Sets zoning, permitted/prohibited uses and development standards for land in Albury (lot sizes, building heights, floor‑space ratios), plus heritage, environmental and special local controls and exempt/complying pathways (see cll 2.1–4.6, 5.10). It affects landowners, developers and the Council: the Council is the consent authority (cl 1.6) and developers/landowners carry compliance and infrastructure‑arrangement costs (cll 6.1–6.2). The Plan alters what uses and subdivisions need consent, and imposes conditions and site‑specific limits on development.
This instrument is the local environmental plan (LEP) setting the statutory land‑use regime for the City of Albury. Mechanically it does the following.
Establishes the local plan and its commencement date (the day it was published on the NSW legislation website, cl 1.1AA), the geographic extent by reference to the Land Application and Land Zoning Maps (cls 1.3, 2.2), and the Dictionary that defines terms used throughout the Plan (cl 1.4).
Repeals preceding local environmental plans and deemed instruments that applied only to this area (cl 1.8). A savings rule preserves the legal regime for development applications made but not finally determined before commencement (cl 1.8A(1)). Specific later amendments are excluded from application to DAs made prior to their commencement (cl 1.8A(2)-(3)).
Allocates land to a defined set of zones (cl 2.1) and puts the Land Use Table at Pt 2 (cl 2.3) as the core permissions framework: objectives for each zone, what is permitted without consent, what is permitted only with consent, and what is prohibited (cl 2.3(1)-(2)). The applicable maps (Land Zoning Map, Lot Size Map, Height of Buildings Map, Floor Space Ratio Map, and other named maps) provide the numerical and spatial controls cited throughout (cl 1.7, cl 4.1(2), cl 4.3(2), cl 4.4(2), cl 4.1(3)).
Prescribes consent rules and thresholds: subdivision requires consent (cl 2.6); demolition requires consent (cl 2.7); certain temporary uses are time‑limited (cl 2.8); exempt and complying development is governed by Pt 3 and Schedules 2-3, with exclusions for environmentally sensitive areas (cl 3.1-3.3); and a series of development standards govern minimum lot sizes, strata and community title subdivisions, height and floor space ratio calculations (Part 4, cls 4.1-4.6, including exceptions and limits).
Current sections
Direct links to the current provisions in Albury Local Environmental Plan 2010.
State Environmental Planning Policy (Transport and Infrastructure) 2021, Chapter 2—relating to infrastructure facilities, including air transport, correction, education, electricity generating works and solar energy systems, health services, ports, railways, roads, waste management and water supply systems
Aquaculture; Bed and breakfast accommodation; Dual occupancies; Dwelling houses; Extractive industries; Farm buildings; Farm stay accommodation; Group homes; Intensive livestock agriculture; Landscaping material supplies; Open cut mining; Plant nurseries; Roads; Roadside stalls; Rural workers’ dwellings; Secondary dwellings; Any other development not specified in item 2 or 4
4
Prohibited
4 Prohibited
4 Prohibited
Air transport facilities; Amusement centres; Camping grounds; Car parks; Caravan parks; Cemeteries; Centre-based child care facilities; Commercial premises; Correctional centres; Crematoria; Depots; Eco-tourist facilities; Educational establishments; Entertainment facilities; Exhibition homes; Exhibition villages; Freight transport facilities; Function centres; Health services facilities; Heavy industrial storage establishments; Home occupations (sex services); Industrial retail outlets; Industrial training facilities; Industries; Information and education facilities; Livestock processing industries; Local distribution premises; Marinas; Mooring pens; Mortuaries; Passenger transport facilities; Places of public worship; Port facilities; Recreation facilities (indoor); Registered clubs; Residential accommodation; Respite day care centres; Restricted premises; Service stations; Sex services premises; Storage premises; Tourist and visitor accommodation; Truck depots; Vehicle body repair workshops; Vehicle repair stations; Warehouse or distribution centres; Wharf or boating facilities; Wholesale supplies
Part 3
Exempt and complying development
Part 3 Exempt and complying development
Part 3 Exempt and complying development
Part 4
Principal development standards
Part 4 Principal development standards
Part 4 Principal development standards
Part 5
Miscellaneous provisions
Part 5 Miscellaneous provisions
Part 5 Miscellaneous provisions
5
Relevant acquisition authority
5 Relevant acquisition authority
5.1 Relevant acquisition authority
(1) The objective of this clause is to identify, for the purposes of section 3.15 of the Act, the authority of the State that will be the relevant authority to acquire land reserved for certain public purposes if the land is required to be acquired under Division 3 of Part 2 of the Land Acquisition (Just Terms Compensation) Act 1991 (the owner-initiated acquisition provisions).
Note.
If the landholder will suffer hardship if there is any delay in the land being acquired by the relevant authority, section 23 of the Land Acquisition (Just Terms Compensation) Act 1991 requires the authority to acquire the land.
(2) The authority of the State that will be the relevant authority to acquire land, if the land is required to be acquired under the owner-initiated acquisition provisions, is the authority of the State specified below in relation to the land shown on the Land Reservation Acquisition Map (or, if an authority of the State is not specified in relation to land required to be so acquired, the authority designated or determined under those provisions).
| Type of land shown on Map | Authority of the State |
| Zone RE1 Public Recreation and marked “Local open space” | Council |
| Zone RE1 Public Recreation and marked “Regional open space” | The corporation constituted under section 2.5 of the Act |
| Zone SP2 Infrastructure and marked “Classified road” | Transport for NSW |
| Zone C1 National Parks and Nature Reserves and marked “National Park” | Minister administering the National Parks and Wildlife Act 1974 |
(3) Development on land acquired by an authority of the State under the owner-initiated acquisition provisions may, before it is used for the purpose for which it is reserved, be carried out, with development consent, for any purpose.
Note.
If land, other than land specified in the Table to subclause (2), is required to be acquired under the owner-initiated acquisition provisions, the Minister of Planning is required to take action to enable the designation of the acquiring authority under this Part. Pending the designation of the acquiring authority for that land, the acquiring authority is to be the authority determined by order of the Minister for Planning (see section 21 of the Land Acquisition (Just Terms Compensation) Act 1991).
Part 6
Urban release areas
Part 6 Urban release areas
Part 6 Urban release areas
6
Arrangements for designated State public infrastructure
6 Arrangements for designated State public infrastructure
6.1 Arrangements for designated State public infrastructure
(1) The objective of this clause is to require satisfactory arrangements to be made for the provision of designated State public infrastructure before the subdivision of land in an urban release area to satisfy needs that arise from development on the land, but only if the land is developed intensively for urban purposes.
(2) Development consent must not be granted for the subdivision of land in an urban release area if the subdivision would create a lot smaller than the minimum lot size permitted on the land immediately before the land became, or became part of, an urban release area, unless the Director-General has certified in writing to the consent authority that satisfactory arrangements have been made to contribute to the provision of designated State public infrastructure in relation to that lot.
(3) Subclause (2) does not apply to—
(a) any lot identified in the certificate as a residue lot, or
(b) any lot to be created by a subdivision of land that was the subject of a previous development consent granted in accordance with this clause, or
(c) any lot that is proposed in the development application to be reserved or dedicated for public open space, public roads, public utility undertakings, educational facilities or any other public purpose, or
(d) a subdivision for the purpose only of rectifying an encroachment on any existing lot.
(4) This clause does not apply to land in an urban release area if all or any part of the land is in a region within the meaning of the Act, Division 7.1, Subdivision 4.
(a) to ensure that earthworks for which development consent is required will not have a detrimental impact on environmental functions and processes, neighbouring uses, cultural or heritage items or features of the surrounding land,
(b) to allow earthworks of a minor nature without separate development consent.
(2) Development consent is required for earthworks unless—
(a) the work does not alter the ground level (existing) by more than 600 millimetres, or
(b) the work is exempt development under this Plan or another applicable environmental planning instrument, or
(c) the work is ancillary to other development for which development consent has been given.
(3) Before granting development consent for earthworks, the consent authority must consider the following matters—
(a) the likely disruption of, or any detrimental effect on, existing drainage patterns and soil stability in the locality,
(b) the effect of the proposed development on the likely future use or redevelopment of the land,
(c) the quality of the fill or the soil to be excavated, or both,
(d) the effect of the proposed development on the existing and likely amenity of adjoining properties,
(e) the source of any fill material and the destination of any excavated material,
(f) the likelihood of disturbing relics,
(g) the proximity to and potential for adverse impacts on any watercourse, drinking water catchment or environmentally sensitive area.
Use of certain land at Willowbank Road, East Albury
4A Use of certain land at Willowbank Road, East Albury
4A Use of certain land at Willowbank Road, East Albury
(1) This clause applies to land at Willowbank Road, East Albury, being Part Lot 2, DP 999814 and Part Lot 37, DP 1007315 and identified as “4A” on the Additional Permitted Uses Map.
(2) Development for the purpose of general industries or agricultural produce industries is permitted with development consent.
6A
Use of certain land at 481 Urana Road, Lavington
6A Use of certain land at 481 Urana Road, Lavington
6A Use of certain land at 481 Urana Road, Lavington
(1) This clause applies to land at 481 Urana Road, Lavington, being Lot 3, SP 41799.
(2) Development for the purposes of a service station is permitted with development consent.
8
Use of certain land at 997–1009 Mate Street, North Albury
8 Use of certain land at 997–1009 Mate Street, North Albury
8 Use of certain land at 997–1009 Mate Street, North Albury
(1) This clause applies to land at 997–1009 Mate Street, North Albury, being Lot 261, DP 22813.
(2) Development for any of the following purposes is permitted with development consent—
(a) service stations,
(b) food and drink premises,
(c) shops.
9
Use of certain land at 545 Union Road, North Albury
9 Use of certain land at 545 Union Road, North Albury
9 Use of certain land at 545 Union Road, North Albury
(1) This clause applies to land at 545 Union Road, North Albury, being Lot 4, DP 776810.
(2) Development for any of the following purposes is permitted with development consent—
(a) service stations,
(b) food and drink premises,
(c) shops.
10
Use of certain land at 1001 Waugh Road, North Albury
10 Use of certain land at 1001 Waugh Road, North Albury
10 Use of certain land at 1001 Waugh Road, North Albury
(1) This clause applies to land at 1001 Waugh Road, North Albury, being Lot 4, DP 771722.
(2) Development for the purpose of business premises is permitted with development consent.
11
Use of certain land at 482 Hovell Street, South Albury
11 Use of certain land at 482 Hovell Street, South Albury
11 Use of certain land at 482 Hovell Street, South Albury
(1) This clause applies to land at 482 Hovell Street, South Albury, being Lot 11, DP 1067319 and identified as “11” on the Additional Permitted Uses Map.
(2) Development for the purpose of industrial retail outlets is permitted with development consent.
11A
Use of certain land at Wodonga Place, South Albury
11A Use of certain land at Wodonga Place, South Albury
11A Use of certain land at Wodonga Place, South Albury
(1) This clause applies to following land at South Albury—
(a) part of Lot 1, DP 1087117, Wodonga Place,
(b) part of Lot 4120, DP 1087043, being part of 317 Wodonga Place,
(2) Development for any of the following purposes is permitted with development consent—
(a) business premises,
(b) office premises,
(c) function centres,
(d) food and drink premises,
(e) shops.
12
Use of certain land at 330 Kaitlers Road, Springdale Heights
12 Use of certain land at 330 Kaitlers Road, Springdale Heights
12 Use of certain land at 330 Kaitlers Road, Springdale Heights
(1) This clause applies to land at 330 Kaitlers Road, Springdale Heights, being Lot 1969, DP 629850.
(2) Development for the purpose of pubs is permitted with development consent.
13
Use of certain land at 338 Kaitlers Road, Springdale Heights
13 Use of certain land at 338 Kaitlers Road, Springdale Heights
13 Use of certain land at 338 Kaitlers Road, Springdale Heights
(1) This clause applies to land at 338 Kaitlers Road, Springdale Heights, being Lots 2, 3 and 4, DP 861754.
(2) Development for any of the following purposes is permitted with development consent—
(a) business premises,
(b) food and drink premises,
(c) shops.
14
Use of certain land at 634 Gerogery Road and 149 Marnie Road, Table Top
14 Use of certain land at 634 Gerogery Road and 149 Marnie Road, Table Top
14 Use of certain land at 634 Gerogery Road and 149 Marnie Road, Table Top
(1) This clause applies to land at 634 Gerogery Road and 149 Marnie Road, Table Top, being Lot 503, DP 588266 and Lot 2, DP 854316.
(2) Development for the purpose of rural industries is permitted with development consent.
15
Use of certain land at 208 Winchester Lane, Table Top
15 Use of certain land at 208 Winchester Lane, Table Top
15 Use of certain land at 208 Winchester Lane, Table Top
(1) This clause applies to land at 208 Winchester Lane, Table Top, being Lot 2, DP 101841 and Lot 3, DP 233061.
(2) Development for the purpose of extractive industries is permitted with development consent.
16
Use of certain land at 5 Kinross Court, Thurgoona
16 Use of certain land at 5 Kinross Court, Thurgoona
16 Use of certain land at 5 Kinross Court, Thurgoona
(1) This clause applies to land at 5 Kinross Court, Thurgoona, being Lot 581, DP 785549.
(2) Development for the purpose of pubs is permitted with development consent.
17
Use of certain land at 1033 Padman Drive, West Albury
17 Use of certain land at 1033 Padman Drive, West Albury
17 Use of certain land at 1033 Padman Drive, West Albury
(1) This clause applies to land at 1033 Padman Drive, West Albury, being Lot 6, DP 243742 and identified as “17” on the Additional Permitted Uses Map.
(2) Development for the purpose of garden centres, landscaping material supplies and plant nurseries is permitted with development consent.
18
Use of certain land for food and drink premises and shops
18 Use of certain land for food and drink premises and shops
18 Use of certain land for food and drink premises and shops
(1) Development for the purposes of pubs and restaurants or cafes is permitted with development consent on land identified as “Area 18” on the Additional Permitted Uses Map.
(2) Development for the purposes of food and drink premises is permitted with development consent on land identified as “Area 19” on the Additional Permitted Uses Map.
(3) Development for the purposes of shops is permitted with development consent on land identified as “Area 20” on the Additional Permitted Uses Map.
Exempt development may be carried out without the need for development consent under the Act. Such development is not exempt from any approval, licence, permit or authority that is required under any other Act and adjoining owners’ property rights and the common law still apply.
sch.2-sec Fuel tanks in Zone RU1 Primary Production
Fuel tanks in Zone RU1 Primary Production
(1) Must be located above ground.
(2) Must be less than 6m above ground level (existing).
(3) Must not be used for commercial or industrial activities unless ancillary to primary lawful land use.
(4) Must not have a capacity more than 5,000L.
(5) Must be constructed of prefabricated materials, freestanding and not rely on other structures for support.
(6) Must be located at least 30m from each lot boundary.
(7) Must be located at least 100m from a classified road.
(8) Must be located at least 40m from a river (inclusive of watercourses, tributary, branch or other watercourse).
(9) Must not be located on a ridgeline or in a visually prominent location.
(10) Must comply with AS 1940—2004, The storage and handling of flammable and combustible liquids.
(11) Must not be located within bush fire prone land.
sch.2-sec-oc.2
Signage in Zone E2—above awning signs
sch.2-sec-oc.2 Signage in Zone E2—above awning signs
Signage in Zone E2—above awning signs
(1) Must not cover windows or doors above awning level.
(2) Must be non-illuminated.
(3) Must not cover more than 50% of the above awning building face.
(4) Must be centred on the wall.
(5) Must not be located on or in, or in relation to, a heritage item or draft heritage item.
(6) Maximum number—1 per lot.
(7) Maximum projection—100mm.
sch.2-sec-oc.3
Signage—bracket signs
sch.2-sec-oc.3 Signage—bracket signs
Signage—bracket signs
(1) Maximum number—1 per lot.
(2) Maximum dimensions—0.6m long and 0.3m wide.
(3) Must be at least 2.7m above ground level (existing).
(4) Must be located less than 3m above ground level (existing) or must be below fascia, whichever is the lesser.
(5) Maximum projection—300mm.
sch.2-sec-oc.4
Signage—drop awning signs
sch.2-sec-oc.4 Signage—drop awning signs
Signage—drop awning signs
(1) Must not cover more than 50% of the blind.
(2) Must be a sign that is painted onto, fixed flush to or part of a roll down blind, which is secured to an awning.
(3) Must be non-illuminated.
sch.2-sec-oc.5
Signage—fascia signs
sch.2-sec-oc.5 Signage—fascia signs
Signage—fascia signs
(1) Must be painted onto or attached to the fascia or return of an awning and not exceed the height of the fascia or return.
(2) Must be non-illuminated.
(3) Must not extend more than 100mm from the fascia or return end of the awning.
sch.2-sec-oc.6
Signage—wall signs
sch.2-sec-oc.6 Signage—wall signs
Signage—wall signs
(1) Must be attached to the wall of a building (other than the transom of a doorway or display window).
(2) Must not cover more than 50% of the wall surface.
(3) The upper and lower 1m of the wall must be free of signage.
(4) Maximum number in residential and conservation zones—1 per lot.
(5) Maximum number in rural, employment, mixed use and recreational zones—2 per lot.
sch.2-sec-oc.7
Signage—real estate signs
sch.2-sec-oc.7 Signage—real estate signs
Signage—real estate signs
(1) Must be non-illuminated.
(2) Must be removed within 14 days of sale or lease.
(3) If advertising an entire estate or complex, must be removed at sale or lease of 90% of lots or tenancies, or within 5 years, whichever occurs first.
(4) Maximum number—2 per lot.
(5) Maximum area for a residential site—3m2.
(6) Maximum area for a business or industrial site—5m2.
sch.2-sec-oc.8
Signage—top hamper signs
sch.2-sec-oc.8 Signage—top hamper signs
Signage—top hamper signs
(1) Must be attached to the transom of a doorway or display window.
(2) Maximum number—2 per frontage.
(3) Must not extend below the head of the doorway or window to which it is attached.
(4) Must be non-illuminated.
sch.2-sec-oc.9
Signage—under awning signs
sch.2-sec-oc.9 Signage—under awning signs
Signage—under awning signs
(1) Must not project beyond awning edge.
(2) Must be at least 2.7m above ground level (existing).
(3) Maximum number—1 per lot.
sch.2-sec-oc.10
Signage—window signs
sch.2-sec-oc.10 Signage—window signs
Signage—window signs
(1) Must be painted or displayed on the interior or exterior of the window.
(2) Must not occupy more than 50% of the window surface.
This Plan is Albury Local Environmental Plan 2010.
1 Commencement
1 Commencement
1.1AA Commencement
This Plan commences on the day on which it is published on the NSW legislation website.
1 Aims of Plan
1 Aims of Plan
1.2 Aims of Plan
(1) This Plan aims to make local environmental planning provisions for land in Albury in accordance with the relevant standard environmental planning instrument under section 3.20 of the Act.
(2) The particular aims of this Plan are as follows—
(aa) to protect and promote the use and development of land for arts and cultural activity, including music and other performance arts,
(a) to give effect to the desired outcomes, principles and actions contained in the Council’s adopted strategies and policy documents, and
(b) to promote sustainable urban development by providing for efficient management of urban growth and resource utilisation, and
(c) to promote a city for the people, with a high level of social and physical amenity and a diversity of activities and uses, and
(d) to maintain or improve biodiversity across Albury, and to avoid significant impacts on matters of environmental significance.
The Dictionary at the end of this Plan defines words and expressions for the purposes of this Plan.
1 Notes
1 Notes
Creates tailored local controls and overlays in Part 7 (Additional local provisions) and Part 6 (urban release areas): heritage requirements (cl 5.10; Schedule 5 lists items and conservation areas), riverfront controls (cl 7.5), landfill buffer considerations (cl 7.7), airspace and airport noise matters (cls 7.8-7.9), site‑specific provisions for Willowbank Road and the Albury Regional Jobs Precinct (cls 7.11-7.15), and urban release infrastructure and staging controls (Part 6, cls 6.1-6.4).
Provides procedural and practical exceptions: suspension of private covenants to the extent necessary to enable development under the Plan (cl 1.9A), and an exceptions mechanism allowing departure from development standards subject to comparative planning grounds and prohibited exceptions (cl 4.6).
The Plan states its policy aims (cl 1.2): to make local environmental planning provisions for Albury in accordance with the standard instrument; to protect and promote arts and cultural activity; to give effect to council strategies; to promote sustainable urban development; to promote social and physical amenity and diversity of uses; and to maintain or improve biodiversity. Those aims are explicitly descriptive; the operative effect is the regulatory architecture summarised above (see cls 1.2, 2.3, Part 4, Part 7 and Schedules).
Key statutory decision‑makers are named: the Council is the consent authority for the purposes of the Plan, subject to the Environmental Planning and Assessment Act (cl 1.6). Where acquisition of reserved land is owner‑initiated the Plan specifies the State acquiring authorities for particular reservation types (cl 5.1).
Readers should treat the Plan as the spatial and use‑specific rulebook for development in Albury, implemented via maps and the Land Use Table, supplemented by the schedules and by the Act and State environmental planning policies that prevail where stated (cl 1.9(1)). The Plan embeds a number of localised, quantifiable constraints (minimum lot sizes, maximum gross floor areas for certain uses, signage dimensions in Schedule 2, time limits for temporary uses) and process controls that will shape who can develop what, where, and under what conditions.
Main concepts
The Plan organises regulation around a small set of recurring legal instruments and spatial tools. Understanding these concepts is essential for operational compliance.
Zones and the Land Use Table (cls 2.1-2.3)
Zoning is the primary legal device. The Plan lists standard zones (R, RU, E, MU, SP, RE, C, W) and identifies the zone for each parcel via the Land Zoning Map (cl 2.1, cl 2.2). The Land Use Table in Pt 2 sets objectives for each zone and maps uses into three legal categories: permitted without consent, permitted only with consent, and prohibited (cl 2.3(1)). The consent authority must have regard to zone objectives when determining DAs (cl 2.3(2)).
Maps as operative controls (cl 1.7)
Named maps (Lot Size Map, Height of Buildings Map, Floor Space Ratio Map, Heritage Map, Key Sites Map, Natural Resources Sensitivity,Water Map and others) are adopted by the Plan and may be amended or replaced in accordance with plan‑making rules; they are kept for public access (cl 1.7). Numeric controls (minimum lot sizes, height, FSR) derive from these maps (cls 4.1, 4.3, 4.4).
Consent architecture: exempt, complying, and development consent (Pt 3; cls 2.6-2.8)
Exempt development is limited to items in Schedule 2 and must meet the Schedule’s standards and the Building Code of Australia requirements (cl 3.1). Exempt and complying development are excluded from certain environmentally sensitive areas (cl 3.3). Complying development is set out in Schedule 3 and must be permissible with consent in the zone, meet the Building Code requirements, and any local conditions (cl 3.2).
Development standards and flexibilities (Part 4)
Minimum lot size, strata and community title rules, special exceptions for specific zones (cls 4.1-4.2C), height limits (cl 4.3), and floor space ratios and calculation rules (cls 4.4-4.5) are the primary standards. Clause 4.6 permits departures from development standards where the applicant demonstrates compliance would be unreasonable or unnecessary and there are adequate environmental planning grounds, but lists particular standards and clauses that cannot be varied under this clause (cl 4.6(3), (8)).
Local overlays and special provisions (Part 7 and Part 6)
Part 7 contains locally targeted controls: earthworks thresholds and assessment matters (cl 7.1), riparian and groundwater protections (cls 7.2, 7.12), river front area restrictions (cl 7.5), landfill buffer considerations (cl 7.7), airport obstacle limitation consultation (cl 7.8), and noise/ANEF considerations (cl 7.9). Part 6 creates procedural requirements for urban release areas including development control plans, infrastructure certification, and staging (cls 6.1-6.4).
Heritage and cultural‑heritage safeguards (cl 5.10; Schedule 5)
The Plan requires development consent for demolition or altering heritage items and specifies when heritage management documents or conservation management plans may be required; it mandates notice to the Heritage Council or local Aboriginal communities in certain scenarios (cl 5.10(2)-(9)). Schedule 5 lists heritage items and conservation areas and identifies State and Local items.
Suspension of private instruments (cl 1.9A)
The Plan can render private covenants, agreements or similar instruments inoperative to the extent necessary for carrying out development in accordance with the Plan, subject to a list of exclusions. The clause expressly preserves rights or interests of public authorities under registered instruments and excludes covenants imposed or required by Council, Crown Land instruments and several specific conservation instruments (cl 1.9A(1)-(3)).
Operational and administrative rules (schedules and technical conditions)
Schedules set detailed, measurable standards: exempt development conditions (Schedule 2: fuel tanks, signage), complying development reference to State SEPP conditions (Schedule 3), additional permitted uses (Schedule 1), and aquaculture site/operational rules (Schedule 6). Where a Schedule sets a metric (e.g. 52 days for temporary use, cl 2.8(2); signage dimensions, Sch 2), those numbers translate to clear compliance thresholds.
Interactions with State policy (cl 1.9)
The Plan is subject to State environmental planning policies (SEPPs) that prevail under s 3.28 of the Act; the Plan lists SEPPs that may be relevant (Land Use Table notes and cl 1.9). Where a SEPP prevails it will displace inconsistent local provisions.
Decision‑makers and acquisition authorities
The Council is the consent authority unless otherwise provided (cl 1.6). Clause 5.1 specifies the State authority to acquire reserved land under owner‑initiated acquisition provisions for certain reservation types.
Together these concepts establish a layered decision framework: maps and zones set the starting legal position, schedules and clauses provide detailed numerical and locational constraints, the consent authority applies the planning tests and statutory consultation triggers, and the Plan contains limited avenues for flexibility and exceptions with records required (cl 4.6(4)). The Plan repeatedly anchors assessment to local objectives and site‑specific matters (zone objectives, heritage impacts, environmental sensitivity, and infrastructure staging in urban release areas).
Who it affects
The Plan distributes regulatory rights, duties and costs across a set of identifiable stakeholder groups. Those affected include:
Landowners and developers
All owners of land within the mapped area are subject to the zoning and mapped numerical controls (cl 2.2, cl 4.1-4.4). Owners must obtain development consent for subdivision (cl 2.6), demolition (cl 2.7), many forms of development specified as "permitted with consent" in the Land Use Table (cl 2.3(1)(b)-(c)), and for earthworks above 600 mm (cl 7.1(2)). Developers proposing departures from development standards must prepare the environmental planning grounds required by cl 4.6(3) and be aware of the list of standards that cannot be varied under cl 4.6(8).
Owners who have made development applications before the Plan (or certain amendments) commenced have transitional protections: such DAs "must be determined as if this Plan had not commenced" (cl 1.8A(1)), and specific amendments are explicitly non‑applicable to pre‑existing DAs (cl 1.8A(2)-(3)).
Council (consent authority) and other public authorities
The Council is named as the consent authority for the Plan (cl 1.6). Council decisions on DAs must have regard to zone objectives (cl 2.3(2)), consider specified matters in many clauses (e.g. cl 7.1(3) earthworks, cl 5.19 aquaculture, cl 5.21 flood planning, cl 7.7 landfill buffer), and keep records of assessments when exercising the flexibility in cl 4.6(4). Clause 5.1 prescribes different State authorities as the relevant acquisition authorities for owner‑initiated acquisition in respect of particular reserved land types; the Council is listed for "Local open space" in Zone RE1 (cl 5.1(2) table).
Holders of private covenants and beneficiaries under agreements
Clause 1.9A can, to the extent necessary, suspend covenants, agreements or other instruments that restrict development to enable development in accordance with the Plan, subject to enumerated exceptions (cl 1.9A(1)-(3)). Owners and covenant beneficiaries must therefore account for a statutory override to private restrictions in some circumstances; certain covenants (Council‑imposed, Crown Land instruments, conservation agreements, biobanking, planning agreements) remain enforceable (cl 1.9A(2)).
Heritage interests and Aboriginal communities
Owners of heritage items or land in heritage conservation areas face explicit consent requirements for demolition, exterior alteration or excavation that may affect relics or Aboriginal objects; the consent authority must notify and consider responses from the Heritage Council for certain archaeological and State heritage items (cl 5.10(2), (7)-(9)). Local Aboriginal communities must be notified and consulted where development is in an Aboriginal place of heritage significance (cl 5.10(8)).
Operators of licensed premises and live entertainment venues
The Plan restricts grounds on which consent can be refused for licensed premises with respect to music, dancing and related features; the consent authority cannot refuse consent on those grounds provided noise can be managed to an acceptable level (cl 5.20(1)-(2)). Licencees and applicants for premises servicing alcohol should thus consider cl 5.20 when preparing noise management strategies and DA materials.
Infrastructure providers and the State
The Plan imposes infrastructure conditions in urban release areas: subdivision creating smaller lots may require certification from the Director‑General that satisfactory arrangements exist for designated State public infrastructure (cl 6.1(2)-(3)); Council must be satisfied essential public utility infrastructure is or will be available for development in urban release areas (cl 6.2). The State remains involved where acquisition or airport airspace approvals are required: the Plan obliges consultation with the relevant Commonwealth body for Obstacle Limitation Surface penetrations (cl 7.8).
Operators of particular industries and agricultural activities
Intensive livestock agriculture is subject to industry‑specific assessment matters (cl 5.18(3)) and small capacity thresholds are specified below which consent is not required subject to siting limits (cl 5.18(4)-(5)). Aquaculture (pond, tank, oyster) is governed by cl 5.19 and Schedule 6 which set site and operational requirements (cl 5.19(2)-(6); Sch 6 Part 1 & 2).
Neighbouring landholders and the community
Many clauses require explicit consideration of impacts on adjoining land and amenity (e.g. cl 2.4 unzoned land consent test, cl 2.8 temporary use cl 2.8(3)(b), cl 7.1(3)(d) for earthworks, cl 7.5(3)(c) for riverfront development, cl 7.7 landfill buffer area). This places on applicants the practical requirement to address amenity, environmental and hazard impacts that affect neighbours.
Who pays and who decides
Costs fall primarily on applicants and landowners: preparing statements of environmental effects, heritage management documents, specialist studies (noise, flood, groundwater), and meeting schedule standards (e.g. Sch 2 signage, Sch 6 aquaculture). The Council and, where specified, State agencies make the decisions (cl 1.6, cls 6.1(2), 7.8(2)-(4)). Where State infrastructure certification is required the Director‑General or specified State authorities must provide written certification before certain subdivisions are approved (cl 6.1(2)-(3)).
The Plan therefore places procedural burdens and substantive use limits on a wide set of private actors while creating explicit roles for the Council and certain State bodies. The instrument is spatially precise and granular in many respects, with detailed schedules that convert policy aims into specific thresholds and locational prohibitions.
Key duties and rights
This section identifies the principal legal duties the Plan imposes and the principal entitlements or options it creates, with section citations.
Duties to obtain development consent
Subdivision: No subdivision is permitted except with development consent (cl 2.6(1)). Secondary dwelling related subdivision restrictions (cl 2.6(2)). Special rules for strata/community title subdivisions are provided (cls 4.1AA, 4.2A).
Demolition: Demolition of a building or work requires development consent (cl 2.7).
Earthworks: Earthworks that alter ground level by more than 600 mm require development consent (cl 7.1(2)).
Heritage‑affecting works: Demolition, moving, exterior alteration of a heritage item or a building in a heritage conservation area requires consent; excavation that may expose relics requires consent (cl 5.10(2)).
Conversion of fire alarm monitoring: Converting a fire alarm monitoring arrangement requires development consent (cl 5.8(2)). Certain conversions may be complying development if limited to internal works or mounting a small antenna and subject to time‑of‑work restrictions (cl 5.8(3)-(4)).
Intensive livestock agriculture and aquaculture: If these uses are permitted only with consent in a zone, the applicant must satisfy the consent authority on the environmental and amenity matters set out in cl 5.18(3) and cl 5.19(2); thresholds exist under cl 5.18(4)-(5) where consent is not required subject to distance and location limits.
Procedural duties on the consent authority (Council)
Regard to zone objectives: The consent authority must have regard to objectives for development in the zone when deciding DAs (cl 2.3(2)).
Record keeping for exceptions: If the authority exercises discretion under cl 4.6 it must keep a record of its assessment (cl 4.6(4)). The authority must not grant consent under cl 4.6 to contravene certain specified standards (cl 4.6(8)).
Heritage consultation and notification: For archaeological sites and State heritage items the consent authority must notify and consider responses from the Heritage Council where relevant (cl 5.10(7), (9)). For Aboriginal places of heritage significance the authority must consult local Aboriginal communities and consider responses (cl 5.10(8)).
Airport/airspace consultation: Where proposed development may penetrate the Albury Airport Obstacle Limitation Surface, the consent authority must consult the relevant Commonwealth body and may only grant consent if the body has no objection (cl 7.8(2)-(4)).
Flooding and climate change: For land in the flood planning area the consent authority must be satisfied that development is compatible with flood function, will not adversely affect flood behaviour elsewhere, and incorporates measures to manage risk to life (cl 5.21(2)).
Rights and entitlements for applicants and landowners
Permitted without consent uses: Certain low‑impact uses are permitted without development consent where specified in the Land Use Table and subject to Part 5 environmental assessment and approval requirements (cl 2.3(1)(b); note after cl 2.3 clarifies Part 5 requirements).
Exempt and complying development pathways: Schedule 2 lists exempt development (cl 3.1), and Schedule 3 identifies complying development where applicable (cl 3.2). Exempt development still must meet Building Code and other statutory requirements (cl 3.1(3)(a), (5)).
Exceptions to standards: Applicants can seek consent to contravene development standards under cl 4.6 if they demonstrate compliance is unreasonable or unnecessary and provide sufficient environmental planning grounds; the consent authority must record the assessment (cl 4.6(2)-(4)).
Suspension of covenants: Where private agreements or covenants restrict development inconsistent with the Plan, those instruments do not apply to the extent necessary to enable development in accordance with the Plan (cl 1.9A(1)), subject to specified exclusions (cl 1.9A(2)). This creates an entitlement to proceed with Plan‑consistent development despite some private restrictions.
Specific quantitative duties or caps
Temporary use cap: Temporary use may be permitted for up to 52 days in any 12‑month period (cl 2.8(2)), with exception for dwellings used as sales offices (cl 2.8(4)).
Minimum lot sizes and exceptions: Minimum lot sizes from the Lot Size Map are binding (cl 4.1(3)), but cls 4.1A, 4.1B, 4.1C, 4.1D create controlled exceptions for specified zones, split lots, or dual occupancies, some with numeric minima (for example cl 4.1A(3) allows two lots not less than 300m2 where certain conditions are met).
Signage and exempt development metrics: Schedule 2 sets specific ceilings (e.g. kiosk 10m2, neighbourhood shop 100m2, neighbourhood supermarket 1,000m2, fascia/bracket dimensions, fuel tank capacity 5,000L in RU1 subject to siting and AS 1940, Sch 2 provisions).
Constraints on refusal grounds and assessment
Music and licensed premises: The consent authority is prohibited from refusing consent to development in relation to licensed premises on the grounds listed in cl 5.20(1) (music genre, live or amplified, presence of dance floor, etc.) and cannot refuse on grounds of noise caused by playing or performance of music if satisfied the noise may be managed to an acceptable level (cl 5.20(2)).
Rights preserved for public authorities and exceptions
The suspension of private instruments does not affect rights or interests of any public authority under any registered instrument (cl 1.9A(3)). Clause 1.9A was approved by the Governor under s 3.16 of the Act prior to making (cl 1.9A(4)).
Recordable and enforceable instruments
Consent conditions can require registration of covenants to prevent "double dipping" in floor space calculations (cl 4.5(9)-(10)). Also, Schedule and clause conditions will attach to complying development certificates (cl 3.2(4); sch.3 general conditions referring to SEPP 2008 Schedule 6).
In short, duties are a mix of procedural obligations for Council (notification, consultation, assessment record‑keeping) and substantive obligations on applicants and landowners to meet mapped controls, obtain consents where required, and address a range of environmental, heritage, amenity and hazard matters specified across the Plan. The Plan also grants rights: permitted uses, pathways for exempt/compliant development, and an avenue to seek exceptions to standards where robust environmental planning grounds exist.
Penalties and enforcement
The Plan itself does not set out a discrete schedule of fines or criminal penalties. Enforcement and sanctioning mechanisms for non‑compliance with the Plan sit within the broader framework of the Environmental Planning and Assessment Act 1979 and related regulations and are therefore not restated in the text of the Plan. However the Plan creates a set of enforceable legal requirements and conducts that will trigger compliance actions under the Act and associated instruments.
How enforcement is signalled in the Plan
Development requiring consent: The Plan converts many activities that would otherwise be undertaken by landowners into activities requiring development consent (e.g. subdivision cl 2.6, demolition cl 2.7, earthworks cl 7.1, heritage works cl 5.10). Undertaking those activities without consent places the actor outside the lawful planning regime and therefore within the enforcement scope of the Act.
Consent conditions and covenants: The Plan expressly permits consent conditions that require registration of covenants to prevent duplication of floor area or to record other development limitations (cl 4.5(9)-(10)). Breach of a condition attached to development consent is typically enforced under the Act by penalty notices, orders, or injunctions, even though the Plan does not restate those sanctions.
Heritage and Aboriginal heritage protections: The Plan makes consent mandatory for demolition and similar works affecting heritage items and archaeological sites (cl 5.10(2)). Non‑compliant works affecting heritage may be subject to enforcement action under the Act and the Heritage Act, with notification and consultation requirements explicit in the Plan (cl 5.10(7)-(9)).
Operational enforcement mechanisms (by implication and through referenced laws)
The Plan cross‑references the Building Code of Australia and other Acts: exempt development must still comply with the Building Code (cl 3.1(3)(a)). Where the Plan refers to matters under other statutes (e.g. Native Vegetation Act 2003 in cl 3.1(5), Rural Fires Act 1997 in cl 5.11), non‑compliance with those statutory duties attracts the enforcement mechanisms in those Acts.
Public authorities retain rights and registered instruments are protected: the suspension of private covenants under cl 1.9A expressly preserves rights and interests of public authorities under registered instruments (cl 1.9A(3)). That limits certain enforcement avenues where public interests are recorded.
Practical enforcement consequences for practitioners
Council will be the front line for compliance checks because it is the consent authority (cl 1.6). It holds the discretion to refuse or impose conditions, to require management plans or heritage documents (cl 5.10(5)-(6)), and to impose conditions,for example to manage aquaculture siting and operations per cl 5.19 and Schedule 6.
Failure to satisfy local thresholds (e.g. exceeding signage dimensions in Sch 2, erecting a fuel tank beyond Sch 2 limits, or constructing on river front areas contrary to cl 7.5) will not be lawful and will expose the party to enforcement actions available under the Act and related instruments.
Limits in the Plan on refusing or imposing conditions
The Plan constrains refusal grounds in discrete areas: for licensed premises the consent authority must not refuse on specified music and dancing grounds if noise can be managed (cl 5.20). That limits one avenue of enforcement for neighbours opposed to certain entertainment activity; however, noise management and relevant statutory nuisance frameworks remain available if amenity thresholds are exceeded.
In summary, while the Plan does not specify penalties in its text, it creates a structured set of development controls, duties to obtain consent, and procedural obligations that, if breached, engage the enforcement machinery under the Environmental Planning and Assessment Act and related statutes referenced in the Plan. Practitioners should therefore plan for enforcement risk when proposing development that triggers consent conditions, environmental or heritage controls, mapped restrictions, or other Plan obligations.
How it interacts with other laws
The Plan is designed to operate within the broader statutory environment. It explicitly references and preserves the primacy of State policies and other legislation where applicable, and it imports many operational duties by cross‑reference.
Primacy of State environmental planning policies and the Act
The Plan is subject to any State environmental planning policy that prevails under section 3.28 of the Environmental Planning and Assessment Act 1979 (cl 1.9(1)). The Land Use Table and many notes expressly identify SEPPs (for example SEPP (Housing) 2021, SEPPs on Transport and Infrastructure, Resources and Energy, Resilience and Hazards, Industry and Employment, Primary Production , see Land Use Table notes). Where a SEPP is inconsistent with a local provision the SEPP will prevail as provided by the Act.
Cross‑reference to other Acts and provisions
The Plan cross‑references and interacts with a number of other Acts; these references either import duties or limit local application:
Crown and Crown land instruments: the suspension of covenants excludes relevant instruments within the meaning of s 13.4 of the Crown Land Management Act 2016 (cl 1.9A(2)(b)), and the Plan preserves public authorities' rights under registered instruments (cl 1.9A(3)).
Heritage Act 1977: State heritage lists and interim heritage orders remain relevant; cl 3.1(3)(d) excludes exempt development on State Heritage Register items; cl 5.10 interacts closely with the Heritage Act and requires notification to the Heritage Council in some cases (cl 5.10(7), (9)).
Local Government Act 1993: cl 5.2 enables the Council to classify or reclassify public land under that Act, and several notes explain how Plan classification interacts with Local Government Act mechanisms (cl 5.2(1)-(3)).
Land Acquisition (Just Terms Compensation) Act 1991: cl 5.1 identifies the relevant State authorities for owner‑initiated acquisitions and notes Section 23 of the Land Acquisition Act in the event of hardship (cl 5.1(1) note).
Rural Fires Act 1997: bush fire hazard reduction work authorised by that Act may be carried out without consent (cl 5.11).
Fisheries Management Act 1994, Biodiversity Conservation Act 2016, Marine Estate Management Act 2014: these Acts are referenced in aquaculture and environmentally sensitive area provisions (cl 3.3, cl 5.19, Sch 6).
Building Code of Australia: exempt and complying development must meet BCA deemed‑to‑satisfy provisions (cl 3.1(3)(a); cl 3.2(3)(b)).
Limits on local variation to State standards
Clause 4.6 allows departures from development standards but lists development standards and clauses that cannot be contravened through cl 4.6, including standards for complying development, BASIX commitments, clause 5.4, clause 5.5, and specific clauses like 4.1A, 4.2A, 6.1 and 7.5 (cl 4.6(8)). This both imports State policy limits and restricts local discretion.
Overlap with SEPPs covering exempt/complying development
The Plan’s Schedule 2 and Schedule 3 are explicitly supplementary to the State SEPP that defines exempt and complying development (cl 3.1 note; sch notes). Schedule 3 refers DCP conditions to Schedule 6 of SEPP (Exempt & Complying Development Codes) 2008 where applicable (sch.3 sec). Practitioners must therefore read both the LEP schedules and the relevant SEPP.
Interaction with environmental regulation and natural resource laws
Provisions targeting waterways, riparian land and groundwater require the consent authority to consider impacts in ways consistent with other environmental statutes and policy: cl 7.2 (Water) requires consideration of water quality, flow regime and groundwater; cl 5.21 (Flood planning) cross‑references the Considering Flooding in Land Use Planning Guideline and the NSW Flood Risk Management Manual; cl 7.12 imposes groundwater considerations for Willowbank Road.
Restrictions on aquaculture reference the Fisheries Management Act and require compliance with aquaculture industry development plans and the NSW Oyster Industry Sustainable Aquaculture Strategy where relevant (cl 5.19).
Airport and Commonwealth law interface
Airspace matters are routed to the relevant Commonwealth body; the consent authority must consult and is bound by the Commonwealth body’s advice on Obstacle Limitation Surface penetrations (cl 7.8(2)-(4)). Airport noise assessment is tied to ANEF contours and Australian Standard AS 2021,2000 (cl 7.9(2)(b)-(c)).
Effect on private instruments
Clause 1.9A permits the Plan to override private covenants to the extent needed to enable Plan‑consistent development, but excludes covenants imposed by Council, Crown Land instruments, conservation agreements, biobanking agreements and planning agreements (cl 1.9A(1)-(2)). This statutory override modifies the legal effect of private instruments in the planning context but preserves public authority interests (cl 1.9A(3)).
In sum, the Plan is not a stand‑alone statute: it validates and enforces local spatial planning decisions while operating alongside SEPPs, building code obligations, heritage laws, environmental and natural resource statutes, and Commonwealth aviation regulation. Users must read the LEP in conjunction with the Act and the listed external instruments because the Plan both imports duties from, and is constrained by, those other laws (cl 1.9, cl 3.1 notes, cl 4.6(8)).
Amendment history
The Plan carries an explicit record of amendments as annotations to many clauses and schedules. The instrument itself contains embedded amendment citations; the following summarises the amendment pattern visible in the text and highlights notable changes recorded in clause notes.
Temporal and instrumented amendments (as annotated)
Early and recurring amendments in 2011: Many inserted clauses and updates trace to 2011 (for example cl 1.9A was amended 2011 (363), Sch 1[1]; cl 3.3 amended 2011 (363), Sch 1[38]; general schedule amendments sch 1, sch 2). The amendment notes appended to clauses frequently cite 2011 instruments (e.g. cl 4.5, cl 5.4).
Subsequent amendments through the 2010s and early 2020s: The recorded amendment notes show updates in 2012, 2014, 2015, 2016, 2017, 2018, 2019 and 2021, 2022, 2023, 2024 and 2025. For example:
Clause 4.1A (exceptions to minimum lot sizes) was amended in 2016 (2016 (469), Sch 1) and again in 2022 (2022 (828), Sch 1.1[5]).
Part 6 and infrastructure provisions were amended in 2019 and 2023, including certification requirements and other updates (cl 6.1 amended 2019 (621), Sch 5[5]; 2023 (554), Sch 1).
Clause 7.11 and 7.12 (Willowbank Road site controls and groundwater) were inserted in 2018 (2018 (265), Sch 1[1]).
Clause 7.15 (Albury Regional Jobs Precinct controls) was inserted by an amendment noted as 2023 (696), Sch 1[6].
Clause 1.8A (savings provision) records amendments by 2019 (621), 2023 (696) and 2025 (597).
Clauses 4.1C and 4.1D establishing minimum lot size and subdivision lot size rules for dual occupancies in Zone R2 were inserted by 2025 (597), Sch 1[2].
The Land Use Table and zone lists have multiple amendment annotations across years including 2011, 2014, 2017, 2018, 2019, 2021, 2022, 2023 and 2024 (Land Use Table note at the end records a sequence of amendment instruments).
Notable policy inserts and named instruments
The Plan’s text explicitly references State Environmental Planning Policy Amendment (Albury Regional Jobs Precinct) 2023 in cl 1.8A(2) and refers to that amendment in the context of savings provisions for DAs. The cl 7.15 controlling development in the Albury Regional Jobs Precinct was introduced by the 2023 amendment (cl 7.15 header references Ins 2023 (696), Sch 1[6]).
The Plan notes amendments to add maps, change zone lists, and insert localised constraints such as the Willowbank Road site‑specific development control plan requirements (Inserted 2018 (265), Sch 1[1]) and the related groundwater rules (cl 7.12).
Amendments in 2022 (2022 (828), Sch 1.1) appear to be omnibus updates across the Plan, including updating the zone list (cl 2.1), additions to Schedules, and inserting specific local provisions (several clauses show 2022 (828) Sch 1.1 references).
The Plan tracks later minor and substantive changes through 2023-2025 with specific entries for the Albury Regional Jobs Precinct amendment (2023 (696), Sch 1) and a 2025 amendment (Mosman LEP Amendment cited in cl 1.8A(3) as [Mosman Local Environmental Plan Amendment (Exempt and Complying Development Codes and Housing,Dual Occupancies) 2025]).
Where to find authoritative amendment records
Each clause contains short amendment notes summarising the amending instrument and year (for example cl 1.8A: "Am 2019 (621), Sch 5[1]; 2023 (696), Sch 1[1] [2]; 2025 (597), Sch 1[1]"). For formal amendment instruments and the precise text of amendments consult the NSW legislation website and the Plan’s page where those amending instruments are hyperlinked or referenced (cl 1.3 notes link to the Land Application Map, and many amendments are referenced in clause notes).
Patterns in amendment content
Amendments have been used to:
Add zone types and adjust the Land Use Table (cls 2.1-2.3).
Insert site‑specific controls and precinct provisions (Willowbank Road cls 7.11-7.12; Albury Regional Jobs Precinct cl 7.15).
Update technical standards and thresholds (Sch 2 adjustments, cl 4.1AA, cl 4.1A, and introduction of cl 4.1C/D for R2 dual occupancies).
Carve out transitional arrangements for development applications relative to certain amendments (cl 1.8A).
Implications for practice
The Plan’s amendment notes indicate changes are frequent and granular. Practitioners must confirm the Plan version applicable at the time of lodgement and check whether any recent amending instruments (identified in clause notes) affect a particular parcel or use. The Plan itself preserves the maps as the enduring spatial source of numeric and locational constraints (cl 1.7).
This summary is drawn only from the amendment annotations as they appear in the Plan text. For authoritative instrument names, commencement dates and precise textual changes consult the NSW legislation website where each amending instrument is published.
Litigation history
The text of the Plan does not record any judicial decisions or litigation history. The instrument itself lists statutory amendments and internal clause histories (see amendment notes appended to clauses), but it contains no references to court rulings, appeals, or Tribunal decisions.
What the document records and what it does not
The Plan explicitly documents statutory amendment history by way of short annotations at the end of many clauses and schedules (for example cl 1.8A, cl 4.6 and others contain "Am" or "Ins" notes). Those notes identify the amending year and instrument shorthand but do not indicate litigation or contested determinations.
The Plan includes transitional savings provisions (cl 1.8A) that can be material in appeals and litigation because they preserve the legal position for pre‑existing development applications; however the Plan itself provides the rule rather than any adjudication record.
Where litigation and appeal records would be found
Administrative and merits review or judicial review of decisions under this Plan would typically be recorded in tribunal and court records (NSW Land and Environment Court, Administrative decisions tribunal archives, etc.). The Plan does not include or summarise such cases. Users seeking litigation history should search the jurisprudence and case databases of the Land and Environment Court and other relevant tribunals for decisions that interpret or apply this Plan.
Implications for practitioners
Because the Plan contains a number of discretionary provisions (e.g. exceptions to standards cl 4.6; heritage assessments cl 5.10; special local provisions cll 7.11-7.15) and places duties on the consent authority to consider particular matters, there is potential for contested decisions. The Plan provides the substantive and procedural hooks that parties typically litigate (interpretation of zone objectives, application of exceptions, sufficiency of environmental grounds, and heritage impacts), but the Plan itself offers no litigation summary.
In short, the Plan text provides the legal framework; it does not report on litigation. To assemble litigation history users must consult case law databases and tribunal records for decisions that refer to or interpret this LEP.
Gotchas
This Plan contains several specific provisions that commonly generate implementation pitfalls. The following items are drawn to attention because they convert familiar planning concepts into operational traps for practitioners and landowners.
Suspension of private covenants (cl 1.9A)
The Plan can suspend private covenants, agreements or instruments that restrict development "to the extent necessary" to enable development in accordance with the Plan (cl 1.9A(1)). However this suspension does not apply to covenants imposed by Council or that the Council requires to be imposed, Crown Land instruments, conservation agreements, property vegetation plans, biobanking agreements, planning agreements, and certain other instruments (cl 1.9A(2)). Practitioners must therefore check the covenant source and type carefully: a covenant that looks private may nevertheless be excluded from suspension.
Transitional savings and amendment carve‑outs (cl 1.8A)
Development applications made before this Plan (or certain amendments) commenced "must be determined as if this Plan had not commenced" (cl 1.8A(1)). Specific amendments are excluded from applying to DAs made before their commencement (cl 1.8A(2)-(3)). This can create differing applicable rules between two adjacent DAs on the same site depending on application dates; check the DA lodgement date against clause 1.8A and any relevant amending instrument.
Exempt/compliant development exclusion zones (cl 3.3)
Exempt and complying development are prohibited on a wide set of "environmentally sensitive areas", which include coastal features, wetlands of international significance, the Landfill Buffer Area and land to which cl 7.5 (river front areas) applies (cl 3.3(2), (ja), (jb)). A development that looks like exempt development may not be able to rely on that pathway if it is within one of those mapped or designated areas.
Clauses that cannot be varied under cl 4.6(8)
Clause 4.6 allows departures from development standards but expressly excludes contravention of standards for complying development, BASIX commitments, and several named clauses (e.g. cl 5.4, cl 5.5, cls 4.1A, 4.2A, 6.1 and 7.5). Attempts to use cl 4.6 to override these protected standards will fail (cl 4.6(8)).
Heritage triggers and notice obligations (cl 5.10)
Works affecting heritage items, Aboriginal objects, archaeological sites, or buildings inside conservation areas commonly require consent, may trigger the need for heritage management documents or conservation management plans and in some cases mandatory notification to the Heritage Council or local Aboriginal communities (cl 5.10(3)-(9)). Heritage constraints can thus add significant time and cost.
Detailed mapping is determinative (cl 1.7)
Many standards (minimum lot sizes, heights, FSR) are map‑based. Practitioners must check the Land Zoning Map, Lot Size Map, Height of Buildings Map and FSR Map and their most recent versions because the maps are the operative source (cl 1.7, cl 4.1(3), cl 4.3(2), cl 4.4(2)). The Plan permits maps to be amended or replaced and to be kept in electronic form (cl 1.7(1)(b), (3)-(4)).
Precinct and site‑specific caps on gross floor area (cls 7.14, 7.15)
Site‑specific provisions limit gross floor area: for example cl 7.14(3) caps business premises, office premises or specialised retail premises at Willowbank Road "Area B" at 250 m2; cl 7.15(2)(b) limits gross floor area per tenancy to 250 m2 in E3 Productivity Support in the Albury Regional Jobs Precinct. These numeric caps can defeat otherwise permissible uses unless the policy pathway explicitly allows larger formats elsewhere.
Temporary use time‑limits (cl 2.8)
Temporary uses without permanent consent are capped at 52 days in any 12‑month period except for dwellings used as sales offices (cl 2.8(2)-(5)). Organisers, event managers and applicants must plan staging and repeat events with the cap in mind.
Flood and climate change considerations (cl 5.21)
Consent authorities must be satisfied development on land within the flood planning area is compatible with flood function and will not adversely affect flood behaviour, including consideration of projected changes due to climate change (cl 5.21(2)-(3)). Compliance requires up‑to‑date flood studies and design measures.
Music and licensed premises,limited refusal grounds (cl 5.20)
While cl 5.20 prevents refusal purely on music‑related grounds, it leaves noise management as a material condition: the consent authority "must not refuse ... if the consent authority is satisfied the noise may be managed and minimised to an acceptable level" (cl 5.20(2)). Applicants should therefore supply robust noise management strategies. Neighbour objections on amenity grounds may still be relevant where noise cannot be controlled.
Aquaculture and environmental overlays (cl 5.19 and Sch 6)
Aquaculture is allowed subject to detailed site and operational requirements (cl 5.19, Sch 6). Certain types of pond and tank aquaculture are allowed without consent if they meet site/location and operational thresholds (cl 5.19(4), (6)). Failure to meet Schedule 6 minimum requirements can convert what the applicant thought was an exempt activity into development requiring full assessment.
Interaction with Commonwealth aviation advice (cl 7.8)
If development may penetrate the airport Obstacle Limitation Surface the consent authority must consult the relevant Commonwealth body and may not grant consent if the body objects (cl 7.8(2)-(4)). This adds a potential external veto to otherwise locally permissible development.
These are concrete operational issues that require early, parcel‑specific checks: map extents, applicable schedules, whether covenants are excluded from cl 1.9A, whether DAs predate amendments in cl 1.8A, and whether site‑specific clauses apply (Willowbank, Albury Regional Jobs Precinct, Landfill Buffer Area, river front areas, heritage items, and flood planning areas). Failure to factor these into project scoping will produce regulatory delay or refusal risk.
How to comply
A practical, stepwise compliance checklist for practitioners, landowners and applicants based on the Plan’s operative provisions.
Confirm the operative maps and zoning for the parcel
Consult the Land Zoning Map, Lot Size Map, Height of Buildings Map, Floor Space Ratio Map, Heritage Map, Natural Resources Sensitivity,Water Map and Key Sites Map as identified by the Plan (cl 1.7; cl 2.2; cl 4.1(2), cl 4.3(2), cl 4.4(2)). These maps supply the first‑order constraints: permissible uses, minimum lot size, height, FSR, and whether the site is in the Landfill Buffer Area, river front area, heritage conservation area, flood planning area or urban release area.
Classify the proposed use against the Land Use Table and Schedules
Determine if the proposed use is permitted without consent, permitted only with consent, or prohibited for the zone (cl 2.3(1) and Land Use Table entries). Then check if the use appears in Schedule 1 (additional permitted uses for particular land) or is listed as exempt development in Schedule 2 or as complying development under Schedule 3 (cl 2.5, cl 3.1-3.2).
Check exempt/compliant development exclusions and environmental overlays
If you believe the development is exempt or complying, confirm it does not fall within the environmentally sensitive area exclusions in cl 3.3 (which include the Landfill Buffer Area and river front areas per cl 3.3(2)(ja),(jb)). Even exempt development must meet the Building Code of Australia and other statutory approvals (cl 3.1(3)(a), (5)).
Verify minimum standards and any special local controls
For subdivision, apply the Lot Size Map and exception clauses (cl 4.1, cl 4.1A-4.2C). For floor space and heights, use the relevant maps and cl 4.4-4.5. If the proposal needs a departure, prepare the cl 4.6 supporting material: show why compliance is unreasonable or unnecessary and provide environmental planning grounds (cl 4.6(3)). Note that certain standards cannot be varied under cl 4.6(8).
For sites in river front areas, Albury Regional Jobs Precinct, Willowbank Road or Zone E4 "Area A", apply the site‑specific tests and caps (cls 7.5, 7.11-7.15) and any gross floor area limits (cls 7.14(3), 7.15(2)(b)).
For licensed premises and entertainment venues, prepare noise management strategies to demonstrate the noise "may be managed and minimised to an acceptable level" in line with cl 5.20.
Address heritage and Aboriginal heritage requirements early
If the site is listed in Schedule 5 or within a heritage conservation area, prepare heritage management documents or conservation plans where the consent authority requests them (cl 5.10(5)-(6)). For archaeological sites or Aboriginal places of heritage significance, follow the mandatory notification obligations to the Heritage Council (cl 5.10(7), (9)) and local Aboriginal communities (cl 5.10(8)) and allow time for responses.
Prepare environmental and technical studies aligned to clause lists
The Plan lists specific matters the consent authority must consider on various topics: earthworks (cl 7.1(3)), water and riparian impacts (cl 7.2(3)-(4)), flood planning and climate change impacts (cl 5.21(2)-(3)), intensive livestock agriculture (cl 5.18(3)), aquaculture (cl 5.19 and Sch 6) and groundwater at Willowbank Road (cl 7.12). Provide targeted evidence addressing those matters (hydrology, flood modelling, odour/noise/soil management, groundwater baseline monitoring where cl 7.12 applies).
Check infrastructure and urban release area requirements
If the land is in an urban release area, ensure a Development Control Plan covering staging, transport, landscaping and services is prepared (cl 6.3(2)-(3)), and obtain necessary certification from the Director‑General for creation of lots smaller than the pre‑release minima (cl 6.1(2)). Confirm availability or arrangements for essential public utilities (cl 6.2).
Assess private instruments and covenant status
Identify any covenants or agreements. If a covenant restricts development consistent with the Plan, cl 1.9A may render it inoperative to the extent necessary, except where the covenant falls into an exclusion category (cl 1.9A(2)-(3)). Where covenants are Council‑imposed or relate to Crown Land or conservation, they remain effective.
Consult early with the Council and relevant agencies
The consent authority is the Council (cl 1.6). Early pre‑lodgement consultation will clarify whether heritage, airspace/airport, Commonwealth aviation, flood, or other external agency consultation is required (cls 5.10(7)-(9), 7.8(2)-(4), 5.21). For Obstacle Limitation Surface issues, obtain Commonwealth advice early (cl 7.8).
Prepare DA documentation to meet regulatory tests and recordkeeping
For departures under cl 4.6 assemble the required document setting out planning grounds (Environmental Planning and Assessment Regulation 2021 requires this document; cl 4.6 note). For consent authorities, be prepared to record assessments (cl 4.6(4)). Ensure compliance with BCA requirements where exempt/compliant pathways are proposed (cl 3.1(3)(a), cl 3.2(3)(b)).
Manage noise, odour, and externalities
For uses that may impact amenity (intensive livestock, industrial uses, licensed premises, facilities near landfill buffer), include specific mitigation measures, siting strategies to maximise separation (cl 7.7(3)(c)), hours of operation limitations and operational management plans. For Albury Regional Jobs Precinct and certain industrial areas, demonstrate how nearby residential amenity will be protected (cl 7.15(2)(a)(ii), cl 7.13(3)).
Understand and prepare for conditions and covenants
Consent may be conditional, including registration of covenants to prevent double counting of floor space (cl 4.5(9)-(10)). Be prepared to accept and register such instruments on title as part of consent.
Keep an eye on amendments and transitional rules
Because the Plan has an active amendment history, verify whether a proposal is caught by savings provisions (cl 1.8A) and whether recent amendments change the applicable rules. Clause notes include amendment citations that should be checked against the NSW legislation website.
Engage specialist consultants where required
Heritage specialists, flood and stormwater engineers, noise/odour consultants, groundwater experts, arborists (for tree and vegetation rules), and planning lawyers should be engaged early where the Plan triggers their specialties (clls 5.10, 7.1, 5.21, 7.12, Sch 6).
Time and resource the application properly
Expect additional time for mandatory notifications (Heritage Council and Aboriginal communities , cl 5.10(7)-(8) provide 28‑day response windows) and for State or Commonwealth consultations where cl 7.8 applies. Allow lead time for registering covenants or securing Director‑General certification in urban release situations (cl 6.1).
This compliance route maps the Plan’s operative provisions into a practical sequence: map check, use classification, exemption/compliance screening, targeted technical studies keyed to the Plan’s specified assessment matters, pre‑lodgement consultation with Council and relevant agencies, DA preparation addressing cl 4.6 or cl 5.10 triggers where necessary, and anticipation of consent conditions and post‑consent obligations (including registered covenants and infrastructure arrangements).
Notes in this Plan are provided for guidance and do not form part of this Plan.
1 Consent authority
1 Consent authority
1.6 Consent authority
The consent authority for the purposes of this Plan is (subject to the Act) the Council.
1 Maps
1 Maps
1.7 Maps
(1) A reference in this Plan to a named map adopted by this Plan is a reference to a map by that name—
(a) approved by the local plan-making authority when the map is adopted, and
(b) as amended or replaced from time to time by maps declared by environmental planning instruments to amend or replace that map, and approved by the local plan-making authority when the instruments are made.
(1AA) (Repealed)
(2) Any 2 or more named maps may be combined into a single map. In that case, a reference in this Plan to any such named map is a reference to the relevant part or aspect of the single map.
(3) Any such maps are to be kept and made available for public access in accordance with arrangements approved by the Minister.
(4) For the purposes of this Plan, a map may be in, and may be kept and made available in, electronic or paper form, or both.
Note.
The maps adopted by this Plan are to be made available on the NSW Planning Portal. Requirements relating to the maps are set out in the documents entitled Standard technical requirements for LEP maps and Standard requirements for LEP GIS data which are available on the website of the Department of Planning and Environment.
1 Repeal of planning instruments applying to land
1 Repeal of planning instruments applying to land
1.8 Repeal of planning instruments applying to land
(1) All local environmental plans and deemed environmental planning instruments applying only to the land to which this Plan applies are repealed.
Note.
The following local environmental plans are repealed under this provision—
Albury Local Environmental Plan 2000
(2) All local environmental plans and deemed environmental planning instruments applying to the land to which this Plan applies and to other land cease to apply to the land to which this Plan applies.
1 Savings provision relating to development applications
1 Savings provision relating to development applications
1.8A Savings provision relating to development applications
(1) If a development application has been made before the commencement of this Plan in relation to land to which this Plan applies and the application has not been finally determined before that commencement, the application must be determined as if this Plan had not commenced.
(2) An amendment made to this plan by State Environmental Planning Policy Amendment (Albury Regional Jobs Precinct) 2023 does not apply to a development application made but not finally determined before the commencement of the amendment.
(3) An amendment made to this plan by Mosman Local Environmental Plan Amendment (Exempt and Complying Development Codes and Housing—Dual Occupancies) 2025 does not apply to a development application made, but not finally determined, before the commencement of the amendment.
(1) This Plan is subject to the provisions of any State environmental planning policy that prevails over this Plan as provided by section 3.28 of the Act.
(2) The following State environmental planning policies (or provisions) do not apply to the land to which this Plan applies—
1 Suspension of covenants, agreements and instruments
1 Suspension of covenants, agreements and instruments
1.9A Suspension of covenants, agreements and instruments
(1) For the purpose of enabling development on land in any zone to be carried out in accordance with this Plan or with a consent granted under the Act, any agreement, covenant or other similar instrument that restricts the carrying out of that development does not apply to the extent necessary to serve that purpose.
(2) This clause does not apply—
(a) to a covenant imposed by the Council or that the Council requires to be imposed, or
(b) to any relevant instrument within the meaning of section 13.4 of the Crown Land Management Act 2016, or
(c) to any conservation agreement within the meaning of the National Parks and Wildlife Act 1974, or
(d) to any Trust agreement within the meaning of the Nature Conservation Trust Act 2001, or
(e) to any property vegetation plan within the meaning of the Native Vegetation Act 2003, or
(f) to any biobanking agreement within the meaning of Part 7A of the Threatened Species Conservation Act 1995, or
(g) to any planning agreement within the meaning of Subdivision 2 of Division 7.1 of the Act.
(3) This clause does not affect the rights or interests of any public authority under any registered instrument.
(4) Under section 3.16 of the Act, the Governor, before the making of this clause, approved of subclauses (1)–(3).
For the purposes of this Plan, land is within the zones shown on the Land Zoning Map.
2 Zone objectives and Land Use Table
2 Zone objectives and Land Use Table
2.3 Zone objectives and Land Use Table
(1) The Land Use Table at the end of this Part specifies for each zone—
(a) the objectives for development, and
(b) development that may be carried out without development consent, and
(c) development that may be carried out only with development consent, and
(d) development that is prohibited.
(2) The consent authority must have regard to the objectives for development in a zone when determining a development application in respect of land within the zone.
(3) In the Land Use Table at the end of this Part—
(a) a reference to a type of building or other thing is a reference to development for the purposes of that type of building or other thing, and
(b) a reference to a type of building or other thing does not include (despite any definition in this Plan) a reference to a type of building or other thing referred to separately in the Land Use Table in relation to the same zone.
(4) This clause is subject to the other provisions of this Plan.
Notes.
2
1
Schedule 1 sets out additional permitted uses for particular land.
2
2
Schedule 2 sets out exempt development (which is generally exempt from both Parts 4 and 5 of the Act). Development in the land use table that may be carried out without consent is nevertheless subject to the environmental assessment and approval requirements of Part 5 of the Act.
2
3
Schedule 3 sets out complying development (for which a complying development certificate may be issued as an alternative to obtaining development consent).
2
4
Clause 2.6 requires consent for subdivision of land.
2
5
Part 5 contains other provisions which require consent for particular development.
2 Unzoned land
2 Unzoned land
2.4 Unzoned land
(1) Development may be carried out on unzoned land only with development consent.
(2) In deciding whether to grant development consent, the consent authority—
(a) must consider whether the development will impact on adjoining zoned land and, if so, consider the objectives for development in the zones of the adjoining land, and
(b) must be satisfied that the development is appropriate and is compatible with permissible land uses in any such adjoining land.
2 Additional permitted uses for particular land
2 Additional permitted uses for particular land
2.5 Additional permitted uses for particular land
(1) Development on particular land that is described or referred to in Schedule 1 may be carried out—
(a) with development consent, or
(b) if the Schedule so provides—without development consent,
in accordance with the conditions (if any) specified in that Schedule in relation to that development.
(2) This clause has effect despite anything to the contrary in the Land Use Table or other provision of this Plan.
2 Subdivision—consent requirements
2 Subdivision—consent requirements
2.6 Subdivision—consent requirements
(1) Land to which this Plan applies may be subdivided, but only with development consent.
Notes.
(2) Development consent must not be granted for the subdivision of land on which a secondary dwelling is situated if the subdivision would result in the principal dwelling and the secondary dwelling being situated on separate lots, unless the resulting lots are not less than the minimum size shown on the Lot Size Map in relation to that land.
Note.
The definition of secondary dwelling in the Dictionary requires the dwelling to be on the same lot of land as the principal dwelling.
2
1
If a subdivision is specified as exempt development in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, the Act enables it to be carried out without development consent.
2
2
Part 6 of State Environmental Planning Policy (Exempt and Complying Development Codes) 2008 provides that the strata subdivision of a building in certain circumstances is complying development.
2 Demolition requires development consent
2 Demolition requires development consent
2.7 Demolition requires development consent
The demolition of a building or work may be carried out only with development consent.
Note.
If the demolition of a building or work is identified in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, as exempt development, the Act enables it to be carried out without development consent.
2 Temporary use of land
2 Temporary use of land
2.8 Temporary use of land
(1) The objective of this clause is to provide for the temporary use of land if the use does not compromise future development of the land, or have detrimental economic, social, amenity or environmental effects on the land.
(2) Despite any other provision of this Plan, development consent may be granted for development on land in any zone for a temporary use for a maximum period of 52 days (whether or not consecutive days) in any period of 12 months.
(3) Development consent must not be granted unless the consent authority is satisfied that—
(a) the temporary use will not prejudice the subsequent carrying out of development on the land in accordance with this Plan and any other applicable environmental planning instrument, and
(b) the temporary use will not adversely impact on any adjoining land or the amenity of the neighbourhood, and
(c) the temporary use and location of any structures related to the use will not adversely impact on environmental attributes or features of the land, or increase the risk of natural hazards that may affect the land, and
(d) at the end of the temporary use period the land will, as far as is practicable, be restored to the condition in which it was before the commencement of the use.
(4) Despite subclause (2), the temporary use of a dwelling as a sales office for a new release area or a new housing estate may exceed the maximum number of days specified in that subclause.
(5) Subclause (3) (d) does not apply to the temporary use of a dwelling as a sales office mentioned in subclause (4).
2 Canal estate development prohibited
2 Canal estate development prohibited
2.9 Canal estate development prohibited
(1) Canal