JURISDICTION: South Australian Employment Court - Dust Diseases Act 2005 (SA)
26, 27, 28 & 29 May 2025, 24 & 26 June 2025, 21, 22, 23 & 24 July 2025
DELIVERED ON: 31 October 2025, amended on 19 November 2025
Dust Diseases Act 2005 - The applicant has malignant peritoneal mesothelioma and seeks damages in negligence from the State of South Australia (the State) for exposure to asbestos at the Royal Adelaide Hospital (RAH), and from Amaca Pty Ltd (Amaca) for exposure to asbestos containing products manufactured by James Hardie and Coy Pty Ltd (James Hardie) - The State denies liability - Amaca admits the applicant was exposed to asbestos in its products but asserts the exposure is much less in terms of quantity and potency compared to the exposure to asbestos at the RAH - If found liable, the State seeks contribution from two third parties (BI) who are responsible for spraying crocidolite asbestos on structural steelwork in buildings constructed at the RAH in the middle of the last century.
1. The applicant was exposed to asbestos dust and fibres, predominantly from crocidolite, when he worked at the RAH in 1991.
2. The applicant was exposed to asbestos dust and fibres, predominantly from chrysotile, when working with products manufactured by James Hardie in employment, self-employment and performing renovations to a house he previously owned.
3. The applicant relies on the presumptions in s 8 of the Dust Diseases Act 2005 and has established that the State and Amaca negligently caused him injury.
4. The State owed the applicant a duty of care under s 17c(2) of the Wrongs Act 1936 (SA) and was in breach of the duty in failing to provide the applicant with: safe plant, equipment and supervision; a safe system of work; a safe place of work; any effective measures to protect him from asbestos dust and fibre; effective masks of other respiratory protective equipment; and any warning of the danger which he was exposed to.
5. Amaca owed the applicant a duty of care to warn him of the danger of inhaling, ingesting and being exposed to dust generated by using its products and was in breach of that duty by failing to give the applicant any or any proper warning.
6. The applicant is entitled to compensatory damages in the total amount of $2,120,824.20.
7. On the cross-claims made by the respondents, the State is liable for 80%, of the compensatory damages, and Amaca for 20% of the compensatory damages.
8. The State is to pay the applicant exemplary damages of $40,000 pursuant to s 9(2) of the Dust Diseases Act 2005.
9. Amaca is to pay the applicant exemplary damages of $50,000.
10. The crocidolite asbestos sprayed on structural steel beams at the RAH was sprayed by the fourth third party and is the responsibility of the third third party.
11. The State seeks contribution from BI and is able to rely on the evidentiary presumptions in s 8 of the Dust Diseases Act 2005 in that regard.
12. BI knew that the material it sprayed at the RAH was: injurious to health; incapable of being sprayed accurately and was mis-sprayed and over-sprayed; likely to become friable and need repair; likely to be encountered by 7 tradespersons who needed to run services through or near it.
13. The State is entitled to contribution equivalent to 40% of the applicant's damages from BI. The contribution does not apply to the exemplary damages payable by the State.
Briginshaw v Briginshaw [1938] HCA 34; (1938) 60 CLR 336
Amaca v Werfel [2020] SASCFC 125; (2020) 138 SASR 295
Bendix Mintex Pty Ltd v Barnes (1997) 42 NSWLR 307
Julia Farr Services v Hayes [2003] NSWCA 37
Australian Safeway Stores Pty Ltd v Zaluzna [1987] HCA 7; (1987) 162 CLR 479
Neindorf v Junkovic [2005] HCA 75; (2005) 222 ALR 631
Stevens v Brodribb Sawmilling Co Pty Ltd (1986) 160 CLR 16
Wade v Australian Railway Historical Society (t/as Steamranger) [2000] SASC 233; (2000) 77 SASR 221
Collins v Hunt and Anor [2007] SASC 123; (2007) 97 SASR 392
Errington v Target Australia Pty Ltd [1995] SASC 5332; (1995) 65 SASR 378
Wyong Shire Council v Shirt [1980] HCA 12; (1980) 146 CLR 40
Complete Scaffold Services Pty Ltd v Adelaide Brighton Cement Ltd [2001] SASC 199
Papatonankis v Australian Telecommunications Commission [1985] HCA 3; (1985) 156 CLR 7
Leighton Contractors Pty Ltd v Fox [2009] HCA 35
Planet Fisheries Pty Limited v La Rosa (1968) 119 CLR 118
Wallaby Grip Limited v Peirce [2000] NSWCA 299
Dunning v BHP Billiton Ltd [2014] NSWDDT 3
BHP Billiton Ltd v Hamilton [2013] SASCFC 75; (2013) 117 SASR 329
Latz v Amaca Pty Ltd [2017] SADC 56
Lowes v Amaca Pty Ltd [2011] WASC 287
Parkin v Amaca Pty Ltd [2020] WASC 306
Kennedy v CIMIC Group Limited and CPB Contractors Pty Ltd [2020] NSWDDT 7
Ewins v BHP Billiton Ltd [2005] SASC 95; (2005) 91 SASR 303
Hannell v Amaca Pty Ltd [2006] WASC 310
MR & RC Smith Pty Ltd (trading as Ultra Tune (Osborne Park) v Wyatt (No 2) [2012] WASCA 110
Amaca Pty Ltd v King [2011] VSCA 447; (2011) 35 VR 280
Todorovic v Waller [1981] HCA 72; (1981) 150 CLR 402
Joyce v Pioneer Tourist Coaches Pty Ltd [1969] SASR 501
Griffiths v Kerkemeyer [1977] HCA 45; (1977) 139 CLR 161
Van Gervan v Fenton [1992] HCA 54; (1992) 175 CLR 327
Kars v Kars [1996] HCA 37; (1996) 187 CLR 354
Grincelis v House [2000] HCA 42; (2000) 201 CLR 321
Ramsay v Watson [1961] HCA 65; (1961) 108 CLR 642
Boothy v Morris [2002] SASC 126
Husher v Husher [1999] HCA 47; (1999) 73 ALJR 1414
Spargo v Haden Engineering [1993] SASC 3793; (1993) 60 SASR 39
James Hardie & Coy Pty Ltd v Roberts and Anor [1999] NSCWA 314; [1999] NSWCA 314; (1999) 47 NSWLR 425
Fitch v Hyde-Cates (1982) 150 CLR 482
Amaca Pty Ltd v Latz [2017] SASCFC 145; (2017) 129 SASR 61
BHP Billiton Ltd v Parker [2012] SASCFC 73; (2012) 113 SASR 206
Whitfield v De Lauret & Co Ltd [1920] HCA 75; (1920) 29 CLR 71
Uren v John Fairfax & Sons Pty Ltd [1966] HCA 40; (1966) 117 CLR 118
Gray v Motor Accident Commission [1998] HCA 70; (1998) 196 CLR 1
Wynbergen v Hoyts Corporation Pty Ltd [1997] HCA 52; (1997) 149 ALR 25
Podrebersek v Australian Iron & Steel Pty Ltd [1985] HCA 34; (1985) 59 ALJR 492
Pennington v Norris [1956] HCA 26; (1956) 96 CLR 10
E.M. Baldwin and Son Pty Ltd v Plane (1999) Aust Tort Reports 81-499
Macquarie Pathology Service Pty Limited v Sullivan (unreported) New South Wales Court of Appeal, 28 March 1995
State of New South Wales t/a New South Wales Department of Agriculture v Allen [2000] NSWCA 141
Seltsam Pty Ltd v McGuiness; James Hardie and Co Pty Ltd v McGuiness [2000] NSWCA 29; (2000) 49 NSWLR 262
Jones v Dunkel [1959] HCA 8; [1959] HCA 8; (1959) 101 CLR 298
West v Government Insurance Office of NSW [1981] HCA 38; [1981] HCA 38; (1981) 148 CLR 62
State Government Insurance Commission v Laube (1984) 37 SASR 31
Caltex Refineries (Qld) Pty Limited v Stavar [2009] NSWCA 258; (2009) 75 NSWLR 649
Geyer v Resi Corporation [2013] SADC 122
The State of South Australia v Bradford Insulation (S.A.) (in Liquidation) & Anor (No 3) [2023] SAET 13
Thompson v Johnson & Johnson Pty Ltd & Anor [1991] VicRp 84; [1991] 2 VR 449
Wright v Dunlop Rubber Co Ltd (1972) 13 KIR 255
Pennington v Norris [1956] HCA 26; [1956] HCA 26; (1956) 96 CLR 10
Stapley v Gypsum Mines Ltd [1953] UKHL 4; [1953] UKHL 4; (1953) AC 663
Smith v McIntyre [1958] TASStRp 11; (1958) Tas.SR 36
Broadhurst v Millman [1976] VicRp 15; [1976] VicRp 15; (1976) VR 208
Pfeiffer v Amaca Pty Ltd (Under NSW Administered Winding Up) & Ors [2016] SADC 101
Resi Corporation v Bradford Insulation (S.A.) (in Liq) & B.I. (Contracting) Pty Ltd (No 2) [2018] SADC 21
Public Trustee SA v Clifton Financial Services Pty Ltd (No 3) [2004] NSWDDT 40
BI (Contracting) Pty Ltd v The Public Trustee of South Australia and Anor [2005] NSWCA 306
Micallef v The Myer Emporium Ltd [2005] NSWDDT 13
BI (Contracting) Pty Limited v The Myer Emporium Limited [2005] NSWCA 305
Oliver v ACN 007 870 484 Pty Ltd & Ors (No 3) [2017] SADC 52
David Jones Ltd v BI (Contracting) Pty Ltd [2017] SADC 79
BI (Contracting) Pty Ltd v David Jones Ltd [2019] SASCFC 138
First Respondent: Mr M Roberts KC with Ms E Denbigh
AIHW means Australian Institute of Health and Welfare;
asbestos zone means an area or part of the RAH that had been identified as containing asbestos;
Audit Report means the Royal Adelaide Hospital Occupational Health and Safety Injury Management Department Audit Report into the Asbestos Management Policy of the Royal Adelaide Hospital, 2007;
Bathroom Concepts means Bathroom Concepts Pty Ltd;
BI means the third and fourth third parties, Bradford Insulation (SA) Pty Ltd (in liquidation) and Bradford Insulation (Contracting) Pty Ltd;
BISA means Bradford Insulation (SA) Pty Ltd (in liquidation);
BIC means Bradford Insulation (Contracting) Pty Ltd;
bubble means a sealed box on wheels with an upper part that could be extended into ceiling spaces and allow work to be performed in ceiling spaces without asbestos contaminating the surrounding area;
catacombs means the basements and sub-basements of RAH buildings;
DD Act means Dust Diseases Act 2005 (SA);
DLI means Department of Labour as well as Department of Labour and Industry;
E&BS means the Engineering and Building Services department of the RAH;
EIL means Environmental and Industrial Laboratories;
ETSA means Electricity Trust of South Australia;
external contractors means employees of labour hire firms who performed work at the RAH;
Full Court means the Full Court of the Supreme Court of South Australia;
HIPEC means hyperthermic intraperitoneal chemotherapy;
IMVS means the Institute of Medical and Veterinary Science;
internal contractors means contractors who were engaged to work at the RAH by the RAH and were not employed by another entity;
James Hardie means James Hardie and Coy Pty Ltd;
LR Act means Law Reform (Contributory Negligence and Apportionment of Liability) Act 2001 (SA);
Manpower is the trading name of a labour hire company that employed Mr Miller during part of 1991;
Manpower electricians means the non-expert witnesses called by Mr Miller; Stephen Drury, Dean Bastian and Russell Villiers;
NOHSC means National Occupational Health and Safety Commission;
OHSIMD means Occupational Health and Safety Injury Management Department;
RAH means the Royal Adelaide Hospital in its original location at the eastern end of North Terrace, Adelaide;
Total Electrical means Total Electrical Pty Ltd;
WHS means work, health, safety and work, health and safety.
[n]o, depending on the areas it could be a very common occurrence, but it ranged. I couldn't put a number on it.
MR ROBERTS: As I understand your evidence, you're telling his Honour that you don't recall there being any induction whatsoever at any time that you came to the Royal Adelaide Hospital.
WITNESS: Correct.
MR ROBERTS: And that's the questions I'm asking you about now. You say that you don't recall being taken around the site. Is it the same answer that you don't recall there being any discussions around patient safety in the hospital?
WITNESS: No.
MR ROBERTS: Do you recall that the work that you were being assigned to do was work of a project nature?
WITNESS: Yes.
MR ROBERTS: In other words, it involved, more or less, doing renovations and refurbishments at different parts of the hospital.
WITNESS: Correct.
MR ROBERTS: And in many wards.
WITNESS: Not initially. Not wards initially, no.
MR ROBERTS: What was the first job you remember doing there?
WITNESS: I believe it was in one of the theatres.
Just, you know, when you first started, I didn't know. You just didn't know. And different variations of it, you know, white asbestos, blue asbestos, asbestos sheeting, asbestos lagging. You know, there's - what it's used in, you know. Brakes. Who knew? Like, everything. Like, there's things, the pipes, made out of asbestos. Floor tiles made out of asbestos. There was asbestos in concrete. For that building, at that site, people had loaded asbestos into concrete to save weight, or bulk out the concrete. You didn't know it till you drilled a hole in it years later and, even then, you may not have known it, if you didn't know what you were looking for.
No, I know, because they refer to Zellamid, which is the material that's in the meter boxes, and other asbestos lagging, but in addition to that when they come into a hospital or a place, they are obliged to look at the register. It's part of the regulations, that each person, when you go to do some work, you look at the register.
...but there was an external body that, early on in my time at the RAH, I became aware of there being no safe exposure level.
We would recognise asbestos in its most prevalent form, when we were working in the ceiling spaces you're working around it, and you could see the asbestos. You identified it. I'm aware that asbestos exists in other forms - cement sheet. And we knew that that was on the back of riser doors. But I was never taught how to identify it. That wasn't my job.
We had two types of contractors. We had in-house, who worked in our workshop. And we had external, that were called in, who were specialists in - in a certain product. So I wouldn't be involved with the external contractors that came in and did their work. But as far as in-house, they mirrored exactly what the in-house trades would do. Because they were under the direct control of the - the team leader.
MR TZOUGANATOS: Mr Carlaw, it is entirely possible for a tradesman working at the Royal Adelaide Hospital in the early 1990s to be exposed from time to time to asbestos, dust and fibre, in various locations at the hospital. Do you accept that?
WITNESS: I do accept that.
... there was awareness that exposure to asbestos was potentially harmful, and the reality was that working with asbestos was something that potentially occurred on a daily basis at the hospital.
Witness statement - 7 March 2025 and supplementary statement- 17 June 2025
Findings in relation to exposure to asbestos at the RAH
When I commenced employment at the RAH I was not given any induction or information about the presence of asbestos within the RAH, or the potential dangers of inhaling asbestos. I was not given any training on how to identify asbestos within the RAH or how to protect myself against it. I became aware that asbestos was present at the RAH as a result of informal discussions with older tradesmen many of whom had worked with asbestos for years before I became a tradesman. In those early years at the RAH, my perception of asbestos was that it was a good idea to avoid it, but I certainly did not know that even small amounts of it could kill me and my family. In those days I did not know that there was no safe level of exposure to asbestos.
As I have said above, the bubble was only used in areas where it was known (or where the bosses told us) that asbestos was located above the ceiling tiles. The problem was that there were times when I came across and was exposed to clumps of asbestos spray when popping up and removing a ceiling tile in an area not considered to have asbestos. This happened because the ceiling spaces were interconnected, and open to other areas of the building, or adjacent buildings and so clumps of asbestos spray moved. There were times when I saw clumps of asbestos only a few metres away, or pieces of clumps of dislodged asbestos on ceiling tiles around me when I entered the ceiling space. Once the ceiling tile had been popped, and the dust had been disturbed all around you, exposure had already occurred. There was never a requirement to wear a mask or a respirator in these areas. There was no bubble used on these occasions.
To be honest, I can't answer that because talking to you right now, it wasn't on my radar for a long time after I started working at the Royal Adelaide Hospital.
To the best of my recollection when I commenced employment at the RAH through Manpower I was not told anything about the dangers of inhaling asbestos dust, or given any safety induction or training on where asbestos was located in the buildings, how to identify asbestos, and what I should do if I encountered asbestos on the job. I became aware of the presence of asbestos in buildings by word of mouth through co-workers on the job.
... if you're working in an asbestos area, you definitely have discussions about the methods of work. If you weren't in an asbestos area, and that was just by word of mouth, there was no care taken, you just went in there.
WITNESS: It was their - and they had to - well, the contractor, whoever it was, had to certify to the contract manager that all the employees that they were putting on site had had the appropriate training.
MR TZOUGANATOS: So to the extent that you refer to training and yearly training or annual training in your statements, what you're talking about is training of employees of - - -
WITNESS: Correct.
MR TZOUGANATOS: - - - E&BS, not employees of contractors.
WITNESS: Yes. Correct.
MR TZOUGANATOS: - - - any kind of information or training, you took the view as the point man for asbestos management at the hospital that that was not E&BS's responsibility, that was Manpower's responsibility.
WITNESS: That's correct.
MR TZOUGANATOS: For that reason, you didn't require them to be trained. Correct?
WITNESS: No. I didn't have to - require them to be trained again. No.
David [McGowan] was delegated to be the person who was responsible for asbestos safety in the hospital and this responsibility filtered down to the respective divisional managers, section leaders and trade supervisors.
(a) the State knew that asbestos fibres were carcinogenic, and that there was no safe level of exposure to asbestos dust;
(b) the State knew that asbestos dust could be friable and resuspended in the air if tradesmen disturbed it;
(c) the State considered that workers at the RAH should be provided with an induction, training and information regarding asbestos and the need to protect themselves from it;
(d) the State knew that because of the risk that any service riser, ceiling space and catacomb at the RAH might be contaminated with asbestos, all of these areas were deemed by the ALU to be contaminated with asbestos; and
(e) the State knew that any tradesman entering a service riser, ceiling space or catacomb at the RAH should wear respiratory protection at all times because of the risk of exposure to asbestos.
We had two types of contractors. We had in-house, who worked in our workshop. And we had external, that were called in, who were specialists in - in a certain product. So I wouldn't be involved with the external contractors that came in and did their work. But as far as in-house, they mirrored exactly what the in-house trades would do. Because they were under the direct control of the - the team leader.
(a) the RAH was extensively contaminated with asbestos, most of it being in the form of the particularly lethal crocidolite (blue) asbestos including in the places set out in the asbestos surveys and registers tendered in evidence;
(b) Despite the recommendation in the early asbestos surveys that the asbestos contamination be cleaned, the State did not do so;
(c) from time to time, on multiple days, over a period of about 6 months from about May 1991 during his work as an electrician upgrading electrical equipment and wiring at the RAH, Mr Miller was exposed to and inhaled crocidolite, amosite and chrysotile asbestos dust and fibres while working in confined spaces in ceilings, services risers and catacombs;
(d) during the course of Mr Miller's exposure to and inhalation of asbestos at the RAH, he did not know that the dust and fibres he was disturbing, re-suspending in the air around him as he worked in confined spaces, and inhaling, contained asbestos. He did not wear a respirator or take any other measures to minimise or obviate his exposure to asbestos fibres. This was so because when he worked at the RAH, Mr Miller did not know how to identify asbestos, or what to do if he encountered it. The State did not give him any induction or training about asbestos or its dangers, or how to work safely with it.
It was on the same day, on 24 March 1987, that McGowan wrote to Reynolds and advised that he had attended an inspection of S2 with Watkins and another union official to determine the asbestos risk, and that the unions had imposed a complete ban until the SAHC undertook a complete removal of asbestos from the area. Reynolds relayed this information to Barter that day and stated that 'if funding is not forthcoming soon, S2 will remain closed.'
On 25 March 1987, Kearney wrote to McCullough and informed him of the ban imposed by Watkins. Further correspondence passed between the Commission and the RAH regarding the removal of asbestos on S2. It was suggested that tenders be obtained from removal contractors.
...
The documents reveal the significant impact by reason of the union work ban, which persisted for some months until funding was ultimately approved. By 2 June 1987, the Department had approved the asbestos removal work. Air monitoring was approved and commenced on 8 June 1987. The work to remove the asbestos from S2 commenced in early July 1987 and was completed on 31 August 1987. (footnotes omitted)
Findings in relation to exposure to Amaca products
Amaca was formerly known as James Hardie & Coy Pty Limited. From about 1937 to about 1987 it was the largest manufacturer and distributor of asbestos cement building materials in Australia. From 1977, it was the sole manufacturer and distributor of asbestos cement building materials in Australia. Until 2001, Amaca was a wholly owned subsidiary of James Hardie Industries Limited ("JHIL"), its parent company.
Amaca manufactured and sold a variety of asbestos cement building materials including flat and corrugated sheets and building planks which were used to build commercial, industrial and residential buildings. James Hardie has been responsible for 70% of Australian asbestos consumption,[526] a vast proportion of this being used by Amaca in the production of building materials. Amaca's asbestos cement building materials continue to form part of hundreds of thousands of buildings throughout Australia including houses. In the 1980s Amaca considered that there were "asbestos building products, in some form, in almost every building in Australia."[527] The majority of houses throughout Australia built prior to 1985 had Amaca's building product in the eaves and wet areas.[528]
Importantly, from 1 January 1961 Amaca had a monopoly on the production and sale of asbestos cement building materials in the State of South Australia.[529] The evidence of its long term employee, Mr Graham Allen, confirms that it was the sole manufacturer of asbestos cement fibro products in South Australia and that Amaca's asbestos cement products were the only type of fibro products sold in South Australia after 1956.[530] He said that Wunderlich "continued to operate in South Australia as a distributor of products manufactured by James Hardie."[531] Amaca continued to manufacture and distribute fibro cement products in South Australian until the late 1980s, asbestos being removed from the products in the early 1980s.[532] Mr Allen testified that in South Australia, Amaca manufactured a variety of asbestos cement building materials including flat sheets, planks[533] and corrugated sheets which were originally called "Deep Six" because of the six inch profile from ridge to ridge...
4.41 From 1 January 1960, Amaca was the sole manufacturer and distributor of asbestos cement building materials including flat sheets, Hardiflex, Deep Six and Super Six corrugated sheets, Versilux and Villaboard in South Australia.
4.42 The asbestos cement sheets sold by Amaca in South Australia prior to about 1968 contained about 15% asbestos made up of varying amounts of crocidolite, amosite and chrysotile.
4.43 The asbestos cement sheets sold by Amaca after about 1968 to about the mid-1980s contained about 15% asbestos made up of varying amounts of amosite and chrysotile.
4.44 Prior to 1978 no warnings were ever affixed to Amaca's asbestos cement products.
4.45 The asbestos cement building materials manufactured and sold by Amaca in South Australia prior to about 1968 contained between 10% and about 15% asbestos made up of varying amounts of crocidolite, amosite and chrysotile.
4.46 The asbestos cement building materials manufactured and sold by Amaca in South Australia after about 1968 until about the early to mid-1980s contained between 10% and about 15% asbestos made up of varying amounts of amosite and chrysotile.
4.47 Mr Miller was an impressive and truthful witness. His testimony as to the matters of fact referred to above should be accepted.
4.48 In 1994, Mr Miller was exposed to asbestos dust from asbestos cement sheets manufactured by Amaca when he performed all of the required electrical work including disconnections of light fittings and switches that were mounted on the asbestos cement lean to at his residence at 7 Thanet Street, Brooklyn Park, South Australia.
4.49 Between late 1991/early 1992 and about 1996/97, Mr Miller was regularly exposed to and inhaled crocidolite, amosite and chrysotile asbestos dust from asbestos cement sheets manufactured by Amaca (including Hardiflex flat sheets on eaves and walls of lean to's, Versilux sheets and Villaboard sheets on walls in wet areas including bathrooms), when he used power tools to cut, and drill these materials (while installing electric equipment and cables) during his work as an electrician on domestic houses;
4.50 Throughout the course of Mr Miller's exposure to and inhalation of asbestos from asbestos cement building materials manufactured by Amaca as set out above, he did not know that the materials he was cutting and drilling contained asbestos. He did not wear a respirator or take any other measures to minimise or obviate his exposure to asbestos fibres.
Expert evidence in relation to foreseeability of risk of injury
Given the resources available to the State of South Australia and James Hardie, in my opinion the hazards of exposure to asbestos should have been well known to both defendants.
Yes. Assuming there's no big time difference, which there doesn't look to be here, in which the - you know, if there was one exposure occurred 20 years before the other, it would matter. But that doesn't look to be the case here. So, yes. The - essentially 500 times, possibly even a little bit more on account of the crocidolite exposure, if I've really got it correct, preceding the self-employed chrysotile exposure.
Relevant provisions of the Dust Diseases Act/Regulations
(1) If it is established in a dust disease action that a person (the injured person) -
(a) suffers or suffered from a dust disease; and
(b) was exposed to asbestos dust in circumstances in which the exposure might have caused or contributed to the disease,
it will be presumed, in the absence of proof to the contrary, that the exposure to asbestos dust caused or contributed to the injured person's dust disease.
(2) A person who, at a particular time, carried on a prescribed industrial or commercial process that could have resulted in the exposure of another to asbestos dust will be presumed, in the absence of proof to the contrary, to have known at the relevant time that exposure to asbestos dust could result in a dust disease.
Any industrial or commercial process involving asbestos or products containing asbestos (not being a process referred to in items 1 to 9 above, and not including where the only involvement of asbestos or products containing asbestos in the process is the presence of asbestos or the product in a structure comprising or forming part of the premises in which the process occurred)
(a) asbestos fibre (in all its forms) was carcinogenic, toxic, and a cause of latent injury, including mesothelioma;
(b) mesothelioma was a fatal illness which caused immense suffering prior to death;
(c) the dose of asbestos required to cause injury was unknown but it was known that, individuals reacted differently to different exposures;
(d) it was a fundamentally accepted principle of occupational hygiene that the inhalation of all dust, especially asbestos dust carried a serious risk of injury to those exposed and was to be avoided;
(e) practicable measures were available and had been recommended to reduce exposure to asbestos including wearing a respirator, avoiding the use of power tools and informing the worker/end user of the dangers of inhaling asbestos dust and the need to take precautions;
(f) there is no safe level of exposure to asbestos which did not carry with it a risk of mesothelioma;
(g) mesothelioma could be (and had been) caused by small, transient, brief, one-off, non-occupational and domestic exposure to asbestos including from asbestos cement products disturbed during home renovations by handymen;
(h) so called exposure "standards" or "maximum allowable concentrations" of asbestos published by some authorities including the NHMRC, were based on weak and dubious scientific evidence, were merely guides and did not delineate between safe and unsafe levels of exposure to asbestos - there was no safe level of asbestos exposure to asbestos;
(i) [in relation to Amaca only] as at the early to mid-1980s there were asbestos cement building materials in most Australian houses, the overwhelming proportion, particularly in South Australia, containing asbestos cement products manufactured by Amaca;
(j) [in relation to Amaca only] home renovations, repairs, painting and extensions were very common activities in Australia;
(k) [in relation to Amaca only] after the early to mid -1980s it was almost impossible to distinguish between building products containing asbestos and those that did not containing this substance because the products looked the same;
(l) [in relation to Amaca only] during the course of home renovations including electrical upgrades and bathroom renovations, Australians who used power tools to cut and drill, and otherwise manipulate in situ asbestos cement materials, could be exposed to respirable asbestos fibres;
(m) [in relation to Amaca only] during the course of home renovations including electrical upgrades and bathroom renovations, Australians who used power tools to cut and drill, and otherwise manipulate in situ asbestos cement materials, could contract mesothelioma and die many years later;
(n) significant concern was being expressed in Australia and internationally regarding the advent of the third wave of asbestos victims from exposure to in situ asbestos in environmental, domestic, home handyman and para-occupational settings;
(o) from the late 1980s to the mid-1990s, the pattern of exposure history recorded in the Australian Mesothelioma registry in cases of mesothelioma was changing: more cases of mesothelioma were being reported from exposure to asbestos during domestic, handyman, environmental and para-occupational rather than from the older traditional factory based exposure;
(p) It was reasonably foreseeable to the State that electricians including Mr Miller working at the RAH were at risk of contracting mesothelioma from inhaling asbestos dust and fibres while working in service risers, ceiling spaces and catacombs.
(q) It was reasonably foreseeable to Amaca that the classes of persons of which Mr Miller was a member, being tradesmen who might intermittently use power saws and drills to cut, drill and disturb in situ asbestos cement building materials manufactured by Amaca, were at risk of contracting mesothelioma.
Asbestos has been a well known hazard in industry for at least 60 years. Numerous studies and papers have been published from the 1920s onwards in respect of its dangers. Many of the studies have been in the context of dust hazards generally and some were specifically directed to asbestos. Intermittent exposure to asbestos was considered a problem as early as 1950 when Dr Smith, a respected expert in the field, reported:
[Under] "conditions of intermittent exposure it is more difficult to predict the likely effect on the lungs than if the exposure was continuous but the severity of any dust hazard is usually less in such circumstances. This might, however, not apply with high intermittent exposures."
...
In summary, therefore, the knowledge available in the field of industrial health at least by 1960 was that the inhalation of asbestos was dangerous. It had been known for many years that it could cause asbestosis and by 1960 that it could cause mesothelioma. At that stage no particular distinction was drawn as to whether asbestos in all its forms was dangerous or whether only particular types of fibre were dangerous. The studies up to that time, at least for the most part had involved crocidolite. However, during the 1960s a distinction between fibres was beginning to be drawn. Likewise studies from about this time indicated that end users of asbestos products could be exposed to inhalation of raw fibre and that chrysotile could cause asbestos related diseases.
...
Whilst these concessions did not specifically relate to chrysotile, it was not necessary, in my opinion, for the respondent to establish that it was foreseeable that exposure to a particular type of asbestos could cause injury. At the relevant time it was known that asbestos, as a generic substance, was hazardous.
In my opinion, they (Bendix Mintex v Barnes and CSR v Young) are fatal to the appellant's submissions. Foreseeability can turn on knowledge of the dangers of exposure to asbestos, including in the calculus for breach of duty, and is not confined to knowledge of the dangers of exposure to high levels of asbestos or levels of asbestos above any particular standard.
Subject to this Part, the liability of the occupier of premises for injury, damage or loss attributable to the dangerous state or condition of the premises shall be determined in accordance with the principles of the law of negligence.
...the High Court recognised that, depending on the circumstances, a non-employer/occupier who engages an independent contractor may be personally liable to that independent contractor under a general common law duty of care based upon notions of proximity and reasonable foreseeability. Despite the fact that proximity as a test has been replaced, Stevens remains good law on the question of the reasonable response of an occupier who, as the State did at the RAH when Mr Miller worked there, had a role in co-ordinating and implementing the system of work (including with respect to independent contractors) on premises it owned and controlled. [613]
(1) The amendments made by the Law Reform (Ipp Recommendations) Act 2004 (the Ipp Recommendations Act) are intended to apply only prospectively.
(2) If a cause of action that is based wholly or partly on an event that occurred before the commencement of the Ipp Recommendations Act arises after the commencement of the Ipp Recommendations Act, it will be determined as if the amendments had not been enacted.
**Example - **
Suppose that A was exposed to asbestos in 1990 but a resultant illness is not diagnosed until after the commencement of the Ipp Recommendations Act. An action is then brought in negligence in which damages are claimed for personal injury. The amendments made by the Ipp Recommendations Act would not affect the determination of liability or the assessment of damages.
The State of South Australia was negligent by:
- Failing to provide proper and safe plant, equipment and supervision for the applicant.
- Failing to provide a safe system of work for the applicant.
- Failing to provide a safe place of work for the applicant.
- Failing to take any or any effective measures to protect the applicant from the effects of asbestos dust and fibre.
- Failing to provide effective masks or any other respiratory protective equipment.
- Failing to provide protective clothing for the applicant.
- Failing to provide exhaust equipment or adequate ventilation in the areas where the said asbestos dust and fibre were liberated.
- Failing to restrict the liberation of the said asbestos dust and fibre by water dampening or otherwise.
- Requiring or permitting the applicant to be exposed to the inhalation and ingestion of asbestos dust and fibre.
- Failing to properly supervise the applicant's work.
- Failing to warn the applicant of the dangers to which he was exposed.
- Failing to substitute non asbestos materials for asbestos material where available.
- Failing to medically examine the applicant regularly or effectively knowing the danger of ingestion or inhalation of asbestos dust and fibre.
- Failing to conduct air sampling in areas where the applicant worked to assess the extent of the risk to the health of the applicant as a result of exposure to asbestos dust and fibre.
- The applicant relies upon the breaches of statutory duty set out hereunder as evidence of negligence.
- The applicant relies upon the doctrine of res ipsa loquitur.
- Failing to make enquiries of appropriate authorities including the New South Wales Department of Health, The Commonwealth Department of Health, Division of Occupational Hygiene, the New South Wales Department of Labour and Industry, the Victorian Department of Health, the South Australian Department of Health, occupational hygienists, occupational physicians and consultants and other like persons as to the risks associated with working with insulation products containing asbestos
Part 1B of the Wrongs Act 1936
Interpretation
17b. In this Part, unless the contrary intention appears-
"dangerous" includes unsafe:
"landlord" includes a landlord under a statutory tenancy:
"occupier" of premises means a person in occupation or control of the premises, and includes a landlord:
"premises" means-
(a) land;
(b) a building or structure (including a moveable building or structure);
or
(c) a vehicle (including an aircraft or a ship, boat or vessel).
Occupier's duty of care
17c. (1) Subject to this Part, the liability of the occupier of premises for injury, damage or loss attributable to the dangerous state or condition of the premises shall be determined in accordance with the principles of the law of negligence.
(2) In determining the standard of care to be exercised by the occupier of premises, a court shall take into account-
(a) the nature and extent of the premises;
(b) the nature and extent of the danger arising from the state or condition of the premises;
(c) the circumstances in which the person alleged to have suffered injury, damage or loss, or the property of that person, became exposed to that danger;
(d) the age of the person alleged to have suffered injury, damage or loss, and the ability of that person to appreciate the danger;
(e) the extent (if at all) to which the occupier was aware, or ought to have been aware, of-
(i) the danger;
and
(ii) the entry of persons onto the premises;
(f) the measures (if any) taken to eliminate, reduce or warn against the danger;
(g) the extent (if at all) to which it would have been reasonable and practicable for the occupier to take measures to eliminate, reduce or warn against the danger;
and
(h) any other matter that the court thinks relevant.
(3) The fact that an occupier has not taken any measures to eliminate, reduce or warn against a danger arising from the state or condition of premises does not necessarily show that the occupier has failed to exercise a reasonable standard of care.
(4) Subject to any Act or law to the contrary, an occupier's duty of care may be reduced or excluded by contract but no contractual reduction or exclusion of the duty affects the rights of any person who is a stranger to the contract.
(5) Where an occupier is, by contract or by reason of some other Act or law, subject to a higher standard of care than would be applicable apart from this subsection, the question of whether the occupier is liable for injury, damage or loss shall be determined by reference to that higher standard of care.
(6) ...
Account must be taken of each of the matters that is identified. But in doing so it is important to recall that s 17C(3) makes plain that there are cases in which doing nothing to eliminate, reduce or warn against a danger is consistent with exercising reasonable care. In particular, demonstrating that an occupier "was aware, or ought to have been aware of" both "the danger" that led to an entrant being injured and "the entry of persons onto the premises" does not require the conclusion that the occupier should have taken some step to eliminate, reduce or warn against that danger. Rather, it is necessary to take account of all of the matters specified in s 17C(2), including "the extent (if at all) to which it would have been reasonable and practicable for the occupier to take measures to eliminate, reduce or warn against the danger" (emphasis added). (footnotes omitted)
Insofar as the defendant's liability to the plaintiff arises as an occupier of premises, Part 1B of the Wrongs Act operates as a code which displaces the common law in the absence of intentional injury damage or loss as mentioned in s17E(2) abovementioned. There is no allegation in the present case which would bring s17E(2) into operation. Therefore, applying s17E(1) I conclude that the common law has no direct application to this case although its principles generally remain by virtue of s17C(1) of the Wrongs Act which reads as follows:
"Subject to this Part, the liability of the occupier of premises for injury, damage or loss attributable to the dangerous state or condition of the premises shall be determined in accordance with the principles of the law of negligence."
In deciding whether there has been a breach of the duty of care the tribunal of fact must first ask itself whether a reasonable man in the defendant's position would have foreseen that his conduct involved a risk of injury to the plaintiff or to a class of persons including the plaintiff. If the answer be in the affirmative, it is then for the tribunal of fact to determine what a reasonable man would do by way of response to the risk. The perception of the reasonable man's response calls for a consideration of the magnitude of the risk and the degree of the probability of its occurrence, along with the expense, difficulty and inconvenience of taking alleviating action and any other conflicting responsibilities which the defendant may have. It is only when these matters are balanced out that the tribunal of fact can confidently assert what is the standard of response to be ascribed to the reasonable man placed in the defendant's position.
The considerations to which I have referred indicate that a risk of injury which is remote in the sense that it is extremely unlikely to occur may nevertheless constitute a foreseeable risk. A risk which is not far-fetched or fanciful is real and therefore foreseeable. But, as we have seen, the existence of a foreseeable risk of injury does not in itself dispose of the question of breach of duty. The magnitude of the risk and its degree of probability remain to be considered with other relevant factors.
I approach these issues on the basis that ABC was the occupier of the premises generally, putting aside for the moment the question of who was the occupier of the chute. In my opinion the Judge was right to conclude that ABC took reasonable care to ensure that workers on the site were informed about safety issues generally, in relation to safety at its premises in particular and the Judge was right to conclude that ABC took reasonable care to control entry into confined spaces. There can be no doubt that ABC employed competent contractors to carry out the maintenance work and to provide scaffold. I proceed on the basis that Mr Henry was injured because of the failure by Scaffolding, a specialist contractor, to carry out its work carefully and safely.
ABC's common law duty of care as an occupier
As an occupier of the premises in question, ABC owed a duty to take reasonable care for the safety of persons entering the premises, including persons like Mr Henry: Wrongs Act (SA) s 17C. That duty would include a duty to take reasonable care to protect a person like Mr Henry from harm resulting from the activities of contractors working on ABC's premises. That duty in turn could involve a duty to warn an entrant to the premises about a source of harm, or a duty to keep an entrant away from an area in which contractors are working. Subject to that, the main focus of the duty of an occupier relates to the state of the premises, rather than to activities taking place on the premises. The duty of ABC as occupier of the premises would not usually extend to a duty to protect a person on the premises, not being an employee of ABC but an employee of a contractor working on the premises, from harm that resulted from the carelessness of the worker's own employer, or from harm that resulted from the manner in which another contractor carried out its work. Once again, even that proposition has to be qualified. As occupier of the premises ABC had a duty to consider safety issues arising from the presence of Allied and Scaffolding on ABC's premises, and from the interaction between those two firms as contractors separately engaged for the one task.
In my view, to the extent that Mr Henry makes a claim against ABC as occupier of the premises, that claim is answered by the conclusion that as occupier ABC was not under a duty to supervise the manner in which workers employed by Scaffolding went about the task of erecting scaffolding. And it was the manner in which they did that that led to Mr Henry's injury. Putting it a little differently, ABC as occupier was under no duty to protect Mr Henry against the risk of harm as a result of workers employed by Scaffolding erecting a scaffold that was not safe. In my opinion, this aspect of the claim by Mr Henry against ABC fails.
Application of the criteria in s 17c(2) of the Wrongs Act 1936
The nature and extent of the danger arising from the state or condition of the premises
The circumstances in which the person alleged to have suffered injury, damage or loss, or the property of that person, became exposed to that danger
The age of the person alleged to have suffered injury, damage or loss, and the ability of that person to appreciate the danger
The extent (if at all) to which the occupier was aware, or ought to have been aware, of (i) the danger; and (ii) the entry of persons onto the premises
The measures (if any) taken to eliminate, reduce or warn against the danger
The extent to which it would have been reasonable and practicable for the occupier to take measures to eliminate, reduce or warn against the danger
capable of being put into practice, done, or effected, especially with the available means or with reason or prudence; feasible.
Technical Bulletin 24 was released by the SAHC some time prior to 30 June 1980. It was a comprehensive document addressing a number of issues, including the potential hazards posed by exposure to asbestos, identification, legislation, responsibility for the control of hazards, procedures during minor works in ceiling spaces, procedures during major alterations, procedures in rooms containing exposed sprayed asbestos, respiratory protection, protective clothing, the use of vacuum cleaners and waste disposal. The purpose of Technical Bulletin 24 was 'to lay down procedures to be adopted by those engaged in maintenance and alteration work in the vicinity of sprayed asbestos coatings.' Among other things, it specified that exposure to asbestos should be kept as low as possible.
(1) Subject to subsection (2), this Part operates to the exclusion of any other principles on which liability for injury, damage or loss attributable to the state or condition of premises would, but for this Part, be determined in tort.
(2) This Part does not apply to a case where an occupier causes a dangerous state or condition of premises, or allows premises to fall into a dangerous state or condition, intending to cause injury, damage or loss to another.
...
Requiring or permitting the applicant to be exposed to the inhalation and ingestion of asbestos dust and fibre.
...
- Failing to warn the applicant of the dangers to which he was exposed.
(a) Amaca is responsible for the legal liabilities of James Hardie for manufacturing and supplying the asbestos cement building products to hardware stores and retail outlets which were purchased by persons engaged in building and construction in South Australia and did so exclusively from 1977 onwards (paragraphs 3 to 5);
(b) between 1991 and 2003, Mr Miller owned a house at 7 Thanet Street, Brooklyn Park during which time building, renovation and construction work was undertaken upon existing asbestos cement sheeting manufactured and supplied by Amaca. The renovation and construction work released asbestos, dust and fibre which Mr Miller inhale (paragraph 9);
(c) in the early to mid-1990s, Mr Miller, while a self-employed electrician, handled asbestos cement products including their removal, drilling, cutting and working with as a result of which he was exposed to asbestos dust and fibre (paragraph 10);
(d) Amaca's manufacture and supply of asbestos cement products falls within s 8(2) and s 9(2) [sic] of the Dust Diseases Act 2005 (SA) and the Dust Diseases Regulations 2006 (SA) (paragraph 11); and
(e) Amaca relevantly knew, by 1990, of the dangers associated with asbestos exposure and took no steps to warn members of the public, including Mr Miller as to the dangers associated with working with or interfering with such products (paragraphs 10-13);
(f) Amaca failed, in the media, to produce and then utilise a public marketing campaign warning the community of the dangers associated with asbestos use including persons in the position of Mr Miller (paragraphs 15-22).
It is a necessary, but not sufficient condition, for the imposition of a duty of care in the use of a product, that the manufacturer or distributor ought to have foreseen that risk. In this case Mr Werfel must prove that James Hardie should have foreseen a material risk that persons engaged only occasionally in working on in‑place asbestos home building products, as tradespeople or householders, could contract mesothelioma. The other circumstances supporting the imposition of a duty to warn, or negating it, are to be found in the matrix of circumstances connecting the manufacturer or distributor with, or distancing it from, the person who suffers a foreseeable injury. In this case, those circumstances include:
- the commercial nature of James Hardie's manufacture and distribution of asbestos-cement products;
- the extensive and widespread use of those products in Australia's post-war residential construction;
- the continual operations of James Hardie in manufacturing and distributing asbestos free materials after 1987;
- the large number of people, tradespersons and home handypersons who would come to work on those products over a long period of time;
- the lack of any direct commercial relationship between those tradespersons and handypersons in respect of the asbestos-cement products on which they worked; and
- the adverse effect on James Hardie's business were it to warn that people who worked on asbestos-cement products might contract mesothelioma.
(a) the nature and extent of exposure to asbestos products proven against Amaca;
(b) whether that exposure gives rise to a liability specifically in circumstances where Amaca failed to undertake a media or publicity campaign concerning the dangers of its products and whether that campaign caused Mr Miller's loss;
For the above reasons, we find that by 1990:
the degree of foresight that occasional exposure to asbestos by remodelling, repairing or removing asbestos-cement home building products may cause mesothelioma;
the magnitude of that risk; and
the other salient features of the relationship;
combined to justify the imposition of a duty on James Hardie to take reasonable care to avoid injury to the occupiers of homes constructed with asbestos-cement building products, and the tradespersons they engaged, who occasionally remodelled, repaired or removed its asbestos-cement building products.
Expert evidence in relation to an asbestos awareness media campaign
James Hardie & Coy demonstrated a sophisticated and professional approach to corporate communications and marketing during the period outlined in the documents...They appointed, briefed and approved mass market media campaigns, corporate sponsorship and public relations activities that promoted their products and supported their sales force. These marketing activities were designed and executed by reputable advertising and other professional services agencies operating in the 60s, 70s, and 80s. Budgets were allocated, advertisements and other communications material were created, approved and run in the media. Research was regularly undertaken to assess the effectiveness of the messages, the media selected, and the money spent. I have also gained further information on Hardie Groups promotions budget and expertise from 1988 - 1996 from the former Group Account Director on their account, Mr Jim Kiernan.
Had they chosen to commission a communications campaign aimed at warning consumers and other customers about the risks of exposure to asbestos and how to avoid them during their transition to becoming asbestos free from the late 1980s, it is my view it would have been timely. They could have reassured their customers that Hardie products were now asbestos free in the same campaign. Classic problem and solution advertising.
So, in summary, I believe James Hardie had the collective know-how and the creative flair to best make the business and its products known to the media. Interestingly, Document 91 in the Reid Collection also signals that James Hardie staff members are enjoying "increasing self-reliance" when it comes to public relations for the business. I think it also opportune to note that Eric White Associates, having a presence in the UK and a vested interest in asbestos (See document 41 in the Reid Collection), would find it difficult to miss the regulatory and media developments in the UK, as outlined earlier in this document.
Findings in relation to the effectiveness of a public media campaign
(a) on Mr Miller's own expert evidence, as set out in the reports of Ms Caro and Mr Roberts, the very media campaign for which they advocate would only have the relevant effect on a minority of people;
(b) Mr Miller was not a consumer of media beyond sport and therefore is unlikely to have been aware of the relevant campaign at least as far back as 1991;
(c) his exposure to asbestos was very minor;
(d) there is no clear evidence that he was actually aware that he was drilling into asbestos or otherwise working in and around the vicinity of asbestos while working for Total Electrical and then Bathroom Concepts;
(e) his explanation as to what he would have done is implausible ie. he effectively demanded only doing work on guaranteed asbestos-free jobs.
The submissions at trial and in this Court often treated this allegation of breach as a failure to engage in a mass media advertising campaign. That description unduly focussed attention on only one element of the postulated campaign. Properly formulated, the duty is to warn those members of the public engaging in the remodelling, repairing or removing of domestic asbestos‑cement home building products of the risk in doing so.
The most obvious first step in discharging the duty to warn is a frank public acknowledgement by James Hardie itself of the risk, that even occasional work on asbestos-cement building products can cause mesothelioma. The labels it placed on some asbestos-cement products were hedged with qualifications which diminished the danger. The labels were also a relatively limited publication. The same holds for the warnings in the promotional material referred to in paragraph [307]-[311] below.
The sobering effect on the Australian community of an unequivocal and very public warning that an activity might cause cancer should not be underestimated. Such an acknowledgement by James Hardie, and an endorsement by it of the precautions which occasional users should take, would have been inherently newsworthy and was likely to have been published and republished by the mainstream news media, by government and non-government agencies, by trades associations, building hardware suppliers and by public health and occupational safety authorities. Moreover, in the absence of a comprehensive acknowledgement by James Hardie of those risks, the commentary of others naturally enough was, as we shall see, guarded.
Expert evidence in relation to causation, treatment and longevity
Peritoneal mesothelioma and exposure to chrysotile asbestos and Dr Gal's report
The actual tumour mass then consists of genetically diverse cells that have accumulated many small abnormalities, through multiple molecular events, and that continue to accumulate further mutations as the tumour evolves.
MR SHELLER: Can I just ask you then as a general proposition, you would regard working in and around crocidolite asbestos as an incredibly dangerous activity?
WITNESS KLEBE: Yes. Absolutely.
MR SHELLER: And that's because of the particular potency of the crocidolite fibre - - -
WITNESS KLEBE: Yes.
MR SHELLER: - - - in terms of causing mesothelioma?
WITNESS KLEBE: Yes.
WITNESS KLEBE: Well, because they've got - the fibres have different shapes.
MR SHELLER: Yes.
WITNESS KLEBE: So the amphiboles are straight shaped. So they're kind of needle shaped, and they do some mechanical damage owing to their shape, and they do some direct eruption of cell membranes of that, whilst the chrysotile fibres, they are curved fibres. They are sort of serpentine, sort of snake like shape and they do probably less mechanical damage. And they also clear more quickly.
So what the body is trying to do, it's trying to get rid of the fibre. It's trying to digest the fibre. The chrysotile eventually will get cleared quicker. So it stays there for less long, whilst the amphiboles stay there longer. But the basic processes in the body - like, what the body is trying to do with it remain the same.
MR SHELLER: The word I've seen used is "biopersistence".
WITNESS KLEBE: Yes. That's the clearance, basically.
MR SHELLER: And so the amphibole fibres, for example, crocidolite - because of that needle-like appearance, they have a capacity to penetrate - - -
WITNESS KLEBE: Yes. If they stay there for long enough. Yes.
MR SHELLER: - - - and then they stay there for longer as a result. And is it right to say that the longer they are there, the greater risk that they will cause damage?
WITNESS KLEBE: They've got more chances to cause mutations, yes. Because they stay there for longer.
MR SHELLER: All right. Whereas the curly white fibres, the chrysotile, as - and you told us a couple of times, they are more capable of being cleared by the lungs?
WITNESS KLEBE: Yes.
MR SHELLER: And is that interaction within the lungs replicated in and around the peritoneum?
WITNESS KLEBE: Yes.
MR SHELLER: And I think, again, you've set this out in your report that the process of interaction between fibre and cell in the lungs is the same as fibre - - -
WITNESS KLEBE: Yes. The process of the macrophage and action is the same. Of course, you know, when we talk about the lung - I mean, the fibres already have to be moved from the actual lung to the mesothelial lining. And, of course, the lining to the of (indistinct) surface - - -
Well, I'm glad that's your problem, and not my problem, because I think that's a really horrible problem. I mean, in all truth, if you'd asked me, would I rather walk down the catacombs of the Royal Adelaide Hospital or change a switchboard, I would rather change the switchboard. But that's prospectively. Right. I mean, that is now if I was - if I had these two options in front of me right now, I would feel less at risk. But, of course, we are dealing with a retrospective case, and he's had - - - - - - all of those exposures. So it becomes really difficult, because, you know, like, trying to apply the retrospective - you know, like, retrospectively applying the prospective chances. Yes, I'm glad that's your problem.
Palliative care or pain management specialist visits x 8 $1,600
Immunotherapy for 24 months with medical oncology supervision
Part 1 - For aspirations or complications of treatment $20,000
Second line chemotherapy with cisplatin/pemetrexed if no
response to immunotherapy and good status for treatment $6,000
Prognosis is poor, with overall survival rates between 9 & 17 months after diagnosis. However, in patients who are able to have HIPEC, there is marked improvement in median survival from 34 months to 100 months with five-year survival rates from 30% to 60%.
No, I can only go on what we - in the past, 10 years ago, we were sort of saying, this is world's worst disease. People were not surviving 12 months, 12 to 18 months. That was just sort of the average. It was just - it was pretty dismal. With the advent of some of the newer treatments, firstly chemotherapy became an accepted part of treatment and more recently immunotherapy, we are starting to see some improvements.
Now, that's - medical (indistinct) sometimes get excited about small incremental benefits of sometimes only 6-month improvement in progression-free survival or maybe 9 to 10-month improvements in overall survival. It's not brilliant, but it's something. What we are now seeing with some of the bigger centres, where they are handpicking and selecting their very, very, very best patients for surgery and subsequent treatments is they're sometimes reporting even better outcomes.
WITNESS: I - if the Werfel case came in today with the same information, I would come up with the same prognosis. And I think that the caution you have to make that it is based on the information we had at the time, and I would advise that the idea that he was cured which was being proposed by someone else was, I think, way more sort of flamboyant and out there than saying that he was at very high risk of recurrence.
MR ROBERTS: Sure. But if you were to also accept that that occurred six years ago - - -
WITNESS: Yes.
MR ROBERTS: - - - and Mr Werfel was still alive - - -
WITNESS: That is fabulous news.
MR ROBERTS: It is wonderful news. It truly is wonderful news. But the reality is that it would also reflect that, in that case at least, your view was wrong.
WITNESS: Well, at the time, I was asked to make a call, and I sort of stood by it then, based on the information, and I would stand by it today. Now, as it turned out, he's done a whole lot better than we had expected and I - whenever I see patients (indistinct) and I give prognosis, sometime they'll say, "How long have I got?" And I say, "I don't want to tell you how long you've got, because I'm mostly wrong. You can only be right one per cent of the time." And so I don't. But if you are put on the spot, you are going to say, "Well, this is what I'm going to say." And I said, "Now, it's your job to prove me wrong."
I would draw caution with regards to the PET scan report. Because I think what she's saying is that there was stable peritoneal thickening. The PET scan didn't show that to be FDG-avid. And FDG avidity on a PET scan often indicates whether there is a lot of physiological activity. But it has to be quite active for it to show up on a PET scan. So even though they may say there doesn't seem to be any evidence of FDG-avid cancer, it doesn't necessarily mean that there is no cancer there or that there's no active cancer. It might just be very low-level - a low level of activity that's not showing up on the imaging. So I think she's just talking about the fact that the PET didn't show significant activity.
Mr Miller submits that his peritoneal mesothelioma was caused or materially contributed to by each of his multiple episodes of exposure to asbestos during his employment at the RAH, and asbestos cement building products manufactured by Amaca.
The presumption under s 8(1) of the Dust Diseases Act 2005 (SA) operates. Pursuant to this section, if it is proved or admitted in a dust disease action that the plaintiff suffers from a dust disease (as is the case here), where the plaintiff has suffered exposure to asbestos dust which might have contributed to the disease, causation will be presumed. Clearly, Mr Miller has suffered exposure to asbestos which might have contributed to this mesothelioma. No evidence has been called by the State or Amaca which would be capable of rebutting the presumption and establishing that his exposure to asbestos at the RAH and from products manufactured by Amaca might not have contributed to his disease.
...Klebe was asked by Miller's counsel whether her opinion would be different if she assumed that the exposure history she was asked to accept in preparation of her report was not as it existed, or as detailed in Miller's affidavit of evidence, but rather based on a new hypothetical exposure limited 'to a single occasion' where Miller was 'in the ceiling space' and 'clumps of fluffy fibres fell on him' while he worked in that space 'for a few hours or an hour'.[833]
Over objection by the State, Klebe was permitted to answer that question and said it did not change her opinion.
While her opinion remained unchanged, she was not asked whether any exposure at the RAH, regardless of how trivial, would be sufficient to the development of his condition. She was merely asked about a single occasion, in a ceiling space, with Miller being in direct contact with asbestos fibres for at least an hour. That is the assumption that is required to be proven by the applicant for her (sic) Klebe's opinion based on the new assumption to be admissible. It has not been.
Moreover, it is important to appreciate that when Klebe articulates a view concerning asbestos being a carcinogen for the development of mesothelioma, she is referring to respirable asbestos. This is based on the theory that the biological mechanism commences, of necessity, with the inhalation of asbestos fibres. Her report makes that clear.
It follows that the mere visual presence of asbestos in one's proximity is not to the point. The meaning of exposure necessary for attribution to mesothelioma demands the inhalation of asbestos fibres. Accordingly, interrogating the evidence of exposure requires affirmation that Miller was exposed to respirable asbestos fibres that were not only capable of being inhaled, but on balance were inhaled by him. In other words, simply being in a space where asbestos may be present does not equate to relevant exposure. Even being in a space where asbestos may be disturbed does not necessarily equate to relevant exposure. It depends on whether one is in sufficient proximity to inhale airborne fibres for them to be inhaled.
If Miller's evidence of exposure is rejected, it follows that the Court cannot be asked to accept a different version of that evidence. The only version of his exposure is the version about which he gave evidence. A rejection of Miller's evidence must inevitably lead to the conclusion that he has been unsuccessful in proving causation.
Costs associated with past hospital admissions and outpatient appointments
Clean windows, balcony glass, fittings, and furniture
Upper level only - floors, kitchen, bathrooms, etc.
Travel time and trolley, bag and lifting assistance
Including cleaning, all meal preparation, shopping, and laundry
Supervision for personal care including food and eating
Clean windows, balcony glass, fittings, and furniture
Upper level only - floors, kitchen, bathrooms, etc.
Travel time and trolley, bag and lifting assistance
Clean windows, balcony glass, fittings, and furniture
Upper level only - floors, kitchen, bathrooms, etc.
Travel time and trolley, bag and lifting assistance
Driving to and from appointments and recreational outings
Including cleaning, all meal preparation, shopping, and laundry
Supervision for personal care including food and eating
24-hour "live-in" care (plus 2-5 hours nursing care)
He's independent in all his personal care, can prepare and clean up after meals, but paces himself heavily...he experiences ongoing fatigue, reduced strength and endurance...he requires assistance with day-to-day domestic and community activities".
In my experience with end of life mesothelioma patients, I have not seen a case yet where home nursing has been implemented.
Assistance with transferring from bed to shower commode
Meal preparations and assistance with feeding 3 times daily
A comparison of the evidence of Ms Dolling and Mr Burgoyne
He is living a relatively normal life. But at the end stage, he will be weak, he won't - maybe not be able to get out of bed. He will have a very large, distended abdomen if the fluid keeps building up. He will be - not be able to eat. But the biggest thing is he will likely have a bowel blockage, and really is basically dying by starvation. So just slowly fading away, but mentally still very competent. It's actually one of the most horrible ways to die.
Dr Broadbridge testified that in terms of suffering, peritoneal mesothelioma was worse than pleural mesothelioma, as patients with pleural mesothelioma tend to go quicker. She explained that patients with peritoneal mesothelioma tended to linger as "it's surprising how much the body doesn't need food to actually survive."[874]
Dr Broadbridge described the pain that Mr Miller will experience: "Pain can be a prominent feature, because of where the disease is where all the nerve fibre runs through. So, yes, he will have pain, and he will need pain medication. And potentially be sedated and have tubes down his throat to stop the vomiting and the nausea."[875]
In cross-examination Dr Broadbridge stated that the "end stage" for Mr Miller would likely be about two to four weeks. She also stated that the best care for Mr Miller would likely be in a hospital or a hospice during that period of time.
Dr Broadbridge confirmed in cross-examination that her reference to Mr Miller not having "active cancer" in her report dated 30 January, was a reference to active cancer on a PET scan. She clarified however that a PET scan may not always pick up active cancer. (some footnotes omitted)
The task of determining an appropriate sum for general damages involves a consideration of what has happened to Mr Miller in the past, and what will happen to him in the future and then fixing a figure "... by the use of the awareness produced by general experience, current general ideas of fairness and moderation", it being "a matter of judgment in the sound exercise of sense of proportion."[877]
In Brennan -v- James Hardie & Coy Pty Limited (NSWDDT, 2 March 2001), Curtis J said of the assessment of damages in a mesothelioma case: "What sum is reasonable and proportionate not only for the exquisite pain confronting the plaintiff, the appalling reality of the manner of his impending death, but also the grief and outrage at the fact of that death itself? The sum must reflect the fact that his life is no trifling thing. The plaintiff must have the consolation that the community through this [Court] values his life highly."[878]
If we take into account the changes in the CPI, the award that Mr Werfel obtained in 2020, of $280,000 is by itself, just with CPI changes, $344,344 today.
So, your Honour, I would ask your Honour to consider what the average South Australian person doing their shopping in Rundle Mall would consider, if they were told that a person with exactly the same disease, who was older in New South Wales or Queensland or Victoria, that person is getting $450,000, $500,000, $800,000. And the same person with the same disease in South Australia is getting $280,000. What would the average South Australian person think about that state of affairs? And I would suggest to your Honour that the average South Australian would be outraged by that state of affairs.
In particular, the Judge did not undertake any review (nor even acknowledge) any awards apart from Dunning,[885] whether made in this State or elsewhere. For example, no reference was made to the award of $190,000 made in Hamilton in 2013,[886] nor the award of $230,000 made in Latz in 2017.[887] Likewise, no review was undertaken of decisions here, or interstate. The review undertaken by Corboy J in Lowes v Amaca Pty Ltd in 2011 was cited to the Judge, but not mentioned in her Honour's reasons.[888] Both sides provided extensive references to awards made both here, and interstate.
That is not to say that it was necessary for the Judge to address every case cited, or to embark on her own review of awards made across Australia in the years since Hamilton. Rather, it was necessary to engage with the case made against Mr Werfel in respect of the reliance placed on Dunning, and to heed the warning given by this Court in Hamilton that the weight to be given to awards made in the Dust Diseases Tribunal "is much reduced ... [e]xtreme caution should ... be exercised" before having regard to them, because appeals from that Tribunal are confined to errors in point of law.[889]
Quite apart from the inadequacy of the Judge's reasons on this issue, the reference to the decision of the Dust Diseases Tribunal in Dunning, as if it provided some form of benchmark in this State, is inconsistent with the approach of this Court in Hamilton, and revealed an error of law.
As to the amount awarded, though we are aware of recent interstate decisions in mesothelioma cases where the awards have been made in the order of $350,000 to $430,000,[890] the review of the award of damages made in this case must give primary emphasis to the general level of damages awarded in South Australia. Whilst interstate awards are not irrelevant, particularly on appeal, we were not asked to review awards made for general damages across Australia since Hamilton was decided in 2013. Neither party on the hearing of this appeal furnished the Court with anything like the material made available in Hamilton. Neither party, particularly Mr Werfel, suggested that a review of awards of the kind undertaken in Hamilton furnished a basis for the conclusion that, in the circumstances of this case, an award more than twice that made in Hamilton can be justified by awards made here or interstate, or on the grounds of inflation and CPI movements since 2013, when Hamilton was decided.
Nonetheless, we accept that there remains a difference in awards of damages for pain and suffering and loss of amenities across Australian jurisdictions in terminal illness cases. Any apparent anomaly caused by a difference in awards between the Australian jurisdictions flows from the need for consistency of approach within each jurisdiction.[891] For example, in 2013, the Full Court in Hamilton decided to award general damages of $190,000, rather than the sum claimed of $230,000, even though interstate authorities supporting a higher award were cited to it, such as the Western Australian case of Lowes v Amaca Pty Ltd, in which $250,000 was awarded in 2011.[892]
It may be accepted that historical changes in the value of money over time will generally support an incremental increase in the level of general damages awards made over time across Australia.[893] However, the result in Hamilton serves to show why, in our view, it would be wrong to fail to give primary emphasis to awards made in this State. Though there is no reason why the pain and suffering of a South Australian should be assessed at anything less than the pain and suffering of any other Australian, there remain differences nevertheless. These must be addressed incrementally over time, with the benefit of whatever submissions and materials the parties and their representatives choose to put before the Court.
Regardless of the inadequacy of the reasons of the Judge, and the error of law which vitiates her assessment, in our opinion the award of $400,000 made in this case for general damages for pain and suffering and loss of amenities was manifestly excessive and out of step with the general level of damages awarded in this State. It must be set aside.
There's Ewins in 2005, that awarded $100,000. Geyer in 2013, that awarded 175,000. Hamilton in 2013, and that was an award of $115,000, but was increased on appeal to $190,000. Latz in 2017, which was $230,000. And then Werfel - as you have heard - was originally $400,000, but reduced on appeal to $280,000. So three of those five decisions were findings of the Supreme Court, and that was... Werfel, Hamilton and Ewins. And the other two, Geyer and Latz, were decisions of this court.
It is the role of this Court, as the final appellate court in South Australia (subject to the grant of special leave to appeal by the High Court) to oversee damages awards and ensure overall consistency. Accordingly, in considering comparable awards, primacy should be given to awards considered by this Court.
This is not to say that no regard can or should be had to first instance decisions from which an appeal lies, or ultimately lies, to this Court. There is a right of appeal to this Court from an assessment of damages by a judge of the District Court or a justice of this Court at first instance. There is a right of appeal from an assessment of damages by a magistrate to a justice of this Court and, by permission, to this Court. All such awards are potentially subject to the supervision of this Court. However, the regard had to first instance decisions should take into account that there may be reasons other than merely prospects of success why in a particular case no appeal is taken from an assessment. Caution should be exercised in relation to such awards particularly where the general level of awards in the relevant category has not been the subject of recent consideration by this Court. (citations omitted)
It is nearly eight years since Ewins was decided. In Amaca Pty Ltd v King,[898] the Victorian Court of Appeal, citing with approval the judgment of our Full Court in Joyce v Pioneer Tourist Coaches Pty Ltd,[899] noted that, insomuch as contemporary society pays and receives vastly greater amounts of remuneration than a generation ago (even allowing for inflation), and speaks of the importance of the quality of life to an extent not before contemplated, it cannot be doubted that modern society places a higher value on the loss of enjoyment of life and the compensation of pain and suffering than was then the case in the past.
In my view, the award of $115,000 is manifestly inadequate. I would increase the award to $190,000. I consider such an award to be proportionate to the injury suffered by the deceased. In reaching this consideration I am influenced by the disparity between the level of award of damages under this head, reflected in Ewins, and the level of awards in mesothelioma cases in other jurisdictions. This Court should adjust the level of awards for mesothelioma cases in this State.
The above considerations, coupled with an analysis of the assessments interstate between 2001 and 2011 set out at [130]-[136] above, clearly demonstrate that an assessment of damages in Mr Hamilton's case of $115,000 in 2012 was manifestly inadequate. This Court should decide that the general level of damages for pain, suffering and loss of amenities of life in a terminal illness case should be increased well above the level of approximately $100,000 referred to by Doyle CJ in Ewins.
a) visits to the GPs x 20 $2000 > > b) visits to the oncologist x30 $6000 > > c) visits to palliative care specialist or pain
management specialist x8 $1600
d) medications including pain relief etc (PBS subsidised) $3000
e) home oxygen $1000
f) x-rays and/or CT scans $5000
g) lung function tests - not required;
h) surgery including aspirations of ascites $1000
i) immunotherapy for 24 months (PBS subsidised)
with medical oncology supervision including day
care facility payment $24000
(i) radiotherapy for symptomatic control $8000
j) hospitalisation;
(i) part 1 - for aspirations or complications of treatment $20000
(ii) part 2 - hospice management $40000
k) second line chemotherapy with Cisplatin/Pemetrexed
if does not respond to immunotherapy and good
performance status to have more treatment $6000
Persons who are injured are often assisted by relatives or friends, who provide nursing, perform domestic chores, help with travel or look after a business during the period of incapacity...[t]he law is now clearly settled that the need for the services entitles the plaintiff, in the absence of a statutory prohibition or limitation, to recover the reasonable costs of meeting these needs at commercial rates...Some plaintiffs may have greater needs than others; the test is subjective and the defendant must take the particular plaintiff as found.
The decisions of Griffiths v Kerkemeyer[910] and Van Gervan v Fenton[911] have been considered anomalous for at least two reasons.[912] First, they involve the provision of compensation in circumstances where there is no obligation on the plaintiff to recompense the carer for the services provided. Secondly, they operate on the basis of a legal fiction as to the rate to be applied, namely the "market cost" of the services provided gratuitously, a cost which may never be paid.
In support of these awards, the Judge was presented with a medico-legal report prepared prior to the trial by an occupational therapist, Ms Anne Morgan. This report contained a recitation of Mr Werfel's history of illness and described the assistance he had received since his diagnosis, surgery and treatments. It provided a helpful, high-level chronology of treatment, surgeries and hospital in‑patient and out-patient attendances. However, it did not record the dates when, for example, Mr Werfel received chemotherapy ("approx. 4 sessions"). At times, it recorded Mr Werfel's estimated need for care if he lived alone, which was contrary to the evidence as Mr Werfel lived with his wife and three young daughters.
....
... Almost no consideration was given to the need to ensure that the factual assumptions made by the occupational therapist were proved, and her calculations were made independently of what Mr and Mrs Werfel described in their evidence. Rather, Ms Morgan seemed to take the topics they described, and fashion her own time estimates according to her own views of what could or should have been required. Consequently, there was no correlation between the oral evidence given at trial and the calculations made by the occupational therapist which were repeated in submissions to the Judge, and used by the Judge for the purposes of her findings and awards.
Ultimately, there is little evidence of the actual care and services provided by England to meet the needs of Miller and more particularly the number of hours that were allegedly provided. At best, the evidence is vague and nonspecific.
Miller's evidence is that following discharge from hospital, on 2 July 2024, he spent most of his time resting and that during the first week or so, England was providing the care and was not working.[918] Thereafter England returned to work but continued to provide Miller with some assistance. She did 'all the cleaning, meal preparation, laundry and shopping...[spending] two to three hours per day attending to all of these tasks'.[919] England drove the applicant to medical appointments,[920] and for approximately 6 weeks helped overnight, with toileting and medication.[921]
Broadbridge first met Miller four weeks post the surgery. At that stage she recorded that Miller had no abdominal pain, had a good appetite and that his bowels were functioning normally. He looked clinically well.[922]
Miller was driving himself around by four weeks post the surgery.[923]
By mid-August, Miller was less reliant on England for day to day support although she continued doing all 'cleaning, laundry, and laundry [sic]'.[924] It is noted that by this time, Miller was able to travel to Coffin Bay alone and care for himself.
When seen by Dolling on 2 September 2024 it was noted that Miller was already independent in his personal care.
When next seen Dr Broadbridge, on 21 October 2024, Miller remained well with no abdominal symptoms and 'seems to have completely recovered from the abdominal surgery'.[925]
In his statement, Miller refers to going back to preparing his own meals. He does not specify from when he was able to do so. It was presumably around the time he was able to be in Coffin Bay alone, therefore mid-August 2024.
He refers to England 'still spending at least an extra hour a day doing things for me around the home'[926] however it is not specified what this relates to.
England did not give evidence. She presumably would have been able to give direct evidence of the care she provided to Miller and the hours she spent providing that care. She would also have been able to give evidence to delineate what care and services were required by Miller, and what services were provided for their joint benefit. Her failure to give evidence was surprising in the circumstances. While her absence permits a Jones v Dunkel inference, it probably does not advance the matter significantly. What the Court is left with are extremely broad estimates around the care.
Future care (whether provided gratuitously or commercially)
... Not only does she intentionally ignore the reality of the situation concerning the living arrangements of Miller and England, but she further concedes in her report that the time she allows to undertake tasks bear no relationship to the time that Miller and England would spend undertaking them[933] - the same error as made in relation to the past care.
Secondly, Dolling has based her assessment on the assumption that Miller does not have the ability to independently engage the care himself. On that basis she has used agency rates as the basis of calculating the commercial cost of the care he will require. This was the same error that was identified in Werfel.
Sullivan v Gordon damages - s 9(3) of the Dust Diseases Act 2005
... As the text of s 9(3) makes clear, what is compensable is the loss or impairment of the plaintiff's capacity to perform domestic services for another person. Damages are not awarded pursuant to s 9(3) for the plaintiff's incapacity to meet his own need for domestic services. The award depends on the loss or reduction of the plaintiff's capacity to provide services of a particular kind, namely domestic services, to another person. The cross-appellant submits that the words of s 9(3) should be construed to give the fullest relief which the fair meaning would allow. "[A]nother person" could be anyone if those words are given their widest amplitude. I do not consider that to be the correct construction of those words as used in s 9(3). Those words take their meaning from the concept of "domestic services". Those domestic services must be services rendered or which would have been rendered to a member of the plaintiff's household, i.e. a person residing in the plaintiff's home. In that way, the concept of domestic services informs the qualification of the person or persons who are or would be the recipient of those services.
While the Note does not form part of the Act it is nonetheless available, like a Second Reading Speech, as an extrinsic aid to interpretation. It can be seen that the term "domestic" imposes some limit on the nature of the services which are compensable. In addition, it also imposes some limit on the identity of the other person referred to in the subsection. The award of damages pursuant to s 9(3) is confined to compensating any loss or impairment of the injured person's capacity to perform such services for a member of the plaintiff's household. It does not extend to compensating for the loss or impairment of the injured person's capacity to perform such services to persons outside his or her household.
To the extent that there is any ambiguity in the phrase "for another person" so as to suggest that the liability for damages pursuant to s 9(3) extends to any loss or impairment of the plaintiff's capacity to perform such services for any other person beyond the plaintiff's household, recourse can be had to the Second Reading Speech and the Note to the subsection.
Consideration of the second reading speech reveals that the mischief towards which s 9(3) is directed is to ensure that care would continue to be provided to dependent children and spouses of persons injured by exposure to a dust disease.
The Note provides that the subsection is intended to restore the effect of Sullivan v Gordon. The context in which s 9(3) was enacted was the High Court's decision in CSR v Eddy which overruled the decision in Sullivan v Gordon.
Sullivan v Gordon held that a plaintiff who is rendered unable to provide gratuitous personal or domestic services for another because of personal injury, is entitled to recover as damages an amount calculated by reference to the commercial value of those services. The New South Wales Court of Appeal allowed the recovery of damages for the loss of the capacity of the plaintiff to care for her daughters.
I accept that the compensable loss for which Sullivan v Gordon damages were, and are to be awarded pursuant to s 9(3), remains the loss to the injured person and is not the loss to the person to whom the services were and are to be provided. Nonetheless, that loss falls to be assessed in damages on the basis of the commercial cost of replacing those services. (footnotes omitted)
Concurrent oral evidence of Mr Thompson and Mr Wallace
1. Whether or not the business can continue to operate profitably in the absence of Mr Miller?
2. If the business cannot continue absent Mr Miller, what is the appropriate measure of economic loss?
3. If the business can continue absent Mr Miller, what is the appropriate measure of economic loss?
I note that the financial impact of the absence of a key working owner from the business is not able to be determined with certainty until it has actually occurred.
In my opinion, Mason J [in Fitch v Hyde-Cates[1064]] clearly equated the living expenses which were deductible with those which would have enabled the deceased to earn future wages or which should be regarded as an essential condition of the exercise of the deceased's earning capacity. No doubt the living expenses to enable a company executive to earn a future salary would be different from those to enable a rural worker to earn future wages. In that sense the standard of life which the job and career prospects would suggest the deceased was reasonably likely to achieve must be taken into account.
For present purposes what is important is that, consistently with what was said by the High Court in Fitch v Hyde-Cates, no deduction is required for items of expenditure which Judge Curtis described as entertainment or indulgence in pursuing a standard of living commensurate with the plaintiff's hard work. A distinguishing characteristic of such expenditure is that it is not necessary to maintenance.
Experts called by the applicant and the second respondent have provided evidence of what they consider to be a reasonable amount to allow for expenditure on essential items and the applicant has agreed to adopt the figure arrived at by the second respondent's expert in that regard. No objection was made to, and no qualification was placed upon receipt of that evidence by any party. While calculating expenditure on essential items and luxury items respectively based upon the applicant's evidence rather than expert evidence may theoretically be superior, as Blue J observed in Amaca Pty Ltd v Latz [2017] SASCFC 145 [120], whether that method is superior in practice may well depend upon the applicant's ability to recall or reconstruct what he has purchased based upon credit card records. While that may be achievable with single item purchases, it may prove difficult with supermarket shopping and other multiple purchases made under one transaction.
If further cross-examination of the applicant about expenditure is allowed, it may lead to a request being made to recall one or both financial witnesses. If that occurred, the present listing dates and the completion of the hearing would be materially delayed.
The District Court or SAET (as the case may be) should make an award of exemplary damages in each case against a defendant if it is satisfied that the defendant -
(a) knew that the injured person was at risk of exposure to asbestos dust, or carried on a prescribed industrial or commercial process that resulted in the injured person's exposure to asbestos dust; and
(b) knew, at the time of the injured person's exposure to asbestos dust, that exposure to asbestos dust could result in a dust disease.
...We consider that the effect of s 9(2) is to establish conditions which are sufficient for an award of exemplary damages in a dust diseases action, and to indicate that if those circumstances exist, an award should usually be made. That is to say, if the defendant is in the category identified in sub-par (a) and had the knowledge to which sub-par (b) refers, the Court ought, absent some sufficient countervailing consideration, make an award of exemplary damages. It is no longer necessary that a defendant's conduct be characterised as reprehensible before an award is made (although if a defendant's conduct is reprehensible, that would be relevant to both the exercise of the discretion and to the assessment of the amount to be awarded). Section 9(2) should be understood as substituting the statutory criteria for the common law criteria; not as adding to those criteria. There will be circumstances in which, despite the use of the word "should", the Court may exercise the discretion not to make an award, but those circumstances will be outside the norm.
This has the effect that an award of exemplary damages may be made against a defendant in respect of a breach of duty occurring many years previously, who no longer has any involvement with asbestos, whose conduct does not in the eye of the common law warrant punishment, and in respect of whom notions of deterrence are of no or limited weight. That however is the legislative intention. There is no indication that s 9(2) is not to apply in such circumstances and, indeed, they are the circumstances which are likely to exist in many, if not most, dust diseases actions.
It should be kept in mind that many dust diseases do not become manifest for many years after the injured person's exposure to asbestos. The evidence in this action indicated that periods of 15 to 30 years are common. In these circumstances it is almost inevitable that some defendants will have ceased business altogether, or changed their practices, or ceased any use of asbestos. Nevertheless, s 9(2) contemplates that an award of exemplary damages should be the norm.
At common law, exemplary damages are awarded against a wrongdoer who is guilty of reprehensible conduct representing, as it is often said, a "contumelious disregard of another's rights".[1074]
Where a plaintiff wishes to bring to account, in addition to the statutory preconditions, any common law considerations which have been recognised as relevant to an award of exemplary damages, the burden remains with the plaintiff to adduce evidence and to prove those matters which it is said demonstrate a basis for punishment and condemnation. Whilst, in a general sense, one may wish to punish and condemn James Hardie for its conduct, the award in favour of Mr Werfel must focus on the circumstances of its negligent conduct towards Mr Werfel, or the class of which he is a member, and identify exactly what it is about that negligent conduct that is deserving of punishment and condemnation.
That is, if a plaintiff wishes to demonstrate why at common law an award of exemplary damages ought be made, proof must start with the particular negligence finding made against the defendant, and then identify what it is about that conduct, necessarily beyond the statutory preconditions supplied by a combination of s 9 and 8 of the Dust Diseases Act, which justifies an award.
DD Act, the Court said that the award should "be characterised by moderation".[1076] The Court awarded $35,000 for exemplary damages. 2. An award of exemplary damages can be made even though the conduct complained of has ceased.[1077] However, cessation of the conduct is relevant to the quantum of the award as there is no need for specific deterrence. The Full Court in Latz said that general deterrence is still relevant because there may still be businesses that handle asbestos.[1078] 3. Another relevant consideration discussed in Werfel is the effect of a prior award of exemplary damages against a party for the same or similar conduct. In Latz, Stanley J suggested that prior awards might need to be taken into account when assessing the quantum of exemplary damages:[1079]
In that regard, I am conscious that Amaca might be exposed to further actions in the future in which a claim for exemplary damages could be made. This is the first award of exemplary damages made against the cross-respondent. It is for courts in the future who may have to assess a claim for exemplary damages to determine whether, if an award of such damages is to be made, it should be mitigated because of any earlier award made against the cross-respondent for exemplary damages for the conduct which justified the award in this case.
Plainly what the Full Court in Amaca v Latz had in mind is that a relevant consideration when assessing exemplary damages is that there must be a conclusion to punishment, and that there may come a time when lesser awards ought be made before punishment is complete...
(1) A person who is liable in damages for harm suffered by another may recover contribution from a third person who is also liable in damages for the same harm.
(2) The right to contribution -
(a) exists even though the act or omission that gave rise to the liability of the person seeking to recover contribution may amount to an offence; and
(b) extends to liabilities incidental to damages (such as a liability for interest),
(but the right is subject to Part 3 and any other statutory provision that may operate to modify, exclude or limit it in a particular case).
(a) by way of third party proceedings, or proceedings between the parties, in an action in which damages are sought from the person entitled to contribution; or
(b) by way of a separate action brought within the relevant time limit against the person from whom contribution is sought.
(4) The relevant time limit is the longer of the following -
(a) the period within which the person who suffered the harm could have brought an action against the person from whom contribution is sought;
(b) 2 years after the damages payable by the person entitled to contribution are finally determined.
(5) The contribution is to be an amount that is fair and equitable having regard to the extent of each contributory's responsibility for the harm.
(6) In determining the contribution to be made by a contributory whose liability for the harm is a derivative liability, the court is to have regard to the act or omission from which the liability arose.
(7) If it is fair and equitable to do so, the court may exempt a person from liability to make contribution or order that the contribution to be recovered is to amount to a complete indemnity.
(8) ... (notes omitted)
The State's submissions in relation to contribution and apportionment
No doubt the making of the apportionment which the legislation requires involves comparison of the culpability of the parties, ie, the degree to which each has departed from the standard of what is reasonable,[1091] but that is not the only element to be considered. Regard must be had to the "relative importance of the acts of the parties in causing the damage"[1092] and it is "the whole conduct of each negligent party in relation to the circumstances of the accident which must be subjected to comparative examination"[1093] (emphasis added).
Amaca's submissions in relation to contribution and apportionment
In my opinion, the evidence provides no rational basis for the division of causation between the earlier and later periods of Mr Plane's employment by Baldwin, especially when regard is paid to the complex pathogenesis of mesothelioma explained by Professor Henderson. Axiomatically, causation therefore cannot be proportionally allocated between his different work activities or the different amphibole asbestos fibres to which he was exposed.
In these circumstances, I consider it impossible to establish that any apportionment is 'just and equitable' other than an equal apportionment of responsibility for Mr Plane's damage between Baldwin and Jsekarb. (citations omitted)
Judge Curtis applied the dictum of Clarke JA in Macquarie Pathology Service Pty Limited v Sullivan (unreported) Court of Appeal, 28 March 1995. The appellant first submitted that, having found the defendants equally blameworthy and set the causal potency at 75 per cent to the appellant and 25 per cent to the second respondent, the trial Judge ignored equal blameworthiness and simply apportioned the responsibility for the plaintiff's damages 75 per cent to the appellant and 25 per cent to the second respondent. On its face what his Honour did seems entirely sensible. He regarded the parties as equally blameworthy, but regarded the causal potency of the appellant as greater in a proportion of three to one to that of the second respondent. It is not a mathematical exercise, and where the responsibilities were not to be distinguished in one respect but were to be distinguished in another respect I see no reason why the distinguishing respect should not be given full effect. To apportion as Judge Curtis did seems just and equitable.
...
Professor Henderson's evidence, which Fitzgerald AJA had earlier said the Tribunal substantially accepted, was that while there was uncertainty concerning the process of development of mesothelioma it was related to the cumulative effect of all asbestos fibre inhaled in the material period which ends about ten years before the first diagnosis of the disease. The Tribunal, his Honour thought, correctly accepted this theory and rejected the manufacturer's fundamental proposition that inhalation of more than one amphibole form of asbestos fibre raised a number of separate, independent, possible causes of mesothelioma and the conclusion for which it contended, namely, that the plaintiff's mesothelioma was probably caused by only one of the other amphiboles which he had probably inhaled.
In the present case there was evidence before the Tribunal from Dr James Leigh that for all fibre types there is a dose response relationship between the risk of asbestosis, lung cancer and mesothelioma. The appellant submitted, however, that apportionment must be calculated by reference to causal potency, and in the absence of evidence providing a rational basis for the division of causation between the defendants there could not be apportionment by reference to the extent of risk related to the length of exposure or the potency of exposure.
...
On the evidence in this case Judge Curtis found that the degree of exposure, and hence the degree of risk, varied between the two defendants. I can see no error in his Honour applying the relevant proportions to determine what was a just and equitable apportionment having regard to each defendant's responsibility for the damage.
If E M Baldwin & Son Pty Ltd v Plane is properly understood as being a factual determination by this Court of approximate equality of culpability in a case where the Court was entitled to re-assess that culpability, the decision is one restricted to its particular facts and of no relevance in this appeal. On the other hand if it is to be regarded, as it fairly might be, as a statement of legal principle that, in circumstances where successive employers have exposed a worker to the risk of injury from asbestos over different periods with, perhaps, different intensities of exposure to asbestos with different degrees of toxicity, apportionment of liability between successive negligent employees, found to have caused disease resulting from such exposure, must be equal, then in my respectful opinion, such statement is wrong. In cases of this sort, where causation is proved by evidence of exposure to risk and there is a rational basis for distinguishing between the degrees of exposure, it is not correct to say that there is no rational basis for the division of causation. Nor, indeed, should the conventional regard to culpability and causation obscure the need to examine the whole conduct of each party, an examination which in circumstances of inability to quantify comparative causal potency could itself lead to differential responsibility by regard to the degree of exposure to risk.
The decision at first instance is a paradigm example of a feature of fact finding often found in cases involving medical issues. That feature is the major cleavage between proof of a fact in non criminal court cases to the satisfaction of the fact finding tribunal on the balance of probabilities and proof of a fact for scientific purposes to the satisfaction of those expert in the particular field of science. The latter kind of proof is much more rigorous and demanding than the former.
The two kinds of proof are quite different in their objects and methods, but are frequently the cause of confusion when medical issues are concerned. In many such cases, experts in the field of the relevant medical science give evidence of their expert opinion concerning the medical issue. Trained in the scientific method of proof, some such experts find difficulty in adjusting themselves, when giving evidence in court, to the lesser requirements of legal proof, which, looked at from their scientific standpoint, they regard as inferior and unreliable...
The predominant position in Australian case law is that a balance of probabilities test requires a court to reach a level of actual persuasion. This process does not involve a mechanical application of probabilities: see Briginshaw v Briginshaw [1938] HCA 34; (1938) 60 CLR 336 at 361-362; Jones v Dunkel [1959] HCA 8; (1959) 101 CLR 298 at 304-305; West v Government Insurance Office (NSW) [1981] HCA 38; (1981) 148 CLR 62 at 66; State Government Insurance Commission v Laube (1984) 37 SASR 31 at 33...
Contribution between the State and Bradford Insulation
What there is in this case, is no evidential basis for your Honour to find that the State had awareness of the commercial arrangements between Bradford Insulation, in terms of the spraying obligations, and Baulderstone, in relation to what it was doing at the hospital. Certainly, no level of awareness that would lead to the inference that the State knew that Bradford Insulation was spraying blue asbestos. No basis to infer that the State was aware of the fact that the manner in which Bradford Insulation applied the insulation spray was such that 25 per cent of that product missed the mark. In other words, where they were intending to spray it on the structural beams of the hospital, only 75 per cent of what was coming out of the applicator of the spray was hitting that target.
The rest was being sprayed elsewhere. And there is no basis for an inference to be drawn that the State was aware of something which Bradford Insulation was, and that is that Bradford Insulation knew, at the time of the application, that the product would deteriorate over time, and it would become friable. They knew that in 1960. And what I have just done there, your Honour, is repeat some key findings of fact made in other decisions, which I have referred to in our primary submissions.
In general terms, the imposition on manufacturers and suppliers of products of a duty to take reasonable care not to cause injury to the consumers of their products is uncontroversial. It is also well established that the standard of care may extend to warning of known dangers and to instruct on appropriate precautions. The duty is a continuing one, such that a manufacturer or supplier who subsequently becomes aware of a product danger must take such reasonably practicable measures as are available to recall or warn. It is an element of the duty to take active steps to discover possible product dangers. Moreover, it is recognised that discharge of the duty may extend to instructing third parties, such as health care workers, on symptoms that they should be alert to for the purposes of diagnosing the effects of a defective product. (citations omitted)
The question is, "what is the scope of that duty of care?" Is it to take reasonable care to avoid injury to the appellant from her use or continued use of the product? If such is the duty then in determining whether the respondents were in breach of that duty it is necessary to evaluate the magnitude of that risk and all other relevant circumstances and matters in order to determine whether the respondents' response to the risk was reasonable or whether it was such as to constitute a breach of the duty owed: see Wyong Shire Council v Shirt, at p 47. If, however, as was contended for on behalf of the appellant the scope of the duty was to warn the appellant as being a member of the class of persons to whom the duty was owed, of the risk involved in using or continuing to use Carefree Super tampons then, putting aside any question of causation in the event of a breach of that duty, the appellant would be entitled to succeed.
The making of an apportionment as between a plaintiff and a defendant of their respective shares in the responsibility for the damage involves a comparison both of culpability, i.e. of the degree of departure from the standard of care of the reasonable man (Pennington v. Norris [1956] HCA 26; (1956) 96 CLR 10, at 16) and of the relative importance of the acts of the parties in causing the damage: Stapley v. Gypsum Mines Ltd. [1953] UKHL 4; (1953) AC 663 at 682; Smith v. McIntyre [1958] TASStRp 11; [1958] Tas.S.R. 36 at 42-49 and Broadhurst v. Millman [1976] VicRp 15; (1976) VR 208 at 219 and cases there cited. It is the whole conduct of each negligent party in relation to the circumstances of the accident which must be subjected to comparative examination. The significance of the various elements involved in such an examination will vary from case to case; for example, the circumstances of some cases may be such that a comparison of the relative importance of the acts of the parties in causing the damage will be of little, if any, importance.
In my view the culpability of James Hardie is worse. It created the product. It supplied the product to consumers of all levels of sophistication including individuals, like the plaintiff, knowing that it was hazardous. Yet it did not provide any information about the hazards that it presented. Its indifference to the health and safety of those who it knew would be using products that it manufactured and supplied and which it knew were dangerous was an extreme departure from the standard of care that would be expected of the reasonable person.
ETSA, as the employer, had a non-delegable duty of care to provide Mr Geyer with a safe working environment. It was inexcusable for ETSA to rely completely upon BI, and fail to take any steps of its own to determine the risks of asbestos to its own employees before the early 1970's. ETSA was a much larger, sophisticated, and well-resourced entity, in comparison to BI. Being an instrument of the State, it had access to a wider range of resources at its fingertips. As accepted by Resi, ETSA could have and should have taken earlier steps to make enquiries about the risks that working with asbestos entailed.
Fine particles of asbestos fibre in the form of dust may be produced in the mining, processing, or transport of this substance.
[2] Exhibit A6, Affidavit of David Miller, 19 February 2025, [6]-[7].
[17] Exhibit A6, Affidavit of David Miller, 19 February 2025 [29].
[71] Exhibit A7, Affidavit of David Miller, 6 March 2025 [2].
[143] Statement of Dean Bastian, 21 February 2025 [17].
[162] Statement of Russell Villiers, 21 February 2025 [23].
[171] Tr 735, 4-45; Tr 736, 1-45; Tr 737, 1-35.
[179] Exhibit 1R12, Statement of Joseph Busuttil, 7 March 2025 [28].
[206] Exhibit 1R19, Supplementary statement of Darryl Pitcher, 19 June 2025 [2].
[207] Exhibit 1R19, Statement of Darryl Pitcher, 7 March 2025 [14] (Statement of Mr Pitcher).
[222] Tr 1183, 24-44; Tr 1184, 1-8; Tr 1184, 15-25; Tr 1186, 7-45; Tr 1188, 6-11; Tr 1195, 31-45.
[223] Tr 1181, 1-6; Tr 1182, 9-29; Tr 1183, 33-44; Tr 1188, 24-28; Tr 1192, 39-45; Tr 1193, 1-28; Tr 1195, 3-29; Tr 1201, 18-23; Tr 1273, 35-39.
[224] Mr Pitcher was asked to assume a non-occupier was "somebody other than the RAH or the E&BS... for example, ... a contractor... Somebody that comes in to do a specific job and then leaves". See Tr 1192, 37-45; Tr 1193, 1.
[241] Statement of Michael Maybank, 7 March 2025 [8].
[253] Tr 1299, 9-17; Tr 1299, 29-35; Tr 1300, 7-11; Tr 1300, 13-17.
[260] Statement of John Hill, 7 March 2025 [16].
[315] Exhibit 1R22, Statement of David McGowan, 6 March 2025 [29].
[319] Tr 1327, 1-10; Tr 1327, 45; Tr 1328, 1-3.
[339] Statement of Glen Reynolds, 6 March 2025 [21].
[363] Statement of David Hawkins, 7 March 2025 [1].
[412] Exhibit 1R35, Statement of Rick Crichton, 6 March 2025 [21].
[424] Exhibit 1R34, Statement of Robert Archer, 7 March 2025 [2] (Statement of Mr Archer).
[439] Exhibit 1R34, Supplementary statement of Robert Archer, 17 June 2025 [1].
[477] Written submissions of the first respondent [322]-[335].
[480] Statement of Michael Maybank, 7 March 2025 [8].
[481] Exhibit A6, Affidavit of David James Miller, 19 February 2025 [37].
[483] Written submissions of the first respondent [166].
[484] Ibid [208]; Briginshaw v Briginshaw [1938] HCA 34; (1938) 60 CLR 336.
[485] Exhibit A9, Statement of Stephen Drury, 24 February 2025 [6].
[487] Exhibit A24, Statement of Russell Villiers, 21 February 2025 [14] (Statement of Mr Villiers).
[489] Statement of Mr Villiers [10].
[493] Exhibit 1R22, Statement of David McGowan, 6 March 2025 [10]-[11].
[499] Exhibit 1R23, Statement of Glen Reynolds, 6 March 2025 [22].
[504] Written submissions of the first respondent [76].
[506] Exhibit 1R7 is identical to exhibit A2 except it does not have the arrows in exhibit A2.
[507] Mr Miller was shown exhibit A2. The photos have arrows on them that point to asbestos.
[508] Applicant's closing submissions [3.303].
[512] Exhibit 1R29, Statement of Michael Maybank, 7 March 2025 [9], [29].
[522] Applicant's closing submissions [3.535].
[523] Written submissions of the first respondent [117]-[118], [121].
[525] Applicant's closing submissions [4.1]-[4.3].
[526] Exhibit A17, 84-85 [3.42]-[3.45].
[527] Exhibit A10, Reid Family Papers in 2 Volumes, 495, item no. 50.
[528] Exhibit A18, 432-458; Evidence of Des Hoens at Tr 920, 32-36.
[529] Exhibit A18, 462; Affidavit of Grahan Allen [2].
[533] Exhibit A18, 469; Page 31 in Werfel; Evidence of Graham Allen Tr 62, 23-25.
[535] Amaca Pty Ltd v Werfel [2020] SASCFC 125; (2020) 138 SASR 295.
[536] Applicant's closing submissions, 138 [4.6].
[547] Applicant's closing submissions [4.41]-[4.50].
[549] Exhibit A20, Letter to Michael Kottek, 27 November 2024, 1-4.
[551] Exhibit A20, Report of Mr Kottek, 2 December 2024, 1.
[587] Exhibit 2R5, Hodgson and Darnton, 'The Quantitative Risks of Mesothelioma and Lung Cancer in Relation to Asbestos Exposure' (2000).
[605] Applicant's closing submissions, 5.5 - 5.163.
[606] (1997) 42 NSWLR 307 at 329, 331 and 332.
[610] Applicant's closing submissions [6.3]; [2005] HCA 75; (2005) 222 ALR 631 [42].
[612] Applicant's closing submissions [6.4].
[613] Stevens v Brodribb Sawmilling Co Pty Ltd (1986) 160 CLR 16 per Mason J at [26], Deane J at [53], Wilson and Dawson JJ at [25] and Brennan J at [2].
[614] Wade v Australian Railway Historical Society (t/as Steamranger) [2000] SASC 233; (2000) 77 SASR 221 [115] (Doyle CJ with Duggan and Lander JJ agreeing).
[619] [2007] SASC 123; (2007) 97 SASR 392; Debelle J at [9]; Anderson J at [71], Doyle CJ agreeing.
[622] [1980] HCA 12; (1980) 146 CLR 40, 47-48.
[625] Macquarie Dictionary (online at 28 October 2025) "practicable" (def 1).
[627] Ibid 30 per Brennan and Dawson JJ.
[628] Leighton Contractors Pty Ltd v Fox [2009] HCA 35.
[630] Written submissions of the first respondent [79].
[631] Exhibit 1R20, statement of Edward Carlaw, 7 March 2025 [8].
[632] Exhibit 1R22, statement of David McGowan, 6 March 2025 [20]-[21].
[633] Exhibit 1R19, statement of Darryl Pitcher, 19 June 2025 [16]-[18].
[641] Exhibit A12, Report of Ms Caro, 2 December 2024, 7.
[648] Tr 350. See also the discussion at 351-352 regarding Cancer Council campaigns and sun-protection.
[672] Tr 377-379. See also Tr 343-345.
[678] Exhibit A22, Report of Mr Roberts, 3 December 2024, 8.
[703] [2020] SASCFC 125; (2020) 138 SASR 295 [229]-[231].
[704] Wagner JC, Sleggs CA, Marchand P, 'Diffuse pleural mesothelioma and asbestos exposure in the North Western Cape Province' (1960) British Journal of Industrial Medicine 17:260-71.
[705] Exhibit 2R5, Hodgson and Darnton, 'The Quantitative Risks of Mesothelioma and Lung Cancer in Relation to Asbestos Exposure' (2000).
[706] Exhibit A28, Report of Professor Klebe, 28 October 2024, 21-22.
[721] Exhibit 2R5, Hodgson and Darnton, 'The Quantitative Risks of Mesothelioma and Lung Cancer in Relation to Asbestos Exposure' (2000).
[723] A comparison of asbestos fibre potency and elongate mineral particle (EMP) potency for mesothelioma in humans, Journal of Toxicology and Applied Pharmacy 361, Garabrant and Pastula.
[731] Exhibit A29, Meisenkothen, 'Underestimation of Chrysolite Health Risk Due to the Under-ascertainment of Mesothelioma: Evidence from a Century of Connecticut's Experience with the "Magic Mineral"' (2025).
[749] Exhibit A35, Report of Dr Broadbridge, 5 September 2024, 2.
[753] Exhibit A35, Report of Dr Broadbridge, 5 September 2024, 3.
[757] Exhibit A35, Report of Dr Broadbridge, 8 November 2024, 1.
[762] Exhibit A35, Report of Dr Broadbridge, 30 January 2025, 1.
[826] Exhibit A35, Report of Dr Broadbridge, 30 January 2025.
[828] Exhibit A27, Yan et al., 'Cytoreductive Surgery and Hyperthermic Intraperitoneal Chemotherapy of Malignant Peritoneal Mesothelioma: Multi-Institutional Experience', (2009).
[830] Applicant's closing submissions [7.1]-[7.2].
[831] Bendix Mintex Pty Limited v Barnes (1997) 42 NSWLR 307, 311.
[832] Written submissions of the first respondent [379]-[384].
[841] Exhibit 2R3, Report of Mr Burgoyne, 23 October 2024, 3 (Report of Mr Burgoyne).
[858] Tr 796, 6-32; Report of Ms Dolling, 22 September 2024, 33 (Report of Ms Dolling).
[860] Report of Mr Burgoyne[1790] EngR 2435; , 3; Tr 779, 5-21.
[861] See Report of Ms Dolling, 34-37.
[871] Applicant's closing submissions [9.1].
[873] Applicant's closing submissions [9.50]-[9.53].
[876] Applicant's closing submissions [9.78]-[9.79].
[877] Planet Fisheries Pty Limited v La Rosa (1968) 119 CLR 118 at 125 and 124; Wallaby Grip Limited v Peirce [2000] NSWCA 299 at [13].
[881] Applicant's closing submissions [9.87].
[883] [2020] SASCFC 125; (2020) 138 SASR 295 [391]-[411].
[885] Dunning v BHP Billiton Ltd [2014] NSWDDT 3.
[886] BHP Billiton Ltd v Hamilton [2013] SASCFC 75; (2013) 117 SASR 329.
[887] Latz v Amaca [2017] SADC 56 (Gilchrist J).
[888] Lowes v Amaca Pty Ltd [2011] WASC 287, [814]-[829] (Corboy J), where $250,000 was awarded for general damages in addition to $15,000 for loss of expectation of life.
[889] BHP Billiton Ltd v Hamilton [2013] SASCFC 75; (2013) 117 SASR 329, [121] (Blue J, with whom Kourakis CJ agreed).
[890] Parkin v Amaca Pty Ltd [2020] WASC 306, [153]-[168] (Le Miere J), where $360,000 was awarded for general damages, and $15,000 was the "objectively determined amount" for loss of expectation of life, because in "Western Australia a conventional award of $15,000 is usual"; Kennedy v CIMIC Group Limited and CPB Contractors Pty Ltd [2020] NSWDDT 7, [156]-[180] (Judge Scotting) where $350,000 was awarded for general damages at common law, $430,000 was awarded for general damages having regard to s 10A of the Civil Liability Act 2002 (WA) and $8,000 was awarded for each year of life "lost" as damages for loss of expectation of life.
[891] Ewins v BHP Billiton Ltd [2005] SASC 95; (2005) 91 SASR 303, [71] (Doyle CJ); BHP Billiton Ltd v Hamilton [2013] SASCFC 75; (2013) 117 SASR 329, [97], [102], [118] (Blue J with whom Kourakis CJ agreed), [316]-[318] (Stanley J with whom Kourakis CJ agreed).
[892] Lowes v Amaca Pty Ltd [2011] WASC 287, [814]-[829] (Corboy J). No attempt was made in this case to address or explain the effect of s 10A of the Civil Liability Act 2002 (WA) on awards made in WA. See Hannell v Amaca Pty Ltd [2006] WASC 310, [334] (Le Miere J); Lowes v Amaca Pty Ltd [2011] WASC 287, [820] (Corboy J); MR & RC Smith Pty Ltd (trading as Ultra Tune (Osborne Park) v Wyatt (No 2) [2012] WASCA 110, [130] (Pullin JA, with whom Newnes JA agreed): "[w]hile cases from outside Western Australia are relevant, attention should be paid to relevant comparable decisions in courts in this jurisdiction ...". See also Luntz, Assessment of Damages for Personal Injury and Death, 4th ed, Lexis Nexis, Sydney, 2001, [7.1.5]. The Victorian Court of Appeal distinguished Lowes v Amaca Pty Ltd in Amaca Pty Ltd v King [2011] VSCA 447; (2011) 35 VR 280, [178] (Nettle, Ashley and Redlich JJA) because there is no equivalent to s 10A in Victoria.
[893] A generally consistent feature in Australia before and since the High Court's decision in Todorovic v Waller [1981] HCA 72; (1981) 150 CLR 402, 409. See also Amaca v King [2011] VSCA 447; (2011) 35 VR 280, [175]-[184] (Nettle, Ashley and Redlich JJA).
[896] Ibid [102]-[103]; Kourakis CJ agreeing.
[897] [2013] SASCFC 75; (2013) 117 SASR 329 [324].
[898] [2011] VSCA 447; (2011) 35 VR 280 [177].
[899] [1969] SASR 501, 503.
[900] [2013] SASCFC 75; (2013) 117 SASR 329 [330].
[902] Parkin v Amaca Pty Ltd [2020] WASC 306, [153]-[168] (Le Miere J), where $360,000 was awarded for general damages, and $15,000 was the "objectively determined amount" for loss of expectation of life, because in "Western Australia a conventional award of $15,000 is usual"; Kennedy v CIMIC Group Limited and CPB Contractors Pty Ltd [2020] NSWDDT 7, [156]-[180] (Scotting J) where $350,000 was awarded for general damages at common law, $430,000 was awarded for general damages having regard to s 10A of the Civil Liability Act 2002 (WA) and $8,000 was awarded for each year of life 'lost' as damages for loss of expectation of life.
[904] Tr 1544, 13-15; Exhibit A39, Vincents Litigation Tables, May 2025, 8.
[906] Applicant's closing submissions [9.103].
[909] [2020] SASCFC 125; (2020) 138 SASR 295, [487].
[912] Kars v Kars [1996] HCA 37; (1996) 187 CLR 354, 371; Grincelis v House [2000] HCA 42; (2000) 201 CLR 321, [25]-[28] (Kirby J), [50]-[60] (Callinan J).
[913] [2020] SASCFC 125; (2020) 138 SASR 295, [473], [475].
[916] Doyle CJ and Williams J agreeing.
[917] Written submissions of the first respondent [427]-[436].
[918] Exhibit A6, Statement of David Miller, [153].
[922] Exhibit A35, Report of Dr Broadbridge, 5 September 24.
[923] Exhibit A6, Statement of David Miller, [162].
[925] Exhibit A35, Report of Dr Broadbridge, 8 November2024.
[926] Exhibit A6, Statement of David Miller, [160].
[931] [1992] HCA 54; (1992) 175 CLR 327; Tr 779, 5-21; Applicant's closing submissions [9.135].
[932] Written submissions of the first respondent [453].
[933] Exhibit A11, Report of Ms Dolling, 22 September 2024, 26 [4].
[934] [2017] SASCFC 145; (2017) 129 SASR 61 [193]-[199], Hinton J agreeing.
[939] Chartered Accountants Australia and New Zealand.
[940] Exhibit A32, Report of Mr Thompson, 27 September 2025, 49 (Report of Mr Thompson).
[957] Report of Mr Thompson, 17-18, 29.
[968] Assessment of Damages for Personal Injury and Death, Harold Luntz and Sirko Harder
[970] Exhibit 2R7, Report of Mr Wallace, 18 October 2024, 11.
[973] Exhibit A11, Report of Ms Dolling, 22 September 2024, 159 (Report of Ms Dolling).
[1043] Tr 971. The questions are: 1. Whether or not the business can continue to operate profitably in the absence of Mr Miller? 2. If the business cannot continue absent Mr Miller, what is the appropriate measure of economic loss? 3. If the business can continue absent Mr Miller, what is the appropriate measure of economic loss?
[1057] Written submissions of the first respondent [514]-[525].
[1059] Exhibit A32, Report of Mr Thompson, 27 September 2024 [14.3] (Report of Mr Thompson).
[1060] Report of Mr Thompson [14.4.iii].
[1068] Sent on 7 July 2025 at 11:16am.
[1074] Whitfield v De Lauret & Co Ltd [1920] HCA 75; (1920) 29 CLR 71, 77 (Knox CJ); Uren v John Fairfax & Sons Pty Ltd [1966] HCA 40; (1966) 117 CLR 118, 138 (Taylor J); Gray v Motor Accident Commission [1998] HCA 70; (1998) 196 CLR 1, [14] (Gleeson CJ, McHugh, Gummow and Hayne JJ).
[1075] [2020] SASCFC 125; (2020) 138 SASR 295 [669]-[670].
[1077] BHP Billiton Ltd v Parker [2012] SASCFC 73; (2012) 113 SASR 206, [233]; Werfel [649].
[1091] Podrebersek v Australian Iron & Steel Pty Ltd [1985] HCA 34; (1985) 59 ALJR 492 at 494; Pennington v Norris [1956] HCA 26; (1956) 96 CLR 10 at 16.
[1092] Podrebersek [1985] HCA 34; (1985) 59 ALJR 492 at 494.
[1095] Written submissions of the first respondent [610].
[1096] [2017] SASCFC 145; (2017) 129 SASR 61 [220]-[224].
[1097] [2020] SASCFC 125; (2020) 138 SASR 295 [154], [167], [172], [226], [320].
[1098] Written submissions of the first respondent [622].
[1100] (1999) Aust Tort Reports 81-499.
[1101] Ibid at 65,649-65,650, per Fitzgerald A-JA, Beazley JA agreeing, Meagher JA dissenting.
[1102] Spigelman CJ, Meagher, Stein and Giles JJA.
[1103] [1999] NSWCA 314; (1999) 47 NSWLR 425 [92]; [96]-[97]; [100]-[101].
[1104] [2000] NSWCA 141 [2]-[3].
[1106] [2000] NSWCA 29; (2000) 49 NSWLR 262.
[1108] Submissions of the third parties [2.7].
[1115] Thompson v Johnson & Johnson Pty Ltd & Anor [1991] VicRp 84; [1991] 2 VR 449, 489.
[1116] Wright v Dunlop Rubber Co Ltd (1972) 13 KIR 255, per Sachs and Lawton LJJ.
[1117] Further written submissions of the first respondent [34].
[1123] [2023] SAET 13 [148].
[1128] Public Trustee (SA) v Clifton Financial Services Pty Ltd (No 3) [2004] NSWDDT 40; BI (Contracting) Pty Ltd v The Public Trustee of South Australia and Anor [2005] NSWCA 306; Micallef v The Myer Emporium Ltd [2005] NSWDDT 13; BI (Contracting) Pty Limited v The Myer Emporium Limited [2005] NSWCA 305; Oliver v ACN 007 870 484 Pty Ltd & Ors (No 3) [2017] SADC 52; David Jones Ltd v BI (Contracting) Pty Ltd [2017] SADC 79; BI (Contracting) Pty Ltd v David Jones Ltd [2019] SASCFC 138.
Miller
The State of South Australia & Ors [2025] SAET 119
(1938) 60 CLR 336
(2020) 138 SASR 295
(1997) 42 NSWLR 307
(1987) 162 CLR 479
(2005) 222 ALR 631
(1986) 160 CLR 16
(2000) 77 SASR 221
(2007) 97 SASR 392
(1995) 65 SASR 378
(1980) 146 CLR 40
(1985) 156 CLR 7
(1968) 119 CLR 118
(2013) 117 SASR 329
(2005) 91 SASR 303
(2011) 35 VR 280
(1981) 150 CLR 402
(1977) 139 CLR 161
(1992) 175 CLR 327
(1996) 187 CLR 354
(2000) 201 CLR 321
(1961) 108 CLR 642
(1999) 73 ALJR 1414
(1993) 60 SASR 39
(1999) 47 NSWLR 425
(1982) 150 CLR 482
(2017) 129 SASR 61
(2012) 113 SASR 206
(1920) 29 CLR 71
(1966) 117 CLR 118
(1998) 196 CLR 1
(1997) 149 ALR 25
(1985) 59 ALJR 492
(1956) 96 CLR 10
(2000) 49 NSWLR 262
(1959) 101 CLR 298
(1981) 148 CLR 62
(1984) 37 SASR 31
(2009) 75 NSWLR 649