What it does
The Pipelines Act 1967 establishes a comprehensive licensing and regulatory regime for the construction, alteration, reconstruction and operation of pipelines in New South Wales. At its core, s 11(1) prohibits any person from commencing or continuing construction of a pipeline, or altering or reconstructing one, unless they are the registered holder of a licence (or acting on their behalf) and the activity is pursuant to that licence. Similarly, s 11(2) prohibits operation of a pipeline without both a licence and the Minister's separate written consent under s 25, which may itself be conditioned. The Act applies to any "pipeline" (defined in s 3(1) as a pipe or system of pipes for conveyance of any substance in gaseous, liquid or solid state, excluding offshore petroleum pipes under the Petroleum (Offshore) Act 1982), and expressly includes part of a pipeline (s 3(6)), apparatus or works connected to it (s 3(7)), and pipelines in, under, through, across or above land (s 3(2)).
Part 2 (Div 1) provides a gateway mechanism: a person proposing to construct a pipeline may apply for an authority to survey under s 5E. The application must be in the prescribed manner, specify lands, be accompanied by maps, particulars of technical qualifications, advice, financial resources, the prescribed fee and any other regulatory requirements (s 5E(2)). If the Minister is satisfied of compliance (or that non-compliance was not material), an authority may be granted (s 5F), lasting for a specified period (extendable or cancellable under s 5G) and authorising entry, surveys, route determination, access land identification and sampling (s 5H).
The main licensing process is in Part 3. An application under s 12 must follow the detailed requirements of s 13: approved form, prescribed manner, design and capacity particulars, substance to be conveyed, work and expenditure proposals, technical and financial resources, a prescribed plan showing route, apparatus, access lands and identified easements or vested lands, details of acquisition agreements, evidence of public notification (published at least 7 days prior in a Minister-approved manner under s 13(3)), service on prescribed public authorities if required (s 13(4)), and the fee. Further information can be demanded (s 13(2)). Applications may be amended to include or exclude lands (s 13A, with minor variation defined in s 13A(1)) or for other changes (s 13B), each with their own plan, notification, fee and compliance hurdles. The Minister grants a licence under s 14(1) only if satisfied the application (and any amendments) complied (or non-compliance was immaterial), that lands or easements are vested in the applicant or available for compulsory acquisition under s 22, and that security for compensation and acquisition costs has been provided. Refusal requires procedural fairness via notice and consideration of submissions (s 14(2)), with partial fee refund (s 14(3)).