[2025] NSWCATAP 177
General information, not legal advice.
NCAT Appeal Panel
2025-07-30
R C Titterton OAM, Senior MemberD Goldstein, Senior Member
Original judgment source is linked above.
Alexandria Landfill Pty Ltd v Transport for NSW (2020) 103 NSWLR 479; [2020] NSWCA 165
Aon Risk Services Australia Ltd v Australian National University [2009] HCA 27; (2009) 239 CLR 175
Carbery v Warringah Rugby Club Ltd [2021] NSWCATAP 153
Collins v Urban [2014] NSWCATAP 17
Culleton v Tonks [2025] NSWCATAP 129
Flightdeck Geelong Pty Ltd v All Options Pty Ltd [2020] FCAFC 138
Galdona v Peacock [2017] NSWCATAP 64
Gokani-Robins Pty Ltd v The Owners - Strata Plan No 77109 [2025] NSWCATAP 107
Housing Commission of New South Wales v Tatmar Pastoral Co Pty Ltd [1983] 3 NSWLR 378
Kurmond Homes Pty Ltd v Marsden [2018] NSWCATAP 23
Leung v Alexakis [2018] NSWCATAP 11
New South Wales Land and Housing Corporation v Orr [2019] NSWCA 231
Pholi v Wearne [2014] NSWCATAP 78
Prendergast v Western Murray Irrigation Ltd [2014] NSWCATAP 69
Public Service Association and Professional Officers' Association Amalgamated Union of New South Wales v Secretary of the Treasury [2014] NSWCA 112
Re Minister for Immigration & Indigenous Affairs; Ex parte Lam (2003) 214 CLR 1
Stead v State Government Insurance Commission (1986) 161 CLR 141
Taylor Construction Group Pty Ltd v The Owners - Strata Plan No 92888 [2020] NSWCATAP 163
The Owners - Strata Plan 87003 v Raysons Constructions Pty Ltd [2025] NSWSC 66
Unique Commercial Group Pty Ltd v Cusumano [2024] NSWCATAP 204
Wainohu v New South Wales (2011) 243 CLR 181
Westerweller v The Owners Strata Plan No 18482 [2023] NSWCATAP 113
(1) the decision was not fair and equitable; or
(2) the decision was against the weight of evidence; or
(3) significant new evidence has arisen (being evidence that was not reasonably available at the time the proceedings under appeal were being dealt with).
(1) the grounds of appeal do not give rise to any error of fact or law;
(2) the matter was not conducted or decided in a way that deprived the Builder of any chance that was fairly open of achieving a better outcome than occurred;
(3) the Builder will not be able to demonstrate something more than that the primary decision maker was arguably wrong in the conclusion arrived at or that there was a bona fide challenge to an issue of fact; and
(4) the Tribunal permissibly weighed the evidence and came to a conclusion that was open on the evidence.
(1) whether there has been a failure to provide proper reasons;
(2) whether the Tribunal identified the wrong issue or asked the wrong question;
(3) whether a wrong principle of law had been applied;
(4) whether there was a failure to afford procedural fairness;
(5) whether the Tribunal failed to take into account relevant (that is, mandatory) considerations;
(6) whether the Tribunal took into account an irrelevant consideration;
(7) whether there was no evidence to support a finding of fact;
(8) whether the decision was so unreasonable that no reasonable decision-maker would make it.
"32 To the above list [referring to the list in Prendergast extracted above] might be added the following (some of which are nuanced aspects of the categories in Prendergast):
(1) Whether the Tribunal drew inferences that were not available from the facts as found (an extension of item 7 [of Prendergast]) ...
(2) Whether the construction of a statute or contract arrived at by the Tribunal at first instance was wrong in some identified way: ...
(3) Whether the Tribunal's decision was vitiated by bias, or a reasonable apprehension of bias, relates to and intersects with the fair hearing rule, and may encompass or be related to the procedural fairness question: ...
(4) Whether the Tribunal failed to respond to substantial, clearly articulated arguments based on established facts which may constitute a failure to accord natural justice, that is, procedural unfairness. Alternatively, it may also constitute a constructive failure to exercise jurisdiction: ...
(5) Whether the facts as found necessarily satisfied the statute or necessarily did not: ...
..."
(1) the decision of the Tribunal under appeal was not fair and equitable; or
(2) the decision of the Tribunal under appeal was against the weight of evidence; or
(3) significant new evidence has arisen (being evidence that was not reasonably available at the time the proceedings under appeal were being dealt with).
"Ordinarily it is appropriate to grant leave to appeal only in matters that involve:
(a) issues of principle;
(b) questions of public importance or matters of administration or policy which might have general application; or
(c) an injustice which is reasonably clear, in the sense of going beyond merely what is arguable, or an error that is plain and readily apparent which is central to the Tribunal's decision and not merely peripheral, so that it would be unjust to allow the finding to stand;
(d) a factual error that was unreasonably arrived at and clearly mistaken; or
(e) the Tribunal having gone about the fact finding process in such an unorthodox manner or in such a way that it was likely to produce an unfair result so that it would be in the interests of justice for it to be reviewed..."
(1) the parties entered into a contract dated 18 June 2016.
(2) practical completion was reached on 16 April 2018.
(3) the final payment was made on 16 April 2018, and handover took place on that day.
(4) the occupation certificate was issued on 18 June 2018.
(5) these proceedings were filed on 11 June 2024.
(1) are the defects complained of defects in a major element of the building?
(2) do the defects cause, or are they likely to cause, the inability to inhabit or use the building (or part of the building) for its intended purpose, or the destruction of the building or any part of the building, or a threat of collapse of the building or any part of the building?
(3) when did the applicant become aware of the breach of warranty?
(4) when ought the applicant reasonably to have become aware of the breach of warranty?
(1) what is required to rectify the breach, and at what cost?
(2) should the Tribunal make a work order or a money order?
"7 Both parties relied upon expert evidence. The [Homeowner's] expert Michael Waddell adopted the Tribunal's code of conduct. His qualifications and experience qualify him to give expert evidence. He reports leaking from the main bathroom, causing damage to the floor, and leaking from the laundry, ensuite and powder room, resulting in high moisture readings at the threshold of each room. He observed that the fall on all of the floors was less than 1:100. In each case, he concluded that there had been a major failure to comply with the statutory warranties, on the basis that there are defects in the waterproofing, which is, by definition, a major element of the building. He noted some damage and concluded that the defect has caused or is likely to cause destruction of part of the building.
8 The [Builder's] expert John Stevenson did not refer to the Tribunal's code of conduct but stated that he had read the Uniform Civil Procedure Rules and agreed to be bound by them. He noted that the shower screens in all three bathrooms had been sealed on both inside and out. He carried out a flood test in the main bathroom and observed that water ran out under the shower screen bottom sill when the water levels passed the floor channels of the shower screen. He relied upon a plumber's report prepared for the applicant's insurer. That plumber found evidence of a leaking mixer tap seal. Mr Stevenson concluded that the damage observed to the main bathroom subfloor had been occurring over many years and opined that if it had been acted on it would not exist or be as extensive. He said that in his opinion the major area of damage was caused by the leaking mixer tap, and the fact that the shower screens had been sealed inside and out. Overall, he stated that 'the damage to this property is caused by the client's negligence in maintenance upkeep of their property'.
9 Mr Stevenson agreed that the falls on the floors were less than 1:100 but said that as water did not pool on the floors, the performance standards had been met."
"10 I prefer the evidence of the [Homeowner's] expert. If the waterproof membrane was intact, water collecting on the floor (because the shower sills had been sealed inside and out) should not have penetrated under the membrane such as to cause damage to the subfloor. If the waterproofing systems are operating properly, water should not be escaping the rooms to cause high moisture readings outside the wet areas. It is a fact that the falls on all of the tiled areas do not come close to meeting the 1:100 standard, and it cannot be said that the areas are meeting the performance standards if water is escaping from the rooms into adjoining areas."
"When did the applicant become aware of the breach of warranty?
12 The applicant says that he became aware of the damage to the floor a few months before he lodged his insurance claim. The insurance claim was lodged in about May 2024. I accept the applicant's evidence, and find that he became aware of the breach in early 2024.
When ought the applicant reasonably to have become aware of the breach?
13 The respondent submitted that the applicant ought to have become aware of the breach much earlier, as both experts agreed that the leaking would have been occurring over a lengthy period of time. I do not accept this submission. There is no evidence that the pest inspector or any other person inspecting the house detected the issue. The applicant had a plumber address a leak in the pipework. The leak under the bathroom was visible only once the carpet was lifted, or from under the subfloor.
14 I am not satisfied that the applicant ought to have become aware of the breach at an earlier time such as to disqualify the claim.
15 I find that the claim is brought within time as:
(1) the warranty period ended on 15 April 2024, being 6 years after the completion of the work, and
(2) the applicant only became aware of the breach in the last 6 months of the warranty period, and
(3) the claim was made within 6 months of the end of the warranty period."
(1) whether water ingress occurred due to defective waterproofing or due to maintenance/user fault given:
(a) the certified waterproofing inspection in which no defects in the installation of waterproofing membrane or detailing at the door jamb were identified;
(b) the insurer's plumbers report findings after a flood test to the shower which supported the appellant's expert;
(2) whether the readings from moisture meters indicated current or historical leakage;
(3) how the water ingress was considered a "major defect" under s 18E(4) of the HB Act in the absence of sufficient evidence; and
(4) the relative reliability of competing expert methodologies ("e.g. digital spirit levels, flood testing").
"A failure to give reasons is a breach of the judicial process because it prevents the parties from knowing the basis upon which the decision was made and undermines the possibility of a successful appeal. Wainohu v NSW (2011) 243 CLR 181 at [44]."
"The duty upon judges to give reasons for their decisions has often been linked to the availability of rights of appeal against those decisions. A wider rationale, foreshadowed in the passage quoted from [Broom's Constitutional Law], can be derived from the nature of the judicial function. In Housing Commission of New South Wales v Tatmar Pastoral Co Pty Ltd, Mahoney JA, after referring to the importance of reasons for decision to the effective exercise of appeal rights, said:
But, in my opinion, the requirement that reasons be given should not be limited to cases where there is an appeal. There is as yet no finally authoritative decision on this question. I think that the requirement should be seen as an incident of the judicial process.
The proposition that the provision of reasons for decision is an aspect of the judicial function has been supported by other decisions of the Supreme Courts of New South Wales, Victoria and Queensland."
"The damage which has been observed in our opinion has been occurring over a period of years. And if it had been acted on the damage would not exist or be as extensive. In our opinion this is neglect in the client's duty of care to maintain their home."
(emphasis added)
(1) the Homeowner's reliance on Orr to excuse the Tribunal's failure to engage with conflicting expert evidence is misplaced, and that "tolerance for language in reasons" does not extend to omission of substantive reasoning;
(2) the Tribunal's single-paragraph justification for preferring Mr Waddell's evidence fails to address the materially conflicting expert opinion of Mr Stevenson, who provided findings of long-term, visible damage;
(3) the Tribunal's failure to engage with this evidence falls below the standard required under Wainohu.
(1) provide proper reasons underpinning the key findings of fact necessary to extend the time limitation under s 18E(1)(e) of the HB Act;
(2) make express or clear factual findings regarding those matters set out in [43] above;
(3) "reconcile" the competing reports of the two experts.
The Tribunal failed to provide proper reasons underpinning the key findings of fact necessary to extend the time limitation under s 18E(1)(e) of the HB Act
The Tribunal failed to make express or clear factual findings regarding those matters set out in [43] above
"In Tatmar at 386, Mahoney JA (as he then was) observed in the context of the obligation to give reasons for a discretionary judgment that it was not necessary for a judge:
'who is exercising a discretionary judgment to detail each factor which he has found to be relevant or irrelevant, or to itemi[s]e, for example, in the assessment of damages for tort, each of the factual matters to which he has had regard: ... Nor is a judge required to make an explicit finding on each disputed piece of evidence. It will be sufficient, if the inference as to what is found is appropriately clear: ...
But, subject to matters such as these, the basis of the decision of a trial judge or of an intermediate court of appeal should be made apparent. This does not mean that the reasons given need to elaborate: an elaborate argument may not require an elaborate answer. Reasons need be given only so far as is necessary to indicate to the parties why the decision was made and to allow them to exercise such rights as may be available to them in respect of it.'"
(emphasis added)
The Tribunal's failure to "reconcile" the competing reports of the two experts.
"WADDELL: [2] ... I would agree with the other expert that this issue of water escaping from the bathroom, has happened over a long period of time.
...
So as I just said, I agree that this is typically the sort of damage you would see over a long period of time. It's located beneath the membrane. There's nothing moving until six months ago. Nothing obvious to the eye, to a lay person and that I say that it's likely that it's the membrane detailing where the water bars meet the wall, it's likely and yes.
SENIOR MEMBER:[3] All right. So when, just so that I understand, when you said you agree that there's been water escaping over a long period.
WADDELL: Yes.
SENIOR MEMBER: You're not saying the membrane has failed in the last six months.
WADDELL No, no, I ...
SENIOR MEMBER Do you think that the detailing has been wrong from the outset?
WADDELL Correct? Yes."
(emphasis added)
"I think it's a defect that has been there for a very long time."
(emphasis added)
"So it's not just a little drip where its on the floor. And if that's been leaking for quite some time then that's the cause of the damage underneath the floor."
(emphasis added)
(1) the Homeowner incorrectly claims the Tribunal considered both limbs of s 18E(1);
(2) the Tribunal's findings merely assert that the Homeowner was unaware of the breach, without analysing whether a reasonable person in his position ought to have been aware earlier;
(3) Mr Stevenson's evidence of progressive and visible damage was ignored; and
(4) the Tribunal's approach fails the standard set out in Raysons at [54].
18E Proceedings for breach of warranty
(1) Proceedings for a breach of a statutory warranty must be commenced in accordance with the following provisions -
(a) proceedings must be commenced before the end of the warranty period for the breach,
(b) the warranty period is 6 years for a breach that results in a major defect in residential building work or 2 years in any other case,
(c) the warranty period starts on completion of the work to which it relates (but this does not prevent proceedings from being commenced before completion of the work),
(d) if the work is not completed, the warranty period starts on ...,
(e) if the breach of warranty becomes apparent within the last 6 months of the warranty period, proceedings may be commenced within a further 6 months after the end of the warranty period,
(f) a breach of warranty becomes apparent when any person entitled to the benefit of the warranty first becomes aware (or ought reasonably to have become aware) of the breach.
"...the concept of a breach of warranty "becoming apparent" resonates with other concepts applicable where limitation periods are extended, such as a plaintiff being "unaware" of various matters for the purposes of ss 60F and 60I of the Limitation Act 1969 (NSW). However, it is defined for present purposes in s 18E(1)(f), in a manner which is quite compressed and warrants careful unpacking. It involves two limbs. On its face, it asks whether "any" person entitled to the benefit of the warranty has either (i) become aware or (ii) ought reasonably to have become aware of the breach; plainly enough, actual awareness is sufficient to disentitle a plaintiff. But a plaintiff also cannot obtain the benefit of the provision if notwithstanding actual unawareness the plaintiff ought objectively to have been aware. That is to say, there is both a subjective and an objective element to the test, and either will be disentitling. There are three elements in applying the paragraph:
(1) identifying the various persons who may be entitled to the benefit of the warranty;
(2) identifying what is meant, in its application to the particular residential building, by the compressed conclusion of awareness of the breach;
(3) asking whether in relation to each person entitled to the benefit of the warranty the subjective or objective awareness occurred earlier than the six month period at the end of the warranty period."
(1) failing to definitively determine which version of the BCA and AS 3740 applied after significant dispute between the experts regarding the meaning and enforceability of the BCA;
(2) misconstruing the mandatory effect of Appendix D (fall requirements) of AS 3740, which was incorporated by reference into the BCA 2016;
(3) giving insufficient weight to the explicit requirements of s 3.8.1.2 of the BCA (requiring compliance with AS 3740);
(4) "[failing to determine] whether the 1:100 fall ratio was mandatory or advisory".
(1) during the Tribunal hearing, the Homeowner's expert applied the current standard rather than the applicable standard at the time of construction in 2018, and the Tribunal erred in law by failing to determine whether the relevant standard in force at the time of construction had been properly applied and tested. The Builder submits that the Tribunal instead treated the "1:100 fall ratio as prescriptive, binding minimum", an approach it submits is inconsistent with "the approach mandated under section 18B" of the HB Act which focuses on performance and fitness for purpose;
(2) while the 1:100 gradient is referenced in the guidance notes and appended tables, it is not a strict prescriptive requirement but rather an indicative measure of acceptable performance, and the failure to achieve this gradient does not, of itself, establish a breach of statutory warranty unless the performance standard - being effective drainage without ponding or escape - is not achieved;
(3) in treating the deviation from the gradient standard as conclusive evidence of defectiveness, the Tribunal failed to ask the critical statutory question under ss 18B(1)(a), (b), and (c) of the HB Act namely, whether the work was done:
(a) in a proper and workmanlike manner:
(b) in accordance with the law, and
(c) so that the dwelling is reasonably fit for occupation and use.
"3.3 FALLS IN FLOOR FINISHES
Where required, falls in floor finishes shall allow all surface water to drain without ponding except for residual water remaining due to surface tension.
For general bathroom floor area, the minimum fall to the waste shall be 1:100."
(emphasis added)
"It is a fact that the falls on all of the tiled areas do not come close to meeting the 1:100 standard, and it cannot be said that the areas meeting the performance standards if water is escaping from the rooms into adjoining areas."
"...In our view, the BCA is not to be construed as if it were a statute. In Owners Corporation v Lu Simon Builders Pty Ltd at [35] the Victorian Civil and Administrative Tribunal adopted a submission made on behalf of the building surveyor that:
The Tribunal is tasked with construing various provisions of the BCA and it must do so as an exercise of statutory interpretation. The task is complicated because the instrument which is to be interpreted and given the force of regulations, is not drafted in the form of legislation or regulations, or by those experienced in the act of legislative drafting. ... However, the task of interpreting the provisions of the BCA is a matter for the Tribunal and not predicated upon the opinion of experts. The text, context and purpose of the provision to be interpreted ought to be taken into account in the ordinary [way], whilst recognising that what is to be interpreted is a technical document not drafted in the same way as Acts of Parliament and is to be applied by those in the construction industry on a daily basis, and not ordinarily by lawyers. ... in undertaking that task, the Tribunal will be aided by reference to dictionaries and technical dictionaries."
(1) failing "to clearly explain to the self-represented parties who bore the burden of proof on the statute of limitation issue, the alleged defects (particularly the waterproofing vs maintenance issue) and the cost/scope of rectification";
(2) suggesting conclusions about the source of water ingress and performance standard breaches before fully hearing from both experts;
(3) referring to the claim being "in time" prior to final submissions;
(4) permitting "prompting and help by the Homeowner's expert during the Homeowner's". This submission is incomplete in the original, but presumably the Builder meant to refer to Homeowner's oral evidence at the Tribunal hearing.
(1) the Tribunal erred as the limitation question depended upon when the Homeowner became aware or ought to have reasonably become aware of the alleged defect, which is an issue of fact as well as law under s 18E(1)(f) of the HB Act;
(2) the Tribunal then dismissed the relevance of expert evidence to the limitation issue, potentially "sidelining" evidence from Mr Stevenson suggesting the damage had been evident for a long time, relevant to when a reasonable person might have discovered the breach;
(3) a failure to afford procedural fairness will invalidate a decision if the denial deprived a party of the possibility of a different result: Stead v State Government Insurance Commission (1986) 161 CLR 141 (Stead) at 145-146;
(4) fairness in litigation requires not only a fair hearing but also a fair opportunity to present or meet a case: Aon Risk Services Australia Ltd v Australian National University [2009] HCA 27; (2009) 239 CLR 175 (Aon Risk).
(1) the transcript passages relied on by the Builder take the statements made by the Tribunal out of context; and
(2) the Tribunal was correct to observe that the question of whether or not the application was "out of time" was not a matter for expert evidence;
(3) the Tribunal has a wide discretion as to the manner in which it conducts proceedings: NCAT Act, s 38(1);
(4) the proposition that the Tribunal prevented Mr Stevenson from addressing the Tribunal should be rejected as a matter of fact; and
(5) a denial of procedural fairness must work a practical injustice on the appellant in order for a Court (here the Appeal Panel) to exercise its discretion to grant relief: Re Minister for Immigration & Indigenous Affairs; Ex parte Lam (2003) 214 CLR 1 at [38]. If the denial of procedural fairness would not have made a difference in the outcome of the proceedings, relief will not be granted: Flightdeck Geelong Pty Ltd v All Options Pty Ltd [2020] FCAFC 138 at [58].
(1) when the "applicant/respondent"[5] "applied" and gave evidence preferring a work order;
(2) in accepting the Builder's refusal to perform rectification works without considering whether that refusal was reasonable;
(3) in accepting inconvenience to the Builder (due to workload) as a sufficient reason to deny a work order;
(4) in awarding damages that were unreasonable for excessive scope of rectification works not included in the Homeowner's application.
(1) despite the Homeowner expressing a willingness for a work order, the Tribunal accepted the Builder's refusal based on workload without assessing its reasonableness;
(2) the Homeowner indicated a willingness to consider a rectification order if subject to a time limit. However, the Tribunal rejected this in favour of a money order without fully exploring the reasonableness of the Builder's stated inability to perform the work;
(3) section 48MA requires that rectification by the Builder be the preferred outcome;
(4) the failure to test the appellant's refusal under that framework constitutes legal error;
(5) section 48MA expresses a clear legislative intention that rectification by the responsible builder is the preferred outcome unless it is not practicable;
(6) the Tribunal therefore erred by not testing the practicability of the Builder's performance and instead defaulted to a monetary award which contravenes s 48MA.
"... ignores the requirement to meaningfully test practicability. The Tribunal did not do so, constituting legal error as confirmed in Galdona v Peacock [2017] NSWCATAP 64 at [60]- [65]."
48MA Rectification of defective work is preferred outcome in proceedings
A court or tribunal determining a building claim involving an allegation of defective residential building work or specialist work by a party to the proceedings (the responsible party) is to have regard to the principle that rectification of the defective work by the responsible party is the preferred outcome.
"Rather, there was a discretion the Tribunal was required to exercise as to whether or not to make an order for compensation, an order in the nature of a work order or some other order as permitted by s 48O(1). In this regard, s 48O(2) provides the Tribunal can make a work order even if not asked for by the applicant who makes a claim for defective residential building work. In doing so, s 48MA requires the Tribunal "to have regard to the principle that rectification of the defective work by the responsible party is the preferred outcome". Section 48MA is not, in terms, mandatory. Rather, it is a factor to be taken account of in the exercise of a discretion about what orders should be made to resolve a building claim."
"Under the Home Building Act, I have to consider, as a preferred option, giving the [B]uilder the opportunity to rectify the work if I find it to be defective."
"[i]t is the experience of the Appeal Panel that costs decisions in the Consumer and Commercial Division and on appeal (unless dealt with at the time of the hearing) are routinely considered "on the papers", and without a hearing. The parties were given an opportunity to provide written submissions and did so. They can be presumed to have included all relevant issues in their written submissions."
(1) The appeal is dismissed.
(2) Any party opposing an order that the appellant pay the respondent's costs as agreed or as assessed is to file and serve submissions (and if necessary evidence) on or before 13 August 2025.
(3) The other party may reply on or before 27 August 2025.
I hereby certify that this is a true and accurate record of the reasons for decision of the Civil and Administrative Tribunal of New South Wales.
J & E Miller (Builder) Pty Ltd
Awad [2025] NSWCATAP 177;
(2020) 103 NSWLR 479
(2009) 239 CLR 175
(2003) 214 CLR 1
(1986) 161 CLR 141
(2011) 243 CLR 181