[2025] NSWCATAP 107
General information, not legal advice.
NCAT Appeal Panel
2025-05-15
D Robertson, Principal MemberR C Titterton OAM, Senior Member
Original judgment source is linked above.
Alamdo Holdings Pty Ltd v Croc's Franchising Pty Ltd [2022] NSWSC 1746
Calderbank v Calderbank [1975] 3 All ER 333
Collins v Urban [2014] NSWCATAP 17
FSX v Chief Commissioner of State Revenue [2024] NSWCATAP 169
Gokani-Robins Pty Ltd v The Owners - Strata Plan No 77109 [2022] NSWCATCD 164
Liang v University of Technology, Sydney [2018] NSWCATAP 285
Minister for Aboriginal Affairs v Peko-Wallsend Ltd (1986) 162 CLR 24
New South Wales Land & Housing Corporation v Orr [2019] NSWCA 231
Noori v JMG Auto Parts Pty Ltd [2022] NSWCATAP 250
Prendergast v Western Murray Irrigation Ltd [2014] NSWCATAP 69
SZCBT v Minister for Immigration and Multicultural Affairs [2007] FCA 9
The Owners of Strata Plan No 3397 v Tate (2007) 70 NSWLR 344; [2007] NSWCA 207
The Owners - Strata Plan No. 77109 v Gokani-Robins Pty Ltd [2023] NSWCATAP 82
Unique Commercial Group Pty Ltd v Cusumano [2024] NSWCATAP 204
"Owners General Obligations
.1 [Referred to as SBL16(1)]
An owner or occupier must not do anything or cause or permit any Authorised person to do anything, in or on that Owner's or Occupier's Lot or anywhere in the Building that:
.1.1 Interferes with, impedes, or affects, or is likely to interfere with, impede or affect, the operation of a Fire Safety System, or reduce the level of fire safety in the Lot or anywhere else in the Building, including but not limited to:
(a) Interference with any smoke detector or smoke alarm installed in the Lot or the Building.
(b) Use of or interference with any fire hydrant or any other fire fighting or Fire Safety System except in the case of emergency.
(c) Tampering with fire doors or fire exits so that they remain open or ajar allowing unauthorised entry or exit to the Building.
(d) Tampering with entry doors to Lots including but not limited to, removing and replacing door locks or drilling holes in the door (except with Owners Corporation's consent), popping entry doors open or otherwise interfering with the entry doors so that the integrity of the doors as a fire door is diminished.
(e) Tampering, touching, or hanging items from a fire sprinkler head.
.1.2 Triggers a false alarm in respect of the Fire Safety Systems or any common property services within the strata scheme or cause the Fire Brigade or some other authority or Service Provider or person to attend the Building for a false alarm.
.1.3 (Otherwise than in an emergency) Would cause a call out of an Authority, a Service Provider, the Fire Brigade, or some other person at the Building.
.2 [Referred to as SBL 16(2)]
If the Owners Corporation or anyone authorised by them, gives a notice to an Owner or Occupier requiring access to their Lot for the purposes of inspecting, testing, repairing or replacing Fire Safety Systems, the Owner and Occupier of a Lot must comply with that notice and allow that access to the Lot to take place at the time and date notified to that Owner or Occupier by the Owners Corporation (however, in the event of an emergency, the Owner or Occupier acknowledge that no notice will be required).
Owner's indemnity and responsibility for costs
.3 [Referred to as 16(3)]
An Owner and/or Occupier shall pay and indemnify the Owners Corporation against any claim, charge (including fines) or costs (including rectification costs) arising from:
.3.1 A false fire alarm;
.3.2 Call-out or attendance of any Authority, Service Provider or the Fire Brigade to the Lot or Building (where the Owners Corporation is charged);
.3.3 Damage from fire, smoke, water or fire retardant or other chemicals to the Common Property or Building from impeding or affecting the Fire Safety System;
.3.4 Works required to repair, remediate or upgrade the Fire Safety System
caused by or arising as a consequence of the act, negligence or omission of that Owner and/or Occupier (or their Authorised Persons) in respect of their Lot, Common Property or Building.
.3.5 A failure by an Owner and/or Occupier to give access to their Lot in accordance with clause 53.2 (sic) (where the Owners Corporation or their Authorised Fire Safety Inspector is required to attend at the Lot to carry out the inspection at another time and date at additional cost); and .3.6 A breach and subsequent enforcement of this By-Law.
For the purposes of this bylaw, negligence includes but is not limited to inadequate ventilation and the carrying out of works.
.4 [Referred as SBL 16(4)]
The Owners acknowledge the Owners Corporation's right under clause .6.5 to demand payment of monies and that the provisions of Schedule 2, clause 10(8) of the SSMA will apply to any failure to make such payment, such that the voting rights of the Owner are diminished in accordance with that part.
.5 [Referred to as 16(5)]
Notwithstanding that the Owner may allow an Occupier or other person authorised by them to occupy their lot, the Owner will remain responsible to the Owners Corporation and, where appropriate, to an Authority for complying with the obligations of the Owner or Occupier under this By-Law.
Owners Corporation's rights
.6 [Referred to as 16(6)]
Despite anything contained in the By-Laws and in addition to the powers, authorities, duties and functions conferred on or imposed on the Owners Corporation pursuant to the SSMA, the Owners Corporation shall have the following powers, authorities, duties and functions:
.6.1 To receive reports from the NSW Fire Brigade on the call of a nature of any false fire alarm or call-out to the building in response to a Fire Safety System.
.6.2 To receive reports from any Service Provider on the cause or nature of any Call-out to the Building in response to a Fire Safety System and on the cause or nature of any work or service provided by that Service Provider to the Building.
.6.3 To investigate a false alarm, a Call-out or a service provided by a Service Provider and the circumstances giving rise to such a false claim, Call-out or service.
.6.4 To determine, by reference to any report, advice or document or otherwise, who is responsible for the Call-out, alarm or service (whether it be an Owner or Occupier of the Lot, the Owners Corporation or otherwise).
.6.5 To demand from an Owner or Occupier, payment of the costs, expenses and charges referred to in clause .3 and to recover such monies as a debt due and payable to the Owners Corporation under s80 of the SSMA, if not paid within one month after the date on which notice of such cost has been given to the Owner or occupier, together with any interest payable at the rate applicable to contributions under clause 79 of the SSMA or the SSMR until paid together with the expenses of the Owners Corporation incurred in recovering those amounts.
.6.6 To include on a notice under s109 of the SSMA monies payable under this By-Law which remain unpaid.
.6.7 To demand that a defaulting Owner or Occupier under this By-Law do certain acts or things to remedy its default or to carry out such acts or things on behalf of the defaulting Owner and recover the costs of the work from the defaulting Owner as a due and payable.
.6.8 To enter upon the lot to carry out any work relating to the obligations in this By-Law.
...
.8 In this By-Law, these defined terms have the following meanings:
...
.8.1 Fire Safety Systems includes any fire detection or protection systems on Lot or Common Property including any but not limited to any device or structure which:
(a) monitors or signals the incidents of smoke, heat or fire within or adjacent to the Building;
(b) provides lighting in the case of smoke, heat or fire within or adjacent to the Building;
(c) controls access throughout the Building and any adjacent structures in the case of smoke, heat or fire in or adjacent to the Strata Building (Including doors, stairs and lifts);
(d) extinguishes or decreases the spread of fire, smoke or heat through or adjacent to the Strata Building;
(e) is required by Law for fire safety or that otherwise improves fire safety
and includes but is not limited to any fire alarms and panels, fire fighting or safety equipment, hoses, hydrants, sprinklers, heat or smoke detectors, fire rated doors, entrance door locksets & security devices, exit and emergency signage and any associated wiring or cable.
..."
"8.7 SSMA means the Strata Schemes Management Act 1996."
"To demand from an Owner or Occupier, payment of the costs, expenses and charges referred to in clause .3 and to recover such monies as a debt due and payable to the Owners Corporation under s80 of the SSMA in and subject to the determination of a Court or Tribunal of competent jurisdiction of the reasonableness of the costs, expenses and charges, if not paid within one month after the date on which notice of such cost has been given to the Owner or occupier, together with any interest payable at the rate applicable and available at law to contributions under clause 79 of the SSMA or the SSMR until paid together with the expenses of the Owners Corporation incurred in recovering those amounts."
(deletions and additions as in original)
(1) Whether the Tribunal erred in finding that SBL 16 "as a whole (as amended)" was not 'harsh, oppressive or unconscionable" (Ground 1);
(2) Whether the Tribunal erred in its construction of SBL 16 (as amended) (Ground 2);
(3) Whether the Tribunal erred by failing to provide proper reasons in in its findings in relation to SBL 16 (Ground 3);
(4) Whether the Tribunal erred by applying a wrong principle of law, in its findings in relation to SBL 16, "including but not limited that at [at] [152], Clause 6(6.6) 'on its face no longer has any application' because SSMA 1996 has been repealed'"; (Ground 4);
(5) Whether the Tribunal erred by failing to take into account "relevant considerations, precedent, submissions and/or evidence (often unchallenged)" relied upon by the appellants (Ground 5);
(6) Whether the Tribunal erred by failing to identify the right issues or ask the right questions, in seeking not to determine if SBL 16 "in its original form" was not "harsh, oppressive or unconscionable" (Ground 6).
(1) whether there has been a failure to provide proper reasons;
(2) whether the Tribunal identified the wrong issue or asked the wrong question;
(3) whether a wrong principle of law had been applied;
(4) whether there was a failure to afford procedural fairness;
(5) whether the Tribunal failed to take into account relevant (that is, mandatory) considerations;
(6) whether the Tribunal took into account an irrelevant consideration;
(7) whether there was no evidence to support a finding of fact;
(8) whether the decision was so unreasonable that no reasonable decision-maker would make it.
"32 To the above list [referring to the list in Prendergast extracted above] might be added the following (some of which are nuanced aspects of the categories in Prendergast):
(1) Whether the Tribunal drew inferences that were not available from the facts as found (an extension of item 7 [of Prendergast]) ...
(2) Whether the construction of a statute or contract arrived at by the Tribunal at first instance was wrong in some identified way: ...
(3) Whether the Tribunal's decision was vitiated by bias, or a reasonable apprehension of bias, relates to and intersects with the fair hearing rule, and may encompass or be related to the procedural fairness question: ...
(4) Whether the Tribunal failed to respond to substantial, clearly articulated arguments based on established facts which may constitute a failure to accord natural justice, that is, procedural unfairness. Alternatively, it may also constitute a constructive failure to exercise jurisdiction: ...
(5) Whether the facts as found necessarily satisfied the statute or necessarily did not: ...
...
(1) the respondent to file a transcript of Local Court Proceedings between the parties and the minutes of a general meeting to be held on 3 November 2023, at which time a motion was to be considered for the repeal and amendment of parts of SBL 16;
(2) the parties to file further submissions.
(1) On 31 August 2020 the respondent commenced proceedings in the Local Court of NSW (Local Court Proceedings) in which it relied on:
(a) SBL 16, to claim costs (including call out costs) and other loss and damage incurred by the respondent in respect of the fire safety system of the strata scheme arising from the activation of fire alarms; and
(b) Special By-Law 17 (SBL 17), described as a "costs recovery by-law", to claim the costs of enforcement of SBL 16.
(2) In January 2022, the appellants applied to the Tribunal for SBL 17 to be declared invalid. That application was successful, the Tribunal declaring on 8 August 2022 that on and from 14 July 2020 SBL was invalid on the basis that it was harsh, unconscionable or oppressive: Gokani-Robins Pty Ltd v The Owners - Strata Plan No 77109 [2022] NSWCATCD 164.
(3) That decision was upheld on appeal: The Owners - Strata Plan No. 77109 v Gokani-Robins Pty Ltd [2023] NSWCATAP 82.
32 The matters for consideration therefore include:
(1) Whether, having regard to principles of Anshun Estoppel, it was unreasonable for the applicants not to have sought the relief claimed in respect of SBL 16 in the previous Tribunal proceedings in respect of SBL 17 and whether the applicants are estopped from maintaining the claim.
(2) Whether the application is out of time and whether the applicants require an extension of time to bring the application, and if so, whether time to bring the application should be extended.
(3) Whether the Application seeks for the Tribunal to determine issues of fact or law already determined by the Local Court and if so, the extent to which it does so.
(4) Whether SBL 16 [or more particularly subclauses 16(1) to (16.8) [sic, 16(8)]] is harsh, unconscionable or oppressive and ought to be declared invalid.
(5) Subject to a consideration of (1) to (4) whether any orders ought to be made for the relief claimed by the Applicants, and if so, what orders should be made.
(1) although both SBL 16 and SBL 17 were relied on in the Local Court Proceedings, they were different by-laws that operated differently and have a different purpose;
(2) SBL 17 was a general by-law for the recovery of money owed to the respondent. SBL 16 is concerned with fire safety in the strata scheme, and in that light operates differently and the facts relevant to its operation are different to the operation of SBL 17;
(3) accordingly, save for statements of general principle, findings in respect of whether SBL 17 is harsh, unconscionable or oppressive and invalid, are not relevant to a determination of whether SBL 16 is harsh, unconscionable or oppressive and ought to be declared invalid;
(4) it was not satisfied that the facts relevant to the consideration of the validity of SBL 16 were so connected with the subject matter of the proceedings to have SBL 17 declared invalid that it was unreasonable for the claim in respect of SBL 16 not to have been made in the proceedings in respect of SBL 17.
41 I therefore find that the fact that the respondent has commenced proceedings against the applicants in the Local Court for recovery of costs which it says it is entitled to claim pursuant to SBL 16, and the applicants have previously (successfully) sought to have SBL 17 declared invalid (in circumstances where the claim was initially made in the Local Court Proceedings in reliance on SBL 16 and 17), does not mean the applicants are now Anshun estopped from seeking to have SBL16 declared invalid.
42 It would follow that any contention (relying on principles of Res judicata or issue estoppel) that the applicants are otherwise estopped from maintaining the present application because of the determination of the application in respect of SBL 17 should also be rejected.
(1) is concerned with fire safety and provides a common set of rules with respect to fire safety for the benefit and safety of all lots;
(2) prohibits an occupier or lot owner from doing anything that:
(a) interferes with, impedes or affects, or is likely to interfere with, impede or affect the operation of a Fire Safety System (FSS) or reduce the level of fire safety in the owner's lot or anywhere else in the building;
(b) triggers a false alarm in respect of the FSS; or
(c) otherwise than in an emergency, would cause a call out of, for example, an Authority, a Service Provider or the Fire Brigade;
(3) enables the respondent to demand that a defaulting owner remedy their default and provides for the respondent to enter upon a lot (subject to the notice provisions) to do work required by or relating to the obligations of the by-law and for the purposes of, inter alia, inspecting, testing, repairing or replacing the FSS;
(4) provides that an owner is to indemnify the respondent in respect of any claim or charge arising from, inter alia, a false fire alarm or call out or any damage or work required that is caused by or arises because of the act, negligence or omission of the owner;
(5) allows for the respondent to enforce the by-law by providing that the respondent can:
(a) receive reports and investigate any false fire alarm or call out;
(b) determine by reference to any report, advice or document who is responsible for that call out, alarm or service; and
(c) if it is determined that an owner is responsible, demand payment of the cost, expenses and charges from the responsible owner.
(1) [91]-[100], in relation to SBL 16(1);
(2) [101]-[107], in relation to SBL 16(2);
(3) [108]-[115], in relation to SBL 16(3);
(4) [116]-[119] in relation to SBL 16(4);
(5) [120]-[126], in relation to SBL 16(5);
(6) [127]-[128], in relation to SBL 16(6);
(7) [129]-[135], in relation to SBL 16(6.1-6.3);
(8) [136]-[142], in relation to SBL 16(6.4);
(9) [143]-[149], in relation to SBL 16(6.5);
(10) [150]-[154], in relation to SBL 16(6.6);
(11) [155]-[162], in relation to SBL 16(6.7);
(12) [163]-[169], in relation to SBL 16(6.8);
"Mindful of the Special Resolution, even if, having regard to s 141 of the SSMA, I would be required to consider SBL 16 in its unamended state and I found that SBL 16 (4) by how it impacted on voting rights and SBL 16 (6.5) because it didn't require disputed costs and expenses to be determined by a court or tribunal, were in some way harsh, because SBL 16 (4) has been repealed and SBL 16 (6.5) amended to make clear that disputed costs, expenses and charges may only be recovered in a court or tribunal and that the right of recovery would be subject to the court or tribunal's determination as to their reasonableness, I would decline to exercise my discretion to declare SBL (4) or SBL 16 (6.5) invalid."
(1) SP 77109 was registered on 16 June 2006 with 113 commercial lots;
(2) the appellants have owned lots 21, 22, 23, 24, 25, 48, 49, 93, 94, 95 and 96 since October 2006;
(3) SBL16, "Fire safety", was made following a special resolution passed at an extraordinary general meeting on 29 November 2013;
(4) the respondent commenced the Local Court Proceedings on 31 August 2020 in which it relied on SBL 16 and SBL 17;
(5) SBL 17 was declared invalid on 8 August 2022 and that decision was upheld on appeal;
(6) the Local Court Proceedings have been adjourned to permit the respondent to apply to the Tribunal to seek to have SBL 16 declared invalid;
(7) on 3 November 2023, the respondent passed the Special Resolution that:
(a) repealed SBL 16(4); and
(b) amended SBL 16(6.5) as set out at [5] above to provide that:
(i) the costs, expenses and charges may only be recovered in a Court or Tribunal of competent jurisdiction; and
(ii) the right of recovery is subject to the determination of a Court or Tribunal of the reasonableness of the cost, expenses and charges;
(8) notwithstanding that there was no evidence that a relevant notice had been lodged or a recording made of the amendments pursuant to ss 141(2)(a) and (b) of the SSMA, the Tribunal saw no reason why it should not determine the matter by reference to SBL 16 as amended by the Special Resolution.
(1) the appellants' written submissions in chief, filed 4 December 2024 (51 pages);
(2) the respondent's written submissions in response filed 20 December 2024 (16 pages);
(3) the appellants' written submissions in reply, filed 15 January 2024 (13 pages);
(4) Mr Gokani's oral submissions at the appeal hearing; and
(5) Mr Forgács' oral submissions at the appeal hearing.
"... It is not necessary for us to make findings on every argument or every submission, particularly where the arguments advanced are numerous and of varying significance, and are often unsupported by any evidence at all, and we have not done so: Beale v Government Insurance Office of NSW (1997) 48 NSWLR 430 at 443; Rajski v Bainton (Court of Appeal, unreported, 6 September 1991). This is particularly so where, as is the case here, the submissions are voluminous, unfocused and diffuse."
Whether the Tribunal erred by failing to identify the right issues or ask the right questions, in seeking not to determine if SBL 16 in its original form was "harsh, unconscionable or oppressive"
"28.0 ... the right issue/question that the Tribunal failed to identify was whether SBL 16 (original) was 'harsh, unconscionable or oppressive' and ought be found invalid as a result. That includes in relation to SBL 16 (original):
28.1. As a whole
28.2. Clause 4
28.3. Clause 6.5
29.0 The Appellants identify the following instances whereby the Tribunal so failed:
29.1. At Paragraph [18] of the Primary Decision
29.2. At Paragraphs [116]-[119] of the Primary Decision
29.3. At Paragraph [149] of the Primary Decision."
(1) Ground 6 concerns an amendment to SBL 16, which was passed by special resolution on 3 November 2023 (the week after the Tribunal hearing);
(2) the proposed special resolution was the subject of evidence at the hearing, and further evidence was filed following the hearing (with the Tribunal's leave) as to the Special Resolution having been passed;
(3) the effect of the Special Resolution was, as the Tribunal recorded at [16] of the Primary Decision, to repeal by-law 16(4) and to amend by-law 16(6.5). Accordingly, the respondent submits that the Tribunal considered whether SBL 16, as amended, was "harsh, unconscionable or oppressive";
(4) the Tribunal was correct to do so, as s 150 of the SSMA empowers the Tribunal to make an order declaring a by-law to be invalid "if the Tribunal considers ... that the by-law is harsh, unconscionable or oppressive" (emphasis added by the respondent);
(5) it is clear from the terms of s 150 of the SSMA, in particular the framing of the precondition to the exercise of the power in the present tense, that the Tribunal must consider whether the by-law in question is harsh, unconscionable or oppressive at the time of its determination, not at some other time. Unless the Tribunal makes an order otherwise, an order under s 150 also only operates prospectively: SSMA s 150(3). Accordingly, in making the Primary Decision, the Tribunal considered whether SBL 16, as it existed at that time (that is, with the amendments passed on 3 November 2023), was "harsh, unconscionable or oppressive";
(6) further, at [171] of the Primary Decision, the Tribunal found that even if it was required to consider SBL 16 in its unamended state, it would decline to exercise its discretion to declare it invalid, given that amendments were made to it on 3 November 2023. It follows that even if the appellants were correct in their contention that the Tribunal was required to consider SBL 16 in its unamended form, the Tribunal did not fail to address that question;
(7) the matters to be determined in the Local Court Proceedings have no bearing on the issues to be determined by the Tribunal; there was no referral by the Local Court of an issue to the Tribunal for determination (and no such process exists). The Local Court proceedings had merely been adjourned, at the appellants' request, pending the determination of the Tribunal proceedings, as the appellants maintained that the Tribunal proceedings would bear on the outcome of the Local Court proceedings. The fact of that adjournment could not affect the proper exercise of the Tribunal's functions.
Whether the Tribunal erred by failing to take into account relevant considerations, precedent, submissions and/or evidence (often unchallenged)
"40.1. Regarding whether the by-law is 'harsh, unconscionable or oppressive' by reference to the reasons the Tribunal gave to declare SBL 17 invalid
40.2. Regarding the by-law as a whole
40.3. Regarding Clause 1 of the by-law
[The appellants then also invoke each of by-laws 16(2), (3), (5), (6), (7) and (8) and continue]
40.13. Regarding denial by the Respondent of the Appellants' voting rights
40.14. Regarding the harsh and arbitrary application of the by-law by the Respondent against the Appellants."
"41.1. Without taking into account relevant considerations, the conclusions reached by the Tribunal appears to be ill-formed and cannot be relied upon. The Tribunal has failed to meet the standard required by law for rendering a decision.
41.2. Had the Tribunal considered all relevant matters as summarised above, the further conclusion that the by-law is not 'harsh, unconscionable or oppressive' and ought not be found invalid as a result may not have been reached.
41.3. In circumstances where the conclusion of the Tribunal cannot be relied upon, there is a risk that the by-law is 'harsh, unconscionable or oppressive' and ought be found invalid as a result on proper consideration."
"(i) It is not apparent how the alleged "strong similarities" between SBL 16 and SBL 17 could constitute a mandatory consideration in applying the test in s 150 to the by-law in question, SBL 16.
In any event, the Tribunal did consider that argument, and found that SBL 16 and SBL 17 were "different by-laws that operate differently and have a different purpose", SBL 17 being "a general by-law for the recovery of money owed to the Respondent", whilst SBL 16 was concerned with fire safety: Decision at [37]-[38].
The Tribunal also found that "save for statements of general principle, findings in respect of whether SBL 17 is harsh, unconscionable or oppressive are ... not relevant to a determination of whether SBL 16 is harsh, unconscionable or oppressive and ought to be declared invalid": Decision at [39].
Thus, even if alleged similarities to SBL 17 had constituted a mandatory relevant consideration in the context of a discretionary decision, the Tribunal would not have failed to consider them. There is no foundation in principle or authority for the Appellants' assertions that the Tribunal was required to undertake a lengthy process of distinguishing the two by-laws, in order to perform its statutory task: contra AS [47]-[48].
Moreover, the Tribunal's conclusion that the application of the statutory test to a different by-law was not relevant was, it is respectfully submitted, plainly correct."
Whether the Tribunal erred by applying a wrong principle of law
Because SSMA 1996 has been repealed, SBL 16(6.6) on its face no longer has any application.
(1) while s 109 of the SSMA 1996 has been repealed, it has been replaced by s 184 of the SSMA and thus by-law 16(6.6) continues to apply and the Tribunal should have construed by-law 16(6.6) in the context of s 184 of the SSMA. The Tribunal has not done so and instead proceeded by applying a wrong principle of law. The appellants submit that that has resulted in an arbitrary result with the Tribunal failing to "exercise its judicial power to the standard required by law for rendering a reasoned decision";
(2) further or in the alternative, the Tribunal appears to have made a "rather heroic and quite incorrect" assumption that SBL 16 (as amended) does not permit inclusion of costs, expenses and charges on a notice pursuant to s 184 of the SSMA. Contrary to that assumption, it is reasonable to interpret SBL 16(6.6) as providing a distinct right of the respondent to include such amounts.
"20 The appellants do not identify any principle of law which is said to have been wrongly applied, [and] simply assert that the Tribunal's finding was wrong and 'Clause (6.6) continues to apply' because there is a similar provision in the [SSMA] to the SSMA 1996. At best, that raises a mixed question of fact and law, and leave is required (which has not been sought);
21 In any event, the Tribunal's conclusion involved no error. The Tribunal construed clause (6.6) of SBL 16 in accordance with its terms. Where that clause referred to legislation which has been repealed, and SBL 16 contained no definition or provision which would have the effect of substituting the reference to the repealed legislation with reference to any other legislation, the Tribunal quite properly concluded that it had no ongoing operation. It is not apparent how the appellants contend that the Tribunal could have read s 184 of the SSMA ... into clause (6.6) ... Indeed, had the Tribunal read words into clause (6.6) which were not there, it would almost certainly have fallen into error;
22 The Tribunal did not make any finding (or 'heroic and quite incorrect assumption') to the effect asserted [by the appellants]. Rather, it found at [153] ... that, to the extent that SBL 16(6.6) provided that monies that were repayable could be included in a notice (thereby putting the owner on notice of the moneys payable), that was not harsh, unconscionable or oppressive, particularly given that, following the Special Resolution, the moneys could only be recovered in a court or tribunal of competent jurisdiction in any event. That finding involved no error. A notice given pursuant to s 184 of the SSMA ... is precisely that - at notice. It is not a recovery mechanism and it does not preclude an owner from selling a lot ..."
Any act, matter or thing done or omitted to be done under a provision of the former Act and having any force or effect immediately before the commencement of a provision of this Act that replaces that provision is, on that commencement, taken to have been done or omitted to be done under the provision of this Act.
Whether the Tribunal erred by failing to provide proper reasons
"... the Tribunal's reasons in this case were far from falling below the minimum standard for the provision of reasons. Under the guise of an attack on the adequacy of reasons, the [a]ppellants seek, in substance, to reargue the merits of individual findings made by the Tribunal. They require leave to do so, which has not been sought."
"66. In the context of appellate review of the adequacy of reasons, the function of an appellate court is to determine not the optimal level of detail required in reasons for a decision but rather the minimum acceptable standard: Resource Pacific Pty Ltd v Wilkinson [2013] NSWCA 33 at [48] (Resource Pacific). The standard is not one of perfection: Bisley Investment Corporation v Australian Broadcasting Tribunal [1982] FCA 58; (1982) 40 ALR 233 at 255 (Bisley).
67. ... as Basten JA said in Resource Pacific at [48], "[t]ransparency in decision-making is an important value, but it is not cost free, and may involve separate parameters of quantity and quality." ...
68. In terms of the former parameter, the quantity (or detail) of reasons, necessary for those reasons to be adequate may vary both with the nature of the decision maker, i.e. whether or not it is a court of tribunal, and, if the latter, possibly the type of tribunal, and the nature of the question being decided: Wainohu v New South Wales (2011) 243 CLR 181; [2011] HCA 24 at [56] ... Thus even superior courts are not required to give reasons for every interlocutory decision ... and other aspects of decision making such as findings on pure credibility or matters that necessarily call for estimation or impression may require less or only allow for limited reasoning to be exposed ...
...
71. ... even in the less formal setting of a tribunal which has significant powers the exercise of which is capable of affecting the lives of citizens in profound ways, there are certain minimum characteristics that a Tribunal's reasons must possess. These are really supplied, in relation to the Tribunal, by s 62(3) of the CAT Act which, as noted at [52] above, requires there to be set out in reasons (when requested by a party):
(a) the findings on material questions of fact, referring to the evidence or other material on which those findings were based,
(b) the Tribunal's understanding of the applicable law, and
(c) the reasoning processes that lead the Tribunal to the conclusions it made. ...
"might not be required to 'submit the material before [it] to the most meticulous analysis and carry into [the reasons for its decisions] a detailed exposition of every aspect of the evidence and the arguments ...' or '... incorporate an extended intellectual dissertation upon the chain of reasoning ...', at least 'a basic explanation of the fundamental reasons which led the [Tribunal] to [its] conclusion ...' is necessary". ...
74. In Tatmar at 386, Mahoney JA (as he then was) observed:
... Nor is a judge required to make an explicit finding on each disputed piece of evidence. It will be sufficient, if the inference as to what is found is appropriately clear: see Selvanayagam v University of the West Indies [1983] 1 WLR 585, at 587, 588; [1983] 1 All ER 824 at 826.
But, subject to matters such as these, the basis of the decision of a trial judge or of an intermediate court of appeal should be made apparent. This does not mean that the reasons given need to elaborate: an elaborate argument may not require an elaborate answer. Reasons need be given only so far as is necessary to indicate to the parties why the decision was made and to allow them to exercise such rights as may be available to them in respect of it." ...
76. What constitutes adequate reasoning on the part of a tribunal is also informed, in my opinion, by statements from well-known administrative law decisions relating to the limits of judicial review and the need for practical as well as principled restraint in that context: Pozzolanic at 287.
77. These principles include the following:
...
(iii) the reasons must be read fairly and as a whole: Ex parte Applicant at [147] per Kirby J; Wu Shan Liang at 291; Bisley at 251;
(iv) the reasons recorded ought not to be inspected with a fine tooth-comb attuned to identifying error: Collector of Customs v Pozzolanic Enterprises Pty Ltd [1993] FCA 356; (1993) 43 FCR 280 at 287; [1993] FCA 456 (Pozzolanic) at 287_; Wu Shan Liang_ at 272, 291_;"_
(emphasis added)
"Mindful that SBL 16 is a fire safety by law, I do not see how SBL16, by providing for any of those matters operates to restrict the enjoyment of a lot owner's rights in a way which 'could not on any rational view enhance or be needed to preserve the other lot owners' enjoyment of their lots and the scheme common property'."
(1) Prevents the doing of anything that interferes, impedes or affects or is likely to interfere, impede or affect the operation of the FSS;
(2) Provides for the Owners Corporation to enter a lot to inspect, test, repair or replace the FSS following (except in the case of an emergency), the giving of notice;
(3) Entitles the Owners Corporation to investigate and determine the cause of a false alarm or call out and to have an owner indemnify it for the costs associated with any false claim or false call out plus the costs of any recovery.
(4) Provides that a claimed cost, expense or charge can only be recovered in a court or tribunal and the right of recovery is subject to a court or tribunal's determination as to reasonableness."
"91.0 The Appellants submit the Tribunal has erred in the above instance because:
91.1. It is uncontroversial that any by-law that operates to restrict the enjoyment of a lot owner's rights in a way which "could not on any rational view enhance or be needed to preserve the other lot owners' enjoyment of their lots and the scheme common property" is 'harsh, unconscionable or oppressive' and may be found invalid as a result.
91.2. The position of the Appellants is that the by-law does operate to so restrict lot owners and could not on any rational view so support other lot owners or the scheme common property. The Appellants provide evidence in support of its position.
91.3. The Tribunal identifies at preceding Paragraph [88] several ways in which the by-law operates. However, nowhere does the Tribunal explain:
91.3.1. If or how the same restrict (or do not restrict) the enjoyment of a lot owner's rights
91.3.2. If or how the same enhance or are needed (or do not enhance or are not needed) to preserve the other lot owners' enjoyment of their lots and the scheme common property
91.3.3. Why the position of the Appellants as above is otherwise not correct or preferred.
91.4. For example, the Tribunal identifies that the by-law entitles the Respondent to investigate and unilaterally to determine the cause of a false fire alarm or call out. To afford the Respondent such broad power clearly operates to restrict the enjoyment of a lot owner's rights, because it deprives the lot owner its right to require liability to be determined by a Court or Tribunal in the first instance. Indeed, the right granted to the Respondent in Clause 6.4 to determine liability, whether by reference to the results of such investigation or not effectively empowers the Respondent with the judicial power to determine liability. Nowhere does the Tribunal explain if or how the same enhances or is needed to preserve the other lot owners' enjoyment of their lots and the scheme common property. Such a matter is not made clear in the Primary Decision and, rather, it is the submission of the Appellants that such a matter does not enhance and is not needed to preserve the other lot owners' enjoyment of their lots and the scheme common property and is 'harsh, unconscionable or oppressive' both in general and as a result.
91.5. Without proper reasons being provided by the Tribunal, the conclusion reached appears to be an unsupported assumption and cannot be understood. The Tribunal has failed to meet the standard required by law for rendering a reasoned decision.
92.0 The Appellants submit the above error is prejudicial to the case of the Appellants because:
92.1. The above conclusion referred to supports a further conclusion that the by-law is not 'harsh, unconscionable or oppressive' and ought not be found invalid as a result. That is because it implies the by-law is consistent with agreed-upon principles and precedence and may be widely accepted as fair and reasonable.
92.2. In circumstances where the conclusion of the Tribunal cannot be understood, there is a risk that the by-law in fact does operate to restrict the enjoyment of a lot owner's rights in a way which could not on any rational view enhance or be needed to preserve the other lot owners' enjoyment of their lots and the scheme common property, leading to the opposite conclusion that the by-law is 'harsh, unconscionable or oppressive' and ought be found invalid as a result."
Whether the Tribunal erred in its construction of SBL 16 (as amended)
"121.1. Consider the literal meaning of the text of the by-law
121.2. Consider the ordinary and natural meaning of the text of the by-law
121.3. Consider the context of the by-law, including its history and any extrinsic material. Any meaning of words inconsistent with the context are to be eliminated.
121.4. Consider the intended purpose of the by-law, including its history and any extrinsic material. Any meaning of words inconsistent with the purpose are to be eliminated.
121.5. Consider the provisions of the by-law on the prima facia [sic] basis that its provisions are intended to give effect to harmonious goals. In the event of inconsistency between provisions, alleviate the conflict by adjusting the meaning of the competing provisions to achieve that result which will best give effect to the purpose and language of those provisions while maintaining the unity of all the provisions. This will often require the Tribunal to determine which is the leading provision and which the subordinate provision, and which must give way to the other."
"122.1. On 29 November 2013, SBL 16 (original) was approved by the Respondent.
122.2. The reason that SBL 16 (original) was passed was because a number of lots in Strata Plan 77109 failed to keep their fire compliances in order, with the result that the ability to obtain insurance for the same became more difficult.
122.3. Prior to SBL 16 (original) being passed, there was never any issue with fire compliances for the lots owned by the Appellants and the same issue was very carefully managed by the Appellants.
122.4. From the Appellants' perspective, there was no need for SBL 16 (original) to be passed.
122.5. It follows that the purpose of SBL 16 (original) was for the Respondent to assume complete control and authority over fire compliance and safety matters for the scheme. That includes over the entirety of the fire safety systems installed on both lot and common property of the scheme.
122.6. Prior to proliferation of the fire charges the subject of the Local Court Proceedings, the Respondent sought very little (if any) input from the Appellants in relation to management of fire safety matters over the scheme save for organising and obtaining access to its lots in order to complete the annual fire safety statement for the scheme (including the Appellants' lots). That is, in line with the terms of SBL 16 (original), and to the total exclusion of the Appellants, the Respondent actively and independently managed and completed all fire compliance matters of its own accord and volition."
"1. By-laws are the "series of enactments" by which the proprietors in a body corporate administer their affairs; they do not deal with commercial rights, but the governance of the strata scheme ...
2. By-laws have a public purpose which goes beyond their function of facilitating the internal administration of a body corporate; ...
3. Exclusive use by-laws may be inspected by third persons interested in acquiring an interest in a strata scheme, whether, for example, by acquiring units, or by lending money to a lot proprietor; such persons would ordinarily have no access to the circumstances surrounding their making; their meaning should be understood from their statutory context and language: ...
4. By-laws may be characterised as either delegated legislation or statutory contacts...;
5. Whichever be the appropriate characterisation, exclusive use by-laws should be interpreted objectively by what they would convey to a reasonable person: ...
6. In interpreting exclusive use by-laws the Court should take into account their constitutional function in the strata scheme in regulating the rights and liabilities of lot proprietors inter se : ...
7. Unlike the articles of a company, there does not appear to be a strong argument for saying exclusive use by-laws should be interpreted as a business document, with the intention that they be given business efficacy: ... That does not mean that an exclusive use by-law may not have a commercial purpose, ..., but due regard must be paid to the statutory context in so doing;
8. An exclusive use by-law should be construed so that it is consistent with its statutory context; a court may depart from such a construction if departure from the statutory scheme is authorised by the governing statute and if the intention to do so appears plainly from the terms of the by-law: ...
9. Caution should be exercised in going beyond the language of the by-law and its statutory context to ascertain its meaning; a tight rein should be kept on having recourse to surrounding circumstances: ..."
[Citations omitted].
"SBL 16(1) prohibits the doing of things that would or a [sic - be] likely to have a negative impact on the FSS."
"1 An Owner or Occupier must not do anything or cause or permit any Authorised Person to do anything, in or on that Owner's or Occupier's Lot or anywhere in the Building that:
1.1 Interferes with, impedes, or affects, or is likely to interfere with, impede or affect, the operation of a Fire Safety System, or reduce the level of fire safety in the Lot or anywhere else in the Building, including but not limited to:
(a) Interference with any smoke detector or smoke alarm installed in the Lot or the Building.
(b) Use of or interference with any fire hydrant or any other fire fighting or Fire Safety System except in the case of an emergency.
(c) Tampering with fire doors or fire exits so that they remain open or ajar allowing unauthorised entry or exit to the Building.
(d) Tampering with entry doors to lots including but not limited to, removing and replacing door locks or drilling holes in the door (except with Owners Corporation's consent), propping entry doors open or otherwise interfering with the entry door so that the integrity of the door as a fire door is diminished.
(e) Tampering, touching, or hanging items from a fire sprinkler head.
1.2 Triggers a false alarm in respect of the Fire Safety System or any common property services within the strata scheme or cause the Fire Brigade or some other Authority or Service Provider or person to attend the Building for a false alarm.
1.3 (Otherwise than in an emergency) Would cause a Call-out of an Authority, a Service Provider, the Fire Brigade, or some other person at the Building."
"124.3. Specifically, the Tribunal construes Clause 1 in the very limited, general context of fire safety. There appears to have been no consideration of the full context and purpose of the by-law as summarised above. Further, in that regard, the Tribunal does not explain:
124.3.1. If it is correct that the by-law only prohibits actions which have a "negative" impact on the fire safety of the scheme, what is the purpose of the by-law at all. It is already required of lot owners or occupiers that they not take such action as a matter of law. Such requirement derives from many sources, including contract law, property law, strata law, statute, common law and equity. Given the same, if the by-law only prohibited actions in the manner found by the Tribunal, the by-law would have no work to do at all. The reasonable conclusion in that circumstance is that the Respondent intended at the time of by-law approval to assume complete control and authority over fire safety matters of the scheme, which is not a matter automatically derived from the above sources of law.
124.3.2. Why the position of the Appellants as above is otherwise not correct or preferred
124.4 In construing Clause 1 as above, the Tribunal appears to pay little (if any) attention to the fact that the terms and operation of the by-law go far beyond anything provided for by SSMA 2015 or the model by-laws. If it is assumed that the legislature did not intend for owners' corporations to be conferred powers exceeding SSMA 2015 or the model by-laws, the construction of Clause 1 simply cannot be correct.
124.5. Without proper construction by the Tribunal, the conclusion reached appears to be premature and cannot be relied upon. The Tribunal has failed to meet the standard required by law for interpreting a by-law."
136 Matters by-laws can provide for
(1) By-laws may be made in relation to the management, administration, control, use or enjoyment of the lots or the common property and lots of a strata scheme.
(2) A by-law has no force or effect to the extent that it is inconsistent with this or any other Act or law.
"111 Firstly, on its own, SBL16 (3) it does not deal with the issue of recovery. It simply operates to require a lot owner to indemnify the respondent in respect of costs and charges incurred because of the act, negligence or omission of an owner and/or occupier, the failure by an owner or occupier to give access to their lot or a breach and subsequent enforcement of the bylaw.
112 Secondly, it is the costs and charges that the respondent says it is entitled to be indemnified for that are the subject of the Local Court Proceedings, such 31 that the existence of the facts upon which the claimed charges and costs are based is being determined by the Local Court. In that light, SBL16(3) is not operating in the way contended for by the applicants.
113 Thirdly, as noted above, the Special Resolution amended SBL 16 by making clear that the costs, expenses, and charges may only be recovered in a court or tribunal of competent jurisdiction and the right of recovery is subject to the determination of a court or tribunal of the reasonableness of the costs, expenses and charges."
"127.0 The Appellants submit the Tribunal has erred in the above instance because:
127.1. Clause 3 of the by-law does on its own deal with the issue of recovery. That is clear from the opening text of Clause 3 as stated below:
'An Owner and/or Occupier shall pay and indemnify the Owners Corporation against any claim, charge (including fines) or costs (including rectification costs) arising from: ...' (emphasis added)
127.2. At Paragraph [112] and following, the Tribunal proceeds to explain its reasons for the above finding, including by implying that Clause 3 relies on Clause 6.5. However, there is no requirement that the Respondent must first exercise any power, authority, duty or function conferred upon it by Clause 6, including Clause 6.5. Clause 6.5 operates despite and in addition to the powers conferred by Clause 3. In fact, it is case that Clause 6.5 relies on Clause 3 (and not vice versa). That is clear from the text of Clause 6 as stated below:
6 Despite anything contained in the bylaws and in addition to the powers, authorities, duties and functions conferred on or imposed on the Owners Corporation pursuant to the SSMA, the Owners Corporation shall have the following powers, authorities, duties and functions:
6.5 To demand from an Owner or Occupier, payment of the costs, expenses and charges referred to in clause 3...
127.3. The above was clearly submitted by the Appellants at first instance.
127.4. It follows that Clause 3 operates independently of, and without limitation by, anything contained in Clause 6.5. The findings of the Tribunal at Paragraphs [112] and following must fall away in that circumstance.
128.0 The Appellants further submit the Tribunal has erred in the above instance because, even if it were the case that Clause 3 relied on Clause 6.5 (which is denied), there are other problems with the construction adopted by the Tribunal not considered or addressed as below:
128.1. Firstly, the amendments made do not overcome the issues presented by Clause 6.4, which permits the Respondent to make unilateral determination of liability which a Court or Tribunal does not have purview over, or jurisdiction to assess, review or constrain.
128.2. Secondly, the amendments made do not address the issue that the by-law permits recovery of costs which a Court or Tribunal does not have purview over, or jurisdiction to assess, review or constrain. Such costs include those that are not legal costs, such as the costs of any repair, rectification or remediation works and the costs of any strata manager, building manager or other expert.
128.3. Thirdly, even if it were the case that a Court or Tribunal could review all heads of costs claimed by the Respondent against a lot owner (which is denied):
128.3.1 In considering any claim made relying on the by-law, the Court or Tribunal must assume it is valid and can only interpret and apply the terms of the bylaw.
128.3.2. However, in doing so, the Court or Tribunal is constrained by any earlier determination of liability by the Respondent. That leads to the potentially perverse but valid outcome of a Court or Tribunal finding costs were reasonably incurred and may be recovered even though the underlying determination of liability was not.
128.3.3. The burden being placed upon the Court or Tribunal is too heavy given the matters at hand. Considering this Strata Plan alone, which is comprised of 113 commercial lots and is required to complete a mandatory review of the FSS each year in order to obtain the AFSS and considering the fact that the Respondent is not required to justify any action it takes under the by-law to any lot owner or occupier, the volume and frequency of potential litigation is unpalatable.
128.4. It is readily apparent from the above that any Court or Tribunal approached to assist with review of costs claimed pursuant to the by-law will encounter great difficulty making its decision. That is the very position the Court finds itself in the Court Proceedings and the Appellants submit the same as yet further evidence of the perverse (but valid) outcomes of this by-law."
114 That is to say, if an amount claimed is disputed, the respondent would need to prove in a court or tribunal of competent jurisdiction, its entitlement to the amount claimed by way of indemnity by establishing, for instance, that it was caused by or arose as a consequence of:
(1) the act, negligence or omission of the owner and/or occupier;
(2) the failure by an owner or occupier to give access to their lot; or
(3) a breach and subsequent enforcement and that the cost, charge or expense was reasonable.
(1) The setting up of a regime to implement and enforce the bylaws and to claim the costs associated with a non-compliance with them is not unreasonable, and in my view, is necessary to ensure the bylaw has effect.
(2) The indemnification provisions only apply when there has been a breach and/or costs have been incurred as a consequence of an act, negligence or omission of the Owner because of, for instance, a false fire alarm, a breach of the bylaw, or failure of the Owner to give access to their lot where required.
"140 Second, where an amount claimed is in dispute it can only be recovered in a court or tribunal which would then determine liability, which was (in the context of the Local Court Proceedings) what was occurring even before the Special Resolution."
"136.1. Clause 6.4 is not dependent on, nor limited by, anything contained in Clause 6.5. That is for the same reasons submitted at Items 127.0 - 128.0 above. A Court or Tribunal may only review the reasonableness of the cost, expenses and charges claimed. It may not, however, review the reasonableness of the underlying determination of liability itself. Where a Court or Tribunal cannot go behind, and is strictly subject to, any determination of liability by the Respondent, the protections the Tribunal suggests are afforded to lot owners and occupiers in requiring the parties to engage in a Court or Tribunal process are simply not there. The findings of the Tribunal at Paragraph [140] must fall away in that circumstance.
136.2. Without proper construction by the Tribunal, the conclusion reached appears to be erroneous and cannot be relied upon. The Tribunal has failed to meet the standard required by law for interpreting a by-law."
"The Appellants' submissions in relation to this paragraph (at AS [136]) again appear to conflate determining who is responsible for an amount and recovery of that amount. The suggested limitation on what a Court or Tribunal may review is without foundation: the Respondent is not afforded the ability to conclusively determine anything. It follows that there is no substance in the Appellants' complaint."
"Did the Tribunal err in finding that ... SBL 16 was not 'harsh, oppressive or unconscionable' including in relation to:..."
"152.1. Without confidence that the Tribunal acted reasonably in making its decision, the conclusions reached appear to be erroneous and cannot be relied upon. The Tribunal has failed to meet the standard required by law for interpreting a by-law.
152.2. Had the Tribunal acted reasonably in considering SBL 16 as above, the further conclusion that the by-law is not 'harsh, unconscionable or oppressive' and ought not be found invalid as a result may not have been reached.
152.3. In circumstances where the conclusion of the Tribunal cannot be relied upon, there is a risk that the by-law in fact is 'harsh, unconscionable or oppressive', leading to the opposite conclusion that the by-law ought be found invalid as a result."
"154.1 Even if each of the components of SBL 16 in isolation was rightly found not to be harsh, unconscionable or oppressive (which is denied), taken as a whole, the operation of SBL 16 is still 'harsh, unconscionable or oppressive' and ought be invalid as a result";
...
154.2 Any interaction between the respondent and a lot owner or occupier in a scheme gives rise to rights and obligations on both sides. However there are several instances whereby the Tribunal takes no issue with the fact that the Respondent is provided an explicit power, authority, duty or function to do something in the interests of fire safety but a lot owner or occupier has no reciprocal explicit power, authority, duty or function to reasonably verify, defend or properly engage in the process. It is not palatable for a lot owner or occupier to, at every level, be required to approach a Court or Tribunal to verify, defend or properly engage when the owners' corporation has a right to do so in the first instance. The category of the by-law as relating to 'fire safety' as thereby being sui generis in some manner or by extension (see, inter alia, Paragraphs [74], [89] and [168] of the Primary Decision) and thereby allow a greater imbalance is not correct. It is not a basis to permit such a one-sided by-law with such an incredible imbalance of power and is 'harsh, unconscionable or oppressive' as a result.
154.3 The Tribunal does not have appeared to consider the by-law in the practical circumstances of the matter referred to at Item 61.1.3, wherein the respondent has delegated management of the fire compliance process to BSM [the strata manager], who in turn delegated that process to EFS [Essential Fire Services]. Whether or not that is accepted, it is obvious that is a pathway open to the [respondent]. It is trite to note, in that regard, not a single piece of evidence has been provided by any strata committee member of the respondent at all....
154.4 Relatedly, the by-law gives rise to obvious moral hazard issues by restricting what lot owners can do with fire safety systems located on their lots, including engaging their own service providers, and leaving matters of fire safety to the owners corporation but, in the event of failure of the owners corporation in meeting their obligations, putting the costs of the same back on the lot owners. That is not fair and balanced but rather 'harsh, unconscionable or oppressive';
154.5 As a fundamental matter, the terms of the by-law are unclear, ambiguous and confusing. This leads to various problems including ... a total imbalance of rights and obligations ...
154.5.1 The by-law makes clear what lot owners or occupiers cannot do in relation to the FSS [fire safety systems]. However it does not make clear what lot owners or occupiers can do in relation to the FSS. This is problematic because if action required to be taken is not taken, or action thought to be required is wrongly taken, the costs consequences are potentially very severe ..."
"Further thereto, a real consideration in the circumstances is whether the failure to expressly permit a lot owner to also receive the relevant reports actually prejudices other lot owners' enjoyment of their lots and the scheme common property. In the instant circumstances, it is quite clear that the owners' corporation delegated management of the fire compliance process to BSM, who in turn delegated that process to [Essential Fire Services]. No evidence whatsoever has been provided of overview by BSM or [Beaver Fire Services], who were not competent and subsequently discharged. That lack of oversight and incompetence could have been detected at an earlier stage had the relevant reports been shared, to the benefit of all lot owners. The Appellants provide unchallenged evidence in support of the above."
74. ... an appeal to the Appeal Panel does not provide a losing party in the Tribunal below with the opportunity to run their case again: Ryan v BKB Motor Vehicle Repairs Pty Ltd [2017] NSWCATAP 39 at [10]. ...
75 To put the matter another way, as indicated in the Tribunal's Guideline 1, Internal Appeals (which can be found on the Tribunal's website):
... an appeal is not an opportunity to have a second go at a hearing."
"If any party wishes to make an application for costs of the appeal, that party is to lodge with the Appeal Registry and give to the other party any submissions on costs at the same time as their submissions in relation to the appeal."
(1) all the time, effort and expense incurred by the parties and the Tribunal in conducting these appeal proceedings was avoidable by the respondent;
(2) the respondent ought meet its own costs as well as the costs of the appellants regardless of the outcome of these proceedings;
(3) any submissions of the respondent ought to be disregarded in favour of the submissions of the appellants by the Appeal Panel and the costs of the appeal met by the respondent regardless of the outcome.
(1) the respondent provide submissions (and if necessary evidence) on costs within 14 days;
(2) the appellants may respond within a further 14 days; and
(3) the respondent may reply within a further seven days.
(4) submissions in chief are to be limited to five pages and submissions in reply to three pages.
(1) The appeal is dismissed.
(2) The respondent is to provide submissions, limited to five pages, (and if necessary evidence) on costs within 14 days from the date of these orders.
(3) The appellants may file submission in response, limited to five pages, within 28 days from the date of these orders.
(4) The respondent may file submissions in reply, limited to three pages, within 35 days from the date of these orders.
I hereby certify that this is a true and accurate record of the reasons for decision of the Civil and Administrative Tribunal of New South Wales.
[1] SZCBT v Minister for Immigration and Multicultural Affairs [2007] FCA 9 at [26]; referred to in Ballas v Department of Education (State of NSW) [2020] NSWCA 86 at [79]
Gokani-Robins Pty Ltd
The Owners �e" Strata Plan No 77109 [2025] NSWCATAP 107
(1986) 162 CLR 24
(2007) 70 NSWLR 344
(1997) 48 NSWLR 430
(1982) 40 ALR 233
(2011) 243 CLR 181
(1993) 43 FCR 280