[2024] VSC 40
General information, not legal advice.
Supreme Court of Victoria
2024-02-16
Croft J
Original judgment source is linked above.
CONTRACT - Construction - Contract for Sale of Land - Parcel of land subject to unregistered plan of subdivision - Conditional power for Vendor to terminate where a Requirement imposed in subdivision approval is "too onerous for the Vendor to perform" - Purported termination by Vendor pursuant to conditional power to terminate - Proper construction of discretionary conditional power to terminate - Whether preconditions to power conferred were satisfied to enable its valid exercise - Abu Dhabi National Tanker Co v Product Star Shipping [1993] 1 Lloyd's LR 397 - Service Station Association Ltd v Berg Bennett & Associates Pty Ltd (1993) 45 FCR 84 - Pacific Carriers Ltd v BNP Paribas (2004) 218 CLR 451 - Questband Pty Ltd v Macquarie Bank Ltd [2009] QCA 266 - Electricity Generation Corporation v Woodside Energy Ltd [2014] HCA 7; -
EVIDENCE - Application of rule in Jones v Dunkel [1959] HCA 8; (1959) 101 CLR 298 - Chong & Neale v CC Containers Pty Ltd [2015] VSCA 137; (2015) 49 VR 402 - Business records exception to hearsay rule - Evidence Act 2008, s 69(3)(a).

[10.7]
Without limiting the obligation in special condition 10.2, if the responsible Authority:
(a) refuses to grant an Approval other than as a result of an act or omission of the Vendor; or
(b) imposes a Requirement[8] that in the opinion of the Vendor (in its absolute discretion) is too onerous for the Vendor to perform;
the Vendor may terminate this Contract by giving written notice to the Purchaser in which case the Deposit and any Interest will be refunded to the Purchaser, provided that if any such Requirement relates to an obligation regarding Subdivision Works, as defined in special condition 12.1, the Vendor may not terminate this Contract if the Purchaser agrees to accept such Requirement. If this Contract is terminated or rescinded by the Vendor under this special condition the Purchaser will not have any right to Claim against the Vendor as a result of the termination or rescission.
("SC 10.7")
[10.2]
On and from the Day of Sale, the Vendor must at its own expense (except where the Purchase is responsible for any cost and expense in accordance with this special condition 10) take all necessary steps to cause the Plan to be certified by the relevant Authority and endorsed with a statement of compliance as required by the Act.
[12.1]
The Purchaser is responsible, at its cost, for all works specified by the Approvals and otherwise necessary to procure Registration of the Plan, including, without limitation, all Earth Works, traffic and road works, any works associated with easements, right of way, construction, drainage, water, sewerage, electricity and all other service and infrastructure works (Subdivision Works).
("SC 12.1");
[12.2]
The Purchaser must carry out and do everything necessary to complete the Subdivision Works as soon as practicable. If, in the Vendor's reasonable opinion and after providing reasons in writing in support of such opinion, the Purchaser is not satisfactory complying with this special condition 12.2, the Vendor may step in and carry out the Subdivision Works, the cost of which will be payable by the Purchaser as an adjustment at Settlement.
("SC 12.2").
[("Condition 1(a)")]
...
Before the plan of subdivision is certified, amended subdivision plans to the satisfaction of the responsible authority must be submitted to and approved by the responsible authority. When approved, the plans will be endorsed and will then form part of the permit. The plans must be generally in accordance with the plans provided, but modified to show:
a) The existing road "Clipsal Drive" vested in [the Council]. The width of the road reserve must include the footpaths on either side of the road and have a minimum width of 20 metres.
[("Condition 2(a)")]
b) The common boundary between Lot 1 and Lot 2 to be repositioned to ensure that all of the service road is contained within Lot 2 in accordance with the changes required by the Department of Transport.
[("Condition 2(b)")]
...
Before the Statement of Compliance is issued under the Subdivision Act 1988, an asset condition assessment must be undertaken on the Clipsal Drive road and footpath and all drainage assets proposed to be transferred to Council's ownership, and all defects identified should be rectified to the satisfaction of the responsible authority, unless otherwise agreed in writing with the responsible authority.
[("Condition 5")]
(a) the proper construction of SC 10.7 and the meaning of the precondition to the exercise of the power to terminate that the responsible Authority "imposes a Requirement that in the opinion of the Vendor (in its absolute discretion) is too onerous for the Vendor to perform";
(b) whether the defendant formed the opinion required by paragraph (b) of SC 10.7; and
(c) if the defendant did form the requisite opinion, whether it complied with the limits of this discretion, which involved consideration of:
(i) whether the defendant formed the "opinion" required in SC 10.7 as properly construed;
(ii) if it formed the opinion about performance of the Requirements, whether that was opinion reasonably formed on the evidence; and
(iii) if it was entitled to consider the commercial desirability of the Requirements, whether there was a commercial detriment capable of justifying termination such that the opinion was reasonably formed.
Mr Solomon: "So, if their construction on onerous to perform or to perform is correct, I imagine it follows that their case succeeds because we don't have any further answer to that point of construction and then there would be a question for Your Honour as to whether the relief is specific performance or damages in lieu."[13]
The parties' submissions on the construction of SC 10.7
"... if any such Requirement relates to an obligation regarding Subdivision Works, as defined in special condition 12.1, the Vendor may not terminate this Contract if the Purchaser agrees to accept such Requirement."
"The Purchaser is responsible, at its cost, for all works specified by the Approvals and otherwise necessary to procure Registration of the Plan, including, without limitation, all Earth Works, traffic and road works, any works associated with easements, rights of way, construction, drainage, water, sewerage, electricity and all other service and infrastructure works (Subdivision Works)"
("SC 12.1")
(a) a condition must objectively impose a burden greater than would be expected in performing a condition of a kind ordinarily imposed;
(b) DCI must hold an opinion to the same effect; and
(c) the vendor must exercise its power to terminate.
The defendant submits there is no sensible commercial utility in requiring the Vendor to additionally hold a subjective opinion which aligns with an objective standard before the power is enlivened.
When the terms of a contract confer upon one of the parties to it an absolute or unfettered discretion to do or refrain from doing an act the term must be given effect and the words conferring the discretion their full force. Murphy v Zamone Pty Ltd (1993) 31 NSWLR 439; Australian Mutual Providence Society v 400 St Kilda Road Pty Ltd [1991] VicRp 80; [1991] 2 VR 417. The conferral of an absolute discretion on a party to a contract excludes an obligation to act reasonably in the exercise of the discretion. Vodafone Pacific Ltd v Mobile Innovations Ltd (2004) NSWCA 15 para 195.
Where one party has an express power the exercise of which will significantly affect the interests of the other party (eg by cancellation of their supply contract) if the holder of the power is satisfied that a certain state of affairs exists, the words of the contract are fairly readily construed (and the more so when the parties have given such a power to a third party) as requiring a reasonable as well as honest state of satisfaction. But this is a result arrived at by a process of construction of the express terms in the setting of the contract as a whole. It is best not seen at all as the implication of a further term.[48]
What is the nature of the discretion in SC 10.7?
What is the proper construction of the expression "too onerous for the Vendor to perform"?
...
We refer to planning permit No. M/2021/554 (Subdivision Permit)[70] issued by Maroondah City Council on 4 April 2022 and our recent discussions about it.
As explained on the phone and as mentioned in previous email correspondence, there are several conditions in the Subdivision Permit that are too onerous for our client to perform.
Conditions 1(a) and 2(b) - our client needs to maintain full control over the Dorset service road entrance. Our client has an agreement to provide future access over this road for tenants of lot 1 on plan of subdivision PS901390: (Lot 1). Passing title over that land to include it in lot 2 on plan of subdivision PS901390L (Lot 2) would also negatively impact on the redevelopment flexibility that our client currently maintains whilst retaining the service road entrance in its ownership. We had highlighted the unacceptability of this condition to you in November last year when it was raised in correspondence from the Department of Transport - which you acknowledged.
Condition 2(a) - the vesting of "Clipsal Drive" forming part of Lot 1 in Maroondah City Council is also unacceptable to our client. Whilst you have pointed out that maintenance and upkeep would pass from our client to Council, the vesting of a road up the middle of Lot 1 would significantly affect the redevelopment potential of Lot 1 and therefore, its value. Due to the age of the existing buildings on Lot 1, it is likely that our client will look to redevelop the entire site (Lot 1) in the future and needs to retain the ability to reclaim "Clipsal Drive" as part of a new scheme that may involve a change in road location or realignment, both of which would [sic] unavailable if the road is vested in Council.
Condition 5 - this condition relates to condition 2(a). "Clipsal Drive" was constructed by our client under old Council standards but never inspected. Our client is concerned that Council will require significant works to occur at our client's expense to bring the road up to Council's current standards. The cost of the potential upgrading works could be very expensive.
Under the terms of the Contract of Sale, it is the opinion of our client that conditions 1(a), 2(a), 2(b) and 5 of the Subdivision Permit represent Requirements (as that term is defined in the Contract of Sale) that are too onerous for it to perform. Whilst it is quite likely that compliance with condition 5 would constitute Subdivision Works (as that term is defined in the Contract of Sale) to be carried out at the cost of your client, those works are unacceptable to our client as they would be part of vesting "Clipsal Drive" in Council. That is unacceptable for the reasons stated above.
The imposition of the above-mentioned permit conditions has an unacceptable and significant detrimental impact on the development potential and value of Lot 1. This was neither contemplated nor factored in when our client agreed to sell Lot 2 to your client.
Accordingly, our client gives the purchaser notice under special condition 10.7 of the Contract of Sale that it is terminating the Contract of Sale with immediate effect.
...
Is there sufficient evidence of the formation of an opinion by the defendant?
In Dilosa v Latec Finance Pty Ltd [No 2][88], Street J recognised that where the absent witness is a party then considerable importance may well attach to the inference that nothing which the party could say would assist his or her case. As Gleeson CJ said in Azzoparti,[89] the judgments in Weissensteinder[90] recognise that the inference that may be drawn from the silence of a party to civil litigation may be significant. Santow J drew such an inference in ASIC v Adler because the parties who were available and not called had a personal involvement in the transactions in question.[91] Where a party elects not to give evidence 'the court is entitled to be bold'.[92] As Heydon, Crennan and Bell JJ stated in Kuhl v Zurich Financial Services Australia Ltd,[93] the rule has a particular application where it is the party which is the uncalled witness and may permit the court to draw, with greater confidence, any inference unfavourable to the party that failed to call the witness, if that uncalled witness appears to be in a position to cast light on whether the inference should be drawn.[94]
On the available evidence as to performance of the conditions, was it open to the defendant to form the opinion that the Requirements were "too onerous for [it] to perform"?
The evidence as to Condition 1(a) and Condition 2(b)
To comply with the condition, amended plans would be required to be submitted and approved showing the common boundary between Lot 1 and Lot 2 repositioned to ensure that all of the service road is contained within Lot 2.
My Pagliaro agrees with this and also (at paragraph 62) notes 'This process requires council to refer the updated plan to DoT for their final approval. I consider this to be a standard condition and a relatively simple way to address the lot boundary and access issues'.
I agree with Mr Pagliaro the process would have been reasonably straight forward, but query whether the specific nature of the conditions could be described as 'standard'. While the conditions represent one way to address the lot boundary and access issues, it is not the only way and has potentially burdensome and/or onerous flow-on consequences.
In my view, this response demonstrates Mr Crowder's tendency to incorporate other considerations external to his expertise, based substantially on background assumptions provided directly from the defendant's solicitors, into his evidence. In this instance, the fact that the relevant Authority, in its approval of the proposed plan of subdivision, did not provide other options to "address the lot boundary and access issues" is not a relevant consideration in answering the question of what was required to comply with the condition. Providing options to overcome an obstacle to an implicit intention attributed to the applicant with respect to an area of land is not within the ambit of the authorities assessing a proposed subdivision of land, and the failure to do so does not go to whether or not conditions imposed are 'standard' or otherwise. Whilst this element of Mr Crowder's evidence can be explained by reference to the defendant's case as to the proper construction of "too onerous to perform", which appears likely to have been an assumption implicit within his brief, his evidence as to these matters is not informed by his relevant expertise. In this regard, Mr Crowder concluded that "in a town planning sense I believe compliance with the conditions, in isolation, would not likely be unduly burdensome, oppressive, difficult, troublesome or onerous for the Vendor to perform" and would have been "relatively simple".[110]
If the defendant was entitled to consider the broader commercial considerations, was it open to it to form the opinion that the Requirements imposed were "too onerous for [it] to perform"?
[1] Annotated diagram attached in the Email of Tan Partners dated 27 October 2021, SCB1969. Issues were raised in further discussions with respect to the northeast boundary of Lot 1 where it abuts Dorset Road.
[2] Lease between DC Consolidated Investments Pty Ltd and Bunnings Group Limited (dated 8 February 2018); CB484-532 ("Bunnings Lease").
[3] Bunnings Lease, cl 15.1(a)-(b), CB515; Bunnings Lease, Annexure B: Licensed Areas Plan, CB529-30.
[4] Bunnings Lease, cl 15.2(a)(i)-(ii), CB515; Bunnings Lease, Annexure B: Licensed Areas Plan, CB529-30.
[5] Planning Permit M/2002/454 at [13], CB424.
[6] Planning Permit M/2002/340 at [24], CB431.
[8] The word "Requirement" is defined in SC 1.1 as follows:
"Requirement means any condition, requirement, notice, order, direction, requirement [sic], statute, ordinance, proclamation, regulation, scheme, permit, by-law or other regulatory requirement, present or future, affecting or relating to the Land or the Development."
[9] Referred to in these reasons as "the Subdivision Permit"; and also see below [77].
[10] Planning Permit M/2021/554, CB1808-12.
[14] Taylor v Johnson [1983] HCA 5; (1983) 151 CLR 422 at 444 per Dawson J.
[15] Pacific Carriers Ltd v BNP Paribas (2004) 218 CLR 451 at 461-2.
[16] Codelfa Constructions Pty Ltd v State Rail Authority of New South Wales (1982) 149 CLR 337 at 353 per Mason J; Electricity Generation Corporation v Woodside Energy Ltd [2014] HCA 7; (2014) 251 CLR 640 at 656-7, [35] per French CJ, Hayne, Crennan and Kiefel JJ ("Electricity Generation").
[17] Electricity Generation at 656-7, [35] per French CJ, Hayne, Crennan and Kiefel JJ.
[18] Electricity Generation at 656-7, [35] per French CJ, Hayne, Crennan and Kiefel JJ.
[19] CPB Contractors Pty Ltd v JKC Australia LNG Pty Ltd (No 2) [2017] WASCA 123 at 41, [131]; George 218 Pty Ltd v Bank of Queensland Ltd (No 2) [2016] WASCA 182 at 26-7, [88].
[20] Australian Broadcasting Corporation v Australasian Performing Right Association Ltd [1973] HCA 36; (1973) 129 CLR 99 at 109.
[21] Re Golden Keys Ltd [2009] EWCA Civ 636 at [28]; Electricity Generation at 656-7, [35] per French CJ, Hayne, Crennan and Kiefel JJ.
[22] Zhu v Treasurer of New South Wales [2004] HCA 56; (2004) 218 CLR 530 at 559, [82] per Gleeson CJ, Gummow, Kirby, Callinan and Heydon JJ.
[23] Australian Broadcasting Corporation v Australasian Performing Right Association Ltd [1973] HCA 36; (1973) 129 CLR 99 at 109; Darlington Futures Ltd v Delco Australia Pty Ltd [1986] HCA 82; (1986) 161 CLR 500 at 510.
[24] Ecosse Property Holdings Pty Ltd v Gee Dee Nominees Pty Ltd [2017] HCA 12; (2017) 261 CLR 544 at 580-1, [98].
[25] Defendant's closing submissions [6](a), citing Macquarie Dictionary (online at 17 October 2023), "Too", 2nd def.
[26] Defendant's closing submissions [6](b), citing Macquarie Dictionary (online at 17 October 2023), "Onerous".
[27] Defendant's closing submissions [6](c), citing Macquarie Dictionary (online at 17 October 2023), "Perform", 1st def.
[28] Defendant's closing submissions [6](c), citing Macquarie Dictionary (online at 17 October 2023), "Perform", 3rd def.
[29] Defendant's closing submissions [9].
[30] XL Insurance CO SE v BNY Trust Co of Australia Ltd [2019] NSWCA 215 at [72]; AFC Holdings Pty Ltd v Shiprock Holdings Pty Ltd [2010] NSWSC 985; (2010) 15 BPR 28,199 at [13]. See also North v Marina [2003] NSWSC 64 at [45]; Davuro Pty Ltd v Wilkins [2000] FCA 1902, (2000) 105 FCR 476 at [152], [230].
[31] Defendant's closing submissions [6](a), citing Macquarie Dictionary (online at 17 October 2023), "Too", 2nd def.
[33] Defendant's closing submissions [6](a), citing Macquarie Dictionary (online at 17 October 2023), "Too", 2nd def.
[34] See above at [33], discussing the plaintiff's invited comparison between the burden of conditions imposed and that which would be expected in performing conditions ordinarily imposed.
[35] Defendant's closing submissions at [109], citing Eastbound's opening filed 15 September 2023, [21].
[36] Defendant's closing submissions at [109], citing Eastbound's opening filed 15 September 2023, [21].
[37] Defendant's closing submissions [6](c), citing Macquarie Dictionary (online at 17 October 2023), "Perform", 1st def.
[38] Defendant's closing submissions [114].
[43] [2009] QCA 266 at [66], (Fraser JA, McMurdo P and Philippides J concurring).
[45] Jones v United Super Pty Ltd [2016] NSWSC 1551 at [55] (Brereton J).
[46] Plaintiff's closing submissions [63], [69].
[47] (1993) 45 FCR 84 at 94.
[48] (1993) 45 FCR 84 at 94, citations omitted.
[49] Abu Dhabi National Tanker Co v Product Star Shipping [1993] 1 Lloyd's LR 397 at 404.
[50] Cantor Fitzgerald International v Horkulak [2004] EWCA Civ 1287 at [30] per Potter LJ.
[51] Cromwell Property Securities Ltd v Financial Ombudsman Service Ltd [2014] VSCA 179; (2014) 288 FLR 374 at 392 [47], 397‑9 [80]-[85] (Warren CJ and Osborn JA), 438-40 [246]-[251] (Tate JA). The plaintiff distinguishes this proposed standard from the Wednesbury standard, and a deferential standard in contexts where third parties are employed as independent arbitrators.
[52] Renard Constructions (ME) Pty Ltd v Minister for Public Works (1992) 26 NSWLR 234 at 263 (Priestley JA); Esso Australia Resources Pty Ltd v Southern Pacific Petroleum NL [2005] VSCA 228 at [2] (Warren CJ) ("Renard").
[53] Burger King Corporation v Hungry Jack's Pty Ltd [2001] NSWCA 187; (2001) 69 NSWLR 558 at 573 [185].
[54] Secured Income Real Estate (Australia) Ltd v St Martins Investments Pty Ltd [1979] HCA 51; (1979) 144 CLR 596 at 607 (Mason J, with Barwick CJ, Gibbs, Stephen and Aickin JJ agreeing); BAE Systems Australia Ltd v Cubic Defence New Zealand Ltd [2011] FCA 1434; (2011) 285 ALR 596 at 610 [56]- [57] (Besanko J).
[55] Peters (WA) Ltd v Petersville Ltd [2001] HCA 45; (2001) 205 CLR 126 at 142 [36] (Gleeson CJ, Gummow, Kirby and Hayne JJ).
[56] Adaz Nominees Pty Ltd v Castleway Pty Ltd [2020] VSCA 201 at [116]- [117] (Whelan and McLeish JJA and Riordan AJA).
[57] [2016] NSWCA 30; (2016) 92 NSWLR 639 at [40], [49] (Macfarlan JA, with Meagher and Simpson JJA relevantly agreeing).
[58] See Abu Dhabi National Tanker Co v Product Star Shipping [1993] 1 Lloyd's LR 397 at 404 (Leggatt LJ).
[60] (2004) NSWCA 15 at [195].
[61] [2006] SASC 119; (2006) 94 SASR 376 at 390-1 (Debelle J).
[63] Electricity Generation at 656-7 [35], 661-2 at [47]-[51].
[66] The word "Requirement" is defined in SC 1.1 as follows:
"Requirement means any condition, requirement, notice, order, direction, requirement [sic], statute, ordinance, proclamation, regulation, scheme, permit, by-law or other regulatory requirement, present or future, affecting or relating to the Land or the Development."
[71] Vitali v Stachnik [2001] NSWSC 303 at [12] (Barrett J) ("Vitali"). See also Nikolaidis v Legal Services Commission [2007] NSWCA 130 at [61] (Beazley JA).
[72] Lewis v Nortex Pty Ltd [2002] NSWSC 1083 at [4] (Hamilton J); Timms v Commonwealth Bank of Australia [2003] NSWSC 576 at [14] (Barrett J) ("Timms").
[73] Australian Competition and Consumer Commission v Advanced Medical Institute [2005] FCA 1357; (2005) 147 FCR 235 at 241 [41]- [43] (Lindgren J); Nikolaidis v Legal Services Commission [2007] NSWCA 130 at [61] (Beazley JA); Di Liristi v Matautia Developments Pty Ltd [2021] NSWCA 328; (2021) 396 ALR 545 at 557 [58] (Gleeson JA, with Macfarlan and Brereton JJA agreeing).
[74] Vitali at [17]-[18] (Barrett J).
[76] (2000) 49 NSWLR 262 ("Seltsam") at [149].
[78] Velkovski v R [2014] VSCA 121; (2014) 45 VR 680 at [198]- [200].
[81] See, for example, email from Rigby Cooke Lawyers to Tan Lawyers dated 7 April 2022 at 4.33pm ("It is important we set out our views in the context of the provisions of the Contract of Sale between our respective clients.").
[85] [1959] HCA 8; (1959) 101 CLR 298 at 320.
[86] Australian Securities and Investments Commission v Hellicar (2012) 247 CLR 345 at 413 [167].
[87] [2015] VSCA 137; (2015) 49 VR 402 at 464 [212] (Redlich, Santamaria and Kyrou JJA).
[88] [1966] 1 NSWR 259, 277.
[90] Weissensteinder v The Queen [1993] HCA 65; (1993) 178 CLR 217.
[92] SS Pharmaceutical Co Ltd v Qantas Airways Ltd [1991] 1 Lloyd's Rep 288, 293 (Gleeson CJ and Handley JA), citing Insurance Commissioner v Joyce [1948] HCA 17; (1948) 77 CLR 39, 49 (Rich J).
[94] Ibid 384-5, citing Dilosa v Latec Finance Pty Ltd [No 1] [1966] 1 NSWR 255, 276-7; ASIC v Fortescue Metals Group Ltd [No 5] [2009] FCA 1586; (2009) 264 ALR 201, 225. See also Schellenberg v Tunnel Holdings Pty Ltd [2000] HCA 18; (2000) 200 CLR 121, 142-3 [51]; Commercial Union Assurance Co of Australia Ltd v Ferrcom Pty Ltd [1991] NSWCA 103; (1991) 22 NSWLR 380 (Handley JA); Oran Park Motor Sport Pty Ltd v Fleissig [2002] NSWCA 371 (Hodgson JA, with whom Beazley JA and Einstein J agreed); State Bank of NSW v Brown (as liq of Parkston Ltd (in liq)) [2001] NSWCA 223; (2001) 38 ACSR 715, 718 [17][18] (Spigelman CJ); Manly Council v Byrne [2004] NSWCA 123 [50]-[55] (Campbell J, with whom Beazley JA and Pearlman AJA agreed)' Mamo v Surace [2014] NSWCA 58; (2014) 86 NSWLR 275 (McColl JA).
[95] [1942] HCA 18; (1942) 66 CLR 116 at 126.
[98] Letter from Bill Karvela to Simon Tan (dated 19 April 2022), CB1832.
[100] Joint Statement of David Crowder and Andrea Pagliaro at 2; CB284.
[102] Expert Report of David Crowder at 6 [15]; CB244.
[103] Tendered on 24 October 2023; Plaintiff's Final Tender List (dated 26 October 2023), items [30]-[35].
[104] Expert Report of Jason Walsh at 11 [60]; CB147.
[106] Expert Report of Andrea Pagliaro at 16 [66]; CB93.
[107] Expert Report of Valentine Gnanakone at 18-19; CB61-62.
[108] Expert Report of David Crowder at 31; CB269.
[109] Expert Report of David Crowder at 32; CB270.
[110] Expert Report of David Crowder at 32; CB272.
[111] Expert Report of Jason Lee Walsh at 12 [69]-[70]; CB148.
[112] Expert Report of Jason Lee Walsh at 147 [62], [64].
[114] Expert Report of Andrea Pagliaro at 16 [70]; CB93.
[115] Expert Report of Valentine Gnanakone at 18; CB61.
[116] Expert Report of David Crowder at 38-39; CB276-7.
[117] Expert Report of Jason Lee Walsh at 9 [31]; CB145.
[118] Expert Report of Jason Lee Walsh at 10 [42]; CB146.
[119] Expert Report of Jason Lee Walsh at 13 [79]-[80]; CB149.
[121] Letter from Bill Karvela to Simon Tan (dated 19 April 2022), CB1832.
[122] Expert report of Andrea Pagliaro at [76]; CB92.
[123] Joint Statement of David Crowder and Andrea Pagliaro at 4; CB286.
[124] Defendant's closing submissions, [7]-[8], [103]-[107].
[125] See, particularly, [74] to [76], above.
[130] Email from Lander & Rogers to Tan Partners dated 16 July 2021, CB1168-9.
[131] Email from Lander & Rogers to Tan Partners dated 30 August 2021, SCB1946.
[132] Defendant's closing submissions at 52-3.
[133] Bunnings Lease, cl 4.9, CB498; Bunnings Lease cl 17.4, CB519.
[135] Joint Statement of David Crowder and Andrea Pagliaro at [7]; CB289.
[138] Defendant's closing submissions [164].
[139] Plaintiff's closing submissions [112]; Email from Lander & Rogers to Tan Partners dated 16 July 2021; CB1168-9.
[140] Plaintiff's closing Submissions [113]; Email from Rigby Cooke Lawyers to Tan Partners dated 1 November 2021; CB153; Email from Rigby Cooke Lawyers to Tan Partners dated 7 April 2022; CB1819.
[144] Expert Report of Valentine Gnanakone; CB57, CB59, CB61.
[145] Expert Report of David Crowder; CB279.
[146] DC Consolidated Investments Pty Ltd v Maroondah CC [2012] VCAT 999; CB447-483.
Eastbound Estate Pty Ltd
DC Consolidated Investments Pty Ltd [2024] VSC 40
(1993) 45 FCR 84
(2004) 218 CLR 451
(2014) 251 CLR 640
(1959) 101 CLR 298
(2015) 49 VR 402
(1993) 31 NSWLR 439
(1983) 151 CLR 422
(1982) 149 CLR 337
(1973) 129 CLR 99
(2004) 218 CLR 530
(1986) 161 CLR 500
(2017) 261 CLR 544
(2000) 105 FCR 476
(2014) 288 FLR 374
(1992) 26 NSWLR 234
(2001) 69 NSWLR 558
(1979) 144 CLR 596
(2011) 285 ALR 596
(2001) 205 CLR 126
(2016) 92 NSWLR 639
(2006) 94 SASR 376
(2005) 147 FCR 235
(2021) 396 ALR 545
(2000) 49 NSWLR 262
(2014) 45 VR 680
(2012) 247 CLR 345
(2001) 205 CLR 50
(1993) 178 CLR 217
(1948) 77 CLR 39
(2011) 243 CLR 361
(2009) 264 ALR 201
(2000) 200 CLR 121
(1991) 22 NSWLR 380
(2014) 86 NSWLR 275
(1942) 66 CLR 116