Medium Neutral Citation: Y&M Australia Pty Ltd v Waverley Council [2026] NSWLEC 1657
Hearing dates: 17, 18 June and 28 August 2026
Date of orders: 02 October 2026
Decision date: 02 October 2026
Jurisdiction: Class 1
Before: Porter C
Decision: The Court orders:
(1) The appeal is dismissed.
(2) Development application 146/2025 for demolition of existing structures and construction of a twelve storey shop top housing development with affordable housing at 40 Ebley Street and 31 Newland Street, Bondi Junction, is refused.
Catchwords: DEVELOPMENT APPEAL — overshadowing clause — development standard or prohibition — whether clause 4.6 is excluded — housing SEPP incentive provisions
Legislation Cited: Acts Interpretation Act 1954 (QLD), s 38
Community Land Development Act 2021 (NSW)
Environmental Planning and Assessment Act 1979 (NSW), ss 1.4, 8.7, 8.15
Interpretation Act 1987 (NSW), s 33
Limitation of Actions Act 1974 (QLD)
Environmental Planning and Assessment Regulation 2021 (NSW), s 35B
State Environmental Planning Policy (Housing) 2021, Chs 5, 6, Div 1, s 16, Sch 10
State Environmental Planning Policy (Housing for Seniors or People with a Disability) 2004, s 15 (Repealed)
Waverley Local Environmental Plan 2012, Pt 6, cll 4.3, 4.4, 4.6, 6.5, 6.7, 6.8, 6.12
Cases Cited: 193 Liverpool Road Pty Limited v Inner West Council [2017] NSWLEC 13
Eddy Lau Constructions Pty Ltd v Transdevelopment Enterprise Pty Ltd [2004] NSWSC 754
Elimatta Pty Ltd v Read and Anor [2021] NSWLEC 75
Inner West Council v XYZ Services Pty Limited [2025] NSWLEC 68
Perrett v Robinson (1988) 169 CLR 172; [1988] HCA 41
Price v JF Thompson (Q) Pty Limited (1990) 1 Qd R 278
Principal Healthcare Finance Pty Ltd v Council of the City of Ryde (2016) 222 LGERA 212; [2016] NSWLEC 153
R.I.G. Consulting Pty Ltd v Queanbeyan-Palerang Regional Council (2021) 249 LGERA 377; [2021] NSWCA 130
Ku-ring-gai Council v Pathways Property Group Pty Ltd [2018] NSWLEC 73
Texts Cited: Perry Herzfeld and Thomas Prince, Interpretation (3rd ed, 2024, Lawbook Co)
Category: Principal judgment
Parties: Y&M Australia Pty Ltd (Applicant)
Waverley Council (Respondent)
Representation: Counsel:
A Pickles SC (Applicant)
N Hammond (Respondent)
Solicitors:
Conomos Legal (Applicant)
Lindsay Taylor Lawyers (Respondent)
File Number(s): 2025/341297
Publication restriction: Nil
COMMISSIONER: This appeal is about an affordable housing development in a highly accessible area within Bondi Junction, its amenity impacts both internally and externally and whether an overshadowing provision is amenable to cl 4.6 of the Waverley Local Environmental Plan 2012 (WLEP).
The Applicant, Y&M Australia Pty Ltd (Y&M) has appealed pursuant to s 8.7 of the Environmental Planning and Assessment Act 1979 (NSW) (EPA Act) against a refusal of DA-146/2025 by Waverley Council (Council).
During the hearing, Y&M sought leave to amend the DA. Unopposed by Council, leave was granted. As the amendments were more than minor, the Court made orders during the hearing for the Applicant to pay the Respondent’s costs thrown away by reason of the amended development application pursuant to s 8.15(3) of the Environmental Planning and Assessment Act 1979 (NSW) in the agreed amount of $3,000.
The DA, as amended, seeks development consent for:
Consolidation of lots.
Demolition of the existing structures.
Construction of a twelve storey shop top housing development and roof top communal space, comprising residential dwellings, ground floor shops and office/commercial tenancies with basement car parking.
The proposed development provides in-fill affordable housing pursuant to Div 1 of State Environmental Planning Policy (Housing) 2021 (Housing SEPP).
On 28 August 2026, on an agreed Notice of Motion from the parties, the hearing was reopened to tender Council’s endorsed Bondi Junction Vision and Master Plan 2026 (Master Plan) (Ex G). Short submissions were made as to the weight to be afforded to the document, generally reflective of those made in the hearing. Y&M’s case placed more weight on the Master Plan given its endorsed status. Less weight was to be afforded on Council’s case.
With consideration of the submissions on the first contention in relation to additional overshadowing of Clementson Park, I find that cl 6.7 prevails over cl 4.6 of the WLEP, and that development consent cannot be granted.
The subject site is legally identified as Lots 1 and 2 in DP 954472 and known as 40 Ebley Street and 31 Newland Street, Bondi Junction. The site has two street frontages to Ebley Street and Newland Street, with an overall site area of 559.1m2. The site is within short walking distance from Bondi Junction train station.
The hearing commenced on site. The Court heard oral concerns from two objectors, including on behalf of a child care centre to the south and impacts to residents to the north. The Court benefitted from observing those stated impacts within those two sites. The parties drew the Court’s attention to areas of Clementson Park and aspects within the objector’s respective sites.
The subject site is located to the north of Clementson Park, which is extensively overshadowed by existing tall development. The site is shown below, extracted from Figure 1 of Council’s Statement of Facts and Contentions:
The site is zoned MU1 mixed use under the WLEP. Clause 4.3 allows a maximum height of 32m and cl 4.4 allows a maximum floor space ratio (FSR) of 4:1.
At the hearing, Council pressed that the following contentions in the Amended Statement of Facts and Contentions (ASOFAC) (Ex 1) warrant refusal:
Contention 2 – Solar access to public spaces in Bondi Junction (Clementson Park)
Contention 5 – Residential amenity and design excellence
Contention 6 – Design excellence and view loss
Contention 8 – Public interest
Contention 9 - Heritage
In relation to contention 2, Council submitted that the contention had evolved during the hearing, though the issue was still pressed that cl 6.7 of the WLEP is a prohibition and not a development standard, but for related but different reasons. The Court agreed with Y&M that the reframing of the issue created a procedural fairness issue, and to resolve this in an agreeable manner to the parties, issued directions for written submissions on the reframed issue. The below orders were made on 18 June 2026:
The parties are directed to provide written submissions on the operation of cl 6.7 of the WLEP and its operation with the height and FSR provisions in the WLEP and Housing SEPP.
(a) The Respondent’s submissions are due 1 July 2026. (b) The Applicant’s submissions are due 8 July 2026.
Parties are directed to submit the final conditions of consent to the Court (including a word version) by 8 July 2026.
Hearing is adjourned to 4pm 15 July 2026.
All submissions were received and judgment was reserved on 10 July 2026 in chambers.
Expert town planning and urban design evidence was submitted in a joint expert report (Planning JER) by Adam Byrnes (town planner) and Alan Cadogan (urban designer) for Y&M and Sandra Robinson (town planner) and Timothy Williams (urban designer) (Council)
Expert heritage evidence was submitted in a joint expert report (Heritage JER) by Anthony Dakhoul for Y&M and Timothy Williams for Council.
Expert traffic evidence was submitted in two joint expert reports (Traffic JERs) by Michael Logan for Y&M and Jae Morse for Council.
Oral evidence was adduced at the hearing.
Council presses contention 2 that cl 6.7 solar access to public spaces in Bondi Junction is a prohibition and is not subject to cl 4.6. In the alternative, if the clause is a development standard, then the Applicant has not demonstrated that the matters set out in cl 4.6(3) have been met.
The proposed development seeks to contravene cl 6.7 and would cause additional shadow impacts at 12 noon on 21 June to a nominated park, being Clementson Park. Y&M relies on clause 4.6 and has provided the required ‘document’ prescribed by s 35B of the Environmental Planning and Assessment Regulation 2021 (NSW) (EPA Reg) as well as the evidence of Mr Byrnes and Mr Cadogan.
Section 1.4 of the EPA Act defines a development standard as follows:
development standards means provisions of an environmental planning instrument or the regulations in relation to the carrying out of development, being provisions by or under which requirements are specified or standards are fixed in respect of any aspect of that development, including, but without limiting the generality of the foregoing, requirements or standards in respect of—
(a) the area, shape or frontage of any land, the dimensions of any land, buildings or works, or the distance of any land, building or work from any specified point,
(b) the proportion or percentage of the area of a site which a building or work may occupy,
(c) the character, location, siting, bulk, scale, shape, size, height, density, design or external appearance of a building or work,
(d) the cubic content or floor space of a building,
(e) the intensity or density of the use of any land, building or work,
(f) the provision of public access, open space, landscaped space, tree planting or other treatment for the conservation, protection or enhancement of the environment,
(g) the provision of facilities for the standing, movement, parking, servicing, manoeuvring, loading or unloading of vehicles,
(h) the volume, nature and type of traffic generated by the development,
(i) road patterns,
(j) drainage,
(k) the carrying out of earthworks,
(l) the effects of development on patterns of wind, sunlight, daylight or shadows,
(m) the provision of services, facilities and amenities demanded by development,
(n) the emission of pollution and means for its prevention or control or mitigation, and
(o) such other matters as may be prescribed.
4.6 Exceptions to development standards
(1) The objectives of this clause are as follows—
(a) to provide an appropriate degree of flexibility in applying certain development standards to particular development,
(b) to achieve better outcomes for and from development by allowing flexibility in particular circumstances.
(2) Development consent may, subject to this clause, be granted for development even though the development would contravene a development standard imposed by this or any other environmental planning instrument. However, this clause does not apply to a development standard that is expressly excluded from the operation of this clause.
(3) Development consent must not be granted to development that contravenes a development standard unless the consent authority is satisfied the applicant has demonstrated that—
(a) compliance with the development standard is unreasonable or unnecessary in the circumstances, and
(b) there are sufficient environmental planning grounds to justify the contravention of the development standard.
Note—
The Environmental Planning and Assessment Regulation 2021 requires a development application for development that proposes to contravene a development standard to be accompanied by a document setting out the grounds on which the applicant seeks to demonstrate the matters in paragraphs (a) and (b).
(4) The consent authority must keep a record of its assessment carried out under subclause (3).
(5) (Repealed)
(6) Development consent must not be granted under this clause for a subdivision of land in Zone RU1 Primary Production, Zone RU2 Rural Landscape, Zone RU3 Forestry, Zone RU4 Primary Production Small Lots, Zone RU6 Transition, Zone R5 Large Lot Residential, Zone C2 Environmental Conservation, Zone C3 Environmental Management or Zone C4 Environmental Living if—
(a) the subdivision will result in 2 or more lots of less than the minimum area specified for such lots by a development standard, or
(b) the subdivision will result in at least one lot that is less than 90% of the minimum area specified for such a lot by a development standard.
(7) (Repealed)
(8) This clause does not allow development consent to be granted for development that would contravene any of the following—
(a) a development standard for complying development,
(b) a development standard that arises, under the regulations under the Act, in connection with a commitment set out in a BASIX certificate for a building to which State Environmental Planning Policy (Building Sustainability Index: BASIX) 2004 applies or for the land on which such a building is situated,
(c) clause 5.4,
(caa) clause 5.5,
(cab) clause 6.12,
(ca) clause 4 of Schedule 1.
….
6.7 Solar access to public spaces in Bondi Junction
(1) The objective of this clause is to ensure that buildings are designed to maximise sunlight access to the public places set out in this clause.
(2) Despite any other provision of this Plan, development consent must not be granted to development that results in any part of a building causing an additional shadow impact at 12 noon on 21 June on the following—
(a) Clementson Park,
(b) Waverley Street Mall,
(c) Eora Park,
(d) Norman Lee Place (also known as the Boot Factory), being Lot 6, Section A, DP 145, other than the shadow that would be cast by a notional wall, with a vertical height of 20 metres, located on the southern boundary of any lot that adjoins the northern alignment of Spring Street,
(e) Oxford Street Mall (between Bronte Road and Newland Street), other than the shadow that would be cast by a notional wall, with a vertical height that matches the relevant height on the Height of Buildings Map, located on the southern boundary of any lot that adjoins the northern alignment of Oxford Street.
(f) (Repealed)
(3) In this clause additional shadow impact means any overshadowing caused by the proposed development that is additional to the amount of shadow cast by existing buildings as at the date of commencement of this provision.
16 Affordable housing requirements for additional floor space ratio
(1) The maximum floor space ratio for development that includes residential development to which this division applies is the maximum permissible floor space ratio for the development on the land plus an additional floor space ratio of up to 30%, based on the minimum affordable housing component calculated in accordance with subsection (2).
(2) The minimum affordable housing component, which must be at least 10%, is calculated as follows—
…
(3) If the development includes residential flat buildings or shop top housing, the maximum building height for a building used for residential flat buildings or shop top housing is the maximum permissible building height for the development on the land plus an additional building height that is the same percentage as the additional floor space ratio permitted under subsection (1).
Example—
Development that is eligible for 20% additional floor space ratio because the development includes a 10% affordable housing component, as calculated under subsection (2), is also eligible for 20% additional building height if the development involves residential flat buildings or shop top housing.
(4) This section does not apply to development on land for which there is no maximum permissible floor space ratio.
…
Schedule 10 Dictionary
maximum permissible building height means the maximum building height permitted on the land under Chapter 5 or 6, where relevant, an environmental planning instrument, other than this Policy, or a development control plan.
Ms Hammond for Council submits that cl 6.7 is a prohibition. Consistent with Inner West Council v XYZ Services Pty Limited [2025] NSWLEC 68 at [36]-[37], the test is a statutory one and development standards are defined in s 1.4(1) of the EPA Act. As articulated in Principal Healthcare Finance Pty Ltd v Council of the City of Ryde (2016) 222 LGERA 212; [2016] NSWLEC 153, the three elements of a development standard are that the provisions relate to the carrying out of development, that the provisions specify requirements or standards and that the provisions are found in an environmental planning instrument (EPI) or regulation. A prohibition is a criterion to determining whether development is at all permissible.
It was accepted that cl 6.7 does not prohibit the development, which is permissible with consent in the zone.
Clause 6.7 states that development consent must not be granted for development that results in additional shadow impacts at 12 noon on 21 June. The provision commences with the words “Despite any other provision of this Plan” and these words must be given work to do.
Clause 4.6 is another provision of the WLEP. Clause 6.7 overrides cl 4.6 as it operates despite any other provision of this Plan. The fact that cl 4.6(8) does not specify cl 6.7 as an exclusion does not take the matter further, as cl 6.7 overrides all other provisions of the plan.
This construction is consistent with the aims of the plan and the application of cl 6.7, which has never been varied by Council. The only variation allowed was by way of an amendment to the actual WLEP.
Further, as demonstrated by the ‘yellow line’ drawing, clause 6.7 also prevails over cll 4.3 and 4.4 of the WLEP.
Figure 2: Yellow Line Drawing prepared by Katris Architects Pty Ltd
Further, it is that height shown by the yellow line that the bonus incentives of the Housing SEPP should be applied, not to the allowable maximum under cll 4.3 and 4.4 of the WLEP. This approach is consistent with s 16(3) of the Housing SEPP that the maximum building height is one permitted on the land under an EPI. Relevantly, “building height” under the WLEP and Housing SEPP are not the same and are separately defined terms. Y&M’s approach gives no effect to cl 6.7.
Ms Hammond relies on several authorities that deal with the meaning of “despite”. In Eddy Lau Constructions Pty Ltd v Transdevelopment Enterprise Pty Ltd [2004] NSWSC 754 (‘Eddy Lau*’*), His Honour detailed numerous decisions at [12] – [15] where ‘despite’ had been considered by various Courts.
In the context of planning law and the word “despite”, the Court of Appeal in *R.I.G. Consulting Pty Ltd v Queanbeyan-*Palerang Regional Council (2021) 249 LGERA 377; [2021] NSWCA 130 (RIG Consulting) found that there was no inconsistency with a similar provision of “despite clause 4.1” and that the words made clear which clause prevails at [22]. At [55], Preston CJ found that there was no clash between cll 4.1 and 4.1B(4) of the Palerang Local Environmental Plan 2014, as the parts of cl 4.1 do not apply to subdivisions under the C**ommunity Land Development Act 2021 (NSW). There was no clash between the provisions that the phrase “despite clause 4.1” can resolve.
Ms Hammond submits that the approach to statutory construction is as set out in Elimatta Pty Ltd v Read and Anor [2021] NSWLEC 75 (‘Elimatta*’*) at [43]-[45]:
“The object of statutory construction is to construe the relevant statutory provision, so it is consistent with the language and purpose of the statute when considered as a whole. As a result, the statutory provision may, in certain (limited) circumstances, not be read in a way that reflects the literal or grammatical meaning of the statutory provision: Project Blue Sky Inc v Australian Broadcasting Authority (1998) 194 CLR 355; [1998] HCA 28 at [69], [78]. As stated by the High Court in SZTAL v Minister for Immigration and Border Protection (2017) 262 CLR 362; [2017] HCA 34 at [14]:
‘The starting point for the ascertainment of the meaning of a statutory provision is the text of the statute whilst, at the same time, regard is had to its context and purpose. Context should be regarded at this first stage and not at some later stage and it should be regarded in its widest sense. This is not to deny the importance of the natural and ordinary meaning of a word, namely how it is ordinarily understood in discourse, to the process of construction. Considerations of context and purpose simply recognise that, understood in its statutory, historical or other context, some other meaning of a word may be suggested, and so too, if its ordinary meaning is not consistent with the statutory purpose, that meaning must be rejected.’ (citations omitted)
These general principles are applicable to the interpretation of environmental planning instruments: Cranbrook School v Woollahra Municipal Council (2006) 66 NSWLR 379; [2006] NSWCA 155 at [36]. In this respect, while environmental planning instruments should be interpreted in a practical manner (such that meticulous examination of language is avoided), it is clear that this does not override general principles of statutory interpretation nor require “laxity or flexibility” when construing environmental planning instruments: Tovir Investments Pty Ltd v Waverley Council [2014] NSWCA 379 at [54]; Wingecarribee Shire Council v De Angelis [2016] NSWCA 189 at [20]; 4nature Incorporated v Centennial Springvale Pty Ltd (2017) 95 NSWLR 361; [2017] NSWCA 191 at [45].
The approach described above is also consistent with the strictures of s 33 of the Interpretation Act, which applies to environmental planning instruments by virtue of s 5(6) of the Interpretation Act, and provides:
33 Regard to be had to purposes or objects of Acts and statutory rules
In the interpretation of a provision of an Act or statutory rule, a construction that would promote the purpose or object underlying the Act or statutory rule (whether or not that purpose or object is expressly stated in the Act or statutory rule or, in the case of a statutory rule, in the Act under which the rule was made) shall be preferred to a construction that would not promote that purpose or object.”
(pp 4-5 Respondent’s written submissions (RWS)).
Applying these authorities, the words “despite any other provision of this Plan” are clear that cl 6.7 prevails if there is a conflict with any other provision of the WLEP. There is a conflict between cll 6.7 and 4.3 as the height standard allows a greater height than that permitted as a consequence of cl 6.7. Clause 4.6 creates an inconsistency, which would permit additional overshadowing of Clementson Park contrary to cl 6.7. Ms Hammond submits that the purpose of the word ‘despite’ “is to ensure that the operation of one clause is unaffected by some other clause”: R.I.G. at [22] and that cl 6.7 is not a development standard that can be varied through the operation of cl 4.6: see Elimatta at [48].
Council’s interpretation is consistent with the objects of the EPA Act, as required by s 33 of the Interpretation Act 1987 (NSW).
Mr Pickles SC submits for Y&M that cl 6.7 of the WLEP is a development standard. The clause seeks to regulate overshadowing of a building on a park. Development standard is defined in s 1.4 of the EPA Act, and the clause meets the definition at (l). The clause is not a prohibition under any circumstances.
Mr Pickles SC submits that the relevant principles of statutory construction are:
“The first principle of statutory construction relevant to the question raised by the Council’s submission at [2] above is that the construction of an environmental planning instrument must be approached according to conventional principles. In Cranbrook School v Woollahra Council [2006] NSWCA 155; (2006) 66 NSWLR 379; 146 LGERA 313 at [36] per McColl JA.
The second principle is that the process of statutory construction must always begin with consideration of the text itself: Alcan (NT) Alumina Pty Ltd v Commissioner of Territory Revenue [2009] HCA 41; 239 CLR 27 at [47]; Valuer-General (NSW) v Fivex (2015) 206 LGERA 450 at [26].
The third principle is that statutory construction requires consideration of the text in the context of the whole statute in the widest sense. More recent dicta of the High Court has emphasised the importance of reading the text in context: Federal Commissioner of Taxation v Consolidated Media Holdings Limited (2012) 250 CLR 503 at [39] and SZTAL v Minister for Immigration and Border Protection (2017) 262 CLR 362 per Kiefel CJ, Nettle and Gordon JJ at [14].
The fourth principle is that the Courts will always endeavour to read legislation to avoid conflicts within its provisions: Project Blue Sky Inc v Australian Broadcasting Authority (1998) 194 CLR 355 at [70] per McHugh, Gummow, Kirby, Hayne JJ. This may be achieved by construing provisions in a way that the apparent inconsistency disappears. If not, it will be necessary to determine which provision prevails and which is subordinate (p 2 Applicant’s written submissions (AWS)).”
Mr Pickles SC submits that the two relevant provisions of the WLEP are potentially inconsistent. Clause 4.6(8) does not expressly state that it is excluded from cl 6.7.
The ordinary meaning of “despite any other provision” would usually convey that the provision prevails over other provisions: RIG Consulting at [22] per Leeming JA and per Preston CJ of LEC at [55]. However, the term in that case was “despite cl 4.1” and excluded only a specific provision. This decision does not stand for a proposition that the phrasing of cl 6.7 excludes any and all other provisions. However, RIG Consulting dealt with a term within the confines of a clause (‘despite cl 4.1’) and does not stand for a proposition that a provision that excludes any other provision has the effect of excluding all other provisions.
A provision expressed with generality to operate despite any other provision of an act or other law was addressed by Perry Herzfeld and Thomas Prince, Interpretation (3rd ed, 2024, Lawbook Co) at [5.200]:
“Even if express words of this kind are used, there may still be a question of construction whether a broadly expressed “notwithstanding” clause does indeed cause a provision to prevail over all other provisions or whether it has a narrower focus”
The phrase “Notwithstanding anything in this Act” and “notwithstanding any other Act” were considered by the High Court in Perrett v Robinson (1988) 169 CLR 172; [1988] HCA 41 at 178-179 per Wilson, Gaudron JJ (Perrett) and the Full Court of the Supreme Court of Queensland in Price v JF Thompson (Q) Pty Limited [1990] 1 Qd R 278 (Price). In Perrett, the phrase was found not to displace s 5 of the relevant Act. In Price, the majority held that the term within the Limitation of Actions Act 1974 (QLD) did not exclude the operation of s 38(3) of the Acts Interpretation Act 1954 (QLD) as they were not expressly excluded.
The words “despite any other provision” must be considered with regard to the context of the provision in the WLEP. Clause 6.7 appears in Part 6 with other local provisions including cll 6.5, 6.8 and 6.12, which are development standards. Only cl 6.12 is expressly excluded under cl 4.6(8). If cl 6.7 was intended to have been excluded, it would have been simply to include cl 6.7 at cl 4.6(8) or for cl 6.7 to express ‘including cl 4.6’. Applying the principle from Jersey J’s decision in Price, cl 4.6 applies unless expressly excluded. This gives rise to a conflict between cl 6.7 and cl 4.6(2) as the words “despite any other provision” does not expressly exclude cl 4.6.
The express exclusion of cl 4.6 is consistent with Ku-ring-gai Council v Pathways Property Group Pty Ltd [2018] NSWLEC 73 (Pathways Property), where similar wording of “despite the provisions of any other environmental planning instrument” did not expressly exclude the operation of cl 4.6. The decision is consistent with Price and Perrett.
The use of the general words “despite any other provision” do not expressly exclude its operation and as per the quoted text authored by Herzfeld and Prince, a narrower focus should be adopted. The narrow focus is that cl 6.7 operates despite the height and FSR provisions in cll 4.3 and 4.4. It is agreed that the words “despite any other provision” must be given work to do, but that the focus is more relevant directed to prevailing over cll 4.3 and 4.4, not cl 4.6.
In response to Council’s submissions about the objects of the EPA Act, the objects do not prevail over the cardinal principles of statutory construction. However, Council’s construction does not advance object 1.3(b) “to promote the supply, delivery and maintenance of housing, including affordable housing.” An alternate interpretation of cl 6.7 would undermine the provision and supply of more affordable housing.
Mr Pickles SC submits that the maximum building height for the purposes of the incentive provisions of s 16(3) of the Housing SEPP is the height permitted under cl 4.3 of the WLEP. The relevant height provision is the maximum height allowed of any building on the land: 193 Liverpool Road Pty Limited v Inner West Council [2017] NSWLEC 13 at [37]-[38]. Clause 6.7 does not specify a maximum building height but rather, specifies a standard in respect of overshadowing.
I have considered the submissions of the parties and the approaches to this contention, which I have addressed over three questions that appear to arise. The approaches advanced about how to construe the two provisions are generally similar, albeit with a different outcome and different emphasis on some of the cases relied on.
It is not in dispute that the proposed development increases overshadowing to Clementson Park at 12 noon on 21 June and relies on a written request pursuant to clause 4.6 of the WLEP to contravene cl 6.7.
I accept Ms Hammond’s submissions and find that cl 4.6 is excluded from operation in relation to cl 6.7 of the WLEP for the following reasons.
I have considered the principles of statutory construction and the various cases provided by the parties.
In considering the decision of Perrett, the relevant provisions, when read in their context, were not in similar terms as cll 4.6 and 6.7 of the WLEP. In Price, the facts of the case were between two Acts and whether one was expressly excluded. The facts and regime are quite different to the circumstances here, but the principles expressed about any inconsistency between provisions or an express exclusion of provisions is relevant to the issues in this case. I accept Y&M’s submissions that Price does not necessarily deal with the issue of a provision prevailing over all other provisions in tangible circumstances.
Having considered Pathways Property, I am of the view that the facts are different to those here. The disputed inconsistency was between EPIs and whether there was an implied exclusion under s 15 of the now repealed State Environmental Planning Policy (Housing for Seniors or People with a Disability) 2004. The terms to allow development despite the provisions of any other EPI are different to the provisions being considered here.
In considering RIG Consulting and acknowledging that the Court of Appeal was dealing with a narrower construction within a single provision, cl 4.1, aspects of the decision are indirectly relevant. In RIG Consulting, the Court found that there was no inconsistency, clash, or overlap, as the provisions within cl 4.1 regulated different forms of subdivision, and accordingly there was no work for the phrase “despite clause 4.1” to do.
My understanding of the relevant parts in RIG Consulting and Price is that phrases such as “despite” or “notwithstanding” are used to ‘ensure that the operation of one clause is unaffected by some other clause’. There needs to be a clash between provisions or clauses for the opening phrase “despite” to resolve: RIG Consulting at [22] and [54] – [55].
Extracted below is the offending part of the building that causes increased shadowing impacts to Clementson Park, shown in white and above the yellow shadow plane (the plane created by cl 6.7).
Figure 3: Extract of the shadow plane prepared by Katris Architects, Dwg A031
I accept that there is a clash between clauses 4.6 and 6.7. Clause 6.7 seeks to restrain additional shadow impacts on Clementson Park at 12 noon on 21 June. Clause 4.6, not necessarily by its own terms but by way of its operation to allow flexibility to a development standard, which would allow for an additional shadow impact subject to subcl 4.6(3) in the manner sought by this DA.
As submitted by Council, I find that cl 4.6 is a provision of the WLEP like any other provision, such as height, FSR and the various other provisions. There are no textual references in the WLEP or cl 6.7 that indicate that a narrower focus to cl 6.7 should be applied and that the focus should be restrained to development standards such as cl 4.3 (height) and cl 4.4 (FSR), which are also capable of competing with or clashing with cl 6.7. The location of cl 6.7 within Part 6 additional local provisions of the WLEP is not, of itself, an indication that cl 4.6 should prevail or continues to apply. Clause 6.7 is not from the Standard Instrument and is a local provision applying to only a few parks identified in the WLEP. It is located within Part 6 by its purpose as a local provision.
I accept Ms Hammond’s submissions that a plain reading of the text is that cl 6.7 prevails over any other provision in “this Plan”, being the provisions of the WLEP. I accept that in giving meaning to these words, cl 6.7 intends to prevail over all other provisions in the WLEP, including cl 4.6, where there is a clash. Though expressed in different ways, the submissions of the parties agreed there is an inconsistency or clash between the two provisions. As previously stated, cl 4.6, by how it operates to permit flexibility as opposed to any express subclause, would permit additional overshadowing that cl 6.7 expressly seeks to not allow. As there is a clash between the two, the words “despite any other provision of this Plan” have work to do and I find that they prevail over cl 4.6 as a provision like any other of the Plan (the WLEP).
Y&M submits that there is no express exclusion of cl 6.7 and therefore it still applies. I accept that other development standards referred to by Y&M such as local provision cl 6.12 have been expressly excluded under cl 4.6(8). However cl 6.12 is expressed in different terms, more akin to the usual drafting convention of a development standard. Clause 6.7 contains the phrase “despite any other provision of this Plan” that is not included in cl 6.12 or most other development standards in the WLEP. This phrase only occurs elsewhere in the WLEP in relation to cll 2.5 and 2.8 but with a more permissive use of the phrase. I prefer Council’s construction and accept that cl 6.7 prevails on a plain reading of the phrase “despite any other provision of this Plan”. Y&M’s approach undermines a plain reading of cl 6.7. I accept that “despite any other provision of this Plan” also operates to exclude the operation of cl 4.6 where it would clash with cl 6.7, as the phrase seeks to prevail over any others in the WLEP.
Accordingly, I find that cl 6.7 prevails over cl 4.6 and that cl 4.6 cannot be relied on to allow flexibility to cause additional shadow impacts to Clementson Park at 12 noon on 21 June. This is determinative of the DA as consent must not be granted to a development that causes an additional shadow impact at 12 noon on 21 June to Clementson Park, which the proposed building does.
Though the above findings are determinative, for completeness I have considered the remaining aspect relevant to this issue.
I accept Mr Pickles SC’s submissions that cl 6.7 is not the relevant height provision for the purposes of s 16(3) of the Housing SEPP.
The Housing SEPP expresses that the maximum building height pursuant to s 16(3) and Sch 10 is the maximum permissible building height for development on the land under Chs 5 or 6 or another EPI or DCP. As there are no relevant provisions in Ch 5 or 6 of the Housing SEPP, the relevant maximum building height is found under cl 4.3 maximum height of buildings in the WLEP. This approach is consistent with 193 Liverpool Road Pty Limited v Inner West Council [2017] NSWLEC 13 at [37]-[38].
As demonstrated by the ‘yellow line diagram’, whilst cl 6.7 of the WLEP may have a practical outcome of restraining height, it is still not a height control on its terms. It is a development standard regulating shadowing that could result in a range of different built form constraints including height, building width/length, building placement, setbacks or FSR depending on the location of a site captured by the provision. Accordingly, I find that the relevant height control is cl 4.3 of the WLEP.
Notwithstanding, whether the height provision is taken from cll 4.3 or 6.7 of the WLEP is ultimately of little consequence for this application. The proposed development in its current form increases shadowing to a nominated park captured by cl 6.7 of the WLEP and relies on flexibility to vary the development standard pursuant to cl 4.6. As a distinctly different provision that regulates overshadowing, and therefore not in conflict with the provisions of the Housing SEPP, there are no other provisions in the Housing SEPP that would set it aside or allow cl 6.7 to be varied. As previously found, clause 6.7 prevails and clause 4.6 of the WLEP is excluded from operation. Accordingly, development consent cannot be granted for a development that increases shadowing impacts to Clementson Park pursuant to cl 6.7 of the WLEP. Despite the indications by Council in its recent endorsement of the Master Plan to increase height on and around the site and make changes to cl 6.7, the DA must be refused on the basis of the current provisions of the WLEP.
The Court orders that:
The appeal is dismissed.
Development application 146/2025 for demolition of existing structures and construction of a twelve storey shop top housing development with affordable housing at 40 Ebley Street and 31 Newland Street, Bondi Junction, is refused.
**********
Hearing dates inserted to the cover page.
Y&M Australia Pty Ltd
Waverley Council
[2009] HCA 41
(1988) 169 CLR 172
(1990) 1 Qd R 278
(2016) 222 LGERA 212
(2021) 249 LGERA 377
(1998) 194 CLR 355
(2017) 262 CLR 362
(2006) 66 NSWLR 379
(2017) 95 NSWLR 361
(2015) 206 LGERA 450
(2012) 250 CLR 503