[2026] WASAT 7
General information, not legal advice.
State Administrative Tribunal (WA)
2026-01-29
Original judgment source is linked above.
(a) Is the complaint in relation to a regulated building service?
(c) Was it carried out in a proper and proficient manner, or was that work faulty or unsatisfactory?
(d) If the relevant works were not performed to the required standard, what is the appropriate building remedy order?
(a) (in relation to the wine cellar) 'I don't think that Mr Ayad ... is in a position of even speculating about this because he wasn't there';[19] and
(b) 'if [Mr Ayad] would have performed [as a builder], we wouldn't have been here ... but we are here because his failure to perform his contract and - and perform as a builder'.[20]
... His role as project manager was to assist Mr and Ms Leach to construct the house at the site. Part of that assistance was to use his network to access significant discounts in relation to the supply of materials or labour which were passed onto Mr and Ms Leach in full to minimise their costs of construction. He worked to their instructions and provided guidance because he had more experience.
Mr Forte stated that his system worked in conjunction with a 'kitty'. All incoming funds whether from bank finance, owners' savings or government grants were paid into the kitty and all costs came out of it. The exception was when he had to advance funds to keep the project moving, or if owners paid for work directly.
Mr Forte stated that the kitty was held in a bank account in the name of his company. He controlled the money in the kitty and the cashflow. He paid for all of the materials and retained all the contractors, save for those paid for or retained by Mr and Ms Leach. He said it was necessary for the bills to be in his name or the name of his company, because otherwise the suppliers would not provide the discounts. He told HD when to send invoices. His company would send an invoice to HD one or two days after HD had received the funds, or when Mr or Ms Leach advised him they had approved payment. The majority of the funds went into the kitty, apart from a minimal amount kept by HD. (paragraph numbers and footnotes omitted)
(b) he was the sole director of Building Renewals Pty Ltd and the sole shareholder was himself in the capacity as trustee for a family discretionary trust.
(a) said he was on the site multiple times per day;[22]
(b) asked Mr and Ms Leach to not communicate directly with contractors;[23] and
(c) asked Mr and Ms Leach to let him 'run the job as he sees best'.[24]
(a) Mr Forte requested (or demanded) that Mr and Ms Leach take responsibility for certain aspects of construction of the house; and
(b) Mr and Ms Leach as a result directly engaged and supervised contractors.
Garage ceiling - CC 1108/2023 item 34 and CC 57/2024 item 2
Garage ceiling not finished - ceiling lining not installed.
(a) We accept the evidence that Mr and Ms Leach agreed that they rather than Mr Forte would install the ceiling. This is consistent with the Waters report that wiring had been installed in conduit.
(b) The installation of the conduit suggests the garage was compliant with relevant building standards, in that a ceiling was not required to isolate exposed wiring.
(c) Mr Leach alleged other wiring in the garage was exposed. We do not accept that evidence. Firstly, there is no photographic or other evidence of the exposed wiring. Secondly, we would expect the Waters report to identify exposed wiring as a fault and it does not.
(d) Therefore, the evidence suggests the garage works performed by Forte met the required standard.
(e) The non-installation of the garage ceiling was removed from the scope of the work to be undertaken by Mr Forte as a result of Mr and Ms Leach agreeing to install the ceiling.
Unfinished work - Loft: The Plasterboard Lining was not fully installed to the Brickwork. Stud work and Raking Ceiling to this area unfinished.
Exposed Services. Water Service and Waste Pipes have been installed post preliminary Tube Stage and have been left exposed.
Wine cellar - CC 1108/2023 item 37 and CC 57/2024 item 5
Exposed water and electrical services are unsightly and recommend concealing with a False Ceiling
Wine cellar - CC 1108/2023 item 38 and CC 57/2024 item 6
Wine cellar - CC 1108/2023 item 39 and CC 57/2024 item 7
Rendered or hard plastered surfaces are defective as they do not confirm [sic] to the documented surface sample and/or description to this area.
Poor workmanship during the installation of the stairs. These stairs are at risk of deterioration over time which could result in safety concerns. Width of stair is not as wide as documented to plans.
(a) the evidence suggests the house was close to completion when Mr and Ms Leach purported to terminate the 2020 building contract; and
(b) Mr Forte did not explain what had to that point prevented the installation of the permanent stairs.
East side elevation - CC 1108/2023 item 41 and CC 57/2024 item 9
Retaining Wall 1 (RW1) has not been installed to the length documented on the structural drawings and hence there is a section of boundary adjacent to the cellar stairs that requires retaining
(a) The site slopes so that the ground level at the front is approximately 3 metres higher than at the rear.
(b) The store and wine cellar are below the level of the ground at the point they were constructed.
(c) There was an excavation, approximately 3 metres deep, in order to pour the slab for the store and wine cellar.
(d) The excavation process caused subsidence on the boundary. Mr Forte arranged for urgent grout injections to stabilise the excavation. The grout injections were not suitable for, nor intended to be, a permanent solution.
Store - CC 1108/2023 item 42 and CC 57/2024 item 10
The slab in the store had to be removed with the full consent of the Applicants as the sewer line was higher and a collection tank and sewage pump had to be installed. The Applicants deferred installing a chequer plate on it or pouring concrete as they were not sure and were in between the two solutions. What they did after termination, we had nothing to do with.
(a) By Mr Leach to Mr Forte on 2 August 2022 at 5.24 pm:
We've found a tiler that can start on the 8th. What is the plan for filling the plumbing channels in the lower area?
(b) By Mr Forte to Mr Leach on 2 August 2022 at 6.00 pm:
The tiler should fill them up around the pipes as part of the screed. Of course you need to decide where your falls will be in this area.
At the store I suggest you fill above the tank and create a screed with an opening of 400x400 above the tank middle neck access with sides in mass concrete mix. The sides can be finished same as the floor. Happy to meet the tiler on the day to explain further.
(c) By Mr Leach to Mr Forte on 2 August 2022 at 6.58 pm:
Ok, thanks. I like the board or plate over the tank idea. From what I understand, floors fall to the floor waste, is this correct? Are there floor wastes in these areas? That might make a difference.
Thank you.
(d) By Mr Forte to Mr Leach on 2 August 2022 at 9.47 pm:
There is one in the cellar and the grate in the store.
Garage stairs - CC 1108/2023 item 43 and CC 57/2024 item 11
West side of building - CC 1108/2023 item 44 and CC 57/2024 item 12
Exposed Concrete Footing and SlabStrip footing does not appear to step to follow the wall line at the SF1 - SF2 interface. The footing to this area appears to be installed as SF1 footing rather than SF2 as there is no concrete filled blockwork visible between the footing and the footing. This footing has also been installed higher than the ground level as a result of not stepping the footing/following the correct detail.
Slabs and footings were poured at the levels as per the drawings. Applicants changed their mind several times about the passage finish and levels, from concrete to exposed gravel to pavers to grass. The proof is that there are no issues with levels on the opposite side as they were poured to the levels on the drawings. The contract was terminated prematurely and the Applicants did this work.
(a) The footings and slab were installed correctly and in accordance with the levels as defined in the survey.
(b) The footing was not installed in accordance with the engineering drawings. It would have required more time and more cost to have engaged a contractor to install the formwork to create the recessed portion of the wall. So instead, he had the concreter continue the strip footing in a straight line.
(c) This was discussed with Mr and Ms Leach and they agreed because removing the recess made the room bigger.
(d) He considered strip footing SF1 to be superior to strip footing SF2 because the depth of the concrete was greater.
(e) It had not been his intention to leave the works in that condition. The area (or passage) between the external wall of the house and the boundary fence was to have been finished in concrete and that concrete would have covered the exposed footing. These works were not completed because Mr and Ms Leach terminated the building contract. Therefore, he considered the work to be incomplete (rather than defective work) and the responsibility of Mr and Ms Leach to complete.
(f) The failure of Mr and Ms Leach to install the concrete to cover the exposed footing caused the cracking (the subject of the next complaint).
(g) The opinion expressed in the Cenit report cannot be relied upon because Mr Lucchesi and Mr McDonald had no knowledge of the history or what happened on the site and did not go underground to examine the footings and slab. Therefore, the report was simply speculation.
(a) There is no independent evidence of the level to which the footings were poured, whether the level was correct nor the relevance the level has to the complaint.
(b) Other parts of the external walls are not simple straight lines and would have required more complex formwork. It is not consistent for Mr Forte to have engaged a form worker for other parts of the footings but not the West wall.
(c) It is not necessary for us to reach a conclusion regarding the differences between the different kinds of strip footings specified in the plans. Any proposed change to the footings should have been approved by the engineer and recorded in amended engineering drawings. There is no evidence Mr Forte obtained such approval.
(d) Mr Forte did not produce expert engineering evidence that the footings installed were appropriate for that location. We are not satisfied Mr Forte's verbal assurances outweigh the concerns contained in the Cenit report.
(e) We do not agree with Mr Forte's criticisms of the Cenit report. We consider the faults visible in the photographs and described in the report a sufficient basis for the engineers' conclusions.
(f) We do not accept Mr Forte's evidence that the footings were supposed to have been covered with concrete, because:
(i) Mr Forte gave evidence the reason the concrete 'passage' was not installed was because Mr and Ms Leach had not decided whether the area was to be grassed, paved or concreted over.
(ii) Neither the DA nor engineering plans indicate that area was to have been covered in concrete.
Master bedroom - CC 1108/2023 item 45 and CC 57/2024 item 13
...cracking/deterioration to the slab internally as the internal leaf of wall is now bearing over the 100mm thick ground slab.
(a) The cracking in the slab was not more than 2 millimetres in width and therefore within tolerances.
(c) The cracking could have been caused by normal settling.
(d) Had Mr and Ms Leach poured the concrete 'passage' over the exposed footings; the cracking would not have occurred.
(e) No one had checked the width of the footings and that the footings were in fact supporting the wall appropriately.
Roof void - CC 1108/2023 item 46 and CC 57/2024 item 14
House slab - CC 1108/2023 item 47 and CC 57/2024 item 15
Alfresco pillars - CC 1108/2023 item 48 and CC 57/2024 item 16
Alfresco pillars due to poor workmanship and not finished off. Exposed tie bar, cabling and brackets.
(a) Item 5 - wine cellar - The respondent is to re-fix the exposed pipes so that they are sitting parallel to each other without any kinks.
(b) Item 6 - wine cellar - The respondent is to remove the formwork, and then plaster and paint the area where the formwork has been removed.
(c) Item 8 - store - The respondent is to install new concrete stairs (including the removal and disposal of the existing concrete stairs).
(d) Item 9 - east side elevation - The respondent is to install the missing portion of Retaining Wall 1 in accordance with the approved engineering drawings.
(e) Item 11 - garage stairs - The respondent is to remedy the honeycombing to the garage stairs.
(f) Item 12 - west side of building - The respondent is to remedy the footings in the manner recommended in the Cenit report dated 2 March 2023.
(g) Item 13 - master bedroom - The respondent is remedy the cause and effect of the cracking to the concrete slab.
(h) Item 14 - roof void - The respondent is to install backing boards to the plasterboard sheets.
(i) Item 16 - alfresco pillars - The respondent is to move the metal brackets down to the top of the pillars and re-fix them accordingly. The metal tie downs are to be cut off to an appropriate length. These works are to be in compliance with the relevant construction details and requirements.
I certify that the preceding paragraph(s) comprise the reasons for decision of the State Administrative Tribunal.
[1] Leach and HA-Decgroup Pty. Ltd. [2025] WASAT 78.
[2] Noting the relevant contractual complaints concern only HD. Item 1 of the complaint lodged by Mr and Ms Leach against Mr Forte contained contractual allegations but was not accepted by the Building Commissioner and was not referred to the Tribunal.
[3] Owners of Island Apartments Strata Plan 52597 and Pindan Pty Ltd [2018] WASAT 2 (Island Apartments) at [67].
[4] Gemmill Homes Pty Ltd v Sanders [2018] WASC 179 at [133] and [134].
[9] Raftland Pty Ltd v Federal Commissioner of Taxation [2008] HCA 21; 238 CLR 516 at [151]; See also Lee and Holmes [2020] WASAT 108 at [20].
[10] Millar v Commissioner of Taxation [2016] FCAFC 94, (2016) 243 FCR 302 at [82].
[12] See [109] - [110] and [143] of the preliminary decision.
[13] Macquarie Dictionary Online, Macquarie Dictionary Publishers, an imprint of Pan Macmillan Australia Pty Ltd. Retrieved on 17 September 2025 from www.macquariedictionary.com.au.
[14] Suburban & Country Formwork Contractors Pty Ltd and Rawlinson [2015] WASAT 66 at [14].
[16] BSCRA Act, s 3 and Building Act 2011 (WA), s 3.
[21] Preliminary decision at [79] - [81].
[25] Exhibit 1, page 35; Exhibit 2, page 5.
[26] Exhibit 1, page 35; Exhibit 2, page 5.
[27] Exhibit 1, page 36; Exhibit 2, page 5.
[29] Exhibit 1, page 36; Exhibit 2, page 5.
[30] Exhibit 1, page 36; Exhibit 2, page 6.
[31] Exhibit 1, page 36; Exhibit 2, page 6.
[34] Exhibit 1, page 36; Exhibit 2, page 6.
[36] Brooks and Gransden Building Company Pty Ltd [No 2] [2021] WASAT 86 at [14] - [17].
[37] Exhibit 1, pages 36 - 37; Exhibit 2, page 6.
[39] Exhibit 1, page 37; Exhibit 2, page 7.
Brooks and Gransden Building Company Pty Ltd [No 2] [2021] WASAT 86
Gemmill Homes Pty Ltd v Sanders [2018] WASC 179
Leach and HA-Decgroup Pty. Ltd. [2025] WASAT 78
Lee and Holmes [2020] WASAT 108
Millar v Commissioner of Taxation [2016] FCAFC 94, (2016) 243 FCR 302
Owners of Island Apartments Strata Plan 52597 and Pindan Pty Ltd [2018] WASAT 2
Raftland Pty Ltd v Federal Commissioner of Taxation [2008] HCA 21; 238 CLR 516
Suburban & Country Formwork Contractors Pty Ltd and Rawlinson [2015] WASAT 66
(2016) 243 FCR 302