[2017] TASFC 14
Supreme Court of Tasmania (Full Court)
2017-12-22
Pearce J, Brett J, Porter AJ
Original judgment source is linked above.
CITATION: Sultan Holdings Pty Ltd v John Fuglsang Developments Pty Ltd
APPEALED FROM: John Fuglsang Developments Pty Ltd v Sultan Holdings
Pty Ltd [2017] TASSC 1
Environment and Planning - Environmental planning - Development control - Matters for consideration of consent authority - Consideration of development standards - Particular development standards - Requirement of planning scheme that development of land satisfy provisions of schedules - Schedule setting out environmental management objectives - Clause of schedule stating that certain environmental objectives must be satisfied - Whether particular clause a matter to be taken into account or a prescriptive control - Prescriptive control.
Environment and Planning - Environmental planning - Development control - Consents, approvals and permits - Validity - Generally - Certainty and finality - Condition of permit imposed by appeal tribunal for construction and management plan - Plan to be approved by officer of original planning authority - No real possibility that development will be significantly different from that proposed - Consent not invalid.
Mison v Randwick Municipal Council (1991) 23 NSWLR 734, considered.
Buzzacott v Minister for Sustainability [2013] FCAFC 191, 215 FCR 301, applied.
Environment and Planning - Environmental impact assessment and approval - Other States and Territories - Tasmania - Requirement for application for permit for development that is a scheduled activity to be referred to environmental authority - Scheduled activity of "quarries: the extraction of any rock or gravel" and producing more than a certain quantity per year - Application for building development which included substantial excavation at more than prescribed rate - Provision related to activity as such - Activity need not amount to a quarry in the ordinary sense.
Environmental Management and Pollution Control Act 1994 (Tas), s 25(1), Sch 2.
Residents Against Improper Development Inc v Chase Property Investments Pty Ltd [2006] NSWCA 323, 149 LGERA 360; Penrith City Council v Waste Management Authority (1990) 71 LGRA 376, considered.
Environment and Planning - Courts and tribunals with environmental jurisdiction - Tasmania - Resource Management and Planning Appeal Tribunal - Other matters - Issue estoppel - Issue estoppel does not apply to planning determinations - Whether in any event the decision was a fundamental part of or indispensable to the ultimate determination.
Land Use Planning and Approvals Act 1993 (Tas), ss 53(5), 62(2).
Thorpe v Corporation of the City of Charles Sturt [1999] SASC 10, followed.
Porter v Secretary of State for Transport [1996] 3 All ER 693, applied.
Procedure - Costs - Appeals as to costs - When appeal lies - Appeals as to costs only - Where costs appeal part of a wider appeal - When substantive appeal is rejected the costs appeal is an appeal as to costs only - Principles to be applied to costs in appeals.
Howlin v Clarence City Council [2013] TASFC 7, explained.
Bostik Australia Pty Ltd v Liddiard (No 2) [2009] NSWCA 304, applied.
First and Second Respondents: A Galasso SC, A C R Spence
Judgment Number: [2017] TASFC 14
SULTAN HOLDINGS PTY LTD v JOHN FUGLSANG DEVELOPMENTS PTY LTD, SALAMANCA INN HOLDINGS PTY LTD, HOBART CITY COUNCIL
*(c) The orders of the primary judge made on 17 January 2017 in appeal 1696/2015 be amended by including, after order no 2, the following:
"2A Before any reconsideration by the differently constituted Tribunal, the application be referred to the Board of the Environment Protection Authority pursuant to s 25(1)(b) of the Environmental Management and Pollution Control Act 1994."
(e) The costs orders made on 2 February 2017 be set aside except to the extent of the grant of an indemnity certificate under the Appeal Costs Fund Act 1968 to each respondent, and in lieu, it is ordered that the respondents pay 50% of the appellants' costs of appeal 1696/2015.
On 6 March 2018 the Court vacated order (c), and made the following orders in substitution:
(ca) The orders of Blow CJ dated 17 January 2017 are set aside.
(cb) The order of the Resource Management and Planning Appeal Tribunal published 27 August 2015 in appeal 20-15P is set aside.
(cc) It is declared that the decision of the Hobart City Council to grant planning permit PLN-14-01301-01-01 dated 17 September 2015 is invalid.
SULTAN HOLDINGS PTY LTD v JOHN FUGLSANG DEVELOPMENTS PTY LTD, SALAMANCA INN HOLDINGS PTY LTD, HOBART CITY COUNCIL
SULTAN HOLDINGS PTY LTD v JOHN FUGLSANG DEVELOPMENTS PTY LTD, SALAMANCA INN HOLDINGS PTY LTD, HOBART CITY COUNCIL
SULTAN HOLDINGS PTY LTD v JOHN FUGLSANG DEVELOPMENTS PTY LTD, SALAMANCA INN HOLDINGS PTY LTD, HOBART CITY COUNCIL
(1) This section applies to an application for a permit in respect of a use or development which, under the provisions of a planning scheme-
(a) is of a kind specified as being a use or development which a planning authority has a discretion to refuse or permit;
(1) This section applies to an application for a permit in respect of a use or development for which, under the provisions of a planning scheme, a planning authority is bound to grant a permit either unconditionally or subject to conditions or restrictions.
(j) To ensure sound environmental planning and management for all activities.
"All development of land must satisfy the relevant provisions contained within the schedules of this Scheme."
The ecologically sustainable development of the Cove's natural and physical resources is a primary planning principle of this Scheme.
Whilst the protection and enhancement of the total natural resource stock of the Cove is important, there are a number of specific environmental issues to be addressed in the future planning for the Cove. These include protection of water quality in the Cove, minimisation of air pollution, assessment and management of land contamination on all land, waste minimisation and control of noise pollution and vibration.
This schedule outlines matters which must be considered when assessing applications for activities, and outlines the linkages of the Planning Scheme to the Environment Management & Pollution Control Act 1994.
Where an activity constitutes either a Permissible 'Level 1' activity or a Permissible 'Level 2' activity within the relevant Activity Area, the following environmental objectives must be satisfied in determining such an application.
Buildings shall be sited and designed having regard to current noise levels in the area as well as their intended use.
Where activities with the potential to generate significant noise are proposed in proximity to residential accommodation and other 'noise sensitive' activities, appropriate measures to mitigate and minimise noise emissions must be undertaken.
New 'noise sensitive' activities such as residential accommodation shall be located and where necessary incorporate acoustic measures to minimise the potentially adverse impacts of existing or likely future activities on nearby land.
The first two paragraphs under "Noise" are of interest in these proceedings. It is convenient to refer to them as "Noise [1]" and "Noise [2]".
"4 The Tribunal erred in its determination that cl 29.5 of the Scheme did not provide matter relevant to, and hence bases for, the refusal of the proposal."
"55 The Tribunal turns to the provisions of the Scheme engaged in the remaining grounds of appeal, being Clause 16.2(j) and Clause 29. These grounds of appeal focus on the issues of dust, noise and vibration from the development. This analysis informs the content of the Construction Management Plan ('CMP'), if the development, satisfies the Scheme requirements.
"61 Clause 29.5 sets out environmental objectives relevant to an assessment of this development.
"68 The purpose of the Objective is to ensure management of environmental nuisance, or risk arising from development. Development includes construction.
"72 Satisfaction of Clause 16.2(j) will, it seems to the Tribunal, ipso facto, result in a development in harmony with the Objectives in Clause 29. Clause 16.2(j) imposes a standard required to be applied to the development, and to be satisfied by it. Again 'development' includes the construction phase. This clause requires that in order to fulfil the objective of ensuring 'sound environmental planning and management for all activities', use and development 'must minimise direct and indirect environmental risk or effects and where possible provide a new environmental gain for the wider environment.'
"88 The Tribunal cannot ignore the possibility that the excavation works could take a considerable time, and it will assume for the purposes of this assessment that it could take as long as Mr Moore suggests. [Up to 52 weeks.] The real question is not 'How long will this take?' Rather it is whether the direct and indirect risk of environmental harm or effects, can be managed so that they are minimised to an acceptable level. That question adopts elements of the Objectives at Clause 29 (management of risk of harm) and the performance criterion at Clause 16.2(j)-(minimisation of risk). The Tribunal considers that conflating the two elements of the Scheme captures appropriately the requirement which the Scheme enshrines - that is the minimisation of risk through management of it." [Emphasis added.]
"[51] The third paragraph of cl 29.1, which says that the schedule 'outlines matters which must be considered when assessing applications' indicates that, as a general rule, the schedule imposes mandatory requirements for certain relevant considerations to be taken into account, as distinct from imposing mandatory requirements which must be satisfied before a permit application may be granted. However the introduction to cl 29.5 says, '... the following environmental objectives must be satisfied ...'. Within cl 29.5, there are provisions that certain things 'shall be' done, and provisions as to what 'must' happen. None of those provisions impose quantitative or definite requirements. All of them require value judgments.
[52] Counsel for the appellants submitted to me that cl 29.5 imposed requirements that had to be complied with, as distinct from specifying objectives, the non-fulfilment of which did not require a permit application to be rejected. However it is difficult to see how the requirement that a building be 'designed having regard to current noise levels in the area' could be interpreted as a mandatory requirement. But it is clear that cl 29.5 at least required the current noise levels and the noise consequences of the proposed excavation to be taken into account in the making of a discretionary decision.
[53] It would have been open to the Tribunal, in making a discretionary decision, to decide that the noise that the excavation would generate would have such adverse effects on nearby hotels, offices and businesses, and on members of the public, that, for that reason alone, a permit should be refused. It erred in law by treating the objectives in cl 29.5 as being incapable of providing a basis for refusing a permit. Ground 4 must therefore succeed."
(a) by construing the environmental objectives of cl 29.5 as separate and distinct from the environmental objectives of cl 16.2(j);
(b) by determining that the Scheme required a two-stage decision-making process which erroneously required the separation of what is, in law, "an integral [sic] decision making process".
(a) misconstrued the Scheme as expressing mandatory requirements;
(b) reasoned inconsistently with reasoning later expressed;
(c) misconstrued cl 29.5 as requiring the Tribunal to consider whether the development as designed was appropriate having regard to current noise levels in the area.
(a) misconstrued cl 29 as providing for prerequisite requirements which must be met before a permit is granted in the exercise of discretionary powers under s 57 of the LUPA Act, when the clause is limited to the management of noise issues;
(b) misconstrued cl 29.5 as providing for a stand-alone power to refuse the application;
(c) overlooked the decision-making process in which the Tribunal engaged.
"106 The evidence reveals that there is considerable uncertainty around the specifications for blasting at this site. But that is not a matter for concern to the Tribunal because the development of a blast management plan need not precede the grant of a permit, and nor must it be settled in order for a permit to be considered and determined against the requirements of the Scheme. That process should be required to be undertaken by conditions attaching to a permit and in due course produce a plan within a CMP which will become an operative condition with which compliance must be achieved.
"123 The Tribunal considers that this approach achieves the lowest overall environmental impact from the excavation stage. This amounts to "minimising" the direct and indirect environmental risk or effects and thus compliance with the performance criterion at Cl 16.2 (j) of the Scheme."
"149 The Tribunal accepts that the excavation phase of this project will have impacts. Such impacts are inevitable with any development, but these will occur in relatively close proximity to a hotel and offices. It is recognised in the evidence and in the publications pertaining to vibration management, that significant benefit accrues if people are warned before activities which will generate excessive noise and / or vibration occur. That practice must be observed in the carrying out of these works. Furthermore, the information should be distributed within a wide radius of the subject site, and not less than 2 kilometres therefrom.
Constructive failure to exercise jurisdiction
"The Tribunal erred by way of a constructive failure to exercise jurisdiction in failing, pursuant to cl 16.2(j) and/or cl 29.5 of the Scheme, to ensure that the proposed excavation, as an activity within the meaning of these provisions, was managed in a way which would not cause environmental nuisance or material or serious environmental harm."
"6 In varying the permit granted by the [Council] by amending condition 9 (which required a Construction Management Plan) the Tribunal erred in issuing a purported final approval of the proposal which impermissibly:
(a) Deferred determination of the impacts of excavation for subsequent consideration by the [Council] and thereby authorised a development without assurance of compliance with the scheme;
(b) Deferred for subsequent determination an essential element of the proposal therefore depriving the approval of finality."
"Construction management plans for the excavation and construction works must be prepared. The construction management plan for the excavation works must be submitted to and approved by the Council's General Manager prior to the commencement of the excavation works.
(i) A description of all activities proposed to be undertaken on the site during the works, including an indication of stage of works, where relevant, ...
(ii) Proposed hours of construction in accordance with the Environmental Management and Pollution Control (Noise) Regulations 1994 ...
(iii) A traffic management protocol to outline management of traffic conflicts that may be generated during the works including but not limited to:
(a) details of traffic routes for heavy vehicles, including any necessary route or timing restrictions;
(iii) [sic] A Dust Management Plan including an air quality protocol to outline measures to minimise impacts from the works on local air quality particularly regarding dust generated from the work and continuous continuous [sic] video monitoring;
(iv) a noise and vibration management protocol, Including a Vibration Management Plan established by reference to Cosmetic Damage Standards as provided for in the Australian Standard AS2436-2010; and details of measures to mitigate and manage noise and vibration during the works in accordance with AS 2436-2010 - Guide to Noise and Vibration Control on Construction, Demolition and Maintenance sites and New South Wales Department of Environment and Climate Change - July 2009 Interim Construction Noise Guidelines ('the Guidelines') including but not limited to:
(a) Procedures to ensure that all reasonable and feasible noise and vibration mitigation measures are applied during operation of the construction management plan (any determination of what is reasonable and feasible is to be made by reference to the explanation of those two terms as appears at Section 1.4 of the Guidelines);
(b) Details of all management methods and procedures that will be implemented to control individual and overall noise and vibration emissions from the site during the operation of the construction management plan;
(c) Identification of potentially noisy works phases, such as operation of rock breakers, explosives or pile drivers if they are to be used, and proposed means to minimise impact on the amenity of neighbouring buildings;
(d) Identification of potentially vibration causing activities, such as operation of rock drills, rock breakers, explosives or pile drivers if they are to be used and proposed means to minimise impact on the amenity of neighbouring buildings.
(e) Identification of vibration limits for surrounding and adjoining properties and including 2 Salamanca Place.
(f) Identification of sensitive equipment at surrounding and adjoining properties as per (e), and protocols for the protection of that equipment.
(g) Identification of a radius within which notice of any blasting activity is to be given.
It is noted that the identification of noisy construction phases in (c) and vibration causing activities (d) does not infer an entitlement to undertake those activities if they cannot be satisfactorily managed; ....
Once approved the construction management plans form part of the permit and must be complied with. "
"[I]f the effect of an imposed condition is to leave open the possibility that development carried out in accordance with the consent and the condition will be significantly different from the development for which the application was made, then again, it seems to me that the Council has not granted consent to the application made.
The result of the imposition of the condition was to leave unknown what the height of the building would turn out to be. The appellants might well ask the question what that height would be if the development consented to went to completion. It is quite clear that a precise answer to that question is impossible. That, in my opinion, does not of itself mean that finality and certainty, in a substantial sense, were lacking. However, the further and more general question, within what range will the height of the building be, seems likewise to admit of no answer. This seems to me to be fatal to the contention that the consent was sufficiently final and certain in what was in my opinion an important aspect of it, to be regarded as a consent in fact to a particular application, and consequently, in the circumstances of the present case, as a consent in point of law."
"... the test of uncertainty or lack of finality, being determined by reference to an important aspect of the development, requires that what is left uncertain must be the possibility that the development as approved may be significantly different from the development the subject of the application."
"7 The Tribunal erred in failing to give adequate written reasons as required by s 24 of Resource Management and Planning Appeal Tribunal Act 1993, including reasons for its findings on material questions of fact and reference to the evidence or other material on which those findings were based.
(a) The Tribunal failed to refer to or address the evidence of Hylton White called by the Appellants in respect of the impact of blasting.
(b) The Tribunal failed to assess the evidence of Adrian Moore for the Retirement Benefits Fund Board and Hylton White for the Appellants against the evidence of Rauf Osterman and Aaron George for the First Respondent.
(c) In circumstances where, at paragraph 87, the Tribunal stated that it could reach no concluded view about the duration of the excavation, it held at paragraph 150 that 'the Tribunal had adopted an approach which ensures that such work is undertaken in as short period of time [sic] as is reasonable' and in so doing it failed to provide reasons as to this conclusion.
(d) At paragraph 132 the Tribunal stated that it was 'satisfied that, through the adoption of these steps, best practice outcomes can be achieved and that through that process the requisite minimisation of direct and indirect environmental risk or effects, is achieved' however it did not provide any adequate reasons for this conclusion."
"If no right of appeal is given against findings of fact, a failure to state the basis of even a crucial finding of fact, if it involves no legal standard, will only constitute error of law if the failure can be characterised as a breach of the principle that justice must be seen to be done."
"(1) that the same question has been decided; (2) that the judicial decision which is said to create the estoppel was final; and, (3) that the parties to the judicial decision or their privies were the same persons as the parties to the proceedings in which the estoppel is raised or their privies."
"The doctrine of estoppel extends to the decision of any tribunal which has jurisdiction to decide finally a question arising between parties, even if it is not called a court, and its jurisdiction is derived from statute or from the submission of parties, and it only has temporary authority to decide a matter ad hoc."
"A decision to grant a permit or not ... is not a decision as to what are the legal rights of the so-called parties as existing immediately before giving the decision. Rather, it seems to me to be an administrative decision of the question whether permits to do otherwise prohibited acts shall be granted in the discretion of the administrative tribunal."
"A decision to grant or refuse planning permission does not involve the determination of a legal right. Instead, it is an administrative decision determining whether a person will be permitted to proceed with an intended development. A planning authority ... is not making a judicial or an administrative decision. The authority is exercising an administrative discretion to permit what would otherwise have been permitted [sic prohibited]: Cook v Faithland Inc ... An applicant for planning permission, generally speaking, has no right or entitlement to a grant of planning permission in the event that certain facts are established. This is in contradistinction to a decision of a court of law or a tribunal where, if a party establishes certain facts which satisfy a principle of law, as a general rule, that party is entitled to a decision in his favour ... Thus, the decision whether to grant or refuse planning permission is an administrative decision which does not give rise to an estoppel in the form of res judicata."
"It is well established that a judgment pending trial, such as whether or not to grant interlocutory injunction, cannot give rise to an estoppel ... because it lacks [the] element of finality. As Lord Bridge pointed out in Thrasyvoulou, a refusal of planning permission does not finally determine the matter; fresh application can be made. Moreover, although a grant of planning permission can create rights and if acted upon cannot be revoked, if it is allowed to lapse it determines nothing."
"25 Assessment of permissible level 2 activities
(1) Where an application has been made to a planning authority under the Land Use Planning and Approvals Act 1993 for a permit in respect of a use or development of land that is a permissible level 2 activity or a use or development of land that is on the same land as, and is not ancillary to, an existing level 2 activity, the planning authority must -
(i) an application made under Division 2A of Part 3 of the Land Use Planning and Approvals Act 1993, as in force before the commencement of section 10 of the Land Use Planning and Approvals Amendment (Tasmanian Planning Scheme) Act 2015; or
(ii) an application made under section 40T of the Land Use Planning and Approvals Act 1993, as in force after the commencement of section 10 of the _Land Use Planning and Approvals Amendment (Tasmanian Planning Scheme) Act 2015 - _
deal with the application in accordance with section 57 of that Act; and
(9) In this section, permissible level 2 activity means a level 2 activity in respect of which a planning authority -
(b) is bound to grant a permit either unconditionally or subject to conditions."
(a) Quarries: the extraction of any rock or gravel and producing 5 000 cubic metres or more of rock or gravel per year.
(b) Extractive Pits: the extraction of sand or clay and producing 5 000 cubic metres or more of product per year.
(c) Mines: the extraction of any minerals and producing 1 000 tonnes or more of minerals per year."
(a) Cement Works: the conduct of works for the use of argillaceous and calcareous materials in the production of cement clinker or the grinding of cement clinker.
(b) Ceramic Works: the conduct of works for the production of any products such as bricks, tiles, pipes, pottery goods, refractories or glass that are manufactured or are capable of being manufactured in furnaces or kilns fired by any fuel, being works with a total capacity for the production of such products of 200 tonnes or more per year.
(c) Ferrous and Non-ferrous Metal Melting: the melting of ferrous or non-ferrous metal in a furnace or furnaces that alone or in aggregate have the capacity to melt 500 kilograms or more of metal in a working day of 8 hours."
(a) Fuel Burning: any process or combination of processes involving the use of fuel burning equipment or incineration and where the equipment alone or in aggregate is capable of burning combustible matter at a rate of one tonne or more per hour.
(d) Pre-mix Bitumen Plants: works in which crushed or ground rock aggregates are mixed with bituminous or asphaltic materials for the purpose of producing road-building mixtures and capable of producing more than 1 000 tonnes of material per year.
(e) Conduct of Certain Activities in Waters Within the Limits of the State: the dumping of dredge spoil or the dumping or sinking of boats, aircraft, platforms or other man-made structures and the placement of artificial reefs in waters within the limits of the State.
(f) Wind Energy Facilities: facilities for generating energy through wind with a maximum generating capacity of 30 megawatts or more."
"In my view the applicability or otherwise of s 25(1)(b) depends on the interpretation of cl 5, which I have set out above. For the purposes of cl 5(a), is any use or development involving the extraction of rock at the rate of 5,000 cubic metres or more per year deemed to constitute a quarry? Or does cl 5(a) apply only to activities that are quarries in the ordinary sense of that word, and only to those quarries where extraction occurs at an annual rate of 5,000 cubic metres or more? The heading 'Extractive Industries' tends to suggest that the latter proposition is correct. A large-scale excavation would not necessarily be regarded as an industry, but any quarry, in the ordinary sense of that word, would be regarded as an extractive industry."
"2 Ferrous and non-ferrous metal works, being works in which metal melting processes for casting or metal coating are carried out.
"Quarries used for the extraction of any valuable substance and producing or processing more than 100 cubic metres of raw material per year."
"(a) to protect and enhance the quality of the Tasmanian environment;
(c) to regulate, reduce or eliminate the discharge of pollutants and hazardous substances to air, land or water consistent with maintaining environmental quality."
"(4) An activity in respect of which an application is referred to the Board under subsection (1) and which is assessed under this Act as if it were a level 2 activity is subsequently to be treated for the purposes of this Act as a level 1 activity unless the Board determines otherwise.
(4A) If the Board determines that an activity referred to in subsection (4) is not subsequently to be treated as a level 1 activity, the activity is to be treated, for the purposes of this Act, as if it were a level 2 activity and subsections (8A), (8B) and (8C) of section 25 apply to the application in respect of that activity as if it were a level 2 activity."
"Where the court can see the purpose of a provision from an examination of its terms, little difficulty should be met in giving effect to that purpose. The days are gone when judges, having identified the purpose of a particular statutory provision, can legitimately say, as Lord Macmillan said in Inland Revenue Commissioners v Ayrshire Mutual Insurance Association Ltd [1946] 1 All ER 367 at 641, of the means used to achieve the purpose: 'The legislature has plainly missed fire.' Lord Diplock in an extra-judicial comment ... has said, that 'if ... the Courts can identify the target of Parliamentary legislation their proper function is to see that it is hit: not merely to record that it has been missed'."
"There will always be situations in which a court can be satisfied that the intention of the maker of a document is not reflected in the text chosen. Sometimes even Parliament can miss its intended target in a manner where that target is nevertheless plain, in which event a court should endeavour, if possible, to do more than record that the target has been missed (Kingston v Keprose Pty Ltd (1987) 11 NSWLR 404 at 424)."
"It is not as simple as that because, as a general rule, the degree of merit, if any, on an unsuccessful ground of appeal will be relevant to the question whether to depart from the general rule and the question of what order ought to be made if the general rule is departed from."
"So this, in my view, isn't a case where there were grounds that had some merit but failed. I don't think any of the grounds that failed had any significant merit and the result of ... arguing them to the full and producing appeal books that provided all the material for them to be argued to the full, was to increase the costs very significantly. In the circumstances, I think that it is appropriate to make [the] orders ...".
"(1) No appeal shall lie to a Full Court from any judgment or order given or made by a judge, whether sitting in court or in chambers, as to costs only, which are by any statute or any Order or Rule of Court left to the discretion of the judge, except -
(a) by leave of the judge giving such judgment or making such order;
(b) in cases in which the judge has declined or failed to exercise the discretion; or
(c) in cases in which the judge has proceeded on a wrong principle or otherwise contrary to law, or on irrelevant or insufficient materials, or has failed to consider any material fact.
(2) No person who has been admitted to institute or defend or be a party to any proceeding in the Court as a poor person, shall be permitted to appeal to a Full Court or to apply to a Full Court for a new trial as a poor person, except with the leave of the judge by or before whom the cause or matter was heard or tried, or of a Full Court."
"In cases of this kind the usual course is for a tribunal to submit to such order as the court may make. The course which was adopted by the Tribunal in this Court is not one which we would wish to encourage. If a tribunal becomes a protagonist in this Court there is the risk that by so doing it endangers the impartiality which it is expected to maintain in subsequent proceedings which take place if and when relief is granted."
"• Where there are multiple issues in a case the Court generally does not attempt to differentiate between the issues on which a party was successful and those on which it failed. Unless a particular issue or group of issues is clearly dominant or separable it will ordinarily be appropriate to award the costs of the proceedings to the successful party without attempting to differentiate between those particular issues on which it was successful and those on which it failed.
(c) The orders of the primary judge made on 17 January 2017 in appeal 1696/2015 be amended by including, after order no 2, the following:
"2A Before any reconsideration by the differently constituted Tribunal, the application be referred to the Board of the Environment Protection Authority pursuant to s 25(1)(b) of the Environmental Management and Pollution Control Act 1994."
(e) The costs orders made on 2 February 2017 be set aside except to the extent of the grant of an indemnity certificate under the Appeal Costs Fund Act 1968 to each respondent, and in lieu, it is ordered that the respondents pay 50% of the appellants' costs of appeal 1696/2015.
[1] Australian Legal Dictionary, LexisNexis, 2nd ed.
(1) For the purposes of this Act, the best practice environmental management of an activity is the management of the activity to achieve an ongoing minimization of the activity's environmental harm through cost-effective measures assessed against the current international and national standards applicable to the activity."
[3] Pars 127-130 of Fuglsang's written submissions dated 25 February 2016.
[4] Pars 98-112 of the Council's written submissions dated 3 March 2016; adopted by Sultan in its written submissions dated 1 [sic] March 2016.
[5] It is arguable that the Tribunal seems to have accepted the expert view arrived at during the conference without any independent assessment. That of itself may well be an error: Terrigal Grosvenor Lodge Pty Ltd v Gosford Shire Council (1972) 25 LGRA 450 at 456. But that is not the present issue. It also failed to resolve the question about the application and interpretation of the documents.
[6] Section 23(2) of the RMPAT Act requires the Tribunal to make a decision affirming or varying a decision appealed against, or setting it aside and making a decision in substitution or remitting the matter. Section 62(1) of the LUPA Act enables the Tribunal (among other things) to direct the planning authority to grant the permit, to grant the permit with or without conditions, or direct the planning authority not to grant a permit.
[7] Cases cited as establishing the predominant view were Comcare Australia v Grimes [1994] FCA 1054; (1994) 50 FCR 60; Minister for Immigration and Ethnic Affairs v Daniele (1981) 39 ALR 649; Commonwealth of Australia v Sciacca (1988) 17 FCR 476; Midland Metals Overseas Ltd v Comptroller-General of Customs (1991) 30 FCR 87; Re Cooper and Repatriation Commission (1995) 38 ALD 164; Lilienthal v Migration Agents Registration Authority [2001] FCA 2. And see also Underdown v Secretary, Department of Education Employment and Workplace Relations [2009] FCA 965; Minister for Immigration and Multicultural Affairs v Ali [2000] FCA 1385, 106 FCR 313.
[8] See the outline in HCC v RMPAT [2007] TASSC 99, 17 Tas R 137 per Slicer J at [40].
[9] As earlier noted, environmental harm is any adverse affect on the environment (of whatever degree or duration) and includes an environmental nuisance: s 5 of the Act.
[10] There are four provisions of the LUPA Act that refer to activities. The word is not defined. The only provision that relates to the EMPC Act is s 60L. Under the LUPA Act, a project may be declared to be one of regional significance. In that event, the project must be referred to the EPA Director who may determine that an environmental impact assessment is required. In that event, s 60L(3)(c) makes a reference to an activity in the EMPC Act, a reference to the project.
[11] A further example is an adaptation of one given by Fuglsang. A development proposal for a "Hotel/Function Centre", both of which are discretionary uses within Activity Area 2 of the Scheme, might include an in-house restaurant, something that is included in the Scheme's definition of "Hotel". The proposal might contain a development aspect providing for the slaughter of animals on the premises to provide meat for the restaurant and function centre. If 100 tonnes of meat or more are to be produced in a year, that is an activity referred to in Sch 2 as "Abattoirs or Slaughterhouses: the conduct of meat processing ... for producing 100 tonnes or more of meat or meat products per year". See subcl (a) in cl 4 which is headed "Food Production and Animal and Plant Product Processing".
[12] This definition is also to be found in the New Oxford English Dictionary.
Sultan Holdings Pty Ltd
John Fuglsang Developments Pty Ltd [2017] TASFC 14
(1991) 23 NSWLR 734
(2011) 242 CLR 573
(1995) 86 LGERA 134
(1994) 125 ALR 577
(1990) 170 CLR 321
(1981) 151 CLR 170
(1987) 10 NSWLR 247
(1950) 81 CLR 418
(1988) 180 CLR 491
(1985) 1 NSWLR 416
(1939) 62 CLR 464
(1966) 91 FLR 152
(1973) 130 CLR 353
(1996) 90 LGERA 326
(1993) 79 LGERA 308
(2006) 152 LGERA 312
(1927) 39 CLR 381
(1963) 109 CLR 285
(1994) 84 LGERA 434
(1998) 194 CLR 355
(1987) 11 NSWLR 404
(1980) 144 CLR 13
(2000) 174 ALR 53
(1975) 13 SASR 4
(1994) 50 FCR 60
(1981) 39 ALR 649
(1988) 17 FCR 476
(1991) 30 FCR 87