[2024] WASCA 168
Court of Appeal (WA)
2025-01-22
Buss P
Original judgment source is linked above.
In the 2023 MCPs, the CITIC parties take a phased approach to obtaining necessary approvals under the State Agreement for Project continuation. The areas over which the activities the subject of the 2023 MCPs are to be conducted are a subset of the areas the subject of the 2017 MCPs, and are confined to areas over which Mineralogy has already provided to Sino Iron and Korean Steel, by agreement, rights of access and use ... Approval of the 2023 MCPs will support the continued operation of the Project for an interim period, but will not be sufficient for life-of-mine operations for a combined two billion tonne extraction right (par 2.3).
The 2023 MCPs are not intended to be an alternative to the 2017 MCPs. The 2023 MCPs are proposed as an interim solution to the urgent need to extend the operating areas of the Project, by obtaining the approval of the State Agreement Minister of project proposals in respect of those parts of the 2017 MCPs that do not require Mineralogy to make available additional land (par 5.1).
The 2023 MCPs, if submitted to and approved by the SA Minister, would:
(a) enable Sino Iron and Korean Steel to continue to exercise the Sino/Korean Project Rights; further or alternatively
(b) enable the continued operation of the Sino Iron Project for an interim period; further or alternatively
(c) avoid, or minimise the period of, suspension of the operation of the Sino Iron Project in that interim period.
The 2023 MCPs, if submitted and approved, would enable continuous operation of the Project for an interim period in the sense that they would not enable the full exercise by Sino Iron and Korean Steel of their combined rights to mine and process up to two billion tonnes of magnetite ore, and therefore they would not enable continuous operation for the full period that it would take to exercise those rights. That is because, being confined to areas over which Sino Iron and Korean Steel have existing rights of access and use, the 2023 MCPs do not provide sufficient capacity for storage of waste rock and tailings generated by the mining and processing of two billion tonnes of magnetite ore.
(a) Sino Iron and Korean Steel have failed to develop the mine pit, tailings storage facility and waste rock landforms efficiently and in accordance with cl 16 of the MRSLAs ...
(b) if the mine pit, tailings storage facility and waste rock landforms are constrained in the manner alleged by [the CITIC parties], which is denied, it has been caused by Sino Iron and Korean Steel's breaches of cl 16 of the MRSLAs.
a real public interest in the ongoing disputes between these parties regarding the submission of new mine continuation plans to the minister being resolved as soon as possible [167].
[T]he scope of the discovery needs to be appropriately tailored to ensure the parties have a proper opportunity to present their cases at trial, but also to ensure the trial dates can be achieved and unnecessary delays are avoided [53].
The primary judge noted that the pre-trial directions contemplated discovery being completed by 1 November 2024. It was, in the circumstances, necessary to 'closely' assess the potential scale of the discovery process and its effect on the parties' ability to achieve the court-ordered timetable. The primary judge considered it appropriate to give weight to various matters impacting on the discovery process arising from the breadth of the disputed categories including the time period over which the disputed categories stretched and the scale of the Sino Iron Project [53] - [65].
Leave to appeal - applicable principles for leave to appeal from an interlocutory order on a matter of practice and procedure
Where leave to appeal is necessary, leave may be granted whenever the interests of justice require it. The principles on which this court considers whether to grant leave to appeal are well-established:
(a) first, whether the decision was wrong or, at the least, attended with sufficient doubt to warrant its being reconsidered; and
(b) second, whether substantial injustice would result if the decision is left unreversed, supposing the decision to be wrong. However, the requirement to show substantial injustice is no more than a guideline for the exercise of what is a broad discretion.
The two considerations bear on each other. The degree of doubt that is sufficient in one case may be different from that required in another. It will be affected by the extent of the risk of substantial injustice if leave were refused, supposing the decision to be wrong.
These considerations provide general guidance only. Thus, while the question of leave is normally considered within the rubric of these organising principles, there will be cases raising special considerations. The touchstone remains the interests of justice. The nature and risk of the injustice said to result from the order appealed from will generally be a material consideration. There is a far greater risk of injustice where an interlocutory decision determines a substantive right. In such a case leave will be granted more readily. By contrast, as is mentioned in the authorities establishing the principles set out [in the previous paragraph], a 'tight rein' must be kept on appeals involving interlocutory decisions on matters of practice and procedure [117] - [118]. (citations omitted) (original emphasis)
[T]here is a material difference between an exercise of discretion on a point of practice or procedure and an exercise of discretion which determines substantive rights. In the former class of case, if a tight rein were not kept upon interference with the orders of Judges of first instance, the result would be disastrous to the proper administration of justice. The disposal of cases could be delayed interminably, and costs heaped up indefinitely, if a litigant with a long purse or a litigious disposition could, at will, in effect transfer all exercises of discretion in interlocutory applications from a Judge in Chambers to a Court of Appeal.[17]
[T]he injustice that must be demonstrated must be properly characterised as 'substantial'. If every infraction of a party's procedural rights were to be regarded as a 'substantial injustice', this aspect of the requirements for the grant of leave would become meaningless, as virtually every erroneous interlocutory decision will involve an infraction of a party's procedural rights. Accordingly, the notion of 'substantial injustice' looks to the substantive rights of the party adversely affected by the order under review, and requires that party to demonstrate that the effect of the order will go beyond mere inconvenience and procedural disadvantage.[28]
Disposition - the merits of the grounds of appeal
The primary judge erred in fact and law by taking into account an erroneous consideration, namely that the course of the conferral process was relevant to the exercise of his Honour's discretion in circumstances where his Honour had found it was not the case that the appellant ... was to be punished or penalised in some way for the lack of early conferral.
[Primary decision] (J) at [17], [22]
To be clear, the manner in which the conferral process has played out does not now prevent this Court from exercising its discretion to expand the scope of the discovery categories as proposed by Mineralogy. The important point to be made, in my opinion, is that the course of these events is relevant to the exercise of the discretion [22]. (original emphasis)
Ground 2: the confining of certain categories to the end-date of 27 November 2023
I have great difficulty in accepting that documents which are created after the proceeding were commenced could rationally bear on whether Mineralogy was in breach of its contractual obligations to submit the MCPs by the time the proceedings were in fact commenced. In the result, I was not satisfied [Mineralogy] had properly demonstrated that the time line for discovery should extend beyond the date on which the proceedings were filed [77].
Ground 3: category EE - CITIC parties' consideration of acquiring additional tenure
Ground 4: category EF - CITIC parties' consideration of Golder's tailings storage proposals
[The CITIC parties] will, through these other categories, be obliged to discover a large number of documents concerning the TSF [ie tailings storage facility] and the tailings disposal requirements. I do not consider it appropriate, and indeed it would be disproportionate, to exercise the discretion to order an additional category which would appear to overlap with the other agreed categories. I accordingly refused the category [106].
Ground 5: categories EJ, EK and EL - the CITIC parties' future plans
says that, on their terms, the 2023 MCPs are said to be 'interim' to other measures which Sino Iron and Korean Steel have not fully identified, but which include the measures in the 2017 MCPs, which:
(i) are not acceptable to Mineralogy;
(ii) Sino Iron and Korean Steel have no right to compel Mineralogy to accept;
(iii) were found to be defective in the 2017 MCP Decision (including for the reasons summarised in paragraph 2462 of the 2017 MCP Decision);
(b) says that Sino Iron and Korean Steel have failed to identify any long-term or permanent measures (beyond those in the 2017 MCPs, which are unacceptable) that the 2023 MCPs could facilitate as an 'interim' measure;
(d) says that in the absence of any acceptable good faith proposal from Sino Iron and Korean Steel capable of ensuring the continued operation of the Sino Iron Project for the life of mine, Mineralogy is not bound to consider or accept proposals that are expressed to be 'interim' thereto;
Grounds and Discovery Categories as sought by Mineralogy
(i) created after 27 November 2023 (the only significance of that date being the date proceedings were filed); and
(ii) otherwise were within discovery categories employing the definition 'Post Production Period' (Categories AB, C, D, E, EM, F and G),
were highly unlikely to be directly relevant to the matters in issue in the proceeding, in circumstances where such documents would tend to prove or disprove (at least) contested issues of performance and breach and the availability of the relief sought by [the CITIC parties];
(b) finding that considerations of efficiency and clarity of the temporal scope of the discovery categories supported imposing the commencement of proceedings as an end-date for the 'Post Production Period';
(c) as a consequence of one or both of the errors in subparagraphs (a) and (b), confining Categories EA and EH to documents created no later than 27 November 2023.
J at [75] - [79], [82(a)], [86] and [108]
All Documents from 1 January 2012 to 27 November 2023 recording or referring to the CITIC parties' consideration of the mine pit or waste storage capacity for the purpose of the Sino Iron Project. [Orders Wanted par 3(b)(iii)][36]
All documents from 1 January 2012 to 27 November 2023 which are minutes of the meetings or the budgets of, or for, any of the following groups, teams, committees, departments, or boards:
i the 'Fulcrum Group', 'Project Fulcrum' or 'Fulcrum Team';
vi the boards of CPMM, CITIC Limited (including both CITIC Pacific Ltd and CITIC Ltd as they existed from time to time) or CITIC Minerals International (also known as 'CMI'),
which refer to the expansion of the mine pit or waste storage capacity for the purposes of the Sino Iron Project. [Orders Wanted par 3(b)(iii)][37]
The primary judge erred in law by finding that Category EE focused on a false issue, when, in fact, that category was directly relevant to [40(a)(iv)] of the Amended Defence filed 11 March 2024, which was denied without limitation by the CITIC parties ([1] and [8(c)] of the Amended Reply filed 2 August 2024).
All Documents since 1 January 2012 recording or referring to the CITIC parties' consideration of acquiring access to or use of areas in addition to the Site Lease Area in the MRSLAs.
The primary judge erred in fact and law in rejecting Category EF:
(a) by finding that Mineralogy must have already had access to a range of documents otherwise falling within Category EF when:
(i) the transcript of evidence relied on by his Honour was incapable of supporting that finding, by way of empirical inference or otherwise; and
(ii) there was otherwise no evidence before the Court capable of supporting that finding;
(b) by finding that it was disproportionate, or otherwise not appropriate, on the basis that it involved a likely degree of overlap with other categories.
All Documents since 1 January 2012 recording or relating to the CITIC parties' consideration of Golder's proposals in connection with the storage of tailings.
The primary judge erred in law by rejecting Categories EJ to EL:
(a) as falling outside the pleaded case revealed by the Statement of Claim (SOC), when the subject documents would tend to prove or disprove the contested issues of performance and breach;
(b) on the basis that [61(gA)], [64(b)] and (although not expressly referenced at J [120]) [64(d)] of the Amended Defence, or one or some of them:
(i) were not directly relevant to any issue in dispute,
(ii) otherwise raised a question of law that did not generate a requirement for additional discovery, when, properly characterised,
in circumstances where those paragraphs themselves gave rise to issues of fact that were expressly denied, or the subject of a general joinder of issue, and responsive to Categories EJ to EL.
All Documents during the Post Production Period[38] recording or referring to consideration by the CITIC parties of any measures to enable:
i the full exercise of the Sino/Korean Project Rights; or
ii the full implementation of the Sino Iron Project.
SOC par 64 and pt E [ie breach pleas] (inc par 77)
All Documents during the Post Production Period recording or referring to future phases or stages of the Sino Iron Project after implementation of the 2023 MCPs.
All Documents during the Post Production Period recording or referring to consideration by the CITIC parties of the relationship between the 2017 MCPs and the 2023 MCPs.
I certify that the preceding paragraph(s) comprise the reasons for decision of the Supreme Court of Western Australia.
[1] Mineralogy Pty Ltd v Sino Iron Pty Ltd [2022] WASCA 26 [6] - [22].
[2] Sino Iron Pty Ltd v Mineralogy Pty Ltd [2024] WASC 242 [6] - [27].
[3] Sino Iron Pty Ltd v Mineralogy Pty Ltd [No 15] [2023] WASC 56.
[4] See Sino Iron Pty Ltd v Mineralogy Pty Ltd [No 15] [823] - [824].
[5] See Sino Iron Pty Ltd v Mineralogy Pty Ltd [No 15] [818].
[6] See Sino Iron Pty Ltd v Mineralogy Pty Ltd [No 15] [825] - [826].
[7] Palmer v CITIC Ltd [No 12] [2024] WASC 322 [5](c), [77] - [93].
[8] Sino Iron Pty Ltd v Mineralogy Pty Ltd [No 2] [2024] WASC 413 (primary decision) [2].
[9] Roe v The State of Western Australia [2013] WASC 130 [10] - [11].
[10] Maek Pty Ltd v Ibrahim [2022] WASC 285 [25] - [27].
[11] House v The King [1936] HCA 40; (1936) 55 CLR 499, 505.
[12] Supreme Court (Court of Appeal) Rules 2005 (WA) r 32(4A)(a).
[13] Durham v Durham [2011] NSWCA 62; (2011) 80 NSWLR 335 [74].
[14] Appeal ts 2 - 3, 20, 34, 38, 46 - 47.
[16] NRW Contracting Pty Ltd v Cliffs Asia Pacific Iron Ore Pty Ltd [2020] WASCA 107.
[17] In re the Will of FB Gilbert (Dec'd) [1946] NSWStRp 24; (1946) 46 SR (NSW) 318, 323.
[18] Adam P Brown Male Fashions Pty Ltd v Philip Morris Inc [1981] HCA 39; (1981) 148 CLR 170, 177.
[19] State of New South Wales v Meredith [2024] NSWCA 287 [21] - [22].
[20] Mohareb v Local Court of New South Wales [2024] NSWCA 235 [25].
[22] Singh v Friedman [2013] WASC 78 [3].
[23] Hamersley Iron Pty Ltd v Lovell (1998) 19 WAR 316, 321.
[24] Arvind Pty Ltd v Lamers [2020] WASCA 47.
[25] Hancock Prospecting Pty Ltd v DFD Rhodes Pty Ltd [No 2] [2023] WASCA 108.
[26] Kelbush Pty Ltd v Australia and New Zealand Banking Group Ltd [2016] WASCA 14; (2016) 49 WAR 374.
[27] Scanlan v 2-4 McCabe Pty Ltd [2023] WASCA 135.
[28] Waller v Waller [2009] WASCA 61 [10].
[29] Attorney-General of Botswana v Aussie Diamond Products Pty Ltd [No 2] [2012] WASCA 73 [142].
[33] Roy Morgan Research Centre Pty Ltd v Commissioner of State Revenue (Vic) [2001] HCA 49; (2001) 207 CLR 72 [25] - [26].
(1936) 55 CLR 499
(2016) 49 WAR 374
(2001) 207 CLR 72
(2011) 80 NSWLR 335
(1981) 148 CLR 170
(1998) 19 WAR 316