[2025] VCAT 159
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2025-06-20
Original judgment source is linked above.
Background Context...........................................................................18
Legislative framework........................................................................40
General Environmental Duty..............................................................56
Principles of statutory interpretation..................................................59
What is jurisdictional error? ..............................................................61
Tribunal Determination - Grounds 1 and 2: Was there a constructive failure to exercise jurisdiction and failure to consider mandatory relevant considerations? ....................................................................69
Tribunal Determination - Ground 3: Uncertainty or is permission significantly different from application...........................................112
Tribunal Determination - Ground 4: Beyond power.......................115
Materiality and discretion................................................................117
Conclusion.......................................................................................122
Costs reserved..................................................................................122
Appendix A - Timeline of proceeding - P1641/2023..............................123
Appendix B - Preliminary matters............................................................131
Appendix C - Submissions - Grounds 1 and 2: Was there a constructive failure to exercise jurisdiction and failure to consider mandatory relevant considerations?..........................................................................................134
Appendix D - Submissions - Ground 3: Uncertainty or is permission significantly different from application.....................................................223
Appendix E - Submissions - Ground 4: Beyond Power...........................252
PHI lodged works approval application 1004200 ('Application') with the Environment Protection Authority ('EPA') pursuant to the EP Act 1970.
Former EP Act 1970 was replaced by the EP Act 2017.
EPA granted Development Licence DL00030041 ('Development Licence') to PHI for the proposal pursuant to section 69(1) of the EP Act 2017.
L. Bisinella Developments Pty Ltd ('Bisinella') commenced two proceedings concerning the EPA's decision to grant the Licence:
Tribunal ruled that the two proceedings would not be heard and determined together, with the Declaration Proceeding to be heard first.[4]
436 Application for declaration
(1) A person may apply to VCAT for a declaration concerning any matter in relation to which the person may apply to VCAT under this Act or anything done by the Authority under this Act.
(2) On an application under subsection (1) VCAT may make any declaration it thinks appropriate in the circumstances.
(3) VCAT's power to make a declaration under this section is exercisable only by a presidential member of the Tribunal.
(4) Without limiting subsection (1), a person proposing to engage in an activity may apply to VCAT for a declaration as to whether or not a permission is required to engage in that activity.
That the decision of the Environment Protection Authority made 6 December 2023 to grant development licence number DL000300041 is affected by jurisdictional error.
434 Application for review by third parties
(1) A person who is not an eligible person in relation to a reviewable decision specified in subsection (2) may, if the person's interests are affected by the decision, apply to VCAT for review of the decision within 15 business days after the day on which the decision was made.
(2) The following reviewable decisions are specified for the purposes of subsection (1) -
(a) the issue of a development licence;
(b) the removal of the suspension of an operating licence.
(3) An application under subsection (1) for the review of a decision may only be made on one or more of the following grounds -
(a) the decision unreasonably and adversely affects the financial, physical or personal interests of the applicant;
(b) the licence to which the decision relates authorises a licence activity that, if conducted in accordance with the licence, would lead to a contravention of the general environmental duty;
(c) the licence authorises a licence activity that, if conducted in accordance with the licence, would pose an unacceptable risk of harm to human health or the environment;
(d) any condition of the licence that specifies how a person is to comply with the general environmental duty when engaging in a licence activity is not sufficient to minimise the risks of harm to human health or the environment from pollution or waste to which the condition relates, so far as reasonably practicable.
(4) Without limiting section 5 of the Victorian Civil and Administrative Tribunal Act 1998, VCAT may take into account the following matters when determining whether a person's interests are affected by a decision -
(a) the principles of environment protection specified in Chapter 2 and the purposes of this Act;
(b) the objective of the Authority specified in section 357;
(c) the nature of the licence activity specified in the licence that is the subject of the decision;
(d) the impact of the licence activity on human health and the environment;
(e) whether the person has a genuine connection with the subject of the decision, including but not limited to whether the person made comments or submissions to the Authority in relation to the application for, or the review of, the licence that is the subject of the decision.
(5) A person may not apply to VCAT under subsection (1) for the review of the decision to issue a development licence -
(a) if the application for the licence specifies an activity that is works to which the Environment Effects Act 1978 applies -
(i) the notice of the application for the licence under section 52 is combined with any notice under the Environment Effects Act 1978 in accordance with section 70; and
(ii) the licence is substantially in accordance with the assessment, by the Minister administering that Act, of the Environment Effects Statement prepared under that Act for those works; or
(b) if the application for the licence specifies an activity that requires a planning permit or the preparation of an amendment to a planning scheme under the Planning and Environment Act 1987 -
(i) the notice of the application for the licence under section 52 is combined with any notice under the Planning and Environment Act 1987 in accordance with section 70; and
(ii) a panel has been appointed under that Act to hear the application or amendment; and
(iii) the licence is substantially in accordance with the application or amendment as heard by the panel.
a) the land the applicant or its related entities own in the 'vicinity' of the subject land; and > > b) the applicant's participation in the EPA's decision making process in respect of the development licence application, particularly the public consultation process.
Without this information, the standing of the applicant to bring the application is not clear. Unless this is established by the applicant, then Proceeding P1641/2023 should be summarily dismissed.
a) irrespective of the outcome of the application for declaration, the Decision has been made under the Environment Protection Act 2017 (Vic), as provided for by section 4(2) of the Victorian Civil and Administrative Tribunal Act 1998 (Vic); > > b) the Decision is the subject of a separate application for review made in proceeding P1642/2023 by the same applicant. In determining proceeding P1642/2023, the Tribunal will 'stand in the shoes' of the EPA and make its own determination of the application for development licence; and > > c) even if the Tribunal was to make the declaration sought by the applicant in this Proceeding P1641/2023, namely that the Decision is affected by jurisdictional error, this would not preclude the Tribunal considering and determining the application for review in proceeding P1642/2023.
For these reasons, the question of whether the Decision itself was affected by jurisdictional error is of no practical consequence, and this Proceeding P1641/2023 should be summarily dismissed on the basis that it is misconceived.
Joint statement of facts agreed and not agreed
The Prospect Hill Energy from Waste Project (the Project) proposes the development of an EfW plant near Lara, Geelong. The Project proposes to use conventional moving grate boiler technology, with a steam boiler and steam turbine to recover energy by combusting non-hazardous Municipal Solid Waste (MSW) supplemented with Commercial and Industrial (C&I) waste. The plant aims to divert approximately 400,000 tonnes per annum (tpa) of MSW and C&I waste from landfill and generate approximately 35 megawatts of electricity (MWe) which will be fed into the existing grid.

Process following lodgement - requests further information
EPA'S assessment of the application - overview
























Historic context and new regime under EP Act 2017
The purpose of the EP Act 2017[86]
Purposes
1 The main purposes of this Act are -
(a) to provide for the continuation of the Environment Protection Authority; and
(b) to specify a new objective of the Environment Protection Authority; and
(c) to provide for a new governance structure of the continued Environment Protection Authority; and
(d) to provide for the Governing Board of the Environment Protection Authority; and
(e) to set out principles of environment protection; and
(f) to set out the legislative framework for the protection of human health and the environment from pollution and waste; and
(g) to provide for a general environmental duty to minimise risks of harm to human health and the environment from pollution or waste; and
(h) to establish a permissions scheme that enables the Environment Protection Authority to issue or grant development licences, operating licences, pilot project licences, permits and registrations; and
(i) to provide a framework for the management of waste; and
* * * * *
(k) to enable the Environment Protection Authority and authorised officers to ensure compliance with the Act and require action to manage risks of harm to human health and the environment from pollution or waste; and
(l) to provide for a system of criminal and civil penalties; and
(m) to provide for a system of civil remedies and compensation orders available to the Court; and
(o) to make consequential amendments to the Public Administration Act 2004 and other Acts.
(1) The objective of the Authority is to protect human health and the environment by reducing the harmful effects of pollution and waste.
(2) The Authority must exercise its powers and perform its duties and functions under this Act or any other Act for the purposes of achieving the objective set out in subsection (1) to the extent that it is practicable to do so having regard to the nature of the power being exercised or the duty or function being performed.
359 Powers of the Authority
(1) The Authority has -
(a) any power conferred on the Authority under this or any other Act; and
(b) the power to do all things that are necessary or convenient to be done for or in connection with the performance of the Authority's functions and duties and to enable the Authority to achieve its objective.
(2) The Authority may give advice to a person who has a duty or obligation under this Act about complying with that duty or obligation.
(3) The Authority's power under subsection (2) to give advice may also be exercised by an authorised officer.
(4) The giving of advice under subsection (2) by the Authority or an authorised officer does not give rise to -
(a) any liability of, or other claim against, the Authority; or
(b) any right, expectation, duty or obligation that would not otherwise be conferred or imposed on the person given the advice; or
(c) any defence that would not otherwise be available to that person.
(5) The Authority has power -
(a) to apply for, obtain and hold intellectual property rights (including patents, copyrights, trade marks and registered designs); and
(b) to enter into agreements or arrangements for the commercial exploitation within or outside Victoria of those intellectual property rights and ancillary services on any terms or conditions as to royalties, lump sum payments or otherwise as the Authority may see fit.
Part 4.2 - Permissions required for certain activities
(1) A person must not engage in one or more of the following activities except as authorised by a development licence in respect of the activity -
(a) the construction or installation of plant or equipment for a prescribed development activity;
(b) the development of processes or systems for a prescribed development activity;
(c) the modification, other than general maintenance, of plant, equipment, processes or systems for a prescribed development activity or of the operation of a prescribed development activity -
(i) if the modification creates a risk of material harm to human health or the environment from pollution or waste; or
(ii) in prescribed circumstances.
Penalty: In the case of a natural person, 2000 penalty units;
In the case of a body corporate, 10 000 penalty units.
Note
Section 314 provides that subsection (1) is a civil penalty provision. The penalty for contravention of this civil penalty provision is set out in the table in section 314.
(2) Subsection (1) does not apply -
(a) in respect of any action or thing the person takes or does to comply with -
(i) a pilot project licence issued to the person that is in force in respect of the activity; or
(ii) an authorisation granted to the person under section 157 that is in force in respect of the activity; or
(iii) an exemption granted to the person under section 80(1) that is in force in respect of the activity; or
(iv) requirements specified under section 48(a) in respect of the activity; or
(b) in respect of any action or thing that the person is required to take or do under an improvement notice or environmental action notice; or
(c) if a prescribed exemption applies to the person.
(3) An offence under subsection (1) is an indictable offence.
Note
This offence may be heard and determined summarily (see section 28 of the Criminal Procedure Act 2009).
activity includes -
(a) the storage or possession of waste or any other substance or thing; or
(b) anything prescribed to be an activity;
(1) For the purposes of section 44 of the Act, an activity set out in column 3 of the Table in Schedule 1 is a prescribed development activity if the corresponding entry in column 4 of that Table specifies that the activity is a prescribed development activity.
(2) ...
Recovering energy from waste at a rated capacity of at least 3 megawatts (MW) of thermal capacity or at least one MW of electrical power'
Part 4.3 - General provisions relating to permissions
50 Form and contents of applications
(1) An application for a permission must -
(a) be made -
(i) in the case of an application made to the Authority, in a form and manner approved by the Authority; or
(ii) in the case of an application made to a council, in the prescribed form and manner; and
(b) be accompanied by the prescribed fee (if any) for the application; and
Note
An additional fee may be payable under section 50A.
(c) specify whether the application is for -
(i) a development licence; or
(ii) an operating licence; or
(iii) a pilot project licence; or
(iv) a permit; or
(v) a registration;
(d) specify the activity in relation to which the permission is sought; and
(e) include any prescribed information.
(2) The Authority or a council -
(a) must not deal with an application that does not comply with this section; and
(b) must advise an applicant if an application does not comply with this section.
83 My understanding is that there are no prescribed matters of relevance in this case.
51A Authority or council may require additional information
The Authority or council (as the case requires) may require an applicant to provide the Authority or council with any information relating to a relevant permission application that the Authority or council considers necessary.
(1) The Authority or a council may issue a permission subject to conditions specified in the permission.
(2) Without limiting subsection (1), the Authority or council may specify that a permission is subject to a condition -
(a) specifying measures the permission holder must take to comply with the general environmental duty when engaging in the permission activity; or
(b) measures the permission holder must take to meet the objects set out in section 111 when engaging in the permission activity; or
(c) ensuring that the permission activity is engaged in consistently with the Victorian Recycling Infrastructure Plan; or
(d) relating to the commissioning of plant or equipment, including the setting of performance standards for the commissioning of plant or equipment; or
(e) relating to the monitoring, testing or analysis of any impacts of engaging in the permission activity; or
(f) requiring the permission holder to provide monitoring data, information or performance reports to the Authority or council, the public or both; or
(g) relating to consultation with the local community; or
(h) requiring the permission holder to report to the Authority or council on compliance with the conditions of the permission; or
(i) relating to pollution incident planning, reporting or responses; or
(j) relating to the cessation of the permission activity; or
(k) requiring the permission holder to provide a financial assurance; or
(l) relating to any prescribed matter.
(3) Without limiting subsection (1), the Authority or council may specify that a permission is subject to a condition -
(a) that the permission activity must only be engaged in at a specified place or using a specified vehicle; or
(b) requiring a person or class of persons approved by the Authority or council to engage in a specified activity.
(4) For the purposes of subsection (2)(f), the Authority or council may specify in the permission -
(a) the intervals of time at which any monitoring data, information and performance reports must be supplied to the Authority or council or provided to the public; and
(b) the form and manner in which that data and information must be supplied to the Authority or council or provided to the public.
[Tribunal emphasis]
(1) The Authority must, not later than 4 months after receiving an application for a development licence that complies with section 50 -
(a) issue a development licence subject to any specified conditions that the Authority considers appropriate; or
(b) refuse to issue a development licence.
(2) The Authority must refer an application for a development licence to a prescribed agency for comment in the prescribed circumstances.
(3) When determining whether or not to issue a development licence, the Authority must take into account -
(a) any measures the applicant has taken or proposes to take in order to comply with the general environmental duty when engaging in the activity that is the subject of the application; and
(b) the impact of the activity on human health and the environment, including the impact on any environmental values identified in any relevant environment reference standard, taking into account any other activities being or proposed to be engaged in by the applicant or any other person; and
(c) the principles of environment protection; and
(d) the best available techniques or technologies; and
(e) whether the activity is otherwise consistent with this Act and the regulations;
(f) if the regulations require the Authority to refer the application to a prescribed agency, any comments or submissions received from that agency; and
(g) any comments and submissions received -
(i) in response to the notice of the application published under section 52; and
(ii) within the time specified in that notice; and
(iii) any prescribed matter.
(4) The Authority must refuse to issue the development licence if -
(a) the Authority considers that the activity that is the subject of an application poses an unacceptable risk of harm to human health or the environment; or
(b) the Authority determines that the person is not a fit and proper person to hold a development licence; or
(c) any prescribed circumstances exist.
(5) The development licence must specify the date on which the development licence expires.
(6) If the Authority decides to issue a development licence, the Authority must, within 5 business days of issuing the licence, take reasonable steps to notify each person who made a submission in relation to the application for the licence of the following -
(a) the decision to issue the licence;
(b) that certain persons may seek review of the decision under section 434.
[Tribunal emphasis]
(1) For the purposes of section 69(2) of the Act, the following agencies are prescribed -
(a) in the case of an application to conduct extractive industry or mining activities, the Minister administering the Mineral Resources (Sustainable Development) Act 1990;
(b) in the case of an application relating to an activity that is to be engaged in within one or more municipal districts, any responsible authority within the meaning of the Planning and Environment Act 1987;
(c) in the case of a significant development licence application, the Secretary to the Department of Health;
(d) any agency to which the Authority considers it appropriate in the circumstances to refer the application for comment.
(5) For the purposes of section 69(4)(c) of the Act, the following are prescribed circumstances -
(a) the proposed activity that is the subject of the application is prohibited by a planning scheme, unless the Authority has been advised under subregulation (2)(b) that an amendment to the planning scheme is to be prepared;
(b) the Secretary to the Department of Health provides written comments under subregulation (4) objecting to the issue of the development licence on the ground that public health is likely to be endangered if the development licence is issued.
25 General environmental duty
(1) A person who is engaging in an activity that may give rise to risks of harm to human health or the environment from pollution or waste must minimise those risks, so far as reasonably practicable.
Notes
See section 6 in relation to the concept of minimising risks of harm to human health and the environment.
Section 314 provides that subsection (1) is a civil penalty provision. The penalty for contravention of this civil penalty provision is set out in the table in section 314. See also section 314(3).
(2) A person commits an offence if the person contravenes subsection (1) in the course of conducting a business or an undertaking.
Penalty: In the case of a natural person, 2000 penalty units;
In the case of a body corporate, 10 000 penalty units.
(3) An offence under subsection (2) is an indictable offence.
Note
This offence may be heard and determined summarily (see section 28 of the Criminal Procedure Act 2009).
(4) Without limiting subsection (1), a person who is conducting a business or an undertaking contravenes that subsection if the person fails to do any of the following in the course of conducting the business or the undertaking, so far as reasonably practicable -
(a) use and maintain plant, equipment, processes and systems in a manner that minimises risks of harm to human health and the environment from pollution and waste;
(b) use and maintain systems for identification, assessment and control of risks of harm to human health and the environment from pollution and waste that may arise in connection with the activity, and for the evaluation of the effectiveness of controls;
(c) use and maintain adequate systems to ensure that if a risk of harm to human health or the environment from pollution or waste were to eventuate, its harmful effects would be minimised;
(d) ensure that all substances are handled, stored, used or transported in a manner that minimises risks of harm to human health and the environment from pollution and waste;
(e) provide information, instruction, supervision and training to any person engaging in the activity to enable those persons to comply with the duty under subsection (1).
(5) Without limiting subsection (1), a person who is conducting a business or an undertaking and engaging in an activity that involves the design, manufacture, installation or supply of a substance, plant, equipment or structure, contravenes that subsection if the person fails to do any of the following in the course of conducting the business or the undertaking and engaging in the activity, so far as reasonably practicable -
(a) minimise risks of harm to human health and the environment from pollution and waste arising from the design, manufacture, installation or supply of the substance, plant, equipment or structure when the substance, plant, equipment or structure is used for a purpose for which it was designed, manufactured, installed or supplied;
(b) provide information regarding the purpose of the substance, plant, equipment or structure and any conditions necessary to ensure it can be used in a manner that complies with the duty under subsection (1).
Section 6 - harm minimisation
(1) A duty imposed on a person under this Act to minimise, so far as reasonably practicable, risks of harm to human health and the environment requires the person -
(a) to eliminate risks of harm to human health and the environment so far as reasonably practicable; and
(b) if it is not reasonably practicable to eliminate risks of harm to human health and the environment, to reduce those risks so far as reasonably practicable.
(2) To determine what is (or was at a particular time) reasonably practicable in relation to the minimisation of risks of harm to human health and the environment, regard must be had to the following matters -
(a) the likelihood of those risks eventuating;
(b) the degree of harm that would result if those risks eventuated;
(c) what the person concerned knows, or ought reasonably to know, about the harm or risks of harm and any ways of eliminating or reducing those risks;
(d) the availability and suitability of ways to eliminate or reduce those risks;
(e) the cost of eliminating or reducing those risks.
4 What is harm?
(1) In this Act, harm, in relation to human health or the environment, means an adverse effect on human health or the environment (of whatever degree or duration) and includes -
(a) an adverse effect on the amenity of a place or premises that unreasonably interferes with or is likely to unreasonably interfere with enjoyment of the place or premises; or
(b) a change to the condition of the environment so as to make it offensive to the senses of human beings; or
(c) anything prescribed to be harm for the purposes of this Act or the regulations.
(2) For the purposes of subsection (1), harm may arise as a result of the cumulative effect of harm arising from an activity combined with harm arising from other activities or factors.
EPA Publication 1799.2 'Permissions Scheme Policy'
....
The EP Act introduces a new duties-based framework to target the risks of harm from pollution and waste in a more preventative manner, so that harms to human health and the environment are minimised.
The permissions scheme is an important part of EPA's broader approach to setting performance standards, such as conditions, and supporting and monitoring compliance. The permissions scheme in the new EP Act complements and supports the GED and waste duties by providing greater assurance that key risks are being effectively managed. It does this by prohibiting persons from engaging in specified activities without the appropriate permission and setting standards and customised conditions, including reporting requirements for permission holders.
...
The permissions scheme reinforces the GED and the prevention of harm through the control of who can conduct prescribed activities and participate in aspects of the waste industry, and the application of specific conditions for the conduct of prescribed activities.
The permissions scheme allows a risk-based and proportionate control of activities that present a significant risk to human health and the environment. Over time, the scheme will evolve along with the overall legislative framework, further utilising risk-based mechanisms to incentivise and sustain high performance.
...
Licences are a category of permission that address complex activities that justify the highest level of regulatory control due to the significant risk of harm to human health and the environment or a high potential for mismanagement. Decisions on licence applications will involve a detailed assessment and a licence that is granted will include customised conditions and undergo ongoing oversight by EPA.
A Development Licence (DL) covers the design, construction and modification stages of complex, high-risk activities. The process allows EPA to make a science and evidence-based assessment of the design, seek the views of the community and interested stakeholders, and drive innovation and better practice. This is an important tool in preventing harm as it supports the proponent to more effectively seek options to mitigate risks and allows EPA to influence the design of works or a facility, including operating and management capability, before it is built.
DLs will lead to an Operating Licence or Permit where specified in the Regulations, and once the development activity has been completed, to enable the operational stage of the activity.
The statutory EPA assessment time of DL applications is up to four months. These licences can contain conditions specifically for the commissioning of the plant or equipment. DLs are subject to expiry dates which will be specified within the licence. DLs are subject to a public notification and consultation process set out in the EP Act and the Charter of Consultation.
As the permissions scheme supports the operation of the GED, conditions of a permission will complement a permission holder's compliance with the GED and reinforce the state of knowledge around the management of risks of harm.
Conditions in a permission will focus on the key risks of the permissioned activity and may not be exhaustive of all measures that the holder needs to take to discharge their GED. Therefore, a permission may include conditions that address only a subset of the risks that a duty holder may need to manage under the GED, with guidance and good industry practices providing state of knowledge about how other risks should be managed.
Where compliance with a permission condition addresses a particular risk of harm, and the holder of the permission complies with that condition, they will be taken to have performed a duty or satisfied an obligation.
In some circumstances, including where the combined impact of multiple activities results in risks of a cumulative nature, EPA may raise the performance standards beyond the level of the GED by specifically requiring the use of best available techniques and technology.
Permissions may also include conditions that require administrative and management actions, such as:
Consistent with the principle of accountability in the EP Act, EPA believes that the public should have access to reliable information that supports a good understanding of the condition of the environment, risks of harms, and of how decisions are made in relation to environmental protection. This principle includes providing opportunities to be engaged in decision-making and have their interests taken into consideration.
EPA Publication 2011 'Development licence application guidance'
Anderson v PWM (Lyndhurst) Pty Ltd & Anor ('Anderson')[97]
The Court of Appeal in Mason & Ors v Head, Transport for Victoria [2021] VSCA 19 summarised the relevant principles of statutory construction through the leading cases at [24] and observed that:
In Alcan (NT) Alumina Pty Ltd v Commissioner of Territory Revenue (Northern Territory) [2009] HCA 41; (2009) 239 CLR 27, 46-7 [47] (citations omitted), Hayne, Heydon, Crennan and Kiefel JJ said:
This Court has stated on many occasions that the task of statutory construction must begin with a consideration of the text itself. Historical considerations and extrinsic materials cannot be relied on to displace the clear meaning of the text. The language which has actually been employed in the text of legislation is the surest guide to legislative intention. The meaning of the text may require consideration of the context, which includes the general purpose and policy of a provision, in particular the mischief it is seeking to remedy.
In SZTAL v Minister for Immigration and Border Protection [2017] HCA 34; (2017) 262 CLR 362, 368 [14] (citations omitted), the High Court (Kiefel CJ, Nettle and Gordon JJ) again emphasized the importance of text, context and purpose:
The starting point for the ascertainment of the meaning of a statutory provision is the text of the statute whilst, at the same time, regard is had to its context and purpose. Context should be regarded at this first stage and not at some later stage and it should be regarded in its widest sense. This is not to deny the importance of the natural and ordinary meaning of a word, namely how it is ordinarily understood in discourse, to the process of construction. Considerations of context and purpose simply recognise that, understood in its statutory, historical or other context, some other meaning of a word may be suggested, and so too, if its ordinary meaning is not consistent with the statutory purpose, that meaning must be rejected.
In Project Blue Sky Inc v Australian Broadcasting Authority [1998] HCA 35; (1998) 194 CLR 355, McHugh, Gummow, Kirby and Hayne JJ also gave guidance with respect to the proper construction of the statutory text, explaining that the primary object of statutory construction is to construe the relevant provision so that it is consistent with the language and purpose of all the provisions of the statute and emphasising that the meaning of the provision must be determined by reference to the language of the instrument viewed as a whole. Their Honours continued (381-2 [69]) (citations omitted):
A legislative instrument must be construed on the prima facie basis that its provisions are intended to give effect to harmonious goals. Where conflict appears to arise from the language of particular provisions, the conflict must be alleviated, so far as possible, by adjusting the meaning of the competing provisions to achieve that result which will best give effect to the purpose and language of those provisions while maintaining the unity of all the statutory provisions.
Section 35 of the Interpretation of Legislation Act 1984 (Vic) further expressly provides that in the interpretation of the provision of an Act, a construction that would promote the purpose or object underlying the Act shall be preferred to a construction that would not promote that purpose or object.
Principles - jurisdictional error and materiality
[1] This appeal concerns jurisdictional error and the requirement of materiality.
Jurisdictional error and materiality
[2] Jurisdictional error can refer to breach of an express or implied condition of a statutory conferral of decision-making authority which results in a decision made in the purported exercise of that authority lacking the legal force attributed to exercise of that authority by statute. Though a decision affected by jurisdictional error is a decision in fact, it is "in law ... no decision at all" and is in that sense "void".
[3] Because an express or implied condition of a statutory conferral of decision-making authority can take many different forms, and because breach can occur in many different circumstances, the categories of jurisdictional error are not closed. Jurisdictional error can result from breach by a third party of a condition of a statutory process preceding a decision, but more often results from breach by a statutory decision-maker of a condition of the making of a decision. Jurisdictional error on the part of a statutory decision-maker in making a decision can include: misunderstanding the applicable law; asking the wrong question; exceeding the bounds of reasonableness; identifying a wrong issue; ignoring relevant material; relying on irrelevant material; in some cases, making an erroneous finding or reaching a mistaken conclusion; or failing to observe some applicable requirement of procedural fairness.
[4] A statute which contains an express or implied condition of a conferral of decision-making authority is not always to be interpreted as denying legal force and effect to every decision that might be made in breach of that condition. Only by construing the statute so as to understand the limits of the statutory conferral of decision-making authority is it possible to determine, first, whether an error has occurred (that is, whether there has been a breach of an express or implied condition of the statutory conferral of decision-making authority) and, second, whether any such error is jurisdictional (that is, whether the error has resulted in the decision made lacking legal force).
[5] Determining whether an error exists as well as whether it is jurisdictional starts with an analysis of the nature of the error alleged in the statutory context within which the decision has been made. Given the broad range of decisions in which errors might be made, the large variety of statutory schemes in which those decisions might be made, and the range of circumstances which may attend the making of any particular decision, it is impossible to divine a rigid classification of the errors that constitute jurisdictional errors. There are no bright lines to be drawn -
"[t]he nature of the error has to be worked out in each case concerning a specific decision under a particular statute".
[6] In some cases, where an error is established, the error will be jurisdictional irrespective of any effect that the error might or might not have had on the decision that was made in fact. In other cases, the potential for an effect on the decision will be inherent in the nature of the error. An example of the former is apprehended or actual bias. An example of the latter is unreasonableness in the final result. In such cases, the error necessarily satisfies the requirement of materiality.
[7] In most cases, however, an error will only be jurisdictional if the error was material to the decision that was made in fact, in the sense that there is a realistic possibility that the decision that was made in fact could have been different if the error had not occurred. That is because it is now accepted that a statute which contains an express or implied condition to be observed in a decision-making process is ordinarily to be interpreted as incorporating such a "threshold of materiality" in the event of non-compliance.
[8] The reasons of the primary judge and the Full Court in the present case, as well as other trial and intermediate appellate decisions, suggest uncertainty or confusion about the meaning and effect of some of the language used by the Court in identifying the principles to be applied in assessing materiality. It would be unsatisfactory if that uncertainty or confusion persisted. It is desirable to give practical guidance in terms with which all the Court agree. Necessarily, differences of expression and emphasis previously adopted by individual Justices have been set aside in favour of the guidance that is now set out.
Two questions
[9] Where it is alleged in an application for judicial review that a decision is affected by jurisdictional error constituted by a breach of an express or implied condition of a conferral of decision-making authority by a statute which incorporates a requirement of materiality, there are two questions: has an error occurred; and, if so, was that error material.
[10] The inquiry posited by each question is wholly backward-looking. Both questions are to be answered by reference to the decision that was made and, depending on the nature of the error, how that decision was made. Those are facts in respect of which the applicant for judicial review bears the onus of proof on the balance of probabilities. Proof of these facts ought to be neither difficult nor contentious.
[11] What must be proved to show what decision was made and how it was made will depend upon the nature of the error. In a common case - of which the present is an example - where the error alleged is breach of a condition governing the reasoning to be undertaken by the decision-maker, the applicant's onus of proving the relevant facts is discharged by nothing more than the tender of the decision-maker's statement of reasons.
[12] Where the jurisdictional error alleged is one concerned with the process of the decision making, such as a denial of procedural fairness, what must be proved by the applicant will depend upon the precise error alleged to have occurred in the decision-making process, having regard to any relevant statutory provisions within the applicable legislative framework. Examples of the types of evidence that have been sufficient for establishing the relevant facts in such cases include the appellate record, and evidence of the content of a document or information that was required to be provided as part of the decision-making process.
[13] The applicant must satisfy the court on the balance of probabilities that the alleged error in fact occurred. Unless the error is of a type such as those identified at [6] above (where the error is always material and therefore jurisdictional), whether the error is, or is not, material is determined by inferences drawn from the evidence adduced on the application.
[14] The question in these cases is whether the decision that was in fact made could, not would, "realistically" have been different had there been no error. "Realistic" is used to distinguish the assessment of the possibility of a different outcome from one where the possibility is fanciful or improbable. Though the applicant must satisfy the court that the threshold of materiality is met in order to establish that the error is jurisdictional, meeting that threshold is not demanding or onerous.
[15] What must be shown to demonstrate that an established error meets the threshold of materiality will depend upon the error. In some cases, it will be sufficient to show that there has been an error and that the outcome is consistent with the error having affected the decision. Where the error is a denial of procedural fairness arising from a failure to put the applicant on notice of a fact or issue, the court may readily be able to infer that, if fairly put on notice of that fact or issue, the applicant might have addressed it by way of further evidence or submissions, and that the decision-maker would have approached the applicant's further evidence or submissions with an open mind. In those cases, it is "no easy task" for the court to be satisfied that the loss of such an opportunity did not deprive the person of the possibility of a successful outcome. Importantly, a court called upon to determine whether the threshold has been met must be careful not to assume the function of the decision-maker: the point at which the line between judicial review and merits review is crossed may not always be clear, but the line must be maintained. This case affords an example.
[16] In sum, unless there is identified a basis on which it can be affirmatively concluded that the outcome would inevitably have been the same had the error not been made, once an applicant establishes that there has been an error and demonstrates that there exists a realistic possibility that the outcome of the decision could have been different had that error not been made, the threshold of materiality will have been met (and curial relief will be justified subject to any issue of utility or discretion).
[Tribunal emphasis] [Footnotes excluded]
The application of the principles in LPDT in this proceeding
...
It would be unsatisfactory if that uncertainty or confusion persisted. It is desirable to give practical guidance in terms with which all the Court agree. Necessarily, differences of expression and emphasis previously adopted by individual Justices have been set aside in favour of the guidance that is now set out.
Starting point - ascertain nature of error alleged
Summary - the test to be applied when jurisdictional error is pleaded
Nature of the errors alleged by Bisinella and materiality
Were any of the alleged errors advanced by Bisinella material to the EPA's decision?
WAS THERE A CONSTRUCTIVE FAILURE TO EXERCISE JURISDICTION AND FAILURE TO CONSIDER MANDATORY RELEVANT CONSIDERATIONS?**
all point to a situation where the EPA purported to make a 'decision' in granting the Development Licence. However, in doing so, it acted unlawfully because it did not comply with the statutory scheme and thus there is no valid 'decision' made under section 69 of the EP Act 2017;
Principles to be applied in consider whether an error is established
Why EPA accepted the application in the form of a concept plan
Assessing concept design and performance-based applications
[101] EPA assesses development licence applications on a case-by-case basis. This takes into consideration the specific circumstances of the application, proposed activity, the activity site, and local community.
[102] In this case, the application was submitted based on a concept design. The concept design was developed with suitable technical support from an engineering consultancy firm experienced in the WtE industry, as well as a WtE technology vendor.
[103] The concept design does not present the final detailed designs of the facility. This will be finalised at a later stage subject to EPA oversight. However, it has clearly established specific environmental performance standards for the facility that the future design and constructed facility must adhere to.
[104] This includes such standards as air emission levels of pollutants from the facility's stack, noise and odour emissions, and hazardous waste management. The application demonstrates the reliability of the concept's design performance standards through reference facilities, other studies and literature, and internationally recognised standards such as the IED framework.
[105] This approach is only suitable for robust and well proven technology types such as moving grate incineration WtE facilities. This approach is commonly used when seeking environmental approvals for the WtE industry.
[106] EPA's assessment of the application focuses on whether the concept design and environmental performance standards are consistent with EPA's assessment criteria including the general environmental duty (GED) and the elimination or reduction of risks of harm to human health and environment so far as reasonably practicable, and the adoption of BATT.
[107] EPA also assesses the application to determine if the proposed technology type is robust and proven and whether the concept design and environmental performance standards are reliably and technically viable.
[108] As explained in Section 3.6, if a development licence is granted the company will proceed to an open EPC tender process. The development licence and its conditions form part of these commercial arrangements.
[109] EPA incorporates a comprehensive set of conditions if EPA is satisfied that the application demonstrates compliance with EPA's assessment criteria. This ensures that these are firmly established for the applicant's EPC tender process. For this reason, the development licence includes more conditions than would otherwise be considered necessary.
[110] EPA also imposes additional requirements on concept design and performance-based applications which are not usually required. For example, EPA requires involvement of an EPA-appointed auditor (or suitably qualified person approved in writing) at the detailed design, construction and commissioning phase of the project.
[111] The following assessment should be read with this context in mind.
Form of Application as a 'concept plan' acceptable
Abbreviations
Executive summary
Background: waste to energy
Application proposal
Development licence application details
EPA assessment framework
Referral agency consultation
Community engagement
EPA assessment
EPA decision
Next steps
Other approvals required
Independent verification of detailed design and construction
Development licence milestones
1 Background
1.1 Applicant information
1.2 Facility overview
1.3 Assessment process timeline
1.4 What is waste to energy?
1.4.1 Waste to energy in Victoria
2 Activity site
2.1 Activity site description
2.2 Surrounding environment
2.3 Land use zones and development overlays
2.3.1 Statuary planning context
2.3.2 Strategic planning context
3 Proposal overview
3.1 Waste to energy facility
3.2 Conceptual design and configuration
3.2.1 Activity site layout
3.2.2 Proposed waste or 'waste feedstock'
3.2.3 Waste tipping hall
3.2.4 Waste bunker and cranes
3.2.5 Waste feeding hopper
3.2.6 Moving combustion grate
3.2.7 Furnace and heat recovery boiler
3.2.8 Steam turbine and generator
3.2.9 Flue gas emission and air pollution control system
3.2.10 Continuous emission monitoring system
3.2.11 Stack
3.2.12 Cooling water system
3.2.13 Wet bottom ash extraction system
3.2.14 Bottom ash treatment building
3.3 Construction
3.4 Commissioning
3.5 EPC tender process and concept design
3.6 Reference facilities
4 Consultation
4.1 Consultation carried out by applicant
4.2 Consultation carried out by EPA
5 Assessment framework
6 Assessment
Assessing concept design and performance-based applications
6.1 Measures to comply with the general environmental duty
6.1.1 Risk and hazard identification and management framework
Risk assessment
Conclusion
6.1.2 Construction activities
Identification of risk and degree of harm
Knowledge of risk and availability and suitability of controls to eliminate or reduce risks
Cost of eliminating or reducing those risks
Table 11: Environmental control measures and environmental performance standards - construction
Key considerations
Construction environment management plan
Conclusion
6.1.3 Greenhouse gas emissions
Identification of risk and degree of harm
Table 12: GHG inventory results (Scope 1-3 emissions)
Table 13: Operation non-energy relation emissions by source
Knowledge of risk and availability and suitability of controls to eliminate or reduce risks
Table 14: Environmental control measures and environmental performance standards - GHG emissions
Cost of eliminating or reducing those risks
Key considerations
Resource recovery
Energy efficiency
Commissioning and proof of performance
Conclusion
6.1.4 Air
Identification of risk and degree of harm
Knowledge of risk and availability and suitability of controls to eliminate or reduce risks
Cost of eliminating or reducing those risks
Table 15: Environmental control measures and performance standards - air emissions
Key considerations
Incineration plant, furnace and heat recovery boiler
Emission characterisation
Flue gas cleaning system
Licence limits and emission monitoring
Table 16: Proposed licence limits and emission monitoring
Reference facilities
Other than normal operating conditions (OTNOCs)
Commissioning and proof of performance
Conclusion
6.1.5 Noise
Identification of risk and degree of harm
Knowledge of risk and availability and suitability of controls to eliminate or reduce risks
Cost of eliminating or reducing those risks
Table 17: Environmental control measures and performance standards - noise emissions
Key considerations
Site planning, plant layout and configuration\Emission characterisation
Plant and mechanical equipment
Onsite vehicle movement
Other than normal operating conditions
Commissioning and proof of performance
Conclusion
6.1.6 Water, wastewater and stormwater
Identification of risk and degree of harm
Knowledge of risk and availability and suitability of controls to eliminate or reduce risks
Cost of eliminating or reducing those risks
Table 18: Environmental control measures and performance standards - water, wastewater and stormwater
Key considerations
Water consumption
Wastewater management
Stormwater management
Conclusion
6.1.7 Land and groundwater
Identification of risk and degree of harm
Knowledge of risk and availability and suitability of controls to eliminate or reduce risks
Cost of eliminating or reducing those risks
Table 19: Environmental control measures and performance standards - land and groundwater
Key considerations
Chemical, fuels and dangerous goods storage
Construction, waste bunker and groundwater
Conclusion
6.1.8 Odour
Identification of risk and degree of harm
Knowledge of risk and availability and suitability of controls to eliminate or reduce risks
Cost of eliminating or reducing those risks
Table 20: Environmental control measures and performance standards - odour
Key considerations
Waste tipping hall and bunker
Other than normal operating conditions
Commissioning and proof of performance
Conclusion
6.1.9 Waste (incoming)
Identification of risk and degree of harm
Knowledge of risk and availability and suitability of controls to eliminate or reduce risks
Incoming waste management controls
Cost of eliminating or reducing those risks
Table 21: Environmental control measures and performance standards - waste (incoming)
Key considerations
Targeted waste feedstock - access and availability
Targeted waste - Victorian Waste to Energy Framework
Waste characterisation and auditing
Waste Acceptance Criteria and procedures
Pre-incineration waste storage and management
Waste treatment or incineration
Commissioning and proof of performance
Conclusion
6.1.10Waste (outgoing)
Outgoing waste management controls
Cost of eliminating or reducing those risks
Table 22: Environmental control measures and performance standards - waste (outgoing)
Waste characterisation and classification
Monitoring and classification
Storage, handling and management
Resource recovery and IBA treatment
Conclusion
6.2 Impact of the activity on human health and environment
6.2.1 Human health
Human health risks associated with waste to energy facilities - EPA Victoria (2018)
Human health risks associated with waste to energy facilities - Public Health England (2019)
Human health risks associated with waste to energy facilities - Public Health Scotland (2022)
Human Health Impact Assessment
Psychological health impacts
Conclusion
6.2.2 Climate change and greenhouse gas emissions
Operations - variation in feedstock
Operations - displaced gird electricity
Operations - avoided emissions from landfilling
Other avoided emissions not accounted
Avoided emissions over the lifespan of the facility
Conclusion
6.2.3 Air
Conclusion
6.2.4 Noise
Risk of low frequency sound
Risk from noise emissions on environment values
Conclusion
6.2.5 Odour
Conclusion
6.3 Principles of environment protection
6.3.1 Relevance of the principles to the approvals process
6.3.2 Principle of integration of environmental, social and economic considerations
6.3.3 Principle of proportionality
6.3.4 Principle of primacy of prevention
6.3.5 Principle of polluter pays
6.3.6 Principle of waste management hierarchy
6.3.7 Principle of evidence-based decision-making
6.3.8 Precautionary principle
6.3.9 Principle of equity
6.3.10 Principle of accountability
6.3.11Principle of conservation
Conclusion
6.4 Best available techniques and technologies
6.5 Whether the activity is otherwise consistent with the Act and Regulations
6.5.1 Section 52A Authority may refuse certain applications inconsistent with Victorian Recycling Infrastructure Plan
6.6 Comments or submissions from prescribed referral agency
6.6.1 Planning Authority - Minister for Planning
Conclusion
6.6.2 Barwon Region Water Corporation
Conclusion
6.6.3 City of Greater Geelong
6.6.4 WorkSafe Victoria
Conclusion
6.6.5 Recycling Victoria
6.6.6 Sustainability Victoria
6.7 Comments and submissions received from third parties
6.7.1 Submission period 24 March to 28 April 2021
6.7.2 Community conference 13 July 2021
6.7.3 Submission period 13 to 28 October 2021
6.7.4 Submission period 22 June to 13 July 2023
6.7.5 Consideration of key themes and issues in comments and submissions by third parties
Human health: Risks to human health from air emissions and residual wastes
Consultation
Applicant documentation
EPA assessment
Controls and conditions
Human health: Risks to human health from emergency or other than normal operating conditions
Consultation
Applicant documentation
EPA assessment
Controls and conditions
Separate or buffer distances to sensitive receptors (such as homes, schools): many submissions
Consultation
Applicant documentation
EPA assessment
Controls and conditions
Public reporting of monitoring performance
Consultation
Controls and conditions
Contamination in incoming waste
Consultation
Applicant documentation
EPA assessment
Controls and conditions
Resource recovery
Consultation
Applicant documentation
EPA assessment
Controls and conditions
Level of detail and scope of assessments supporting the concept design
Consultation
Applicant documentation
EPA assessment
Controls and conditions
Greenhouse gas emissions and climate change
Consultation
Applicant documentation
EPA assessment
Controls and conditions
Waste
Consultation
Applicant documentation
EPA assessment
Fit and proper person assessments
Consultation
Response
Environment effects statement
Consultation
Response
Principles of environment protection
Consultation
Response
Matters raised but not assessed by EPA
6.8 Any prescribed matters
6.8.1 Regulation 112 Generators or emitters of Class 3 substances
6.8.2 Regulations 167 and 168 Financial assurances
7 Other assessment considerations
7.1 Climate Change Act 2017
7.1.1 Potential impacts of climate change relevant to the decision or action
7.1.2 Potential contribution to the state's greenhouse gas emissions of the decision or action
7.1.3 Conclusion
7.2 Flora and Fauna Guarantee Act 1988
7.2.1 Flora and fauna assessment
7.2.2 Objectives of the FFG Act
Instruments of the FFG Act
7.2.3 Conclusion
7.3 Charter of Human Rights and Responsibilities Act 2006
7.3.1 Right to life
7.3.2 Right to privacy and reputation
7.3.3 Protection of families and children
7.3.4 Taking part in public life
7.3.5 Conclusion
7.4 Minamata Convention on Mercury
7.4.1 Conclusion
7.5 Stockholm Convention on Persistent Organic Pollutants
7.5.1 Conclusion
7.6 Prohibited and fit and proper person
7.6.1 Prohibited person
7.6.2 Fit and proper person
7.6.3 Conclusion
8 Decision
8.1.1 Other approvals required
8.1.2 Independent verification of detailed design and construction
8.1.3 Development licence milestones
9 Conditions
References
Appendix
Appendix A: List of application documents and information
Appendix B: Summary of submissions received between 24 March and 28 April 2021
Appendix C: Conference of Interested Persons Report
Appendix D: Summary of submissions received between 13 and 28 October 2021
Appendix E: Summary of submissions received between 20 June and 13 July 2023
Appendix F: BATT assessment
Appendix G: Referral agency responses
[611] Under section 69(3)(e) of the EP Act, EPA must take BATT into account. BATT can be defined as techniques and technologies with the lowest impact on the environment without compromising the economic health of the (industrial) enterprises concerned (EPA, 2022c) (EPA, 2021a).
[612] In considering BATT for the application, EPA has relied primarily on the EU framework under EU IED and the BREF and BATC 2019, as discussed in Section 3.2.
[613] The EU framework is informed by decades of regulatory and technical expertise overseeing the development and operation of WtE facilities throughout the EU. EPA considers this framework as the leading international standard for the industry, a position also recommended in NSW (EPA, 2107) (NSW Government, 2020). BAT under this framework is taken to be compatible with BATT under the EP framework (Article 3(10) of the EU IED).
[614] Under the EU framework, BATC 2019 provides the key elements of the BAT reference document. They are intended as a reference for setting permit or approval conditions for installations covered by Chapter II of EU IED. Existing EU facilities were given four years to comply with the BATC. The BATC offers a suitable BATT performance standard and benchmark for this application.
[615] EPA's assessment of the application against the EU framework is presented in Appendix F: BATT assessment. The standards specified in the BATC are considered critical performance benchmarks for the detailed design phase of the development either as proposed in the application or as prescribed by condition. As the BATC 2019 recommendations are intended as references for setting approval conditions, the assessment also includes an alignment of EPA conditions with the BATC.
'Eliminate risk' or 'reduce risks' 'so far as reasonably practicable'
EPA's primary role is to protect human health and environment from waste and pollution. EPA's permissioning assessment framework requires risks of harm to human health to be eliminated. If that is not feasible, risks must be reduced so far as reasonably practicable. EPA must refuse to grant a development licence for any activity that poses an unacceptable risk of harm to human health and the environment.
Prospect Hill considered the potential impacts of its activities, carrying out impact assessments and proposing administrative and engineering controls designed to eliminate or reduce risks of harm. EPA reviewed the assessments submitted by Prospect Hill to ensure their conclusions were evidence based and used scientifically valid methodology. The EPA also reviewed the application's proposed controls against EPA guidelines, the internationally recognised best available technique (BAT) standards of the European Union (EU) and any other relevant information.
Table B summarises the assessment done for the seven key issues raised during consultation.
In assessing potential risks, EPA has identified a series of conditions which, when implemented, will further reduce risk of harm to human health and the environment (Table C).
[112] Under section 69(3)(a), EPA must take into account any measures the applicant has taken or proposes to take to comply with the GED when engaging in the activity subject of the application. The GED is defined under section 25(1) of the EP Act:
S 25(1) A person who is engaging in an activity that may give rise to risks of harm to human health or the environment from pollution or waste must minimise those risks, so far as reasonably practicable.
[113] Section 25(4) and (5) also sets out the actions a person conducting such an activity must do, so far as reasonably practicable, to comply with the GED:
S 25(4) _Without limiting subsection (1), a person who is conducting a business or an undertaking contravenes that subsection if the person fails to do any of the following in the course of conducting the business or the undertaking, so far as reasonably practicable - _
S 25(4)(a) use and maintain plant, equipment, processes and systems in a manner that minimises risks of harm to human health and the environment from pollution and waste;
S 25(4)(b) use and maintain systems for identification, assessment and control of risks of harm to human health and the environment from pollution and waste that may arise in connection with the activity, and for the evaluation of the effectiveness of controls;
S 25(4)(c) use and maintain adequate systems to ensure that if a risk of harm to human health or the environment from pollution or waste were to eventuate, its harmful effects would be minimised;
S 25(4)(d) ensure that all substances are handled, stored, used or transported in a manner that minimises risks of harm to human health and the environment from pollution and waste;
S 25(4)(e) provide information, instruction, supervision and training to any person engaging in the activity to enable those persons to comply with the duty under subsection (1).
[114] Section 6 of the EP Act defines the concept of 'minimising risks of harm to human health and environment' along with a guiding framework for determining 'so far as reasonably practicable'. The GED requires persons carrying out such an activity to eliminate risks of harm to human health and the environment so far as reasonably practicable and, if it is not reasonably practicable, to reduce those risks so far as reasonably practicable.
[115] To determine what is reasonably practicable (EPA, 2020b) in relation to minimising risks of harm to human health and environment, the following must be considered:
• the likelihood of those risks eventuating,
• the degree of harm that would result if those risks eventuated,
• what the person concerned knows, or ought reasonably to know, about the harm or risks of harm and any ways of eliminating or reducing those risks,
• the availability and suitability of ways to eliminate or reduce those risks, and
• and the cost of eliminating or reducing those risks.
[116] EPA's assessment of the application against the GED framework looks at how the application has identified risks of the proposed activity and the measures identified to eliminate or reduce risks of harm to human health and environment so far as reasonably practicable (EPA, 2022a) (EPA, 2021a). It also considers to what extent the measures address or are consistent with the requirements outlined in S25(4)(a)-(e). In doing so, EPA's assessment follows the general advice or process steps in controlling hazards and risks as recommended by EPA (see Figure 5).
[117] BATT for WtE under the EU framework specifies both mechanical and administrative controls - and does so in a risk-based approach. In this regard, the BATT measures of the EU framework may also be considered generally consistent and complementary with the preventative approach of the GED. While the EU framework refers to BAT under its framework, this is compatible with BATT under the EP framework. These terms are used interchangeably throughout this report. For further details on these terms, see Section 6.4.
[Tribunal emphasis]
2. constantly adhering to the same principles, course, etc.
3. Obsolete holding firmly together; cohering.
4. Obsolete fixed; firm; solid.
'Compatible'
adjective
1. capable of existing together in harmony.
2. capable of orderly, efficient integration with other elements in a system.
3. (of a drug) capable of tolerating another drug without undesirable chemical reaction or effect; biocompatible.
4. (of a computer peripheral) able to work in conjunction with another specified device.
noun
5. an item of computer software or hardware able to work in conjunction with another specified device.
'Complementary'
adjective
1. forming a complement; completing.
2. complementing each other.
'Complement'
noun
1. that which completes or makes perfect.
2. the quantity or amount that completes anything.
verb
12. to complete; form a complement to.
13. to suit or go well with; enhance the good qualities of.
'Comparable'
adjective
1. capable of being compared.
2. worthy of comparison.
'Comparison'
noun
1. the act of comparing.
2. the state of being compared.
5. the capability of being compared or likened.
6. Grammar
[96] EPA takes an evidence and risk-based approach to its regulatory function and decision-making under the permissioning framework. EPA has regard to principles and obligations of the EP Act and all relevant subordinate regulations and policy frameworks. This application has been assessed against:
[97] Under section 69(3) of the EP Act, EPA must consider the following when deciding whether to issue a development licence:
6.1.1 Risk and hazard identification and management framework
6.1.2 Construction activities
6.1.3 Greenhouse gas emissions
6.1.4 Air
6.1.5 Noise
6.1.6 Water, wastewater and stormwater
6.1.7 Land and groundwater
6.1.8 Odour
6.1.9 Waste (incoming)
6.1.10Waste (outgoing)
[147] EPA has given regard to costs of eliminating or reducing risks of harm to human health and the environment and is satisfied that the proposed or imposition of BATT measures as defined under the EU IED 2010/75/EU and BREF and BATC 2019 represents reasonably practicable measures that the applicant must take and are proportionate to the risks of harm to human health and the environment.
[156] EPA has given regard to costs of eliminating or reducing risks and is satisfied that the proposed or imposition of BATT measures as defined under the EU IED 2010/75/EU and BREF and BATC 2019 is proportionate to the risks of harm. Cost has been raised by the applicant regarding additional resource recovery options prior to incineration. EPA has assessed this in further detail under key considerations below.
[157] EPA is imposing requirements for a system for the ongoing identification and implementation of resource recovery prior to incineration when it becomes financially feasible. This is implemented through development licence conditions and future operating licence conditions.
[158] In 2024, EPA will be reviewing operating licence conditions for large scale thermal WtE facilities. EPA will further develop the conditions and standards for identifying and implementing resource recovery prior to thermal treatment. This will ensure there is an ongoing, consistent, and industrywide standard in place.
[189] EPA has given regard to costs of eliminating or reducing risks and is satisfied that the proposed or imposition of BATT measures as defined under the EU IED 2010/75/EU and BREF and BATC 2019 is proportionate to the risks of harm assessed in section 6.2.3 Air.
[190] There are different treatment technologies and design configuration available for air emission controls and the FGCS treatment trains. The applicant has identified a configuration capable of achieving performance standards of the IED. This includes deployment of upgraded systems such as an advanced SNCR system to achieve standards of the BREF and BATC 2019.
[191] Cost has not been raised by the Applicant as a substantive impediment for eliminating or reducing risks including through implementation of BATT.
[241] EPA has given regard to costs of eliminating or reducing risks and is satisfied that the proposed or imposition of BATT measures as defined under the EU IED 2010/75/EU and BREF and BATC 2019 is proportionate to the risks of harm. Cost has not been raised by the Applicant as a substantive impediment for eliminating or reducing risks including through implementation of BATT.
[268] EPA has given regard to costs of eliminating or reducing risks and is satisfied that the proposed or imposition of BATT measures as defined under the EU IED 2010/75/EU and BREF and BATC 2019 is proportionate to the risks of harm. Cost has not been raised by the Applicant as a substantive impediment for eliminating or reducing risks including through implementation of BATT.
[290] EPA has given regard to costs of eliminating or reducing risks and is satisfied that the proposed or imposition of BATT measures as defined under the EU IED 2010/75/EU and BREF and BATC 2019 is proportionate to the risks of harm. Cost has not been raised by the Applicant as a substantive impediment for eliminating or reducing risks including through implementation of BATT.
[308] EPA has given regard to costs of eliminating or reducing risks and is satisfied that the proposed or imposition of BATT measures as defined under the EU IED 2010/75/EU and BREF and BATC 2019 is proportionate to the risks of harm. Cost has not been raised by the Applicant as a substantive impediment for eliminating or reducing risks including through implementation of BATT.
[330] EPA has given regard to costs of eliminating or reducing risks and is satisfied that the proposed or imposition of BATT measures as defined under the EU IED 2010/75/EU and BREF and BATC 2019 is proportionate to the risks of harm.
[384] EPA has given regard to costs of eliminating or reducing risks and is satisfied that the proposed or imposition of BATT measures as defined under the EU IED 2010/75/EU and BREF and BATC 2019 is proportionate to the risks of harm.
[Emphasis added]
Table 16: Proposed licence limits and emission monitoring
(a) First, that assessment was both context-specific and detailed. As noted in Part B.2 above, it was informed by a risk-assessment;
(b) Second, it formed part of a broader multi-disciplinary assessment of the measures proposed to implement the GED;
(c) Third, focussing specifically on that part of the EPA's assessment of the GED relating to air emissions, the Assessment Report documented that:
(i) The Application was properly informed by the current state of knowledge concerning the risks and hazards associated with the proposed activities;
(ii) The EPA was satisfied that the risks posed by air emissions had been undertaken in accordance with EPA Publication 1961, the environmental reference standards, and to an adequate standard for the concept phase of the proposal;
(iii) the Application identified a series of specific measures to 'reduce risks of harm associated with air emissions', being those engineering controls summarised in Table 15 of the Assessment Report;
(iv) those measures included the particular design elements specified in the Application, and secured under the Licence, in respect of:
- furnace combustion control;
- the Advanced Selective Non-Catalytic Reduction system;
- the Flue Gas Recirculation;
- lime and activated carbon powder injection in the flue gas duct;
- bag filter capture and Air Pollution Control residues;
- the Continuous Emissions Monitoring System;
(v) the EPA considered the question of cost, concluding that there was not any basis to not require the application of best available technologies and techniques (BATT) as a proportionate response to the risks posed;
(vi) the EPA proceeded to document the key considerations that informed its assessment in respect of various components and attributes of the proposal and the Application, including:
- the incineration plant, furnace and heat recovery boiler;
- emissions characterisation;
- the flue gas cleaning system;
- licence limits and emission monitoring;
- the reference facilities;
- other than normal operating conditions; and
- commissioning and proof of performance;
(vii) based upon the totality of this analysis, the EPA concluded that it was:
[233] ... satisfied that the application demonstrates a sufficient understanding of air emissions and the associated risks of hazards from the proposed activity. EPA is satisfied that the range of controls and performance standards incorporated into conditions will reduce the risk of harm from air emissions so far as reasonably practicable. This includes the ongoing administrative systems and processes for monitoring air emissions and contingency arrangements should risks or hazards occur.
(a) First, that assessment formed part of a broader multi-disciplinary assessment of the impacts of the proposal on human health and the environment;
(b) Second, the EPA's assessment was informed by the applicable Environmental Reference Standard, and focussed upon the residual risk posed by the proposal, noting EPA's satisfaction that it would implement the GED and adopt BATT;
(c) Third, the EPA noted that whilst the Air Quality Impact Assessment (AQIA) and Human Health Impact Assessment (HHIA) that formed part of the Application were prepared at the time that the former EP Act was in force, it was satisfied that the Application contained sufficient technical information to allow an assessment under the EP Act;
(d) Fourth, the EPA was satisfied that the AQIA was prepared to the standard of a 'Level 2 assessment' as defined in EPA's air pollution guideline, which was the 'most common type of risk assessment';
(e) Fifth, in respect of the approach that was adopted in respect of the modelling of proposed emissions by reference to the 'maximum emission limits allowed under the [2010 EC] IED', the EPA noted the following:
The AQIA applied a conservative assessment strategy. This included modelling the proposed air emissions for each pollutant assuming the maximum emission limits allowed under the [2010 EC] IED. For example, NOx was modelled using the 30-minute average under the [2010 EC] IED emission limits of 400 mg/Nm3. This compares to the daily BAT-AEL of 120 NOx under the [2019] BREF... - refer to Table 16 in this assessment report for more details. The modelling results may therefore be seen as representative of upset or OTNOCs rather than continuous normal operations.
(f) Sixth, the requirement that the facility comply with the BAT-AELs of the 2019 BREF and BATC 2019 under transient, part load, start-up and shut down, and normal operating conditions (Condition DL_G03/4f), was identified as a measure to 'reduce risks posed by air emissions';
(g) Seventh, based on the totality of this analysis, EPA concluded that:
Modelled risk estimates were not predicted to significantly impact sensitive receptors. EPA is satisfied that air emissions pose a low and acceptable risk to human health and the environment.
(a) First, that assessment was both context-specific and detailed. As noted in Part B.2 above, it was informed by a risk-assessment;
(b) Second, it formed part of a broader multi-disciplinary assessment of the measures proposed to implement the GED;
(c) Third, focussing specifically on that part of the EPA's assessment of GED relating to noise emissions, the Assessment Report documented that:
(i) EPA was satisfied that 'the application demonstrates an understanding of the noise emission risks of hazards associated with the proposed activities consistent with state of knowledge such as EPA WtE guidance (EPA, 2017), the [2010 EC] IED and [2019]BREF and BATC 2019, and standard industry practice';
(ii) the application had identified and assessed the risk of emitting unreasonable noise as determined in accordance with the EP Regulations and Noise Protocol;
(iii) whilst EPA had identified certain methodological issues in the Noise Impact Assessment (NIA), it was satisfied that the application had identified and assessed risks of noise emissions to a sufficient standard for the concept phase of the proposal, subject to a condition requiring submission of a revised NIA before commencing construction;
(iv) a number of specific measures and performance standards were specified within the Application 'to reduce risks of hazards associated with noise emissions';
(v) the EPA was satisfied that '[t]he final detailed design of the noise-generating plant and equipment will be confirmed through the detailed design phase but will adhere to the concept design in the application';
(vi) the EPA considered the question of cost, concluding that there was not any basis to not require the application of BATT as a proportionate response to the risks posed;
(vii) the EPA proceeded to document the key considerations that informed its assessment in respect of various components and attributes of the proposal and the Application, including:
- site planning, plant layout and configuration;
- plant and mechanical equipment;
- onsite vehicle movement;
- other than normal operating conditions; and
- commissioning and proof of performance;
(viii) based upon the totality of this analysis, the EPA concluded that it was:
[261] ... generally satisfied that the application demonstrates a sufficient understanding of noise risks associated with the proposed activity. EPA is satisfied that the range of noise controls should be sufficient to reduce the risk of harm from noise so far as reasonably practicable. This includes the ongoing administrative systems and processes for monitoring noise emissions should they occur.
Noise and Impacts on Human Health and the Environment
(a) First, that assessment formed part of a broader multi-disciplinary assessment of the impacts of the proposal on human health and the environment;
(b) Second, the EPA's assessment was informed by the applicable Environmental Reference Standard, and the applicable Noise Protocol;
(c) Third, the revised NIA submitted in response to the EPA's request for further information, was prepared in accordance with the EP Regulations and the Noise Protocol;
(d) Fourth, the EPA identified that a more stringent noise limit should be imposed, than the one that was utilised within the NIA;
(e) Fifth, the EPA cited the range of noise attenuation measures identified within the Application that could be implemented onsite, as a means of further reducing noise emissions below those modelled within the NIA;
(f) Sixth, the EPA indicated that it was 'satisfied that the proposed noise emission controls not incorporated into the noise modelling are sufficient to achieve its preferred noise limit';
(g) Seventh, the EPA indicated that this outcome would be secured as a consequence of PHI being required to 'verify this by providing an updated NIA based on the final detailed design before commencing construction, endorsed by a suitably qualified EPA appointed auditor (Condition DL_R04/13)', and noted that '[t]his will undergo further proof-of performance verification during the commissioning phase';
(h) Eighth, the EPA also specifically considered risk posed by low frequency noise and risk from noise emission on environment values;
(i) Ninth, based on the totality of this analysis, EPA concluded that it was:
... satisfied that noise emissions pose a low and acceptable risk to human health and environment and the relevant value of the ERS.
For some EfW plants processing hazardous wastes, a second stage wet scrubber is introduced which may be used to further treat flue gases. However, this is not considered necessary for MSW and C&I feedstock to meet the European air emission limits. This option will not be employed for this project due to the additional raw water and wastewater treatment requirements and additional water emissions generated.
UNCERTAINTY OR IS PERMISSION SIGNIFICANTLY DIFFERENT FROM APPLICATION**
EPA discharged its functions - the 'thing' applied for is the 'thing' which has been approved
Discretion should be exercised if error established


... Mechanisms allowing only a limited form of review of the decision have not been regarded as adequate, so the discretion to refuse relief has not been exercised against the applicant.
In support of this view, the Court referred to the decision in Robb v Nixon [2005] VSC 310 (Robb) where the Supreme Court held that a police officer's right to appeal against the Chief Commissioner's decision to dismiss them was not an adequate alternative to seeking judicial review of the Chief Commissioner's decision in the circumstances where the grounds of review were limited, and the applicant bore the onus of proof;[130]
Bisinella lodges application for declaratory relief in VCAT pursuant to d 436(1) of the EP Act 2017.
PHI makes a request for information from Bisinella. In P1641/2023 and P1642/2023.
VCAT tells PHI it is a non-party in P1641/2023 and can request a file inspection.
PHI requests a copy of the application in P1642/2023 to prepare a statement of grounds ('SOG').
Lara Residents write to VCAT indicating they are intending to register as an incorporated association with a view to lodging a SOG in P1641/2023 and P1642/2023.
O'Halloran's Road Pty Ltd & Ors seek to lodge grounds in P1641/2023 and P1642/2023 and they lodge SOGS.
PHI seeks advice from VCAT if it needs to re-lodge SOG in P1642/2023.
O'Halloran's Road Pty Ltd & Ors file a SOG in P1641/2023.
O'Halloran's Road Pty Ltd file an application out of time under sections 434(1) and (3)(a) of EP Act in P108/2024
VCAT tells PHI that if it wishes to amend its SOG in P1642/2023, it must do so by 5 February 2024.
O'Halloran's Road Pty Ltd & Ors seek to amend their SOG form to relate to P1642/2023 (and not P1641/2023).
VCAT advises O'Halloran's Road Pty Ltd & Ors that their SOG in P1641/2023 was filed late and if they wish to be joined they must file a joinder request, but the Tribunal later confirmed the email was sent by VCAT in error.
Application materials in P1641/2023, P1642/2023 and P108/2024 were sent by VCAT to the EPA, PHI and O'Halloran's Road Pty Ltd.
Charles Street files SOG in P1641/2023 and seeks joinder in P1641/2023.
Charles Street circulates his SOGs to Bisinella, EPA, PHI and O'Halloran's Road Pty Ltd & Ors.
VCAT advises and grants O'Halloran's Road Pty Ltd its request to amend SOGs to relate to P1642/2023 (and not P1641/2023).
VCAT provides a copy of the applications in P1641/2023 and P1642/23 to the EPA, PHI and O'Halloran's Road Pty Ltd & Ors.
VCAT advises PHI that a SOG fee in P1642/2023 was required but later advised this should be disregarded as an email sent in error.
Charles Street seeks amendments to his SOG lodged on 4 February 2024 which incorrectly referred to P1641/2023 when it should be P1642/2023.
VCAT advises Charles Street that his SOG is amended to relate to P1642/2023.
Bisinella advise that they can't file statements of contention in P1641/2023 and P1642/2023 by 14 February 2024 but can do so by 16 February 2024.
O'Hallorans's Road Pty Ltd & Ors indicate they consent to PHI filing statement of contentions on 16 February 2024.
Separate subsequent orders in P1641/2023, P1642/2023 and P108/2024 - scheduling:
Group case subsequent order in P1641/2023 and P1642/2023 & P108/2024
O'Halloran's Pty Ltd - provide consent order re no joinder in P1642/2023 and seek to withdraw P108/2024.
Procedural order - granting request that O'Halloran's Pty Ltd not be joined to P1642/2023 and no order as to costs.
Procedural order - granting leave for O'Halloran's Pty Ltd & Ors to withdraw the proceeding in P108/2024. No order as to costs.
Correction order to add extra orders to vacate the PLM on 9 & 10 May 2024 and vacate the second PDH on 17 June 2024.
Group order for P1641/2023 & P1642/2023 only - to delete purposes or milestones which are no longer relevant or have been vacated.
Preliminary hearing order in P1642/2023 and P1641/2023:
Hearing (interim orders) adjourning hearing to 28 August 2024:
Vacated by order of the Tribunal dated 2 August 2024:
Procedural order granting request to file joint issues statement on 24 September 2024
Leave for additional documents - new Tribunal Book 6
WAS THERE A CONSTRUCTIVE FAILURE TO EXERCISE JURISDICTION AND FAILURE TO CONSIDER MANDATORY RELEVANT CONSIDERATIONS?**
[Bisinella submits] there is no statutory basis for the Tribunal to accept the approach adopted by PHI and EPA because:
(1) identifies the assessment of BATT as 'part of' assessing controls to identify the most reasonably practicable measures to manage risks;[140]
(2) in Table 5 which identifies the matters the EPA will consider when evaluating compliance with the GED for development applications, identifies the consistency of proposed controls with BATT as one factor to be considered;[141]
(3) expressly provides that 'it is expected that an evaluation of multiple control options will be presented' which 'need[s] to highlight the relative benefits, costs and disadvantages of each option,[142] and this approach contemplates quantitative assessment of options in determining whether GED is met, rather than simply an adoption of BATT and notably no such evaluation occurred here;
(1) that each of BATT (section 69(3)(d)), compliance with the GED (section 69(3)(a)) and impacts to human health (section 69(3)(b)), will be considered whenever the EPA has to make a decision;
(2) section 69(4) impliedly imposes an obligation to consider whether the activity the subject of the application poses an unacceptable risk to human health and the environment;
(3) the obligations to consider these matters is not expressly nor impliedly qualified in any way by the text of the EP Act 2017;
(1) the Environment Reference Standard ('ERS') and this is confirmed in the Guide to the Environmental Reference Standard;[143]
(2) the air pollution assessment criteria ('APACs) also made in the GAMAPV, noting the EPA assessed the risk to human health as low and acceptable because the air emissions, if generated in accordance with BATT, would not exceed any of the APACs;[144]
(3) EU standards to act as a 'proxy' for discharging the GED;
EPA could not undertake the statutory task given how the Application was framed
Mischaracterisation of Bisinella's 'attack' to say the EPA's decision was 'open to it'
How the EPA misdirected itself in applying the EU framework
BATT for WtE under the EU framework specifies both mechanical and administrative controls - and does so in a risk-based approach. In this regard, the BATT measures of the EU Framework may also be considered generally consistent and complementary with the preventative approach of the GED. While the EU framework refers to BAT under its framework, this is compatible with BATT under the EP framework. These terms are used interchangeably throughout this report...
How EPA applied the EU framework and imposed conditions
...meets the requirements and procedures (including applicable emission limits) of the EU IED 2010/75/EU with and reduced emission levels necessary to reflect the outcomes of the future reports provided under condition DL_RO4 and which is capable of:
(i) operating within the BAT-AEL ranges for new plants contained in BAT 25, BAT 27, BAT 28, BAT 29, BAT 30 and BAT 31 of BATC 2019 under transient, part load and start-up and shutdown operating conditions; and
(ii) does not exceed the BAT-AEL ranges for new plant contained in BAT 25, BAT 27, BAT 28, BAT 29, BAT 30 and BAT 31 of BATC 2019 under all other operating conditions and reduce emissions within those ranges so far as reasonably practicable'
means the most effective and advanced stage in the development of activities and their methods of operation which indicates the practical suitability of particular techniques for providing the basis for emission limit values and other permit conditions designed to prevent and where that is not practicable, to reduce emissions and the impact on the environmental as a whole:
(a) 'techniques' includes both the technology used and the way in which the installation is designed, built, maintained, operated and decommissioned;
(b) 'available techniques' means those developed on a scale which allows implementation in the relevant industrial sector, under economically and technically viable conditions, taking into consideration the costs and advantages, whether or not the techniques are used or produced inside the Member State in question, as long as they are reasonably accessible to the operator;
(c) 'best' means most effective in achieving a high general level of protection of the environment as a whole;
[emphasis added]
Comparing the GED and concept of 'minimising risks of harm'
A person who is engaging in an activity that may give rise to risks of harm to human health or the environment from pollution or waste must minimise those risks, so far as reasonably practicable.
(1) A duty imposed on a person under this Act to minimise, so far as reasonably practicable, risks of harm to human health and the environment requires the person - > > > (a) to eliminate risks of harm to human health and the environment so far as reasonably practicable; and > > > > (b) if it is not reasonably practicable to eliminate risks of harm to human health and the environment, to reduce those risks so far as reasonably practicable. > > (2) To determine what is (or was at a particular time) reasonably practicable in relation to the minimisation of risks of harm to human health and the environment, regard must be had to the following matters - > > > (a) the likelihood of those risks eventuating; > > > > (b) the degree of harm that would result if those risks eventuated; > > > > (c) what the person concerned knows, or ought reasonably to know, about the harm or risks of harm and any ways of eliminating or reducing those risks; > > > > (d) the availability and suitability of ways to eliminate or reduce those risks; > > > > (e) the cost of eliminating or reducing those risks.
How the EU framework is not the same as the EP Act 2017
How the EPA misdirected itself and fell into error - using EU framework as a surrogate for GED
[611] Under section 69(3)( e) of the EP Act, EPA must take BATT into account. BATT can be defined as techniques and technologies with the lowest impacts on the environment without compromising the economic health of the (industrial) enterprises concerned (EPA, 2022c) (EPA, 2021a). > > ... > > [615] EPA's assessment of the application against the EU framework is presented in Appendix F: BATT assessment. The standards specified in the BATC are considered critical performance benchmarks for the detailed design phase of the development either as proposed in the application or as prescribed by condition. As the BATC 2019 recommendations are intended as references for setting approval conditions, the assessment also includes an alignment of EPA conditions with the BATC.
A consequence of the misdirection / error - section 69(4) of the EP Act 2017 (a risk that is an unacceptable risk of harm be refused)
Section 44 of the EP Act 2017 and plant and equipment
(1) A person must not engage in one or more of the following activities except as authorised by a development licence in respect of the activity - > > > a) the construction or installation of plant or equipment for a prescribed development activity; > > > (b) the development of processes or systems for a prescribed development activity; > > > > (c) the modification, other than general maintenance, of plant, equipment, processes or systems for a prescribed development activity or of the operation of a prescribed development activity - > > > > > (i) if the modification creates a risk of material harm to human health or the environment from pollution or waste; or > > > > > > (ii) in prescribed circumstances. > > Penalty: In the case of a natural person, 2000 penalty units; > > In the case of a body corporate, 10 000 penalty units
Common ground - a conceptual design is not unlawful per se
Part A - How the Application was framed and informed by a 'concept design' was appropriate







Appendix M should be read in context of the Application as a whole
Was there a suffcient level of specificity to enable the EPA to assess the approval in accordance with its statutory obligations?
Part B - The statutory regime and why a 'concept design' could form the basis of the Application
(a) a defining feature of new approval regime established under Part 4 is that permission required is for a specified activity (refer to section 44 of the EP Act 2017);
(b) the permission that is required is the activity under section 44(a) the 'construction or installation of plant or equipment' of 'prescribed development activity'; in this case being the WtE facility contained in regulations;
(c) it is no longer that the relevant approval is required for the plant and equipment itself. The permission is for the 'activity' as it concerns the prescribed development activity. To the extent Bisinella submits that it is for the plant and equipment itself, PHI says this is not correct. This is made clear in the explanatory memorandum for the Environment Protection Amendment Bill 2018 which expressly states:

Relationship between section 69(3)(a) and section 69(4) EP Act 2017
Actions or decisions under this Act should be based on the best available evidence in the circumstances that is relevant and reliable.
Form and content of applications - broad discretion

The Authority or council (as the case requires) may require an applicant to provide the Authority or council with any information relating to a relevant permission application that the Authority or council considers necessary.

Part C - PHI's specific response to Bisinella's first and second grounds
Disconnect between Bisinella's grounds and submissions












Why PHI says EU framework is 'complementary' to EP Act 2017
The assessment concludes that the emissions to air from the proposed EfW Plant are minimal, with no advise air quality impacts anticipated. Table 7.1 shows the key emissions from the EfW Plant and the compliance with relevant legislative requirements. Emissions from the EfW Plant will meet all IED and SEPP (AQM) emission limits. The air quality assessment results for all substances are also summarised in the following table and paragraphs...


How the EPA utilised the EU Guidelines in its Assessment

















...The achievement of a high level of protection of human health and the environment as a whole has been jeopardised by the practice of setting emission limit values at the laxest end of the range of emission levels associated with the best available techniques, without considering the potential of a given installation to achieve lower emission levels through the application of best available techniques...

Were the risks reduced as far as reasonable practicable?
Complete answer to how GED was considered with the EU framework
[117] BATT for WtE under the EU framework specifies both mechanical and administrative controls - and does so in a risk-based approach. In this regard, BATT measures of the EU framework may also be considered generally consistent and complementary with the preventative approach of the GED. While the EU framework refers to BAT under its framework, this is compatible with BATT under the EP framework. These terms are used interchangeably throughout this report...
Did EPA engage with the obligation of 'reasonably practicable'?
Relevance that Application was 'preliminary' or 'indicative'
UNCERTAINTY OR IS PERMISSION SIGNIFICANTLY DIFFERENT FROM APPLICATION**
The first category is where a condition has the effect of "significantly altering the development in respect of which the application is made": at 737B; 351 (Priestley JA). The second category is where a council has purportedly granted consent, but in terms which lack either finality or certainty, so that there is, in substance, no effective consent to the application.[212]
Although different language is used in relation to the separate categories of invalidity, it would seem that the test of uncertainty or lack of finality, being determined by reference to an important aspect of the development, requires that what is left uncertain must be the possibility that the development as approved may be significantly different from the development the subject of the application. Thus, the result should not be different depending upon which approach is adopted: a consent will only fail for uncertainty where it leaves open the possibility of a significantly different development. On the other hand, a consent may fail, within the first category, where a condition of great precision and certainty of operation results in a significantly different development. Whichever category is preferred in the case of a consent which lacks certainty or finality, it is helpful to bear in mind the relationship between the two tests.[213]
On one view, all that condition 71 does in respect of the approved infrastructure identified by condition 70, is provide for its variation, so long as the environmental values or considerations identified in condition 71 paras (a)-(d) are met, these values or considerations having been outlined in the assessment report and having informed the Minister's decision to impose condition 70. This view could be accepted if all that condition 71 does is permit BHPB to propose an alternative alignment to that prescribed by condition 70 on the basis that the alternative alignment will be one of those already assessed in the assessment report. This is because it will already have been assessed under the EPBC Act. As the primary judge said, the alternative may well be an "alternative proposal" under the Act.
The difficulty with this view, however, is that nothing in the Sch 6 conditions and particularly in conditions 70 and 71 limits the Minister's power to approve an alternative alignment of condition 70 infrastructure to options 1, 2 and 3 the subject of the assessment report. There is nothing in the terms of conditions 70 and 71 to prevent the Minister approving an alignment of such infrastructure not previously discussed in the EIS or the assessment report. The result is that by condition 71 the Minister has created, in himself, an infrastructure approval power, albeit one to be exercised by reference to the four values or considerations specified in condition 71(a)-(d), to approve the identified infrastructure but on a new alignment without any reference to the particular requirements and mechanisms specified in the EPBC Act that would otherwise apply in relation to such a fresh infrastructure proposal. Consequently, it may reasonably be said the approval containing condition 71 does not answer the description of an approval granted under s 133 in respect of the condition 70 infrastructure activity referred under the EPBC Act and the subject of the draft EIS. Or put another way, condition 71 is not authorised by s 134, as it does not involve the protection of the environment or the management of environmental impacts identified by the proposed activity, but provides for the assessment and approval of some other potential infrastructure proposal.
The Licence allows for significant differences between the Concept Design and the Detailed Design
In the event of any inconsistency between the approved documents and the conditions of this permission, the conditions of this permission shall prevail.
Friends of the Gelorup Corridor Inc v Minister for Environment[222] (Gelorup)



Relevance and application of other case authorities

Does the Application lack precision such that it is uncertain?
Are validating conditions evidence of deferral of an unlawful assessment?
it can be seen that the Development Licence has been carefully formulated not to allow outcomes which deviate from that which is assessed as a concept design.
The risk of the 'thing' applied for and granted is wholly aligned

Was the permission so uncertain that it is no permission at all?

Argument the conditions allow for significantly different development
In the event of any inconsistency between the approved documents and the conditions of this permissions, the conditions of this permission shall prevail.
Matuschka v Glenelg SC (the 'Matuschka' decision)
If Bisinella wants to argue that the second wet scrubber or the selective catalytic reactor are necessary in order for the GED to be met, these arguments are open to them [sic].
[1] The submissions of the parties, any supporting exhibits given at the hearing and the statements of grounds filed have all been considered in the determination of the proceeding. In accordance with the practice of the Tribunal, not all of this material will be cited or referred to in these reasons.
[2] 'Waste to energy' ('WtE') and 'energy from waste' ('EfW') are both used throughout the application materials. 'A08 - Waste to Energy' is the permission sought under the EP Regulations, as such we have used 'waste to energy' ('WtE') in this decision, except where quoted.
[3] Environment Protection Authority Victoria, Development licence assessment report (6 December 2023) ix [Executive summary] ('Assessment Report') [Tribunal Book 1, 17].
L. Bisinella Developments Pty Ltd
Environment Protection Authority [2025] VCAT 159
(2009) 239 CLR 27
(2017) 262 CLR 362
(1998) 194 CLR 355
(2000) 204 CLR 82