Step 1 , Identify the parcel-specific controls. Start with the Land Application Map and Land Zoning Map to confirm the zone (clause 1.3(1); cl 2.2). Consult the Lot Size Map for minimum lot-size controls (clause 4.1), the Height of Buildings Map (clause 4.3), the Floor Space Ratio Map (clause 4.4), Active Frontages Map (clause 7.13), Building Height Allowance Map (clause 4.3A) and any other applicable overlay maps noted in the Plan. Where the parcel is identified in Schedule 1 (additional permitted uses) or Schedule 4 (public land classification) or Schedule 5 (heritage items), record these bespoke controls.
Step 2 , Confirm permissible use in the zone. Read the Land Use Table entry for the zone (clause 2.3 and the Land Use Table). Determine whether the proposed use is permitted without consent, permitted with consent, or prohibited. If the land is unzoned, development is only permissible with consent and the consent authority must consider impacts on adjoining zoned land and compatibility (clause 2.4).
Step 3 , Determine whether the proposal is exempt, complying or requires development consent. Check Schedule 2 for exempt development and note the Schedule 2 standards and exception list (clause 3.1). If the proposal could be complying development, check Schedule 3 and clause 3.2 to ensure it is permissible in the zone and meets the Building Code and other requirements, and check any applicable local conditions in Part 2 of Schedule 3. If not exempt or complying, prepare a development application for consent (Parts 3 and 4).
Step 4 , Identify and meet clause-specific documentary requirements. Where clauses mandate submissions, include them early in the application. Examples: acid sulfate soils management plan where relevant (clause 7.1(3)); heritage management document or heritage conservation management plan where requested (clause 5.10(5)-(6)); aquaculture site location and operational compliance evidence in accordance with Schedule 6 (clause 5.19(2)); flood studies and evacuation/occupancy measures where in flood planning areas (clause 5.21(2)-(3)); and compliance statements for any proposed contravention under clause 4.6 (clause 4.6(3) and Environmental Planning and Assessment Regulation 2021 requirements).
Step 5 , Assess any need for external referrals and notifications. If the development affects an archaeological site or nominated State heritage item, notify the Heritage Council and consider its response (clause 5.10(7), (9)). For Aboriginal places of heritage significance, notify local Aboriginal communities and take responses into account (clause 5.10(8)). If the development may penetrate airport Limitation or Operations Surfaces, consult the relevant Commonwealth body as required (clause 7.5(2)-(4)). For public roads and footpath commercial use, obtain approvals under the Roads Act or Local Government Act as required by Schedule 2 conditions.
Step 6 , Check for covenant or registered instrument effects and the scope of clause 1.9A. If the proposed development would otherwise be restricted by private covenants, review clause 1.9A to see whether suspension may apply, and confirm whether the covenant is one of the exceptions listed in clause 1.9A(2). Also identify any rights of public authorities under registered instruments which clause 1.9A preserves.
Step 7 , For proposal touching multiple lots or mapped split zones, apply split-zone subdivision rules and exceptions. Use clause 4.2C for split-zone subdivisions, and consider clause 4.5 rules for calculating site area and any covenant conditions to prevent double counting of site area or floor space.
Step 8 , If seeking to depart from a development standard, prepare the required clause 4.6 material. Demonstrate why compliance is unreasonable or unnecessary, and supply environmental planning grounds to justify the contravention; ensure the proposal does not attempt to use clause 4.6 for standards expressly excluded or for prohibited subdivision outcomes (clause 4.6(2)-(8)). The consent authority must keep assessment records (clause 4.6(4)).
Step 9 , Where heritage or Aboriginal heritage is relevant, prepare heritage impact statements, management documents or conservation plans and allow the statutory notice periods to elapse. Be prepared to include conservation incentives and conditions to secure conservation outcomes where the consent authority may grant permission for otherwise inconsistent development (clause 5.10(10)).
Step 10 , Ensure design and construction compliance with the Building Code and specialised standards. For exempt and complying development confirm Building Code of Australia deemed-to-satisfy compliance, fire safety certificates where relevant (clause 3.1(4)), and for certain complying development include certifications such as registered professional engineer certificates where the Plan requires (Schedule 3 sch.3-sec Raising of dwelling houses, cl (6)).
Step 11 , Confirm infrastructure and service availability. The consent authority must be satisfied essential services (water, electricity, sewage disposal, stormwater, vehicular access, telecommunications) are available or arrangements made before consent (clause 7.7). For urban release areas, ensure certification from the Director-General about arrangements for designated State public infrastructure where subdivision creates smaller lots (clause 6.1).
Step 12 , Address community and neighbour amenity issues. For uses such as intensive livestock, farm gate premises, function centres and temporary events, prepare statements addressing noise, traffic, environmental impacts, capacity of infrastructure, and measures to avoid land use conflict (clause 5.18(3); cl 5.25; cl 7.14; cl 2.8(3)). For licensed premises, note that the Plan prevents refusal on specified music-related grounds provided noise can be managed (clause 5.20).
Step 13 , Register covenants, easements or conditions where required at settlement. Where consent imposes a covenant to prevent double-counting of floor space or to secure conservation works, ensure registration and appropriate title documentation in accordance with clause 4.5(9)-(10) and clause 5.2 where public land reclassification occurs.
Step 14 , Monitor temporal and locational expiry of special permissions. If relying on time-limited clauses or emergency exemptions (for example clauses 7.15-7.16), confirm whether the expiry date has passed and seek formal variation or a permanent pathway if continued use is required.
Following these steps and aligning submissions to the clause-specific tests, map-based limits and documentary requirements in the Plan will materially reduce the risk of refusal, delay or enforcement. When in doubt, early engagement with Council planning officers, heritage officers, and the relevant State or Commonwealth referral bodies identified in the Plan is essential because the Plan requires such consultation in multiple contexts.