[2026] VCAT 136
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2026-02-25
Mr J
Original judgment source is linked above.
Item 8(c) and 8(d) - window sills - amount claimed $10,707.00
Did the owners unreasonably allow the builder an opportunity to rectify?
It was noted that the window frames for dwelling present with severe moisture damage in the form of bloating. As per AS 2047, clause 7.4 inserted, the windows are now defective and will need to be made "as new" prior to installing same.
Item 8(e) - roof flashing - amount claimed $200.00
There is a hole to the flashing due to the method of forming the lead. The area needs to be reworked to remove the cupping that likely will result in water ingress under heavy rain events.
Item 8(f) - masonry mortar - amount claimed $974.00
(a) Mr Love - $545.00.
(b) Mr Brownhill - $279.55.
(c) Mr Molnar accepts Mr Love's scope of work and estimate of cost.
Item 8(g), item 8(k) and item 8(o) - level of concrete at front of dwelling, weep holes at porch and driveway stormwater - amounts claimed $13,710.00, $4,326.00 and $9,240.00
(a) Jim's Plumbing call out fees of $132.00.
(b) Jim's Plumbing investigation of $748.00.
(c) Sunny Concrete Construction Pty Ltd for removal of driveway and relaying of $4,980.00.
(d) S&S Plumbing & Gas Fitting Pty Ltd for rectification of underground stormwater drainage of $3,380.00.
(a) The owners said the works needed to be undertaken as soon as possible and two days later the builder offered to replace all the concrete driveway starting the next day and finishing within a week. Whilst I accept the owners' concern about possible difficulties accessing the property, I reject their submission that they would then have been denied all access to the dwelling for two to three weeks.
(b) It was not reasonable to reject the offer to also replace the porch to rectify any issue with the weep holes because the owners wanted the Tribunal to make a decision about that issue and the builder had not offered to rectify that issue before.
(c) When the owners said they did not want all of the concrete driveway replaced, the builder offered to replace only part of the driveway if the owners were prepared to take the risks if all the driveway was not replaced. The owners then rejected that offer and said they did want all the concrete replaced.
(a) $3,600.00 in the quote dated 20 October 2021 from Jarrcon Constructions which includes both the concrete driveway and pathway - rather than the quote for $3,470.00 which only refers to the driveway; and
(b) $1,320.00 in the quote dated 14 October 2021 from LCL Plumbing & Drainage as that was the plumbing quote the builder had at about the time it proposed to do the works - rather than the quote for $450.00 plus GST that was not obtained until 30 November 2021.
Item 8(g) - level of concrete at front of dwelling - $13,710.00
Item 8(h) - roof void insulation - amount claimed $768.00
Item 8(i) - sliding door aluminium frames damage - amount claimed $4,620.00
the damage to all aluminium frames must be made "as new". Given the information above, we would suggest replacement of the damaged sections is warranted as a minimum. Please note that the repairs on site to date carry out by the builder's trades are not preforming [sic] in a manner that is consistent with the original powder coating installation.
Item 8(j) - grouting air bubbles - amount claimed $866.00
Item 8(l) - concrete isolation joint (entrance porch) - amount claimed $715.00
At the time of my inspection, it was identified that the installation of Able Flex 10mm compressible filler material in accordance with the standard has been installed to the joint between the concrete and the building.
The Able flex has been installed at the same finished height as the finished height of the concrete slab.
As there is no void at the isolation joint location, the installation of the optional "Sealant to prevent the ingress of detritus" is not required as there is no void or area for detritus to accumulate.
Item 8(m) - doors - not installed correctly - amount claimed $898.00
Item 8(n) - external pillars - amount claimed $322.00
Tiling in bathroom and ensuite - No defect in ensuite; Cracks in bathroom shower tiles not defective; Shower wall in bathroom not plumb is a defect but not reasonable to rectify
Masonry concrete paving - Defective - cost included in 8(o)
Roof void insulation - Not defect caused by builder
Grouting air bubble - Defective in the showers of the bathroom and ensuite
ARE THE OWNERS ABLE TO CLAIM LIQUIDATED DAMAGES FOR ANY LATE COMPLETION OF THE WORKS? IF SO, WAS THE BUILDER LATE IN COMPLETING THE WORKS?
[1] Reifek v McElroy [1965] HCA 46; (1965) 112 CLR 517 at 521-2 as referred to in Olivera v Google Homes Pty Ltd (Building and Property) [2015] VCAT 835 at [33].
[2] Item 14 of the Appendix to the building contract.
[3] The Owners - Strata Plan No 76674 v Di Blasio Constructions Pty Ltd [2014] NSWSC 1067, 46.
[4] Bellgrove v Eldridge [1954] HCA 36; (1954) 90 CLR 613 ('Bellgrove') at 617 - 618 and 620.
[5] [2009] HCA 8; (2009) 236 CLR 272, [17].
[6] Clarendon Homes v Zalega (Domestic Building) [2010] VCAT 1202, [165]; Stone v Chappel [2017] SASFC 72, [255].
[7] [2010] VCAT 1202, [165].
[8] [1996] 1 AC 344; [1995] WLR 118.
[9] (Building and Property) [2022] VCAT 1086, [47] and [61] - [66].
[10] [1977] Ch 106; 2 WLR 496; [1977] 3 All ER 129; [1977] ChD 106 (which had been quoted in Ruxley).
[13] Grilli v Downing (Building and Property) [2020] VCAT 704, [142], which references The Gombac Group Pty Ltd v Vero Insurance Ltd [2004] VCAT 2540; The Gombac Group Pty Ltd v Vero Insurance Ltd [2005] VSC 442; Ashjam Pty Ltd v Carroll [2006] VCAT 2612.
Thomas
Profine Constructions Pty Ltd [2026] VCAT 136
(1965) 112 CLR 517
(1954) 90 CLR 613
(2009) 236 CLR 272