This Act makes the National Electricity Law and its regulations (originally enacted in South Australia) operate as Queensland law, gives the Australian Energy Regulator (AER) authority to regulate distribution under those rules (including special treatment for the Mount Isa–Cloncurry network), and allows Queensland regulations to modify national rules in limited, customer‑protection cases. It binds the Crown and is intended to operate extra‑territorially.
It primarily affects the AER, distribution network businesses and retail customers: the AER decides and issues instruments; network businesses must comply with applied national rules; retail customers may bear costs or receive targeted protections under modification regulations.
This Act imports and applies the National Electricity Law and associated regulations into Queensland, sets a statutory framework for how those instruments operate in this State, and creates a small set of Queensland-specific interventions. Mechanically, it does four principal things.
First, it makes the National Electricity Law, as set out in the schedule to the National Electricity (South Australia) Act 1996, a law of Queensland (s 6). That applied law may be referred to in Queensland as the National Electricity (Queensland) Law (s 6). The regulations made under the South Australian Act, part 4, are likewise applied as regulations for the purposes of the Queensland law and may be referred to as the National Electricity (Queensland) Regulations (s 7). The Act requires that the text of the National Electricity Law be attached and revised in reprints to reflect amendments (s 9).
Second, it ensures consistency of meaning between this Act and the applied National Electricity Law by providing that words and expressions used in both instruments have the same meanings, unless context requires otherwise (s 3(2)). It also provides that certain South Australian Acts' interpretation mechanisms do not apply to the applied law and regulations in Queensland (s 8(2)).
Third, it gives the Australian Energy Regulator (AER) specific roles. It makes the AER responsible for economic regulation of distribution services provided over the Mount Isa-Cloncurry supply network under the National Electricity Rules, chapters 6 and 11, treating that isolated network as if it were part of the national grid for the relevant regulatory control periods starting 1 July 2010 and subsequent periods (s 10). Separately, the Act validates certain instruments and decisions made by the AER in a discrete transitional timeframe (s 13) and treats preparatory steps taken by the AER in that timeframe as satisfying any authorising-law preconditions (s 14).
Current sections
Direct links to the current provisions in Electricity—National Scheme (Queensland) Act 1997.
20
pt.1
Preliminary
Preliminary
sec.1
Short title
sec.1 Short title
This Act may be cited as the Electricity—National Scheme (Queensland) Act 1997.
sec.2
Commencement
sec.2 Commencement
This Act commences on a day to be fixed by proclamation.
sec.3
Definitions
sec.3 Definitions
In this Act—
AER has the meaning given in the National Electricity (Queensland) Law .
s 3 def AER ins 2009 No. 16 s 28
National Electricity (Queensland) Law means the provisions applying because of section 6 .
National Electricity (Queensland) Regulations means the provisions applying because of section 7 .
National Electricity (South Australia) Act 1996 means the National Electricity (South Australia) Act 1996 of South Australia.
Words and expressions used in this Act and also in the National Electricity (Queensland) Law have the same meanings in this Act as they have in that Law.
Subsection (2) does not apply to the extent that the context or subject matter otherwise indicates or requires.
(sec.3-ssec.1) In this Act— AER has the meaning given in the National Electricity (Queensland) Law . s 3 def AER ins 2009 No. 16 s 28 National Electricity (Queensland) Law means the provisions applying because of section 6 . National Electricity (Queensland) Regulations means the provisions applying because of section 7 . National Electricity (South Australia) Act 1996 means the National Electricity (South Australia) Act 1996 of South Australia.
(sec.3-ssec.2) Words and expressions used in this Act and also in the National Electricity (Queensland) Law have the same meanings in this Act as they have in that Law.
(sec.3-ssec.3) Subsection (2) does not apply to the extent that the context or subject matter otherwise indicates or requires.
sec.4
Crown to be bound
sec.4 Crown to be bound
This Act, the National Electricity (Queensland) Law and the National Electricity (Queensland) Regulations bind the Crown, not only in right of Queensland but also, so far as the legislative power of Parliament permits, the Crown in all its other capacities.
sec.5
Extra-territorial operation
sec.5 Extra-territorial operation
It is the intention of Parliament that the operation of this Act, the National Electricity (Queensland) Law and the National Electricity (Queensland) Regulations should, so far as possible, include operation in relation to the following—
land situated outside Queensland, whether in or outside Australia;
things situated outside Queensland, whether in or outside Australia;
acts, transactions and matters done, entered into or occurring outside Queensland, whether in or outside Australia;
things, acts, transactions and matters (wherever situated, done, entered into or occurring) that would, apart from this Act, be governed or otherwise affected by the law of the Commonwealth, another State, a Territory or a foreign country.
(a) land situated outside Queensland, whether in or outside Australia;
(b) things situated outside Queensland, whether in or outside Australia;
(c) acts, transactions and matters done, entered into or occurring outside Queensland, whether in or outside Australia;
(d) things, acts, transactions and matters (wherever situated, done, entered into or occurring) that would, apart from this Act, be governed or otherwise affected by the law of the Commonwealth, another State, a Territory or a foreign country.
pt.2
National Electricity (Queensland) Law and National Electricity (Queensland) Regulations
National Electricity (Queensland) Law and National Electricity (Queensland) Regulations
sec.6
Application in Queensland of National Electricity Law
sec.6 Application in Queensland of National Electricity Law
The National Electricity Law set out in the schedule to the National Electricity (South Australia) Act 1996 , as in force for the time being—
applies as a law of Queensland, with the modification stated in section 6A ; and
as so applying, may be referred to as the National Electricity (Queensland) Law .
See, however, the Energy (Infrastructure Facilitation) Act 2024 for the application of particular provisions of the National Electricity (Queensland) Law in particular circumstances.
s 6 amd 2014 No. 49 s 33 ; 2024 No. 15 s 186 ; 2025 No. 30 s 73 sch 1
(a) applies as a law of Queensland, with the modification stated in section 6A ; and
(b) as so applying, may be referred to as the National Electricity (Queensland) Law .
sec.6A
Application of National Energy Retail Law amendments
sec.6A Application of National Energy Retail Law amendments
The amendments made to the National Electricity Law by the Statutes Amendment (National Energy Retail Law) Act 2011 (SA) start to apply in Queensland when the National Energy Retail Law , part 2 commences.
In this section—
National Electricity Law means the National Electricity Law set out in the Schedule to the National Electricity (South Australia) Act 1996 .
s 6A ins 2014 No. 49 s 34
(sec.6A-ssec.1) The amendments made to the National Electricity Law by the Statutes Amendment (National Energy Retail Law) Act 2011 (SA) start to apply in Queensland when the National Energy Retail Law , part 2 commences.
(sec.6A-ssec.2) In this section— National Electricity Law means the National Electricity Law set out in the Schedule to the National Electricity (South Australia) Act 1996 .
sec.7
Application in Queensland under National Electricity Law
sec.7 Application in Queensland under National Electricity Law
The regulations in force for the time being under the National Electricity (South Australia) Act 1996 , part 4 —
apply as regulations in force for the purposes of the National Electricity (Queensland) Law ; and
as so applying, may be referred to as the National Electricity (Queensland) Regulations.
(a) apply as regulations in force for the purposes of the National Electricity (Queensland) Law ; and
(b) as so applying, may be referred to as the National Electricity (Queensland) Regulations.
sec.8
Interpretation of expressions in National Electricity (Queensland) Law and National Electricity (Queensland) Regulations
sec.8 Interpretation of expressions in National Electricity (Queensland) Law and National Electricity (Queensland) Regulations
In the National Electricity (Queensland) Law and the National Electricity (Queensland) Regulations—
Legislature of this jurisdiction means the Parliament of Queensland.
the National Electricity Law or this Law means the National Electricity (Queensland) Law .
this jurisdiction means the State of Queensland.
The Acts Interpretation Act 1915 , and other Acts, of South Australia do not apply to—
the National Electricity Law set out in the schedule to the National Electricity (South Australia) Act 1996 in its application as a law of Queensland; or
the regulations in force for the time being under part 4 of the National Electricity (South Australia) Act 1996 in their application as regulations in force for the purposes of the National Electricity Law.
s 8 amd 2005 No. 51 s 9
(sec.8-ssec.1) In the National Electricity (Queensland) Law and the National Electricity (Queensland) Regulations— Legislature of this jurisdiction means the Parliament of Queensland. the National Electricity Law or this Law means the National Electricity (Queensland) Law . this jurisdiction means the State of Queensland.
(sec.8-ssec.2) The Acts Interpretation Act 1915 , and other Acts, of South Australia do not apply to— the National Electricity Law set out in the schedule to the National Electricity (South Australia) Act 1996 in its application as a law of Queensland; or the regulations in force for the time being under part 4 of the National Electricity (South Australia) Act 1996 in their application as regulations in force for the purposes of the National Electricity Law.
(a) the National Electricity Law set out in the schedule to the National Electricity (South Australia) Act 1996 in its application as a law of Queensland; or
(b) the regulations in force for the time being under part 4 of the National Electricity (South Australia) Act 1996 in their application as regulations in force for the purposes of the National Electricity Law.
sec.9
Attachment—National Electricity Law
sec.9 Attachment—National Electricity Law
Attached to this Act is a copy of the National Electricity Law set out in the schedule to the National Electricity (South Australia) Act 1996 (the National Electricity Law ).
The attachment must be revised so that it is an accurate copy of the National Electricity Law as amended from time to time.
The revision under subsection (2) must happen in the first reprint of this Act after an amendment of the National Electricity Law.
A copy of an Act passed by the Parliament of South Australia that amends the National Electricity Law must be tabled in the Legislative Assembly by the Minister within 14 sitting days after it receives the Royal Assent.
A copy of any regulation made under the National Electricity (South Australia) Act 1996 , part 4 must be tabled in the Legislative Assembly by the Minister within 14 sitting days after it comes into force.
This section does not affect the operation of sections 6 and 7 .
s 9 amd 2005 No. 51 s 10
(sec.9-ssec.1) Attached to this Act is a copy of the National Electricity Law set out in the schedule to the National Electricity (South Australia) Act 1996 (the National Electricity Law ).
(sec.9-ssec.2) The attachment must be revised so that it is an accurate copy of the National Electricity Law as amended from time to time.
(sec.9-ssec.3) The revision under subsection (2) must happen in the first reprint of this Act after an amendment of the National Electricity Law.
(sec.9-ssec.4) A copy of an Act passed by the Parliament of South Australia that amends the National Electricity Law must be tabled in the Legislative Assembly by the Minister within 14 sitting days after it receives the Royal Assent.
(sec.9-ssec.5) A copy of any regulation made under the National Electricity (South Australia) Act 1996 , part 4 must be tabled in the Legislative Assembly by the Minister within 14 sitting days after it comes into force.
(sec.9-ssec.6) This section does not affect the operation of sections 6 and 7 .
pt.3
Mount Isa–Cloncurry supply network
Mount Isa–Cloncurry supply network
sec.10
Economic regulation of Mount Isa–Cloncurry supply network from 1 July 2010
sec.10 Economic regulation of Mount Isa–Cloncurry supply network from 1 July 2010
The AER is responsible for the economic regulation under the National Electricity Rules, chapters 6 and 11, for a relevant regulatory control period, of distribution services provided by means of, or in connection with, the Mount Isa–Cloncurry supply network as if the supply network were part of the national grid.
National Electricity Rules, chapters 6 (Economic regulation of distribution services) and 11 (Savings and transitional rules)
For applying the National Electricity Rules, chapters 6 and 11—
the distribution services are taken to be distribution services for the National Electricity Rules; and
the Mount Isa–Cloncurry supply network is taken to be a distribution system.
The chapters apply with any necessary changes to give effect to this section.
In this section—
Mount Isa–Cloncurry supply network —
means the supply network as defined under the Electricity Act 1994 , section 8 , other than the 220kV supply network—
located in the Mount Isa–Cloncurry region; and
owned by Ergon Energy at the commencement of this section; and
not connected to the national grid; and
includes any increase in the supply network after the commencement.
National Electricity Rules has the meaning given in the National Electricity (Queensland) Law .
national grid has the meaning given in the National Electricity Rules.
relevant regulatory control period means—
the regulatory control period, within the meaning of the National Electricity Rules, starting on 1 July 2010; and
any regulatory control period after the regulatory control period mentioned in paragraph (a) .
s 10 ins 2009 No. 16 s 29
(sec.10-ssec.1) The AER is responsible for the economic regulation under the National Electricity Rules, chapters 6 and 11, for a relevant regulatory control period, of distribution services provided by means of, or in connection with, the Mount Isa–Cloncurry supply network as if the supply network were part of the national grid. National Electricity Rules, chapters 6 (Economic regulation of distribution services) and 11 (Savings and transitional rules)
(sec.10-ssec.2) For applying the National Electricity Rules, chapters 6 and 11— the distribution services are taken to be distribution services for the National Electricity Rules; and the Mount Isa–Cloncurry supply network is taken to be a distribution system.
(sec.10-ssec.3) The chapters apply with any necessary changes to give effect to this section.
(sec.10-ssec.4) In this section— Mount Isa–Cloncurry supply network — means the supply network as defined under the Electricity Act 1994 , section 8 , other than the 220kV supply network— located in the Mount Isa–Cloncurry region; and owned by Ergon Energy at the commencement of this section; and not connected to the national grid; and includes any increase in the supply network after the commencement. National Electricity Rules has the meaning given in the National Electricity (Queensland) Law . national grid has the meaning given in the National Electricity Rules. relevant regulatory control period means— the regulatory control period, within the meaning of the National Electricity Rules, starting on 1 July 2010; and any regulatory control period after the regulatory control period mentioned in paragraph (a) .
(a) the distribution services are taken to be distribution services for the National Electricity Rules; and
(b) the Mount Isa–Cloncurry supply network is taken to be a distribution system.
(a) means the supply network as defined under the Electricity Act 1994 , section 8 , other than the 220kV supply network— (i) located in the Mount Isa–Cloncurry region; and (ii) owned by Ergon Energy at the commencement of this section; and (iii) not connected to the national grid; and
(i) located in the Mount Isa–Cloncurry region; and
(ii) owned by Ergon Energy at the commencement of this section; and
(iii) not connected to the national grid; and
(b) includes any increase in the supply network after the commencement.
(i) located in the Mount Isa–Cloncurry region; and
(ii) owned by Ergon Energy at the commencement of this section; and
(iii) not connected to the national grid; and
(a) the regulatory control period, within the meaning of the National Electricity Rules, starting on 1 July 2010; and
(b) any regulatory control period after the regulatory control period mentioned in paragraph (a) .
pt.4
Related matters
Related matters
sec.11
Law to be construed not to exceed legislative power of Legislature
sec.11 Law to be construed not to exceed legislative power of Legislature
Clause 2 of schedule 2 to the National Electricity (Queensland) Law has effect in relation to the operation of any provision of this Act, or any regulation forming part of the National Electricity (Queensland) Regulations, as if the provision or regulation formed part of the National Electricity (Queensland) Law .
Subsection (1) does not limit the effect that a provision or regulation would validly have apart from the subsection.
s 11 ins 2009 No. 16 s 29
(sec.11-ssec.1) Clause 2 of schedule 2 to the National Electricity (Queensland) Law has effect in relation to the operation of any provision of this Act, or any regulation forming part of the National Electricity (Queensland) Regulations, as if the provision or regulation formed part of the National Electricity (Queensland) Law .
(sec.11-ssec.2) Subsection (1) does not limit the effect that a provision or regulation would validly have apart from the subsection.
sec.12
Regulation-making power for the National Electricity (Queensland) Law
sec.12 Regulation-making power for the National Electricity (Queensland) Law
The Governor in Council may make such regulations as are contemplated by the National Electricity (Queensland) Law as being made under this Act as the application Act of this jurisdiction.
s 12 ins 2014 No. 49 s 36
sec.12A
Modification regulation-making power
sec.12A Modification regulation-making power
A regulation (a modification regulation ) may modify the operation of any of the following—
the National Electricity (Queensland) Law;
the National Electricity (Queensland) Regulations;
the National Electricity Rules to the extent they apply for the purposes of the National Electricity (Queensland) Law.
However, a modification regulation may be made only—
to prevent or minimise an adverse financial effect the operation of the National Electricity (Queensland) Law would, without amendment, have on a particular class of retail customers in Queensland; or
retail customers who are Aboriginal peoples or Torres Strait Islander peoples, retail customers who are financially disadvantaged, retail customers who live in rural or remote areas
to prevent or minimise an adverse financial effect the operation of the National Electricity (Queensland) Regulations , or the National Electricity Rules mentioned in subsection (1) (c) , would, without amendment, have on—
retail customers in Queensland; or
a particular class of retail customers in Queensland; or
to give effect to the operation of the National Electricity (Queensland) Regulations , or the National Electricity Rules mentioned in subsection (1) (c) , in a way that increases customer protection for retail customers in Queensland.
a requirement for a network service provider to consider additional matters under the National Electricity (Queensland) Regulations or the National Electricity Rules in relation to quality, safety, reliability and security of supply of electricity for retail customers
s 12A ins 2024 No. 15 s 186A
(sec.12A-ssec.1) A regulation (a modification regulation ) may modify the operation of any of the following— the National Electricity (Queensland) Law; the National Electricity (Queensland) Regulations; the National Electricity Rules to the extent they apply for the purposes of the National Electricity (Queensland) Law.
(sec.12A-ssec.2) However, a modification regulation may be made only— to prevent or minimise an adverse financial effect the operation of the National Electricity (Queensland) Law would, without amendment, have on a particular class of retail customers in Queensland; or retail customers who are Aboriginal peoples or Torres Strait Islander peoples, retail customers who are financially disadvantaged, retail customers who live in rural or remote areas to prevent or minimise an adverse financial effect the operation of the National Electricity (Queensland) Regulations , or the National Electricity Rules mentioned in subsection (1) (c) , would, without amendment, have on— retail customers in Queensland; or a particular class of retail customers in Queensland; or to give effect to the operation of the National Electricity (Queensland) Regulations , or the National Electricity Rules mentioned in subsection (1) (c) , in a way that increases customer protection for retail customers in Queensland. a requirement for a network service provider to consider additional matters under the National Electricity (Queensland) Regulations or the National Electricity Rules in relation to quality, safety, reliability and security of supply of electricity for retail customers
(a) the National Electricity (Queensland) Law;
(b) the National Electricity (Queensland) Regulations;
(c) the National Electricity Rules to the extent they apply for the purposes of the National Electricity (Queensland) Law.
(a) to prevent or minimise an adverse financial effect the operation of the National Electricity (Queensland) Law would, without amendment, have on a particular class of retail customers in Queensland; or Examples of classes of retail customers— retail customers who are Aboriginal peoples or Torres Strait Islander peoples, retail customers who are financially disadvantaged, retail customers who live in rural or remote areas
(b) to prevent or minimise an adverse financial effect the operation of the National Electricity (Queensland) Regulations , or the National Electricity Rules mentioned in subsection (1) (c) , would, without amendment, have on— (i) retail customers in Queensland; or (ii) a particular class of retail customers in Queensland; or
(i) retail customers in Queensland; or
(ii) a particular class of retail customers in Queensland; or
(c) to give effect to the operation of the National Electricity (Queensland) Regulations , or the National Electricity Rules mentioned in subsection (1) (c) , in a way that increases customer protection for retail customers in Queensland. Example of increased customer protection— a requirement for a network service provider to consider additional matters under the National Electricity (Queensland) Regulations or the National Electricity Rules in relation to quality, safety, reliability and security of supply of electricity for retail customers
(i) retail customers in Queensland; or
(ii) a particular class of retail customers in Queensland; or
sec.13
Validation of instruments and decisions made by AER
sec.13 Validation of instruments and decisions made by AER
This section applies to an instrument or a decision made by the AER if—
the instrument or decision was made—
at or after the time the amendments of the National Electricity Law by the Statutes Amendment (National Energy Retail Law) Act 2011 (SA) were enacted; but
before the time (the application time ) the amendments started to apply under this Act as a law of Queensland; and
had the amendments started so to apply, the making of the instrument or decision would have been authorised by 1 of the following laws (the authorising law )—
the National Electricity (Queensland) Law ;
the National Electricity (Queensland) Regulations;
this Act;
a regulation under this Act; and
if the making of the instrument or decision would be so authorised subject to the satisfaction of any conditions or other requirements (for example, consultation or publication requirements)—the AER has done anything that would, if the amendments had started so to apply, be required under the authorising law for the instrument or decision to be so authorised.
For the purposes of the authorising law—
the instrument or decision is taken to be valid; and
the instrument or decision has effect from the application time—
as varied, and unless revoked, by any other instrument or decision to which this section applies; and
subject to that law as so applying.
For this section—
guidelines are an example of an instrument; and
the following are examples of decisions—
appointments;
determinations;
approvals.
In this section—
National Electricity Law means the National Electricity Law set out in the Schedule to the National Electricity (South Australia) Act 1996 (SA) .
s 13 ins 2014 No. 49 s 36
(sec.13-ssec.1) This section applies to an instrument or a decision made by the AER if— the instrument or decision was made— at or after the time the amendments of the National Electricity Law by the Statutes Amendment (National Energy Retail Law) Act 2011 (SA) were enacted; but before the time (the application time ) the amendments started to apply under this Act as a law of Queensland; and had the amendments started so to apply, the making of the instrument or decision would have been authorised by 1 of the following laws (the authorising law )— the National Electricity (Queensland) Law ; the National Electricity (Queensland) Regulations; this Act; a regulation under this Act; and if the making of the instrument or decision would be so authorised subject to the satisfaction of any conditions or other requirements (for example, consultation or publication requirements)—the AER has done anything that would, if the amendments had started so to apply, be required under the authorising law for the instrument or decision to be so authorised.
(sec.13-ssec.2) For the purposes of the authorising law— the instrument or decision is taken to be valid; and the instrument or decision has effect from the application time— as varied, and unless revoked, by any other instrument or decision to which this section applies; and subject to that law as so applying.
(sec.13-ssec.3) For this section— guidelines are an example of an instrument; and the following are examples of decisions— appointments; determinations; approvals.
(sec.13-ssec.4) In this section— National Electricity Law means the National Electricity Law set out in the Schedule to the National Electricity (South Australia) Act 1996 (SA) .
(a) the instrument or decision was made— (i) at or after the time the amendments of the National Electricity Law by the Statutes Amendment (National Energy Retail Law) Act 2011 (SA) were enacted; but (ii) before the time (the application time ) the amendments started to apply under this Act as a law of Queensland; and
(i) at or after the time the amendments of the National Electricity Law by the Statutes Amendment (National Energy Retail Law) Act 2011 (SA) were enacted; but
(ii) before the time (the application time ) the amendments started to apply under this Act as a law of Queensland; and
(b) had the amendments started so to apply, the making of the instrument or decision would have been authorised by 1 of the following laws (the authorising law )— (i) the National Electricity (Queensland) Law ; (ii) the National Electricity (Queensland) Regulations; (iii) this Act; (iv) a regulation under this Act; and
(i) the National Electricity (Queensland) Law ;
(ii) the National Electricity (Queensland) Regulations;
(iii) this Act;
(iv) a regulation under this Act; and
(c) if the making of the instrument or decision would be so authorised subject to the satisfaction of any conditions or other requirements (for example, consultation or publication requirements)—the AER has done anything that would, if the amendments had started so to apply, be required under the authorising law for the instrument or decision to be so authorised.
(i) at or after the time the amendments of the National Electricity Law by the Statutes Amendment (National Energy Retail Law) Act 2011 (SA) were enacted; but
(ii) before the time (the application time ) the amendments started to apply under this Act as a law of Queensland; and
(i) the National Electricity (Queensland) Law ;
(ii) the National Electricity (Queensland) Regulations;
(iii) this Act;
(iv) a regulation under this Act; and
(a) the instrument or decision is taken to be valid; and
(b) the instrument or decision has effect from the application time— (i) as varied, and unless revoked, by any other instrument or decision to which this section applies; and (ii) subject to that law as so applying.
(i) as varied, and unless revoked, by any other instrument or decision to which this section applies; and
(ii) subject to that law as so applying.
(i) as varied, and unless revoked, by any other instrument or decision to which this section applies; and
(ii) subject to that law as so applying.
(a) guidelines are an example of an instrument; and
(b) the following are examples of decisions— (i) appointments; (ii) determinations; (iii) approvals.
(i) appointments;
(ii) determinations;
(iii) approvals.
(i) appointments;
(ii) determinations;
(iii) approvals.
sec.14
Authorisation of preparatory steps by AER
sec.14 Authorisation of preparatory steps by AER
This section applies if—
the AER is required to do something (a preparatory step ) before making a decision or making an instrument under 1 of the following (the authorising law )—
the National Electricity (Queensland) Law ;
the National Electricity (Queensland) Regulations;
this Act;
a regulation under this Act; and
the preparatory step would have been required under the authorising law if the amendments of the National Electricity Law by the Statutes Amendment (National Energy Retail Law) Act 2011 (SA) had started to apply under this Act as a law of Queensland; and
the AER takes the preparatory step—
at or after the time the amendments were enacted; but
before the time the amendments started to apply under this Act as a law of Queensland.
For the purposes of the authorising law, the AER is taken to have complied with the requirement to take the preparatory step.
In this section—
National Electricity Law means the National Electricity Law set out in the Schedule to the National Electricity (South Australia) Act 1996 (SA) .
s 14 ins 2014 No. 49 s 36
(sec.14-ssec.1) This section applies if— the AER is required to do something (a preparatory step ) before making a decision or making an instrument under 1 of the following (the authorising law )— the National Electricity (Queensland) Law ; the National Electricity (Queensland) Regulations; this Act; a regulation under this Act; and the preparatory step would have been required under the authorising law if the amendments of the National Electricity Law by the Statutes Amendment (National Energy Retail Law) Act 2011 (SA) had started to apply under this Act as a law of Queensland; and the AER takes the preparatory step— at or after the time the amendments were enacted; but before the time the amendments started to apply under this Act as a law of Queensland.
(sec.14-ssec.2) For the purposes of the authorising law, the AER is taken to have complied with the requirement to take the preparatory step.
(sec.14-ssec.3) In this section— National Electricity Law means the National Electricity Law set out in the Schedule to the National Electricity (South Australia) Act 1996 (SA) .
(a) the AER is required to do something (a preparatory step ) before making a decision or making an instrument under 1 of the following (the authorising law )— (i) the National Electricity (Queensland) Law ; (ii) the National Electricity (Queensland) Regulations; (iii) this Act; (iv) a regulation under this Act; and
(i) the National Electricity (Queensland) Law ;
(ii) the National Electricity (Queensland) Regulations;
(iii) this Act;
(iv) a regulation under this Act; and
(b) the preparatory step would have been required under the authorising law if the amendments of the National Electricity Law by the Statutes Amendment (National Energy Retail Law) Act 2011 (SA) had started to apply under this Act as a law of Queensland; and
(c) the AER takes the preparatory step— (i) at or after the time the amendments were enacted; but (ii) before the time the amendments started to apply under this Act as a law of Queensland.
(i) at or after the time the amendments were enacted; but
(ii) before the time the amendments started to apply under this Act as a law of Queensland.
(i) the National Electricity (Queensland) Law ;
(ii) the National Electricity (Queensland) Regulations;
(iii) this Act;
(iv) a regulation under this Act; and
(i) at or after the time the amendments were enacted; but
(ii) before the time the amendments started to apply under this Act as a law of Queensland.
Source text: opening excerpt
Sourced from Queensland Legislation (legislation.qld.gov.au), CC BY 4.0.
pt.1 Preliminary
Preliminary
sec.1 Short title
sec.1 Short title
This Act may be cited as the Electricity—National Scheme (Queensland) Act 1997.
sec.2 Commencement
sec.2 Commencement
This Act commences on a day to be fixed by proclamation.
sec.3 Definitions
sec.3 Definitions
In this Act—
AER has the meaning given in the National Electricity (Queensland) Law .
s 3 def AER ins 2009 No. 16 s 28
National Electricity (Queensland) Law means the provisions applying because of section 6 .
National Electricity (Queensland) Regulations means the provisions applying because of section 7 .
National Electricity (South Australia) Act 1996 means the National Electricity (South Australia) Act 1996 of South Australia.
Words and expressions used in this Act and also in the National Electricity (Queensland) Law have the same meanings in this Act as they have in that Law.
Subsection (2) does not apply to the extent that the context or subject matter otherwise indicates or requires.
(sec.3-ssec.1) In this Act— AER has the meaning given in the National Electricity (Queensland) Law . s 3 def AER ins 2009 No. 16 s 28 National Electricity (Queensland) Law means the provisions applying because of section 6 . National Electricity (Queensland) Regulations means the provisions applying because of section 7 . National Electricity (South Australia) Act 1996 means the National Electricity (South Australia) Act 1996 of South Australia.
(sec.3-ssec.2) Words and expressions used in this Act and also in the National Electricity (Queensland) Law have the same meanings in this Act as they have in that Law.
(sec.3-ssec.3) Subsection (2) does not apply to the extent that the context or subject matter otherwise indicates or requires.
sec.4 Crown to be bound
sec.4 Crown to be bound
This Act, the National Electricity (Queensland) Law and the National Electricity (Queensland) Regulations bind the Crown, not only in right of Queensland but also, so far as the legislative power of Parliament permits, the Crown in all its other capacities.
sec.5 Extra-territorial operation
sec.5 Extra-territorial operation
It is the intention of Parliament that the operation of this Act, the National Electricity (Queensland) Law and the National Electricity (Queensland) Regulations should, so far as possible, include operation in relation to the following—
land situated outside Queensland, whether in or outside Australia;
things situated outside Queensland, whether in or outside Australia;
acts, transactions and matters done, entered into or occurring outside Queensland, whether in or outside Australia;
things, acts, transactions and matters (wherever situated, done, entered into or occurring) that would, apart from this Act, be governed or otherwise affected by the law of the Commonwealth, another State, a Territory or a foreign country.
Fourth, the Act establishes Queensland-specific regulatory powers and limits. It grants the Governor in Council the power to make regulations contemplated by the applied National Electricity Law (s 12) and a targeted modification power by regulation (s 12A). The modification regulation power is constrained: a regulation may only modify the applied law, regulations or Rules to prevent or minimise adverse financial effects on particular classes of retail customers in Queensland or to increase customer protection for retail customers in Queensland (s 12A(1)-(2)).
Procedurally, the Act binds the Crown (s 4), signals Parliament’s intent for extra-territorial operation (s 5), and sets mandatory tabling and revision duties for the Minister regarding South Australian amending Acts and regulations (s 9(4)-(5)). The Act also cross-references other Queensland legislation (for example, the Electricity Act 1994 for the definition of the Mount Isa-Cloncurry supply network at s 10(4)(a)) and flags interaction with the Energy (Infrastructure Facilitation) Act 2024 for particular provisions (s 6 note).
The Act therefore establishes a selective national law adoption model with limited, express Queensland carve-outs and tools to tune the national framework where the Minister or Governor in Council considers targeted financial relief or consumer protection measures necessary.
Main concepts
The Act’s principal concepts can be grouped under application, legal equivalence, regulatory allocation, targeted modification and transition. Each concept is embedded in particular sections and carries practical consequences for regulators, network businesses, retail customers and government decision-makers.
Application of an external law: s 6 adopts the National Electricity Law (as in the schedule to the South Australian Act) into Queensland, subject to the modification in s 6A and any later adjustments. The applied Law is to be read as a law of Queensland and may be referred to as the National Electricity (Queensland) Law. The National Electricity (Queensland) Regulations are likewise applied (s 7). The attachment requirement in s 9 requires the Act’s schedule to be revised in the first reprint after any amendment, making the Queensland statute book carry an updated copy of the applied law.
Equivalence of meanings: s 3(2) provides that words and expressions used in this Act and the applied National Electricity (Queensland) Law have the same meanings, unless context dictates otherwise. This is a textual harmonisation device that reduces interpretive divergence between the State Act and the applied national instrument.
Regulatory allocation for a discrete network: s 10 places economic regulation of the Mount Isa-Cloncurry supply network under the AER using chapters 6 and 11 of the National Electricity Rules. The Act treats distribution services over that network as distribution services for the Rules and treats the Mount Isa-Cloncurry supply network as a distribution system (s 10(2)). The chapters apply with necessary changes to give effect to the section, and the definition of the network references the Electricity Act 1994 and ownership by Ergon Energy at commencement (s 10(4)).
Modification power with targeted objectives: s 12A creates a bespoke regulation-making power (a modification regulation) that may modify the operation of the applied National Electricity (Queensland) Law, Regulations, or the National Electricity Rules as they apply in Queensland. Its permitted uses are limited to preventing or minimising adverse financial effects on retail customers or increasing customer protection in Queensland. Subsection 12A(2) gives examples of classes of retail customers (Aboriginal and Torres Strait Islander peoples, financially disadvantaged customers, rural and remote customers) and of increased customer protection (requiring a network service provider to consider additional matters in relation to quality, safety, reliability and security of supply).
Transitional validation and preparatory-step authorisation: ss 13 and 14 are transitional measures arising from an amendments package to the National Electricity Law (the Statutes Amendment (National Energy Retail Law) Act 2011 (SA)). Section 13 validates instruments or decisions made by the AER in the period after those amendments were enacted but before they commenced to apply in Queensland, provided the instrument or decision would have been authorised had the amendments been in force and required preconditions were satisfied by the AER. Section 14 treats preparatory steps taken by the AER in that period as satisfying the requirement to take such steps where they were required by the authorising law.
Constitutional and territorial limits: s 11 gives clause 2 of schedule 2 to the National Electricity (Queensland) Law effect in relation to the operation of any provision of this Act so as to ensure the applied provisions are construed not to exceed the legislative power of the Queensland Parliament. s 5 records Parliament’s intention for extra-territorial operation, including application to land, things and acts done outside Queensland where possible.
Administrative duties: s 9 imposes duties on the Minister to table copies of South Australian amending Acts and regulations in the Legislative Assembly within 14 sitting days, and to revise the attached National Electricity Law in the Act’s first reprint after amendment.
Collectively, these concepts create a regime where a South Australian-sourced, nationally framed law operates in Queensland but with state-specific overlay powers and specified transitional legal safety nets for the AER.
Who it affects
This Act affects several classes of actors directly, and others indirectly through the application of the National Electricity (Queensland) Law and Rules.
Regulator (AER): The AER is a primary addressee. Section 10 confers responsibility on the AER for economic regulation under National Electricity Rules chapters 6 and 11 of distribution services on the Mount Isa-Cloncurry supply network for the relevant regulatory control periods. Sections 13 and 14 operate directly on the AER by validating instruments and preparatory steps it took during the transitional window described in those sections. The AER’s decision-making, guideline-making, appointments, determinations and approvals are the kinds of instruments and decisions contemplated (s 13(3)).
Network service providers and distributors: Distribution service providers operating in the Mount Isa-Cloncurry region are affected because the AER will regulate their economic activities under the National Electricity Rules as if the supply network were part of the national grid (s 10(1)-(3)). The Act also envisages the possibility of modification regulations requiring network service providers to consider additional matters on quality, safety, reliability and security of supply for retail customers (s 12A(2)(c) example). Ergon Energy is named by reference , the network must have been owned by Ergon Energy at the commencement of s 10 to fit the definition (s 10(4)(a)(ii)).
Retail customers (classes): The modification regulation power is expressly targeted at retail customers in Queensland and particular classes of retail customers (s 12A(2)). The section lists examples of classes (Aboriginal and Torres Strait Islander peoples, financially disadvantaged customers, rural and remote customers). Retail customers therefore have standing as the class whose financial exposure and protections are the explicit focus of any Queensland-only modification regulation.
State government actors: The Governor in Council and the Minister have roles. The Governor in Council may make regulations contemplated by the applied Law (s 12) and modification regulations (s 12A). The Minister must table South Australian amending Acts and regulations within 14 sitting days and ensure the attachment is kept up to date in reprints (s 9(3)-(5)).
Crown: The Act binds the Crown in right of Queensland and, so far as legislative power permits, the Crown in all other capacities (s 4). That brings government-owned enterprises and Crown-owned assets within the Act’s legal ambit.
Other jurisdictions and external actors: The Act’s extra-territorial intention (s 5) reaches land, things and acts outside Queensland and acts otherwise governed by Commonwealth, State, Territory or foreign law where possible. That affects entities whose activities cross borders or involve interjurisdictional relationships.
Legislative and regulatory drafters and publishers: Those tasked with drafting modification regulations or maintaining the statutory schedule must attend to the Act’s requirements (s 9, s 12A, s 11). Legal practitioners dealing with electricity regulation in Queensland are affected because the Act changes which law applies and introduces Queensland-specific regulatory levers.
Indirectly affected parties: Market participants, retailers, generators and customers outside the Mount Isa-Cloncurry region will be affected by the applied National Electricity (Queensland) Law generally because the National Electricity Rules and Law (as applied) govern many aspects of market operation, even though this Act is largely a vehicle to import and manage that national framework.
Who pays: The Act itself does not set consumer charges, fines, or tariffs, but confers powers to the AER and to the Governor in Council to modify rules that have obvious effects on prices and allocation of costs. Section 12A’s object to prevent or minimise adverse financial effects on particular retail customers implies that the State contemplates regulatory action that will redistribute or limit cost recovery under the National framework. The Act therefore matters to who ultimately bears electricity network costs, though the precise price effects derive from AER determinations and any modification regulations.
Who decides: The AER decides economic regulation matters for the Mount Isa-Cloncurry network (s 10); the Governor in Council decides whether to make modification regulations and other regulations under the Act (s 12, s 12A); the Minister has tabling duties (s 9). The Queensland Parliament constrains the applied law with s 11 (legislative power limit).
Key duties and rights
The Act allocates discrete duties to public actors and sets rights (mostly rights to regulatory protection or legal effect) for regulators and consumers by operation of the adopted national framework.
Duties imposed on the AER
Economic regulation of the Mount Isa-Cloncurry supply network: The AER is responsible for economic regulation under the National Electricity Rules, chapters 6 and 11, for relevant regulatory control periods for distribution services in the Mount Isa-Cloncurry supply network (s 10(1)). That is a duty to apply the Rules to that previously isolated network as if it were part of the national grid, with necessary adjustments (s 10(2)-(3)). The duty covers the regulatory control period starting 1 July 2010 and subsequent periods (s 10(4)(d)).
Transitional compliance and validation: Where the AER made instruments or took decisions in a specified transitional window (between enactment of certain National Electricity Law amendments and their application in Queensland), the AER is treated as having authority for those instruments if they would have been authorised had the amendments applied and the AER satisfied any authorising-law conditions (s 13(1)-(2)). This gives effect to instruments such as guidelines, appointments, determinations and approvals (s 13(3)).
Preparatory-step authorisation: If the AER took preparatory steps after enactment of those amendments but before application in Queensland, and the preparatory steps would have been required under the authorising law, the AER is taken to have complied (s 14(1)-(2)).
Duties on the Governor in Council and Minister
Regulation-making: The Governor in Council may make regulations contemplated by the National Electricity (Queensland) Law as the application Act of this jurisdiction (s 12). This is a conventional administrative delegation power.
Modification regulation constraints: The Governor in Council may make modification regulations but only for the narrow reasons listed in s 12A(2),preventing or minimising adverse financial effects on particular classes of retail customers in Queensland, preventing or minimising adverse financial effects on retail customers in Queensland generally, or increasing customer protection for retail customers in Queensland. The section lists examples to illustrate the target groups and protective measures (s 12A(2) and examples).
Tabling and reprinting duties: The Minister must table a copy of any South Australian Act that amends the National Electricity Law within 14 sitting days after it receives Royal Assent, and table any regulation made under the South Australian Act, part 4, within 14 sitting days after it comes into force (s 9(4)-(5)). The Act’s attached National Electricity Law must be revised to be an accurate copy as amended, and that revision must happen in the first reprint after an amendment (s 9(1)-(3)).
Duties on network service providers
Compliance with applied Rules: Distribution network service providers operating in the Mount Isa-Cloncurry supply network are subject to economic regulation under chapters 6 and 11 as applied by s 10. The practical duty is to participate in AER regulatory processes, submit regulatory proposals, and comply with determinations as a distribution system taken to be part of the national grid.
Rights and protections for retail customers
Targeted regulatory protections: The Act creates a right, in the sense of a statutory basis for regulation, for retail customers to have adverse financial impacts prevented or minimised, and for increased customer protection, via modification regulations (s 12A). This is not a private right of action in the Act itself, but it establishes the legal ground for the Governor in Council to make protective rules.
Crown obligations and rights
Binding the Crown: The Act binds the Crown in right of Queensland and, to the extent permitted, the Crown in other capacities (s 4). That removes an implied exemption for government actors from the Act’s operation.
Interpretive and constitutional duties
Construction not to exceed power: s 11 gives clause 2 of schedule 2 to the National Electricity (Queensland) Law effect in relation to operation of any provision of this Act so that the applied law and regulations are construed not to exceed the legislative power of the Queensland Parliament. This is a duty on courts and administrative decision-makers to read provisions consistently with state legislative power limits.
Rights derived via adoption
Rights that exist in the National Electricity Law and Rules: By making the national law and regulations applicable (s 6-7), the Act gives Queensland stakeholders the suite of rights, obligations, enforcement mechanisms, and procedural protections contained in the applied Law and Rules. The Act itself does not repeat those rights but makes them part of Queensland law subject to the modifications and constraints in this Act.
Limits and qualifications
Non-application of South Australian interpretive Acts: s 8(2) specifies that the Acts Interpretation Act 1915 and other South Australian Acts do not apply to the applied National Electricity Law or regulations in their Queensland application. That affects how interpretive questions are handled,Queensland interpretation principles apply.
Temporal qualification of validation and authorisation: The validation of AER instruments (s 13) and preparatory-step authorisation (s 14) apply only to a specific transitional window connected to enactment and commencement of certain National Electricity Law amendments; they are not general authorisations.
In short, the Act assigns duties to the AER and the State executive to operate and administer the applied national framework in Queensland, obliges certain administrative acts (tabling and reprinting), and creates a constrained power for Queensland to make modification regulations aimed at consumer financial relief or increased consumer protection.
Penalties and enforcement
The text of this Act contains no standalone penalty provisions or criminal offences. Enforcement and sanctioning within the electricity sector in Queensland therefore depend principally on the enforcement architecture embedded in the National Electricity (Queensland) Law and the National Electricity (Queensland) Regulations as applied by ss 6-7. The Act does, however, contain provisions with legal-effect consequences and validation effects that influence enforcement indirectly.
Absence of express penalties in this Act
No pecuniary penalties, infringement notices or criminal offences are created by the words of the Act as provided. Any enforcement mechanisms that give rise to penalties, civil enforcement or administrative sanctions are contained in, or derived from, the National Electricity Law, the National Electricity (Queensland) Regulations, the National Electricity Rules and any applicable Queensland legislation referenced (s 6-7, s 8). Practitioners must therefore refer to the applied Law and Rules for the specific enforcement tools and penalty levels.
Validation of AER instruments and legal effect (s 13)
Section 13 grants retrospective legal validity to instruments and decisions made by the AER in a particular transitional period provided they meet the section’s conditions. For enforcement, this has the effect of curing potential defects in the authorisation basis for AER actions (for example, guidelines, determinations, approvals made in the gap between enactment and application), thereby preserving enforcement actions or regulatory consequences that relied on those instruments. The section takes any such instrument or decision to be valid and to have effect from the application time, subject to variation or revocation by subsequent instruments to which the section applies (s 13(2)).
Preparatory steps treated as compliance (s 14)
Section 14 treats preparatory steps taken by the AER after the enactment of certain amendments but before their commencement in Queensland as satisfying authorising-law requirements to take such steps. This reduces the risk that AER’s procedural missteps in the transitional window could be used as a basis to challenge subsequent enforcement action.
Enforcement under National Electricity Law and Rules
Because s 6 applies the National Electricity Law “as a law of Queensland,” the enforcement powers, including investigations, infringement notices, civil penalty regimes, and compliance orders that appear in the National Electricity Law and the Rules, will be the primary enforcement mechanisms affecting regulated parties. The Act’s s 8 is relevant to interpretation of those enforcement powers because it disapplies the South Australian Acts Interpretation Act 1915 for the applied Law’s operation in Queensland (s 8(2)).
Ministerial and executive compliance duties
The Minister’s tabling obligations (s 9(4)-(5)) are mandatory timeline duties. A failure to comply could invite political or parliamentary consequences and potentially judicial review of administrative action related to non-tabling where the failure affects the legal availability of a provision, though the Act does not itself provide a penalty for non-compliance.
Regulatory discretion and limits
The modification regulation power (s 12A) constrains executive power to a set of specified aims (preventing or minimising adverse financial effects on particular retail customers, preventing or minimising adverse financial effects on retail customers more broadly, or increasing customer protection). Any modification regulation will be subject to judicial review on standard public law grounds and must be made within the scope specified. The Act’s s 11 also requires applied provisions to be construed not to exceed the Legislature’s power.
Practical enforcement implication
For regulated entities, enforcement risk is primarily function of the applied national regime; the Queensland Act mainly alters which law applies and supplies transitional protection for certain AER acts. Practitioners should therefore consult the applied National Electricity (Queensland) Law and Rules (as revised and tabled under s 9) for the operative enforcement provisions and sanctions. Where a modification regulation is made under s 12A, it will amend enforcement contours by changing the Rules’ operation in Queensland.
In summary, the Act itself does not create new penalties but imports an enforcement regime by adopting the National Electricity Law and Rules and mitigates transitional legal risks to the AER by validating prior instruments and preparatory steps.
How it interacts with other laws
This Act operates as an application statute: it imports the National Electricity Law and associated regulations established under a South Australian Act into Queensland and establishes interaction points with other Queensland and national instruments. The Act contains express cross-references, exclusions and procedural linkages which determine legal priority and interpretive rules.
Connection to the National Electricity (South Australia) Act 1996
The National Electricity Law is the schedule to the National Electricity (South Australia) Act 1996; that schedule is applied in Queensland by s 6. Regulations made under part 4 of the South Australian Act are applied as the National Electricity (Queensland) Regulations by s 7. The Act therefore creates a direct textual and operational link between Queensland law and a South Australian parliamentary instrument.
Non-application of South Australian interpretive Acts
Section 8(2) states explicitly that the Acts Interpretation Act 1915 and other Acts of South Australia do not apply to the National Electricity Law or the South Australian part 4 regulations in their application as Queensland law. This means that Queensland courts and decision-makers should not apply South Australian interpretive presumptions; Queensland statutory interpretation norms will govern. The effect is to avoid importing South Australian interpretive machinery that could lead to inconsistent outcomes in Queensland.
Interaction with Queensland statutes
The Mount Isa-Cloncurry supply network definition in s 10 refers to the Electricity Act 1994, s 8. Consequently, the identification of which assets and services are caught by s 10 depends on the Queensland Electricity Act. Practitioners must therefore read s 10 alongside the Electricity Act 1994 for scope.
Section 11 gives clause 2 of schedule 2 to the National Electricity (Queensland) Law effect in relation to any provision of this Act, making the applied provisions operate so as not to exceed the legislative power of the Queensland Parliament. That is a constitutional harmony device requiring courts and administrators to treat applied provisions in a way consistent with State legislative limits.
Interaction with Commonwealth and other State/Territory laws
Section 5 records Parliament’s intention that the Act, the applied Law and the Regulations have as much extra-territorial operation as possible, including operation in relation to land and acts outside Queensland and acts otherwise governed by Commonwealth, another State or Territory law. The section does not resolve conflicts of law; it records intent to apply extraterritorially where legislative competence allows. Actual conflicts will be resolved by constitutional law principles and the operation of Commonwealth paramountcy where applicable.
Reference to the Energy (Infrastructure Facilitation) Act 2024
Section 6 contains a note: “See, however, the Energy (Infrastructure Facilitation) Act 2024 for the application of particular provisions of the National Electricity (Queensland) Law in particular circumstances.” That indicates an express cross-reference in policy and operation: particular provisions of the National Electricity (Queensland) Law may be treated differently in specified circumstances by the separate Energy (Infrastructure Facilitation) Act 2024. Users must consult that Act to understand how particular provisions might be applied in circumstances involving infrastructure facilitation.
Temporal interaction and validation
Sections 13 and 14 are transitional interaction mechanisms in relation to amendments to the National Electricity Law (the Statutes Amendment (National Energy Retail Law) Act 2011 (SA)). They validate AER instruments and preparatory steps taken in the gap between enactment and application in Queensland, thereby preventing temporal legal gaps from undermining regulatory continuity.
Regulation-making and modification interactions
Section 12 grants the Governor in Council power to make regulations contemplated by the applied Law. Section 12A allows modification regulations to change the operation of the applied Law, Regulations or the Rules as they apply in Queensland but only for narrow consumer protection/financial relief purposes. A modification regulation therefore interacts with the applied national instruments by altering their operation within Queensland: it is a State-specific overlay that adjusts national rules for local objectives.
Administrative and publication obligations
Section 9 requires the Minister to table in the Legislative Assembly copies of South Australian amending Acts and part 4 regulations within 14 sitting days of Royal Assent or commencement, and to revise the attached schedule in the first reprint after amendment. These are publication and administrative obligations that ensure the Queensland statute book and parliamentary record reflect the current content of the applied national instruments.
Practical consequence
The Act makes the National Electricity (Queensland) Law and Rules the operative law for many electricity regulatory matters in Queensland, subject to specific State tools designed to preserve legislative power and to protect selected classes of retail customers. For compliance and litigation, practitioners must read this Act together with the applied Law and Rules, and with relevant Queensland statutes (Electricity Act 1994) and any interacting Queensland Acts such as the Energy (Infrastructure Facilitation) Act 2024. Where amendments to the applied Law occur in South Australia, s 9 creates a parliamentary and publication channel to bring those changes into the Queensland legislative record.
Amendment history
The Act’s text, as supplied, carries internal amendment notation that records when sections were inserted or amended. That notation forms the contemporaneous amendment history within the Act itself. The following enumerates those recorded amendments and insertions referenced in the text.
2005 amendment notation: Section 8 was amended, recorded as “s 8 amd 2005 No. 51 s 9,” and section 9 amended, recorded as “s 9 amd 2005 No. 51 s 10.” Those annotations identify the amending instrument as 2005 No. 51 and the particular schedule items effecting the amendments (s 9 and s 10 of that amending Act). The substance of the amendments is reflected in the current wording of s 8 and s 9 in the text.
2009 insertions: Several provisions were inserted in 2009, recorded as “ins 2009 No. 16 s 28” for s 3 (definition of AER), and “ins 2009 No. 16 s 29” for s 10 and s 11. The 2009 No. 16 Act therefore added the AER-related definition in s 3 and the Mount Isa-Cloncurry regulatory provisions (s 10) and the clause 2 incorporation effect (s 11).
2014 amendments and insertions: Multiple sections show 2014 amendments recorded as “amd 2014 No. 49 s 33,” “ins 2014 No. 49 s 34,” and “ins 2014 No. 49 s 36.” Specifically:
s 6 shows amendment notation “s 6 amd 2014 No. 49 s 33 ; 2024 No. 15 s 186 ; 2025 No. 30 s 73 sch 1,” indicating s 6 was amended in 2014, further amended in 2024 and 2025.
s 6A was inserted in 2014 (s 34 of the 2014 Act) , s 6A ins 2014 No. 49 s 34.
s 12 was inserted in 2014 (s 36 of the 2014 Act) , s 12 ins 2014 No. 49 s 36.
s 13 and s 14 were both inserted in 2014 (s 36 of the 2014 Act) , s 13 ins 2014 No. 49 s 36; s 14 ins 2014 No. 49 s 36.
2024 insertion and amendment: Section 6 records a 2024 insertion or amendment, “2024 No. 15 s 186,” and s 12A was inserted in 2024, recorded as “s 12A ins 2024 No. 15 s 186A.” Those entries indicate that the 2024 No. 15 Act added s 12A and amended s 6. The s 6 text also includes a cross-reference to the Energy (Infrastructure Facilitation) Act 2024, which is consistent with the 2024 amendment package.
2025 amendment: Section 6 also records “2025 No. 30 s 73 sch 1,” indicating a 2025 amendment to s 6 recorded in schedule 1 of the 2025 No. 30 Act.
Cross-references to other amending Acts: s 3 shows insertion in 2009 (s 28), s 8 and s 9 carry 2005 amendment annotations. The presence of these annotations in the Act text indicates a history of periodic amendment to accommodate national reforms and to provide Queensland-specific adaptions.
What the amendment annotations signal practically
The Act has been adjusted at several points to incorporate new national reforms (for example, the Statutes Amendment (National Energy Retail Law) Act 2011 (SA) referenced in ss 13-14 and s 6A) and to provide Queensland mechanisms (s 12A) to address consumer protections and financial impacts locally. The insertion of validation and preparatory-step provisions in 2014 was a transitional response to timing differences between enactment and application of national amendments.
The 2024 insertion of s 12A represents a substantive policy adjustment, authorising Queensland to make modification regulations for specified consumer-protection or cost-bearing purposes. The 2024 amendment to s 6 that references the Energy (Infrastructure Facilitation) Act 2024 indicates a coordination of statutory instruments for infrastructure and rule application.
The 2025 amendment to s 6 (2025 No. 30) suggests continuing alignment and adjustment, though the Act’s text does not give legislative history beyond the citation. Practitioners must consult the amending Acts identified by the annotations for the precise legislative text of each amendment and the parliamentary materials associated with each.
Statutory drafting practice requirements
Section 9 requires that the attached National Electricity Law be revised to reflect amendments and that the revision occur in the first reprint after amendment. The Minister must table copies of South Australian amending Acts and regulations within 14 sitting days. Those duties are part of the Act’s internal amendment-management architecture.
For a complete, operative amendment timeline and the exact wording changes, users should consult the amending instruments cited in the annotations (2005 No. 51; 2009 No. 16; 2014 No. 49; 2024 No. 15; 2025 No. 30) and the reprinted version of the Act that incorporates those amendments as required by s 9.
Litigation history
The supplied Act text does not include or reference any judicial decisions, litigated disputes, or case names. It contains no report of litigation arising under its provisions, and it does not name any judicial determinations. The only references in the Act to other instruments are statutory (for example, the National Electricity (South Australia) Act 1996; the Electricity Act 1994; the Statutes Amendment (National Energy Retail Law) Act 2011 (SA), and the Energy (Infrastructure Facilitation) Act 2024), not judicial authorities.
What that means for research and due diligence
There is no litigation history embodied in this text to cite. To assess how courts have treated issues arising from this Act , for example, disputes about the scope of s 12A modification regulations, the constitutional limit under s 11, or the AER validation measures in ss 13-14 , practitioners must search external case law databases, tribunal decisions and AER-related litigation records. This Act’s text points to issues likely to generate litigation (constitutional construction in s 11, the breadth of modification regulations under s 12A, and the effect of s 13 validation on legal challenges), but the Act itself does not supply cases.
For disputes about enforcement or penalties, courts will primarily interpret and apply the National Electricity (Queensland) Law and National Electricity (Queensland) Regulations that this Act imports. Litigation that questions the application of those national instruments in Queensland will be the proper place to look for precedent on enforcement questions.
Recommended next steps for litigation research
Check decisions of the Federal Court, Supreme Court of Queensland, and administrative tribunals that consider the National Electricity Law and AER actions in Queensland.
Search for litigation addressing AER instruments that were validated under s 13 (transitional instruments), and for judicial review applications that test preparatory-step authorisation under s 14.
Identify any cases that test the scope of s 12A modification regulations, particularly claims that such regulations exceed State legislative power or are inconsistent with national frameworks.
Because the Act itself contains no litigation history, any case law analysis must be undertaken outside the Act text using legal databases and tribunal records.
Gotchas
This Act appears compact and administrative, but it contains several practical and legal traps for regulators, regulated parties and advisers. Below are concrete points to watch, all grounded in the Act’s text.
Validation and timing traps (ss 13-14)
The validation in s 13 and the preparatory-step authorisation in s 14 apply only to a defined transitional window: instruments or decisions made at or after the time the relevant National Electricity Law amendments were enacted but before they started to apply in Queensland (s 13(1)(a); s 14(1)(c)). The AER must have satisfied any conditions that the authorising law would have required had the amendments applied. If the AER did not do those required preconditions (for example, consultation requirements), the validation will not apply (s 13(1)(c)). Practitioners should check the exact commencement and enactment dates of the relevant amending Act to determine whether an instrument falls within the saved window.
Limited scope of modification regulation power (s 12A)
The Governor in Council’s power to modify the applied law, Regulations or Rules is narrow: only to prevent or minimise adverse financial effects on retail customers or to increase customer protection (s 12A(2)). A regulation that purports to modify the Rules for other policy reasons risks being ultra vires. Examples in s 12A(2) are illustrative, not exhaustive, but they set an explicit legislative boundary; any regulation must be drafted and justified within that boundary.
Extra-territorial intent is aspirational, not omnipotent (s 5)
Section 5 expresses Parliament’s intention for extra-territorial operation “so far as possible”. That phrase does not alter constitutional constraints on extraterritorial legislation. Where the Act attempts to reach outside Queensland, it will be limited by Commonwealth constitutional law and the capacity of the State to legislate extraterritorially. Practitioners should not assume automatic extra-territorial effect without constitutional analysis.
Non-application of South Australian interpretive Acts (s 8(2))
The disapplication of South Australian interpretive Acts for the applied Law and Regulations in Queensland means that judicial and administrative interpretation will proceed under Queensland interpretive rules. This can matter in tight interpretive disputes where South Australian precedent and South Australian interpretive presumptions would otherwise be invoked.
Mount Isa-Cloncurry network treated as part of national grid but with “necessary changes” (s 10(3))
Section 10 takes the Mount Isa-Cloncurry supply network to be a distribution system and treats its distribution services as distribution services for the National Electricity Rules, and says the chapters apply “with any necessary changes to give effect to this section” (s 10(3)). That “necessary changes” clause is permissive and may create complexity in applying national Rules to an isolated network. Parties should confirm exactly how the Rules are adapted in practice and whether AER instruments specify further tailoring.
Ownership and connection conditions for Mt Isa network (s 10(4)(a)(ii)-(iii))
The definition of the Mount Isa-Cloncurry supply network references ownership by Ergon Energy at the commencement of the section and that the network is not connected to the national grid (s 10(4)(a)(ii)-(iii)). If ownership changes or a new connection is constructed, the scope of s 10’s application may change; the definition also expressly includes any increase in the supply network after commencement (s 10(4)(b)). Owners and potential purchasers must be aware of the regulatory regime that will apply while those conditions obtain.
Minister’s tabling and reprint duties are strict time obligations (s 9(3)-(5))
The Minister must table amending SA Acts and regulations within 14 sitting days (s 9(4)-(5)) and attach and revise the schedule in the first reprint after amendment (s 9(2)-(3)). Failure to table or reprint on time can cause practical uncertainty for practitioners relying on the State statute book. The Act makes these duties mandatory; administrative oversight can produce legal and advice risks.
Interaction with the Energy (Infrastructure Facilitation) Act 2024 (s 6 note)
The s 6 note directs readers to the Energy (Infrastructure Facilitation) Act 2024 for the application of particular provisions of the National Electricity (Queensland) Law in particular circumstances. The existence of that cross-reference means that applied Law provisions may operate differently under particular facilitation regimes. Advisers must consider both Acts together where infrastructure facilitation is relevant.
Clause 2 of schedule 2 incorporation effect (s 11)
Section 11 gives clause 2 of schedule 2 to the National Electricity (Queensland) Law effect in relation to operations of this Act “as if the provision or regulation formed part of the National Electricity (Queensland) Law”, to avoid exceeding the Legislature’s power. This can complicate construction and may require careful constitutional or limits-of-power argumentation where edge-case issues arise.
No penalties in this Act , enforcement is via applied Law (penalty gap risk)
Because this Act contains no penalty provisions, parties should not assume the Act creates enforcement sanctions. All enforcement power will come from the applied National Electricity (Queensland) Law and the Rules. Failure to consult those applied instruments may create a “penalty gap” in advice or compliance planning.
Drafting precision needed for modification regulations (s 12A examples)
The section’s examples are specific (Aboriginal and Torres Strait Islander peoples, financially disadvantaged customers, rural or remote customers) but not exhaustive. Drafting a modification regulation to target a class of retail customers outside these examples will require a clear statutory justification tied to s 12A(2)(a)-(c). Poorly drafted regulations risk legal challenge on scope or purpose grounds.
Practical mitigation steps
Confirm exact commencement and enactment dates for any national amendments; map the transitional window for ss 13-14.
Review the applied National Electricity (Queensland) Law and Rules (the attached schedule as revised under s 9) rather than relying only on this Act for substantive offences, penalties and compliance obligations.
If advising on modification regulations, prepare clear evidence of the adverse financial effect or consumer-protection gap the regulation aims to address and ensure the regulatory instrument is tightly tailored to s 12A(2).
For Mount Isa-Cloncurry matters, verify ownership and connection status, and obtain the AER’s determinations and instrument texts to see how Rules are adapted in practice.
These are concrete operational risks grounded in the Act’s wording and structure.
How to comply
Compliance with the Act requires actions by several actors: the AER, the Governor in Council and the Minister, network service providers (notably in the Mount Isa-Cloncurry region), and affected retailers and consumers. Below are practical steps, grounded in the Act’s text, that stakeholders should follow to be compliant.
For the AER
Treat the Mount Isa-Cloncurry supply network as part of the national grid for chapters 6 and 11:
Where providing economic regulation for the Mount Isa-Cloncurry supply network, apply chapters 6 and 11 of the National Electricity Rules as if the network were a distribution system and the services were distribution services for the Rules (s 10(1)-(2)). Document any “necessary changes” used to adapt the Rules to this isolated network and publish those rationale and adaptations as part of regulatory decisions to ensure transparency (s 10(3)).
Ensure any previously made instruments fall within s 13’s validation conditions:
For instruments made after enactment but before application of relevant National Electricity Law amendments, the AER must confirm that, had the amendments applied, the making of the instrument would have been authorised under the National Electricity (Queensland) Law, Regulations, this Act or a regulation under this Act (s 13(1)(b)). If authorisation would have required fulfilment of conditions (consultation, publication), ensure record evidence exists that those conditions were effectively satisfied (s 13(1)(c)).
Keep contemporaneous records of preparatory steps:
To rely on s 14’s authorisation treating preparatory steps as compliance, maintain detailed records of procedural steps taken in the transitional period including dates, consultation steps and any stakeholder engagement (s 14(1)-(2)).
For the Governor in Council and Departmental drafters
Confine modification regulations to s 12A’s statutory purposes:
If preparing a modification regulation, ensure the regulation’s explanatory materials clearly identify how the regulation prevents or minimises adverse financial effects on a particular class of retail customers in Queensland or increases customer protection for retail customers in Queensland (s 12A(2)). Assemble evidence demonstrating the adverse financial effects sought to be prevented or the consumer-protection deficiency targeted.
Use the s 12A examples to frame eligibility and targeting:
When specifying classes of retail customers (for example Aboriginal and Torres Strait Islander peoples, financially disadvantaged customers, rural and remote customers), document the basis for class definitions and ensure the regulation is proportionate and no broader than necessary to achieve the stated consumer protection or financial relief objective (s 12A(2) examples).
For the Minister and Parliamentary Office
Timely tabling and reprint obligations:
Table copies of any South Australian Act that amends the National Electricity Law within 14 sitting days after Royal Assent, and table any part 4 regulations under the South Australian Act within 14 sitting days after they come into force (s 9(4)-(5)). Update the attached schedule at first reprint after any amendment (s 9(2)-(3)). Maintain a tracking system to trigger tabling and reprint actions to avoid missing statutory timelines.
For network service providers (including Ergon Energy and purchasers)
Prepare for AER economic regulation and tailored rule application:
For the Mount Isa-Cloncurry supply network, expect AER price determinations and regulatory information requirements analogous to those applying to distribution systems in the national grid and engage with regulatory processes accordingly (s 10(1)-(3)). When the network expands or changes ownership, confirm whether s 10’s definition still applies (s 10(4)(a)(ii)-(iii)).
Be prepared for additional considerations under modification regulations:
If a modification regulation under s 12A requires network service providers to consider additional matters relating to quality, safety, reliability and security of supply for retail customers, integrate those considerations into planning, regulatory proposals and capital planning processes (s 12A(2)(c) example).
For retailers and consumer advocates
Monitor modification regulations and AER instruments:
Because s 12A targets retail customers, consumer groups should monitor emerging modification regulations and AER decisions that could materially change protection or billing arrangements. Engage with consultation processes and provide evidence of adverse financial impacts where relevant.
Ascertain which statutory regime applies to disputes:
For enforcement or dispute resolution, recognise that substantive enforcement powers and penalties will be in the applied National Electricity (Queensland) Law and National Electricity (Queensland) Regulations (s 6-7). Seek and rely on the current reprinted and tabled versions of those instruments as required under s 9(2)-(5).
For legal advisers and compliance officers
Read the Act in combination with the applied Law and Rules:
The Act is mainly an application statute. Substantive rights, obligations, penalties and compliance pathways are in the National Electricity (Queensland) Law and the National Electricity (Queensland) Regulations and Rules as applied (s 6-7). Advise clients using the current, reprinted texts and cross-reference s 8(2)’s note on interpretive Acts.
Document compliance efforts and public law steps:
Because the Act involves public law decisions (Governor in Council regulations, AER instruments), document compliance steps, consultations and statutory decision-making reasons to reduce judicial review risk. In particular, when modification regulations are contemplated, ensure regulatory impact analysis and stakeholder consultation records demonstrate the regulation’s fit with s 12A.
Cross-cutting action points
Confirm dates and transitional windows:
Where the AER or State agencies took action between enactment and application of particular amendments, map those dates precisely to know whether ss 13-14 provide validation or authorisation. Keep a timetable of enactment dates, application/commencement dates and reprint obligations.
Coordinate with Energy (Infrastructure Facilitation) Act 2024 processes:
Where the Energy (Infrastructure Facilitation) Act 2024 applies in particular circumstances, consult that Act to understand any special application of particular provisions of the National Electricity (Queensland) Law (s 6 note).
By following these steps stakeholders can align operational practice with statutory duties and limits. Compliance depends heavily on reading the applied National Electricity (Queensland) Law and Rules as the primary source of substantive obligations, while this Act supplies application mechanics, State-level levers and transitional protections.
(a) land situated outside Queensland, whether in or outside Australia;
(b) things situated outside Queensland, whether in or outside Australia;
(c) acts, transactions and matters done, entered into or occurring outside Queensland, whether in or outside Australia;
(d) things, acts, transactions and matters (wherever situated, done, entered into or occurring) that would, apart from this Act, be governed or otherwise affected by the law of the Commonwealth, another State, a Territory or a foreign country.
pt.2 National Electricity (Queensland) Law and National Electricity (Queensland) Regulations
National Electricity (Queensland) Law and National Electricity (Queensland) Regulations
sec.6 Application in Queensland of National Electricity Law
sec.6 Application in Queensland of National Electricity Law
The National Electricity Law set out in the schedule to the National Electricity (South Australia) Act 1996 , as in force for the time being—
applies as a law of Queensland, with the modification stated in section 6A ; and
as so applying, may be referred to as the National Electricity (Queensland) Law .
See, however, the Energy (Infrastructure Facilitation) Act 2024 for the application of particular provisions of the National Electricity (Queensland) Law in particular circumstances.
s 6 amd 2014 No. 49 s 33 ; 2024 No. 15 s 186 ; 2025 No. 30 s 73 sch 1
(a) applies as a law of Queensland, with the modification stated in section 6A ; and
(b) as so applying, may be referred to as the National Electricity (Queensland) Law .
sec.6A Application of National Energy Retail Law amendments
sec.6A Application of National Energy Retail Law amendments
The amendments made to the National Electricity Law by the Statutes Amendment (National Energy Retail Law) Act 2011 (SA) start to apply in Queensland when the National Energy Retail Law , part 2 commences.
In this section—
National Electricity Law means the National Electricity Law set out in the Schedule to the National Electricity (South Australia) Act 1996 .
s 6A ins 2014 No. 49 s 34
(sec.6A-ssec.1) The amendments made to the National Electricity Law by the Statutes Amendment (National Energy Retail Law) Act 2011 (SA) start to apply in Queensland when the National Energy Retail Law , part 2 commences.
(sec.6A-ssec.2) In this section— National Electricity Law means the National Electricity Law set out in the Schedule to the National Electricity (South Australia) Act 1996 .
sec.7 Application in Queensland under National Electricity Law
sec.7 Application in Queensland under National Electricity Law
The regulations in force for the time being under the National Electricity (South Australia) Act 1996 , part 4 —
apply as regulations in force for the purposes of the National Electricity (Queensland) Law ; and
as so applying, may be referred to as the National Electricity (Queensland) Regulations.
(a) apply as regulations in force for the purposes of the National Electricity (Queensland) Law ; and
(b) as so applying, may be referred to as the National Electricity (Queensland) Regulations.
sec.8 Interpretation of expressions in National Electricity (Queensland) Law and National Electricity (Queensland) Regulations
sec.8 Interpretation of expressions in National Electricity (Queensland) Law and National Electricity (Queensland) Regulations
In the National Electricity (Queensland) Law and the National Electricity (Queensland) Regulations—
Legislature of this jurisdiction means the Parliament of Queensland.
the National Electricity Law or this Law means the National Electricity (Queensland) Law .
this jurisdiction means the State of Queensland.
The Acts Interpretation Act 1915 , and other Acts, of South Australia do not apply to—
the National Electricity Law set out in the schedule to the National Electricity (South Australia) Act 1996 in its application as a law of Queensland; or
the regulations in force for the time being under part 4 of the National Electricity (South Australia) Act 1996 in their application as regulations in force for the purposes of the National Electricity Law.
s 8 amd 2005 No. 51 s 9
(sec.8-ssec.1) In the National Electricity (Queensland) Law and the National Electricity (Queensland) Regulations— Legislature of this jurisdiction means the Parliament of Queensland. the National Electricity Law or this Law means the National Electricity (Queensland) Law . this jurisdiction means the State of Queensland.
(sec.8-ssec.2) The Acts Interpretation Act 1915 , and other Acts, of South Australia do not apply to— the National Electricity Law set out in the schedule to the National Electricity (South Australia) Act 1996 in its application as a law of Queensland; or the regulations in force for the time being under part 4 of the National Electricity (South Australia) Act 1996 in their application as regulations in force for the purposes of the National Electricity Law.
(a) the National Electricity Law set out in the schedule to the National Electricity (South Australia) Act 1996 in its application as a law of Queensland; or
(b) the regulations in force for the time being under part 4 of the National Electricity (South Australia) Act 1996 in their application as regulations in force for the purposes of the National Electricity Law.
sec.9 Attachment—National Electricity Law
sec.9 Attachment—National Electricity Law
Attached to this Act is a copy of the National Electricity Law set out in the schedule to the National Electricity (South Australia) Act 1996 (the National Electricity Law ).
The attachment must be revised so that it is an accurate copy of the National Electricity Law as amended from time to time.
The revision under subsection (2) must happen in the first reprint of this Act after an amendment of the National Electricity Law.
A copy of an Act passed by the Parliament of South Australia that amends the National Electricity Law must be tabled in the Legislative Assembly by the Minister within 14 sitting days after it receives the Royal Assent.
A copy of any regulation made under the National Electricity (South Australia) Act 1996 , part 4 must be tabled in the Legislative Assembly by the Minister within 14 sitting days after it comes into force.
This section does not affect the operation of sections 6 and 7 .
s 9 amd 2005 No. 51 s 10
(sec.9-ssec.1) Attached to this Act is a copy of the National Electricity Law set out in the schedule to the National Electricity (South Australia) Act 1996 (the National Electricity Law ).
(sec.9-ssec.2) The attachment must be revised so that it is an accurate copy of the National Electricity Law as amended from time to time.
(sec.9-ssec.3) The revision under subsection (2) must happen in the first reprint of this Act after an amendment of the National Electricity Law.
(sec.9-ssec.4) A copy of an Act passed by the Parliament of South Australia that amends the National Electricity Law must be tabled in the Legislative Assembly by the Minister within 14 sitting days after it receives the Royal Assent.
(sec.9-ssec.5) A copy of any regulation made under the National Electricity (South Australia) Act 1996 , part 4 must be tabled in the Legislative Assembly by the Minister within 14 sitting days after it comes into force.
(sec.9-ssec.6) This section does not affect the operation of sections 6 and 7 .
pt.3 Mount Isa–Cloncurry supply network
Mount Isa–Cloncurry supply network
sec.10 Economic regulation of Mount Isa–Cloncurry supply network from 1 July 2010
sec.10 Economic regulation of Mount Isa–Cloncurry supply network from 1 July 2010
The AER is responsible for the economic regulation under the National Electricity Rules, chapters 6 and 11, for a relevant regulatory control period, of distribution services provided by means of, or in connection with, the Mount Isa–Cloncurry supply network as if the supply network were part of the national grid.
National Electricity Rules, chapters 6 (Economic regulation of distribution services) and 11 (Savings and transitional rules)
For applying the National Electricity Rules, chapters 6 and 11—
the distribution services are taken to be distribution services for the National Electricity Rules; and
the Mount Isa–Cloncurry supply network is taken to be a distribution system.
The chapters apply with any necessary changes to give effect to this section.
In this section—
Mount Isa–Cloncurry supply network —
means the supply network as defined under the Electricity Act 1994 , section 8 , other than the 220kV supply network—
located in the Mount Isa–Cloncurry region; and
owned by Ergon Energy at the commencement of this section; and
not connected to the national grid; and
includes any increase in the supply network after the commencement.
National Electricity Rules has the meaning given in the National Electricity (Queensland) Law .
national grid has the meaning given in the National Electricity Rules.
relevant regulatory control period means—
the regulatory control period, within the meaning of the National Electricity Rules, starting on 1 July 2010; and
any regulatory control period after the regulatory control period mentioned in paragraph (a) .
s 10 ins 2009 No. 16 s 29
(sec.10-ssec.1) The AER is responsible for the economic regulation under the National Electricity Rules, chapters 6 and 11, for a relevant regulatory control period, of distribution services provided by means of, or in connection with, the Mount Isa–Cloncurry supply network as if the supply network were part of the national grid. National Electricity Rules, chapters 6 (Economic regulation of distribution services) and 11 (Savings and transitional rules)
(sec.10-ssec.2) For applying the National Electricity Rules, chapters 6 and 11— the distribution services are taken to be distribution services for the National Electricity Rules; and the Mount Isa–Cloncurry supply network is taken to be a distribution system.
(sec.10-ssec.3) The chapters apply with any necessary changes to give effect to this section.
(sec.10-ssec.4) In this section— Mount Isa–Cloncurry supply network — means the supply network as defined under the Electricity Act 1994 , section 8 , other than the 220kV supply network— located in the Mount Isa–Cloncurry region; and owned by Ergon Energy at the commencement of this section; and not connected to the national grid; and includes any increase in the supply network after the commencement. National Electricity Rules has the meaning given in the National Electricity (Queensland) Law . national grid has the meaning given in the National Electricity Rules. relevant regulatory control period means— the regulatory control period, within the meaning of the National Electricity Rules, starting on 1 July 2010; and any regulatory control period after the regulatory control period mentioned in paragraph (a) .
(a) the distribution services are taken to be distribution services for the National Electricity Rules; and
(b) the Mount Isa–Cloncurry supply network is taken to be a distribution system.
(a) means the supply network as defined under the Electricity Act 1994 , section 8 , other than the 220kV supply network— (i) located in the Mount Isa–Cloncurry region; and (ii) owned by Ergon Energy at the commencement of this section; and (iii) not connected to the national grid; and
(i) located in the Mount Isa–Cloncurry region; and
(ii) owned by Ergon Energy at the commencement of this section; and
(iii) not connected to the national grid; and
(b) includes any increase in the supply network after the commencement.
(i) located in the Mount Isa–Cloncurry region; and
(ii) owned by Ergon Energy at the commencement of this section; and
(iii) not connected to the national grid; and
(a) the regulatory control period, within the meaning of the National Electricity Rules, starting on 1 July 2010; and
(b) any regulatory control period after the regulatory control period mentioned in paragraph (a) .
pt.4 Related matters
Related matters
sec.11 Law to be construed not to exceed legislative power of Legislature
sec.11 Law to be construed not to exceed legislative power of Legislature
Clause 2 of schedule 2 to the National Electricity (Queensland) Law has effect in relation to the operation of any provision of this Act, or any regulation forming part of the National Electricity (Queensland) Regulations, as if the provision or regulation formed part of the National Electricity (Queensland) Law .
Subsection (1) does not limit the effect that a provision or regulation would validly have apart from the subsection.
s 11 ins 2009 No. 16 s 29
(sec.11-ssec.1) Clause 2 of schedule 2 to the National Electricity (Queensland) Law has effect in relation to the operation of any provision of this Act, or any regulation forming
This is an opening excerpt, not the complete document.