' claim against LU Simon, holding that LU Simon had breached warranties concerning the suitability of materials, compliance with the law and fitness for purpose implied into its Design and Construct Contract ('the D&C Contract') and was therefore primarily liable to pay damages to the Owners.
9 Each of Gardner Group, Elenberg Fraser and Thomas Nicolas (who, for convenience, we will refer collectively to as 'the consultants') were found to have breached consultancy agreements to which they were parties with LU Simon, by failing to exercise due care and skill in the provision of their services. Additionally, the Tribunal found that Mr Gubitta breached a duty of care he owed the Owners by failing to ensure that his cigarette was fully extinguished before leaving it in the plastic container.
10 The failure to exercise reasonable care by each of the consultants and Mr Gubitta was held to be a cause of 'the harm to LU Simon resulting in its breach of the D&C Contract within the meaning of s 51 of the Wrongs Act 1958'. Moreover, the Tribunal concluded that each of the consultants and Mr Gubitta were concurrent wrongdoers within the meaning of s 24AH of that Act.
11 Having made those findings, the Tribunal then determined that the damages payable by LU Simon to the Owners were to be apportioned between the consultants and Mr Gubitta pursuant to pt IVAA of the Wrongs Act in the following proportions:
The Tribunal then determined that, because Mr Gubitta had not taken part in the proceeding and no party had sought judgment against him, there would be no order directly affecting Mr Gubitta. Thus, the effect of the Tribunal's apportionment was that LU Simon would not be reimbursed for 3 per cent of the damages it was liable to pay to the Owners.
12 On 7 March and 1 April 2019, the Tribunal made orders giving effect to the Reasons it had published on 28 February 2019.
13 In separate applications, each of Gardner Group, Elenberg Fraser and Thomas Nicolas now seek leave to appeal from the Tribunal's orders. In the final versions of the three applications there are some 25 proposed grounds of appeal, although there is some overlap between the applications in relation to some of the grounds. Prior to the hearing of the applications, the parties were required to identify the issues they contended were raised by the proposed grounds of appeal and written cases. The parties identified 11 issues that required resolution.[2] The issues are:
14 For the reasons set out below, we have concluded that none of the challenges to the Tribunal's Reasons which are raised by these issues have any real prospect of success save for the question raised by issue 10.
15 Before turning to the issues in detail, it is necessary to say something more about the background facts and the Tribunal's Reasons.
16 The Lacrosse project commenced in 2007. In April of that year, Gardner Group was engaged by the developer to provide regulatory advice and building surveying services. In around October 2008, Mr Galanos was appointed the relevant building surveyor for the project. Gardner Group entered into a formal consultancy agreement in January or February 2010 ('the Gardner Group Agreement'). On 13 May 2010, it gave notice to the Melbourne City Council, under s 80 of the Building Act 1993, of its appointment as the relevant building surveyor.
17 In June 2010, the Gardner Group Agreement was novated to LU Simon. Gardner Group was contracted by LU Simon to ensure that the design and materials used in the construction of the building complied with the BCA.
18 In June 2007, Elenberg Fraser was appointed as the architect for the project. It was initially retained by the developer, having entered into a client and architect agreement dated 12 June 2007. In August 2010, this agreement was novated to LU Simon ('the Elenberg Fraser Agreement').
19 Elenberg Fraser designed the external walls of the proposed building. In what was known as the T2 Specification, and in the relevant architectural drawings, the use of aluminium composite panels, 'Composite metal panel wall and soffit cladding system indicative to Alucobond manufactured by Alucobond Australia Pty Ltd', was specified ('the ACP Specification'). The ACP Specification applied to the external walls of the eastern and western facades of the building, including the relevant wall of the balcony of apartment 805.
20 In August 2007, Thomas Nicolas was first engaged to provide fire safety engineering services. It was subsequently engaged by the developer during 2010 to provide fire safety engineering services, which included preparing a fire engineering report for the building. It signed a consulting agreement in July 2010 ('the Thomas Nicolas Agreement'), which was novated to LU Simon at about the same time.
21 The design of the building proceeded between 2007 and 2010, with the use of ACP to the eastern and western facades first being proposed by Elenberg Fraser in late 2007. The drawings prepared for town planning approval referred to 'lightweight wall infill' which later became ACPs in the architectural design.
22 Early in the design phase of the project, Thomas Nicolas prepared the fire engineering design brief. Later, between 2008 and 2010, it prepared a number of fire engineering reports for the building.
23 Early in the design phase, Con Nicolas, as the principal of Thomas Nicolas, became aware that the design of the eastern and western facades of the building included ACPs. The Tribunal inferred that Mr Nicolas was aware of the proposed use of the ACPs from about March or April 2008 at the latest. The various fire engineering reports prepared by Thomas Nicolas did not address the presence of combustible ACPs in the design of the building.
24 There was no evidence that any of the design team raised any questions or concerns at any time about the fact that none of the various iterations of the fire engineering reports referred to infill wall panels or otherwise referenced the ACPs proposed for use on the eastern and western facades of the building.
25 On 17 April 2008, Elenberg Fraser issued the T2 Specification. The T2 Specification formed part of the design for the Stage 7 Building Permit issued on 2 June 2011. The T2 Specification was also incorporated into the D&C Contract executed in May 2010. At the time the T2 Specification was issued, the term 'superintendent' referred to Elenberg Fraser.
26 As we have already noted, the T2 Specification included details for the ACPs - 'Composite metal panel wall and soffit cladding system indicative to Alucobond manufactured by Alucobond Australia Pty Ltd'. The expression 'indicative to' was defined in cl 1.4 of the General Requirements to mean:
Where used in relation to a manufacturer and/or product reference, this shall demonstrate the level of quality required. The Contractor shall ensure that all products meet the aesthetic and performance requirements specified before commenced on site.
27 Elenberg Fraser's obligations under the Elenberg Fraser Agreement included inspecting and approving samples as required in the architectural specification. Clause 4.4 of Section 01-001 headed 'General Requirements of the T2 Specification' set out how samples were to be reviewed by the superintendent (Elenberg Fraser).
28 Section 04-203 of the T2 Specification headed 'Metal Roof and Wall Cladding' provided that all elements were required to be non-combustible, or not easily ignitable, with low flame spread characteristics, and that they would not produce excessive quantities of smoke or toxic gases.
29 Clause 5.14 of Section 01-100 General Requirements specified the 'Fire Protection' for the building which included:
30 Clause 6.9 of Section 01-100 General Requirements provided:
31 Callum Fraser, a director of Elenberg Fraser, gave evidence at the Tribunal that the T2 Specification encompassed Alucobond, which contained a 100 per cent polyethylene core.
32 The tender for the design and construction of the Lacrosse project closed on 16 May 2008. However, the project then stalled. In 2009, the Lacrosse project was split into two stages with the east tower to be built in Stage 1 and the west tower to be constructed in Stage 2. On 17 September 2009, LU Simon submitted a tender for Stage 1.
33 On 14 May 2010, LU Simon executed the D&C Contract with the then developer, 675 La Trobe Street Pty Ltd. The D&C Contract nominated PDS as the superintendent. PDS was retained by the developer to provide project management and superintendent services for the project.
34 The largest stage of the construction works was Stage 7. On 15 April 2011, LU Simon applied for the Stage 7 Building Permit. On 5 May 2011, Gardner Group issued a Regulatory Review which raised no issue concerning the proposed use of ACPs. On 18 May 2011, Thomas Nicolas prepared the fifth iteration of its Fire Engineering Report ('the Fifth FER'). The Fifth FER did not identify the proposed use of ACPs on the external facade of the Lacrosse building or raise an issue in this regard. The Fifth FER was used in support of a building regulation 309 application to the MFB in respect of the project.[9]
35 On 24 May 2011, LU Simon provided Elenberg Fraser with a sample of the Alucobest ACP it proposed to install on the external eastern and western facades of the building, together with a letter and its sample submission form.
36 On 24 May 2011, David Palmer of Elenberg Fraser, sent an email to George Vasilakis of LU Simon. The subject line of the email was, 'Alucobest Sample'. The email provided:
George, Confirming receipt of the Alucobest sample.
The colour of the sample is acceptable. Could you please confirm that the Alucobest composite panel meets the warranty and other requirements of the specification. Pending this information we confirm that the 4mm sample is acceptable. Once I receive it I will return the completed samples submission form. I will bring the sample along to the meeting tomorrow morning along with the façade screen acid etched sample.
37 Later that day, Mr Palmer received a response from Mr Vasilakis, which stated, 'David, Just received Alucobest's Warranty terms which are 15 years in accordance with the specs and Head Contract.' This email confirmed to Mr Palmer that the Alucobest ACPs met the warranty and other requirements of the T2 Specification.
38 On the same day, Mr Palmer signed a sample submission form and an architect's advice which approved the Alucobest sample and stated 'confirming 15 year warranty in line with spec - as advised'. Minutes of a design development meeting on 25 May 2011 recorded that Elenberg Fraser had signed off on the sample of the Alucobest ACP for the building. Mr Galanos, Gardner Group and Thomas Nicolas were not aware that Mr Palmer had approved the sample of Alucobest.
39 On about 1 June 2011, LU Simon ordered 4708.28m² of Alucobest ACPs_._ On 2 June 2011, Gardner Group issued the Stage 7 Building Permit, signed by Mr Galanos. At the time, Mr Galanos knew that he was giving approval for LU Simon to construct the building using ACPs with a polyethylene core as part of the external walls of the building.
40 The building was constructed during 2011 and 2012. Between 18 May 2012 (when Mr Galanos received the application for an occupancy permit) and 14 June 2012 (being the date the occupancy permit was issued), Gardner Group carried out its final inspections of the project as constructed. Mr Galanos undertook the final inspection on 13 June 2012 and issued the occupancy permit on 14 June 2012.
41 As we have already said, the fire occurred in the early hours of 24 November 2014.
42 As we have already noted, the trial at VCAT was divided into the Owners' claim and LU Simon's claim. In the Owners' claim, the Tribunal found against LU Simon, holding that it breached warranties implied into the D&C Contract by ss 8(b), (c) and (f) of the Domestic Building Contracts Act 1995 ('the DBC Act'). Section 8 relevantly provided:
The following warranties about the work to be carried out under a domestic building contract are part of every domestic building contract -
(b) the builder warrants that all materials to be supplied by the builder for use in the work will be good and suitable for the purpose for which they are used, and that, unless otherwise stated in the contract, those materials will be new;
(c) the builder warrants that the work will be carried out in accordance with, and will comply with, all laws and legal requirements including, without limiting the generality of this warranty, the Building Act 1993 and the regulations made under that Act;
...
(f) if the contract states the particular purpose for which the work is required, or the result which the building owner wishes the work to be achieved, so as to show that the building owner relies on the builder's skill and judgment, the builder warrants that the work and any material used in carrying out the work will be reasonably fit for that purpose or will be of such a nature and quality that they might reasonably be expected to achieve that result.
43 The Tribunal found, however, that LU Simon did not fail to exercise reasonable care in the construction of the building by installing the ACPs on its eastern and western facades. As a result, the Tribunal held that the Owners' claims against LU Simon were not apportionable, and LU Simon was liable for the full amount of the Owners' loss and damage caused by the fire. In consequence of this finding, the Tribunal did not go on to consider what were described as secondary or contingent claims against the other respondents (or relevantly, for present purposes, the consultants and Mr Gubitta). We will return to this aspect of the Tribunal's findings below when considering issues 1 to 3.
44 At the commencement of his Reasons, Vice President Woodward said that 'for convenience' references in his Reasons to Gardner Group would include Mr Galanos, unless the context suggested otherwise.[10] Thus, Mr Galanos and Gardner Group were, by and large, dealt with together under the name 'Gardner Group'. The Tribunal held that Gardner Group breached the Gardner Group Agreement by failing to exercise due care and skill in:
45 The Tribunal rejected Gardner Group's defence that it was not negligent because it had acted in a manner that was widely accepted in Australia, by a significant number of respected practitioners in its field, as competent professional practice in the circumstances.[11] The Tribunal concluded that peer professional opinion, supportive of Gardner Group's defence to the claim of negligence against it, was unreasonable.[12]
46 With respect to Elenberg Fraser, the Tribunal concluded that it breached the Elenberg Fraser Agreement by failing to exercise due care and skill in:
47 With respect to Thomas Nicolas, the Tribunal concluded that it breached the Thomas Nicolas Agreement by failing to exercise due care and skill in:
48 The Tribunal held that aspects of the conduct of each of Gardner Group and Thomas Nicolas giving rise to the breaches of duty identified, also constituted the making of representations to LU Simon that were misleading and deceptive in contravention of the Australian Consumer Law.
49 In relation to Mr Gubitta, the Tribunal concluded that he breached a duty of care he owed to the Owners to take care in the disposal of his smouldering cigarette, and to ensure that it was fully extinguished before leaving it in the plastic container. The Tribunal went on to say, however, that it agreed with a submission made on behalf of the Owners that the extent of Mr Gubitta's responsibility for the loss and damage was 'minimal'.
50 In relation to the remaining respondents (Gyeyoung Kim and PDS) the Tribunal concluded that the evidence did not support any finding being made against them.
51 The Tribunal held that the failure to exercise reasonable care by each of Gardner Group, Elenberg Fraser, Thomas Nicolas and Mr Gubitta was a cause of the harm to LU Simon resulting in its breach of the D&C Contract within the meaning of s 51 of the Wrongs Act, and that each was a concurrent wrongdoer within the meaning of s 24AH of that Act. The Tribunal held that the damages that LU Simon was obliged to pay the Owners for its breaches of the D&C Contract, all arose naturally according to the usual course from the breach of the various consultancy agreements or were within the reasonable contemplation of the parties to those agreements. The Tribunal then apportioned the damages payable by LU Simon to the Owners in the proportions to which we have already referred (Gardner Group, 33 per cent; Elenberg Fraser, 25 per cent; Thomas Nicolas, 39 per cent; and Mr Gubitta, 3 per cent).
52 Thus, the ultimate result at first instance was that LU Simon was required to pay the Owners damages in full and thereafter be indemnified by Gardner Group, Elenberg Fraser and Thomas Nicolas for 97 per cent of those damages (LU Simon being unable to obtain a reimbursement from Mr Gubitta because no party sought judgment against him).
Issue 1-3: Were the Owners' claims against the respondents apportionable under pt IVAA of the Wrongs Act 1958****? Was LU Simon a concurrent wrongdoer in respect of the consultants for the purposes of s 24AH of the Wrongs Act****? Did LU Simon fail to take reasonable care?
53 The arguments advanced by the parties in relation to issues 1 to 3 were interrelated. It is therefore appropriate to deal with these issues together. The submissions in support of the proposed grounds of appeal covered by these issues were advanced primarily by counsel for Thomas Nicolas and counsel for Elenberg Fraser. Broadly speaking, Thomas Nicolas advanced the following contentions:
(1) The Tribunal erred in failing to consider the claim made against LU Simon that it failed to take reasonable care in selecting Alucobest as the product to be used as external cladding. That claim (which Thomas Nicolas contends was not considered by the Tribunal) was a claim that LU Simon failed to take reasonable care in identifying, checking and confirming that the material it chose (Alucobest) was compliant with the BCA, and the obligations imposed on LU Simon by s 16 of the Building Act.
(2) The Tribunal erred in not considering LU Simon's defence that the claim against it was apportionable within the meaning of pt IVAA of the Wrongs Act.
(3) The Tribunal failed to apply the correct test and/or misapplied the correct test under pt IVAA in determining whether the Owners' claim against LU Simon was apportionable.
(4) The Tribunal erred in concluding that the Owners' claim against LU Simon was not apportionable.
54 In its written case in this Court, Thomas Nicolas appeared to contend that it was not open on the evidence for the Tribunal to conclude that there was no want of reasonable care on the part of LU Simon. In oral argument, however, counsel for Thomas Nicolas eschewed any such argument and said that its principal complaint was that the Tribunal failed to deal with an important aspect of the case alleging a lack of reasonable care against LU Simon (being the matter referred to in sub-paragraph (1) above), and if that complaint was made out, then the decision of the Tribunal had to be set aside and the matter remitted to the Tribunal for further hearing and determination.
55 In oral argument, counsel for Elenberg Fraser also made submissions that the Tribunal erred in its failure to determine that claims made by the Owners were apportionable. Like Thomas Nicolas, Elenberg Fraser also contended that the Tribunal erred in arriving at its conclusion that LU Simon had not failed to take reasonable care. The arguments advanced by Elenberg Fraser, however, were not the same as those advanced by Thomas Nicolas.
56 Elenberg Fraser contended that, at VCAT, each of the Owners made one apportionable claim against all of the respondents. That claim, in the broad or considered against LU Simon separately, was submitted to be apportionable irrespective of whether LU Simon failed to take reasonable care. Elenberg Fraser contended that the Tribunal should have commenced its analysis by identifying the damage or loss that was the subject of the Owners' claims, and then asked if there was a person other than LU Simon whose acts or omissions also caused that loss or damage. If the loss or damage claimed arose from a failure to take reasonable care by any of the persons identified, then, so it was contended, the whole of the Owners' claims, against all of those found to have been a cause of the loss and damage, were apportionable.
57 In relation to the Tribunal's failure to conclude that there was a want of reasonable care on the part of LU Simon, counsel for Elenberg Fraser, like counsel for Thomas Nicolas, eschewed any complaint that it was not open to the Tribunal to reject such a finding against LU Simon. Elenberg Fraser's complaint on this issue, again like the complaint of Thomas Nicolas, was confined to a contention that the Tribunal failed to deal with part of the case advanced against LU Simon at trial. Specifically, Elenberg Fraser submitted that the Tribunal failed to consider the question of LU Simon's selection of Alucobest in the context of its responsibilities as a builder. Elenberg Fraser submitted that there was a case in negligence advanced against LU Simon at trial that even if the T2 Specification permitted LU Simon to select Alucobest, as a builder, LU Simon was negligent because it selected a product that did not comply with the BCA. As it was put by counsel for Elenberg Fraser:
We say the judge [Tribunal] considered the question of the builder's selection, or rather the specification of this material in the design, in the context of a designer but not in the context of the responsibilities of a builder.
58 Gardner Group did not advance any submissions of its own in relation to the issue of a lack of reasonable care on the part of LU Simon or the issues concerning apportionability under pt IVAA of the Wrongs Act, although in its written case in this Court it adopted some of the submissions made by Thomas Nicolas on the issue of apportionability.
59 In light of the way the arguments were put by Thomas Nicolas, it is appropriate to commence the analysis of the present issues with a consideration of issue 3, the question of whether there was any error by the Tribunal in failing to find that there was a want of care on the part of LU Simon.
Did the Tribunal fail to consider part of the case against LU Simon?
60 As we have already observed, the complaints made in this Court about the Tribunal's failure to find that there was a want of reasonable care by LU Simon are confined to contentions that the judge did not deal with the whole of the case advanced against LU Simon. In the event that any of these complaints are upheld, the parties submit that it will be necessary to remit the proceeding to the Tribunal so that the entirety of the claim against LU Simon can be fully determined.
61 Plainly, the question of whether the Tribunal failed to determine some aspect of the case against LU Simon falls to be resolved by a consideration of the Tribunal's Reasons. Before dealing with the relevant parts of the Reasons however, it is necessary to deal with a question of fact.
62 At trial, there were issues raised about LU Simon's possible selection of Alucobond in accordance with the T2 Specification, and its actual selection of Alucobest as being 'indicative to Alucobond'. That is, first there was a question of whether or not LU Simon could or should have been held to have been negligent if it in fact selected Alucobond, notwithstanding the T2 Specification; and secondly, there was a question of whether LU Simon was in fact negligent in selecting Alucobest and not Alucobond.
63 The issue of whether LU Simon's selection of Alucobest over Alucobond was a cause of the fire or its spread was the subject of a joint report prepared by the expert fire engineers whose evidence was tendered at trial. Ultimately, all of the relevant experts agreed that the selection of Alucobest over Alucobond did not contribute to the spread of the fire.
64 Before we refer to the relevant parts of the Tribunal's Reasons, we wish to make the following preliminary observations. First, the Tribunal's Reasons are of an exceptionally high quality. Secondly, the clarity with which, and the detail in which, the Reasons are expressed has made our task of dealing with the present applications considerably easier than it might otherwise have been. And for that we are indebted to the Vice President. We move now to the specifics of the Tribunal's Reasons.
65 After setting out matters of background, the Tribunal turned to the relevant contracts entered into by each of LU Simon and the consultants. The Tribunal observed that these contracts were 'pivotal in ascribing liability for the various claims in the proceeding'.[14] The Tribunal next observed that 'despite this (or perhaps because of this) each of Elenberg Fraser and Thomas Nicolas sought to deflect attention from their respective Consultant Agreements'.[15] Having made these observations, over the next 36 paragraphs of its Reasons, the Tribunal described the salient features of the various contracts.[16]
66 With reference to the Elenberg Fraser Agreement, the Tribunal noted that the agreement provided that Elenberg Fraser was 'responsible for the proper coordination and integration of the work of all the other consultants' and was required to 'inspect the works during construction for compliance with ... all legislative requirements ...'.[17]
67 The Tribunal dealt with the issue of whether LU Simon's choice of Alucobest over Alucobond was in any way causally relevant. In conformity with the expert evidence of the fire engineers to which we have already referred, the judge found that the choice of Alucobest over Alucobond was not causally relevant,[18] saying that, 'the relevant necessary condition for the ignition of the Alucobest panels and the subsequent spread of the fire, was the installation of an ACP with a 100 per cent polyethylene core, not the choice of the Alucobest product over Alucobond PE (as it came to be known)'.[19] After further discussion, the judge then said:
I have concluded above that the relevant necessary condition for the ignition of the Alucobest panels and subsequent spread of the fire was the installation of an ACP with a 100% polyethylene core, not the choice of the Alucobest product over Alucobond PE. On the submissions of Gardner Group, that still leaves the question whether the choice of Alucobond with the 100% polyethylene core over another product in the Alucobond range (namely Alucobond Plus or Alucobond A2) was a necessary condition for the ignition of the ACP on the balcony of apartment 805 or for the spread of the fire beyond that balcony.[20]
68 Next, so far as is relevant to the present issues, the Tribunal dealt with a submission made by Gardner Group about the existence of unsealed penetrations in the Alucobest panels and the issue of whether this 'contributed negatively to the extent of the spread of the fire'.[21] The Tribunal referred in detail to the evidence relevant to this issue, before concluding that it was not satisfied that the penetrations in the Alucobest panels contributed to the fire spreading more rapidly than it would otherwise have done.[22]
69 After analysing a number of other issues, the Tribunal turned to the question of whether LU Simon had failed to take reasonable care. The Tribunal first observed that the elements of the claims against LU Simon for failing to take reasonable care were 'somewhat elusive on the pleadings'.[23] The Tribunal then identified the claims made against LU Simon in closing submissions as being:
No party in this Court sought to cavil with the Tribunal's identification of the claims that had been made against LU Simon at trial.
70 Thomas Nicolas submitted in this Court that it is what the Tribunal said next which is critical, and which demonstrates that the Tribunal did not deal with part of the case advanced against LU Simon. The Tribunal said:
I have found above that the choice of the Alucobest product over Alucobond PE (as it came to be known) was not a necessary condition for the ignition of the Alucobest panels. And in my discussion of the claims against Elenberg Fraser below, I have dismissed the argument that LU Simon was obliged by the D&C Contract (including the T2 Specification) to select a non-combustible ACP notwithstanding the specification of an ACP 'indicative to Alucobond'. Thus, in simple terms, I am satisfied that LU Simon's selection of Alucobest ACP's as 'indicative to Alucobond' did not cause the fire or fire spread. It is therefore unnecessary for me to consider the anterior question of whether LU Simon failed to exercise reasonable care in the process of selection of the Alucobest ACPs.
The question whether LU Simon's installation of non-compliant ACP's was a failure to exercise reasonable care, is less straightforward.[25]
71 Thomas Nicolas submitted that the Tribunal's use of the word 'installation' in the second last line of the extract above shows that the Tribunal excluded from its consideration the wider case against LU Simon that it was negligent in selecting an Alucobond product with a polyethylene core.
72 After identifying the relevant issues so far as the claims against LU Simon were concerned, the Tribunal set out the various submissions of the parties as follows:
Gardner Group submits that LU Simon was the principal contractor with control over the Lacrosse project. Its obligations were contained within a D&C Contract and it was obliged under s 16 of the Building Act to construct buildings that comply with the building permit and which comply with the Building Act, Building Regulations and the BCA. It continues:
Section 16 makes it apparent that a builder does not discharge its obligations merely by building a building in accordance with a building permit (in other words, merely by relying on the work of the [relevant building surveyor]). The builder is independently fixed with liability, pursuant to an offence provision, to construct buildings that comply with the BCA. If liability is established against Gardner Group and Mr Galanos for permitting the use of an ACP containing a 100% polyethylene core on the external façade of the Lacrosse building, then LU Simon must be fixed with liability in respect to the same wrongful conduct.
Similarly, Elenberg Fraser submits that:
As a tier 1 or close to tier one builder, LU Simon is expected to know the material aspects of the BCA relevant to its construction obligations [citing the evidence of the expert building surveyors]. Under the D&C Contract, LU Simon was required to manage the design process and procure the permit to construct and under the T2 Specification it was required to select a compliant design/product. When LU Simon selected the material it ought to have known that ACPs, and in particular the PE core, were combustible ... [Mr Moschoyiannis][[26]] may well have relied on the consultants to advise him to the contrary, but he was negligent as a builder not to undertake a more detailed investigation of the materials and design.
Thomas Nicolas' submissions refer primarily to matters relating to the selection of Alucobest, but observe that:
It seems curious that Mr Moschoyiannis claimed to be knowledgeable about PE in the context of HDPE, yet claimed he didn't know it was a plastic, or combustible when discussing Alucobond (PE). Accordingly, his evidence of his knowledge of PE-cored ACPs must be treated with caution.
After referring to evidence of Mr Moschoyiannis that he did not know that there was any risk with an ACP because 'it's protected by aluminium laminate covers', Thomas Nicolas also observe that: 'Implicit in this answer is that Mr Moschoyiannis knew that PE posed a fire risk in Alucobond (PE) panels and that from reading the Alucobond brochure, the risk of fire of the PE was protected by the aluminium laminate covers'.
Unsurprisingly, the Owners argue against a finding that LU Simon failed to take reasonable care. Such a finding would open up the possibility of LU Simon being entitled to a reduction in its liability to the Owners as a 'concurrent wrongdoer' within the meaning of Part IVAA of the Wrongs Act. The Owners submit that: 'the evidence in this case does not suggest any failure to take reasonable care on LU Simon's part'. They argue:
The installation of the Alucobest panels at Lacrosse resulted from a deliberate decision to use those panels for the external cladding. The fact that they did not meet the statutory warranties given by LU Simon, because they were not compliant or fit for purpose, does not of itself constitute a lack of reasonable care. To find that the choice of Alucobest was a failure to take reasonable care would be effectively to open the doors to such an argument in almost every case; as a decision that is subsequently found to be incorrect could almost always be constructively treated as if the decision-maker, by making the wrong choice, had failed to exercise reasonable care.
Dealing first with Thomas Nicolas' submission urging caution in considering Mr Moschoyiannis' evidence, that evidence was summarised in LU Simon's submissions as follows:
Like many other people, Mr Moschoyiannis did not know that polyethylene was a flammable material. Further, Mr Moschoyiannis had seen aluminium composite panels being used in the industry since he graduated from University in the 1980s and had no reason to be concerned about their use. Mr Moschoyiannis was, like so many others in the industry, misinformed by the material which Alucobond published at that time. See also the Alucobond brochure 'Alucobond - 40 years of excellence - From a Pioneer to the Synonym'. Similar comforting statements were made in the Alucobest brochure ..., where in addition to reference to various ASTM test results, it is stated that Alucobest has 'Outstanding characteristics of fireproofing' next to an image of a flaming match.[27]
73 The Tribunal accepted LU Simon's summary of Mr Moschoyiannis' evidence, saying it accepted that evidence as truthful.[28]
74 The Tribunal then said that LU Simon's construction of the Lacrosse building using non-compliant ACPs was clearly an error - which error had given rise to a breach of warranty by LU Simon under the DBC Act.[29] The Tribunal then stated that while LU Simon's breach of warranty rendered it liable to compensate the Owners, it was trite that not every error was negligent.[30]
75 The Tribunal held that despite any breach of its obligations to comply with the BCA, LU Simon had not been shown to have failed to take reasonable care. We summarise the Tribunal's reasons for this conclusion[31] as follows:
(1) LU Simon was unaware of the fire risks associated with ACPs.
(2) LU Simon acted in furtherance of its obligations under the D&C Contract.
(3) In using combustible ACPs, LU Simon relied upon Elenberg Fraser, Gardner Group and Thomas Nicolas to ensure compliance with the BCA.
(4) LU Simon was not responsible for including ACPs into the design.
(5) LU Simon had no role in the inclusion of the words 'indicative to Alucobond' in the T2 Specification.
(6) Given that LU Simon was unaware that the installation of the ACPs in accordance with the D&C Contract posed a fire risk and failed to comply with the BCA, the obvious course for a builder to take in 2010 and 2011 was to use a product that was 'indicative to Alucobond'.
(7) LU Simon sought and obtained approval for the use of Alucobest from Elenberg Fraser.
(8) Compliance with the BCA in respect of both the design and proposed construction of the building was the responsibility of the building surveyor, especially when assessing whether to issue a building permit.
(9) Gardner Group issued the Stage 7 Building Permit, giving approval for LU Simon to construct the building using ACPs with a polyethylene core as part of the external walls.
(10) The failure of Thomas Nicolas to identify any issue with the use of aluminium composite panels was critical. Mr Moschoyiannis' evidence was that 'silence or absence of an alternative solution in the fire engineering report indicate[d] compliance on a deemed-to-satisfy basis'.
(11) There was no evidence that any of LU Simon's conduct in installing ACPs as required under the D&C Contract and as approved by the Stage 7 Building Permit, involved a failure to take reasonable care. Moreover, there was no expert evidence from any party to the effect that LU Simon did not act reasonably or in accordance with what would be expected of a reasonably competent builder in the circumstances of the case.
(12) While LU Simon bore frontline responsibility to the developer and owner:
for a large and complex project, it has sought to cover acknowledged shortcomings in its own expertise by engaging highly skilled professionals to (in a variety of different ways) direct and supervise its work.[32]
76 With respect to the Tribunal's twelfth point, the Tribunal elaborated by saying:
That is not to say, of course, that a substantial commercial builder like LU Simon is inoculated against a finding of negligence, so long as it can show that it complied with the specifications and instructions given by other building professionals. Clearly its expertise and experience is such that there will be many instances where it would be reasonable to expect it to identify errors by another building professional. The case law is replete with examples of this. But where (as here) the skill involved is beyond that which can be expected of a reasonably competent builder and there is no actual relevant knowledge, I consider that LU Simon's relationship with each of the other building professionals is analogous to that between a developer and a building professional. In Berryman v Hames Sharley (WA) Pty Ltd,[33] Hasluck J rejected the architect's allegation of contributory negligence, finding that the client developer was dependent on the architect's professional skills.[34]
77 The submission that the Tribunal failed to consider an aspect of the case alleged against LU Simon in respect of its alleged failure to take reasonable care is without substance. Thomas Nicolas' submission that the Tribunal's Reasons at [295] show that the Tribunal limited its consideration of the issue to one of installation, without reference to selection, is totally without merit. On any fair reading of the Reasons, the reference at [295] to 'installation of non-compliant ACPs' plainly included LU Simon's selection of those ACPs. The point is made more stark when one remembers that the only claim against LU Simon in relation to the actual installation of the ACPs had already been rejected by the Tribunal earlier in its Reasons.[35]
78 Further, the Tribunal's recitation of the various submissions made by the consultants on the issue of LU Simon's exercise of reasonable care discloses that the Tribunal's reasons for not being satisfied that LU Simon had in fact failed to exercise reasonable care were responsive to the cases that were actually made against LU Simon at trial. If there was any doubt about this, such doubt is eradicated when one notes that the Tribunal had already said that, putting the choice of Alucobest over Alucobond to one side, that still left 'the question whether the choice of Alucobond ... was a necessary condition for the ignition of the ACP'.[36]
79 Similarly, we are unpersuaded by the submissions of Elenberg Fraser that the Tribunal somehow considered the selection process engaged in by LU Simon 'in the context of a designer but not in the context of the responsibilities of a builder'. To the contrary, the Tribunal's Reasons which we have already summarised show that the issue of LU Simon's selection of the ACPs was one that the Tribunal considered in the wider context - taking into account the terms of the D&C Contract and the terms of the consultants' agreements.
80 It remains under this heading for us to deal with the submission (advanced by Thomas Nicolas, and supported by Elenberg Fraser) that 'the judge erred in finding that LU Simon was not a concurrent wrongdoer and/or contributorily negligent', in circumstances where s 16 of the Building Act imposed a statutory duty on LU Simon, which statutory duty was 'non-delegable, due to the personal nature of the obligation'.
81 Having regard to these submissions, it is necessary to set out the terms of s 16 of the Building Act. That section provided:
(1) A person must not carry out building work unless a building permit in respect of the work has been issued and is in force under this Act and the work is carried out in accordance with this Act, the building regulations and the permit.
Penalty: 500 penalty units, in the case of a natural person.
2,500 penalty units, in the case of a body corporate.
(2) Subsection (1) does not apply to building work exempted by or under this Act or the regulations.
82 In support of the submission that s 16 imposed a statutory duty on LU Simon, Thomas Nicolas placed reliance upon the decision of Eames J in Toomey v Scolaro's Concrete Constructions Pty Ltd [No 2].[37] In support of the submission that this statutory duty was 'non-delegable, due to the personal nature of the obligation', reference was made to the High Court's decisions of New South Wales v Lepore[38] and Leichhardt Municipal Council v Montgomery.[39]
83 The submission that s 16 of the Building Act imposed a non-delegable duty on LU Simon should be rejected, as should the submission that the Tribunal somehow erred in failing to have proper regard to the existence of that alleged non-delegable duty.
84 First, contrary to Thomas Nicolas' submission, Toomey is not authority for the proposition that s 16 of the Building Act imposes a statutory duty on a builder. Toomey was a case involving a claim for damages by a seriously injured plaintiff who fell from stairs or a landing at a block of apartments. One of the issues in the case was whether cl D2.16 of the BCA (provisions that required balustrades to be provided in certain circumstances, and which specified certain minimum characteristics of such balustrades) created an enforceable statutory duty, breach of which would sound in damages. While the reasons of Eames J contain a detailed consideration of that issue,[40] his Honour was not called upon to determine, and did not determine, whether s 16 of the Building Act imposed any statutory duty on any party.[41] Nor did he consider a duty of care with respect to damage to property and pure economic loss.
85 Secondly, insofar as it is contended in this Court that the Tribunal failed to deal with this issue in its Reasons, we would observe that Thomas Nicolas' submissions at trial in relation to s 16 of the Building Act were limited to a contention that s 16 of the Building Act required LU Simon to carry out work in accordance with the T2 Specification; a submission that the section required LU Simon to comply with the BCA; and a submission that LU Simon was required to satisfy itself that it was constructing the facade in compliance with the BCA. While Toomey was footnoted in Thomas Nicolas' written closing submissions at first instance, no submission was made to the Tribunal of the kind now made in this Court.
86 If Thomas Nicolas, or any other applicant for leave to appeal, wished to contend that s 16 of the Building Act imposed a non-delegable statutory duty on LU Simon actionable by way of a claim for damages in respect of damage to property and pure economic loss, this should have occurred before the Tribunal. No such contention was, however, made at first instance.
87 Moreover, any such contention would need to have been supported by argument, with reference to relevant authorities, additional to Lepore and Leichhardt MC, such as Sovar v Henry Lane Pty Ltd,[42] Byrne v Australian Airlines Limited,[43] Brodie v Singleton Shire Council[44] and AS v Minister for Immigration and Border Protection.[45] No such argument was advanced by any of the applicants for leave to appeal, either at first instance or in this Court.
88 In our view, the Tribunal dealt appropriately with the submissions made to it concerning s 16 of the Building Act. There can be no doubt that the Tribunal concluded that LU Simon breached s 16 of the Building Act. So much is made plain by the Tribunal's conclusion that LU Simon breached the warranty implied by s 8(c) of the DBC Act,[46] and the Tribunal's identification of the claims made against LU Simon as including LU Simon's failure to ensure that the ACPs complied with the BCA, 'which failure gave rise to a breach by LU Simon of s 16 of the Building Act'.[47] Having identified these matters, the Tribunal made further reference to the way in which the consultants put the s 16 issue at trial,[48] before giving its reasons for rejecting the consultants' contentions.[49]
89 Noting that there was no argument of the kind now put made to the Tribunal, and no real argument in this Court beyond little more than mere assertion, we do not think it appropriate to conduct a detailed analysis of the issues now sought to be argued. Whilst this Court retains a discretion to permit a new ground to be raised upon an appeal of this type, it is not in the interests of justice to do so in the present case.[50] The parties joined issue on a particular basis after a lengthy hearing and should be held to the grounds raised before the Tribunal.
90 That said, we would take leave to doubt that s 16 of the Building Act imposes a statutory duty, breach of which sounds in damages, or that any such duty is non-delegable, either generally, or in the circumstances of this case. Telling against the proposition that s 16 creates a right of action is the fact that s 16 contains its own remedy for a breach of the section (the penalty provisions), and the fact that it is difficult to say that the section exists to protect a limited class of people. As was said by Lord Browne-Wilkinson in X v Bedfordshire County Council:
There is no general rule by reference to which it can be decided whether a statute does create such a right of action but there are a number of indicators. If the statute provides no other remedy for its breach and the Parliamentary intention to protect a limited class is shown, that indicates that there may be a private right of action since otherwise there is no method of securing the protection the statute was intended to confer. If the statute does provide some other means of enforcing the duty that will normally indicate that the statutory right was intended to be enforceable by those means and not by a private right of action ... .[51]
91 In any event, it follows from what we have said above that those proposed grounds of appeal in which it is contended that the Tribunal erred in its treatment of, or conclusion about, whether LU Simon failed to take reasonable care must be rejected.
Did the Tribunal err in relation to the issue of apportionability?
92 As we have already observed, the Tribunal found that LU Simon breached warranties implied into the D&C Contract by ss 8(b), (c) and (f) of the DBC Act. It also found that each of the consultants and Mr Gubitta failed to exercise reasonable care and that these failures were a cause of loss to LU Simon. Having determined these issues, the Tribunal turned to the question of proportionate liability and said:
In considering these issues, my task is made easier by my findings above that LU Simon's breaches of the warranties implied by the DBC Act did not arise from a failure to take reasonable care, but that the breaches by each of Gardner Group, Elenberg Fraser and Thomas Nicolas of the Consultant Agreements, did so arise. I have also found that the claim against Mr Gubitta arises from a failure to take reasonable care. As discussed above, I am therefore largely spared the complex and uncertain analysis admirably engaged in by the learned author of a recent article in the Building and Construction Law Journal.[52] I am also spared consideration of the arguments arising from the various claims against LU Simon and the Owners alleging contributory negligence. Those claims are defeated by my findings that neither of these parties failed to exercise reasonable care.[53]
93 While the Owners' claims against LU Simon were originally pleaded more widely than those pursued at trial, the Owners' claim against LU Simon at trial related only to the breaches of warranties to which we have referred. Before the Tribunal, no claim was made by the Owners against LU Simon that LU Simon failed to take reasonable care.
94 Having found for the Owners against LU Simon on the only claims made by them against LU Simon, the Tribunal then proceeded on the basis that those claims were not apportionable within the meaning of pt IVAA of the Wrongs Act. It did so because the breach of warranty claims which it upheld did not 'aris[e] from a failure to take reasonable care'[54] by LU Simon. The Tribunal then proceeded to determine LU Simon's claims for contribution against the consultants (and Mr Gubitta) - all of which claims were apportionable within the meaning of pt IVAA.
95 In its defence at first instance, LU Simon denied any liability for the Owners' claims against it. In the alternative, it pleaded that each of the consultants and Mr Gubitta[55] were liable as a result of their respective failures to take reasonable care, and that LU Simon (pursuant to the provisions of pt IVAA of the Wrongs Act) was only liable in an amount reflecting that proportion of the loss or damage claimed that the Court considered just, having regard to the extent of LU Simon's responsibility for the loss and damage.[56]
96 In this Court, Thomas Nicolas contended that, on the pleadings, the Tribunal was bound to consider the whole of LU Simon's defence. Thus, it was submitted, that in respect of the claims made by the Owners against LU Simon and the other respondents to the primary proceeding (relevantly for present purposes, the consultants and Mr Gubitta), the Tribunal erred in failing to determine those claims in their entirety, and then in failing to apportion liability for the Owners' claims amongst LU Simon and the other respondents who had been found liable.
97 These submissions are without merit. They ignore the way in which the proceeding was conducted at first instance. The following matters are plain from the opening and closing submissions of the parties before the Tribunal:
(1) The Owners' primary claim was against LU Simon for breach of the warranties implied by ss 8(b), (c) and (f). While the Owners made alternative claims against the other respondents to the proceeding at first instance, (including the consultants and Mr Gubitta) those claims were secondary and contingent upon the Tribunal determining that the breach of warranty claims were apportionable. As was made clear by the Owners in their opening and closing submissions to the Tribunal, the Owners did not pursue any claim against any other respondent unless the Tribunal held that the breach of warranty claims were apportionable.
(2) No party (and specifically, none of the consultants) objected to the course taken by the Owners before the Tribunal. Moreover, after the Tribunal delivered its Reasons, and called for submissions in relation to the orders that should be made, no party (including the consultants) raised any argument against the Tribunal making an order on the Owners' claims against LU Simon for the amount of the Owners' claim - with the claims against the consultants and Mr Gubitta then being dismissed with no order as to costs.
98 There is simply no basis upon which it can be sensibly suggested that the Tribunal erred in law in not taking a course which no party contended it should have taken at first instance. The position is even more stark in this case because, far from asserting before the Tribunal that it should not take the course that it took, the consultants acquiesced to the course taken by failing to take any objection or make any submission to a contrary effect.
99 The Tribunal was empowered by s 53 of the DBC Act to make any order it considered fair to resolve the dispute before it. In the circumstances we have identified, the Tribunal acted fairly.
100 These conclusions are sufficient to dispose of Thomas Nicolas's submission that the Tribunal erred in not considering LU Simon's defence that the claim against it was apportionable within the meaning of pt IVAA of the Wrongs Act. Before proceeding to the remaining more fundamental issues agitated by Thomas Nicolas and Elenberg Fraser on the apportionability question, it is necessary to examine more closely the relevant provisions and operation of pt IVAA of the Wrongs Act.
Part IVAA of the Wrongs Act
101 Part IVAA of the Wrongs Act consists of ss 24AE to 24AS. The expression 'apportionable claim' is defined in s 24AE to mean, 'a claim to which this Part applies'. Section 24AF(1) then specifies the claims to which pt IVAA applies as follows:
(1) This Part applies to -
(a) a claim for economic loss or damage to property in an action for damages (whether in tort, in contract, under statute or otherwise) arising from a failure to take reasonable care; and
(b) a claim for damages for a contravention of section 18 of the Australian Consumer Law (Victoria).
102 Section 24AF(2) contemplates that a proceeding may involve two or more apportionable claims:
(2) If a proceeding involves 2 or more apportionable claims arising out of different causes of action, liability for the apportionable claims is to be determined in accordance with this Part as if the claims were a single claim.
103 Section 24AH(1) defines a concurrent wrongdoer as follows:
A concurrent wrongdoer, in relation to a claim, is a person who is one of two or more persons whose acts or omissions caused, independently of each other or jointly, the loss or damage that is the subject of the claim.
104 Section 24AI(1), then relevantly provides:
In any proceeding involving an apportionable claim -
(a) the liability of a defendant who is a concurrent wrongdoer in relation to that claim is limited to an amount reflecting that proportion of the loss or damage claimed that the court considers just having regard to the extent of the defendant's responsibility for the loss or damage;
105 Section 24AI(2) specifically contemplates that a proceeding may involve both an apportionable claim and a claim that is not apportionable.
107 The history and the essential purpose of the statutory scheme containing these provisions was addressed by the majority of the High Court[58] in Hunt & Hunt v Mitchell Morgan Nominees Pty Ltd, as follows:
The Davis Report was not mentioned in the Second Reading Speech or the Explanatory Notes to the Civil Liability Amendment (Personal Responsibility) Act 2002 (NSW), which introduced Pt 4 of the Civil Liability Act. This may be because some seven years had passed since the release of the Davis Report. In the Second Reading Speech it was suggested that the provisions were directed not only to problems regarding insurance but also, as the title to the amending Act suggested, to defining the limits which should be placed on personal responsibility. Nevertheless, there is a clear connection between the Davis Report and Pt 4 of the Civil Liability Act. In 1996, the Standing Committee of Attorneys-General released draft model provisions which reflected the recommendations of the Davis Report. The draft model provisions were eventually adopted, in substantially the same form, in Pt 4 of the Civil Liability Act in New South Wales and by the other States and Territories.
The evident purpose of Pt 4 is to give effect to a legislative policy that, in respect of certain claims such as those for economic loss or property damage, a defendant should be liable only to the extent of his or her responsibility. The court has the task of apportioning that responsibility where the defendant can show that he or she is a 'concurrent wrongdoer', which is to say that there are others whose acts or omissions can be said to have caused the damage the plaintiff claims, whether jointly with the defendant's acts or independently of them. If there are other wrongdoers they, together with the defendant, are all concurrent wrongdoers.
The purpose of Pt 4 is achieved by the limitation on a defendant's liability, effected by s 35(1)(b), which requires that the court award a plaintiff only the sum which represents the defendant's proportionate liability as determined by the court. For that purpose, it is not necessary that orders are able to be made against the other wrongdoers in the proceedings. Section 34(4) provides that it does not matter, for the purposes of Pt 4, that a concurrent wrongdoer is insolvent, is being wound up, has ceased to exist or has died. Thus under Pt 4 the risk of a failure to recover the whole of the claim is shifted to the plaintiff.[59]
108 When the majority in Hunt & Hunt observed that the draft model provisions released by the Standing Committee of Attorneys-General were eventually adopted in substantially the same form in pt IV of the Civil Liability Act 2002 (NSW) and by the other States and Territories, their Honours footnoted that observation with references to a number of legislative regimes, including pt IVAA of the Victorian Wrongs Act.
109 The definition of apportionable claim is directed to a particular class of claims. In order to meet the description of that class, the claim must be a claim which is sustained by findings of fact. It will not be sufficient to simply raise the claim by pleadings.[60]
It seems to me clear that a person will be a 'concurrent wrongdoer' only if the court makes findings about the existence of 'loss or damage' and about which acts or omissions 'caused' the loss or damage. It is only when those findings are made that it is possible to identify, as contemplated by s 34(2), each person whose acts or omissions, as found, 'caused' the 'loss or damage', as found. At that point, and not before, a person can be seen to be a 'concurrent wrongdoer'.
The relevant 'claim' - that is, the claim in relation to which the identified person is a 'concurrent wrongdoer' - can only be the claim in respect of which the findings concerning loss or damage and causation are made. That claim is, of necessity, a claim already litigated, not a pending or foreshadowed claim. Its nature and content (and, therefore, its status under s 34(1)) will be discoverable by looking at the findings that cause it to be determined as it is determined. If, on those findings, it is seen that the loss or damage (as established in 'an action for damages') arose from a failure to take reasonable care and did not arise out of personal injury, the case will be within s 34(1)(a); and if it is seen that there was a contravention of s 42 of the Fair Trading Act, the case will be within s 34(1)(b). In either such case, the already litigated 'claim' will be an 'apportionable claim' because of s 34(1) and, if, on the findings made, the acts or omissions of several persons 'caused' the 'damage or loss' as found, the persons will be 'concurrent wrongdoers'.
The need to know the outcome of the claim in order to apply Pt 4 is emphasised by s 34A. The operation of that section - and, therefore, the ambit of Pt 4 as a whole - depends on the ability to know, among other things, whether a person 'intended to cause' or 'fraudulently caused' the 'loss or damage ... that is the subject of the claim'. These things can be judged only after the loss or damage and its causes have been identified through a process of fact finding and analysis. Viewed in prospect and in its pending state, a claim might allege an intentional or fraudulent act or omission, but it is impossible to say, at that point, whether any loss or damage was caused and, if it was, what caused it - in particular, whether it was intentionally caused or fraudulently caused.
On this basis, the nature of a 'claim', for the purposes of Pt 4, will be determined by what the court has decided in the case, not by what might be prayed or pleaded in an initiating process or points of claim. In short, 'claim' refers to a claim as proved and established, not a claim as made or advanced.[62]
111 In so concluding, his Honour said that this approach accorded with that taken by Middleton J to pt IVAA of the Wrongs Act in Dartberg Pty Ltd v Wealthcare Financial Planning Pty Ltd.[63] Barrett J then said:
I respectfully agree [with Middleton J in Dartberg] that a claim may properly be regarded as one 'arising from a failure to take reasonable care' if, 'at the end of the trial', the evidence warrants a finding to that effect and regardless of the absence of 'any plea of negligence or a "failure to take reasonable care"'. The nature of the claim, for the purposes of Pt 4, is to be judged in the light of the findings made and is not determined by the words in which it is framed.[64]
112 Thomas Nicolas and Elenberg Fraser relied upon Reinhold and Dartberg to support arguments that the Owners' claims against LU Simon were apportionable. In our view, however, the plain meaning of the statutory provision requires a claim arising from a failure to take reasonable care. The claim in Hunt & Hunt exemplifies such a claim.
It is not disputed that Mitchell Morgan's claim against Hunt & Hunt is an 'apportionable claim' within the meaning of s 34(1)(a). The claim was based upon Hunt & Hunt's breach of an implied term of its retainer that it exercise proper skill, diligence and care. Section 34(1A) provides that there is a single apportionable claim in proceedings in respect of the same loss or damage even if the claim for the loss or damage is based on more than one cause of action, whether of the same or a different kind. There is no express limitation on the nature of the claim which might have been brought by the plaintiff against a concurrent wrongdoer, except the requirement of s 34(2) that the acts or omissions of all concurrent wrongdoers have caused the damage in question.[65]
113 The definition does not extend to a claim 'involving circumstances arising out of a failure to take reasonable care'. The claim itself must arise from a failure to take reasonable care. Such a construction is consistent with the purpose identified at [16] of Hunt & Hunt.
114 Moreover, despite the breadth of the observations of Barrett J in Reinhold, in Perpetual Trustee Company Limited v CTC Group Pty Ltd [No 2],[66] his Honour speaking as a member of the NSW Court of Appeal subsequently said:
It cannot be suggested (nor do I think it has been suggested in any decided case) that the nature or quality of a 'claim' is, for relevant purposes, to be determined solely by looking at the court's decision in relation to it. Nor is the nature or quality of a 'claim' to be determined solely by looking at the terms in which it is framed. Rather, it is a combination of the terms in which the claim is framed (or pleaded) and relevant findings of the court in relation to it that must be assessed in order to decide whether it is a claim 'in an action for damages . . . arising from a failure to take reasonable care' and has the other attributes of an 'apportionable claim' under s 34(1)(a).[67]
115 In our view, this passage makes it clear that the terms in which the claim is framed are the starting point for deciding whether the claim is of the kind referred to in s 24AF(1)(a) of the Wrongs Act.
116 In the same case (Perpetual Trustee), referring to Barrett J's decision in Reinhold (and other first instance decisions referred to in that case), Macfarlan JA observed:
Unless his Honour was simply saying that it is necessary to examine the court's findings to identify the cause, or causes, of action upon which the plaintiff succeeded, I cannot, with respect, agree with his Honour that the 'nature of the claim, for the purposes of Pt 4, is to be judged in the light of the findings made and is not determined by the words in which it is framed' ... In my view the application of Part 4 turns not on the facts that happen to be found but on the essential character of the plaintiff's successful cause of action. Subject to cases that are conducted without regard to the pleadings, if negligence is an essential element of that cause of action, it will have been pleaded in the Statement of Claim. If it is not, it will not have been pleaded. It would be curious indeed if, to attract Part 4 of the Act, the defendant pleaded and proved his or her own negligence when that was not alleged by the plaintiff. The text of s 34(1) does not, in my view, contemplate that occurring. The natural meaning of the words used indicates that a failure to take reasonable care must be part of, and therefore an element of, the plaintiff's successful cause of action.[68]
117 Notwithstanding what Barrett J said in Reinhold, it seems to us that his Honour's view (as expressed in Perpetual Trustee) is now that the terms in which the claim is framed are an essential determinant of whether a claim can be said to arise from a failure to take reasonable care. In our opinion, that is the correct approach.
118 The view that the nature of the claim itself is irrelevant to the question whether the claim is one 'arising from a failure to take reasonable care' has a series of anomalous consequences.
(1) It would enable a party strictly liable in contract to plead its own negligence as a partial defence to the claim.
(2) It would substantially deprive s 24AI(2) of operative effect.
(3) It would enable the primacy of contract in determining the allocation and extent of risk at common law in certain situations to be displaced. As to which see Brookfield Multiplex Ltd v Owners - Strata Plan No 61288.[69]
(4) It would subordinate statutory provisions supplementing the law of contract to a rule having the capacity to destroy their purpose. As was said by Crennan, Bell and Keane JJ in Brookfield:
Statutory provisions may supplement the common law of contract by providing for special protection to identified classes of purchasers on the ground, for example, that they may not be expected to be sufficiently astute to protect their own economic interests. Part 2C of the Home Building Act 1989 (NSW) is an example of such a statutory regime.
By enacting the scheme of statutory warranties, the legislature adopted a policy of consumer protection for those who acquire buildings as dwellings. To observe that the Home Building Act does not cover claims by purchasers of serviced apartments is not to assert that the Act contains an implied denial of the duty propounded by the respondent. Rather, it is to recognise that the legislature has made a policy choice to differentiate between consumers and investors in favour of the former. That is not the kind of policy choice with which courts responsible for the incremental development of the common law are familiar; and to the extent that deference to policy considerations of this kind might be seen to be the leitmotif of this Court's decision in Bryan v Maloney, the action taken by the New South Wales legislature served to relieve the pressure, in terms of policy, to expand the protection available to consumers.[70]
(5) In the context of the DBC Act which contains statutory provisions of this kind:
119 The starting point to the construction of the relevant provisions in pt IVAA is the terms in which those provisions are expressed. As the High Court has stated, the task of statutory construction must begin and end with a consideration of the statutory text.[71] The statutory text must be considered in its context, which includes the general purpose and policy of a provision.[72] We have already set out the relevant statutory text, and discussed its context and purpose.
120 Having considered the statutory text, in context, and having had regard to its purpose, we have concluded that the terms in which a claim is framed against a concurrent wrongdoer are an essential determinant of whether the claim can be said to arise from a failure to take reasonable care. In coming to this conclusion, by necessity, we reject the submissions made by Thomas Nicolas and Elenberg Fraser to the contrary for the reasons given above.
122 The same may be said in respect of aspects of the decision in Godfrey Spowers (Vic) Pty Ltd v Lincolne Scott Australia Pty Ltd.[76] Godfrey Spowers was concerned with the consequences of a settled claim in which the plaintiff had alleged breaches of duty falling within the description of 'arising from a failure to take reasonable care'. The Court held that the key to the operation of pt IVAA of the Wrongs Act was the finding of relevant facts and the entry of judgment.
123 In the course of his reasons for judgment, Ashley JA[77] expressed his agreement with Barrett J's conclusion in Reinhold,[78] that a claim may properly be regarded as one 'arising from a failure to take reasonable care' if at the end of the trial the evidence warrants a finding to that effect, and regardless of the absence of 'any plea of negligence or a failure to take reasonable care'.[79]
124 Notwithstanding the apparent breadth of these dicta, Godfrey Spowers is not authority for the proposition that a claim which does not itself arise from a failure to take reasonable care, can be transformed into an apportionable claim by a defendant establishing that the circumstances upon which the plaintiff relies arose out of a failure to take reasonable care.
125 In oral argument, counsel for Thomas Nicolas sought to rely on two articles (Graeme S Clarke QC, 'Proportionate Liability in Commercial Cases: Principles and Practice'[80] and Grant Lubofsky, 'A Contractual Path Around Proportionate Liability?'[81]), in support of his contentions that the Owners' claims against LU Simon were apportionable. It mattered not, so it was submitted, that failing to take reasonable care was not an element of the causes of action pleaded and proved against LU Simon.
126 Fairly read, neither article supports the contentions for which they were cited. In the Clarke article, in addition to referring to other cases not supportive of Thomas Nicolas' contentions, reference is made to a decision of Rothman J in Permanent Custodians Ltd v Geagea [No 4],[82] in which his Honour held that a claim for damages for breach of warranty of authority was not an apportionable claim because it was not a claim which arose from a failure to take reasonable care.
127 In the Lubofsky article, the author expressed the view that a claim for an indemnity or under a strict contractual warranty does not arise from a failure to take reasonable care using those words' ordinary meaning. The author explained his reasoning in this regard in terms with which we agree:
For causes of action in tort, a failure to take reasonable care is essential (if not sufficient) element of the cause of action. However, a failure to take reasonable care has no relevance at all to a contractual cause of action. It is not an element of that action, it need not be proved for the action to succeed, and nor is due care a defence. A failure to take care is, in fact, entirely irrelevant to liability under a contractual claim and damages awarded under it. A contractual claim cannot logically or semantically be said to therefore 'arise from' a failure to take care.[83]
128 It follows that the Tribunal made no error when it determined that the breach of warranty claims that it had upheld against LU Simon were not apportionable. At best, those claims involved circumstances arising out of failures to take reasonable care by the consultants and Mr Gubitta. The Owners' claims against LU Simon, however, did not themselves arise from any failure to take reasonable care.
129 It remains to deal with Elenberg Fraser's contention that each of the Owners made one apportionable claim against all of the respondents to the primary proceedings - and therefore the Owners' claims against LU Simon were apportionable.
130 Elenberg Fraser's argument was that a proper analysis of the apportionability issue commences with the identification of the loss or damage that is the subject of the claim.[84] The next step is to identify those persons whose acts or omissions caused that loss or damage.[85] The third step was then to identify whether the loss or damage claimed arose from a failure to take reasonable care by any of the persons identified as having committed an act or omission that caused that loss or damage. If the answer to that question was in the affirmative, then the whole of the claim for the relevant loss or damage was apportionable.
131 In making the submissions, Elenberg Fraser placed significant reliance upon a number of passages in Hunt & Hunt.[86] It was submitted that the reasoning in Hunt & Hunt supported the approach for which Elenberg Fraser contended.
132 In truth, insofar as Elenberg Fraser's submissions relied upon what the High Court said in Hunt & Hunt, those submissions involved a misreading of that decision. Hunt & Hunt was not a case which concerned whether a claim was or was not apportionable. It was a case about the identification of loss or damage for the purposes of the New South Wales equivalent of s 24AH(1) of the Wrongs Act.[87] As was pointed out by the majority in Hunt & Hunt,[88] it was not disputed in that case that the only relevant claim made in that proceeding was an apportionable claim.[89]
133 The first two steps of the analysis referred to by Elenberg Fraser (the identification of the loss or damage, followed by the identification of the persons whose acts or omissions caused that loss or damage) are steps to be performed in relation to 'a claim' (as required by s 24AH(1)) - which claim must be a claim to which pt IVAA applies (that is, an apportionable claim). So much is plain from the text of the relevant provisions.[90]
134 A fundamental flaw in Elenberg Fraser's contentions is that they require consideration of the question of who is a concurrent wrongdoer in respect of a claim, before considering whether the 'claim' is one to which pt IVAA applies. As the reasoning in Hunt & Hunt shows, the correct approach is to determine whether the 'claim' is apportionable, before then determining whether there are any concurrent wrongdoers in relation to that claim.
135 As we have already observed, pt IVAA of the Wrongs Act makes provision for cases involving two or more apportionable claims[91] and cases involving both an apportionable claim and a claim that is not an apportionable claim.[92] If Elenberg Fraser's submissions were to be accepted, these provisions would largely be deprived of any substantive operation. When one reads all of the provisions of pt IVAA in their context, it is plain that they operate so as to provide for multiple claims against multiple defendants in relation to the same loss and damage; and while some of those claims may be apportionable, there may be other claims which are not apportionable. Moreover, nothing in pt IVAA suggests that a claim that is not apportionable might be transformed into a claim that is apportionable by a party establishing that the circumstances upon which the claimant relies arose out of a failure to take reasonable care.
136 It follows from what we have said above that the application for leave to appeal with respect to those proposed grounds of appeal in which it is contended that the Tribunal erred in its treatment of the issue of apportionability must be rejected.
Issue 4: On the proper construction of the T2 Specification and Elenberg Fraser's drawings, was LU Simon directed and/or permitted to select the product Alucobest or any composite metal cladding product that was contrary to the Building Act 1993 and the Building Code of Australia****?
137 The Tribunal's determination that Elenberg Fraser breached its obligations to LU Simon under the Elenberg Fraser Agreement,[93] was in part based on its finding that Elenberg Fraser's design specified ACPs for the external walls of the Lacrosse building that failed to comply with the BCA. More particularly, the Tribunal found that the Alucobond Specification by its terms at least permitted, and on one view expressly prescribed, an ACP with a 100 per cent polyethylene core.[94]
138 Elenberg Fraser contends that the Tribunal erred in its construction of the T2 Specification.
139 As we have noted above, Elenberg Fraser issued the T2 Specification on 17 April 2008.
140 On 14 May 2010, LU Simon executed the D&C Contract with the developer and the T2 Specification was incorporated into the D&C Contract.
141 The structure of the T2 Specification is outlined in the opening clauses of 'Section 01-100 - General Requirements'. Divisions 1 and 8 provide general requirements applicable to the work sections in divs 2 to 7. The work sections of divs 2 to 7 provide specific requirements for individual trades or elements of the works.
142 Clause 1.1(B) of Section 01-100 reinforces LU Simon's obligation as the design and construct contractor stating:
This Specification is Descriptive (D): All sections when read with the Preliminary Design Drawings, indicate the visual intent of the Superintendent with which the Contractor must comply when undertaking the Design Documents. The design responsibility rests with the Contractor who will be responsible for completing the Design Documents, meeting any specified performance criteria and executing the work under the Contract.
143 Section 04-203 addresses metal roof and wall cladding. In relation to ACPs, cl 2.5 provides:
Composite metal panel wall and soffit cladding system indicative to Alucobond manufactured by Alucobond Australia Pty Ltd.
144 The expression 'indicative to' is defined in cl 1.4 of Section 01-100 as follows:
'Indicative to': Where used in relation to a manufacturer and/or product reference, this shall demonstrate the level of quality required. The Contractor shall ensure that all products meet the aesthetic and performance requirements specified before commencing on site.
145 Clause 7.12(A) of Section 01-100 addresses the requirements where proprietary products are specified and states:
Where proprietary products, systems or items are specified and/or included in the Works, ensure that the method of building, installing, handling, storage, protection, finishing, adjusting and preparation of substrates etc is strictly in accordance with the manufacturers' printed instructions and recommendations and that copies of all such documentation are supplied to the Superintendent prior to commencement of the work under the Contract. All such manufacturers' instructions and recommendations are deemed to be included in the Contract.
146 With respect to selecting products based on the T2 Specification, LU Simon's responsibilities under that document included the final selection of the product.[95]
147 The T2 Specification makes clear that the BCA, and other regulations and codes must be complied with stating:
All materials, components, equipment and workmanship shall comply with all Statutory Authority codes and regulations, Australian Standards, and any other regulations, rules or by-laws applicable to both the design and execution of the Works.[96]
148 Elenberg Fraser was appointed as architect acting as lead consultant for the project. It was initially retained by the developer, having entered into a client and architect agreement dated 12 June 2007. That agreement was novated to LU Simon on or about 4 August 2010.
149 It is relevant to the consideration of Elenberg Fraser's submissions to note that it had, by the Elenberg Fraser Agreement, agreed with LU Simon that it would, in summary and amongst other things:
150 The Tribunal found,[105] and it is undisputed, that the commercial intent of the Elenberg Fraser Agreement was to facilitate the ongoing involvement of Elenberg Fraser in, and its responsibility for, the design and the coordination of its implementation.
151 By its written case, Elenberg Fraser contended that cl 2.5 of the T2 Specification did not prescribe the use of an ACP with 100 per cent polyethylene core and submitted, in summary, that:
152 These submissions were refined during the hearing by senior counsel for Elenberg Fraser who did not dispute that the reference to Alucobond manufactured by Alucobond Australia Pty Ltd in the T2 Specification was a reference to an ACP with a polyethylene core. It is the position of Elenberg Fraser, as put by its senior counsel, that notwithstanding such a product is combustible and inappropriate for application to an external wall, the specification of it was not a failure to take care on the part of Elenberg Fraser. Further, and significantly in relation to the proposed ground of appeal underpinning this issue, it was for LU Simon, in the implementation of the T2 Specification, to select materials that complied with applicable legal requirements.
153 The same submission was made, albeit more expansively, to the Tribunal and was summarised in the Reasons as follows:
154 The D&C Contract, including the T2 Specification, is to be construed objectively, by reference to its text, context and purpose.[107]
155 The Tribunal found that a reference in the T2 Specification to Alucobond encompassed at least the product Alucobond with the 100 per cent polyethylene core.[108] This finding is not disputed by Elenberg Fraser.
156 Therefore, in our opinion, on a plain reading of the text of cl 2.5, with the definition of 'indicative to' in cl 1.4, a reasonable business person would have understood cl 2.5 to permit the selection of:
notwithstanding that such products may comprise a 100 per cent polyethylene core.
157 We reject Elenberg Fraser's submission that, as between it and LU Simon, it was for LU Simon to ensure the product selected by it complied with the BCA. Quite simply, Elenberg Fraser's reliance on the terms and conditions of the D&C Contract (including the T2 Specification) to make good that submission is misplaced. As found by the Tribunal:
There is no material issue of construction of the EF Consultant Agreement where the terms of the D&C Contract might form part of the relevant surrounding circumstances.[109]
158 To construe the T2 Specification as submitted by Elenberg Fraser would require us to ignore the obligations expressly imposed on Elenberg Fraser under the Elenberg Fraser Agreement and would have the unreasonable result of absolving Elenberg Fraser of its liability to LU Simon as a consequence of the contractual obligations owed by LU Simon to the developer.
ignore the clear terms of the Elenberg Fraser Agreement and the reality of Elenberg Fraser's ongoing role.[111]
160 We find no error in that reasoning. Leave to appeal with respect to the proposed ground of appeal raising this issue should be refused.
Issue 5: Did the Tribunal err in finding that Elenberg Fraser was negligent in respect of its inspection and approval of the Alucobest sample?
161 By its fifth proposed ground of appeal, Elenberg Fraser asserts that the Tribunal erred with respect to the proper interpretation of its obligation to inspect samples.
162 Annexure Part D to the Elenberg Fraser Agreement set out the scope of services to be provided by Elenberg Fraser and included an obligation, during the construction phase, to:
Inspect and approve samples as required in the architectural specification.[112]
('Sample Approval Obligation')
163 The reference to the architectural specification is a reference to the T2 Specification. That is not in dispute.
Samples will be reviewed for their visual characteristics only and where moving or operating elements are involved, the Superintendent shall be given the opportunity to review working samples.[113]
('T2 Sample Approval Method')
165 Under the T2 Specification, the obligation to inspect and approve samples is imposed on the superintendent. At the time it was drafted, Elenberg Fraser was the superintendent. This changed in May 2010 when PDS was appointed superintendent.
166 Elenberg Fraser submitted to the Tribunal that its obligation to inspect and approve samples pursuant to the Elenberg Fraser Agreement should be read as incorporating from the T2 Specification the qualification that they be reviewed for visual characteristics only and did not extend to approving a sample on the basis of its regulatory compliance.[114]
167 The Tribunal rejected Elenberg Fraser's submission[115] and found that:
Although the issue is not entirely free from doubt, the words 'as required in the architectural specification' in my view qualify 'samples' (that is, it is the samples identified in the architectural specification that must be inspected and approved). They do not import the method of review.
In this regard, Elenberg Fraser's inadequate assessment of the Alucobest sample gave rise to two distinct breaches of the EF Consultant Agreement. First, it breached the express provision for 'Services' in the construction phase requiring Elenberg Fraser to use due skill and care in inspecting and approving samples, and, based on my preferred construction above, not just for visual characteristics.
But even if I am wrong on that construction, in my view, Elenberg Fraser's approach to the sample approval was also a breach of its broader obligations as head design consultant. In particular, its approval of a sample of product without assessing it against this apparently important aspect of its design,[[116]] was a failure to coordinate its design intent into the final design. Put another way, the provision of the Alucobest sample to Elenberg Fraser for inspection presented it with a clear opportunity as head design consultant (regardless of Mr Fraser's allegation that it had been sidelined from other aspects of this role), to ensure that its design intent reflected in the Alucobond Specification, was fulfilled.
The evidence concerning the sample approval by Elenberg Fraser outlined above shows clearly that this opportunity was missed. Had Mr Palmer been aware of the importance to Mr Fraser of this element of the design, it is likely that he would have approached the sample approval request very differently. For example, he could at least have given notice that the information provided by LU Simon about the sample was 'ambiguous or inaccurate or is otherwise insufficient to enable [Elenberg Fraser] to carry out the Services'.[117]
169 By this proposed ground of appeal, Elenberg Fraser challenges the construction of the Sample Approval Obligation. The proper construction of that obligation is the legal question underpinning the first of the 'two distinct breaches' determined by the Tribunal to flow from Elenberg Fraser's 'inadequate assessment of the Alucobest sample'.
170 Significantly, Elenberg Fraser does not raise any ground of appeal in relation to the second of the two breaches, that is, the breach of its broader obligations as head design consultant. It leaves undisputed the findings underpinning that breach including that:
171 The proposed ground of appeal identified by Elenberg Fraser makes clear that its challenge is directed specifically to the construction of the Sample Approval Obligation. Further, at paragraph [64] of its amended written case it states:
The reasons in [456] seemed to find that there was an opportunity missed for the Architect to impose Mr Fraser's design intent on the selection process however, Mr Fraser's own design intent is irrelevant to the proper construction of the T2 Specification with respect to the approval of samples.
172 As a consequence, even if we found that the Tribunal erred in its construction of the Sample Approval Obligation, the Tribunal's ultimate conclusion that Elenberg Fraser breached its broader obligation as head design consultant as a result of its inadequate assessment of the Alucobond sample, remains unchallenged.
173 That said, we find no error in the Tribunal's construction of the Sample Approval Obligation.
174 By its amended application for leave to appeal, Elenberg Fraser identifies the proposed ground of appeal by reference to the proper interpretation of the Sample Approval Obligation.
175 By its amended written case it refers to the Sample Approval Obligation and the T2 Sample Approval Method and submits that:
Properly construed, the Architect's obligation to inspect samples as required in the T2 Specification is in reference to inspections to be undertaken by the Superintendent because there was no separate requirement under the Specification for an inspection by the Builder's architect. If the intention was to require the Architect to inspect and approve samples for something more than visual characteristic then the words 'in the Architectural specification' were redundant.
176 Oral submissions on this proposed ground were very limited and directed to the question of whether or not Elenberg Fraser had complied with the Sample Approval Obligation rather than the construction of it. Senior counsel referred, in a summary way, to the evidence of the sample inspection and approval undertaken by Mr Palmer on behalf of Elenberg Fraser. That evidence is referred to in the Tribunal's Reasons[121] and we have summarised it above.[122]
177 Against that background senior counsel submitted:
We received a sample of the material. There is no evidence to say that an inspection of the sample of the material would reveal anything about its properties, and then the second proposition that we raise with respect to that is that the question was asked by Mr Palmer. Mr Palmer asked the question, 'Had you satisfied the specifications?' And his Honour has found that although the response came only with respect to the warranty question his Honour still found that it was an answer to that other question. So we put the proposition what more could an architect have done ...
178 The written submissions in relation to the construction of the Sample Approval Obligation were not expanded upon during the hearing of the application for leave to appeal.
179 On a plain reading of the Sample Approval Obligation, an obligation to inspect and approve samples was imposed on Elenberg Fraser.
180 Elenberg Fraser then relies on the words 'as required in the architectural specification' to incorporate from the T2 Specification the qualification that samples be reviewed for visual characteristics only. It says that to do otherwise leaves those words no work to do. We do not agree. The T2 Specification does more than identify the scope of inspection. It also identifies the samples required to be provided. For example, and most relevantly, cl 1.6 of 'Section 04-203 - Metal Roof and Wall Cladding' provides that a sample of each type of wall and roof cladding is to be provided.
181 Therefore, the words 'as required in the architectural specification' operate to identify the samples to be inspected and approved by Elenberg Fraser and/or reference the scope of that obligation.
182 We find no error in the Tribunal's finding that the words 'as required in the architectural specification' qualify the samples that must be inspected and approved.
183 The issue remains whether the words 'as required in the architectural specification' also incorporate from the T2 Specification the qualification that samples be reviewed for visual characteristics only.
184 Having regard to the context of the Sample Approval Obligation we reject that proposition.
185 First, as found by the Tribunal, Elenberg Fraser had an ongoing role in implementing the T2 Specification. Included in that role was the express obligation to inspect the works during construction for compliance with the client brief, contract material and all legislative requirements applicable to the services, exercising the knowledge, skill and expertise of an appropriately experienced competent and qualified architect.
186 Secondly, the Sample Approval Obligation is imposed in the part of the detailed scope of services (set out in Annexure Part D of the Elenberg Fraser Agreement) applicable to the construction phase of the project. It is apparent that the obligations imposed on Elenberg Fraser in the scope of services generally, and that part in particular, are far broader than material aesthetics and extend to checking compliance with project architectural requirements and design intent. Specifically, Annexure Part D commences with a description of General Services to be provided and includes an obligation that:
The Architect is Head Design Consultant and is responsible for coordination of all design issues into the final design including, but not limited to, client briefing, building services (all disciplines), structural, heritage, interiors, acoustics, building surveyor, fire engineering, and landscaping, and shall also include the review of work by all other consultants and obtaining sign-off confirmation for each element of design from other design consultants.
187 And under the heading 'Construction Phase', 'Inspections':[123]
Regularly inspect the Project works (including off-site fabrication locations) during construction and observe critical tasks as they are executed to establish that the work is being constructed in compliance with the project architectural requirements, the design intent of all approved Project documents, samples and prototypes and to the specified quality and promptly furnish weekly inspection/defects status reports and a monthly certificate of compliance of Architectural intent as evidence of such compliance in a format approved by the Client.
Undertake inspections and report on products and prototype sections of work to confirm standard of finish, in accordance with or as set out in the Architectural specifications [T2 Specifications] and documents.
Inspect and approve samples as required in the architectural specification.
188 Conversely, there is no provision in the Elenberg Fraser Agreement which expressly limits Elenberg Fraser's role in relation to approving samples to a visual inspection of appearance.
189 Viewed against the architect's overall scope of responsibility it makes no commercial sense to construe the Sample Approval Obligation so as to:
190 Accordingly, we are not persuaded that the Tribunal erred in its construction of the Sample Approval Obligation. Moreover as we have indicated above, even if the Tribunal misconstrued the Sample Approval Obligation this would not vitiate the Tribunal's conclusion that Elenberg Fraser's approach to the sample approval was in breach of its broader obligation as head design consultant.
191 This proposed ground of appeal has no real prospect of success. Leave to appeal should be refused.
Issue 6: Was it reasonably open to the Tribunal to find that the Owners' loss included an increase in insurance premiums?
192 On 27 July 2018, the Owners' insurance broker, Mr Pappa, emailed Mr Dawson in relation to the increases in insurance premiums for the Lacrosse building since the incident in 2014. Mr Dawson is the chairperson of Owners Corporations No 1 and No 4.[124]
193 The email stated that the premiums had increased 'due to a variety of reasons' including, inter alia, cladding issues. It stated further that 'cladding at the property [had] accounted for approximately 80 per cent of the increases in premium from year to year'.
194 The Owners made a claim for increases in insurance premiums associated with the unburnt Alucobest cladding remaining on the Lacrosse building until the rectification works were complete. It was not disputed that there had been a significant increase in insurance premiums following the fire.
196 The Tribunal determined that the Owners' loss included an increase in insurance premiums and awarded $701,270.16 in compensation.[125]
therefore the Tribunal's acceptance of that evidence was an error of law as no reasonable tribunal could find the claim proved on the basis of the evidence adduced.
198 Section 148(1) of the Victorian Civil and Administrative Tribunal Act 1998 allows appeals on a question of law, including whether or not there is any evidence to support a finding of fact.[126] It does not however extend to a mere error of fact unless the Tribunal made a finding that was 'simply not open to it'.[127] For the most part, this requires 'that there was no evidence on the basis of which the Tribunal could reach that finding, not that there was some evidence tending to a different conclusion'.[128]
199 There was evidence before the Tribunal in support of the Owners' claim for an increase in insurance premiums. Specifically, in determining this claim the Tribunal had regard to the evidence of Mr Dawson (both in his witness statements and in oral evidence) and the email from Mr Pappa.[129]
200 The issue arises whether the Tribunal erred in having regard to that evidence.
201 The Tribunal is not bound by rules of evidence, may inform itself on any matter as it sees fit and enjoys a discretion to regulate its own procedure.[130]
202 The hearing before the Tribunal proceeded on the basis that any document referred to in the written or oral opening submissions, in a witness statement or put to a witness during oral evidence, would be treated as tendered unless the Tribunal otherwise ordered.[131] This put the onus on a party to object at the earliest opportunity. It is not contended that this procedure involved a lack of procedural fairness. Nor could it be.
203 The email from Mr Pappa was attached to the witness statement of Mr Dawson. While the Reasons of the Tribunal record that Elenberg Fraser submitted that the evidence of the insurance broker was insufficient proof, no objection was taken to the tender of that evidence. While it was open to Elenberg Fraser to take steps to secure the attendance of Mr Pappa for cross-examination and/or to lead evidence challenging the reasonableness of the conclusion that 80 per cent of the increase in premium was attributable to the cladding, it did not.
204 Having regard to the powers of the Tribunal noted above and to the fact that the relevant evidence was tendered without objection, we find that it was properly taken into account by the Tribunal and sufficient to support the Owners' claim for damages in respect of increase in insurance premiums.
205 This proposed ground of appeal has no real prospect of success. Leave to appeal should be refused.
Issue 7: Did the Tribunal err in its construction of cl C1.12(f) of the BCA?
206 Gardner Group was contracted by LU Simon to ensure that the design and materials used in the construction of the Lacrosse building complied with the BCA.
207 A key preliminary question identified in the Tribunal's Reasons is whether an ACP meeting the relevant contractual specification and proposed for use in June 2011 as a component of an external wall of a building of the type in issue met the requirements of the BCA.[132]
208 The answer to that question lies in the construction of a particular 'deemed to satisfy' ('DTS') provision of the BCA upon which Gardner Group relies. Before turning to the terms of the DTS provision, we note that there is no real dispute as to the principles of construction to be applied. The Tribunal accepted:[133]
The text, context and purpose of the provision to be interpreted ought to be taken into account in the ordinary [way], whilst recognising that what is to be interpreted is a technical document not drafted in the same way as acts of Parliament and is to be applied by those in the construction industry on a daily basis, and not ordinarily by lawyers.[134]
209 Further, as Lindsay J observed in The Owners - Strata Plan No 69312 v Rockdale City Council & Anor; Owners of SP 69312 v Allianz Aust Insurance[135] in respect of the position of the BCA under cognate New South Wales legislation:
First, the BCA is and was at all material times a publication of the Australian Building Codes Board rather than a form of subordinate legislation in its own right. Secondly, at all material times the BCA had express legislative recognition. Thirdly, regulations under the Environmental Planning and Assessment Act 1979 made within power have, at all material times, provided for 'the adoption and application' of the BCA.
...
Whatever side of the line it might be thought to fall on for the purposes of the definitions of 'instrument' and 'statutory rule' in the Interpretation Act, the task for the Court in these proceedings is to construe it as a formal document designed to define standards, for the promotion of public safety, in the construction of buildings.[136]
210 In Victoria at the time in issue, the BCA was relevantly adopted by, and formed part of, the Building Regulations 2006 by reason of building regulation 109, which was in turn authorised by s 109 of the Building Act 2006.
The goals of the BCA are to enable the achievement and maintenance of acceptable standards of structural sufficiency, safety (including safety from fire), health and amenity for the benefit of the community now and in the future.
These goals are required so that the BCA extends no further than is necessary in the public interest, is cost effective, easily understood, and is not needlessly onerous in its application.[137]
212 The structure adopted in the BCA is to set out:
213 As the introduction to the BCA states, the use of a performance format is intended 'to provide greater flexibility for the use of new and innovative building products, systems and designs'.[139]
214 The fire resistance provisions of the BCA require the external walls of buildings such as the Lacrosse building (being of type A construction) to be non-combustible in order to achieve the appropriate fire-resistance level ('FRL').[140]
215 'Non-combustible' as applied to a material means not deemed combustible as determined by the test in AS 1530.1. 'Non-combustible' as applied to construction or part of a building means constructed wholly of materials that are not deemed combustible.[141]
216 ACPs of the type installed on the Lacrosse building are combustible and would fail the test under AS 1530.1.
217 The requirement for the external walls of buildings of the relevant type gives effect to the following objective of pt C1 of the BCA which deals with 'Fire Resistance and Stability'.
C01
The Objective of this Section is to -
(a) safeguard people from illness or injury due to a fire in a building; and
(b) safeguard occupants from illness or injury while evacuating a building during a fire; and
(c) facilitate the activities of emergency services personnel; and
(d) avoid the spread of fire between buildings; and
(e) protect other property from physical damage caused by structural failure of a building as a result of fire
218 It further implements a series of functional statements and performance requirements including the following:
FUNCTIONAL STATEMENTS
CF1
A building is to be constructed to maintain structural stability during fire to -
(a) allow occupants time to evacuate safely; and
(b) allow for fire brigade intervention; and
(c) avoid damage to other property.
CF2
A building is to be provided with safeguards to prevent fire spread -
(a) so that occupants have time to evacuate safely without being overcome by the effects of fire; and
(b) to allow for fire brigade intervention; and
(c) to sole-occupancy units providing sleeping accommodation; and
Application:
CF2(c) only applies to a Class 2 or 3 building or Class 4 part.
(d) to adjoining fire compartments; and
(e) between buildings.[142]
PERFORMANCE REQUIREMENTS
...
CP2
(a) A building must have elements which will, to the degree necessary, avoid the spread of fire -
(i) to exits; and
(ii) to sole-occupancy units and public corridors; and
Application:
CP2(a)(ii) only applies to a Class 2 or 3 building or Class 4 part.
(iii) between buildings; and
(iv) in a building.
(b) Avoidance of the spread of fire referred to in (a) must be appropriate to -
(i) the function or use of the building; and
(ii) the fire load; and
(iii) the potential fire intensity; and
(iv) the fire hazard; and
(v) the number of storeys in the building; and
(vi) its proximity to other property, and
(vii) any active fire safety systems installed in the building; and
(viii) the size of any fire compartment; and
(ix) fire brigade intervention; and
(x) other elements they support; and
(xi) the evacuation time.[143]
219 Nonetheless, the BCA contemplates that the prescription for non-combustible walls to which we have referred may be modified by way of a building solution if either an alternative solution is justified in accordance with the BCA or specific DTS provisions are met. In particular, pt A0.7 provides that a building solution which complies with DTS provisions is deemed to comply with the relevant performance requirements.
220 Gardner Group contends that the ACPs installed on the facade of the building met the DTS provisions contained in cl C1.12(f) of the BCA which provides:
C1.12 Non-combustible materials
The following materials, though combustible or containing combustible fibres, may be used wherever a non-combustible material is required:
(a) Plasterboard.
(b) Perforated gypsum lath with a normal paper finish.
(c) Fibrous-plaster sheet.
(d) Fibre-reinforced cement sheeting.
(e) Pre-finished metal sheeting having a combustible surface finish not exceeding 1 mm thickness and where the Spread-of-Flame Index of the product is not greater than 0.
(f) Bonded laminated materials where -
(i) each laminate is non-combustible; and
(ii) each adhesive layer does not exceed 1 mm in thickness; and
(iii) the total thickness of the adhesive layers does not exceed 2 mm; and
(iv) the Spread-of-Flame Index and the Smoke-Developed Index of the laminated material as a whole does not exceed 0 and 3 respectively.
221 More particularly, in circumstances where it is agreed that the Alucobest ACPs comprised a bonded laminated material, Gardner Group submits that the word 'laminate' where used in cl C1.12(f)(i) does not include the polyethylene core of the ACPs utilised to clad the Lacrosse building and hence such core was not required to be non-combustible. If this construction of the clause is accepted, the ACP complied with the DTS provisions.
222 Evidence before the Tribunal described the ACP as comprising a layer of aluminium sheeting (treated externally with a fluoropolymer coating), a layer of adhesive, a low density polyethylene sheet, a further layer of adhesive and a further sheet of aluminium (again treated externally with a fluoropolymer coating). Gardner Group submitted that the word 'laminate' may have one of three meanings[144] and that, read in context, it must mean an external layer used to cover another material in the process of lamination (being the application of a protective layer to a material), rather than either a single bonded product comprised of layers bonded together, or a description of each of the layers of a bonded product containing multiple layers.
In my view, the phrase 'bonded laminated materials' describes materials that have been through a process of lamination. In that sense, the phrase is synonymous with Gardner Group's first definition of 'laminate' and the dictionary definitions to which it refers:
The Oxford Dictionary (relevantly) defines 'laminate', when used as a noun, as 'a laminated structure or material'. The Macquarie Dictionary defines 'laminate', when used as a noun, as 'a material made by bonding together, usually under pressure, two or more thin layers'.
The term 'laminate' clearly can be used (depending on context) to mean both the composite product and each of its layered parts. It is therefore unsurprising that the drafter of the provision would use a more comprehensive phrase for the composite product ('bonded laminated materials'), before turning to deal with its component parts (comprising the individual laminates and the bonding agent). Indeed, 'laminated' (the term found in both the chapeau and in clause C1.12(f)(iv), which also refers to the laminated whole) is defined by the Oxford Dictionary as follows:
Consisting of, arranged in, or furnished with laminae; formed or manufactured in a succession of layers of material, as some metallic objects, etc ... Now common as a designation of various manufactured materials made by lamination, as laminated glass, a material consisting of two outer layers of plate or sheet glass attached to an inner layer of transparent plastic; laminated plastic, a more or less rigid material made by bonding together, usu. by means of heat and pressure, layers of cloth, paper, or the like that have been impregnated or coated with a synthetic resin; laminated wood, layers of wood bonded together with the grain in adjacent layers parallel (in contrast to plywood); also laminated spring, a leaf spring.
And, for completeness, 'bond' is relevantly defined as follows:
... in Building: To bind or connect together (bricks, stones, or different parts of a structure) by making one overlap and hold to another, so as to give solidity to the whole; to hold or bind together by bond-stones, clamps, etc
Thus the process of lamination that results in a 'bonded laminated material' involves the binding or connecting together (relevantly, by an adhesive) of a succession (that is, two or more) of layers of one or more materials. Having identified the composite product in those terms, followed by the word 'where' (in the sense of 'in which'), I consider that the immediately following expression 'each laminate' can only refer to each of the bonded layers that together comprise the 'bonded laminated' whole.
It is true that the bonded laminated materials in issue in this case are ACPs that happen to comprise three successive layers (not two, four or more) and that the second or middle of those successive layers is a different material from the first and third. But to contend that these factors alter the character of the middle layer, so that it ceases to be a layer or laminate and becomes a 'core' within an otherwise 'bonded laminated material', to my mind defies both logic and common sense.
...
Read this way, laminate, laminae and layer are indeed interchangeable. Using 'laminate' is to my mind a logical choice, as the singular noun describing the [sic] each of the components that have been 'laminated' by being 'bonded' to form the 'bonded laminated material'. The term 'laminae' is obscure and not an obvious choice of the singular noun for inclusion in the BCA. And while using 'layer' might have left less room for debate, it does not follow that 'laminate' must therefore be construed to mean something different.[145]
224 We respectfully agree with the Tribunal's analysis, save that we prefer the view that 'layer' is deliberately used within requirements (ii) and (iii) of sub-cl (f) as a component of the phrase 'adhesive layer' and as distinct from the structural elements of the material comprising laminates which are bonded together to create the whole.
225 Similarly, the external fluoropolymer layer or any other paint layer would ordinarily be described as a layer and not a laminate.
227 The construction for which Gardner Group contends leads to the conclusion that the clause effectively regulates only the combustibility of the external laminates and the precise extent to which adhesive may be used as an element of the construction. It leaves open the possibility of further layers within the material which are themselves combustible.
228 The precise limitation of the extent of the use of adhesives would seem pointless in these circumstances. As the Tribunal observed:
Returning to C1.12(f), this sub-clause likewise deals with each of the components of the product and prescribes with precision the quantity of the combustible element (namely, the adhesive) that is permitted. Each adhesive layer must not exceed 1 mm in thickness and the total thickness of the adhesive layers must not exceed 2 mm. The clause says nothing about the thickness of 'each laminate', as these are required to be non-combustible. Like clause C1.12(e), it provides the additional prescription that the product as a whole must have a 'Spread-of Flame Index' not exceeding 0 and adds that it must also have a 'Smoke-Developed Index' not exceeding 3.
These provisions define with millimetre precision the thickness of elements such as surface finishes and adhesives that would otherwise offend the fundamental precept for avoiding fire spread (that is, non-combustibility). In my view, it is untenable to suggest in effect that the provisions would limit individual layers to no more than 1mm and (in the case of adhesives) to a maximum thickness of 2mm, and ignore entirely a highly combustible layer of polyethylene with a thickness (in the case of the range of Alucobond products available in 2010 with the Virgin PE core) anywhere between 3mm and 5mm.[148]
229 The same logic applies to the failure to control the combustibility of core materials more generally if Gardner Group's construction of the clause is correct.
230 In our view, the construction preferred by the Tribunal gives effect to:
(a) the plain meaning of the language of the provision when read as a whole;
(b) the underlying purpose of the section of the BCA containing this provision, which is to provide for effective fire safety in buildings of particular types;
(c) a construction which gives work to each element of the clause; and
(d) a construction which avoids the anomalous consequences of the alternative construction for which Gardner Group contends.
231 For completeness, we record the following matters with respect to subsidiary submissions agitated on behalf of Gardner Group:
(1) So to reason is not to construe the clause with hindsight bias by reference to historical events, but to address the text, context and purpose of the provision.
(2) The fact that a practitioners' textbook took a different view of the construction of the provisions at the time in issue is of little assistance.[149] Whilst we accept that practitioners' views might amplify the understanding of the product descriptions contained in sub-cls (a) to (d) of cl C1.12, we do not with respect see how they can materially assist the understanding of sub-cl (f).
(3) It is likewise wrong to postulate that sub-cl (f) was intended to embrace particular existing products and hypothesise its meaning by reference to such products.
(4) Similarly, evidence that at the time of the hearing before the Tribunal a change to the BCA provisions had been proposed does not assist in their construction. The change was put forward on the basis that the relevant provision had been misunderstood.
(5) Whilst we accept that caution must be exercised in displacing the ordinary meaning of words by reference to the concept of purpose,[150] in the present case the ordinary meaning of the words, as we read them, accords with the Tribunal's construction. Further, the BCA itself expressly states that it should be interpreted having regard to its purpose, both in its introduction and in the course of its substantive provisions. Clause A.06 of the BCA provides:
The Objectives and _Functional Statement_s may be used as an aide to interpretation.
232 Lastly, while the proper construction of cl C1.12(f) is a question of law, the meaning of both 'bonded laminated materials' and 'laminate' involves the application of ordinary English words to the facts of a particular case. In our view, it was plainly open to the Tribunal to reach the conclusion which it did with respect to the meaning of those words as applied to the facts of this case.
233 Accordingly, we would refuse the application for leave to appeal with respect to proposed ground 1 by Gardner Group which raises this issue.
Issue 8: Did the Tribunal err in its conclusion that the 'peer professional opinion' was 'unreasonable' for the purposes of s 59(2) of the Wrongs Act 1958****?
234 Section 59 of the Wrongs Act provides that in some circumstances a peer professional opinion constitutes a defence to a claim of negligence on the part of an individual practising a profession. Section 59 provides as follows:
Standard of care for professionals
(1) A professional is not negligent in providing a professional service if it is established that the professional acted in a manner that (at the time the service was provided) was widely accepted in Australia by a significant number of respected practitioners in the field (peer professional opinion) as competent professional practice in the circumstances.
(2) However, peer professional opinion cannot be relied on for the purposes of this section if the court determines that the opinion is unreasonable.
(3) The fact that there are differing peer professional opinions widely accepted in Australia by a significant number of respected practitioners in the field concerning a matter does not prevent any one or more (or all) of those opinions being relied on for the purposes of this section.
(4) Peer professional opinion does not have to be universally accepted to be considered widely accepted.
(5) If, under this section, a court determines peer professional opinion to be unreasonable, it must specify in writing the reasons for that determination.
(6) Subsection (5) does not apply if a jury determines the matter.
(a) that the practice of building surveying was a profession and the building surveyor acted in the course of providing a professional service;[151]
(b) the relevant 'manner' in which the building surveyor acted and which constituted 'professional practice' for the purpose of s 59 was:
the issuing of building permits for the use of ACPs such as Alucobond with a polyethylene core and with a certificate under AS1530.3 on external walls not having an FRL in high-rise buildings of type A construction, relying on BCA C1.12(f).[152]
(c) the practice was widely accepted in Australia by a significant number of respected practitioners in the field as competent professional practice in the circumstances.[153]
236 The Tribunal then went on to hold that the relevant practice was unreasonable within the meaning of s 59(2) of the Wrongs Act and in consequence Gardner Group could not rely upon s 59(1).[154] Gardner Group takes issue with this conclusion and with the process of reasoning leading to it on the basis that s 59(2) is directed to the peer professional opinion underlying the relevant practice and not to the practice itself.
237 There are three answers to Gardner Group's proposition.
238 First, 'peer professional opinion' is a term defined by s 59(1). It is constituted by the acceptance of the relevant practice by a significant number of respected practitioners in the field. It is this 'opinion' as defined that may be the subject of challenge pursuant to s 59(2). The 'opinion' which is in issue is the acceptance of the relevant practice not the underlying rationale for the practice. It may be that the practice is adopted without any coherent basis in an opinion in the latter sense. Thus, in the present case, the Tribunal recorded its general impression 'that otherwise experienced and diligent practitioners were beguiled by a longstanding and widespread (but flawed) practice into giving insufficient scrutiny to the rationale for that practice'.[155]
239 Secondly, whilst we accept that it was in strictness not correct to ask whether the relevant practice was unreasonable but rather s 59(2) required the Tribunal to ask whether the acceptance of that practice was unreasonable (ie whether the peer professional opinion as defined was unreasonable), nonetheless a fair reading of the Tribunal's Reasons demonstrates that it directly addressed this issue.
240 Thirdly, the Tribunal found that the relevant practice was unreasonable (and by necessary implication that its acceptance was unreasonable) in the sense that it lacked a logical basis. In so doing it in fact addressed the underlying opinion advanced on behalf of Gardner Group as the rationale for the relevant practice.
241 Before saying more about the Tribunal's reasoning with respect to the facts of this case, it is appropriate to turn our attention to the relevant concept of unreasonableness. The Tribunal referred to case law in the context of medical negligence forming the background to the Wrongs Act provisions. In Bolitho v City and Hackney Health Authority, Lord Browne-Wilkinson said of the character of the relevant professional opinion in the context of medical negligence:
The use of these adjectives - responsible, reasonable and respectable - all show that the court has to be satisfied that the exponents of the body of opinion relied upon can demonstrate that such opinion has a logical basis. In particular in cases involving, as they so often do, the weighing of risks against benefits, the judge before accepting a body of opinion as being responsible, reasonable or respectable, will need to be satisfied that, in forming their views, the experts have directed their minds to the question of comparative risks and benefits and have reached a defensible conclusion on the matter.[156]
242 We interpolate that in Jones v South Tyneside Health Authority, Walker LJ expressed the concept of a 'logical basis' supporting a 'defensible conclusion' as a 'rationally defensible basis'.[157] It is in this sense that the Tribunal examined whether the relevant practice had a logical basis.
243 The Tribunal further referred to the discussion of the irrationality proviso in s 50 of the Civil Liability Act 2002 (NSW) contained in the decision of Garling J in King v Western Sydney Local Health Network.[158] It noted that irrational peer professional opinion may be expected to be rare.
244 The word 'unreasonable' is broader than the term 'irrational' used in the New South Wales legislation. In our view, the question whether an opinion is unreasonable is ultimately a question of fact. It is obviously open to conclude that an opinion is unreasonable if it lacks a logical basis (in the sense of a rationally defensible basis) but the ultimate question is simply whether in all the circumstances of the case the opinion was unreasonable.
245 In the present case, the Tribunal concluded that the basis of the relevant practice did not withstand logical analysis. In so doing it addressed by necessary implication the question whether the acceptance of the relevant practice was unreasonable. The critical passage in the Tribunal's Reasons is as follows:
I have set out above how I consider C1.12(f) should be construed. I have also explained why, in my view, a building surveyor is in a good position to question the logic of the putative alternative construction and can generally be expected to take positive steps to clarify any uncertainty. I consider that the contrary position represented by the Relevant Practice is both irrational and unreasonable. There is no evidence of any of the experts, individually or collectively, subjecting the Relevant Practice to robust scrutiny of the kind discussed by Lord Browne-Wilkinson in Bolitho and, perhaps for this reason, it does not withstand logical analysis.
For the reasons discussed, it is not logical for a provision to so precisely prescribe the thickness of permitted combustible adhesive and completely ignore another equally combustible element that could be more than twice as thick. At an even more general level, it is not logical for a prescriptive exception to a blanket requirement for non-combustibility, to fail entirely to deal with a highly combustible element comprising at least 50% of the product.
The suggested explanation that this combustible element is addressed by C1.12(f)(iv) (the test under AS1530.3), is also not logical. As discussed above, if that test is sufficient to accommodate the potential combustibility of a polyethylene core and thus justify its omission from C1.12(f), why is it not also sufficient to accommodate the potential combustibility of the adhesive, which is also wholly encapsulated by the aluminium layers? As Mr Kip explained:
The - the other thing I would say, coming back to clause C1.12, is that the argument that we would have strict controls about glue thickness, but you could ignore the core - to me defies logic. It's common in the industry for what are called sandwich panels ... to be up to 250 mil thick. It's certainly very common to have 75 mil or 100 mil thick panels that are polystyrene or polyisocyanurate or polypropylene - all sorts, with a steel cladding system. And to say that because the steel is there - that steel will help that material pass any 1530 part 3 test - but to say that you can ignore a core of any dimension, but that the glue must be no more than one mil thick - to me defies common sense.
I have suggested above that consulting a fire engineer would have been a reasonable step for a building surveyor to take to confirm or test their reliance on C1.12(f) as a compliance pathway for ACPs. It is worth noting that, had they done so, the evidence is clear about the response they would have received. All of the fire engineers (including Mr Nicolas) considered that ACPs with a 100% polyethylene core did not meet the DTS provisions of the BCA. Even the expert architects disagreed with Mr Galanos and the Gardner Group Experts. Mr Quigley said: 'Well I would've considered [the polyethylene is] one of the laminates, very clearly. I mean you've got three materials all laminated together. It's the core, but it's one of the laminates'.
Gardner Group submits that I should reject any assertion that the opinion of the Gardner Group Experts and Mr Galanos is unreasonable by reason of 'at least' two factors. First, that there is no evidence that they knew ACPs were highly combustible, and it cannot be said that an opinion formed in ignorance of that fact was unreasonable. Second, reasonableness must be assessed in context and ACPs had been used in Australia on high rise buildings for 40 years without incident. Unsurprisingly given my observations above, I reject these submissions.
The evidence of the knowledge of the combustibility of polyethylene among the building surveyors was in fact mixed. Regardless, any failure to ascertain this most basic information about a substantial element of the material under scrutiny, serves to highlight a fundamental deficiency in the process by which the Relevant Practice developed. Similarly, as senior counsel for the Owners submitted, the widespread use of a product over many years without reported serious incident, is hardly a scientific or rational basis for regarding it as safe (citing asbestos as an illustration of this point). Further, as discussed above, the evidence internationally of fire hazards associated with ACPs was developing long before 2010. And concerns over their combustibility were being openly discussed in Australia by then, if not earlier. Even a casual enquiry of fire engineers at around this time is likely to have revealed these concerns.[159]
246 The second and third paragraphs quoted above directly address the logic of the opinion upon which Gardner Group seeks to rely. The balance of the passage quoted addresses the reasonableness of that opinion more generally.
247 The Tribunal concluded for the above reasons that it was satisfied that the relevant practice 'was unreasonable within the meaning of s 59(2) of the Wrongs Act.'[160] Whilst, as we have said, we accept that s 59(2) is directed to the question whether the acceptance of the relevant practice (being the 'peer professional opinion' as defined in s 59(1)) was unreasonable, it follows inexorably from the finding that the relevant practice was unreasonable and the reasons stated for this finding, that the acceptance of that practice was also unreasonable.
248 There is nothing in this proposed ground and the application for leave to appeal in respect of this ground should be refused.
Issue 9: By issuing the Stage 7 Building Permit did Gardner Group make a representation to LU Simon that was misleading and deceptive?
249 The application for leave to appeal by Gardner Group on ground 4 of its proposed notice of appeal which relates to this issue, is premised upon success with respect to either issue 7 or issue 8. For the reasons we have stated, leave to appeal should not be granted with respect to the proposed grounds of appeal turning on either of these issues. Accordingly, the application for leave to appeal with respect to proposed ground 4 should also be refused.
Issue 10: Was Gardner Group's failure to identify and remedy the omission in the Fifth FER causative of any loss?
250 The Fifth FER prepared by Thomas Nicolas did not describe the cladding system on the Lacrosse building in terms which identified the use of ACPs. The Fifth FER was significant because it formed the basis of an application to the MFB seeking approval pursuant to reg 309 of the Building Regulations 2006. The Tribunal described these documents as follows:
The Fifth FER
Mr Nicolas's witness statement confirms that Elenberg Fraser issued him with a set of architectural drawings by email on 26 August 2010, including a number of drawings 'that contained a materials legend noting that various parts of the façade were to be clad with "composite wall cladding - silver aluminium composite sheet"'. Mr Nicolas noted that on 13 September 2010, he attended a meeting with the MFB, along with representatives of LU Simon, Elenberg Fraser (including Mr Palmer), Gardner Group (Mr Galanos) and others to discuss the Regulation 309 application. He said that, at the meeting, the MFB raised a number of fire engineering issues that needed to be clarified in an updated fire engineering design report that would accompany the Regulation 309 application.
Thomas Nicolas's Fifth FER bears the date 'November 2010', although Mr Nicolas's evidence was that this was prepared 'between 6 and 9 December 2010'. It was circulated to the design team by email from Mr Nicolas dated 9 December 2010. This is the version of the FER that was used in support of the MFB Application, a draft of which was sent to the MFB on 9 December 2010.
MFB Application and MFB R309 Report
By a letter dated 22 February 2011, Thomas Nicolas wrote to the MFB attaching 'an application with respect to consent per Regulation 309 and Notification together with relevant architectural drawings'. Under the heading 'A. BUILDING DESCRIPTION' on the first page of the covering letter, Thomas Nicolas describes the general structure of the building as comprising 'suspended reinforced concrete floor slabs and reinforced concrete load bearing walls. Precast panel wall systems are proposed for external cladding systems'.
The walls were also incompletely described in the MFB handwritten application form which accompanied this letter. It is Mr Nicolas's handwriting. In this document, under 'Details of Construction' the 'Walls' is entered as 'CONC/MASONRY/DRY WALL'. There is no reference to ACPs.
On 29 March 2011, the MFB provided its 'Report of the Chief Officer pursuant to regulation 309 of the Building Regulations 2006' ('MFB R309 Report'). Mr Nicolas's incomplete description of the walls in the handwritten application was carried through into the first page of the report, which states: 'Construction consists of concrete floors, a combination of concrete, masonry and "dry wall" walls, and a concrete/metal roof'. And the incomplete description of the external cladding systems on the first page of the Thomas Nicolas covering letter of 22 February 2010 is repeated on the third page of the MFB R309 Report. On the other hand, the report attached a set of the current architectural drawings, which incorporated references to 'WP3 Wall Panel Type 3: Composite Panel Cladding' and 'V Composite Wall Cladding - Silver Aluminium Composite Sheet'.[161]
251 When considering whether Gardner Group's response to the Fifth FER was negligent, the Tribunal made the following findings (after referring to the relevant contractual documentation):
Thus, Gardner Group's obligation under the GG Consultant Agreement to perform 'the Services to that standard of care and skill to be expected of a Consultant who regularly acts in the capacity in which the Consultant is engaged' expressly extended to 'Services' that included liaison with the MFB and the Fire Engineer and 'coordination of the Fire Engineering design process' and 'input into the design process'.
Consistently with those provisions, on 9 December 2010, Mr Nicolas sent an email to various parties attaching the Fifth FER and a draft of his MFB Application. The brief covering email included the following: 'Gerry/Stasi/Tam - can you also review the attached MFB submission and make any necessary comments/changes etc'. Stasi is Mr Galanos and Tam Ho was a Gardner Group employee assisting Mr Galanos on the Lacrosse project. Mr Galanos agreed in evidence that from 9 December 2010, he was being asked to review and comment on the Fifth FER. Mr Ho responded to this email by email dated 10 December 2010 stating: 'Have reviewed updated Reg 309 submission, no further comments'.
It follows from this evidence that by about 9 December 2010, Gardner Group had:
• the opportunity to review both the FER and the MFB Application;
It is therefore clear that by 9 December 2010 at the latest, Gardner Group read and was aware of the incomplete description of the external cladding systems in both these documents, namely: 'Precast panel wall systems are proposed for external cladding systems', as discussed above.
In my view, as the consultant with contractual responsibility for 'liaison with the MFB', 'coordination of the Fire Engineering design process' and the other 'Services' referred to above, it is reasonable to expect that Gardner Group would both notice and query this incomplete description. This is particularly so in circumstances where it knew that the ACPs were a significant component of the cladding system and, unlike a 'pre-cast panel', could only be approved for use (on its interpretation of the BCA) by the application of a concession to the requirement under the BCA that external walls must be non-combustible. It is difficult to imagine a more important element of 'Building Description' for a fire engineer to be identifying and describing, particularly in a document for submission to the MFB.[162]
252 It can be seen that the negligence identified by the Tribunal related to the failure to query the reference to pre-cast panel wall systems when the use of ACPs was proposed. This failure related both to deficiencies in the Fifth FER and the MFB Application.
253 In addressing the question of causation, however, the Tribunal made findings only with respect to the Fifth FER.
Similarly, I am satisfied that Gardner Group's failure to identify deficiencies in the Fifth FER was a necessary condition of the relevant harm, although one with considerably less force than the issue of the Stage 7 Building Permit. Had Gardner Group queried with Thomas Nicolas its incomplete description of the cladding system, I consider it is more likely than not that this would have led to an exchange, probably between Mr Galanos and Mr Nicolas, that would have led the latter to share his view that ACPs did not satisfy the DTS provisions of the BCA. This in turn would have led Thomas Nicolas to amend the Fifth FER or otherwise notify the other parties that the proposed use of ACPs required an alternative solution or revision to the T2 Specification and architectural drawings.[163]
254 Gardner Group submits that the counter-factual reasoning postulated by the Tribunal when ascribing causal significance to the negligence it had previously identified, is inconsistent with the Tribunal's findings elsewhere in its Reasons that Thomas Nicolas was aware that ACPs were proposed as cladding by March or April 2008.
255 The Tribunal hypothesised that Gardner Group could have queried the failure to refer to ACPs in the Fifth FER and the reference to the use of pre-cast wall panels. As Gardner Group submits however, the Tribunal makes clear in its Reasons that Thomas Nicolas was already aware that ACPs were proposed to be used.[164] In these circumstances it cannot be correct that, had Gardner Group queried with Thomas Nicolas its incomplete description of the cladding system simply by identifying the failure to refer to ACPs, it is more likely than not that this would have led to an exchange, probably between Mr Galanos and Mr Nicolas that would have led Mr Nicolas 'to share his view that ACPs did not satisfy the DTS provisions of the BCA'. Moreover, as the Tribunal's findings as a whole make clear, the evidence of Mr Nicolas was that he had assumed that a compliant form of ACPs would be utilised.[165]
256 The Tribunal rejected any such assumption as unreasonable.
In my view, the likelihood is that Mr Nicolas in fact gave little or no attention to the proposed use of ACPs referred to in the documents considered by him. The explanation for this is found in his evidence referred to above of how he characterised his role. Put simply, he did not consider the implications of the proposed use of ACPs because he was not asked to do so. This is borne out by his consistent failure to mention them in his description of the building in the FERs (including the Fifth FER) and the MFB Application. But whether he turned his mind to the question or not, any assumption by him that the ACPs proposed were non-combustible, was unjustified and unsound.[166]
Nonetheless it also stands in the way of the simple counter-factual which the Tribunal hypothesises.
257 LU Simon did not directly address or attempt to resolve the causation issue raised by Gardner Group, either in its written case or oral submissions.
258 In our view, Gardner Group has established the deficiency in the Tribunal's reasoning for which it contends.
259 Accordingly, leave to appeal should be granted with respect to Gardner Group's proposed ground 3 of appeal and that ground succeeds.
Issue 11: Did the Tribunal fail to consider the degree of departure by Gardner Group from the relevant standard of care in making apportionment findings?
260 Gardner Group submits that in determining the relative culpability of the consultants found by the Tribunal to be liable to LU Simon, the Tribunal was required to assess the departure from the standard of care by the negligent parties as a relevant factor. It is further submitted that the Tribunal should have had regard to the fact that Gardner Group acted in a manner which was consistent with a widely accepted practice amongst building surveyors but that the Tribunal failed to have regard to this factor.
261 A fair reading of the Tribunal's Reasons demonstrates that the Tribunal did have regard to Gardner Group's submissions concerning this issue.
262 In dealing with the question of apportionment, the Tribunal first set out the relevant principles in terms to which there is no challenge:[167]
Once it has been established that a claim is apportionable, the Tribunal must engage in an 'exercise of the same kind of judgment as the court exercises in apportioning responsibility as between a defendant sued in tort for negligence and a plaintiff who, by his or her own negligence, has been partly responsible for the injury'.[168] The principles to be followed when conducting that exercise are set out in Podrebersek v Australian Iron & Steel Pty Ltd:[169]
The making of an apportionment as between a plaintiff and a defendant of their respective shares in the responsibility for the damage involves a comparison both of culpability, i.e. of the degree of departure from the standard of care of the reasonable man ... and of the relative importance of the acts of the parties in causing the damage ... It is the whole conduct of each negligent party in relation to the circumstances of the accident which must be subjected to comparative examination. The significance of the various elements involved in such an examination will vary from case to case; for example, the circumstances of some cases may be such that a comparison of the relative importance of the acts of the parties in causing the damage will be of little, if any, importance.
As Elenberg Fraser noted in its written closing submissions,[170] the High Court in Podrebersek[171] referred to Smith v McIntyre[172]. In that case, the court identified considerations that might influence a finding of apportionment, including who created the hazard which ultimately caused the injury, the age, role and position of the person causing the damage and failing to take an obvious and available last opportunity to avoid the damage. The court emphasised the need for a broad discretionary assessment of all the circumstances:[173]
We think the true view is that there is no dichotomy between culpability and causation. A comparison of degrees of fault between two negligent actors requires an examination of the whole conduct of each in relation to the circumstances of the accident. The degree of departure from the standard of the reasonable man on the part of either should not be assessed without considering the extent to which that departure was a contributing cause of the accident. A variety of factors may enter into a judicial determination as to which party has the greater share in the responsibility for the accident. There is no single touchstone of responsibility.
263 Reference was then made to cases in which these principles have been applied.[174]
264 The Tribunal then set out verbatim the submission of Gardner Group:
To the extent that it is found that [Gardner Group and Mr Galanos] failed to exercise reasonable care and skill, such a departure must be viewed as a minor one, predicated upon a mistaken construction of the BCA, in circumstances where the relevant provisions of the BCA were poorly drafted and open to alternative interpretations. That each of the Gardner Group experts, made the same 'error' in interpretation indicates that the departure from the standard of care could not have been substantial, given it must have been an error repeated by a number of the leading building surveyors in Victoria. In light of the respective roles of the professional respondents on the project, it is submitted that Mr Galanos and Gardner Group have minimal responsibility for any loss suffered by the Applicants. By contrast, for the reasons that follow, each of the other respondents should be fixed with a significantly higher liability for loss caused.[175]
265 After further setting out Gardner Group's submissions with respect to the roles of the architect and the fire engineer, the Tribunal responded to Gardner Group's submissions in the following terms:
In my view, there is considerable force in Garnder [sic] Group's submissions concerning the role of each of Elenberg Fraser and Thomas Nicolas. Its summary above largely accords with my findings of breach in respect of those parties. But its characterisation of its departure from the standard of reasonable care as 'minor', is less persuasive. In particular, in my view, it overlooks:
By accepting the role of relevant building surveyor, Gardner Group (specifically, Mr Galanos) assumed a special responsibility to ensure that the design and materials complied with the BCA. In that sense, it was engaged by LU Simon under the terms of the GG Consultant Agreement specifically for the purpose of guarding against non-compliance. Its decision to approve the extensive use of ACPs with a 100% polyethylene core, based primarily on a history of similar approvals and without even making the most straightforward inquiry of Thomas Nicolas, points to significant culpability. The fact that this decision manifested in the issuing of the Stage 7 Building Permit and thus the construction of the Lacrosse tower incorporating the ACPs in reliance on that permit, also gives Gardner Group's role particular causal potency.[176]
266 The Reasons addressed both the culpability and causal potency of Gardner Group's negligence.
267 The Tribunal proceeded by responding to the submissions of Gardner Group, and most importantly in the present context, by identifying matters which those submissions 'overlooked'. The identification of matters 'overlooked' necessarily implies that the Tribunal had regard to the matters stated in the submissions including the factor of common mistake by other building surveyors upon which Gardner Group relies.
268 The structure of the Tribunal's Reasons shows that it did not fail to have regard to Gardner Group's submissions. Further, paragraph [593] of the Reasons specifically refers to a history of similar approvals as a relevant circumstance.
269 Gardner Group's real complaint is that the Tribunal failed to accord the weight it should have to the factor of common mistake. Such a complaint is one with respect to the discretionary weighing of elements of a multifactorial complex. It does not give rise to a question of law unless the ultimate exercise of the discretion was not open to the discretion maker. In Podrebersek v Australian Iron and Steel Pty Ltd, the High Court said:
A finding on a question of apportionment is a finding upon a 'question, not of principle or of positive findings of fact or law, but of proportion, of balance and relative emphasis, and of weighing different considerations. It involves an individual choice or discretion, as to which there may well be differences of opinion by different minds'. Such a finding, if made by a judge, is not lightly reviewed.[177]
270 It is presumably because of the difficulties in sustaining such a proposition having regard to the matters identified in paragraphs [592] and [593] of the Reasons, that Gardner Group's case on this issue is put on the basis that the Tribunal simply failed to have regard to a relevant factor.
271 For the reasons we have explained however, this challenge must fail and the application for leave to appeal on Gardner Group's proposed ground 5 should be refused.
272 None of the proposed grounds of appeal argued by Thomas Nicolas or Elenberg Fraser have any real prospect of success. Their applications for leave to appeal must, accordingly, be refused.
273 We have come to the same conclusion with respect to Gardner Group's proposed grounds of appeal, save for proposed ground 3. We would grant Gardner Group leave to appeal with respect to proposed ground 3, and allow the appeal on that ground alone.
274 We will hear the parties in relation to consequential orders and costs.
[1] Owners Corporation No 1 of PS613436T v LU Simon Builders Pty Ltd (Building and Property) [2019] VCAT 286 ('Reasons').
[2] For completeness we should say that in oral submissions, Thomas Nicolas abandoned one of its proposed grounds (ground 6.18), and substantially confined the reach of another (ground 6.19). This did not, however, reduce the number of issues previously identified by the parties as needing to be resolved.
[3] The respondents to the proceeding in VCAT.
[4] A specification issued by Elenberg Fraser on 17 April 2008, which formed part of the design of the Stage 7 Building Permit issued on 2 June 2011, and which was also incorporated into the D&C Contract executed in May 2010.
[5] An Alucobest sample was sent by LU Simon to Elenberg Fraser in May 2011, and inspected by David Palmer, who was the project architect.
[6] An issue run before the Tribunal by Gardner Group.
[7] A building permit issued by Gardner Group on 2 June 2011.
[8] The reference to the 'Fifth FER' is a reference to the fifth iteration of the Fire Engineering Report prepared by Thomas Nicolas bearing the date November 2010, but finalised on about 9 December 2011.
[9] Building reg 309 in force at the time required the report and consent of the chief fire officer to an application for a building permit which involved any of a series of specified fire safety matters if those matters did not meet the DTS provisions of the BCA.
[11] Cf s 59(1) of the Wrongs Act.
[12] See s 59(2) of the Wrongs Act.
[13] International Fire Engineering Guidelines.
[26] Mr Moschoyiannis was a director of LU Simon who had overall responsibility for the Lacrosse project. See Reasons [19].
[27] Reasons [295]-[300] (footnotes and internal references omitted, emphasis in original).
[33] [2008] WASC 59; (2008) 38 WAR 1, [569].
[34] Reasons [308] (citation in original).
[37] [2001] VSC 279 ('Toomey').
[38] [2003] HCA 4; (2003) 212 CLR 511, 598-600 [254]-[259] (Gummow and Hayne JJ) ('Lepore').
[39] [2007] HCA 6; (2007) 230 CLR 22, 29-30 [9]-[10] (Gleeson CJ) ('Leichhardt MC').
[40] Toomey [2001] VSC 279, [125]-[150].
[42] [1967] HCA 31; (1967) 116 CLR 397 ('Sovar').
[44] [2001] HCA 29; (2001) 206 CLR 512 ('Brodie').
[50] See Suttor v Gundowda Pty Ltd [1950] HCA 35; (1950) 81 CLR 418, 438, quoting Connecticut Fire Insurance Co v Kavanagh [1892] UKLawRpAC 39; [1892] AC 473, 480 (Lord Watson). This principle has been applied in Green v Sommerville [1979] HCA 60; (1979) 141 CLR 594, 608; O'Brien v Komesaroff [1982] HCA 33; (1982) 150 CLR 310, 319; Coulton v Holcombe [1986] HCA 33; (1986) 162 CLR 1, 7-8; Water Board v Moustakas (1988) 180 CLR 491, 497; Banque Commerciale SA v Akhil Holdings Ltd (1990) 169 CLR 279, 284; Whisprun v Dixon [2003] HCA 48; (2003) 200 ALR 447, 461 [51]; Botsman v Bolitho [2018] VSCA 278; (2018) 57 VR 68, 105 [167]; Commissioner of State Revenue v Mondous [2018] VSCA 185; (2018) 55 VR 643, 661-2 [77]-[79].
[51] [1995] UKHL 9; [1995] 2 AC 633, 731. See further, Sovar [1967] HCA 31; (1967) 116 CLR 397, 405; Byrne (1995) 185 CLR 410, 460; Brodie [2001] HCA 29; (2001) 206 CLR 512, 541 [58].
[52] Grant Lubofski, 'A Contractual Path Around Proportionate Liability?', (2018) 34 BCL 5.
[53] Reasons [579] (footnote in original, other citations omitted).
[54] See s 24AF(1)(a) of the Wrongs Act.
[55] And the other respondents at trial (Gyeyoung Kim and PDS).
[56] See s 24AI of the Wrongs Act.
[57] Cf Selig v Wealthsure Pty Ltd [2015] HCA 18; (2015) 255 CLR 661, 673 [29].
[59] [2013] HCA 10; (2013) 247 CLR 613, 626-7 [15]-[17] (citations omitted) ('Hunt & Hunt').
[60] Godfrey Spowers (Vic) Pty Ltd v Lincolne Scott Australia Pty Ltd [2008] VSCA 208; (2008) 21 VR 84.
[61] [2008] NSWSC 187; (2008) 82 NSWLR 762 ('Reinhold').
[63] [2007] FCA 1216; (2007) 164 FCR 450 ('Dartberg').
[64] Reinhold [2008] NSWSC 187; (2008) 82 NSWLR 762, 771 [30].
[65] Hunt & Hunt [2013] HCA 10; (2013) 247 CLR 613, 627 [18].
[66] [2013] NSWCA 58 ('Perpetual Trustee').
[69] [2014] HCA 36; (2014) 254 CLR 185, 204 [33], 210 [55], 229 [132], 230-232 [136]-[140] ('Brookfield').
[70] Ibid 230 [133]-[134] (citation omitted).
[71] Federal Commissioner of Taxation v Consolidated Media Holdings Ltd [2012] HCA 55; (2012) 250 CLR 503, 519 [39] (French CJ, Hayne, Crennan, Bell and Gageler JJ) ('Consolidated Media'). See also, Alcan (NT) Alumina Pty Ltd v Commissioner of Territory Revenue (NT) [2009] HCA 41; (2009) 239 CLR 27, 46-7 [47]; SZTAL v Minister for Immigration and Border Protection [2017] HCA 34; (2017) 262 CLR 362, 368 [14] ('SZTAL').
[72] Consolidated Media [2012] HCA 55; (2012) 250 CLR 503, 519 [39]; SZTAL [2017] HCA 34; (2017) 262 CLR 362, 368 [14].
[73] Dartberg [2007] FCA 1216; (2007) 164 FCR 450, 458 [30].
[74] In Dartberg, Middleton J held that pt IVAA had no application in that case because it was not picked up by s 79 of the Judiciary Act 1903 (Cth) and the relevant Commonwealth legislation which allowed an applicant to recover full compensation from a wrongdoer 'otherwise provide[d]' a regime that was inconsistent with pt IVAA of the Wrongs Act.
[75] In Trani v Trani (2019) 59 VR 362, 369, Forbes J followed the approach of Middleton J in Dartberg. It appears from her Honour's judgment, however, that the issue was not the subject of argument in that case.
[76] [2008] VSCA 208; (2008) 21 VR 84 ('Godfrey Spowers').
[77] With whom Nettle and Neave JJA agreed.
[79] Godfrey Spowers [2008] VSCA 208; (2008) 21 VR 84, 104-5 [107]-[109].
[80] (2019) 93 ALJ 188 ('the Clarke article').
[81] (2018) 34 BCL 5 ('the Lubofsky article'). This is the article that the Tribunal made reference to at Reasons [579].
[83] See the Lubofsky article (2018) 34 BCL 5, 10-11.
[84] See s 24AH(1) of the Wrongs Act.
[86] In Elenberg Fraser's oral submissions in chief, we were taken to paragraphs [7]-[9], [16], [18], [19] and the end of paragraph [21] of Hunt & Hunt. In its oral submissions in reply, we were also taken to paragraph [10].
[87] Section 34(2) of the Civil Liability Act 2002 (NSW).
[90] Cf Permanent Custodians Ltd v Geagea (No 3) [2014] NSWSC 1489, [15].
[91] See s 24AF(2) of the Wrongs Act.
[92] See s 24AI(2) of the Wrongs Act.
[95] T2 Specification, Section 01-100 - General Requirements, cls 3.1(B)(12), 3.1(F)(1).
[97] Elenberg Fraser Agreement, General Conditions, cl 3(e).
[106] Reasons [431] (footnotes omitted; emphasis in original).
[107] Mount Bruce Mining Pty Ltd v Wright Prospecting Pty Ltd [2015] HCA 37; (2015) 256 CLR 104, 116 [46] (French CJ, Nettle and Gordon JJ).
[112] Construction Phase, Inspections.
[113] Section 01-100 - General Requirements, Submittals, cl 4.4(B).
[116] The reference to 'important aspect of the design' is a reference to the Alucobond Specification as identified at [452] of the Reasons.
[117] Reasons [454]-[456] (citations omitted) (emphasis added).
[126] Moorabool Shire Council v Taitapanui [2006] VSCA 30; (2006) 14 VR 55, 70 [57] (Ormiston and Ashley JJA); Transport Accident Commission v Hoffman [1989] VicRp 18; [1989] VR 197, 199 (Young CJ and McGarvie J).
[127] S v Crimes Compensation Tribunal [1998] 1 VR 83, 90 (Phillips JA).
[128] Transport Accident Commission v Hoffman [1989] VicRp 18; [1989] VR 197, 199 (Young CJ and McGarvie J).
[133] Ibid [34] (citation in original).
[143] The Lacrosse building contained sole-occupancy units within a Class 2 building.
[145] Ibid [253]-[257], [261] (citations omitted).
[146] The evidence of Mr Galanos was that each of these products had low combustibility.
[147] 'Spread-of-Flame Index' means the index number for smoke as determined by AS/NZS 1530.3. 'Smoke-developed Index' means the index number for smoke as determined by AS/NZS 1530.3. See cl A 1.1 of the BCA.
[148] Reasons [266]-[267] (citation omitted).
[149] The Building Service New South Wales (Thomson Law Book Company Limited, March 2007) postulated that the BCA did not control the 'core' of a laminated material.
[150] Certain Lloyds Underwriters Subscribing to Contract NO IH00AAQS v Cross [2012] HCA 56; (2012) 248 CLR 378, 389-90 [25]-[26] (French CJ and Hayne J).
[152] Which the Tribunal defined as 'Relevant Practice'. See Reasons [356].
[156] [1997] UKHL 46; [1998] AC 232, 241-2.
[157] [2001] EWCA Civ 1701, [25].
[158] [2011] NSWSC 1025. Discussed at Reasons [385]-[386].
[159] Reasons [391]-[396] (citations omitted).
[161] Reasons [139]-[143] (citations omitted).
[162] Ibid [401]-[405] (citations omitted).
[164] See ibid [118], [482]-[483], and [489]-[494].
[167] Ibid [582]-[583] (citations in original).
[168] Yates v Mobile Marine Repairs Pty Ltd [2007] NSWSC 1463, [93]-[94].
[169] [1985] HCA 34; (1985) 59 ALJR 492, 494.
[171] [1985] HCA 34; (1985) 59 ALJR 492, 494.
[177] [1985] HCA 34; (1985) 59 ALJR 492, 494 [8] (emphasis added) (citations omitted).
Tanah Merah Vic Pty Ltd
Owners' Corporation No 1 of PS631436T [2021] VSCA 72
(2018) 57 VR 68
(2012) 250 CLR 503
(2009) 239 CLR 27
(2017) 262 CLR 362
(2015) 256 CLR 104
(2012) 248 CLR 378
(2015) 255 CLR 661
(2014) 254 CLR 185
(2008) 82 NSWLR 762
(2007) 164 FCR 450
(2003) 212 CLR 511
(1967) 116 CLR 397
(2001) 206 CLR 512
(2016) 312 FLR 67
(1950) 81 CLR 418
(1982) 150 CLR 310
(1986) 162 CLR 1
(2003) 200 ALR 447
(2013) 247 CLR 613
(2008) 21 VR 84
(2008) 38 WAR 1
(2007) 230 CLR 22
(1995) 185 CLR 410
(1979) 141 CLR 594
(1988) 180 CLR 491
(1990) 169 CLR 279
(2018) 55 VR 643
(2019) 59 VR 362
(2006) 14 VR 55
(1985) 59 ALJR 492