[2021] WASAT 90
General information, not legal advice.
State Administrative Tribunal (WA)
2021-07-01
Original judgment source is linked above.
... [T]he building appears to still be actively moving as indicated by measurements recorded by the telltales and survey results. In my view that means that the building could move to a point of instability without warning, external influence or warning. This poses a risk to those working in and around the structure at the time.
Such evidence for [Nos.] 424 [ 436] Hay Street includes the regularly measured movement by the telltales, the ceiling collapse of 8 February 2021, the gas pipe leak of 8 March 2021, the additional cracking of 10 February 2021 and 26 March 2021 and the measured movement by the surveyor from 12 March 2021 to 6 April 2021.
In my opinion, all of these indicators suggest movement is still occurring in [Nos.] 424 [ 436] Hay Street building.
And do you agree that the survey data shown here is consistent with there being no movement of the facade of 424 to 436 Hay Street during the survey period?---That's right. That's also taking into consideration that there's multiple - those points were observed from multiple locations as well, so, yes, we were able to - to say that there was no movement as well, yes.
Well, the question is, I suppose, should this [T]ribunal understand the accuracy of the instrument by reference to the manufacturer's specifications or the calibration process and the redundancy that you've described?---It would be as per the - the manufacturer's - the manufacturer's specifications, yes. If we had to go purely by the instrument, as - as such, yes, the Topcon series, that would have to be by the - the manufacturer's.
And so the measurements that you've taken that you refer to measurements or differences between the original coordinates and the date on, say, 19 March of less than two millimetres, that's within the margin of error, is it?---That's right. Yes.
So whilst not conclusive in any way, just sort of indicating potentially that there is some movement happening that has manifested itself in the ground with the pipework as well as in the building.
Does the Tribunal have power in the circumstances of this case to vary the building orders to require demolition of the buildings?
A person who is served with a copy of a building order may apply to the State Administrative Tribunal for a review of the decision of the permit authority -
(a) to make the building order; or
(b) in relation to a requirement of the order.
(1) The review of a reviewable decision is to be by way of a hearing de novo, and it is not confined to matters that were before the decision-maker but may involve the consideration of new material whether or not it existed at the time the decision was made.
(2) The purpose of the review is to produce the correct and preferable decision at the time of the decision upon the review.
(3) The reasons for decision provided by the decision-maker, or any grounds for review set out in the application, do not limit the Tribunal in conducting a proceeding for the review of a decision.
(1) The Tribunal has, when dealing with a matter in the exercise of its review jurisdiction, functions and discretions corresponding to those exercisable by the decision-maker in making the reviewable decision.
(2) Subsection (1) does not limit the powers given by this Act or the enabling Act to the Tribunal.
(3) The Tribunal may -
(c) set aside the decision that is being reviewed and -
(ii) send the matter back to the decision-maker for reconsideration in accordance with any directions or recommendations that the Tribunal considers appropriate,
and, in any case, may make any order the Tribunal considers appropriate.
(4) The fact that a decision is made on reconsideration as required under subsection (3)(c)(ii), does not prevent the decision from being open to review by the Tribunal.
(5) The decision-maker's decision as affirmed or varied by the Tribunal or a decision that the Tribunal substitutes for the decision-maker's decision -
(a) is to be regarded as, and given effect as, a decision of the decision-maker; and
(b) unless the enabling Act states otherwise or the Tribunal orders otherwise, is to be regarded as having effect, or having had effect, from the time when the decision reviewed would have, or would have had, effect.
(6) Without limiting subsection (5)(a), the decision-maker has power to do anything necessary to implement the Tribunal's decision.
(7) Despite subsection (5)(a), the decision as affirmed, varied, or substituted is not again open to review by the Tribunal as a decision of the decision-maker.
(8) Subsection (5)(a) does not affect an appeal under Part 5 against the Tribunal's decision.
(9) To avoid doubt it is declared that this section and section 27 do not extend to requiring or enabling the Tribunal to deal with a matter that is different in essence from the matter that was before the decision-maker.
[Section] 112(2)(g) of the [Building Act] provides a decision[]maker with various options as to how to make safe a building that is 'in a dangerous state or unfit for human occupation'. Once they 'reasonably believe' that the building satisfies that description, the decision[]maker may choose a preferred course of action from between the various subparagraphs of the subsection. That choice represents the exercise of a discretion which the Tribunal has on review.
... [T]he nature of the power that has been exercised [by the City in making the reviewable decisions] is a power under in this case [s] 112(2)(g)(iv) [of the Building Act] in respect of [Nos.] 424 [ 436] Hay Street and [s] 112(2)(g)(v) [of the Building Act] in respect of [No.] 440 Hay Street. And in these proceedings, the applicant is inviting the [T]ribunal to make an order under [s] 112(2)(g)(vi) [of the Building Act], demolition. So it's ... a different power to the one that has actually been exercised ... [.]
... [T]he proper construction of [s] 122(1) [of the Building Act] limits the scope of this [T]ribunal's review to the question of whether the building order should have been made at all and whether the individual requirements of that order should have been made or should be varied within the scope of the power that was actually exercised.
So ... [s] 122(1) does not confer a jurisdiction upon the [T]ribunal to impose additional requirements which go beyond the scope of the building order that was made. The purpose of [s] 122(1) ... is to allow a person who is the subject of a building order to seek review of the building order that was made and not to, in effect, apply for a different building order.
... [N]othing in s 29, or any other provision of the SAT Act, places the Tribunal in the shoes of the [original] decisionmaker for any purpose other than dealing with the decision under review. It is not open to the Tribunal to exercise some other discretion vested in the decisionmaker where a decision in the exercise of that discretion is not the subject of the review ... [.]
The submission is that the source of power is not [s] 110 [of the Building Act] at large. The submission is that ... the functional power is to be identified by reference to the actual function exercised - or actual function performed or power exercised [by the City] which is to be identified as [s] 112(2)(g)(iv) and [s] 112(2)(g)(v) [of the Building Act].
What are the correct and preferable decisions in these proceedings?
... [W]hether the buildings are in an [h]eritage [a]rea and the heritage value of a building are irrelevant to the question of whether a [b]uilding [o]rder should be made in that the scope, subject matter and purpose of the [Building Act] is limited to the identification and compliance with relevant standards for the construction and demolition of buildings and the associated question of whether buildings are safe and fit for human occupation[.]
It must be recognised that, between matters that a decision[]maker is bound to take into account, and those irrelevant considerations that the decisionmaker is prohibited from considering, there may be a wide range of permissible considerations which the decisionmaker may weigh or disregard without committing an error of law.
JACKSON, MR: ... Can the risk - is the risk managed by the current hoarding?
WITNESS, KATZ: Yes.
JACKSON, MR: So, there's no - - -
WITNESS, KATZ: Sorry, is the risk managed by the current hoarding? Sorry, I misheard that. Yes, in should the, in the unlikely event of collapse, it won't affect people or property other than the building and the road.
JACKSON, MR: So, there's no need for the temporary support structure to protect against any collapse, in your view.
WITNESS, KATZ: I don't know if you're happy for collapse to occur in the unlikely event.
(a) in relation to the decisions of the City to make the building orders, even assuming (contrary to our determination) that the Tribunal has power in the circumstances of this case to vary the building orders (or set them aside and substitute building orders) to require demolition of the buildings, having regard to the state of the buildings, the possibility, safety, benefit and cost of carrying out the works required by the building orders, and the heritage conservation significance of the building at Nos. 424 436 Hay Street, to -
(b) in relation to the decisions of the City to issue the heritage conservation notices, to set aside those decisions and substitute decisions that no heritage conservation notices are issued, because the heritage conservation notices cannot be lawfully issued.
Attachment A - Temporary support structure
I certify that the preceding paragraph(s) comprise the reasons for decision of the State Administrative Tribunal.
[1] Amended respondent's section 24 bundle of documents dated 1 April 2021, Volume 2 (Exhibit 1.2), tab 73, page 758 (original emphasis).
[2] Exhibit 1.2, tab 73, page 759 (original emphasis).
[6] Exhibit 1.2, tab 74, page 764 (original emphasis).
[7] Exhibit 1.2, tab 71, page 709 (original emphasis).
[8] Exhibit 1.2, tab 71, page 710 (original emphasis). Although not raised by the parties, the reference in paragraph 2 to 'paragraph 1(b)' is a typographical error and should be a reference to 'paragraph 1(a)', which sets out the remedial works.
[12] Exhibit 1.2, tab 72, page 735 (original emphasis).
[13] Ord Irrigation Cooperative Ltd v Department of Water [2018] WASCA 83; (2018) 232 LGERA 331; (2018) 12 ARLR 135 [121]-[124] (Buss P and Murphy and Mitchell JJA).
[14] The Site Visit Plan (Exhibit 7) is reproduced at [20] below.
[18] Amended respondent's section 24 bundle of documents dated 1 April 2021, Volume 1 (Exhibit 1.1), tab 1, page 116.
[19] Exhibit 1.1, tab 1, page 117 (based on external inspection only).
[25] Exhibit 1.1, tab 1, page 116 (original emphasis).
[26] Exhibit 1.2, tab 47, pages 639-640.
[27] Witness statement of Malcolm Alexander Mackay dated 9 April 2021 (Exhibit 13) [19].
[31] Exhibit 1.1, tab 1, pages 114-115 (based on external inspection only).
[32] Exhibit 1.2, tab 67, page 688 (original emphasis).
[36] Exhibit 1.1, tab 1, page 112 (original emphasis).
[37] Exhibit 1.2, tab 67, pages 689-690.
[38] Mr Meir was not called to give evidence. In the evidence before the Tribunal, Mr Meir's surname is also spelled as 'Mier'.
[42] Statement of evidence of David Alexander James Williams dated 9 April 2021 (Exhibit 14) [11].
[58] Exhibit 1.1, tab 28, page 411 (original emphasis).
[59] Witness statement of David Katz dated 9 April 2021 (Exhibit 8) [10].
[64] Exhibit 1.2, tab 44, page 617 (original emphasis).
[67] Springmist Pty Ltd and Shire of AugustaMargaret River [2005] WASAT 143; (2005) 41 SR (WA) 207 [14] (Judge Chaney DP, Mr DR Parry SM and Ms M Connor M).
[69] These issues are based on the parties' respective statements of issues and contentions (respondent's statement of issues and contentions dated 19 March 2021 (Exhibit 4), applicants' statement of issues and contentions dated 31 March 2021 (Exhibit 5) and respondent's statement of contentions in reply dated 12 April 2021 (Exhibit 6)) and the parties' opening statements at the hearing. The principal issues for determination, in essentially these terms, were then distilled by the Tribunal and agreed by counsel in a document that became Exhibit 17.
[76] ts 234 (Mr Jackson) and ts 221222 (Mr Sharpe), 16 April 2021.
[80] Bolded and italicised emphasis original and underlined emphasis added.
[82] Outline of additional submissions on behalf of the applicants dated 23 April 2021 (applicants' further submissions) [42].
[83] Respondent's additional submissions dated 30 April 2021 (respondent's further submissions) [43].
[84] Respondent's further submissions [44] (emphasis added in respondent's further submissions).
[87] Respondent's further submissions [53].
[88] Applicants' further submissions [19].
[89] Respondent's further submissions [43].
[90] See Puma Energy Australia and City of Cockburn [2016] WASAT 36 [40] [47] (Judge Parry DP and Mr P de Villiers M).
[91] Respondent's further submissions [56].
[92] Exhibit 1.1, tab 18, pages 320321.
[100] Applicants' further submissions [34].
[101] Applicants' further submissions [44].
[102] Applicants' further submissions [45].
[103] Applicants' further submissions [48].
[104] Applicants' further submissions [49].
[105] Applicants' further submissions [50].
[109] Applicants' further submissions [22].
[110] We note that the heading of reg 80 of the LPS Regs is 'Planning instruments in course of preparation'. However, we do not have any regard to this heading in interpreting the meaning of reg 80 of the LPS Regs, because s 32(2) of the Interpretation Act states that ' ... a heading to a ... regulation ... shall be taken not to be part of the written law'.
[111] Applicants' further submissions [23].
[112] Applicants' further submissions [33].
[120] Exhibit 13 [22]; ts 176, 15 April 2021.
[131] Exhibit 1.1, tab 14, pages 272 and 273.
[133] Supplementary statement of evidence of David Katz dated 13 April 2021 (Exhibit 9) [7].
[142] Macquarie Dictionary Online (original emphasis).
[149] Statement of evidence of Gemma Rose Dewar dated 9 April 2021 (Exhibit 15) [72] and [73].
[165] We also note that during this period the City carried out road works on Hay Street.
[177] Statement of evidence of Paul Kim Race dated 9 April 2021 (Exhibit 12), Attachment PR2, page 1.
[178] Exhibit 12, Attachment PR2, page 2.
[179] ts 190, 16 April 2021 (Mr Jackson).
[180] ts 190, 16 April 2021 (Mr Sharpe).
[188] Referred to with approval in The Match Group v Metropolitan South West Joint Development Assessment Panel [2014] WASCA 50; (2014) 200 LGERA 227 [18] [19] (Pullin JA, Newnes and Murphy JJA agreeing).
[193] Sanur did not contest the substitution of the amended plan and elevations of the temporary support structure if the Tribunal determines that Sanur should be required to install it.
[217] A v Corruption and Crime Commissioner [2013] WASCA 288 [100] (Martin CJ and Murphy JA), referring to Minister for Aboriginal Affairs v Peko-Wallsend Ltd 3940 (Mason J).
[218] A v Corruption and Crime Commissioner [90] (Mason CJ and Murphy JA).
[222] Witness statement of Stephen Carrick dated 9 April 2021 (Exhibit 10), page 20.
[228] Exhibit 1.2, tab 47, page 639 (emphasis added).
[231] Exhibit 1.2, tab 47, pages 639640.
[239] Exhibit 13 [37]. Although Mr Mackay refers to the properties in question having 'redevelopment potential of up to 4 storeys', we note that the DA submitted by the applicants to the SDAU seeks approval for development of a 2 to 3 storey presentation to the street rising to 7 storeys in the eastern part of the combined site (Exhibit 3, tab 2).
[244] ts 30, 14 April 2021; see also ts 261, 16 April 2021.
A v Corruption and Crime Commissioner [2013] WASCA 288
Dunbar and Commissioner of Police [2007] WASAT 90; (2007) 51 SR (WA) 318
Minister for Aboriginal Affairs v Peko-Wallsend Ltd [1986] HCA 40; (1986) 162 CLR 24
Ord Irrigation Cooperative Ltd v Department of Water [2018] WASCA 83; (2018) 232 LGERA 331; (2018) 12 ARLR 135
Puma Energy Australia and City of Cockburn [2016] WASAT 36
Springmist Pty Ltd and Shire of AugustaMargaret River [2005] WASAT 143; (2005) 41 SR (WA) 207
The Match Group v Metropolitan South West Joint Development Assessment Panel [2014] WASCA 50; (2014) 200 LGERA 227
(1986) 162 CLR 24
(2018) 232 LGERA 331
(2014) 200 LGERA 227