[2010] VCAT 1202
Victorian Civil and Administrative Tribunal
2010-07-13
Original judgment source is linked above.
Domestic Building - masonry code - Display home - Domestic Building Contracts Act 1995 - s.43 - house to be built to the same plans and specifications as the Display Home - "plans and specifications" means the way the Display Home was built - any difference to be "specifically identified" in the contract - meaning - must identify it as being a difference - identification outside the contract insufficient - consequences of non-compliance with - assessment of damages - whether damages other than rectification can be awarded - and considered - how principles to be applied
Clarendon Homes Vic Pty Ltd v Zalega (Domestic Building) [2010] VCAT 1202
This section gives rules for the design and specification of masonry and buildings complying with the following
(a) a leaf thickness of 90mm or greater;
(b) the top of all walls are supported by a roof or floor structure acting as a diaphragm;
(c) walls that are supported on concrete slabs or footings complying with AS2870 or suspended slabs complying with AS3600; and
(d) geometric limitations of Clause 12.1.2.3.
Masonry that complies in full with the provision of this Section is deemed to satisfy the requirements of other relevant parts of this Standard. (See Appendix J)" (My emphasis)
Further, Mr Cross said that, since the site is a class "P" site, Table 12.14 for the spacing of brick ties at the articulation joints cannot be used because it does not provide for the spacing of brick ties on such a site.
The vapour barrier does not extend up the exposed edges of the slab but in most instances appears to terminate below ground level. In some areas where it rises above ground level it has peeled away from the edge beam, leaving the side of the edge beam exposed. There was a lot of evidence about that but in the end I think the simplest of the alternative solutions proposed by Mr Cross is to extend the vapour barrier to the level of the proposed ground surface.
It was not disputed that the damp proof course should protrude beyond the mortar course in which it is laid. This has not been done, with the result that there is a bridge of mortar that could allow dampness to pass from below the damp proof course to above, reducing its effectiveness. I accept that the remedy for that is to rake out the mortar to expose the damp proof course. Further, according to Mr Cross, the damp proof course of the alfresco is too high. That was demonstrated on site. It will have to be replaced. I also accept Mr Cross' evidence that a damp proof course should have been provided to the garage and that to provide it now will be difficult
There was no dispute as to this item. The articulation joints numbered 9 and 15 on the contract drawings have been omitted and the Builder acknowledges that they must be installed.
I agree with Mr Cross that the mortar was "blown out" and weathered in places. He suggested that this indicated that the mortar was under strength. As a result it was tested by chemical analysis and also by means of a scratch test. Samples were taken from various parts of the brickwork and, unsurprisingly, the results were not uniform. However it seems clear that the mortar does not have either the chemical composition or the strength of an M3 mortar but rather, has a strength equivalent to an M2 Mortar.
The specification required mortar of 6 parts of sand to one part of cement. It was not disputed that this must have been an error because there is no such mortar recognised by the BCA. According to the evidence, an M3 mortar is composed of 1 part of cement and 1 part of lime to 6 parts of sand and it seems likely that this is what was intended by the specification.
I accept Mr Cross's evidence that the mortar does not meet the requirement of the specifications or the BCA. Mr Mo'ane said that it was by no means certain that the mortar tested was typical but the mortar experts did not say that the number of samples taken was insufficient for them to give the evidence they gave. Mr Mo'ane also said that he thought that the mortar was of sufficient strength and so would perform the function required of it. It was, he said, "fit for the purpose". However it was not of the strength required by the Masonry Code or the BCA.
According to Mr Mudge, the strength of the mortar can be increased by applying a proprietary product so this deficiency on its own would not be critical.
Mr Cross said the brick ties have not been provided in accordance with either the BCA or in accordance with Clause 4.10 of the Masonry Code. Mr Mo'ane queried Mr Cross as to how he could know what brick ties have been provided since he had looked at only random locations. Mr Cross said that it was impracticable to attempt to inspect every brick tie in every location in the building. He said that a random inspection would be symptomatic of the tradesman's work on the site. Unless one were to dismantle the building that appears to be a practical approach, although one would have to inspect a sufficient number of brick ties to ensure that one had a representative sample.
Mr Mo'ane said that the maximum 600mm spacing in Section 12 was appropriate except for the top 300mm and the intersecting walls. He said that would be appropriate for this building. However, since Section 12 is not applicable the requirement is that of the BCA.
Mr Mo'ane also said that he had inserted a "Seesnake" colour cavity camera down the cavity in several locations and found that the brick ties in each section that he inspected to be in accordance with the BCA. There was no recording of this inspection tendered but this evidence is inconsistent with Mr Cross's evidence and my own limited observations.
A DVD of the wall cavity that was tendered was difficult to follow. It indicated that some ties had been provided although their location did not seem to follow any pattern. My own limited inspection on site of wall ties was confined to the cavity wall behind the dining room where I saw only two or three ties and the cavity bridged and breached by both mortar and insulating material, and also above the garage, where the brick ties that I saw had been hammered flat and were not connected to the frame.
Since Section 12 cannot be used I accept Mr Cross's evidence that brick ties should have been provided as required by the BCA, that is, every 600 mm except around windows, doors, intersecting walls and along articulation joints, where the spacing must be every 300 mm.
I am satisfied that the bricklayer has not inserted brick ties in accordance with the requirements of the BCA which calls into question the integrity of the brickwork as a whole, because it is impossible to know precisely how many have been provided save to say that, from the observations that have been made, there are not nearly enough.
Mr Mo'ane points to the obvious fact that the structure is nonetheless still standing despite "...high temperatures and severe storms..." over the past two and a half years since it was built. He suggests that this means that the performance requirements of the BCA are met. However to be satisfied as to the structural adequacy of a building I would need engineering evidence and Mr Mo'ane is not an engineer. The test for structural adequacy is not: "Is the building is still standing?" Mr Cross, who is an engineer has said that the brick ties as specified in the BCA are required and so I should accept his evidence.
The question of retrofitting brick ties was raised, with Mr Mo'ane suggesting that it could be done from inside the building. Mr Cross said that would be a very messy way of doing it. The methodology is unclear but Mr Cross said that to fit them now would involve removal of a large amount of brickwork. I accept that evidence.
Mr Cross said that there are no sill clearances below the windows of 5mm on the ground floor and 10 mm on the upper floor as required by the BCA. That accords with my own observation. Mr Mo'ane said that the bricklayer might have left the gap but that it has been taken up now by settlement since construction. Mr Cross said that such a gap would not be taken up after only two and half years and that the bricks are now hard up against the windows. I note that Mr Cross's first inspection was in September 2008, which was less than two years after the bricks were laid. I prefer Mr Cross's evidence.
Mr Cross said that tray flashings are required to be installed in the north wall and over the east kitchen bench wall of the kitchen area where the external brick veneer walls become internal walls below the roof lines. Mr Mo'ane appeared to agree but said that it cannot be established that they have not been installed. Mr Cross inferred that they have not been installed because there are no required apron flashings or weep holes which would allow the flashings to properly function if they had been installed.
On site, I noticed some weep holes above the lower roof at the rear of the house but Mr Cross said they were at the wrong height to drain any tray flashings. Mr Mo'ane suggested that the absence of tray flashings would be reflected in water penetration issues underneath. There was some evidence of deterioration of finished surfaces in two small areas at the foot of the nib walls at the entrance to the entertainment area directly beneath, which might be consistent with water penetration but that could also be referable to the changing of the skirting boards. Mr Cross said that there would not necessarily be any indication of water penetration for some time due to the water being absorbed by other building materials.
Mr Mo'ane said in his report that it was reasonable to consider that there was an experienced and qualified construction supervisor employed throughout the construction and that a private building surveyor had a statutory obligation to ensure that it was constructed in accordance with the BCA and that that would include inspecting the tray flashings. Here his New South Wales experience does not reflect Victorian practice. There is no compulsory inspection which would take in tray flashings and such is the lack of quality of many aspects of this house that I think it would be dangerous to make any assumption that it was properly supervised either by an experienced and qualified construction supervisor or that the building surveyor has done anything other than carry out the minimum number of inspections required. I prefer Mr Cross's evidence.
Mr Cross said that the plans required a continuous perimeter flashing to be installed at the first floor level and part of it has been omitted. He said that flashings below brick window sills have been omitted in their entirety. He said that the design did not accord with the BCA. He suggested that the windows are not flashed sufficiently in order to perform their function. Mr Mo'ane said that on his inspection he was satisfied that the flashings had been installed but since I am not satisfied as to the extent of Mr Mo'ane's inspection I prefer Mr Cross's evidence.
Mr Cross said that the BCA requires there to be cavities of not less than 25mm in a brick veneer construction exclusive of insulation and bracing. He said that the cavities in the house have mortar extrusions that in some cases entirely bridge the cavity, allowing moisture to pass from the external brickwork to the internal walls.
Mr Mo'ane said that he had been unable to identify areas of moisture ingress but he did not dispute the breaching and bridging of the cavities. He said that, in the period since the House was built, Melbourne has incurred some of the wettest rain periods in recorded history (a surprising assertion that he was unable to substantiate) and that it is therefore reasonable to assume that if the cavities were breached in the manner suggested by Mr Cross there would indeed be evidence of water ingress to the structure. His comments in this regard sit uneasily with an assertion he made in the preceding page of his report to the effect that, within 45 minutes of direct rain on an exterior brick veneer masonry wall there would be as much water running down the inside of the brick cavity as on the face of the wall. That was another assertion that he was unable to substantiate.
From my own inspection the extent of breaching and bridging was very substantial indeed to the extent that, in some places, the gap was completely closed by mortar. Although I accept that there will be some breaching of a brick veneer cavity due to extrusion of mortar the walls should be laid in a manner so as to minimise this and that has clearly not happened in this case. I accept Mr Cross's evidence in this regard.
Mr Cross said that no flashing or weep holes has been installed in the parapet wall and that flashing and weep holes are required. I accept his evidence.
I agree with Mr Cross that many beds and perpends are "blown out", particularly on the east side of the building and that the beds and perpends in some areas of brickwork show a wide variation in many areas. I accept Mr Cross's evidence that these are excessive. They certainly look very unsightly and they are not just in isolated spots. I agree with Mr Cross that many mortar joints have been badly finished and smudged. Finally, the bricks used in the construction have hollow cores which are exposed above the lintels.
The appearance of the brickwork in the House contrasts with what I could see from the photographs of the brickwork in the Display Home. What has been supplied is not what the Owners contracted to receive.
"This level is generally the accepted level of finish for domestic construction. It is used for light textures or wall coverings in smooth textured finishes are illuminated by critical lighting and where smooth textured finishes and satin/flat/low gloss paints are illuminated by non critical lighting. In critical lighting areas, flat paint is applied over light textures tend to conceal joints. Gloss and semi gloss paints are not generally suitable over this level of finish".
The plasterboard in the garage on the east wall is not connected to the studs and is bowed in the centre. This was acknowledged at the hearing although denied in Mr Mo'ane's first report. On the site inspection, the middle of the plasterboard could be pushed in and out, having no connection at all to the studs.
Mr Cross complained about the method of fixing this ceiling but the real complaint here is about the level of the ceiling, which was to be the same as the Display Home. That is dealt with below.
I accept that the butt joints to the living room plaster are clearly visible during normal daylight conditions and the ceiling is not level. This ceiling needs to be reworked.
The nib wall in the living room is not vertical. This is particularly noticeable when one is coming down the stairs and visually lines up the nib with other parts of the house.
The west wall of the entry is bowed and the column next to the stairwell is not vertical.
The balustrade at the top of the stairwell is not level. The stair balustrade is also not rigid
The wall in the bathroom is not straight. It is particularly obvious in this location because the tiles in the shower recess have been tapered in order to take account of the fact. The wall will have to be straightened before any remedial work is done in regard to the tiles;
Plasterboard sheets have been installed parallel to the main trusses in the ceiling of the library. According to Mr Cross's evidence, which I accept, this is bad building practice because battens were not used.
The hole for the return air vent directly opposite the top of the stairwell has been simply cut out of the plasterboard without any framework behind it to support the cut out. It needs to be properly framed and finished.
"Requirements concerning display home contracts
43. Requirements concerning display home contracts
(1) In this section display home means a home that is made available for inspection to encourage people to enter into contracts for the construction of similar homes.
(2) A person who makes a display home available for inspection must ensure that the following documents are prominently displayed in the display home-
(a) a copy of the plans and specifications used for its construction; and
(b) a draft copy of the major domestic building contract that the builder on whose behalf the display home is displayed would be prepared to enter to construct a similar home.
Penalty: 50 penalty units. Default penalty: 1 penalty unit for each day.
(a) a display home is made available for inspection by or on behalf of a builder; and
(b) a building owner enters into a contract with the builder for the construction of a similar home-
the builder must construct the home using the same plans and specifications and to at least the same standards of work quality and quality of materials as were used for the construction of the display home. Penalty: 50 penalty units.
(4) However, subsection (3) does not apply to the extent that the contract specifically identifies how the construction of the home will differ from that of the display home.
(5) This section applies to any building suitable for use as a home, regardless of whether it is being used as a home at the time it is displayed."
The identification must be made in the contract
How is the difference to be specifically identified?
_"_To mention, speak of or name (something) definitely or explicitly; to set down or state categorically or particularly;"
"The builder warrants that the work will be carried out in accordance with, and will comply with, all laws and legal requirements including, without limiting the generality of this warranty, the Building Act 1993 and the regulations made under that Act"
The plans and specifications in the present case
"The builder reserves the right to change specifications, materials and supplies without notice provided that the materials or specifications are of a similar finish and standard".
"I/We acknowledge that this specification details the fixtures and fittings to be provided and may differ from those displayed."
"Clarendon Homes Pty Ltd CAN 090 713 732 reserves the right to change nominated suppliers and specifications to items of similar quality".
The Owners' signatures appear between those two sentences. Neither satisfies the requirements of subsection (4) because no difference is specifically identified in either case.
Install rainwater heads in balcony overflow spitter
"In the present case, the respondent was entitled to have a building erected upon her land in accordance with the contract and the plans and specifications which formed part of it, and her damage is the loss which she has sustained by the failure of the appellant to perform his obligation to her. This loss cannot be measured by comparing the value of the building which has been erected with the value it would have borne if erected in accordance with the contract; her loss can, prima facie, be measured only by ascertaining the amount required to rectify the defects complained of and so give to her the equivalent of a building on her land which is substantially in accordance with the contract." (emphasis in original)
"The qualification, however, to which this rule is subject is that, not only must the work undertaken be necessary to produce conformity, but that also, it must be a reasonable course to adopt. No one would doubt that where pursuant to a building contract calling for the erection of a house with cement rendered external walls of second-hand bricks, the builder has constructed the walls of new bricks of first quality the owner would not be entitled to the cost of demolishing the walls and re-erecting them in second-hand bricks. In such circumstances the work of demolition and re-erection would be quite unreasonable or it would, to use a term current in the United States, constitute "economic waste". (See Restatement of the Law of Contracts, (1932) par. 346). We prefer, however, to think that the building owner's right to undertake remedial works at the expense of a builder is not subject to any limit other than is to be found in the expressions "necessary" and "reasonable", for the expression "economic waste" appears to us to go too far and would deny to a building owner the right to demolish a structure which, though satisfactory as a structure of a particular type, is quite different in character from that called for by the contract. Many examples may, of course, be given of remedial work, which though necessary to produce conformity would not constitute a reasonable method of dealing with the situation and in such cases the true measure of the building owner's loss will be the diminution in value, if any, produced by the departure from the plans and specifications or by the defective workmanship or materials.
As to what remedial work is both "necessary" and "reasonable" in any particular case is a question of fact."
"The "ruling principle"... confirmed in this Court on numerous occasions..., with respect to damages at common law for breach of contract is that stated by Parke B in Robinson v Harman [1848] EngR 135; (1848) 154 ER 363 at 365):
"The rule of the common law is, that where a party sustains a loss by reason of a breach of contract, he is, so far as money can do it, to be placed in the same situation, with respect to damages, as if the contract had been performed."
"Now, it may be that, viewed objectively, it is not to the plaintiff's financial advantage to be supplied with the article or service which he has stipulated. It may be that another person might say that what the plaintiff has stipulated for will not serve his commercial interests so well as some other scheme or course of action. And that may be quite right. But that, surely, must be for the plaintiff to judge. Pacta sunt servanda. If he contracts for the supply of that which he thinks serves his interests - be they commercial, aesthetic or merely eccentric - then if that which is contracted for is not supplied by the other contracting party I do not see why, in principle, he should not be compensated by being provided with the cost of supplying it through someone else or in a different way, subject to the proviso, of course, that he is seeking compensation for a genuine loss and not merely using a technical breach to secure an uncovenanted profit."
"The trial judge made the following findings which are relevant to this appeal: (1) the pool as constructed was perfectly safe to dive into; (2) there was no evidence that the shortfall in depth had decreased the value of the pool; (3) the only practicable method of achieving a pool of the required depth would be to demolish the existing pool and reconstruct a new one at a cost of £21,560; (4) he was not satisfied that the respondent intended to build a new pool at such a cost; (5) in addition such cost would be wholly disproportionate to the disadvantage of having a pool of a depth of only 6 feet as opposed to 7 feet 6 inches and it would therefore be unreasonable to carry out the works; and (6) that the respondent was entitled to damages for loss of amenity in the sum of £2,500."
"The Tenant's submissions rested on a loose principle of "reasonableness" which would radically undercut the bargain which the innocent party had contracted for and make it very difficult to determine in any particular case on what basis damages would be assessed. That principle should not be accepted."
Quite obviously, this list is by no means exhaustive. Other matters might be relevant according to the facts of the particular case. For example, the innocent party might have elected to accept the non-conforming work, whether by taking the benefit of it or otherwise; the owner might have waived the breach or so acted after becoming aware of the breach as to create an estoppel or to make rectification impracticable. There might also be many circumstances in which it could be argued that an award of rectification cost would give the innocent party an uncovenanted profit (Radford).
(e) If it would be unreasonable in the circumstances to award rectification cost, what damages will compensate the owner for the breach? Matters to be taken into account might include:
- (i) the magnitude of the breach;
- (ii) the significance of the breach to the owner;
- (iii) whether the owner, after becoming aware of the breach, has acted unreasonably so as to make rectification more expensive;
- (iv) whether and to what extent an owner might have accepted a benefit from the non-conforming work that should be taken into account;
- (v) since the breach is not to be rectified, the reasonable cost of mitigating the effect of it;
- (vi) compensation for any lesser appearance or functionality;
- (vii) loss of amenity;
- (viii) if it appeared likely that less than complete rectification would be undertaken, the cost of that.
Again, this is not intended to be an exhaustive list. It must not be forgotten that the object is to fully compensate the innocent party for the breach but not provide him with an "uncovenanted profit".
Clarendon Homes Vic Pty Ltd
Zalega
(2009) 253 ALR 1
(1954) 90 CLR 613