[2024] WASC 250
General information, not legal advice.
Supreme Court of WA
2024-07-17
Archer J
Original judgment source is linked above.
within 60 days of approval of the right of occupancy appearing in the Government Gazette, the occupant shall mark at a corner of the boundary of the Temporary Reserve a landmark consisting of a post or cairn to serve as a commencing or datum point and shall advise the Minister for Mines in writing the position of such point.
[T]he process was well documented through a process legend which was always endorsed on written temporary reserve applications. In my time, the applications came in and they would be endorsed as to the personnel that the application had to go to for various assessments. So it's usually on the left-hand side of the document and it would be, for example, PR would mean Principal Registrar, RO would be the Records Office, CD would be the Chief Draftsman, and then it may come back to the principal registrar again and then it would go to the DGS which was the Director of Geological Survey and all of those processes were well defined primarily because they were essential inputs required for the administration to make a decision in relation to a temporary reserve.
Mr Dinh - inaccuracy of location of Rocklea Homestead on Page 11 Plan
(c) Michael Fitzpatrick, who undertook tenement management for [BHP]. His evidence goes to exploration and expenditure reports prepared by or on behalf of [BHP], and the marking out of [BHP]'s mining leases in 2005.
(d) Bree Keith, an employee of BHP involved in approvals. Ms Keith became aware of changes in tenement boundaries shown in TENGRAPH in October 2018. Her evidence otherwise goes to expenditure and operational reports prepared by or on behalf of [BHP].
(e) Lambodar Moharana, a resource analyst with BHP. His evidence goes to [BHP]'s activities in the area of TR4286H and [BHP]'s Exploration Licence.
(g) Annette Thomas, an employee of BHP involved in tenement management. Her evidence concerns information on the Department's TENGRAPH system.
The grant of the Rocklea Temporary Reserve and right of occupancy
Datum peg 10.0 miles at bearing 259o 00' from Rocklea Homestead (From Datum peg, the baroundaries [sic] of Area (6) are:
5.0 miles at bearing 192o 30', thence
10.0 " " " 282o 30', thence
5.0 " " " 12o 30', thence
10.0 " " " 102o 30', back to datum peg.
Datum peg [a number of miles] at [a specified bearing in degrees and minutes] from Mudlark Well (North West Corner of Newman Sheets, Scale 1:250,000) from Datum peg, the boundaries of [Area (3)/Area (4)/Area (5)/Area (7)] are:
Datum peg [a number of miles] at [a specified bearing in degrees and minutes] from Mt Newman. From Datum peg, the boundaries of [Area (1)/Area (2)] are:
During my employment with the Department, after a temporary reserve application was received and allocated a number, a draftsperson (geospatial officer) was tasked with preparing a plan (referred to as an Appraisal Plan) for the file and a document (referred to as [an Appraisal Schedule[71]]) which together identified any excluded land, including Crown reserves and freehold title, and the extent of encroachment onto any existing mining tenements or approved temporary reserves affected by the application that were not available for inclusion in the application under appraisal. The Appraisal Plan provided a visual depiction of the area the subject of the application plotted on an extract copy of the relevant Public Plan based on the written description included in the application letter and, where provided, the applicant's plan.
I understand this to mean that the [Page 11 Plan] is an extract of the Department's Public Plan based on Western Australia Sheet 13 (Onslow) with a scale of 1 inch to 10 miles (that is, 1 inch on the plan represents 10 miles on the ground).
Consistent with my experience, the area the subject of application 4286H shown on the [Page 11 Plan] appears to have been plotted onto an extract of the [Onslow 13 Plan] by 'scaling' from the definable feature identified in the description provided by the applicant, in this case, Rocklea Homestead. That gives the datum or commencement point that constitutes a corner point of the temporary reserve. From the datum or commencement point, the boundaries appear to have been drawn using the bearings and distances set out in the description. Based on my experience in the Department, that was most likely done using a scaled rule appropriate to the scale of the [Onslow 13 Plan] and protractor to define the directional bearing of each line relative to true north. The combination of successive bearings and distance result in the final meeting point of the coordinates to form the shape of a rectangular parallelogram.
... however, No. 4282H is substantially upon existing iron ore Reserve No. 4192H (J. D. Nicholas) and, therefore, of necessity, must be refused, while No. 4281H is substantially upon applications for iron ore Reserves Nos. 4266H and 4267H by J. D. Nicholas. The plan at page 10 File 384/67 shows both these applications (Nos. 4281H and 4282H) to be on and close to a group of reserves held by J. D. Nicholas for iron ore and, therefore, it seems more logical to refuse both applications and grant those by Nicholas, especially as No. 4282H must be refused. If the applications by Nicholas for Nos. 4266H and 4267H are refused and [BHP[89]]'s Application No. 4281H is swung around to clear existing Reserve No. 4192H, the Application No. 4281H could be granted. Applications by Nicholas were received 10.5.67 and those by [BHP] 30.5.67.
we now have evidence from the record that it wasn't the case that, invariably, these areas were plotting on a plan in order for it to be progressed to the stage of approval or refusal. It can be refused without there ever being plotting on a map or a plan. The map or the plan is not a critical, usual or necessary step we can deduce from that circumstance because it has been treated and dealt with by both department and Minister without it being placed on a plan or a map.
within 60 days of approval of the right of occupancy appearing in the Government Gazette, the occupant shall mark at a corner of the boundary of the Temporary Reserve a landmark consisting of a post or cairn to serve as a commencing or datum point and shall advise the Minister for Mines in writing the position of such point.[103]
These approvals are in respect only to Crown Land ... with occupancy rights given to the [named companies] to prospect for iron ore until 31.3.1968 subject to: -
[The letter then listed conditions, including the payment of fees]
and upon receipt of your remittance for this total amount, the approvals will be submitted for confirmation in Executive Council.
Submitted for your information together with a sketch to enable you to accurately plot the reserve on your office plans.
Herewith information requested on the description of Temporary Reserves Nos. 4283H, 4284H, 4285H requested by phone 19/11/74.
The descriptions are those supplied by your company when the [temporary reserves] were applied for and the plotted positions of the [temporary reserves] on the 50 chain to an inch line compilations supplied abd [sic] the 1:50,000 Mines Public Plans of Mudlark and Governor are consistant [sic] with these descriptions.
Note that the datum pegs referred to in your advice of 15th November, 1967 (copy attached[124]) would not be recognised by this Department unless they did, in fact, prove to be positioned at the respective [temporary reserve] corners as shown on the referred to plans. Current practice is to relate low level aerial photography of the premarked positions to the aerial photos used to compile the 50 chain line compilations, preferably by a licensed surveyor.
Incorporated material and identification evidence is admissible
It is always open to have regard to extrinsic or secondary evidence to identify the subject matter of a document of title, grant or licence, not to alter or interpret the document but to identify the subject matter.
[I]t would create a confusing and difficult, if not impossible, position if in order to determine what a council had approved one had to go to a whole series of documents and try to determine which of the documents and which part of any particular document the council intended to incorporate in its approval.
[E]xtrinsic evidence of the kind of the [Minister's Recommendation] falls into a different category, because what you have is a prima facie ambiguous statement by the Minister that, 'I'm approving application 4286' and then you have a subsequent statement by the Minister to say, '... and this is what I approved'. And we say that is permissible.
The principles relating to the construction of development consents were not controversial on the appeal. Those principles were explained by the primary judge at [62]-[63]. In particular, it was common ground that the following principles applied:
...
(4) as a general rule, a development consent, being a public document operating in rem for the benefit of third parties, should be construed without reference to extrinsic evidence other than to identify a thing or place referred to in it. That extrinsic evidence is not led to vary the consent but to identify a thing or place referred to in it. Evidence as to the nature or physical features of the land may also be admissible for that purpose, at least those features observable by a third party at the time of the consent: Allandale Blue Metal Pty Ltd v Roads and Maritime Services (2013) 195 LGERA 182; [2013] NSWCA 103 at [44]; Shell Co of Australia at 637.
[E]xtrinsic evidence may be required to identify a thing or place referred to, but that is a very different thing from using evidence of facts which were known to the maker of the document but which are not common knowledge to alter or qualify the apparent meaning of words or phrases used in such a document. Members of the public, entitled to rely on a public document, surely ought not to be subject to the risk of its apparent meaning being altered by the introduction of such evidence.
Evidence may also be led to identify a thing or place referred to in the consent ... That evidence is not led to vary the consent but to identify the thing referred to in it. Evidence as to the nature or physical features of the land or site may also be admissible for that purpose.
As has been held, it is not permissible, in order to determine what development has been approved, to construe the document constituting the approval in the same way as if it evidenced some inter partes transaction, for development approvals operate, as it were, in rem and may be availed of by subsequent owners and other occupiers of the land. The nature and extent of the approved development must be determined by construing the document of approval, including any plans or other documents which it incorporates, aided only by that evidence admissible in relation to construction which establishes, or helps to establish, the true meaning of the document as the unilateral act of the relevant authority, not the result of a bilateral transaction between the applicant and the council. Thus evidence of the nature of the site would always be admissible for this purpose, as would be, in appropriate cases, evidence as to the meaning of the marks on plans, or indeed, the meaning of the absence of particular marks.
(a) at Rocklea Station, approximately 390 metres northwest of the Old Homestead (more precisely at the following location: Map Grid of Australia - Zone 50, 545747.3 metres east and 7469181.8 metres north); and
>
> (b) at a cost of $14,000 (in 1966 terms),
(a) Rocklea Station was the subject of a pastoral lease (no 3114/671), granted to the following 3 lessees:
(i) Kenneth Ernest Troy (then about 37 years old);
(ii) Frank Troy (then about 60 years old), being Kenneth Ernest Troy's father; and
(iii) Allan Ross Troy (then about 39 years old), being Kenneth Ernest Troy's brother and Frank Troy's son,
(b) Frank Troy was domiciled at Lot 1633 Herdsman Parade, Wembley, Perth, Western Australia;
(c) Frank Troy was not domiciled at Rocklea Station;
(d) Kenneth Ernest Troy, his wife, Agnes Esther Troy, and their children resided and were domiciled at the New Homestead;
(e) the New Homestead was the main residence on Rocklea Station;
(f) no-one was domiciled at the Old Homestead; and
(g) the Old Homestead was:
(i) a modest, insubstantial structure;
(ii) made from wood (mulga trees) and tin;
(iii) unlined, with partitioned rooms and no electricity;
(iv) in disrepair, rotting and dilapidated; and
(v) without a bathroom or other facilities.
What material was incorporated by necessary implication?
Datum peg 10.0 miles at bearing 259o 00' from Rocklea Homestead (From Datum peg, the baroundaries [sic] of Area (6) are:
The Minister and, pending a recommendation to the Minister, a warden, may temporarily reserve any Crown land from occupation, and the Minister may at any time cancel such reservation: Provided that if such reservation is not confirmed by the Governor within twelve months, the land shall cease to be reserved.
The Minister may, with the approval of the Governor, authorise any person to temporarily occupy any such reserve on such terms as he may think fit, but subject to the provisions of section two hundred and seventy‑seven.[191]
[T]he maxim of interpretation chartarum benigne faciende est ut res magis valeat quam pereat ... can be of assistance where an instrument, be it legislative, administrative or a document inter partes, is open to two interpretations, one of which would make the instrument effectual in law, and the other would make it ineffectual. The rationale behind the principle rests on the presumed intent of the person or body promulgating the instrument to create a valid instrument. Where what is done is the exercise of a power, the presumption is that the body intends to act within, not outside, its powers.
the instrument of reservation, read with the Application, is complete on its face and not ambiguous or otherwise such that a reader of it, or a person acquainted with the physical features of the land, would conclude that recourse to other documents ... is necessary to give it a sensible meaning.
the area the Department, and therefore the Minister, designated as 4286H was as described in Application Area (6) with the place 'Rocklea Homestead' being a place depicted on the [Page 11 Plan], which was a copy of Mines Department plan Onslow 13 (10 mile topographical).
The position of the homesteads, fences, tracks and wells, in the Pastoral Areas are only approximate; excepting where fixed by survey.
What is the Identification Evidence? (Evidence to identify which homestead was the point of reference)
(a) was made from corrugated iron or tin and bush timber (mulga and blood wood); and
>
> (b) had, amongst other facilities, a bathroom or wash house attached to it.
(a) Frank Troy (about 60 years old in 1967), being the father of Allan Ross Troy and Kenneth Ernest Troy;
>
> (b) (until 15 September 1969) Allan Ross Troy (about 39 years old in 1967); and
>
> (c) Kenneth Ernest Troy (about 37 years old in 1967),
14.1 the cottage to the south of the Old Homestead; and
14.2 the garage to the north of the Old Homestead,
the combined size of the three buildings was smaller than the New Homestead (including all verandas on the New Homestead).
15.1 the cottage to the south of the Old Homestead;
15.2 the garage to the north of the Old Homestead; and
15.3 the fuel shed to the north of the garage,
(without the gaps) to the size of the New Homestead. The combined length of those four buildings (without the gaps) was about as long as the New Homestead (including all verandas on the New Homestead). Those four buildings were not as wide as the New Homestead (including all verandas on the New Homestead).
All right. Well, what caused you to change your recollection?‑‑‑Well, look, I was basing most of my recollections off the fact that the Tom Price Nanutarra Road was on the west side of the homestead, which is where that is. The map I - looking at there I think is quite an early one, but you can - I think you can actually see an outline just west of the - just west of the new homestead where there's a wider strip cleared and that would have been the old air strip, I think, but this is going back and we're only looking at some pretty dodgy maps here. And I don't remember actually driving along on the airstrip with the road so I thought maybe it had come out there so my recollection is that we actually didn't drive across the airstrip, we drove straight - we didn't drive along there, but we drove straight across it and out to the highway.
All right. My question was a bit more specifically what caused you to change your mind between your first and the second statement?‑‑‑Well, there was quite a lot of different (indistinct) and when I was doing my first statement, I hadn't really worked out quite what we were doing and then the second time around, I go, 'Well, maybe' - and when we discussed the map and had a look at it, I did actually change the direction because I wasn't quite sure that we really actually went to the right - curled around the house; I thought we might have gone straight across the back.
(a) at Rocklea Station, approximately 390 metres northwest of the Old Homestead (more precisely at the following location: Map Grid of Australia - Zone 50, 545747.3 metres east and 7469181.8 metres north); and
>
> (b) at a cost of $14,000 (in 1966 terms) ...
(a) Rocklea Station was the subject of a pastoral lease (no 3114/671), granted to the following 3 lessees: > > > (i) Kenneth Ernest Troy (then about 37 years old);
> >
> > (ii) Frank Troy (then about 60 years old), being Kenneth Ernest Troy's father; and
> >
> > (iii) Allan Ross Troy (then about 39 years old), being Kenneth Ernest Troy's brother and Frank Troy's son,
(b) Frank Troy was domiciled at Lot 1633 Herdsman Parade, Wembley, Perth, Western Australia;
(c) Frank Troy was not domiciled at Rocklea Station;
(d) Kenneth Ernest Troy, his wife, Agnes Esther Troy, and their children resided and were domiciled at the New Homestead;
(e) the New Homestead was the main residence on Rocklea Station;
(f) no-one was domiciled at the Old Homestead; and
(g) the Old Homestead was:
(i) a modest, insubstantial structure;
(ii) made from wood (mulga trees) and tin;
(iii) unlined, with partitioned rooms and no electricity;
(iv) in disrepair, rotting and dilapidated; and
(v) without a bathroom or other facilities.
(a) was more readily observable than the Old Homestead, in that visitors entering Rocklea Station usually came to see it first and, from there, the Old Homestead was 'a few hundred metres away behind trees and bushes, and across a creek'. The view of the Old Homestead was, on the usual approach, 'obscured by bushes and trees';
>
> (b) was bigger, taller, longer and wider than the Old Homestead;
>
> (c) cost a significant sum to erect: $14,000 in 1966 terms, which equates to approximately $218,197.10 in 2023 terms. This sum is significant in the context of: > > > (i) Rocklea Station annual pastoral lease rent of $412.50; and
> >
> > (ii) improvements by the pastoralists to Rocklea Station in the successive two financial years totalling just $2,600 (in FY68) and $994 (in FY69); > >
>
> (d) was newer than the Old Homestead. In effect, when it was erected in 1966 the New Homestead replaced - as main residential building - an Old Homestead that was by then 'still standing' but, in part, 'rotting' and 'very old and run down.' The Old Homestead was allowed to become 'more and more run down over time' and, up until as recently as 2013 (at least), the New Homestead continued to be maintained; and
>
> (e) was built from more modern materials - fibreboard or compressed cement board sheeting walls and a corrugated iron roof - as compared with the 'bush built' or 'roughly constructed' Old Homestead, that was made from corrugated iron or tin and materials from the bush, mulga and blood wood.
(a) described the New Homestead as 'New Homestead'. It is not described as an additional homestead; and
>
> (b) wrote that it was 'erected ... at a cost of $14000'.
(a) was a homestead; and
>
> (b) replaced the Old Homestead as Rocklea Homestead.
There's a functional question to be addressed which is are you going to use as a landmark something that is less prominent and more likely to fall into disrepair. That's the functional point that, I think, comes from President Mason's analysis with respect to a planning consent, and on this question, your Honour is going to hear ... about what was observable by a person entering Rocklea Station.
As a matter of common language, it is the function of a building, not its recency, size, or location, that is relevant to its characterisation as being the homestead (or not).
(a) A house with its dependent buildings and offices; esp. a farmstead. (Oxford English Dictionary (1st ed, 1933) (being the edition current as at 1967).
(b) In Australia and New Zealand: the owner's residence on a sheep or cattle station. (Shorter Oxford English Dictionary (6th Ed; 2007)).
(c) A house, usually the principal residence on a rural property. (Australian National Dictionary (2nd Ed, 2016 (1st Ed 1988)). (footnote omitted)
[I]f the Court is to make a factual finding about the location of the Rocklea Homestead in 1967, it can and ought to take into account what [BHP and its predecessors], as holders of the right of occupancy of [the Rocklea Temporary Reserve], and the Minister, have long understood to be the boundary of [the Rocklea Temporary Reserve] and the land that BHP and its predecessors have occupied accordingly. If, as [BHP] contend, that gives rise to a presumption that the boundary is determined by reference to the Old Homestead, then the Court ought not disturb that presumption absent the most positive and direct overwhelming evidence that, in 1967, the reference to the Rocklea Homestead in the Application as incorporated into the Minister's decision would have been regarded by the reasonably informed person familiar with the Repealed Act to be a reference to the New Homestead.
[A] cause of action for a mere declaration arises once a justiciable controversy comes into existence and it accrues to the person who has a real interest in raising it.
'... In 1966, the Troy family built a new homestead, which was not far from the original one ...'
[BHP's Exploration Licence] was calculated from the old Rocklea Homestead, and the values adopted were 546101.6E & 7469012N, but we can find no reference to any field book pick‑up.
It was decided to use the old original homestead because [BHP's Exploration Licence] was lodged on 29/04/1982, and was a transitional conversion of [the Rocklea Temporary Reserve] (identical by description, lodged in 1967) and the new Rocklea Homestead (now labelled PR) did not exist in 1967.
NOTE: Old Rocklea Homestead is located at the south eastern end of the six building symbols currently depicted in TENGRAPH.
The remains of the original homestead can be seen via the Landgate Map Viewer showing Rocklea imagery dated as 2004.
A later position for Rocklea Homestead (apparently provided by DMP to Landgate in August 2006) is now shown in TENGRAPH as position reliable (PR).
We can find no reference to the field book number for the coordinate pick‑up of old Rocklea Homestead, or the new Rocklea Homestead (PR).
The calculated position of [BHP's Exploration Licence] and the resultant Mining Leases has been accepted since July 2005, and we are satisfied with the reasoning behind their spatial position.
However, we can see why you have raised the question, as Rocklea homestead (PR) would result in different coordinates, but DMP considers that the calculated coordinates are absolute for the reasons stated.
I trust that this explanation will satisfy your enquiry.
We have some high resolution aerial imagery that might be useful for me to take you over ...
Looks like we have uncovered a document that confirms the new Rocklea Homestead was constructed in early 1966 (yet to be clarified in terms of acceptability as evidence, but certainly supports the idea of a 1966 time frame, ie importantly per June 1967).
it raised a real question concerning the validity of the mining lease and it had a real interest in that question. The question had not been raised before. There was a proper contradictor and the question was not abstract or hypothetical and the determination of the question had real and foreseeable consequences. Wyloo raised a justiciable controversy and acquired a cause of action for declaratory relief. On that basis I conclude that Wyloo's action is not statute barred.
The justiciable controversy to be resolved by the primary proceedings was raised by the parties' assertion of inconsistent rights in relation to the mining on the Subject Land. Quarry Park and Cauldron Energy asserted rights said to arise from the grant or purported grant of the Mining Lease including the exclusive rights to mine the land conferred by s 85 of the 1978 Act. Wyloo Metals asserted the right to apply for a prospecting licence over the Subject Land and to have that application considered by a mining registrar or warden in accordance with the 1978 Act. I have concluded that, as a matter of law, Wyloo Metals has the right it asserted and Quarry Park and Cauldron Energy do not have the rights they asserted.
...
The fact that Wyloo Metals was seeking relief recognising the rights which it had also affects the way in which the issue of delay must be considered. While Wyloo Metals might have discovered the deficiency in the title to the Mining Lease at any time, the mere discovery of that fact would not have elevated its interest in the matter beyond that of any member of the public so as to give it standing to seek curial relief. The justiciable controversy in this case, and standing to challenge the validity of the Mining Lease, arose only when Wyloo Metals resolved to apply for a prospecting licence over the Subject Land, asserting rights which were inconsistent with those purportedly granted by the Mining Lease. There was no time limit imposed on Wyloo Metals making an application for a prospecting licence over that land. It could do so at any time at which the Subject Land had the status of Crown land open for mining. Wyloo Metals acted promptly to seek declaratory relief on 22 January 2021 shortly after it had applied for a prospecting licence on 11 January 2021. (citations omitted)
Conclusion on whether Aquila's claims are statute‑barred
Substantial delay in the bringing of action that challenges the security and certainty of title has the potential to undermine confidence in the regime under the Mining Act because of the fundamental importance of security and certainty of title to the attainment of the objects of that Act. For this reason, substantial delay in the bringing of such action ought not be condoned by the Court unless there are good reasons for the delay. In this case, there are none.
Title to a mining tenement is not as secure as title to real property. This relative lack of security sits uneasily with the fact that very large amounts of capital may be expended on mining infrastructure. Miners desire as much security of title as possible if they are to make such investment. The State also has an interest in ensuring reasonable security of title so that investment will be encouraged. If this happens, the chance that greater royalties may be earned for the benefit of the State is enhanced.
'... Due to the operation of ss 80(1) and 105B Mining Act 1978, the valid grant of a mining tenement was subject to a condition that a survey be carried out. In the absence of evidence that a survey was carried out, it is not possible to state with certainty the boundaries of a lease or that the tenement was validly created.'
[Rocklea Temporary Reserve] was applied for on 2/6/1967, received on 2/6/1967 and granted on 28/9/1967.
BHP (via Chris Clegg) requested a boundary calculation for [BHP's Exploration Licence] (and hence [Rocklea Temporary Reserve]) in early July 2005 in order to convert [BHP's Exploration Licence] to mining leases.
The 2005 boundary calculations were based on what [the Department] now considers to be 'old Rocklea homestead ruins'.
By mutual agreement with Chris, (as a cost saving measure, as it was for pegging purposes only) it was decided to derive the coordinates for Rocklea homestead from GoogleEarth, instead of sending a surveyor out to DGPS the pick-up.
At the time the imagery indicated that Rocklea homestead was at the eastern end of the cluster of buildings.
This was the best available information in July 2005, and [the Department] was not aware that the actual Rocklea homestead in use at the time [Rocklea Temporary Reserve] was applied for (description starting point) was actually the most westerly building, being about 393 metres bearing 295 degrees westerly of the position adopted.
Based on the boundary calculations BHP applied for M 47/673 to 691 on 18/7/2005.
On 25/5/2018 [the Department] directed that [Aquila's Mining Lease] be surveyed under the statutory survey obligations of the Mining Act 1978.
Peter Winter (tenement consultant for [Aquila's Mining Lease]) requested a meeting prior to the survey instructions being issued, in order to table new information regarding the true position of Rocklea homestead when [Rocklea Temporary Reserve] was applied for.
Peter tabled information sourced from LANDGATE which stated that the Rocklea station leaseholder erected a new homestead in the later part of 1966.
[Rocklea Temporary Reserve] was applied for on 2/6/1967.
Please refer to the first attachment for Peter Winter's information on Rocklea homestead sourced from LANDGATE.
This was presented at the meeting dated Friday 17 August 2018.
In the imagery the western building is labelled 'NEW' and the eastern building is labelled 'OLD'.
The second attachment contains all other relevant historical information.
On that basis Phil Richards (the nominated surveyor for [Aquila's Mining Lease]) was directed by [the Department] to DGPS locate the 'new' Rocklea homestead, on which to base amended boundary calculations for [Rocklea Temporary Reserve] (and hence [BHP's Exploration Licence]) in order to ascertain the ground available to [Aquila's Mining Lease], prior to the survey instructions being issued.
The second boundary calculation for [Rocklea Temporary Reserve] & [BHP's Exploration Licence] (based on the latest Rocklea homestead location information tabled by Peter Winter) resulted in a westerly shift in the calculations of about 393 metres bearing 295 degrees.
This resulted in more ground being available to the grant of [Aquila's Mining Lease] on its western side.
Please refer to the supplied historical information to substantiate these events.
raises a further issue as to whether those companies would need to be joined as necessary and proper parties to [Aquila's] claim, were the Court minded to make declaration A(a),[573] to ensure it was not liable to be set aside. That is not a matter about which [BHP] makes a submission, save to note that Aquila has apparently made a forensic choice not to join those parties despite the above facts having been pleaded in [BHP's] defence. (citation omitted)
No cause or matter shall be defeated by reason of the misjoinder or nonjoinder of any party; and the Court may in any cause or matter determine the issues or questions in dispute so far as they affect the rights and interests of the persons who are parties to the cause or matter.
Changes in Tengraph to the boundaries of BHP's tenements following the Survey, made on the basis that the Rocklea Temporary Reserve was defined by reference to the New Homestead
API Management Pty Ltd, the manager of the joint venture to which the plaintiffs are the parties
Letter by BHP to the Under Secretary of Mines on or around 26 May 1967 applying for seven temporary reserves, Exhibit 1.1 page 215
Plan prepared by a geospatial officer of the Department after a temporary reserve application was received by the Department
Document created by a Departmental officer identifying any excluded land, including Crown reserves and freehold title, and the extent of encroachment onto existing mining tenements or approved temporary reserves
The attachment to the Application Letter describing the areas over which the temporary reserves were sought, Exhibit 1.1 page 216
Exploration licence 47/1413-I granted to Aquila by the Minister on or around 23 March 2005
The seven areas sought to be made temporary reserves in the Application Letter, designated 4281H, 4282H, 4283H, 4284H, 4285H, 4286H, and 4287H in the Attachment
The area that became the Rocklea Temporary Reserve and that was designated 4286H in the Attachment
'Along the Ashburton' book by Rhonda McDonald, an extract of which is Exhibit 4.126
Attachment to the Application Letter describing the areas over which the temporary reserves were sought
First to third defendants and their predecessors in title, collectively and in the singular
The two BHP mining leases (mining leases 47/685‑I and 47/689‑I) which would be affected if the Rocklea Temporary Reserve was defined by reference to the New Homestead
Exploration licence 47/16‑I granted to BHP by the Minister on or around 4 October 1982
The areas covered by mining leases 47/685‑I, 47/686‑I, 47/688‑I and 47/689‑I
Department assisting the Minister with the administration of mining legislation
The part of land over which Aquila would have rights only if the Rocklea Temporary Reserve is defined by reference to the New Homestead
Extrinsic evidence to identify a thing or place referred to in an instrument
Documents incorporated into an instrument (expressly or by necessary implication)
Which of two homesteads on Rocklea Station was the reference point from which the boundary of the Rocklea Temporary Reserve was determined?
Are any of the parties' claims for declarations statute‑barred?
If the plaintiffs are otherwise entitled to declaratory relief, should relief be refused on discretionary grounds?
The Department's file in relation to the Rocklea Temporary Reserve, a redacted copy of which is Exhibit 1.1
Document titled 'Minute Paper for the Executive Council' containing the Minister's recommendation, on or around 28 September 1967, to Cabinet (Executive Council) that it advise the Governor in Council to confirm the temporary reservation of the Rocklea Temporary Reserve and approve the Minister's authorisation of BHP to temporarily occupy it, Exhibit 1.1 page 199
Used as a reference point in the Attachment for Areas (3), (4), (5) and (7)
New building erected in 1966 at Rocklea Station located approximately 390 metres northwest of the Old Homestead
Objection to the Survey Report lodged by BHP in the Warden's Court on 21 November 2018
An older building at Rocklea Station which was, on Aquila's pleading (and not denied by BHP), erected at an unknown date prior to June 1943
Department's public plan from which the Page 11 Plan was extracted
Appraisal Plan for the applications for temporary reserves over Areas (1), (2), (3), (4), (5), and (7), at folio 10 of Mines File 384/67, Exhibit 1.1 page 214
Appraisal Plan for the Rocklea Temporary Reserve Application, at folio 11 of Mines File 384/67, Exhibit 1.1 page 213
Letter written on 21 August 1968 by Frank Troy, on behalf of the pastoralists of Rocklea Station, to the Under Secretary for Lands, Exhibit 3.56 pages 697 ‑ 699
Plaint filed by BHP in the Warden's Court on 31 July 2019
Cases discussing the proper approach to the construction of planning and development consents
Document signed by the Minister on 4 August 1967, accepting the recommendation of the Under Secretary to approve some of the applications, including the Rocklea Temporary Reserve Application, Exhibit 2.3 page 491
Email sent by Mr Sale on behalf of Aquila to Ms Bear at Rio Tinto on 18 December 2013, Exhibit 8.213 page 2977
A temporary reserve on Rocklea Station in the Pilbara. It was labelled Area (6) and designated 4286H in the Attachment to the Application Letter. The first to third defendants have the right to mine in this area.
Application for a temporary reserve over the sixth area (labelled 'Area (6)') in the Attachment
BHP Minerals Pty Ltd v Aquila Steel Pty Ltd [2023] WASCA 21
Email sent by Mr Stevens of the Department to Ms Keith at BHP on 12 November 2018
Letter written by the Superintendent, Surveys and Mapping Branch to Mr Williams at BHP on 19 November 1974, Exhibit 1.1 page 105
Survey of Aquila's Mining Lease requested by the Department on 21 August 2018 and conducted by Phillip Richards
Mr Richards' report to the Department on the Survey on 10 October 2018, Exhibit 9.281 page 3562
Boundaries of third party tenements which are determined, in part, by which homestead the Rocklea Temporary Reserve is defined
I certify that the preceding paragraph(s) comprise the reasons for decision of the Supreme Court of Western Australia.
[1] Other than the fourth defendant, who has filed a notice of intention to abide.
[2] The early events involved BHP's predecessors in title. On or around 27 August 1993, the second and third defendants each became a holder of Exploration Licence 47/16‑I (BHP's Exploration Licence). On or around 20 May 1998, the first defendant became a holder of BHP's Exploration Licence.
[3] On or around 31 October 2007, the second plaintiff became a holder of Exploration Licence 47/1413‑I (Aquila's Exploration Licence), together with the first plaintiff.
[4] At least by the relevant department prior to 2018.
[5] See Agreed Facts [10] ‑ [11], [15].
[6] See also the Agreed Chronology row 5.
[7] See under the heading 'What is the Identification Evidence? (Evidence to identify which homestead was the point of reference)'.
[9] A detailed discussion of the relevant legislation can be found in BHP Minerals Pty Ltd v Aquila Steel Pty Ltd [2023] WASCA 21 (Stay Decision).
[10] See also the Agreed Chronology row 10.
[11] See under the heading 'The grant of the Rocklea Temporary Reserve and right of occupancy'.
[12] See also the Agreed Chronology row 16.
[13] See the Agreed Chronology row 20. Now called the Department of Energy, Mines, Industry Regulation and Safety (for the State of Western Australia).
[14] Agreed Facts [24]. The evidence establishes only that this was done after 4 August 1967 and on or before 28 September 1967. BHP noted this (see ts 280, 410 ‑ 411), but did not suggest it mattered. In any event, it is an agreed fact that it was done 'On or around 28 September 1967'.
[15] Exhibit 3.31 page 651. See also Agreed Facts [33].
[16] See also the Agreed Chronology row 27.
[17] Exhibit 3.112 page 894. See also the Agreed Facts [35] and the Agreed Chronology row 35. The application was made under cl 1(3) of the Second Schedule (Transitional Provisions) to the Mining Act.
[18] Exploration Licence 47/16-I. See also the Agreed Facts [36]. See also the Agreed Chronology row 36. The application was granted under cl 1(4) of the Second Schedule (Transitional Provisions) to the Mining Act.
[20] Being the commencement date of s 16 of the Mining Amendment Act 1990 (WA).
[21] Section 57(2d) and s 57(2e) of the Mining Act.
[22] The application was made under s 58 of the Mining Act.
[24] The application was granted under s 57(1) of the Mining Act.
[25] Prior to 10 February 2006, the Minister's obligation to do this was 'subject to the Act'. From 10 February 2006, it was 'subject to s 75(8)' - see the Mining Amendment Act 2004 (WA) s 31; Western Australia, Government Gazette, No 24 (3 February 2006) 516.
[26] The areas of these leases are shown on the map annexed to these reasons.
[27] See Agreed Facts [52(b)], [55(b)].
[29] Witness Statement of Peter Arthur Winter filed 9 June 2023 (Winter Witness Statement) [43] ‑ [51].
[30] Winter Witness Statement [46] ‑ [51].
[31] See also Agreed Chronology row 74.
[32] See, for example, Exhibit 9.275 page 3542 and Exhibit 9.281 page 3562.
[33] See also Agreed Chronology row 75.
[34] See also Agreed Chronology row 76.
[35] See Agreed Facts [62] ‑ [66] and Agreed Chronology row 92.
[37] I refer to this as the 'Stay Decision'.
[38] under reg 120A(5) of the Mining Regulations 1981 (WA).
[39] Fourth Defendant's Notice to Abide by Decision of the Court filed 21 May 2021.
[40] At that time, called the Western Australian Department of Mines.
[41] Witness Statement of Christopher Clegg filed 18 October 2023 (Clegg Witness Statement) [2].
[43] Tengraph is a spatial enquiry and mapping system displaying the position of Western Australian mining tenements and petroleum titles in relation to other land information - see the Witness Statement of Annette Sophie Thomas filed 20 October 2023 (Thomas Witness Statement) [6].
[44] See under the subheading 'If it is legally ambiguous, is the Page 11 Plan necessarily incorporated?'
[45] See under the heading 'The grant of the Rocklea Temporary Reserve and right of occupancy'.
[49] ts 386 ‑ 387, referring to Exhibit 1.1 pages 215, 218, 219, and 221.
[52] See under the subheading 'BHP's failure to survey' under the discussion of Key Issue 3.
[54] Witness Statement of Simon Andrew Trinder filed 1 November 2023 (Trinder Witness Statement) [1] ‑ [2].
[55] See Trinder Witness Statement [12] ‑ [13].
[56] Being which version of a public plan an extract had come from. This is discussed later under the subheading 'The origin of the Page 11 Plan - a red herring'.
[58] Being whether the claims are statute‑barred.
[59] See the Witness Statement of Jonathon Chiam filed 9 June 2023 and the Witness Statement of Elizabeth Plajzer filed 20 October 2023.
[61] Meaning, in this instance, its predecessors in title.
[62] There had been an earlier application (Exhibit 1.1 pages 220 ‑ 223), but it was deficient.
[65] This is plain from its terms. See also Agreed Facts [19] and the Agreed Chronology row 10 in relation to the Rocklea Temporary Reserve.
[66] See also Exhibit 1.1 page 204 and Clegg Witness Statement [38].
[67] See, for example, the Plaintiffs' Opening Submissions in Reply filed 5 March 2024 (Aquila's Reply Submissions) [46].
[68] Although it was marked on a public plan. And see ts 272.
[71] The full descriptor used by the Department was 'Land Appraisal Summary Schedule'.
[72] Clegg Witness Statement [39] ‑ [43].
[75] See Trinder Witness Statement [12] ‑ [13].
[76] See BHP's Submissions [43] ‑ [44] for a useful summary of the documents that demonstrate this. See also BHP's Submissions [46] in relation to the temporary reserves granted to, or that were about to be granted to, a J.D. Nicholas.
[78] See under the subheading 'If it is legally ambiguous, is the Page 11 Plan necessarily incorporated?' under the heading 'What material was incorporated'.
[85] The parties agreed that, from its location in the file, it had been prepared and placed on the file by 31 July 1967. See Agreed Facts [21] and the Agreed Chronology row 14. I have found it to be earlier, but nothing turns on this.
[89] The actual application was made by BHP's predecessors in title.
[90] Plaintiffs' Opening Submissions filed 19 February 2024 (Aquila's Submissions) [87] and ts 163, 193.
[92] See for example ts 271, 273, 276, 279.
[98] See Exhibit 1.1 page 204 (point 3).
[99] See Exhibit 1.1 pages 209 ‑ 212, all of which appear to have been created on 2 June 1967.
[105] Aquila's Reply Submissions [43].
[106] Minute of Proposed Further Amended Writ of Summons Indorsed with Statement of Claim filed 28 March 2024 (Statement of Claim) [15] ‑ [16(a)].
[108] The Minister also temporarily reserved and authorised the occupation of Areas (3) ‑ (5) and (7), in accordance with the Under Secretary's recommendations.
[111] This was common ground - see the description of document 3 in volume 2 of the Trial Bundles (which is Exhibit 2.3 page 416).
[116] Discussed under the subheading 'Governor's role'.
[117] See the Agreed Chronology row 20.
[120] Exhibit 3.31 page 651. See also Agreed Facts [33].
[124] Being the letter referred to earlier, in which BHP told the Under Secretary that a star iron had been inserted into the ground for the approved temporary reserves - Exhibit 1.1 page 196.
[125] ts 453 ‑ 454 (responding to BHP's submission at ts 284 ‑ 285). Areas (3), (4) and (5) were the three areas described by reference to a datum peg at a specified distance and bearing from 'Mudlark Well (North West corner of Newman Sheet, Scale 1:250,000)'.
[126] BHP's Submissions [19] and Aquila Reply Submissions [17].
[128] Consolidated Gold Mining Areas NL v Oresearch NL (1990) 3 WAR 208.
[130] Oresearch (221), noting that the same issue arose in Phillips v Crown (1910) 12 CLR 287.
[133] See, in particular, Allandale Blue Metal Pty Ltd v Roads and Maritime Services [2013] NSWCA 103; (2013) 195 LGERA 182 [42] ‑ [48] (Meagher JA). Meagher JA's analysis of the applicable principles has been repeatedly endorsed - see, for example, Bunderra Holdings Pty Ltd v Pasminco Cockle Creek Smelter Pty Ltd (Subject to Deed of Company Arrangement) [2017] NSWCA 263; (2017) 96 NSWLR 434 [22], [72], [158(4)], [191], [193], [195] and Hunter Industrial Rental Equipment Pty Ltd v Dungog Shire Council [2019] NSWCA 147; (2019) 101 NSWLR 1 [77].
[134] Allandale [42] ‑ [43] and Bunderra [72] (Leeming JA), [193] (Payne JA).
[135] Allandale [43] ‑ [44] (Meagher JA), [179] (Ward JA); Bunderra [158(4)] (Payne JA).
[142] Auburn Municipal Council v Szabo (1971) 67 LGRA 427.
[144] Bunderra [23], [40] (McColl JA). See also [62], [66] (Leeming JA), [195] (Payne JA).
[148] Aquila's Submissions [82] and ts 255 ‑ 259.
[149] Aquila's Submissions [77] ‑ [78]. See also Aquila's Reply Submissions [62] ‑ [64].
[150] Owners - Strata Plan No 4983 v Canny [2018] NSWCA 275.
[151] Slough Estates Ltd v Slough Borough Council (No 2) [1971] AC 958.
[153] Owners - Strata Plan No 4983 [64].
[156] Allandale [44] (citations omitted).
[157] Parramatta City Council v Shell Co of Australia Ltd [1972] 2 NSWLR 632, 637 (Shell Co).
[163] Slough (968). As it happened, having done so, the correspondence did not help.
[165] Aquila's Submissions [79] ‑ [80]. See also Aquila's Reply Submissions [63].
[166] Statement of Claim [9] ‑ [12].
[169] See under the subheading 'Must it be proved that the document was accessible to the public?' And see Slough (968).
[170] Hubertus Schuetzenverein Liverpool Rifle Club Ltd v Commonwealth of Australia (1994) 51 FCR 213.
[172] BHP's Submissions [21], citing Hunter per Basten JA at [57] ‑ [64], [80], with whom Gleeson JA (at [224]) and Preston CJ (at [265], [311]) agreed.
[173] See the very next sentence in BHP's Submissions [21], in addition to the surrounding paragraphs of [20] ‑ [23].
[176] See Hunter [46] ‑ [67]. In particular, the development application and the notice were required to be placed on the public register. Further, the development application form provided that the full description of the development could be included in the separate information provided in the Environmental Impact Statement.
[177] BHP's Submissions [24], with the footnote 'Hunter [268] ‑ [269]. As to the legislation in that case, see in particular [296] ‑ [301], [309] ‑ [310]'.
[179] See Allandale [42] ‑ [43] and Bunderra [72] (Leeming JA), [193] (Payne JA).
[180] BHP's Submissions [24] and Aquila's Reply Submissions [31].
[181] BHP's Submissions [24] and ts 269 ‑ 270.
[182] See BHP's Submissions [20], [23], [25].
[183] Nicholas v The State of Western Australia (Unreported, WASC, Library No 947, 23 September 1971) 6.
[184] And see Peppers Hotel Management Pty Ltd v Hotel Capital Partners Ltd [2004] NSWCA 114; (2004) 12 BPR 22,879 [125], in which the Court said 'Although one must have regard to the commercial background to the transaction, one gives far less emphasis to this factor when construing a public document than with one that affects only the parties. Indeed, when one gets to the level of a public document such as a ferry timetable, one does not consider the background at all.' See also Moses v State of Western Australia [2007] FCAFC 78; (2007) 160 FCR 148 [166] ‑ [170] in relation to the admissibility of extraneous evidence establishing the Crown's original purpose in creating a temporary reserve.
[185] Aquila's Submissions [57], [82] (as clarified at ts 258), ts 255 ‑ 259 and BHP's Submissions [20], [23].
[186] ts 181 (Aquila) and BHP's Submissions [19] and ts 285 (BHP).
[191] Section 277 of the Repealed Act limited the maximum area over which a right of occupancy could be granted for the purpose of prospecting for gold, and provided for longer periods of a right to occupancy and renewals of rights of occupancy.
[192] BHP's Submissions [15] and Aquila's Submissions [45].
[194] See Agreed Statement of Facts [35] ‑ [36], Exhibit 3.119 page 904, and the Mining Act, Second Schedule.
[199] BHP's Submissions [14] and ts 309, 375.
[200] BHP's Submissions [15], [52] and ts 309.
[204] As defined in s 3 of the Repealed Act.
[205] Nicholas v The State of Western Australia (6). An appeal against this decision was dismissed - Nicholas v State of Western Australia [1972] WAR 168.
[206] BHP's Submissions [49] ‑ [50].
[209] Keen v Telstra Corp Ltd [2006] FCA 834; (2006) 91 ALD 324 [31].
[210] See under the subheading 'Page 11 Plan' under the heading 'What is the Identification Evidence? (Evidence to identify which homestead was the point of reference)'.
[214] See Exhibit 1.1 page 213 bottom right corner.
[215] See the Defence [14(ca)], [14(cb)].
[217] Aquila's Reply Submissions [52].
[218] Aquila's Reply Submissions [48(b)], paraphrasing Allandale [26].
[220] See under the heading 'What is the Identification Evidence? (Evidence to identify which homestead was the point of reference)'.
[221] BHP submits that many documents were incorporated, but they all ultimately led to the Page 11 Plan.
[222] See ts 411, 441 ‑ 442. See also the notation 'Onslow 13 Ten Mile Topo' in the bottom right-hand corner of the plan and Trinder Witness Statement [12] ‑ [13], [15] ‑ [17] and Clegg Witness Statement [20] ‑ [33], [41].
[223] There were seven versions of the Onslow 13 Plan in evidence, numbered 3 to 9 in the series - see Exhibit 3.18 page 577, Exhibit 3.48 page 689, Exhibit 3.58 page 701, Exhibit 3.71 page 727, Exhibit 3.74 page 733, Exhibit 3.80 page 740, and Exhibit 3.96 page 876.
[224] See, for example, the cross‑examination of Mr Clegg at ts 389 ‑ 393 and Aquila's closing submissions at ts 439, 441 ‑ 442, 462.
[225] See Clegg Witness Statement [41] and the notation on the bottom right‑hand side of the Onslow 13 Plan.
[226] Tengraph is a spatial enquiry and mapping system displaying the position of Western Australian mining tenements and petroleum titles in relation to other land information - see Thomas Witness Statement [6].
[231] ts 408 ‑ 409. BHP submits that the Page 11 Plan is admissible on one or more of four different bases. This was the second basis listed. The first, which asserts that the plan is admissible as Identification Evidence, is discussed in the next section under the subheading 'Page 11 Plan'. The third basis given is discussed above under the subheading 'Can subsequent documents be said to be incorporated?' The fourth basis is discussed above under the subheading 'Governor's role'.
[234] See ts 298 ‑ 299 and BHP's Submissions [39], [41].
[235] BHP's Submissions [30] ‑ [39], [41]. See also ts 302 and Defence [14(ca)].
[240] See under the heading 'The grant of the Rocklea Temporary Reserve and right of occupancy'.
[243] ts 460 ‑ 463. See also ts 184, 258 ‑ 259 and Aquila's Reply Submissions [51].
[244] See Aquila's submissions at ts 460 ‑ 463 in relation to documents having to be accessible to the public. I explain why I reject this under the subheading 'Must it be proved that the document was accessible to the public?' And see Slough (968).
[245] Locations Assessment - Engagement of Vincent Dinh as Independent Mapping/GIS Expert, filed 8 August 2023 [19], [32], [35] ‑ [37] (Dinh Report).
[252] See Aquila's Submissions [84] and ts 201 ‑ 202, 437 ‑ 438.
[253] Exhibit 3.56 pages 697 ‑ 699. See also Agreed Chronology row 31.
[256] BHP's Submissions [60] and ts 416.
[260] See Land Act 1933, s 98(7)(a), s 102.
[267] Aquila's Reply Submissions [101] footnote 78, [102] footnote 80, [135(d)] footnote 132 and ts 176 ‑ 177, 446, 484 ‑ 485 (and in cross‑examination of Mr Clegg at ts 395 ‑ 396).
[269] See under the subheading 'BHP's failure to survey' under the heading 'Key Issue 3 - Discretionary refusal?'
[271] See Dinh Report [12], [15] (and the attachments referred to in those paragraphs) and ts 202.
[272] See Exhibit 8.208 page 2967. See also Exhibit 9.281 page 3562. And see BHP's Submissions [66].
[273] Plajzer Witness Statement [8(a)], [8(d)], [8(e)], [8(j)], [8(l)], [8(n)], [8(u)], [8(w)], [8(x)], [8(y)], [8(aa)], (and the documents referred to in those paragraphs) and [10].
[274] Witness statement of Stephen Ernest Troy filed 20 October 2023 (Troy Witness Statement) [4].
[275] Troy Witness Statement [2], [4].
[277] Troy Witness Statement [11] and corrections to witness statement of Stephen Ernest Troy filed 8 March 2024 [2].
[278] Troy Witness Statement [5], [38].
[281] Troy Witness Statement [9] ‑ [10].
[282] Troy Witness Statement [16(a)], [24].
[284] Troy Witness Statement [8], [37].
[293] Troy Witness Statement [24], [26].
[302] Troy Witness Statement [9] ‑ [10], [31], [35].
[312] See ts 358 ‑ 359, 422 ‑ 423, 462. See also ts 355 ‑ 358.
[314] Witness Statement of David Cox filed 20 October 2023 (First Cox Witness Statement) [1] ‑ [3], [6].
[315] First Cox Witness Statement [8].
[316] First Cox Witness Statement [3].
[317] Statement of Claim [10]. BHP did not deny this.
[318] First Cox Witness Statement [5], [8].
[319] First Cox Witness Statement [7].
[320] First Cox Witness Statement [7].
[321] Troy Witness Statement [31], [34] ‑ [35].
[322] Second Witness Statement of David Cox filed, with leave, 5 April 2024 (Second Cox Witness Statement) [3(b)].
[323] First Cox Witness Statement [13].
[324] First Cox Witness Statement [9].
[325] Second Cox Witness Statement [3(a)].
[326] First Cox Witness Statement [9].
[327] First Cox Witness Statement [10].
[328] First Cox Witness Statement [12].
[330] Witness Statement of Michael Geoffrey Herbert filed 8 September 2023 (First Herbert Witness Statement) [1], [3].
[331] First Herbert Witness Statement [3], [5].
[332] First Herbert Witness Statement [11].
[333] First Herbert Witness Statement [31].
[334] First Herbert Witness Statement [15.2].
[335] Second Witness Statement of Michael Geoffrey Herbert filed 6 December 2023 (Second Herbert Witness Statement) [5], [6.2].
[336] Second Herbert Witness Statement [9.2].
[337] Second Herbert Witness Statement [10].
[338] First Herbert Witness Statement [15.1].
[339] First Herbert Witness Statement [13.1] ‑ [13.3].
[341] First Herbert Witness Statement [22].
[342] First Herbert Witness Statement [20].
[343] First Herbert Witness Statement [17] ‑ [18].
[344] Second Herbert Witness Statement [3.3].
[345] First Herbert Witness Statement [19.2] ‑ [19.3] and Second Herbert Witness Statement [3.1], [3.4].
[346] First Herbert Witness Statement [19.1], [19.4] ‑ [19.5].
[347] Second Herbert Witness Statement [3.2].
[348] Second Herbert Witness Statement [7].
[349] First Herbert Witness Statement [21].
[351] Troy Witness Statement [31], [34] ‑ [35].
[352] First Herbert Witness Statement [23], [24.2] ‑ [24.3] and Second Herbert Witness Statement [12].
[353] First Herbert Witness Statement [35] ‑ [36] and ts 345 ‑ 346.
[354] First Herbert Witness Statement [23] ‑ [24.1].
[355] Second Herbert Witness Statement [12].
[357] Second Herbert Witness Statement [14] ‑ [15].
[360] Second Herbert Witness Statement [18].
[361] Second Herbert Witness Statement [20.1] and ts 353 ‑ 354.
[362] Second Herbert Witness Statement [18] and Exhibit 10.518 page 4633.
[363] See Second Herbert Witness Statement [23] ‑ [26].
[364] Second Herbert Witness Statement [18], [27] and Exhibit 10.518 page 4633.
[368] ts 358 and Exhibit 10.518 page 4633.
[369] Second Herbert Witness Statement [18] (cf First Herbert Witness Statement [38.3]) and ts 354.
[370] First Herbert Witness Statement [25] ‑ [27], [37] ‑ [38].
[371] See First Herbert Witness Statement [38] and Exhibit 10.500 page 4614.
[372] See Second Herbert Witness Statement [22] and Exhibit 10.518 page 4633.
[374] Second Herbert Witness Statement [16].
[378] See Exhibit 10.501 page 4615 and ts 348.
[380] First Cox Witness Statement [9] and First Herbert Witness Statement [20].
[381] See the discussion of Mr Cox's evidence above.
[382] Aquila's Submissions [83] ‑ [85].
[383] See the discussion of the evidence of Mr Troy and Mr Herbert under the heading 'Witness evidence on the ground'.
[384] See Troy Witness Statement [33], the photographs referred to in Mr Herbert's witness statements (in particular, Exhibit 10.500 page 4614), and the discussion above of Mr Herbert's evidence.
[388] See under the subheading 'The Pastoralists' Letter'.
[389] Aquila's Reply Submissions [66].
[390] Aquila's Reply Submissions [67].
[391] See Exhibit 2.552 and Exhibit 3.556.
[392] This is discussed above. However, see in particular the Troy Witness Statement [7], [8], [37], [39] and the First Cox Witness Statement [7] ‑ [9], [13].
[393] The only reference he made to where anyone lived was his evidence that, when he went to Rocklea Station to muster for the first time, Kenneth Troy and his family were living in the New Homestead - see ts 344.
[394] Plajzer Witness Statement [8].
[395] Plajzer Witness Statement [8(aa)].
[397] Aquila's Submissions [75] ‑ [76]. See also [91].
[400] House of Peace Pty Ltd v Bankstown City Council [2000] NSWCA 44; (2000) 48 NSWLR 498.
[404] See reg 66 of the Mining Regulations. I also note that, although, like Aquila, BHP used the word 'landmark', it was used to refer to an objectively ascertainable location, rather than something observable from the ground - see, for example, ts 426 ‑ 427.
[405] See under the subheading 'Aquila's pleading'.
[406] BHP's Submissions [56] ‑ [59].
[409] Aquila's Submissions [76], Aquila's Reply Submissions [34] ‑ [38], and BHP's Submissions [63] (the last of which cited TAL Life Ltd v Shuetrim [2016] NSWCA 68; (2016) 91 NSWLR 439 [80]). See also House of Peace [26] ‑ [30] and SDA v Corporation of the Synod of the Diocese of Rockhampton [2021] QCA 172; (2021) 8 QR 440 [10].
[412] ts 426 ‑ 427 (BHP) and ts 440 (Aquila). See also ts 198 ‑ 199.
[415] BHP's Submissions [69]. See also Defence [30] ‑ [33].
[416] ts 318 ‑ 319. See also BHP's Submissions [67] ‑ [68].
[418] See Defence [32], BHP's Submissions [70] ‑ [75], ts 322 ‑ 328 and Aquila's Reply Submissions [104] ‑ [105].
[420] During the hearing, Aquila amended its Statement of Claim by deleting three of the five declarations it had originally sought.
[421] Aquila's Submissions [109] and BHP's Submissions [85] ‑ [86].
[422] Wyloo Metals Pty Ltd v Quarry Park Pty Ltd [2021] WASC 356 (Wyloo).
[423] Wyloo [119] ‑ [120]. See also O 18 r 16 of the Rules of the Supreme Court 1971 (WA).
[424] Ainsworth v Criminal Justice Commission [1992] HCA 10; (1992) 175 CLR 564, 596; Aussie Airlines Pty Ltd v Australian Airlines Ltd (1996) 68 FCR 406, 414.
[426] Aquila's Submissions [109] and BHP's Submissions [80], both citing Wyloo (see [125] ‑ [138]). See also Aquila's Submissions [108] and Aquila's Reply Submissions [107].
[428] Plaintiffs' Submissions on Wyloo Metals Pty Ltd v Quarry Park Pty Ltd [2024] WASCA 38 filed 17 May 2024 (Aquila's Further Submissions) [4].
[429] Winter Witness Statement [14] ‑ [23].
[430] See ts 229 ‑ 230, 254, 361 ‑ 362 and BHP's Submissions [102].
[431] Winter Witness Statement [17], [19].
[432] API is the manager of the joint venture to which the plaintiffs are the parties - see Winter Witness Statement [2].
[433] The relevant pages of the book are Exhibit 4.126 pages 1164 ‑ 1166. It was tendered not to prove this was when the New Homestead was built, but as part of the narrative in relation to Mr Winter's investigations - see ts 170.
[434] Aquila's Reply Submissions [122(d)].
[437] Winter Witness Statement [28].
[438] Winter Witness Statement [32].
[439] Exhibit 8.218 page 2989 and Winter Witness Statement [33].
[440] Winter Witness Statement [36].
[442] Ms Bear was the 'Senior Advisor - Tenure Management and Strategy Approvals; State Agreement; Tenure and GIS' for Rio Tinto.
[445] The date Mr Winter emailed the Shire.
[446] The month in which the ground search for the datum peg began - see Exhibit 8.242 page 3186 and Winter Witness Statement [39]. And in the next paragraph I explain why I would not assume that Mr Winter caused the ground search to be carried out much before it occurred.
[448] Winter Witness Statement [39].
[449] Which had been granted on 15 May 2018 - see Agreed Chronology row 67.
[450] See, for example, Exhibit 8.247 pages 3206 ‑ 3209, Exhibit 8.251 pages 3220 ‑ 3221 and Winter Witness Statement [36] ‑ [41].
[451] Winter Witness Statement [36] and Exhibit 8.264 page 3300.
[452] Exhibit 8.255 page 3244. See also Exhibit 8.260 page 3274.
[454] Winter Witness Statement [46] ‑ [50] and Exhibit 9.267 pages 3305 ‑ 3306.
[455] Winter Witness Statement [46] ‑ [50].
[456] Winter Witness Statement [51].
[457] Aquila's Submissions [113] ‑ [114].
[461] Aquila's Further Submissions [4].
[464] Winter Witness Statement [28].
[466] Winter Witness Statement [51].
[467] Wyloo Metals Pty Ltd v Quarry Park Pty Ltd [2024] WASCA 38 (Wyloo (Court of Appeal)).
[468] In the reasons of Buss P and Livesey AJA, their Honours set out Tottle J's reasons on this point without comment - see Wyloo (Court of Appeal) [67] ‑ [82].
[469] This provided that a mining tenement could not be impeached in certain circumstances. His Honour found that the relevant effect of that provision is to put a person dealing with the registered holder of a mining tenement that had not been validly granted in the same position as if the title had been validly granted and to protect that person from claims founded on any contended invalidity of the tenement - see [96].
[472] Wyloo (Court of Appeal) [511], [513].
[473] Aquila's Further Submissions [3].
[474] Aquila's Further Submissions [4].
[475] See Wyloo (Court of Appeal) [513].
[476] BHP would contend that the first plaintiff had an interest from the time that Aquila's Exploration Licence was granted in 2005 and the second plaintiff had an interest from the time that it became a holder of the licence in 2007. It is unnecessary to decide this because Aquila's cause of action would be statute‑barred if it arose when Aquila applied for Aquila's Mining Lease or any time before that.
[477] See under the subheading 'Communication required?'
[478] See also the Winter Witness Statement [51].
[479] Aquila's Reply Submissions [123].
[481] See s 67 and s 75(7) of the Mining Act.
[482] Ultimately, Aquila's Mining Lease was granted by way of partial conversion of Aquila's Exploration Licence. And see s 67 and s 75(7) of the Mining Act.
[483] Further Amended Reply and Defence to Counterclaim [11].
[484] Second Additional Further Amended Reply and Defence to Counterclaim filed 28 March 2024 [11].
[485] See BHP's Submissions [93] ‑ [94] (and see also [97]). My only qualification would be that BHP said a justiciable controversy arose at the time the surveyor reported to the Department on 10 October 2018. I would have found that time began to run when the Department accepted and acted on the Survey Report by changing the boundary, which it did on 17 October 2018.
[487] Aquila's Submissions [125] and ts 373. See also ts 374.
[488] Clarence City Council [2020] FCAFC 134; (2020) 280 FCR 265 [189], reformatted to list form, quoting Financial Services Authority v Rourke [2001] EWHC 704 (Ch); [2002] CP Rep 14. See also Netline Pty Ltd and Kathryn Isabel Lance v QAV Pty Ltd [2014] WASC 280 [7] ‑ [12] (Beech J, as his Honour then was) and Johnco Nominees Pty Ltd v Albury-Wodonga (New South Wales) Corporation [1977] 1 NSWLR 43, 52 (Street CJ), 56 ‑ 57 (Moffit P).
[491] Re Minister for Resources; Ex parte Cazaly Iron Pty Ltd [2007] WASCA 175; (2007) 34 WAR 403.
[493] Re Minister for Resources; Ex parte Cazaly Iron Pty Ltd [24].
[494] Wyloo (Court of Appeal) [414] (Buss P and Livesey AJA), [510] ‑ [517] (Mitchell JA).
[495] Wyloo (Court of Appeal) [414] (Buss P and Livesey AJA).
[496] Wyloo (Court of Appeal) [512] ‑ [513] (Mitchell JA).
[497] Wyloo (Court of Appeal) [512] (Mitchell JA).
[498] Wyloo (Court of Appeal) [513] (Mitchell JA).
[499] Wyloo (Court of Appeal) [516] (Mitchell JA).
[500] Aquila's Further Submissions [6].
[502] Aquila's Reply Submissions [125]. See also ts 238 ‑ 239, 252.
[503] Graham on behalf of the Ngadju People v State of Western Australia [2014] FCA 516 [93] ‑ [94].
[504] CG (deceased) on behalf of the Badimia People v State of Western Australia [2015] FCA 204 [897] ‑ [899].
[505] State of Western Australia v Graham on behalf of the Ngadju People [2016] FCAFC 47; (2016) 242 FCR 231 [169] ‑ [172]. See also Stay Decision [150] ‑ [152].
[506] See the Stay Decision [162] ‑ [163].
[507] See the Stay Decision [148], [152].
[508] ts 238 ‑ 239, 247, 252 ‑ 253, 482 ‑ 483.
[510] Stay Decision [150] ‑ [152], [164]. These points are largely quotations.
[514] See the discussion under the heading 'Key Issue 2 - Time Barred?'
[516] And see s 75(7) of the Mining Act.
[517] See under the subheading 'Litigation' under the heading 'Background facts'.
[519] BHP's Submissions [104], [109].
[520] See Exhibit 10.359 pages 3993 ‑ 3994.
[522] See Stay Decision [156], [183]. And BHP concedes its cause of action arose in October 2018 - see BHP's Submissions [94].
[524] BHP's Submissions [123]. Mining lease 47/689‑I was originally 139.3784 ha (see Exhibit 5.169 page 1355). When the boundaries were changed in 2018, it was reduced to 32.42 ha (see Exhibit 10.387 page 10.4437).
[525] BHP's Submissions [124]. And see Aquila's Reply Submissions Schedule [24] (referring to s 75(5), but clearly meaning s 75(7)).
[526] Under this provision, applications for a mining lease made by the holder of an exploration licence 'shall' be granted over land that is the subject of the exploration licence, subject to other provisions of the Act.
[527] Mining Regulations reg 31(1), reg 109 and Schedule 2 items 1 and 8.
[528] Exhibit 7.197, pages 2508 ‑ 2510, 2544 ‑ 2546, 2583 ‑ 2587, and 2608 ‑ 2612.
[529] As noted previously, mining lease 47/689‑I was 139.3784 ha, but was reduced to 32.42 ha when the boundaries were changed in 2018.
[530] Exhibit 7.197, pages 2508 ‑ 2510, 2544 ‑ 2546, 2583 ‑ 2587, and 2608 ‑ 2612.
[531] Exhibit 7.197 pages 2514, 2534, 2566, and 2626.
[532] Mining lease 47/685‑1 was 990.0802 ha (Exhibit 5.161 page 1343) but was reduced to 803.09 ha when the boundaries were changed in 2018 - Exhibit 10.389 page 4448.
[533] Exhibit 7.197 pages 2514, 2534, 2566, and 2626.
[534] Exhibits 5.188, 5.190, 7.197, 8.236, 8.238, 8.248, 8.254, 9.306, 9.307, 9.308, 9.309, 9.310, 9.311, 9.312, and 9.313. The rates were $69,058.
[535] Aquila asserted that the Disputed Area was about 2.8 km2 (Aquila's Submissions [2]). The area applied for and granted in 1982 as BHP's Exploration Licence (E47/16) was 129.5 km2 - see Exhibit 3.112 page 894.
[536] Witness Statement of Lambodar Moharana filed 19 October 2023 (Moharana Witness Statement) [17] ‑ [18] and Exhibits 10.504 and 10.505 (pages 4618 ‑ 4619).
[537] Moharana Witness Statement [18(d)].
[538] Moharana Witness Statement [15]. Mr Moharana referred to the area of BHP's Exploration Licence and its mining leases 47/683‑I to 47/691‑I (which equates to the area of the Rocklea Temporary Reserve) as the 'Rocklea Tenure' - see Moharana Witness Statement [13].
[539] BHP did not make any submissions as to the rates and there is no evidence that rates were calculated by (or solely by) reference to area.
[540] In this instance, meaning the first plaintiff.
[542] See Stay Decision [156], [183]. And BHP concedes its cause of action arose in October 2018 - see BHP's Submissions [94].
[543] See also Aquila's Submissions [2] and the documents referred to in footnote 5, and ts 447, for the location of the confidential documents.
[544] BHP's Submissions [128] and ts 365.
[545] See under the heading 'What is the Identification Evidence? (Evidence to identify which homestead was the point of reference)'.
[547] Aquila's Reply Submissions [135(d)] and ts 484 ‑ 485.
[549] See Aquila's Reply Submissions [135(b)].
[550] See under the subheading 'BHP's failure to survey'.
[551] Stay Decision [150], [152], [164].
[552] Section 63 of the Interpretation Act relevantly provides that, where no time is fixed within which an act shall be done, the act shall be done with all convenient speed.
[553] Aquila's Submissions [101] ‑ [103].
[554] Section 82(1)(ba) of the Mining Act.
[555] Regulation 118B. And see s 3 of the Interpretation Act.
[556] Fitzpatrick Witness Statement [33] ‑ [34].
[560] Aquila's Reply Submissions [130] ‑ [134].
[561] Exhibit 10.365 page 4294 (and see also Exhibit 1.1 pages 178 ‑ 179).
[562] Aquila's Reply Submissions [131(a)].
[564] Aquila's Reply Submissions [131(b)].
[565] Moharana Witness Statement [15].
[566] Moharana Witness Statement [15] ‑ [17] and the map referred to, Exhibit 10.505 page 4619.
[567] See Exhibit 4.122 pages 1052 ‑ 1063, Exhibit 10.424 page 4509, and Trinder Witness Statement [18(b)] ‑ [28].
[570] BHP's Submissions [137] ‑ [138].
[573] Declaration A(a) sought a declaration that the reference to 'Rocklea Homestead' in the Reservation Document was a reference to the New Homestead. It was deleted from Aquila's amended statement of claim. However, in oral submissions, BHP contended, in effect, that this made no difference to the impact that the declarations still sought by Aquila would have on third parties.
[574] Harding v Her Worship Ms B Lane SM [2001] WASCA 37 [15] ‑ [16]. See also John Alexander's Clubs Pty Ltd v White City Tennis Club Ltd [2010] HCA 19; (2010) 241 CLR 1 [131] ‑ [138] and Jones v Miami Waterfront Developments Pty Ltd [2012] WASC 483 [12] ‑ [13], [22], [30] ‑ [31], [41] ‑ [42] (Edelman J).
[576] This was ultimately accepted - see ts 487 ‑ 489. Note that BHP already has priority over third parties on the eastern side, so no third party will lose any land if the declarations sought by BHP are made.
[578] Mining Regulations reg 31(1), reg 109 and Schedule 2 item 8.
[579] A 'graticular block' is an area measuring one minute of latitude by one minute of longitude. See s 56C of the Mining Act.
[580] Aquila's Reply Submissions [139].
[583] Harding [15] ‑ [16]. See also John Alexander's Clubs Pty Ltd [131] ‑ [138] and Jones [12] ‑ [13], [22], [30] ‑ [31], [41] ‑ [42] (Edelman J).
[584] Regulations 118A and 120A(3) of the Mining Regulations.
[586] Aquila's Reply Submissions [139] footnote 138.
[587] BHP's Submissions [137]. Although this submission referred to Declaration A(a), which was deleted from Aquila's amended statement of claim, BHP contended, in effect, that this made no difference to the impact that the declarations still sought by Aquila would have on third parties.
[589] News Ltd v Australian Rugby Football League Ltd (1996) 64 FCR 410, 526.
[592] by which I mean not insignificant.
(2017) 96 NSWLR 434
(2007) 160 FCR 148
(2000) 48 NSWLR 498
(1992) 175 CLR 564
(2007) 34 WAR 403
(2016) 242 FCR 231
(2013) 195 LGERA 182
(1990) 3 WAR 208
(1910) 12 CLR 287
(1994) 51 FCR 213
(1996) 68 FCR 406
(2020) 280 FCR 265
(2019) 101 NSWLR 1
(2016) 91 NSWLR 439
(2010) 241 CLR 1
(1996) 64 FCR 410