These Regulations set out the detailed rules for obtaining and operating exploration permits, retention leases and production licences. They prescribe what must be included in applications and operation, environment, well‑management and rehabilitation plans; reporting, sample and data‑submission obligations; fees, royalties and rent; and when Ministerial consent is required for tests, suspensions or decommissioning.
They affect authority holders, their contractors and affected landholders by creating specific technical and timing compliance duties, payment obligations and Ministerial decision points that determine whether proposed petroleum activities may proceed.
The Petroleum Regulations 2021 (as amended to 1 July 2024) prescribes technical, procedural and administrative requirements for applications, approvals, operational plans, environmental and well management, reporting, fees and certain enforcement matters under the Petroleum Act 1998. The Regulations operate by specifying the content that applicants and authority holders must supply to the Minister, the timeframes for giving notices and reports, the form and quantities for physical samples and data to be provided, and the fees payable for a range of statutory actions. See reg 1 (objectives), reg 2 (authorising provision) and reg 3 (commencement 22 November 2021). The version provided incorporates S.R. No. 64/2024 (Petroleum Amendment Regulations 2024), which substituted Part 10 fees and took effect 1 July 2024 (Endnotes, Table of Amendments).
Mechanically, the Regulations:
Prescribe application content requirements for exploration permits, retention leases and production licences, including regional risk/benefit assessments and, for retention leases and production licences, insurance certificates and rehabilitation bond information (regs 6-11, 8(2), 10(2)).
Set mandatory structure and content for petroleum production development plans and storage development plans, and allow the Minister to require additional or revised information (regs 13-15).
Define detailed operational requirements: operation plans, environmental management plans, well operation management plans, rehabilitation plans, and specified reviews and reporting obligations (regs 22-37).
Require written Ministerial consent for production or well tests and for well suspension or decommissioning, and set the information that must accompany consent applications (regs 28-29).
Current sections
Direct links to the current provisions in Petroleum Regulations 2021.
81
Part 1
Preliminary matters
Part 1—Preliminary matters
1 Objectives
The objectives of these Regulations are—
(a) to provide for the elimination and minimisation, so far as is reasonably practicable, of hazards and risks to the environment, public amenity and public safety involved in undertaking petroleum operations over the life of those operations; and
(b) to provide for the elimination and minimisation, so far as is reasonably practicable, of impacts from petroleum operations on local communities; and
(c) to ensure effective engagement by authority holders with the community over the life of an authority; and
(d) to provide for the effective management of petroleum reservoirs and petroleum storage reservoirs; and
(e) to prescribe requirements for operation plans, storage development plans and petroleum production development plans; and
(f) to prescribe requirements for applications for, and notices of applications for, an authority; and
(g) to prescribe reporting requirements, including the information and samples, that an authority holder must provide to the Minister; and
(h) to provide for various administrative matters, fees and other requirements of the Act.
2 Authorising provision
These Regulations are made under section 252 of the Petroleum Act 1998.
3 Commencement
These Regulations come into operation on 22 November 2021.
4
Revocation
4 Revocation
The Petroleum Interim Regulations 2021[1] are revoked.
5
Definitions
5 Definitions
In these Regulations—
ancillary equipment, in relation to a well, includes—
(a) equipment located downhole; and
(b) pressure control equipment; and
(c) a well-head;
authority number means the unique identification number designated by the Minister for an authority;
environmental legislation means an Act of the State or the Commonwealth or any instrument made or issued under or for the purpose of those Acts that relates to the protection of the environment;
facility means a structure that—
(a) is used or constructed for the purpose of recovering or storing petroleum; or
(b) is used or constructed for the purpose of monitoring impacts from production or storage wells; or
(c) carries, contains or includes—
(i) equipment for the drilling, modification, maintenance or repair of a well or ancillary equipment; and
(ii) gas plants; and
(iii) compression plants; and
(iv) metering stations; and
(v) gathering lines; and
(vi) survey equipment;
hydrocarbon gas emissions means gaseous emissions from leaks, flaring or venting of hydrocarbons;
impact means a negative effect of a petroleum operation that is reasonably predictable at the time that the application for the authority under which the operation is carried out is made;
practicable, in relation to eliminating or minimising hazards and risks, means practicable having regard to—
(a) the severity of the hazard or risk; and
(b) the state of knowledge about the hazard or risk; and
(c) the availability and suitability of ways to eliminate or minimise that hazard or risk; and
(d) the cost of eliminating or minimising that hazard or risk;
relevant person or organisation means—
(a) in relation to an operation plan that is proposed to be varied—
(i) any person or organisation that may be affected by an activity carried out under the operation plan as proposed to be varied; and
(ii) any person or organisation that has interests that may be affected by an activity carried out under the operation plan as proposed to be varied; or
(b) in relation to any other operation plan—
(i) any person or organisation that may be affected by an activity carried out under the operation plan; and
(ii) any person or organisation that has interests that may be affected by an activity carried out under the operation plan;
rig release date, in relation to a well, means the date on which the drilling rig that was last used to drill the well is moved so that it is no longer above the well, if no further drilling of the well is to occur;
risk means the likelihood and consequence of a specific, undesired event occurring;
the Act means the Petroleum Act 1998;
well activity, in relation to a well, means an activity carried out during the life of the well;
well integrity, in relation to a well, means that the entire length of the well, for the life of the well—
(a) is under control, in accordance with an operation plan accepted under section 161 of the Act; and
(b) is able to contain reservoir fluid; and
(c) is not the subject of any unforeseen risks;
well integrity hazard means, for the life of the well, an event—
(a) that—
(i) may compromise the well integrity of a well; or
(ii) may cause loss of a well barrier control; and
(b) that may, if it occurred, cause harm or present a risk to individuals, public safety, public amenity, the environment or a petroleum reservoir.
Part 2
Exploration permits
Part 2—Exploration permits
6
Assessment of risks etc.
6 Assessment of risks etc.
An application under section 20 of the Act must contain the following information in relation to the proposed work program submitted with the application over the life of the permit—
(a) the likely regional economic, social and environmental risks and impacts of the program;
(b) the likely regional benefits of the program relative to its likely risks and impacts;
(c) the extent to which these risks and impacts can be managed at the regional level and how the applicant proposes to do this.
7
Prescribed factors in relation to an application for an exploration permit
7 Prescribed factors in relation to an application for an exploration permit
For the purposes of sections 20B(2)(c) and 21(2)(c) of the Act, the following are prescribed factors—
(a) the likely regional economic, social and environmental risks and impacts of the work program;
(b) the likely regional benefits of the work program relative to its likely risk and impacts;
(c) the extent to which these risks and impacts can be managed at the regional level and how the applicant proposes to do this.
Part 3
Retention leases
Part 3—Retention leases
8
Assessment of risks etc.
8 Assessment of risks etc.
(1) An application under section 38 of the Act must contain the following information in relation to the proposed work program submitted with the application over the life of the lease—
(a) the likely regional economic, social and environmental risks and impacts of the program;
(b) the likely regional benefits of the program relative to its likely risks and impacts;
(c) the extent to which these risks and impacts can be managed at the regional level and how the applicant proposes to do this.
(2) An application under section 38 of the Act must contain the following—
(a) the certificate of any insurance policy maintained by the applicant in accordance with section 171 of the Act in respect of the exploration permit held by the applicant;
(b) the adequacy, as at the date of the application, of that insurance to cover any expenses or liabilities arising from a petroleum operation carried out under the exploration permit held by the applicant;
(c) the amount of the rehabilitation bond obtained by the applicant in accordance with section 173 of the Act in respect of a petroleum operation carried out under the exploration permit held by the applicant;
(d) the sufficiency of the amount secured by a rehabilitation bond described in paragraph (c), as at the date of the application, to cover any costs of rehabilitation work necessary as a result of the relevant petroleum operation.
9
Prescribed factors in relation to an application for a retention lease
9 Prescribed factors in relation to an application for a retention lease
For the purposes of section 40(1)(e) of the Act, the following are prescribed factors—
(a) the likely regional economic, social and environmental risks and impacts of the work program;
(b) the likely regional benefits of the work program relative to its likely risks;
(c) the extent to which these risks and impacts can be managed at the regional level and how the applicant proposes to do this.
Part 4
Production licences
Part 4—Production licences
Division 1—Prescribed factors
10
Assessment of risks etc.
10 Assessment of risks etc.
(1) An application under section 47 of the Act must contain the following information in relation to the proposed work program submitted with the application over the life of the licence—
(a) the likely regional economic, social and environmental risks and impacts of the program;
(b) the likely regional benefits of the program relative to its likely risks and impacts;
(c) the extent to which these risks and impacts can be managed at the regional level and how the applicant proposes to do this.
(2) An application under section 47 of the Act must contain the following—
(a) the certificate of any insurance policy maintained by the applicant in accordance with section 171 of the Act in respect of the exploration permit held by the applicant;
(b) the adequacy, as at the date of the application, of that insurance to cover any expenses or liabilities arising from a petroleum operation carried out under the exploration permit held by the applicant;
(c) the amount of the rehabilitation bond obtained by the applicant in accordance with section 173 of the Act in respect of a petroleum operation carried out under the exploration permit or retention lease held by the applicant;
(d) the sufficiency of the amount secured by a rehabilitation bond described in paragraph (c), as at the date of the application, to cover any costs of rehabilitation work necessary as a result of the relevant petroleum operation.
11
Prescribed factors—determining grant of application for a production licence
11 Prescribed factors—determining grant of application for a production licence
For the purposes of section 49(1)(d) of the Act, the following are prescribed factors—
(a) the likely regional economic, social and environmental risks and impacts of the proposed work program submitted with the application;
(b) the likely regional benefits of the work program relative to its likely risks;
(c) the extent to which these risks and impacts can be managed at the regional level and how the applicant proposes to do this.
12
Prescribed factors—granting of production licences following tender
12 Prescribed factors—granting of production licences following tender
For the purposes of sections 52(3) and 52A(3) of the Act, the following are prescribed factors—
(a) the likely regional economic, social and environmental risks and impacts of the proposed work program submitted with the application;
(b) the likely regional benefits of the work program relative to its likely risks;
(c) the extent to which these risks and impacts can be managed at the regional level and how the applicant proposes to do this.
Division 2—Petroleum production development plans
13
Matters to be included in petroleum production development plan
13 Matters to be included in petroleum production development plan
(1) For the purposes of section 63(2) of the Act, a petroleum production development plan must include
(a) a description of each stage of the petroleum operation, including equipment or facilities to be used; and
(b) a description of the relevant existing geological and reservoir data and interpretations of that data; and
(c) details of proposed further data acquisition and studies to enhance geological and reservoir understanding; and
(d) a reservoir management plan that
(i) describes how the reservoir will be produced; and
(ii) provides the reasons for adopting the proposed approach; and
(iii) estimates the future petroleum to be recovered from the reservoir; and
(iv) specifies the proposed rate of recovery of petroleum.
(2) The holder of the authority must ensure that the petroleum production development plan is reviewed within 12 months after initial petroleum production and then at intervals not exceeding one year.
(3) For the purposes of subregulation (1)(d)(iv), the proposed rate of recovery of petroleum may be expressed as a range.
14
Storage development plan
14 Storage development plan
(1) For the purposes of section 68(2) of the Act, a storage development plan must include
(a) a description of each stage of the petroleum operation, including equipment or facilities to be used; and
(b) a description of the reservoir using geological data and interpretations of that data; and
(c) a reservoir management plan that
(i) estimates the recoverable petroleum reserve, owned by the Crown pursuant to section 13 of the Act located in the reservoir before the commencement of underground petroleum storage activities; and
(ii) evaluates the suitability of the reservoir and seal for storage purposes; and
(iii) specifies the proposed storage operating volume; and
(iv) specifies the proposed rates of injection and recovery of petroleum; and
(v) details the methods to monitor and verify containment of injected gas and the petroleum-water contact; and
(vi) provides information about how storage operations interact with storage operations at nearby petroleum fields; and
(d) a description of the measures to be used to ensure containment of the stored petroleum.
(2) The holder of the authority must ensure that the storage development plan is reviewed within 12 months after initial petroleum production and storage operations and then at intervals not exceeding one year.
15
Additional information
15 Additional information
(1) If a petroleum production development plan or a storage development plan has been submitted by the holder of an authority for the purposes of section 64 or 69 of the Act, the Minister may, by notice in writing, require the holder to provide any additional information that the Minister considers to be relevant to the approval of the plan.
(2) The Minister may, by notice in writing, require the holder of an authority to submit a revised petroleum production development plan or a storage development plan incorporating the additional information referred to in subregulation (1).
Part 5
Provisions applying to authorities generally
Part 5—Provisions applying to authorities generally
Division 1—Applications
16
Other details in work program
16 Other details in work program
(1) For the purposes of section 97(e) of the Act, a work program must contain details regarding how the authority holder intends to engage, over the term of the authority, with the community and, if relevant, traditional owner groups within the meaning of the Traditional Owner Settlement Act 2010.
(2) For the purposes of section 97(d) and (e) of the Act, a work program in relation to an exploration permit must set out the annual estimated expenditure for each year of the term of the permit, in the form of a table.
Division 2—Surrender or cancellation of authorities
17
Surrender of authority
17 Surrender of authority
For the purposes of section 111(2)(f) of the Act, the following are prescribed factors—
(a) that the requirements of any plan required under the Act or these Regulations have been met;
(b) that any reporting obligations under the Act or these Regulations have been met;
(c) that the relevant land in the authority area has been rehabilitated for the purposes of section 170 of the Act.
Division 3—Miscellaneous matters
18
Prescribed period for certain notices
18 Prescribed period for certain notices
For the purposes of sections 39A(2)(b) and 48A(2)(b) of the Act, the prescribed period is 21 days from the day on which the notice is published.
19
Prescribed information for certain notices
19 Prescribed information for certain notices
(1) For the purposes of sections 39A(2)(c) and 48A(2)(c) of the Act, the following is prescribed information—
(a) the proposed work program submitted with the application;
(b) the contact details of a representative of the Minister, for any queries about the application;
(c) the contact name, telephone number, address and email address of a representative of the applicant;
(d) the location at which a copy of the application can be inspected by members of the public within business hours;
(e) in the case of an application for a retention lease, a statement that subject to other statutory requirements being satisfied, the lease, if granted—
(i) will entitle the holder to retain rights to a petroleum discovery that is not commercially viable to develop; and
(ii) will entitle the holder to carry out further petroleum exploration and work incidental to that purpose; and
(iii) will not entitle the holder to undertake petroleum production;
(f) in the case of an application for a production licence, a statement that, subject to other statutory requirements being satisfied, the licence, if granted, will entitle the holder—
(i) to carry out petroleum production; and
(ii) to explore for petroleum; and
(iii) to do anything in the licence area that is necessary for, or incidental to, those purposes;
(g) a statement that further information is available on the Department's Internet site regarding the statutory requirements that the applicant must comply with before work is undertaken in the authority area, if the authority is granted;
(h) the Internet address of the Department at which the information set out in paragraph (g) can be accessed.
(2) A notice must be in a form approved by the Minister.
Part 6
Royalties and rent
Part 6—Royalties and rent
20
Time of payment of royalties
20 Time of payment of royalties
(1) Subject to subregulation (5), for the purposes of section 154(2) of the Act, a royalty for a production licence must be paid—
(a) for each period of 6 months ending on 30 June and 31 December in each year; and
(b) within 30 days of the expiry of the period for which it is payable.
(2) Unless otherwise specified in a production licence, the royalty payment for the period must be accompanied by a copy of records of the quantity of petroleum extracted or recovered in that period from any well within the licence area as measured by an approved measuring device.
(3) For the purposes of section 179(b) of the Act, the holder of a production licence must retain a copy of records of petroleum extracted or recovered for inspection purposes for 5 years.
Note
Under section 179 of the Act, a person who contravenes this subregulation may be liable to a penalty not exceeding 60 penalty units.
(4) Subregulations (2) and (3) do not apply in relation to a well in any period in which the quantity of petroleum extracted or recovered from that well in that period was determined by the Minister in accordance with section 153(3) of the Act.
(5) The Minister, by notice in writing to the holder of the authority, may vary the period set out in subregulation (1) in respect of which royalties for a production licence are payable.
(6) In this regulation—
approved measuring device has the same meaning as in section 153 of the Act.
21
Rent for occupancy of Crown Land
21 Rent for occupancy of Crown Land
(1) For the purposes of section 160(3) of the Act, the amount of rent payable is the current market value for occupying the land, having regard to the use of the land permitted by the authority, as determined by a valuer nominated by the valuer-general.
(2) The holder of the authority is liable for the costs incurred in obtaining the determination.
(3) The rent must be reviewed by a valuer nominated by the valuer-general at intervals not exceeding 3 years but not less than one year.
(4) Rent must be paid for each period of 6 months ending on 30 June and 31 December in each year and must be paid within 10 days of the commencement of the period for which the rent is payable.
(5) In this regulation—
valuer-general means the valuer-general referred to in section 3(1) of the Valuation of Land Act 1960.
Part 7
Conduct of operations etc.
Part 7—Conduct of operations etc.
Division 1—Operation plan
22
Content of operation plan
22 Content of operation plan
(1) For the purposes of section 161(1)(d) of the Act, an operation plan—
(a) must set out—
(i) a comprehensive description of the equipment and facilities to be used in the petroleum operation; and
(ii) a comprehensive description of the petroleum operation, including details of each of the proposed stages of the petroleum operation that must include, if appropriate, the following stages—
(A) construction;
(B) operation;
(C) decommissioning;
(D) rehabilitation; and
(iii) details of the proposed process to ensure that the Minister is notified prior to commencement of each stage of the petroleum operation; and
(iv) an environment management plan; and
(v) if the petroleum operation involves petroleum exploration, a statement of the activities referred to in section 7 of the Act that are proposed to be carried out; and
(vi) if the petroleum operation includes the making of a new well, carrying out activities on an existing well or decommissioning a well, a well operation management plan in accordance with Division 3; and
(b) must provide for—
(i) a review of the operation plan by the holder of the authority before the holder commences each stage of the petroleum operation; and
(ii) a review by the holder of the authority of the risks identified in the operation plan whenever there is a significant change in the risks that the petroleum operation may pose; and
(iii) a review of the operation plan by the holder of the authority at least once every 5 years; and
(iv) the submission of a report by the holder of the authority, within 7 days of each review being finalised, to the Minister setting out the findings of that review; and
(c) must include, in relation to any facility proposed to be used in connection with the petroleum operation—
(i) a map of the location of the facility, and
(ii) a description of the location; and
(iii) details of all the sites related to the petroleum operation (including, but not limited to, accommodation camps), the activities to be undertaken at those sites and their location on the map referred to in subparagraph (i); and
(iv) details of the proposed design, construction, installation and maintenance of the facility; and
(v) if the facility is to be modified, details of the proposed modifications; and
(vi) details of the proposals for the decommissioning of the facility.
(2) The details provided under subregulation (1)(a)(ii) must enable the Minister to assess whether the facility is adequate for the proposed petroleum operation.
(3) The operation plan must—
(a) be appropriate for the nature and scale of the activities to be carried out during the petroleum operation; and
(b) include a rehabilitation plan.
(4) If an operation plan has been submitted by the holder of an authority, the Minister may, by notice in writing, require the holder to provide any additional information that the Minister considers to be relevant to acceptance of the plan.
(5) The Minister may, by notice in writing, require the holder to submit a revised operation plan incorporating the additional information referred to in subregulation (4).
23
Notice of operation plan
23 Notice of operation plan
For the purposes of section 161(1B)(c) of the Act, the following is prescribed information—
(a) the name and postal address of the holder of the authority;
(b) a contact name, telephone number and email address of a representative of the holder of the authority to which requests for further information may be made;
(c) the form in which written submissions must be made, and the physical address or email address to which any submission may be conveyed or submitted;
(d) the date on which the holder of the authority proposes to commence considering the submissions;
(e) a description of the petroleum operation;
(f) a summary of the environmental and social risks and impacts of the petroleum operation and the measures that will be adopted to mitigate those risks over the life of the petroleum operation;
(g) a summary of the public safety risks and impacts of the petroleum operation, including risks relating to any wells, and the measures that will be in place to mitigate those risks over the life of the petroleum operation;
(h) a summary of the proposed measures to rehabilitate land affected by the petroleum operation;
(i) a summary of how the authority holder proposes to ensure any relevant persons or organisations are consulted over the life of the petroleum operation.
24
Prescribed factors for accepting or varying an operation plan
24 Prescribed factors for accepting or varying an operation plan
(1) For the purposes of section 161(1D) of the Act, the following are prescribed factors—
(a) whether the Minister is satisfied that the holder of the authority will implement effective rehabilitation measures for the petroleum operation;
(b) whether the Minister is satisfied that the holder of the authority will consult effectively with any relevant persons or organisations over the life of the petroleum operation;
(c) whether the Minister is satisfied that the holder of the authority has identified the key risks and impacts of the petroleum operation;
(d) whether the Minister is satisfied that the risks and impacts of the petroleum operation will be adequately mitigated.
(2) For the purposes of section 163(3) of the Act, the Minister must take into account the following factors in considering an application to vary an operation plan—
(a) whether the Minister is satisfied that the holder of the authority will implement effective rehabilitation measures for the petroleum operation;
(b) whether the Minister is satisfied that the holder of the authority will consult effectively with any relevant persons or organisations over the life of the petroleum operation;
(c) whether the Minister is satisfied that the holder of the authority has identified the key risks and impacts of the petroleum operation;
(d) whether the Minister is satisfied that the risks and impacts of the petroleum operation will be adequately mitigated.
25
Prescribed form for evidence regarding notice and submissions for operation plan
25 Prescribed form for evidence regarding notice and submissions for operation plan
(1) For the purposes of section 161(3)(a) of the Act, evidence regarding notice of an operation plan is in the prescribed form if it—
(a) is in writing (whether or not it is in electronic form); and
(b) contains a copy of the notice given by the holder of the authority under section 161(1A) of the Act; and
(c) contains a list of the relevant persons or organisations to whom the notice has been given.
(2) For the purposes of section 161(3)(b) of the Act, evidence regarding submissions on an operation plan is in the prescribed form if it—
(a) is in writing (whether or not it is in electronic form); and
(b) contains a copy of all submissions received or, if no submissions are received, a statement to this effect; and
(c) contains a summary of the submissions (if any) that sets out the substantive matters raised by the submissions, how each matter has been considered and, for each relevant matter, how it has been addressed in the operation plan.
26
Notice regarding variation to operation plan
26 Notice regarding variation to operation plan
For the purposes of section 163(5)(c) of the Act, the following is prescribed information—
(a) the name and postal address of the holder of the authority;
(b) a contact name, telephone number and email address of a representative of the holder of the authority to which requests for further information may be made;
(c) the form in which written submissions must be made, and the physical address or email address to which any submission may be conveyed or submitted;
(d) the date on which the holder of the authority proposes to commence considering the submissions;
(e) a description of the petroleum operation;
(f) a summary of the environmental and social risks and impacts of the petroleum operation and the measures that will be adopted to mitigate those risks over the life of the petroleum operation;
(g) a summary of the public safety risks and impacts of the petroleum operation, including risks relating to any wells, and the measures that will be in place to mitigate those risks over the life of the petroleum operation;
(h) a summary of the proposed measures to rehabilitate land affected by the petroleum operation;
(i) a summary of how the authority holder proposes to ensure any relevant persons or organisations are consulted over the life of the petroleum operation.
27
Prescribed form of evidence required to be submitted for the variation of an operation plan
27 Prescribed form of evidence required to be submitted for the variation of an operation plan
(1) For the purposes of section 163(6)(a) of the Act, evidence is in the prescribed form if it—
(a) is in writing (whether or not it is in electronic form); and
(b) contains a copy of the notice given by the holder of the authority under section 163(4) of the Act; and
(c) contains a list of the relevant persons or organisations to whom the notice has been given.
(2) For the purposes of section 163(6)(b) of the Act, evidence is in the prescribed form if it—
(a) is in writing (whether or not it is in electronic form); and
(b) contains a copy of all submissions received or, if no submissions are received, a statement to this effect; and
(c) contains a summary of the submissions (if any) that sets out the substantive matters raised by the submissions, how each matter has been considered and, if relevant, how each matter has been addressed in the variation.
28
Consent to conduct production tests or well tests
28 Consent to conduct production tests or well tests
(1) The holder of an authority must not conduct a production test or well test in a well except with, and in accordance with, the written consent of the Minister.
Penalty: 20 penalty units.
(2) An application for consent under subregulation (1) must include a plan setting out—
(a) the equipment to be used; and
(b) the timeframe for the testing; and
(c) how 2 verified well barriers will be maintained in the well at all times or, if this cannot be achieved, the alternative measures that will be in place to maintain well integrity; and
(d) the controls that will be in place to manage any potential well integrity hazards; and
(e) details regarding the suitably qualified or experienced person who designed the well testing; and
(f) details regarding the suitably qualified or experienced person who will be onsite to supervise the testing; and
(g) details of how any owner or occupier of the land on which the proposed test is to be conducted will be notified of the proposed test.
29
Consent to suspend or decommission a well
29 Consent to suspend or decommission a well
(1) The holder of an authority must ensure that a well is not suspended except with, and in accordance with, the written consent of the Minister.
Penalty: 20 penalty units.
(2) The holder of an authority must ensure that a well is not decommissioned except with, and in accordance with, the written consent of the Minister.
Penalty: 20 penalty units.
(3) An application for consent to suspend or decommission a well must include—
(a) the name and number of the well; and
(b) the reasons for the proposed suspension or decommissioning; and
(c) a plan setting out details of the proposed suspension or decommissioning program, including the method by which the well will be made safe after it is suspended or decommissioned.
(4) The plan under subregulation (3)(c) must set out—
(a) the authority holder's proposed measures for care and maintenance of the well, if proposed to be suspended; and
(b) the equipment to be used; and
(c) the timeframe for the suspension or decommissioning; and
(d) how 2 verified well barriers will be maintained in the well at all times or, if this cannot be achieved, the alternative measures that will be in place to maintain well integrity; and
(e) the controls that will be in place to manage any potential well integrity hazards; and
(f) the controls that will be in place to maintain well integrity while the well is suspended (including but not limited to the period in which suspension activity is occurring); and
(g) details of the suitably qualified or experienced person who will be responsible for designing the suspension or decommissioning of the well; and
(h) details of the suitably qualified or experienced person who will be responsible for supervising the suspension or decommissioning of the well; and
(i) details of how any owner or occupier of the land on which the well is located will be notified of the proposed suspension or decommissioning of that well.
Division 2—Environment management plan
30
Description of the environment
30 Description of the environment
An environment management plan included in an operation plan under regulation 22(1)(a)(iv) must—
(a) describe the environment, including any relevant values and sensitivities; and
(b) describe any relevant cultural, historical, aesthetic, social, recreational, ecological, biological, landscape and economic aspects of the environment that may be affected by the petroleum operation; and
(c) identify any communities, land or property in the vicinity of the operation and any petroleum operation or petroleum resources that the petroleum operation might affect.
31
Description of environmental risks and impacts
31 Description of environmental risks and impacts
An environment management plan must include an assessment of the environmental risks and impacts of the petroleum operation that—
(a) identifies and evaluates the environmental risks and impacts that may arise directly or indirectly from the normal activities of the petroleum operation (including construction if applicable); and
(b) assesses the environmental risks and impacts resulting from—
(i) reasonably possible activities in relation to the petroleum operation; and
(ii) incidents or events (whether planned or unplanned) that are not normal activities, incidents or events in relation to the operation including emergencies and foreseeable but unwanted events; and
(c) specifies the methodology used for the assessment.
32
Environmental performance objectives and standards
32 Environmental performance objectives and standards
An environment management plan must—
(a) define environmental performance objectives, and set environmental performance standards, against which performance by the holder of the authority in protecting the environment from the petroleum operation is to be measured; and
(b) include measurement methods for determining whether the objectives and standards have been met.
33
Implementation strategy for the environment management plan
33 Implementation strategy for the environment management plan
An environment management plan must contain an implementation strategy that—
(a) identifies the controls, specific systems, practices and procedures to be used to ensure that—
(i) any potential environmental risks and impacts arising from the petroleum operation are eliminated or minimised as far as is reasonably practicable; and
(ii) the environmental performance objectives and standards in the environment management plan are met; and
(b) specifies why the controls, specific systems, practices and procedures to eliminate or minimise risks and impacts have been adopted, whether other measures were considered but not adopted and the reasons why; and
(c) establishes a clear chain of command, setting out the roles and responsibilities of personnel in relation to the implementation, management and review of the environment management plan; and
(d) includes measures to ensure that each employee or contractor working in connection with the petroleum operation—
(i) is aware of the employee's or contractor's responsibilities in relation to the environment; and
(ii) has the appropriate skills and training to be able to fulfil those responsibilities; and
(e) provides for the monitoring, audit and review of the environmental performance and implementation strategy of the holder of the authority; and
(f) provides for the maintenance of a quantitative record of emissions and discharges into the air, or onto the land surface environment, or below the land surface environment that is accurate and that can be monitored and audited against the environmental performance standards; and
(g) includes arrangements for recording, monitoring and reporting information about the petroleum operation (including information required to be recorded under the Act, these Regulations and any other environmental legislation applying to the activity) sufficient to enable the Minister to determine whether the holder of the authority is complying with the environment management plan; and
(h) provides for appropriate consultation, ongoing for the life of the petroleum operation, about the authority holder's environmental performance with—
(i) relevant agencies of the Commonwealth and the State; and
(ii) other relevant persons or organisations; and
(i) provides for the maintenance of an up-to-date emergency response manual prepared for the petroleum operation that includes detailed response arrangements for—
(i) dealing with any threat to individuals, public safety, public amenity or the environment in the vicinity of the petroleum operation; and
(ii) ensuring that the threat does not harm individuals, public safety, public amenity or the environment; and
(iii) dealing with any unwanted event that occurs that is harming individuals, public safety, public amenity or the environment; and
(j) in relation to hydrocarbon gas emissions from the petroleum operation, includes—
(i) the measures in place to ensure any hydrocarbon gas emissions will be minimised as far as reasonably practicable; and
(ii) the measures in place to identify any hydrocarbon gas emissions as they occur; and
(iii) an estimate of the hydrocarbon gas emissions that will be generated by the petroleum operation; and
(k) in relation to any groundwater impacts of a well activity carried out during a petroleum operation—
(i) assesses the risks and impacts to the groundwater environment from the well activity; and
(ii) identifies how these risks and impacts to the groundwater environment will be mitigated; and
(iii) if the operation is a petroleum production operation—
(A) identifies the method by which the holder of the authority will establish the baseline water quality before petroleum production commences; and
(B) identifies the groundwater monitoring methodology, including the frequency of the monitoring and the parameters to be monitored prior to and during petroleum production; and
(C) identifies a reporting schedule for the holder of the authority to report to the Minister in relation to any monitoring identified in sub-subparagraph (B).
34
Other information in the environment management plan
34 Other information in the environment management plan
The environment management plan must contain the following—
(a) a statement of the corporate environmental policy of the holder of the authority;
(b) a list of all environmental legislation of the Commonwealth or the State that may apply to the petroleum operation;
(c) the strategy of the holder of the authority to ensure compliance with the environmental legislation referred to in paragraph (b);
(d) details of how the holder of the authority will consult with any relevant persons or organisations during the petroleum operation.
35
Information on consultation with relevant persons or organisations
35 Information on consultation with relevant persons or organisations
For the purposes of regulation 34(d), the environment management plan must—
(a) identify any relevant persons or organisations; and
(b) set out how the holder of the authority will share information with relevant persons or organisations; and
(c) set out how the holder of the authority will receive feedback from relevant persons or organisations; and
(d) set out how the holder of the authority will manage complaints and other communications from relevant persons or organisations; and
(e) set out how the holder of the authority will ensure that, while the operation plan is in effect, the holder of an authority will engage a suitably qualified or experienced person to be responsible for ensuring that the measures relating to consultation with relevant persons or organisations under the operation plan for the petroleum operation are implemented; and
(f) in the case of an environment management plan for a production licence, set out how the holder of the authority will—
(i) identify concerns and expectations of relevant persons or organisations; and
(ii) analyse feedback from relevant persons or organisations, taking into account those concerns or expectations.
Division 3—Well operation management plan
36
Well operation management plan
36 Well operation management plan
(1) The well operation management plan included in an operation plan under regulation 22(1)(a)(vi) must, in relation to each well to which it relates—
(a) contain the name and number of the well; and
(b) set out the elevation, easting and northing coordinates of the well and the basin and sub-basin (if applicable) in which the well is located; and
(c) describe each of the proposed stages of any well activity carried out during the petroleum operation including, if appropriate, the design, construction, operation, suspension, care, maintenance and decommissioning of the well; and
(d) be appropriate for the nature and scale of each well activity to be carried out under the operation plan; and
(e) include details of the design of the well and ancillary equipment, including details of how the well is to protect petroleum resources and aquifers; and
(f) set out the authority holder's proposed timetable for carrying out each well activity; and
(g) describe how the holder of the authority is to keep records and conduct inspections, including but not limited to leak detections, well-head inspections, well-head maintenance, workovers, and downhole inspections; and
(h) describe the process by which a connection is to be made between the well and a petroleum reservoir so that fluids can be produced from, or injected into, the reservoir; and
(i) include details of how modifications, maintenance and repairs to the well and ancillary equipment are to be managed; and
(j) include details of how any suspension or decommissioning of the well is to be managed, including specifications for all materials that are to be used to maintain well integrity, including but not limited to casings, tubing, mud, cement, and well‑heads; and
(k) describe the equipment and facilities to be used in connection with the well and ancillary equipment; and
(l) identify the risks associated with each well activity during each stage and state how the holder of the authority proposes to eliminate or minimise those risks as far as is reasonably practicable; and
(m) include details of when and how the holder of the authority is to give the Minister reports and information about—
(i) each well activity; and
(ii) any well integrity hazards; and
(iii) progression from one stage to another during the well operation; and
(iv) significant increases in existing risks in relation to the well; and
(v) other matters relevant to the conduct of each well activity; and
(n) demonstrate that the holder of the authority has a well integrity management system in place, or a process for managing well integrity during the life of the well that complies with relevant industry standards.
(2) The well operation management plan must include the following details, unless the Minister gives the holder of the authority written permission for any details specified in that permission not to be included—
(a) information about the conduct of each well activity;
(b) an explanation of the philosophy of and criteria for the design, construction, operational activity and management of the well and ancillary equipment;
(c) the possible petroleum production and storage activities of the well;
(d) details of—
(i) which logs will be run; and
(ii) how those logs will be run;
(e) proposals for testing of the well and ancillary equipment;
(f) proposed sampling and testing methods for petroleum;
(g) performance objectives against which the performance of each well activity is to be measured;
(h) measurement methods for determining whether the performance objectives have been met;
(i) the controls, systems, practices and procedures to be used to deal with—
(i) a well integrity hazard; and
(ii) a significant increase in an existing risk in relation to the well, including if an activity must continue to be carried out for the purpose of dealing with the risk; and
(iii) the protection of any aquifers;
(j) how the holder of the authority will ensure that the design of the well is verified by a person suitably qualified or experienced to verify the well design;
(k) the qualifications or experience of the person referred to in paragraph (j), and that person's work telephone number, email and postal address;
(l) how the holder of the authority will ensure that the construction of the well is supervised by a person suitably qualified or experienced to verify that the well construction—
(i) is completed in accordance with the design of the well; and
(ii) complies with any relevant requirements and standards;
(m) how the holder of the authority will ensure that the decommissioning of the well is supervised by a person suitably qualified or experienced to verify that the well decommissioning—
(i) is completed in accordance with the design of the well; and
(ii) complies with any relevant requirements and standards;
(n) details of how the holder of the authority will ensure well integrity;
(o) how the holder of the authority will ensure that any contractors or subcontractors involved in managing the operation of the well are suitably qualified or experienced;
(p) how the holder of the authority will, during the life of the well—
(i) maintain 2 verified well barriers at all times; and
(ii) keep records containing details of any well interventions, well-head maintenance activities, workovers and well testing.
(3) The holder of the authority must give the following details to the Minister at least 10 days before construction of the well commences—
(a) the qualifications or experience of the person referred to in subregulation (2)(l);
(b) the work telephone number, email address and postal address of the person referred to in subregulation (2)(l).
(4) The holder of the authority must give the following details to the Minister at least 10 days before the well is decommissioned—
(a) the qualifications or experience of the person referred to in subregulation (2)(m);
(b) the work telephone number, email address and postal address of the person referred to in subregulation (2)(m).
Division 4—Rehabilitation plans
37
Rehabilitation plan
37 Rehabilitation plan
(1) For the purposes of regulation 22(3)(b), a rehabilitation plan must include—
(a) details of the proposed rehabilitation of surface areas of land proposed to be affected by the petroleum operation including, but not limited to, facilities and accommodation camps; and
(b) proposed measures for revegetation of that land.
(2) A rehabilitation plan must—
(a) set out rehabilitation performance objectives and rehabilitation performance standards against which the authority holder's performance in rehabilitating the land is to be measured; and
(b) include measurement methods for determining whether those objectives and standards have been met.
Note
Under regulation 39(2)(g), the holder of an authority must give a report to the Minister in respect of each financial year that includes a summary of any rehabilitation undertaken on land on which a petroleum operation is carried out under the authority during that year.
Part 8
Information to be given to the Minister
Part 8—Information to be given to the Minister
Division 1—Notification of activities in respect of petroleum operation
38
Notifying start and end of petroleum operation
38 Notifying start and end of petroleum operation
(1) For the purposes of section 179(c) of the Act, the holder of an authority must notify the Minister of the proposed commencement date of a petroleum operation carried out under the authority at least 10 days before the petroleum operation is to commence.
Note
Under section 179 of the Act, a person who contravenes this subregulation is liable to a penalty not exceeding 60 penalty units.
(2) For the purposes of section 179(c) of the Act, the holder of an authority must notify the Minister of the completion date of a petroleum operation carried out under the authority within 10 days after that completion.
Note
Under section 179 of the Act, a person who contravenes this subregulation is liable to a penalty not exceeding 60 penalty units.
Division 2—Periodic reports
39
Annual report
39 Annual report
(1) For the purposes of section 179(c) of the Act, the holder of an authority must give the Minister a report, in respect of each financial year, setting out—
(a) any petroleum operation carried out under the authority during that year; and
(b) any new petroleum reservoir detected from the petroleum operation identified in a manner that conforms with the prevailing industry standard if reasonably possible; and
(c) test results and conclusions derived from the petroleum operation; and
(d) reports and studies relating to the petroleum operation.
Note
Under section 179 of the Act, a person who contravenes this subregulation is liable to a penalty not exceeding 60 penalty units.
(2) A report under subregulation (1) must include—
(a) details of the expenditure by the holder of the authority on each petroleum operation undertaken during the year; and
(b) the date the report was completed; and
(c) an outline of progress against the work program; and
(d) an outline of the proposed work to be completed during the year following the year to which the report relates (if any), including the estimated costs to complete the proposed work and any anticipated change in risk; and
(e) the findings and outcomes of any review undertaken during the year in relation to the operation plan, petroleum production development plan or storage development plan (if applicable); and
(f) if the authority holder's expenses or liabilities, in relation to which insurance is required to be maintained under section 171 of the Act, have changed during the year, a summary of any changes including any reasons for those changes; and
(g) a summary of any rehabilitation undertaken on land on which the petroleum operation is carried out under the authority during that year; and
(h) if the estimated total costs for rehabilitating the land on which the petroleum operation is carried out have changed during the year, details of the current estimated costs for rehabilitating the land, including any reasons for the changes; and
(i) a summary of the outcomes of any monitoring activities undertaken during the year in accordance with the operation plan, including but not limited to groundwater monitoring; and
(j) a summary of any consultation with the community and relevant persons or organisations undertaken during the year, any issues identified through that consultation, and how those issues were addressed; and
(k) a summary of actions taken to monitor, measure, eliminate or minimise hydrocarbon gas emissions from petroleum operations as far as reasonably practicable.
(3) The holder of the authority must give a report under subregulation (1) to the Minister—
(a) within 60 days after the end of the financial year to which it relates; or
(b) if the authority ceased to have effect during a financial year, within 60 days after the authority ceased to have effect.
(4) The Minister may, on a request from the holder of the authority, extend the period for the submission of a report.
(5) If the Minister extends the period of time under subregulation (4), the holder of the authority must give the report to the Minister within the extended period of time.
(6) For the purposes of this regulation, a holder of an authority includes a person who was the holder of an authority in the financial year to which the report relates.
40
Report by holder of production licence
40 Report by holder of production licence
(1) For the purposes of section 179(c) of the Act, the holder of a production licence must, every 6 months, give to the Minister within 30 days of the end of that period a report of any petroleum production carried out under the licence.
Note
Under section 179 of the Act, a person who contravenes this subregulation is liable to a penalty not exceeding 60 penalty units.
(2) The report must include—
(a) details of the amount of hydrocarbons, water and other substances produced from, or injected into, each well in the licence area during the 6 month period to which the report relates; and
(b) details of petroleum reserves in the licence area, expressed in billion cubic feet, as assessed at the end of that 6 month period.
Div 3
Reports of certain activities
Division 3—Reports of certain activities
41
Requirement for weekly survey report
41 Requirement for weekly survey report
(1) For the purposes of section 179(c) of the Act, the holder of an authority who undertakes a geophysical, geological or geochemical survey in the authority area must give the Minister a weekly survey report as soon as reasonably practicable after the end of each week of the survey.
Note
Under section 179 of the Act, a person who contravenes this subregulation is liable to a penalty not exceeding 60 penalty units.
(2) A weekly survey report under subregulation (1) must include—
(a) the name of the survey; and
(b) the authority under which the survey is being conducted; and
(c) the name of the authority holder; and
(d) the name of the contractor conducting the survey; and
(e) the name and number of the vehicle or aircraft conducting the survey; and
(f) a map showing where the survey was conducted during the week; and
(g) the number of kilometres or square kilometres for which data was acquired during the week; and
(h) the number of points at which data was acquired during the week; and
(i) the number of lines of data acquired during the week; and
(j) the amount of downtime during the week due to equipment problems, bad weather or other circumstances; and
(k) the percentage of the survey completed at the end of the week.
(3) In this regulation—
week of the survey means—
(a) the week starting on the first day of data acquisition for the survey; and
(b) each subsequent week.
42
Requirement for survey acquisition report and data
42 Requirement for survey acquisition report and data
(1) For the purposes of section 179(c) of the Act, the holder of an authority who undertakes a geophysical, geological or geochemical survey in the authority area must give the Minister a survey acquisition report and all survey acquisition data within—
(a) in the case of a 2-dimensional seismic survey—12 months after the day on which the acquisition of the data is completed; or
(b) in the case of a 3-dimensional seismic survey—18 months after the day on which the acquisition of the data is completed; or
(c) if the Minister authorises the holder of the authority to give the report and data within another period—that other period; or
(d) in any other case—6 months after the day on which the acquisition of the data is completed.
Note
Under section 179 of the Act, a person who contravenes this subregulation is liable to a penalty not exceeding 60 penalty units.
(2) A survey acquisition report under subregulation (1) must include—
(a) the name of the survey; and
(b) the authority under which the survey was conducted; and
(c) the name of the holder of the authority; and
(d) the name of the contractor that conducted the survey; and
(e) the name and number of the vehicle or aircraft that conducted the survey; and
(f) a map of where the survey was conducted; and
(g) the dates on which the survey started and ended; and
(h) details of all data acquisition equipment and systems used; and
(i) details of all positions and navigation equipment and systems used; and
(j) the number of lines of data acquired in the survey and the number of data acquisition points along each line; and
(k) navigation data for the survey, in the form of—
(i) in the case of a 2-dimensional survey—line ends and bends; or
(ii) in the case of a 3-dimensional seismic survey—a full fold polygon outline; or
(iii) in the case of any other 3-dimensional survey—a polygon outline; and
(l) the geometry of the acquisition parameters; and
(m) the results of any onboard data processing; and
(n) the results of any system tests, calibrations or diagnostics.
(3) In this regulation—
survey acquisition data means each of the following types of data in a form approved by the Minister—
(a) in the case of a seismic survey—
(i) raw navigation data; and
(ii) seismic field data; and
(iii) seismic support data; and
(iv) an itemised field tape listing showing—
(A) tape number; and
(B) survey name; and
(C) line number; and
(D) shotpoint range; and
(E) data type;
(b) field data;
(c) field support and navigation data.
43
Requirement for survey processing report and data
43 Requirement for survey processing report and data
(1) For the purposes of section 179(c) of the Act, the holder of an authority who undertakes a geophysical, geological or geochemical survey in the authority area must give the Minister a survey processing report and all processed survey data within—
(a) in the case of a 2-dimensional seismic survey—12 months after the day on which the acquisition of the data is completed; or
(b) in the case of a 3-dimensional seismic survey—18 months after the day on which the acquisition of the data is completed; or
(c) if the Minister authorises the holder of the authority to give the report and data within another period—that other period; or
(d) in any other case—6 months after the day on which the acquisition of the data is completed.
Note
Under section 179 of the Act, a person who contravenes this subregulation is liable to a penalty not exceeding 60 penalty units.
(2) A survey processing report under subregulation (1) must include—
(a) the name of the survey; and
(b) the authority under which the survey was conducted; and
(c) the name of the holder of the authority; and
(d) the dates on which processing of the survey started and ended; and
(e) the name of the processing contractor; and
(f) the purpose of the processing; and
(g) a summary of the data acquisition parameters; and
(h) details of all the processing sequences and techniques used; and
(i) a sample Extended Binary Coded Decimal Interchange Code header from the final data set; and
(j) listings of all processed data; and
(k) in the case of a 3-dimensional survey—
(i) a description of the position of the survey polygon; and
(ii) a calculation for the 3-dimensional line numbering convention.
(3) A survey processing report under subregulation (1) must—
(a) be in the form approved by the Minister; and
(b) in the case of a 2-dimensional seismic survey—include each type of the following data—
(i) raw and final stacked data, including near, mid and far sub stacks if generated;
(ii) raw and final migrated data, including—
(A) pre-stack time migration; and
(B) pre-stack depth migration; and
(C) near, mid and far sub stacks;
(iii) final processed navigation and elevation data;
(iv) shotpoint to common depth point relationship;
(v) data for both stacked and migrated velocities, including—
(A) line number; and
(B) shotpoint; and
(C) time versus root mean square pairs;
(vi) an itemised process tape listing showing—
(A) tape number; and
(B) survey name; and
(C) line number; and
(D) shotpoint range; and
(E) common depth points; and
(F) data type; and
(c) in the case of a 3-dimensional seismic survey—include each type of the following data—
(i) raw and final stacked data, including near, mid and far sub stacks if generated;
(ii) raw and final migrated data, including—
(A) pre-stack time migration; and
(B) pre-stack depth migration; and
(C) near, mid and far sub stacks;
(iii) final processed navigation, elevation and bathymetry data;
(iv) final navigation data in the form of—
(A) final processed grid bin coordinates; and
(B) polygonal position data, being an outline of the full fold area;
(v) data for both stacked and migrated velocities, including—
(A) bin number; and
(B) time versus root mean square pairs;
(vi) 2D data subset, if production is required as a condition of the grant of an authority;
(vii) an itemised process tape listing showing—
(A) tape number; and
(B) survey name; and
(C) in-lines and crosslines; and
(D) data type; and
(d) in the case of any other survey—include each type of the following data—
(i) final processed data;
(ii) final processed images;
(iii) final geological or geochemical survey analysis data.
44
Requirement for survey interpretation report and data
44 Requirement for survey interpretation report and data
(1) For the purposes of section 179(c) of the Act, the holder of an authority who undertakes a geophysical, geological or geochemical survey in the authority area must give the Minister a survey interpretation report and interpretative survey data within—
(a) in the case of a seismic survey—18 months after the day on which the acquisition of the data is completed; or
(b) in the case of any other type of survey—12 months after the day on which the acquisition of the data is completed; or
(c) if the Minister authorises the holder of the authority to give the report and data within another period—that other period.
Note
Under section 179 of the Act, a person who contravenes this subregulation is liable to a penalty not exceeding 60 penalty units.
(2) A survey interpretation report must include—
(a) the name of the survey; and
(b) the authority under which the survey was conducted; and
(c) the name of the holder of the authority; and
(d) a description of the objectives of the interpretation; and
(e) in the case of a seismic survey—
(i) a list of the surfaces interpreted; and
(ii) a justification of the surfaces interpreted, including synthetic seismograms if available; and
(iii) the velocity field used to convert time to depth (including ASCII data) and the basis for the velocity field; and
(iv) if available, time slices to describe the environment of deposition; and
(f) an elevation map of the survey area; and
(g) an index of the maps created during the interpretation; and
(h) in the case of a geological or geochemical survey, any interpretations formed after the conclusion of the survey; and
(i) all digital images of interpretation maps, in a form approved by the Minister.
45
Incident reporting
45 Incident reporting
(1) For the purposes of this regulation, a reportable incident means an incident arising directly out of a petroleum operation that is reasonably likely to cause significant harm or damage to individuals, the environment, the integrity of the petroleum operation or the immediate area (whether above or below ground).
(2) The holder of an authority under which a petroleum operation is carried out must notify the Minister of a reportable incident within 2 hours—
(a) after the reportable incident occurs; or
(b) if the holder of the authority is not initially aware of the reportable incident, after the holder becomes aware that it occurred.
Penalty: 20 penalty units.
(3) A notification under subregulation (2) must—
(a) be given orally; and
(b) contain any information that is available at the time of the notification regarding—
(i) the material facts and circumstances of the reportable incident that the holder of the authority knows or is able, by reasonable search or enquiry, to find out; and
(ii) any action taken by the holder of the authority to avoid or mitigate any impacts to individuals, public safety, public amenity or the environment of the reportable incident; and
(iii) any immediate corrective action taken, or proposed to be taken, by the holder of the authority to stop, control or remedy the reportable incident.
(4) Within 3 days after the holder of an authority has notified the Minister of a reportable incident under subregulation (2), the holder must give a written report to the Minister containing the information specified in subregulation (3)(b).
Penalty: 20 penalty units.
(5) Within 30 days after the holder of an authority has notified the Minister of a reportable incident under subregulation (2), the holder must give the Minister a written report that contains—
(a) the date, time and place of the reportable incident; and
(b) a description of the reportable incident; and
(c) any known or suspected causes of the reportable incident; and
(d) a root cause analysis of the reportable incident; and
(e) a description of the steps taken by the holder to minimise the impacts of the reportable incident; and
(f) a description of the steps taken or proposed to be taken by the holder to prevent a recurrence of the reportable incident.
Penalty: 20 penalty units.
Div 4
Reports about drilling wells
Division 4—Reports about drilling wells
46
Requirement for daily drilling report
46 Requirement for daily drilling report
(1) For the purposes of section 179(c) of the Act, the holder of an authority who undertakes drilling in the authority area must give the Minister a daily drilling report, prepared by a suitably qualified or experienced person, before midday on the day after the day of drilling to which the report relates.
Note
Under section 179 of the Act, a person who contravenes this subregulation is liable to a penalty not exceeding 60 penalty units.
(2) A daily drilling report under subregulation (1) must include—
(a) the authority number; and
(b) the name of the well in which the drilling was undertaken; and
(c) the location of the well using easting and northing coordinates; and
(d) the elevation of the well; and
(e) the drilled depth; and
(f) the work carried out; and
(g) the lithology of formations penetrated; and
(h) details of any indication of petroleum; and
(i) a summary of the material used; and
(j) any drilling fluid losses; and
(k) a leak off test summary; and
(l) the geometry of the well bore; and
(m) the results of surveys made in the well bore; and
(n) details of—
(i) any works undertaken in relation to drilling activities that were not within the scope of the operation plan but were carried out to avoid or manage an emergency situation or to overcome an unforeseen circumstance; and
(ii) details of the reasons for those works, any risks and how the risks were eliminated or minimised.
47
Requirement for initial well completion report and data
47 Requirement for initial well completion report and data
(1) For the purposes of section 179(c) of the Act, the holder of an authority who undertakes drilling activities in the authority area must give the Minister an initial well completion report as soon as reasonably practicable, but no later than 6 months, after the rig release date.
Note
Under section 179 of the Act, a person who contravenes this subregulation is liable to a penalty not exceeding 60 penalty units.
(2) The Minister may, in writing, extend the period within which the holder of an authority must give an initial well completion report under subregulation (1).
(3) An initial well completion report under subregulation (1) must contain the following data in relation to the well in a form and manner approved by the Minister—
(a) raw data, edited field data and processed data for all wireline logs, tools used for measurements while drilling (MWD tools) and tools used for logging while drilling (LWD tools);
(b) log displays;
(c) edited field data and processed data for borehole deviation surveys;
(d) mudlogging data;
(e) mudlog displays;
(f) if generated, data from velocity surveys including—
(i) raw data; and
(ii) processed data; and
(iii) checkshot data and a time and depth analysis;
(g) velocity survey displays;
(h) photography of the core and sidewall core, in both natural and UV light.
(4) An initial well completion report under subregulation (1) must include the following information—
(a) the name of the well;
(b) the name of the authority area in which the well is located;
(c) the location of the well in the form of—
(i) latitude and longitude; and
(ii) map sheet name and graticular block number; and
(iii) seismic line location and shotpoint number;
(d) the results of a check survey of the location of the well-head or the top of the casing supporting the blow-out preventer;
(e) if the well is a sidetrack—the name of the parent well;
(f) the names of the rig contractor and rig operator;
(g) the name of the rig used to drill the well;
(h) the make and model of the rig;
(i) the names of the contractors for—
(i) cementing; and
(ii) wireline logging; and
(iii) measurements while drilling; and
(iv) logging while drilling; and
(v) mudlogging;
(j) the names of any MWD tools and LWD tools used;
(k) a list of log runs for wireline logging and velocity surveys;
(l) the purpose of the well;
Examples
Appraisal, exploration, production or storage.
(m) the outcome of the well operation;
Examples
Completion of the well as a producer, suspension of the well or decommissioning of the well.
(n) raw pressure-time listings for any formation fluid sample tests and production tests;
(o) the spud date;
(p) the rig release date;
(q) the reference point from which the depth of the well is measured;
Examples
Kelly bushing or the rig floor.
(r) the height of the depth reference above sea level;
(s) the measured depth of the well;
(t) the true vertical depth of the well;
(u) if applicable, the depth of perforation in the petroleum reservoir;
(v) the date on which the total depth was reached;
(w) if the well is deviated or horizontal—
(i) the surveyed path of the well; and
(ii) the coordinates of the bottom of the well bore; and
(iii) if applicable, the coordinates and true vertical depth of the intersection of the well with the reservoir horizon;
(x) details of equipment and casing installed on or in the well, including schematics;
(y) if applicable, schematics of decommissioning;
(z) information on cementing operations;
(za) bit records;
(zb) drilling fluids used;
(zc) any drilling fluid losses;
(zd) a list of cores, cuttings and samples taken, and their depths and intervals;
48
Requirement for final well completion report and data
48 Requirement for final well completion report and data
(1) For the purposes of section 179(c) of the Act, the holder of an authority who undertakes drilling activities in the authority area must give the Minister a final well completion report as soon as reasonably practicable, but no later than 12 months, after the rig release date.
Note
Under section 179 of the Act, a person who contravenes this subregulation is liable to a penalty not exceeding 60 penalty units.
(2) The Minister may, in writing, extend the period within which the holder of an authority must give a final well completion report under subregulation (1).
(3) A final well completion report under subregulation (1) must contain the following data in relation to the well in a form and manner approved by the Minister—
(a) an interpretative log analysis;
(b) a composite well log;
(c) a well index sheet;
(d) petrophysical, geochemical or other sample analyses.
(4) A final well completion report under subregulation (1) must include the following information—
(a) the name of the well;
(b) the name of the authority area in which the well is located;
(c) the location of the well using easting and northing coordinates;
(d) if the well is a sidetrack—the name of the parent well;
(e) the names of the rig contractor and rig operator;
(f) the name of the rig used to drill the well;
(g) the make and model of the rig;
(h) the names of the contractors for—
(i) cementing; and
(ii) wireline logging; and
(iii) measurements while drilling; and
(iv) logging while drilling; and
(v) mudlogging;
(i) the purpose of the well;
Examples
Appraisal, exploration, production or storage.
(j) the outcome of the well operation;
Examples
Completion of the well as a producer, suspension of the well or decommissioning of the well.
(k) raw pressure-time listings for any formation fluid sample tests and production tests;
(l) the spud date;
(m) the height of the depth reference above sea level;
(n) the measured depth of the well;
(o) the true vertical depth of the well;
(p) if applicable, the depth of perforation in the petroleum reservoir;
(q) the date on which the total depth was reached;
(r) if the well is deviated or horizontal—
(i) the surveyed path of the well; and
(ii) the coordinates of the bottom of the well bore; and
(iii) if applicable, the coordinates and true vertical depth of the intersection of the well with the reservoir horizon;
(s) details of equipment and casing installed on or in the well, including schematics;
(t) bit records;
(u) drilling fluids used;
(v) any drilling fluid losses;
(w) a list of cores, cuttings and samples taken, and their depths and intervals;
(x) a list of logs acquired;
(y) details of any petroleum indications;
(z) the measured depth and true vertical depth of marker horizons or formation tops;
(za) geological interpretations of the observations made as a result of drilling the well, including—
(i) lithology; and
(ii) stratigraphy; and
(iii) reservoir properties and quality; and
(iv) geochemistry of source rocks if available; and
(v) environment of deposition if available;
(zb) wireline formation test results;
(zc) production test results;
(zd) a core analysis;
(ze) if the well is an exploration well—the relevance of the observations and interpretations to the evaluation of the petroleum potential of the area.
Div 5
Reports regarding decommissioning
Division 5—Reports regarding decommissioning
49
Well decommissioning report
49 Well decommissioning report
(1) For the purposes of section 179(c) of the Act, the holder of an authority who plugs and decommissions a well under the authority must give the Minister a well decommissioning report, prepared by a suitably qualified or experienced person.
Note
Under section 179 of the Act, a person who contravenes this subregulation is liable to a penalty not exceeding 60 penalty units.
(2) A well decommissioning report under subregulation (1) must be given to the Minister within 2 months after the day on which the plugging and decommissioning of the well is completed.
(3) A well decommissioning report under subregulation (1) must contain the following information—
(a) the authority number and type of authority;
(b) the name of the well;
(c) the name of the author of the report;
(d) the name of the holder of the authority;
(e) the name of the operator of the well;
(f) the name of the person giving the report;
(g) the date of the report;
(h) a summary and history of the well, including—
(i) spatial information showing its location; and
(ii) if a final well completion report in relation to the well has been lodged, the day on which that final well completion report was lodged;
(i) the following details about the well—
(i) its total depth in metres;
(ii) the top position and bottom position of any natural underground reservoir or aquifer intersected by the well, identified in accordance with subregulation (4);
(iii) the depth in metres of any perforations in the casing of the well;
(iv) the type of drilling rig used to drill the well;
(v) the basis for decommissioning the well;
(j) all surveys conducted and measurements made in relation to the well, including any detailed interpretation of the surveys or measurements;
(k) the following information in relation to the decommissioning of the well—
(i) details of any casing and equipment installed in the well, including diagrams showing the major dimensions and features of the casing and equipment;
(ii) a description of any equipment that has been retained in the well, including the size and nature of the equipment and any features of the equipment that may cause a hazard;
(iii) the surveyed location of any equipment retained in the well;
(iv) details of any cementing operations carried out in or on the well, including—
(A) the location and type of plugs; and
(B) the compressive strength of the cement; and
(C) time graphs; and
(D) the intervals covered; and
(E) the volume and type of cement used; and
(F) any losses of cement due to voids or permeable strata and the methods used to overcome those losses of cement;
(v) a description of any other decommissioning procedures used for the well;
(vi) details of any other activities undertaken in the course of drilling, completing, plugging and decommissioning the well, and an assessment of the possible impacts of those activities.
(4) For the purposes of subregulation (3)(i)(ii), the top position and bottom position of the natural underground reservoir or aquifer must be identified in relation to—
(a) in the case of a directional well—
(i) the total vertical depth in metres; and
(ii) the horizontal plane; or
(b) in any other case, the depth in metres.
Div 6
Retention and submission of samples
Division 6—Retention and submission of samples
50
Requirement to retain core, cutting or sample
50 Requirement to retain core, cutting or sample
The holder of an authority must retain any core, cutting or sample that the holder collects in relation to a petroleum operation that the holder carries out under the authority.
Penalty: 20 penalty units.
51
Requirement to give core, cutting or sample
51 Requirement to give core, cutting or sample
(1) This regulation applies if the holder of an authority—
(a) drills a well or conducts any other petroleum operation in a well under the authority; and
(b) during that operation, collects a core, cutting or sample of a type set out in column 2 of the Table to subregulation (2).
(2) For the purposes of section 179(c) of the Act, the holder of the authority must give the core, cutting or sample to the Minister—
(a) before the corresponding day set out in column 4 of the Table; and
(b) subject to subregulation (3), in the corresponding quantity set out in column 3 of the Table.
Table
Column 1<br>Item
Column 2<br>Type of core, cutting or sample
Column 3<br>Quantity of core, cutting or sample
Column 4<br>Day by which core, cutting or sample must be given
1
Drill cuttings
2 sets of 200 grams dry weight per sample interval
The day that is 6 months after the rig release date
2
Full hole conventional cores
1/3 of the core
The day that is 6 months after the rig release date
3
Full hole conventional cores
2/3 of the core
The day that is 2 months after the holder of
the authority completes tests on the core
4
Gaseous hydrocarbon samples
300 cm3
Either—<br>(a) if the core, cutting or sample is collected during the drilling of a well—the day that is 6 months after the rig release date; or<br>(b) if the core, cutting or sample is collected during a test on a completed well—the day that is 2 months after the collection of the sample
5
Fluid hydrocarbon samples
1 litre
Either—<br>(a) if the core, cutting or sample is collected during the drilling of
a well—the day that is 6 months after the rig release date; or<br>(b) if the core, cutting or sample is collected during a test on a completed well—the day that is 2 months after the collection of the sample
6
Sidewall core material
All material collected
The day that is 12 months after the rig release date
7
Palynological slides and residues, paleontological material and petrological slides
All material collected
The day that is 12 months after the rig release date
Note
Under section 179 of the Act, a person who contravenes this subregulation is liable to a penalty not exceeding 60 penalty units.
(3) If the corresponding quantity is not available for the core, cutting or sample before the corresponding day, the holder of the authority must provide details of the following to the Minister—
(a) the reasons the corresponding quantity was not available;
(b) the quantity of the core, cutting or sample collected before that day.
Part 9
Administrative matters
Part 9—Administrative matters
Div 1
Pecuniary interests
Division 1—Pecuniary interests
52
Duty of disclosure of pecuniary interest
52 Duty of disclosure of pecuniary interest
(1) For the purposes of section 243 of the Act, a person employed in the administration of the Act must disclose a pecuniary interest, in accordance with the procedures for declaring conflicts of interest approved by the Minister.
Note
Under section 243 of the Act, a person who contravenes this subregulation is liable to a penalty not exceeding 60 penalty units.
(2) A person who is required to disclose an interest under subregulation (1) must not perform or exercise any function or power under the Act in relation to the matter to which the interest relates unless the Minister authorises the person to do so.
Div 2
Compensation
Division 2—Compensation
53
Period before a disputed claim can go to the Tribunal or Supreme Court
53 Period before a disputed claim can go to the Tribunal or Supreme Court
Unless otherwise agreed by the owner or occupier of land and the holder of an authority, for the purposes of section 134(2) of the Act, the period of time during which an application may be made in relation to a claim is—
(a) if the claim relates to petroleum exploration—14 days after the claim is made; or
(b) if the claim relates to petroleum production—30 days after the claim is made.
Pt 10 (Heading and regs 54–61) substituted by S.R. No. 64/2024 reg. 4.
Part 10
Miscellaneous matters
Part 10—Miscellaneous matters
Reg. 54 substituted by S.R. No. 64/2024 reg. 4.
54
Application fees
54 Application fees
(1) The fee for an application for an exploration permit is—
(a) in the case of an application made before 1 July 2025, 2932 fee units; or
(b) in the case of an application made on or after 1 July 2025, 3905 fee units.
(2) The fee for an application for a retention lease is—
(a) in the case of an application made before 1 July 2025, 2094 fee units; or
(b) in the case of an application made on or after 1 July 2025, 2789 fee units.
(3) The fee for an application for a production licence is—
(a) in the case of an application made before 1 July 2025, 2094 fee units; or
(b) in the case of an application made on or after 1 July 2025, 2789 fee units.
(4) The fee for an application for a special access authorisation is—
(a) in the case of an application made before 1 July 2025, 1047 fee units; or
(b) in the case of an application made on or after 1 July 2025, 1395 fee units.
Reg. 55 substituted by S.R. No. 64/2024 reg. 4.
55
Fee for renewal of exploration permit
55 Fee for renewal of exploration permit
For the purposes of section 30(1)(b) of the Act, the fee for the renewal of an exploration permit is—
(a) in the case of an application for renewal made before 1 July 2025, 1047 fee units; or
(b) in the case of an application for renewal made on or after 1 July 2025, 1395 fee units.
Reg. 56 substituted by S.R. No. 64/2024 reg. 4.
56
Annual fees for exploration permit, retention lease or production licence
56 Annual fees for exploration permit, retention lease or production licence
(1) The annual fee for an exploration permit is—
(a) in the case of an exploration permit granted before 1 July 2025, 2094 fee units; or
(b) in the case of an exploration permit granted on or after 1 July 2025, 2789 fee units.
(2) The annual fee for a retention lease is—
(a) in the case of a retention lease granted before 1 July 2025, 2932 fee units; or
(b) in the case of a retention lease granted on or after 1 July 2025, 3905 fee units.
(3) The annual fee for a production licence is—
(a) in the case of a production licence granted before 1 July 2025, 2932 fee units; or
(b) in the case of a production licence granted on or after 1 July 2025, 3905 fee units.
(4) The annual fee payable in respect of the first year after the grant of an exploration permit, retention lease or production licence must be paid within 7 days after the permit, lease or licence is granted.
Example
For an exploration permit granted on 1 August 2025—
(a) the annual fee for the first year must be paid on or before 8 August 2025; and
(b) the period for which the first annual fee applies is 1 August 2025 to 31 July 2026.
(5) The annual fee payable in respect of the second year and each subsequent year of an exploration permit, retention lease or production licence must be paid before the anniversary of the grant of the permit, lease or licence.
Example
For an exploration permit granted on 1 August 2025, the annual fee for the second year and each subsequent year must be paid before 1 August of that year.
Reg. 57 substituted by S.R. No. 64/2024 reg. 4.
57
Fees for transfer of exploration permit, retention lease or production licence
57 Fees for transfer of exploration permit, retention lease or production licence
(1) The fee for the transfer or partial transfer of an exploration permit is—
(a) in the case of an application for transfer made before 1 July 2025, 1047 fee units; or
(b) in the case of an application for transfer made on or after 1 July 2025, 1395 fee units.
(2) The fee for the transfer of a retention lease is—
(a) in the case of an application for transfer made before 1 July 2025, 628 fee units; or
(b) in the case of an application for transfer made on or after 1 July 2025, 837 fee units.
(3) The fee for the transfer or partial transfer of a production licence is—
(a) in the case of an application for transfer made before 1 July 2025, 1047 fee units; or
(b) in the case of an application for transfer made on or after 1 July 2025, 1395 fee units.
Reg. 58 substituted by S.R. No. 64/2024 reg. 4.
58
Fees for suspension or variation of conditions of exploration permit, retention lease or production licence
58 Fees for suspension or variation of conditions of exploration permit, retention lease or production licence
(1) The fee for the suspension or variation of conditions of an exploration permit is—
(a) in the case of an application for suspension or variation made before 1 July 2025, 628 fee units; or
(b) in the case of a variation made under section 102 or 104 of the Act before 1 July 2025, 628 fee units; or
(c) in the case of an application for suspension or variation made on or after 1 July 2025, 837 fee units; or
(d) in the case of a variation made under section 102 or 104 of the Act on or after 1 July 2025, 837 fee units.
(2) The fee for the suspension or variation of conditions of a retention lease is—
(a) in the case of an application for suspension or variation made before 1 July 2025, 628 fee units; or
(b) in the case of a variation made under section 102 or 104 of the Act before 1 July 2025, 628 fee units; or
(c) in the case of an application for suspension or variation made on or after 1 July 2025, 837 fee units; or
(d) in the case of a variation made under section 102 or 104 of the Act on or after 1 July 2025, 837 fee units.
(3) The fee for the suspension or variation of conditions of a production licence is—
(a) in the case of an application for suspension or variation made before 1 July 2025, 628 fee units; or
(b) in the case of a variation made under section 102 or 104 of the Act before 1 July 2025, 628 fee units; or
(c) in the case of an application for suspension or variation made on or after 1 July 2025, 837 fee units; or
(d) in the case of a variation made under section 102 or 104 of the Act on or after 1 July 2025, 837 fee units.
Reg. 59 substituted by S.R. No. 64/2024 reg. 4.
59
Fee for registration of documents
59 Fee for registration of documents
The fee for the registration of a document in the petroleum register is—
(a) in the case of a document to be registered before 1 July 2025, 21 fee units; or
(b) in the case of a document to be registered on or after 1 July 2025, 28 fee units.
Reg. 60 substituted by S.R. No. 64/2024 reg. 4.
60
Fees for inspection of, or copy of document in, petroleum register
60 Fees for inspection of, or copy of document in, petroleum register
(1) For the purposes of section 236(1) of the Act, the fee for inspection of the petroleum register and any documents that form part of the register is—
(a) in the case of an inspection before 1 July 2025, 8 fee units; or
(b) in the case of an inspection on or after 1 July 2025, 11 fee units.
(2) For the purposes of section 236(2) of the Act, the fee for a copy of any entry or document in the petroleum register is—
(a) for each page of a copy of an entry or document to be obtained before 1 July 2025, 1 fee unit; or
(b) for each page of a copy of an entry or document to be obtained on or after 1 July 2025, 1⋅4 fee units.
Reg. 61 substituted by S.R. No. 64/2024 reg. 4.
61
Fee for Minister's certificate
61 Fee for Minister's certificate
For the purposes of section 237(2) of the Act, the fee for a certificate is—
(a) in the case of an application for a certificate made before 1 July 2025, 21 fee units; or
(b) in the case of an application for a certificate made on or after 1 July 2025, 28 fee units.
Part 11
Transitional regulations
Part 11—Transitional regulations
62
Definitions
62 Definitions
In this Part—
accepted exempt operation plan means an operation plan that applies to an exempt authority that was, before or during the moratorium period—
(a) accepted by the Minister in accordance with section 161 of the Act; or
(b) the subject of a significant change report;
exempt authority means—
(a) a production licence specified in section 17A(3) of the Act; or
(b) any authority in force immediately before the moratorium period other than a relevant authority;
moratorium period has the same meaning as in section 17A(5) of the Act;
relevant authority has the same meaning as in section 257 of the Act;
significant change report means a report required to be submitted to the Minister in relation to an operation plan under (as applicable)—
(a) regulation 6(1)(b)(iii) of the Petroleum Regulations 2011[2], as in force immediately before the commencement of the Petroleum Interim Regulations 2021; or
(b) regulation 6(1)(b)(iii) of the Petroleum Interim Regulations 2021, as in force immediately before the commencement of these Regulations.
Note
Regulation 6(1)(b) of the Petroleum Regulations 2011 and regulation 6(1)(b) of the Petroleum Interim Regulations 2021 required operation plans to provide for review and reporting to the Minister in the case of a significant change in the risks posed by a petroleum operation.
63
Prescribed circumstances—Minister may require variation of accepted operation plan
63 Prescribed circumstances—Minister may require variation of accepted operation plan
For the purposes of section 163A(2)(e) of the Act, the prescribed circumstances are that—
(a) at least 5 years has elapsed after the date on which either—
(i) the Minister accepted the accepted exempt operation plan; or
(ii) a significant change report was submitted to the Minister in relation to the accepted exempt operation plan; and
(b) the accepted exempt operation plan has not been varied under section 163 or 163A of the Act.
64
Modified reporting requirements for holders of exempt authorities
64 Modified reporting requirements for holders of exempt authorities
(1) This regulation applies if an accepted exempt operation plan is in force that has not been varied under section 163 or 163A of the Act on or after the commencement of these Regulations.
(2) Regulation 39(1)(b) and (2)(c), (f), (g), (h), (i) and (k) do not apply to the holder of an exempt authority.
═════════════
Endnotes
1
General information
1 General information
See www.legislation.vic.gov.au for Victorian Bills, Acts and current Versions of legislation and up-to-date legislative information.
The Petroleum Regulations 2021, S.R. No. 139/2021 were made on 16 November 2021 by the Governor in Council under section 252 of the Petroleum Act 1998, No. 96/1998 and came into operation on 22 November 2021: regulation 3.
The Petroleum Regulations 2021 will sunset 10 years after the day of making on 16 November 2031 (see section 5 of the Subordinate Legislation Act 1994).
INTERPRETATION OF LEGISLATION ACT 1984 (ILA)
Style changes
Section 54A of the ILA authorises the making of the style changes set out in Schedule 1 to that Act.
References to ILA s. 39B
Sidenotes which cite ILA s. 39B refer to section 39B of the ILA which provides that where an undivided regulation, rule or clause of a Schedule is amended by the insertion of one or more subregulations, subrules or subclauses the original regulation, rule or clause becomes subregulation, subrule or subclause (1) and is amended by the insertion of the expression "(1)" at the beginning of the original regulation, rule or clause.
Interpretation
As from 1 January 2001, amendments to section 36 of the ILA have the following effects:
• Headings
All headings included in a Statutory Rule which is made on or after
1 January 2001 form part of that Statutory Rule. Any heading inserted in a Statutory Rule which was made before 1 January 2001, by a Statutory Rule made on or after 1 January 2001, forms part of that Statutory Rule.
This includes headings to Parts, Divisions or Subdivisions in a Schedule; Orders; Parts into which an Order is divided; clauses; regulations; rules; items; tables; columns; examples; diagrams; notes or forms.
See section 36(1A)(2A)(2B).
• Examples, diagrams or notes
All examples, diagrams or notes included in a Statutory Rule which is made on or after 1 January 2001 form part of that Statutory Rule. Any examples, diagrams or notes inserted in a Statutory Rule which was made before 1 January 2001, by a Statutory Rule made on or after 1 January 2001, form part of that Statutory Rule. See section 36(3A).
• Punctuation
All punctuation included in a Statutory Rule which is made on or after
1 January 2001 forms part of that Statutory Rule. Any punctuation inserted in a Statutory Rule which was made before 1 January 2001, by a Statutory Rule made on or after 1 January 2001, forms part of that Statutory Rule.
See section 36(3B).
• Provision numbers
All provision numbers included in a Statutory Rule form part of that Statutory Rule, whether inserted in the Statutory Rule before, on or after
1 January 2001. Provision numbers include regulation numbers, rule numbers, subregulation numbers, subrule numbers, paragraphs and subparagraphs. See section 36(3C).
• Location of "legislative items"
A "legislative item" is a penalty, an example or a note. As from 13 October 2004, a legislative item relating to a provision of a Statutory Rule is taken to be at the foot of that provision even if it is preceded or followed by another legislative item that relates to that provision. For example, if a penalty at the foot of a provision is followed by a note, both of these legislative items will be regarded as being at the foot of that provision. See section 36B.
• Other material
Any explanatory memorandum, table of provisions, endnotes, index and other material printed after the Endnotes does not form part of a Statutory Rule. See section 36(3)(3D)(3E).
2
Table of Amendments
2 Table of Amendments
This publication incorporates amendments made to the Petroleum Regulations 2021 by statutory rules, subordinate instruments and Acts.
Reg. 62 def. of significant change report: S.R. No. 30/2011. Revoked by S.R. No. 45/2021.
——
Fee Units
These Regulations provide for fees by reference to fee units within the meaning of the Monetary Units Act 2004.
The amount of the fee is to be calculated, in accordance with section 7 of that Act, by multiplying the number of fee units applicable by the value of a fee unit.
The value of a fee unit for the financial year commencing 1 July 2024 is $16.33. The amount of the calculated fee may be rounded to the nearest 10 cents.
The value of a fee unit for future financial years is to be fixed by the Treasurer under section 5 of the Monetary Units Act 2004. The value of a fee unit for a financial year must be published in the Government Gazette and a Victorian newspaper before 1 June in the preceding financial year.
Penalty Units
These Regulations provide for penalties by reference to penalty units within the meaning of section 110 of the Sentencing Act 1991. The amount of the penalty is to be calculated, in accordance with section 7 of the Monetary Units Act 2004, by multiplying the number of penalty units applicable by the value of a penalty unit.
The value of a penalty unit for the financial year commencing 1 July 2024 is $197.59.
The amount of the calculated penalty may be rounded to the nearest dollar.
The value of a penalty unit for future financial years is to be fixed by the Treasurer under section 5 of the Monetary Units Act 2004. The value of a penalty unit for a financial year must be published in the Government Gazette and a Victorian newspaper before 1 June in the preceding financial year. ↑
Source text: opening excerpt
Sourced from Victorian Legislation (legislation.vic.gov.au), CC BY 4.0.
1 Petroleum Regulations 2021
Version No. 002
Petroleum Regulations 2021
S.R. No. 139/2021
Version incorporating amendments as at
1 July 2024
TABLE OF PROVISIONS
Regulation Page
Part 1—Preliminary matters 1
1 Objectives 1
2 Authorising provision 2
3 Commencement 2
4 Revocation 2
5 Definitions 2
Part 2—Exploration permits 6
6 Assessment of risks etc. 6
7 Prescribed factors in relation to an application for an exploration permit 6
Part 3—Retention leases 7
8 Assessment of risks etc. 7
9 Prescribed factors in relation to an application for a retention lease 8
Part 4—Production licences 9
Division 1—Prescribed factors 9
10 Assessment of risks etc. 9
11 Prescribed factors—determining grant of application for a production licence 10
12 Prescribed factors—granting of production licences following tender 10
Division 2—Petroleum production development plans 11
13 Matters to be included in petroleum production development plan 11
14 Storage development plan 12
15 Additional information 13
Part 5—Provisions applying to authorities generally 14
Division 1—Applications 14
16 Other details in work program 14
Division 2—Surrender or cancellation of authorities 14
17 Surrender of authority 14
Division 3—Miscellaneous matters 15
18 Prescribed period for certain notices 15
19 Prescribed information for certain notices 15
Part 6—Royalties and rent 17
20 Time of payment of royalties 17
21 Rent for occupancy of Crown Land 18
Part 7—Conduct of operations etc. 19
Division 1—Operation plan 19
22 Content of operation plan 19
23 Notice of operation plan 21
24 Prescribed factors for accepting or varying an operation plan 22
25 Prescribed form for evidence regarding notice and submissions for operation plan 23
26 Notice regarding variation to operation plan 24
Prescribe a broad suite of periodic and event-driven reporting obligations to the Minister: notifications of start/end of operations, weekly survey reports, survey acquisition/processing/interpretation reports with specified time limits, incident reporting with tight timeframes, daily drilling reports, initial and final well completion reports, decommissioning reports, and retention/submission of specific cores, cuttings and samples (regs 38-51).
Prescribe rent, royalty timing and payment rules, and set fee levels and timing for applications, renewals, annual fees, transfers, variations and registry services (regs 20-21, 54-61). Fees are stated in fee units and bifurcated by whether applications or instruments are submitted before or on/after 1 July 2025 (regs 54-61).
Provide transitional arrangements for certain exempt authorities and operation plans (Part 11, regs 62-64).
Who pays, who decides and what behaviour the Regulations change are visible throughout. Holders and applicants pay application, transfer, annual and other fees (Part 10), fund insurance and rehabilitation bonds (regs 8(2), 10(2), 21(2)), and produce and deliver data, samples and detailed plans to the Minister. The Minister decides acceptance of plans, requests additional information, grants consents, can vary payment periods and may require revised plans (regs 15, 22(4)-(5), 20(5), 28-29). Behavioural change required of holders includes preparing systematic environmental and well integrity management systems, maintaining records and specified personnel qualifications, consulting identified persons or organisations, notifying and reporting within tight timelines, and providing large volumes of technical data in Minister‑approved forms.
The Regulations link directly to statutory enforcement in the Act, in particular to the Act’s sections on plan acceptance, ministerial powers and penalties. Many contraventions are linked to monetary penalties via the Sentencing Act 1991 and are quantified by penalty units explained in the Endnotes.
Main concepts
The Regulations introduce and operationalise several core regulatory concepts that structure permit application, approval, operations and oversight.
Definitions and threshold tests (reg 5) are central. The Regulations define "practicable" for elimination or minimisation of hazards and risks by requiring consideration of severity, state of knowledge, availability and suitability of mitigation measures and cost (reg 5, definition of practicable). That four-factor test is the statutory standard that pervades obligations on holders in environment and well integrity instruments (eg regs 33(a), 36(1)(l)). "Impact" is narrowly defined as a negative effect that is reasonably predictable at the time of application (reg 5), which frames what must be assessed in application material and plans (regs 6, 13, 30-31).
Operation-related plans are decomposed into discrete documents with distinct purposes and content requirements:
Operation plan: comprehensive description of equipment, the staged operation (construction, operation, decommissioning, rehabilitation), notification processes, environment management plan and well operation management plan where wells are involved (reg 22). It prescribes review cycles (at each stage, whenever significant risk change and at least every five years) and reporting of review outcomes to the Minister within seven days (reg 22(1)(b)(i)-(iv)).
Environment management plan: describes the environment, assesses normal and non‑normal risks and incidents, sets environmental performance objectives and standards with measurement methods, and contains an implementation strategy addressing controls, monitoring, reporting, emergency response and hydrocarbon gas emissions and groundwater impacts where relevant (regs 30-33). It must identify applicable environmental legislation and arrangements for consultation (reg 34-35).
Well operation management plan: per-well technical and operational prescriptions including coordinates, lifecycle stages, design and construction verification, records and inspections, well integrity systems, maintenance of 2 verified well barriers at all times or specified alternatives, qualifications of supervising persons and notifications to the Minister at least 10 days before certain activities (reg 36).
Petroleum production development plan and storage development plan: reservoir data, reservoir management plan, production or storage rates and monitoring and containment measures (regs 13-14). Each must be reviewed within 12 months after initial production and thereafter at least annually (regs 13(2), 14(2)).
Risk and decision-making concepts are embedded: "risk" is defined as likelihood and consequence (reg 5); "well integrity hazard" identifies events that may compromise well integrity and cause harm (reg 5). The Regulations require identification, evaluation and mitigation measures for both normal activities and incidents that are not normal (reg 31).
Data, samples and record-keeping are core regulatory tools. The Regulations specify what seismic, survey, drilling and well data must be delivered to the Minister, in what form and within what time windows (regs 41-49). They require retention and delivery of physical samples and cores in specified quantities and timeframes (reg 51 and its Table), and five-year retention of records used to support royalty accounting (reg 20(3)).
Ministerial discretion and administrative instruments recur. The Minister may require additional information or revised plans (regs 15, 22(4)-(5)), may vary royalty periods (reg 20(5)), and authorises forms and formats for notices, reports and data submission (eg regs 19(2), 43(3)(a)). Time-limited consents are required for specified high-risk steps such as production/well testing and suspension/decommissioning, each with prescribed content for applications (regs 28-29).
Financial and timing mechanisms are explicit. Fees are expressed in fee units with two-tier schedules depending on whether action occurs before or on/after 1 July 2025 (regs 54-61). Payment schedules for royalties and rent are specified (regs 20, 21). Time limits for reporting vary by activity and severity: incident notifications (2 hours), weekly survey reports (weekly), initial and final well completion reports (6 and 12 months respectively), and many others (regs 45, 41, 47, 48, 42-44).
Transitional definitions and exemptions are also provided to manage authorities in moratorium contexts and exempt authorities (Part 11, regs 62-64).
Who it affects
The Regulations identify direct legal subjects, secondary stakeholders and decision-makers and set out who bears costs, obligations and responsibilities.
Primary affected parties
Applicants for exploration permits, retention leases and production licences. They must include prescribed regional risk/benefit assessments and, for retention leases and production licence applications, certificates of insurance and details of rehabilitation bonds and their sufficiency (regs 6-11, 8(2), 10(2)). Applicants also pay application fees as set in Part 10 (regs 54-56).
Holders of authorities (exploration permits, retention leases, production licences, special access authorisations). Authority holders must prepare, maintain and review operation plans, environment management plans, well operation management plans and rehabilitation plans; obtain Ministerial consents for testing or suspension/decommissioning of wells; furnish extensive technical reports and samples; retain records; maintain insurance and rehabilitation security; and pay annual fees, royalties and rent as applicable (see regs 22-37, 28-29, 38-51, 20-21, 54-61).
Operators and contractors engaged by holders (eg drilling contractors, seismic contractors, processing and interpretation contractors). The Regulations require listing contractors in well completion reports, and require that suitably qualified or experienced persons design or supervise tests, construction and decommissioning, with their contact details provided to the Minister (regs 36(2)(j)-(m), 47(3)-(4), 48(3)-(4)). Contractors therefore are obliged to supply data and cooperate with holders’ reporting duties.
Secondary affected parties
Owners and occupiers of land where operations occur. The holder must notify any owner or occupier of proposed tests, suspensions and decommissioning, and rent for use of Crown land is payable by the holder; the valuer-general nominates the valuer who determines rent and that cost is borne by the holder (regs 28(2)(g), 29(3)(i), 21(1)-(3)).
Relevant persons or organisations and local communities identified under the "relevant person or organisation" definition. Operation plans and environment management plans must set out consultation arrangements and how feedback and complaints will be managed; reg 16(1) requires work programs to explain engagement with the community and, where relevant, traditional owner groups under the Traditional Owner Settlement Act 2010. Notices of operation plans must set out contact details, submission processes and summaries of risks and mitigation (regs 22(1)(a)(v), 23, 35).
The Minister and departmental staff responsible for administering the Act. The Regulations allocate decision and oversight functions to the Minister: accepting or varying plans, requesting additional information, granting or refusing consents, varying royalty payment periods and approving forms and data formats (regs 15, 22(4)-(5), 20(5), 28-29, 43(3)(a), 19(2)). Section 252 of the Act is the authorising provision for the Regulations (reg 2).
Valuer-general, and the person(s) they nominate, who determine rent for occupancy of Crown Land and review rent intervals (reg 21).
Who pays and who decides
Holders and applicants pay application fees, transfer fees, annual fees and inspection fees (Part 10). They also bear costs of providing data, retaining samples, insurance and rehabilitation bonds (regs 8(2), 10(2), 50-51). The Minister decides whether plans are acceptable, what additional information is required and whether consents for testing, suspension or decommissioning are granted (regs 15, 22(4)-(5), 28-29). The Minister also approves forms and can authorise different submission periods for survey deliverables (regs 42-44(1)(c)).
Behavioural effects
Applicants and holders must invest in documentation, technical surveying and data processing workflows, maintain qualified personnel and oversight systems to satisfy extensive detail requirements, and budget for potentially higher fees after 1 July 2025. The requirement to produce raw and processed data, logs and core samples to the Minister (regs 42-44, 47-48, 51) produces concrete information flows into government control and oversight. The routine requirement to consult and report to "relevant persons or organisations" embeds ongoing community engagement and record-keeping obligations (regs 22(1)(a)(iv), 23, 35).
Key duties and rights
This section summarises the principal duties imposed on applicants and authority holders and the rights and discretions allocated to the Minister by these Regulations.
Principal duties on applicants and holders
Application content duties: Applications for exploration permits, retention leases and production licences must include regional economic, social and environmental risk and impact assessments, consideration of regional management of those risks, and for retention leases and production licences the insurance certificate and rehabilitation bond details including sufficiency (regs 6-11, 8(2), 10(2)). These are mandatory elements of the statutory application.
Operation plan and plan review duties: Holders must prepare an operation plan that comprehensively describes equipment, staged activities, notification processes, an environment management plan and, where wells are involved, a well operation management plan; the plan must be reviewed before each stage, whenever risks significantly change and at least once every five years; reviews must be reported to the Minister within seven days of finalisation (reg 22(1)(a)-(b)). The Minister can require additional information or revisions (reg 22(4)-(5)).
Environment management duties: The environment management plan must describe the environment, assess normal and non‑normal risks and incidents, set environmental performance objectives and standards with measurement methods, include an implementation strategy (controls, monitoring, audits, record-keeping), include an emergency response manual and address hydrocarbon gas emissions and groundwater impacts as relevant (regs 30-33). The plan must list relevant environmental legislation and set out consultation strategies (regs 34-35).
Well management and well integrity duties: The well operation management plan must set out per-well coordinates, staging, design and construction details, well integrity philosophy and verification, maintenance of two verified well barriers at all times or alternative measures, records of interventions and inspections, and employ suitably qualified persons for design, supervision and decommissioning. Holders must provide person qualifications and contact details to the Minister at least 10 days before well construction or decommissioning (reg 36(1)-(4)).
Consent duties: Written Ministerial consent is required for production tests or well tests and for suspension or decommissioning of wells; applications must include specified test or suspension/decommissioning plans detailing equipment, timeframes, well barriers, controls for well integrity hazards and notification of land owners or occupiers (regs 28-29). Conducting these activities without consent attracts specified penalties (regs 28(1), 29(1)-(2)).
Reporting and notification duties: Extensive notification and reporting duties with strict timeframes are imposed: notify commencement at least 10 days before and completion within 10 days after (reg 38); annual reports within 60 days after end of financial year setting out specific financial, operational, rehabilitation and emissions information (reg 39); six‑monthly production reports for production licences within 30 days of the period end (reg 40); weekly survey reports promptly after each week (reg 41); survey acquisition, processing and interpretation reports with specified delivery windows (regs 42-44); incident reporting within 2 hours orally and followed by written reports within 3 and 30 days with specified content (reg 45); daily drilling reports by midday the following day (reg 46); initial and final well completion reports within 6 and 12 months respectively (regs 47-48); well decommissioning reports within 2 months (reg 49); retention and giving of core, cutting and sample quantities and deadlines (regs 50-51). Many reporting contraventions are linked to penalties under section 179 of the Act (see notes accompanying regs 38-49).
Sample and data retention duties: Holders must retain cores, cuttings and samples they collect (reg 50) and give specified quantities within specified times (reg 51 and its Table). They must retain records of quantities for royalty inspection purposes for five years (reg 20(3)).
Administrative duties: Disclosure of pecuniary interests by public servants administering the Act is required and disqualification from acting unless authorised by the Minister (reg 52). Holders must also ensure consultation processes are in place and appoint a suitably qualified person to manage consultation under the operation plan (reg 35(e)).
Rights, discretions and Ministerial powers
Ministerial acceptance and request powers: The Minister may accept, require additional information for, or require a revised operation, production development or storage development plan (regs 15, 22(4)-(5)). The Minister approves forms of notices and evidence (regs 19(2), 25(1), 25(2), 27(1)-(2)).
Consent grant or refusal powers: The Minister grants consent for production/well tests and suspension/decommissioning of wells, and those consents set conditions which holders must obey (regs 28-29).
Timing variations: The Minister may vary royalty payment periods (reg 20(5)) and may authorise different delivery periods for survey reports and data (regs 42-44(1)(c)). The Minister may extend timeframes for specific reports (eg regs 47(2), 48(2), 39(4)-(5)).
Form and data approval: The Minister approves formats for submission of reports and data and can require data in a form approved by the Minister (eg regs 42(3), 43(3)(a), 44(2)(i)).
Transitional discretion: The Regulations provide mechanisms to manage accepted exempt operation plans and to require variations after specified intervals (Part 11, regs 62-64).
Payment and budgetary duties
Fee payment duties are set out in Part 10 for applications, renewals, annual fees, transfers, variations, registration and inspections. Fees are expressed in fee units with different amounts depending on whether the relevant action occurs before or on/after 1 July 2025 (regs 54-61).
Rent and royalty payment duties: Royalties are payable every six months and within 30 days after the period end unless varied by the Minister; rent for Crown land is set at current market value by a valuer nominated by the valuer-general and costs of the valuation fall on the holder (regs 20, 21).
Compliance cross‑links
The Regulations reference and reinforce statutory penalties and enforcement powers in the Act and link many reporting contraventions to the penalty in section 179 of the Act, which the Endnotes explain is quantified in penalty units under the Sentencing Act 1991 (see notes accompanying regs 38-49 and Endnotes on penalty units). The Regulations thus create a network of operational duties enforceable by monetary penalties and Ministerial regulatory action.
Penalties and enforcement
The Regulations specify a suite of monetary penalties and procedural enforcement levers, frequently by reference to sections of the Petroleum Act 1998 and the Sentencing Act 1991. Enforcement operates as a mix of fixed penalty provisions in the Regulations and references to the Act for maximum penalty exposure.
Monetary penalties specified directly in the Regulations
Consent offences: Conducting a production or well test without the Minister’s written consent is a specified offence carrying a penalty of 20 penalty units (reg 28(1)). Suspending or decommissioning a well without written Ministerial consent carries a penalty of 20 penalty units (reg 29(1)-(2)).
Incident reporting: Failure to notify the Minister of a reportable incident within 2 hours is a penalty of 20 penalty units (reg 45(2)). Subsequent written reporting obligations within 3 and 30 days also carry penalties of 20 penalty units where the written requirements are contravened (reg 45(4)-(5)).
Sample retention: Failure to retain core, cutting or sample that the holder collects attracts a penalty of 20 penalty units (reg 50).
Other contraventions: Some reporting obligations (for instance, many obligations under regs 38-49) are linked in the notes to section 179 of the Act, which carries a potential penalty not exceeding 60 penalty units; where the Regulation includes a note that contravention is an offence under s 179, the maximum exposure is that specified by the Act (see accompanying notes to regs 38, 39(1), 41(1), 42(1), 43(1), 44(1), 46(1), 47(1), 48(1), 49(1) and reg 52(1)). The Endnotes explain that penalty units are valued under the Monetary Units Act 2004 and the value of a penalty unit for 2024-25 is $197.59.
Enforcement mechanisms beyond monetary penalties
Ministerial powers to accept, require additional information, require revised plans, grant or withhold consents and vary timeframes are primary administrative enforcement levers (regs 15, 22(4)-(5), 28-29, 42-44(1)(c), 20(5)). These powers permit the Minister to condition activities, compel additional documentation and withhold authorisation for high‑risk activities.
Reporting and record‑keeping: Frequent and detailed reporting obligations (regs 38-49) create an evidentiary trail that supports enforcement action and enables auditing. The Minister may require reports in form approved and may require further information, which gives administrative teeth to compliance monitoring (regs 15, 19(2), 25(2), 27(2), 43(3)(a)).
Data and samples: The Regulations require holders to give raw seismic and processed survey data, core samples and log data in Minister‑approved forms (regs 42-44, 47-48, 51). Delivery of these materials to the Minister supports technical review and, where faults are identified, may underpin enforcement steps.
Pecuniary interest disclosure: Employees involved in administering the Act must disclose pecuniary interests and must not exercise powers in relation to matters where they have an interest unless the Minister authorises (reg 52). This is an administrative control on the decision‑making process.
Civil dispute timing: For compensation disputes, reg 53 prescribes short time windows for applications to the Tribunal or Supreme Court (14 days for exploration claims, 30 days for production claims), which has procedural enforcement consequences for claimants and holders.
Quantification and currency of penalties and fees
The Regulations use fee units and penalty units. The Endnotes specify how fee and penalty units are converted to dollar amounts under the Monetary Units Act 2004 and the Sentencing Act 1991 and note the 2024-25 values of a fee unit ($16.33) and a penalty unit ($197.59). Fees in Part 10 are scheduled in fee units and bifurcated by whether an application or instrument is before or on/after 1 July 2025 (regs 54-61). The Endnotes instruct that the number of fee units is multiplied by the fee unit value for the financial year in question.
Practical enforcement risks and implementation mechanics
Many reporting obligations are framed by reference to the Minister’s approval of forms and timeframes. Where the Minister approves forms that require electronic submissions or specific data formats, holders face enforcement risk if they fail to comply with a Minister-approved format. See regs 19(2), 25(1)-(2), 43(3)(a), 44(2)(i) and the repeated phrase that data must be in "a form approved by the Minister" (eg regs 42(3), 43(3)).
The Minister’s discretion to extend or vary timeframes or to require additional information (eg regs 15, 39(4)-(5), 47(2), 48(2), 42-44(1)(c)) means enforcement outcomes are sensitive to administrative practice and case-by-case decisions rather than being entirely mechanical. That discretion concentrates decision rights with the Minister, and the Regulations leave procedural detail to bureaucratic implementation.
Evidence and appeal pathways
The Regulations themselves do not set out appeal rights against Ministerial decisions. They reference the Act where appeal mechanisms would be located. For compensation disputes, reg 53 prescribes the timeframe for applications to the Tribunal or Supreme Court; other appeal rights and judicial review would depend on the Act and general judicial review principles.
How it interacts with other laws
The Regulations are instrumentally linked to the Petroleum Act 1998, and they also cross‑refer to State and Commonwealth environmental law, valuation and monetary legislation, sentencing provisions, and the Traditional Owner Settlement Act 2010. The Endnotes further invoke interpretation rules under the Interpretation of Legislation Act 1984.
Primary statutory basis
The Regulations are made under s 252 of the Petroleum Act 1998 (reg 2) and implement detailed procedural and substantive requirements referenced to multiple sections of the Act (for example, application provisions in Part 2-4 are framed "for the purposes of" specified sections of the Act; see regs 6, 7, 8, 9, 10-12, 13-15). They operationalise statutory duties and powers under the Act such as plan acceptance (s 161 of the Act), requirements to keep records and report (s 179), and rental and royalty provisions (s 154, s 160 and others as referenced).
Connections with environmental law and administrative law
"Environmental legislation" is expressly defined to include Acts of State or Commonwealth and instruments made under those Acts (reg 5). The environment management plan must list all environmental legislation that may apply to the petroleum operation and set out compliance strategies (reg 34(b)-(c)). The Regulations therefore require holders to identify and operationally reconcile overlapping environmental obligations under other statutory regimes.
The Regulations require consultation with "relevant agencies of the Commonwealth and the State" as part of environment management plans (reg 33(h)(i)). This explicitly embeds coordination with other governmental regulators and permits cross-agency input into environmental oversight.
Property and valuation law interactions
Rent for occupancy of Crown Land is to be determined at current market value by a valuer nominated by the valuer-general (reg 21(1)-(3)); the valuer-general is defined by reference to the Valuation of Land Act 1960 (reg 21(5)). The holder bears the costs of obtaining the determination (reg 21(2)). Those provisions couple petroleum regulatory obligations to valuation practice under separate land valuation legislation.
Monetary and sentencing framework
Fees and penalties are expressed in fee and penalty units. The Endnotes explain that the Monetary Units Act 2004 fixes the value of a fee unit for each financial year and the Sentencing Act 1991 sets the value of a penalty unit (Endnotes, Fee Units and Penalty Units sections). Fees listed in regs 54-61 are therefore variable in dollar terms year-on-year depending on Treasury determinations under the Monetary Units Act 2004. The Endnotes give the 2024-25 fee unit ($16.33) and penalty unit ($197.59) values as examples.
Traditional owner and community law
Reg 16(1) requires work programs to describe intended engagement with the community and, if relevant, traditional owner groups within the meaning of the Traditional Owner Settlement Act 2010. That cross-reference embeds indigenous land interest considerations and requires holders to plan engagement in accordance with the separate statutory framework for traditional owners.
Transitional and moratorium interactions
Part 11 defines "exempt authority", "moratorium period" and "relevant authority" by reference to s 17A(3) and s 257 of the Act (reg 62). Transitional provisions (regs 63-64) allow the Minister to require variations of accepted exempt operation plans after set intervals and modify reporting requirements for holders of exempt authorities. These provisions interact with moratorium measures set in the Act and manage legacy instruments created under prior petroleum regulations.
Interpretation Act and instrument structure
The Endnotes reference the Interpretation of Legislation Act 1984 (ILA) and explain that headings, examples and notes form part of the Statutory Rule, and that punctuation and provision numbers are part of the instrument (Endnotes section 1). That affects how courts and administrators may read examples and notes embedded in the Regulations.
Administrative law and appealability
The Regulations leave many substantive and procedural decisions to the Minister, including acceptance of plans, consents and approval of forms and data. Where the Minister exercises discretion there may be administrative law constraints in the Act and in general judicial review principles, but the Regulations themselves do not set out appeal mechanisms; those will depend on the Act and general administrative law.
Data governance and cross‑agency use
The Regulations mandate transfer of raw, processed and interpretative survey data, and core samples to the Minister (regs 42-44, 47-48, 51). The Regulations do not specify the Minister’s obligations regarding confidentiality or public release within these provisions. Interaction with freedom of information laws, confidentiality protections in the Act or other instruments will determine downstream disclosure and use. The requirement to identify applicable environmental legislation (reg 34) suggests cross-agency sharing and cross‑compliance.
Amendment history
The instrument text provided is a Version incorporating amendments as at 1 July 2024 (front matter). The Endnotes record the amendment history that is contained in the printed version.
Key amendment entries captured in the source
Petroleum Regulations 2021 initial making and commencement: The Regulations were made 16 November 2021 under s 252 of the Petroleum Act 1998 and came into operation on 22 November 2021 (Endnotes, General information). Regulation 3 confirms commencement on 22 November 2021. Reg 4 revoked the Petroleum Interim Regulations 2021 (see reg 4 and Endnotes).
Petroleum Amendment Regulations 2024, S.R. No. 64/2024: This instrument is recorded in the Table of Amendments. It was made 25 June 2024 and commenced 1 July 2024 (Endnotes, Table of Amendments). The amendment substituted the heading and regs 54-61 in Part 10 (reg. 4 of S.R. No. 64/2024). The Explanatory details note that regs 54-61 were substituted by S.R. No. 64/2024 reg. 4, and that those substituted provisions reset application, renewal, annual, transfer, variation, registration and inspection fees in fee units with pre and post 1 July 2025 bands (see regs 54-61 and the inserted notes).
Transitional references to earlier instruments: reg 62’s definition of "significant change report" refers to regulation 6(1)(b)(iii) of the Petroleum Regulations 2011 and the Petroleum Interim Regulations 2021 as in force immediately before the commencement of these Regulations for transitional context (reg 62 and its Note). The Endnotes expressly record that regulation 6(1)(b) of the 2011 Regulations and regulation 6(1)(b) of the Interim Regulations required operation plans to provide for review and reporting in case of significant change, indicating continuity of that requirement.
Operational amendment effects recorded in the text
Fees were restructured and explicitly bifurcated by whether the relevant application or instrument is made before 1 July 2025 or on/after that date (regs 54-61). The Endnotes specify fee unit and penalty unit dollar values for 2024-25 and the mechanism for future adjustments by the Treasurer under the Monetary Units Act 2004. That amendment imposes budgetary planning implications on holders and applicants because the Regulations specify two-tier fee amounts and link fee unit conversion to Treasury determinations.
Part 10 headings and regs 54-61 were substituted by S.R. No. 64/2024 reg. 4. The source indicates this substitution explicitly in the margins of the printed text (see immediate notes at reg 54 and reg 55 etc). The Explanatory details record the amendment made by S.R. No. 64/2024.
Sunset and expiry notes
The Endnotes state that the Petroleum Regulations 2021 will sunset 10 years after making on 16 November 2031 pursuant to the Subordinate Legislation Act 1994 (Endnotes, General information). That provides a statutory expiry mechanism unless further action is taken.
Practical record of amendments
The printed version includes an Endnotes section with a Table of Amendments and explanatory details identifying the specific statutory rules that changed the Regulations (Endnotes 2 and 3). The only explicit statutory rule identified in the provided material is S.R. No. 64/2024 (Petroleum Amendment Regulations 2024). The printed text also records the prior revocation of the Interim Regulations and references to S.R. No. 30/2011 for a definition in transition.
What the amendment history implies about change dynamics
The amendments recorded are administrative and fee-structure focused in 2024, with substitution of Part 10 fees and fee-unit banding scheduled around 1 July 2025. The Regulations otherwise retain initial structural mechanics put in place at commencement in November 2021, with transitional provisions to manage authorities and accepted exempt operation plans. The Endnotes set out the conversion regime for fee and penalty units, and that conversion will be administered annually by the Treasurer under the Monetary Units Act 2004.
Litigation history
The instrument as provided contains no reported litigation history, case citations or judicial interpretations. The Regulations and accompanying Endnotes do not mention any cases or decisions that construe or apply these Regulations.
What that means operationally
Practising lawyers and compliance professionals should treat these Regulations as a predominantly administrative and prescriptive instrument with enforcement and review likely to arise through Ministerial action, statutory penalties and, where contested, administrative law or judicial review proceedings. The Regulations themselves do not include an internal list of precedents or interpretations.
The source identifies procedural timelines for taking disputes to Tribunal or Supreme Court only in the context of compensation claims (reg 53), which prescribes short periods for bringing an application (14 days for exploration-related claims and 30 days for production-related claims). That provision frames procedural timeliness rather than recording substantive litigation outcomes.
Any legal challenge to a Ministerial decision under these Regulations would rely upon the decision‑making sections of the Petroleum Act 1998 and general judicial review doctrines. As the Regulations defer many matters to the Minister (for example acceptance of plans, requests for additional information, consents and approvals), litigation arising in practice will likely concern procedural fairness and the exercise of statutory discretion under the Act rather than the Regulations alone.
Recommendations for practitioners seeking case law
Because no litigation is recorded in the instrument, practitioners should search judicial and tribunal databases for cases construing the Petroleum Act 1998, and for any reported disputes about plan acceptance, consents for testing or well decommissioning, or enforcement of reporting obligations under section 179. Pay particular attention to administrative law challenges to ministerial discretion given the Regulations’ multiple references to the Minister’s powers to require further information and approve forms.
If a regulatory decision under these Regulations is contested, consider both merits review pathways under the Act (if any) and judicial review on customary grounds such as jurisdictional error, procedural unfairness or irrationality. Reg 53’s procedural timing for compensation claims should be noted where property access or landowner compensation is in dispute.
Gotchas
The Regulations are detailed and prescriptive. Several practical traps and operational risks are embedded in the text and deserve close attention.
Timing and short windows
Incident reporting requires oral notification within 2 hours of becoming aware of a reportable incident, even if full information is not known; this must be followed by a written report within 3 days and a fuller report within 30 days (reg 45(2)-(5)). The 2‑hour window is operationally tight and requires on-call incident response protocols and personnel who can notify the Minister quickly. Failure risks a 20 penalty unit fine (reg 45(2)).
Many data delivery deadlines are strict: weekly survey reports must be given as soon as reasonably practicable after the end of each week (reg 41), survey acquisition and processing reports have 12-18 month windows depending on survey type (regs 42-43), and initial and final well completion reports are due within 6 and 12 months of rig release date respectively (regs 47(1), 48(1)). Non‑compliance can expose holders to penalties under s 179 of the Act, which can be up to 60 penalty units where the Regulation notes that link (see notes to regs 42-48).
Data and sample delivery obligations create technical burdens
The Regulations require delivery of raw navigation and seismic field data, processed data, sample binary headers, and interpretative data in Minister‑approved formats (regs 42-44). Producing and curating raw, processed and interpretative datasets to Ministerial standards is a non‑trivial technical and cost obligation; failure to provide the required formats or to meet quality specifications may trigger enquiries or withholding of consents.
Physical sample obligations are specific and onerous: for example, two sets of 200 g drill cuttings per sample interval, staged delivery of fractions of full hole cores (1/3 and 2/3 at different times), and the obligation to supply all sidewall core material and palynological residues within 12 months (reg 51 and its Table). These requirements affect logistics, storage and chain-of-custody practices and must be budgeted early.
Ministerial discretion and "form approved by the Minister"
The Regulations repeatedly require submissions to be "in a form approved by the Minister" (eg regs 19(2), 25(1)-(2), 43(3)(a), 44(2)(i), 42(3)). That leaves substantive compliance partly contingent on administrative specifications that may change, and creates risk where holders design internal systems only to find Ministerial formats differ. Seek written confirmation or templates from the Department early and track versions.
"Practicable" includes cost
The definition of "practicable" explicitly includes cost as one of the factors for whether hazards and risks are eliminated or minimised (reg 5). That makes it possible to argue against adoption of certain measures on grounds of cost, but the Regulation also requires the holder to explain why selected controls were adopted and why others were not (reg 33(b)). Prepare a documented decision trail that demonstrates consideration of cost alongside severity, state of knowledge and availability of measures.
Community consultation and "relevant person or organisation"
The definition of "relevant person or organisation" is broad and context-specific (reg 5). Operation plans and environment management plans must set out consultation, feedback and complaint handling mechanisms and appoint a suitably qualified person to manage consultation (regs 22(1)(a)(iv), 35(e)). Failure to identify stakeholders or to execute consultation suitably can be a factor in the Minister’s decision to vary or reject plans (reg 24(1)(b), 24(2)(b)).
Fees and fee unit volatility
Fees are expressed in fee units and bifurcated by whether actions occur before or on/after 1 July 2025 (regs 54-61). Fee units are converted to dollar amounts annually by the Treasurer under the Monetary Units Act 2004 and published in advance (Endnotes). Budget for fee volatility and for the higher band if activities occur on or after 1 July 2025.
Record retention and access
Holders must retain petroleum quantity records for five years for royalty inspection (reg 20(3)), and they must retain cores, cuttings and samples. The Regulations do not themselves set confidentiality or public release standards for data provided to the Minister; practitioners should consider how data transfer may affect commercial confidentiality and what contractual protections are needed with contractors and data processors.
Two verified well barriers requirement
Multiple provisions require maintenance of two verified well barriers at all times or, if that cannot be achieved, specification of alternative measures (regs 28(2)(c), 29(4)(d), 36(2)(p)(i)). Compliance requires planning and real‑time operational controls; the Regulations expect documentation of alternatives and verification processes, which can be operationally demanding.
Transitional exemptions
Reg 64 modifies reporting requirements for holders of exempt authorities under certain circumstances. Holders with older accepted exempt operation plans need to check whether those transitional reductions apply and when the Minister may require variation under reg 63. Do not assume all holders are subject to the same reporting obligations without reviewing Part 11.
Short windows for compensation claims
Reg 53 prescribes 14 days for exploration-related claims and 30 days for production-related claims to bring applications in relation to a claim to Tribunal or Supreme Court unless otherwise agreed. This is a tight procedural rule and landholders and holders must manage claims and negotiations within those timelines.
How to comply
This section sets out a practical compliance checklist and recommended sequences keyed to the Regulations’ provisions. Citations point to the primary prescriptions.
Pre-application and application stage
Prepare the regional risk and benefit analysis required in every application under regs 6, 8(1) and 10(1). Address likely regional economic, social and environmental risks and impacts, anticipated regional benefits relative to risks and the extent and method of regional-level management (regs 6(a)-(c), 8(1), 10(1)). Document methodology and assumptions.
For retention lease and production licence applications, attach the insurance certificate and an assessment of insurance adequacy, plus the rehabilitation bond amount and its sufficiency (regs 8(2)(a)-(d), 10(2)(a)-(d)). Ensure certificates and bond documents are current at application date.
Budget for application fees and note the two-tier fee schedule around 1 July 2025 (Part 10, regs 54-61). Convert fee units to dollar values for the relevant financial year under the Monetary Units Act 2004.
Operation plan and related plans
Draft the operation plan to include the comprehensive descriptions required in reg 22(1)(a)(i)-(vi) and ensure the plan contains the environment management plan and well operation management plan when relevant. Build the staged approach (construction, operation, decommissioning, rehabilitation) and document the notification process to the Minister prior to each stage (reg 22(1)(a)(ii)-(iii)).
Ensure the operation plan contains review arrangements: pre-stage reviews, reviews when risk materially changes, five-year minimum review cycle, and a reporting mechanism to the Minister within seven days after each review finalisation (reg 22(1)(b)(i)-(iv)). Track review dates and prepare templates for review reports.
Prepare a standalone environment management plan that addresses the items at regs 30-34: environmental description, risk assessment for normal and non-normal activities, performance objectives and standards, measurement methods, implementation strategy, emergency response manual, hydrocarbon gas emissions and groundwater monitoring plans where relevant, and a list of applicable environmental legislation (regs 30-34). Keep records demonstrating why particular controls were chosen and why others were not (reg 33(b)).
Prepare the well operation management plan to the detail in reg 36. For each well, include coordinates, basin/sub-basin, lifecycle stages, design and construction details, verification and supervision arrangements with names and contact details for suitably qualified persons, plans to maintain two verified well barriers at all times, record‑keeping processes, and procedures for interventions and unexpected events (reg 36(1)-(3)). Provide supervisors’ qualifications and contact details at least 10 days before construction or decommissioning (reg 36(3)-(4)).
Consultation and community engagement
As required by reg 16(1), include a community engagement plan in the work program and, where relevant, engagement with traditional owners per the Traditional Owner Settlement Act 2010. The environment management plan must identify relevant persons or organisations and describe how information will be shared and feedback managed (reg 35). Appoint a suitably qualified person to manage consultation and document procedures for receiving and analysing feedback (reg 35(e), 35(f)).
For operation plan notices, include the prescribed information listed in reg 23 (holder contact details, form for submissions, commencement date for consideration, summary of risks and mitigation, and consultation process) and ensure notice is in a form approved by the Minister (reg 23, reg 19(2) re form approval).
Consents and well operations
Do not commence any production test or well test without written Ministerial consent. Prepare consent applications that include the testing equipment, timeframe, measures to maintain two verified well barriers or alternative measures, controls for well integrity hazards, and names and qualifications of designers and on-site supervisors, and proof of owner/occupier notification (reg 28(1)-(2)(a)-(g)).
For suspension or decommissioning, apply to the Minister with the name and number of the well, reasons for suspension/decommissioning and a detailed plan including care and maintenance measures, equipment and timeframe, how to maintain two verified well barriers or alternatives, well integrity controls, names/qualifications of responsible designers and supervisors and notification to owners/occupiers (reg 29(1)-(4)).
Data, sample and reporting workflows
Establish data management workflows to collect and retain raw, processed and interpretative survey data and wireline/logging/drilling data in Minister‑approved formats. Map the deliverables for each type of survey and adhere to the specified deadlines: survey acquisition and processing (12-18 months depending on seismic dimensionality), survey interpretation (12-18 months), and weekly survey reports during acquisition (regs 41-44). Secure data format templates from the Department early.
Implement core and sample handling protocols aligned to reg 51’s Table: record sample intervals, ensure required fractions of cores are saved and scheduled for delivery in the specified staging (eg 1/3 and 2/3 core deliveries), hold two sets of drill cuttings per interval and provide palynological slides, sidewall cores and gaseous/fluid hydrocarbon samples in the specified quantities and timeframes. Maintain chain-of-custody logs.
Set up incident response procedures to meet reg 45’s tight timings: oral notification within 2 hours, a written report within 3 days and a root cause, corrective action and prevention plan within 30 days. Test those procedures with drills and maintain a central incident reporting record.
Record retention, auditing and staff competence
Retain petroleum extraction quantity records for five years for royalty inspection purposes (reg 20(3)). Retain all required geological and operational records for the times set out in relevant regs and company document retention policy.
Ensure suitably qualified or experienced personnel are identified for design, supervision and verification tasks (regs 28(2)(e)-(f), 29(4)(g)-(h), 36(2)(j)-(m)). Maintain records of qualifications and experience and provide these to the Minister at least 10 days before well construction and decommissioning (reg 36(3)-(4)). Train site personnel in the operation plan, environment management plan, emergency response manual and records procedures (reg 33(d)).
Financial compliance
Budget for application, transfer, renewal, annual and inspection fees and be aware of higher fee bands effective on or after 1 July 2025 in regs 54-61. Account for rent determined by a valuer nominated by the valuer-general and for the holder’s obligation to pay valuation costs (reg 21). Prepare for royalty payments every six months and submit measurement records with the payment (reg 20(1)-(2)). Consider obtaining an early written variation from the Minister if timing of royalty payments is an issue (reg 20(5)).
Engage early with the Minister/Department
Obtain or request Minister-approved forms and data templates early to avoid rework and to ensure that the format of delivered data conforms with expectations (regs 19(2), 25, 43(3)(a)). Where permitted, request extensions or alternatives in writing (eg additional time for reports, alternative sample quantities) well in advance of statutory deadlines (regs 39(4)-(5), 42-44(1)(c), 47(2), 48(2)).
If planning activities that might be high risk or novel, seek pre-submission meetings with the Department to clarify expectations on content, especially for environment management plans, well integrity measures and survey data formats.
Administrative and legal housekeeping
Put contractual arrangements in place with contractors to ensure that required data, logs, samples and qualifications are delivered and that contractors accept obligations to preserve and transfer required materials to the holder for delivery to the Minister (regs 42-48, 51).
Consider confidentiality agreements and legal advice about data handling, because the Regulations require transmission of substantial technical information to the Minister though they do not specify public disclosure parameters within the Regulations themselves. Coordinate legal counsel on potential FOI or disclosure consequences.
Monitoring and audit readiness
Maintain an audit trail for all required submissions and internal approvals, including dates of Ministerial consents, dates of notices given to relevant persons or organisations, logs of consultation, and records of environmental monitoring and hydrocarbon emissions as required in the environment management plan (reg 33(f)-(g), reg 23(f)-(h)). Produce a compliance register mapping each regulatory obligation (reg number, due date, responsible person, submission status) and review it at least quarterly.
By following the checklists above and documenting decisions and trade-offs against the "practicable" test in reg 5, holders and applicants will assemble the documentary and operational evidence the Minister requires for plan acceptance, consents and ongoing compliance.
Prescribed factors in relation to an application for an exploration permit
27 Prescribed form of evidence required to be submitted for the variation of an operation plan 25
28 Consent to conduct production tests or well tests 26
29 Consent to suspend or decommission a well 27
Division 2—Environment management plan 29
30 Description of the environment 29
31 Description of environmental risks and impacts 29
32 Environmental performance objectives and standards 30
33 Implementation strategy for the environment management plan 30
34 Other information in the environment management plan 34
35 Information on consultation with relevant persons or organisations 34
Division 3—Well operation management plan 35
36 Well operation management plan 35
Division 4—Rehabilitation plans 40
37 Rehabilitation plan 40
Part 8—Information to be given to the Minister 42
Division 1—Notification of activities in respect of petroleum operation 42
38 Notifying start and end of petroleum operation 42
Division 2—Periodic reports 42
39 Annual report 42
40 Report by holder of production licence 45
Division 3—Reports of certain activities 46
41 Requirement for weekly survey report 46
42 Requirement for survey acquisition report and data 47
43 Requirement for survey processing report and data 49
44 Requirement for survey interpretation report and data 53
45 Incident reporting 55
Division 4—Reports about drilling wells 56
46 Requirement for daily drilling report 56
47 Requirement for initial well completion report and data 58
48 Requirement for final well completion report and data 61
Division 5—Reports regarding decommissioning 64
49 Well decommissioning report 64
Division 6—Retention and submission of samples 67
50 Requirement to retain core, cutting or sample 67
51 Requirement to give core, cutting or sample 68
Part 9—Administrative matters 72
Division 1—Pecuniary interests 72
52 Duty of disclosure of pecuniary interest 72
Division 2—Compensation 72
53 Period before a disputed claim can go to the Tribunal or Supreme Court 72
Part 10—Miscellaneous matters 73
54 Application fees 73
55 Fee for renewal of exploration permit 74
56 Annual fees for exploration permit, retention lease or production licence 74
57 Fees for transfer of exploration permit, retention lease or production licence 75
58 Fees for suspension or variation of conditions of exploration permit, retention lease or production licence 76
59 Fee for registration of documents 77
60 Fees for inspection of, or copy of document in, petroleum register 77
61 Fee for Minister's certificate 78
Part 11—Transitional regulations 79
62 Definitions 79
63 Prescribed circumstances—Minister may require variation of accepted operation plan 80
64 Modified reporting requirements for holders of exempt authorities 80
═════════════
Endnotes 81
1 General information 81
2 Table of Amendments 83
3 Explanatory details 84
Version No.002
Petroleum Regulations 2021
S.R. No. 139/2021
Version incorporating amendments as at
1 July 2024
Part 1—Preliminary matters
1 Objectives
The objectives of these Regulations are—
(a) to provide for the elimination and minimisation, so far as is reasonably practicable, of hazards and risks to the environment, public amenity and public safety involved in undertaking petroleum operations over the life of those operations; and
(b) to provide for the elimination and minimisation, so far as is reasonably practicable, of impacts from petroleum operations on local communities; and
(c) to ensure effective engagement by authority holders with the community over the life of an authority; and
(d) to provide for the effective management of petroleum reservoirs and petroleum storage reservoirs; and
(e) to prescribe requirements for operation plans, storage development plans and petroleum production development plans; and
(f) to prescribe requirements for applications for, and notices of applications for, an authority; and
(g) to prescribe reporting requirements, including the information and samples, that an authority holder must provide to the Minister; and
(h) to provide for various administrative matters, fees and other requirements of the Act.
2 Authorising provision
These Regulations are made under section 252 of the Petroleum Act 1998.
3 Commencement
These Regulations come into operation on 22 November 2021.
4 Revocation
The Petroleum Interim Regulations 2021[1] are revoked.
5 Definitions
In these Regulations—
ancillary equipment, in relation to a well, includes—
(a) equipment located downhole; and
(b) pressure control equipment; and
(c) a well-head;
authority number means the unique identification number designated by the Minister for an authority;
environmental legislation means an Act of the State or the Commonwealth or any instrument made or issued under or for the purpose of those Acts that relates to the protection of the environment;
facility means a structure that—
(a) is used or constructed for the purpose of recovering or storing petroleum; or
(b) is used or constructed for the purpose of monitoring impacts from production or storage wells; or
(c) carries, contains or includes—
(i) equipment for the drilling, modification, maintenance or repair of a well or ancillary equipment; and
(ii) gas plants; and
(iii) compression plants; and
(iv) metering stations; and
(v) gathering lines; and
(vi) survey equipment;
hydrocarbon gas emissions means gaseous emissions from leaks, flaring or venting of hydrocarbons;
impact means a negative effect of a petroleum operation that is reasonably predictable at the time that the application for the authority under which the operation is carried out is made;
practicable, in relation to eliminating or minimising hazards and risks, means practicable having regard to—
(a) the severity of the hazard or risk; and
(b) the state of knowledge about the hazard or risk; and
(c) the availability and suitability of ways to eliminate or minimise that hazard or risk; and
(d) the cost of eliminating or minimising that hazard or risk;
relevant person or organisation means—
(a) in relation to an operation plan that is proposed to be varied—
(i) any person or organisation that may be affected by an activity carried out under the operation plan as proposed to be varied; and
(ii) any person or organisation that has interests that may be affected by an activity carried out under the operation plan as proposed to be varied; or
(b) in relation to any other operation plan—
(i) any person or organisation that may be affected by an activity carried out under the operation plan; and
(ii) any person or organisation that has interests that may be affected by an activity carried out under the operation plan;
rig release date, in relation to a well, means the date on which the drilling rig that was last used to drill the well is moved so that it is no longer above the well, if no further drilling of the well is to occur;
risk means the likelihood and consequence of a specific, undesired event occurring;
the Act means the Petroleum Act 1998;
well activity, in relation to a well, means an activity carried out during the life of the well;
well integrity, in relation to a well, means that the entire length of the well, for the life of the well—
(a) is under control, in accordance with an operation plan accepted under section 161 of the Act; and
(b) is able to contain reservoir fluid; and
(c) is not the subject of any unforeseen risks;
well integrity hazard means, for the life of the well, an event—
(a) that—
(i) may compromise the well integrity of a well; or
(ii) may cause loss of a well barrier control; and
(b) that may, if it occurred, cause harm or present a risk to individuals, public safety, public amenity, the environment or a petroleum reservoir.
Part 2—Exploration permits
6 Assessment of risks etc.
An application under section 20 of the Act must contain the following information in relation to the proposed work program submitted with the application over the life of the permit—
(a) the likely regional economic, social and environmental risks and impacts of the program;
(b) the likely regional benefits of the program relative to its likely risks and impacts;
(c) the extent to which these risks and impacts can be managed at the regional level and how the applicant proposes to do this.
7 Prescribed factors in relation to an application for an exploration permit
For the purposes of sections 20B(2)(c) and 21(2)(c) of the Act, the following are prescribed factors—
(a) the likely regional economic, social and environmental risks and impacts of the work program;
(b) the likely regional benefits of the work program relative to its likely risk and impacts;
(c) the extent to which these risks and impacts can be managed at the regional level and how the applicant proposes to do this.
Part 3—Retention leases
8 Assessment of risks etc.
(1) An application under section 38 of the Act must contain the following information in relation to the proposed work program submitted with the application over the life of the lease—
(a) the likely regional economic, social and environmental risks and impacts of the program;
(b) the likely regional benefits of the program relative to its likely risks and impacts;
(c) the extent to which these risks and impacts can be managed at the regional level and how the applicant proposes to do this.
(2) An application under section 38 of the Act must contain the following—
(a) the certificate of any insurance policy maintained by the applicant in accordance with section 171 of the Act in respect of the exploration permit held by the applicant;
(b) the adequacy, as at the date of the application, of that insurance to cover any expenses or liabilities arising from a petroleum operation carried out under the exploration permit held by the applicant;
(c) the amount of the rehabilitation bond obtained by the applicant in accordance with section 173 of the Act in respect of a petroleum operation carried out under the exploration permit held by the applicant;
(d) the sufficiency of the amount secured by a rehabilitation bond described in paragraph (c), as at the date of the application, to cover any costs of rehabilitation work necessary as a result of the relevant petroleum operation.
9 Prescribed factors in relation to an application for a retention lease
For the purposes of section 40(1)(e) of the Act, the following are prescribed factors—
(a) the likely regional economic, social and environmental risks and impacts of the work program;
(b) the likely regional benefits of the work program relative to its likely risks;
(c) the extent to which these risks and impacts can be managed at the regional level and how the applicant proposes to do this.
Part 4—Production licences
Division 1—Prescribed factors
10 Assessment of risks etc.
(1) An application under section 47 of the Act must contain the following information in relation to the proposed work program submitted with the application over the life of the licence—
(a) the likely regional economic, social and environmental risks and impacts of the program;
(b) the likely regional benefits of the program relative to its likely risks and impacts;
(c) the extent to which these risks and impacts can be managed at the regional level and how the applicant proposes to do this.
(2) An application under section 47 of the Act must contain the following—
(a) the certificate of any insurance policy maintained by the applicant in accordance with section 171 of the Act in respect of the exploration permit held by the applicant;
(b) the adequacy, as at the date of the application, of that insurance to cover any expenses or liabilities arising from a petroleum operation carried out under the exploration permit held by the applicant;
(c) the amount of the rehabilitation bond obtained by the applicant in accordance with section 173 of the Act in respect of a petroleum operation carried out under the exploration permit or retention lease held by the applicant;
(d) the sufficiency of the amount secured by a rehabilitation bond described in paragraph (c), as at the date of the application, to cover any costs of rehabilitation work necessary as a result of the relevant petroleum operation.
11 Prescribed factors—determining grant of application for a production licence
For the purposes of section 49(1)(d) of the Act, the following are prescribed factors—
(a) the likely regional economic, social and environmental risks and impacts of the proposed work program submitted with the application;
(b) the likely regional benefits of the work program relative to its likely risks;
(c) the extent to which these risks and impacts can be managed at the regional level and how the applicant proposes to do this.
12 Prescribed factors—granting of production licences following tender
For the purposes of sections 52(3) and 52A(3) of the Act, the following are prescribed factors—
(a) the likely regional economic, social and environmental risks and impacts of the proposed work program submitted with the application;
(b) the likely regional benefits of the work program relative to its likely risks;
(c) the extent to which these risks and impacts can be managed at the regional level and how the applicant proposes to do this.
Division 2—Petroleum production development plans
13 Matters to be included in petroleum production development plan
(1) For the purposes of section 63(2) of the Act, a petroleum production development plan must include
(a) a description of each stage of the petroleum operation, including equipment or facilities to be used; and
(b) a description of the relevant existing geological and reservoir data and interpretations of that data; and
(c) details of proposed further data acquisition and studies to enhance geological and reservoir understanding; and
(d) a reservoir management plan that
(i) describes how the reservoir will be produced; and
(ii) provides the reasons for adopting the proposed app