[2026] VCAT 152
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2026-03-03
Original judgment source is linked above.
DOMESTIC BUILDING: damages claim brought by subsequent owners under s 9 of the Domestic Building Contracts Act 1995 (Vic) ('DBCA'); over 200 alleged defects in the applicants' home; builder liable for breaches of s 8 warranties; and s 42 of the DBCA, handover not achieved; building contract mutually abandoned at completion of contract of sale.
Cases considered: Allianz v Waterbrook [2009] NSWCA 224; Beamish v Rosvoll (Domestic Building)
[2006] VCAT 440; Bonarrigo v DSF Pty Ltd trading as LaRosa Tiling Company (Domestic Building)
[2012] VCAT 1404; Brown v S & B Weerasinghe Pty Ltd (Building and Property) [2019] VCAT 1329;
Mason v Fraser [2021] VSC 461; Troise v Blue Key Properties Pty Ltd (Building and Property) [2025]
VCAT 9; and Barbour v Australian Elegant Homes Pty Ltd [2018] VCAT 1242; DTR Nominees Pty Ltd
v Mona Homes Pty Ltd [1978] HCA 12; (1978) 138 CLR 423; Belgrove and Eldridge [1954] HCA 36; (1954) 90 CLR 613; and Wang v
Moutidis [2025] VCC 1156.
Rudloff v Unik Constructions Pty Ltd [2026] VCAT 152
(a) I ruled that the TESG Report was excluded from evidence under s 102(2) of the Victorian Civil and Administrative Tribunal Act 1998 (Vic) ('VCAT Act'), as there was sufficient expert evidence before the Tribunal of the issues in dispute and the author of the report was not being called for cross examination;
(b) at my direction, the parties filed an amended list of defects in spreadsheet form identifying all defects in issue, that forms part of the evidence; and
(c) I ordered the parties to file written submissions addressing, among other questions:
(i) whether the occupancy permit conditions had been fulfilled?
(ii) whether an unconditional occupancy permit had been issued? and
(iii) the consequence of those answers.
COMPLETION / HANDOVER: WHEN DID HANDOVER OCCUR, IF AT ALL, AS BETWEEN THE BUILDER AND THE VENDOR; AND DID THE BUILDER BRING THE WORKS TO COMPLETION UNDER THE BUILDING CONTRACT?
Development of one double storey dwelling with associated car parking, driveway, stormwater drainage and land scaping works and garage. Unit 1 modifications.
(a) Pre-slab;
(b) Slab reinforcement;
(c) Frame; and
(d) Occupancy permit,
(a) On 16 November 2018, the inspection of the pre-slab footing for unit 2 and garage and unit 1 only - marked as approved subject to:
(i) Lag exposed pipes;
(ii) Clean out loose material and vegetation from trenches.
(b) On 29 November 2028, the inspection of slab reinforcement failed to comply with the Building Permit. The RBS requested the Builder to stop any further work and 'Do not pour concrete.' The following matters required attention:
(i) rear setback is approximately 920 mm from fence. Unable to verify on site using land surveyor pegs. Land surveyor to verify rear setback.
The Builder was required to comply with this written direction before it expired on 29 December 2018.
(c) On 28 September 2019, the inspection of the frame - marked as approved.
(d) On 27 November 2020, the inspection for occupancy permit failed and the RBS directed the Builder to stop work. The following matters required attention:
(i) Complete weatherseal @ Entry & Laundry.
(ii) Provide visual decals to windows @ Dining.
(iii) Bed 1 - Provide lift off hinge to en-suite door.
(iv) Rear setback is 900 mm in lieu of 1,050 mm. This was identified at slab stage.
(v) Provide documentation from land surveyor shows setbacks comply from title boundary line.
(vi) Water tanks yet to be installed.
(vii) Supply any outstanding statements/certificates.
The RBS's direction included a statement that the Builder, '... must comply with this written direction before it expires on 27 December 2020.'
When work is to be considered to have been completed
A builder must not demand final payment under a major domestic building contract until -
(a) the work carried out under the contract has been completed in accordance with the plans and specifications set out in the contract; and
(b) the building owner is given either -
(i) a copy of the occupancy permit under the Building Act 1993 , if the building permit for the work carried out under the contract requires the issue of an occupancy permit; or
(ii) in any other case, a copy of the certificate of final inspection.
NOTICE / 'FULL KNOWLEDGE': WHETHER THE OWNERS TOOK NOTICE OF THE DEFECTS BEFORE SIGNING THE CONTRACT OF SALE, AND, IF SO, WAS THE NOTICE GIVEN TO THE OWNERS DURING THEIR BRIEF INSPECTION OF THE WORKS UNDER CONSTRUCTION?
(a) the vendor producing a Certificate of Occupancy before settlement; and
(b) registering a plan of subdivision before the end of the Registration period, (defined as 60 days after the day of Sale).
(a) Special Condition 1 - acceptance of property:
- 1.1 The Purchaser has inspected and accepts the Property its current state of repair.
- 2.1 The Purchaser buys the Property subject to the following restrictions:
20.1 A Major Domestic Building Contract (within the meaning of the Act) has been entered ... between the vendor and a registered builder under the Builder Act 1993 for the contract of the works ....
20.2. The sale is subject to and conditional upon the execution
and completion, by the Builder on or before Settlement date, of the Works, and if the Certificate of Occupancy as referred to in special condition 22.2 is not issued on or before the Project Completion Date, then the Purchasers at any time thereafter (but not prior to such Certification of Occupancy issuing) may terminate this contract by Notice to the Vendor, and thereupon the deposit monies paid by the Purchasers (less any applicable taxes, duties, and bank fees incurred with respect to the monies paid) shall be refunded to the Purchaser.
20.6 Any defects in the construction of the dwelling (excluding minor
shrinkage and settlement cracks) due to faulty materials or workmanship where the builder has been given written notice of them within 12 weeks from date the Works are completed and handed over to the Vendor under the Major Domestic Building Contract will be repaired in a proper workmanlike manner by the Builder at the Builder's expense as soon as practicable once written notice is given.
22.1 This Contract is subject to completion of the Works under a
Major Dometic Building Contract before the Project Completion Date.
22.2 The Vendor is deemed to have discharged its obligations
under special condition 22.1 upon the Vendor producing to the Purchaser a Certificate of Occupancy.
24.1 It is a fundamental term of this Contract that, provided an
Occupancy Permit has been issued, if at settlement date any dispute arises or has arisen in relation to:
(a) The building works;
(b) The quality or standard of the goods; or
(c) The quality or standard of the fittings and finish to the Property,
the Purchaser must not make any objection or requisition and is not entitled to delay or postpone settlement.
(d) Special condition 28 - final inspection
- The Purchasers may inspect the condition of the Property only once at any reasonable time during the period of seven (7) days preceding the Settlement Date. This Contract of Sale will not be subject to the Purchasers' building inspection feedback under this clause.
(a) the builder had not brought the work to completion;
(b) compliance critical items (including the rainwater tank) were not installed by the time the conditional Occupancy Permit was issued; and
(c) many alleged defects were not reasonably appreciable without 'systematic' inspection, access equipment, and or technical testing. For example, the Owners' experts identified that a missing shower trap requires demolition and reconstruction of a shower.
... in the circumstances where the owners did not know the extent of the problem and the owners had assumed the respondent would continue to investigate the problem, or at least had not denied liability for the problem, there was no need for an adjustment in the purchase price.
[110] a successor in title who acquires a building in full knowledge of its defects, suffers no loss from the existence of those defects. In those circumstances, the builder's breach of statutory warranty could not be said to have diminished the successor's assets, nor increased its liabilities. Any adverse impact to the successor's financial position, and any loss to the successor, would result from the successor knowingly and deliberately paying more for the building that it was worth. The loss would be caused by the successor's own decision to purchase at the agreed price.
[111] the observations in [110] are predicated on "full knowledge" of the defects not only knowledge of the existence of the defects but also knowledge of their significance. A party may know of the existence of defects (because they are patent) but may not appreciate - even acting reasonably - that major expenditure would be required to remedy them.
...the [Tribunal] relied upon a photograph of the floor of the ensuite taken after tiles had been removed, which he concluded suggested the floor was damp and showed no sign of waterproofing, and evidence that when a tradesperson touched the weatherboards external to the ensuite his hand went through the wall, which he concluded demonstrated there was no effective water resistance to the wall. In response, to the Masons' [respondents] submissions that the Scaffaro report put the Frasers [appellants] on notice of this defect, the Member said:
I consider this to be a good example of the sort of situation referred to by IPP JA in Alliance v Waterbrook [[2009] NSWCA 224] where a defect is apparent, but its significance is unknown. I find the Frasers are not disentitled from pursuing this claim simply because of the reference to leaks in the ensuite in their pre-purchase report.[16]
(a) access to the roof to observe flashing defects, among others;
(b) tools including a spirit level to check horizontal and vertical levels;
(c) the removal of a door from the doorjamb to expose an issue relating to a door hinge; and or
(d) technical assessment beyond visual observation.
(a) the contract did not provide for a general right to rescind the defective building work. Rather, it contemplated the Vendor compelling the Builder to perform rectification upon notice; and
(b) after the cooling off period, withdrawal would have exposed the Owners to forfeiture consequences. There was no contractual basis for termination of the Contract of Sale for the existence of defects.
DEFECTS AND COSTING DIRECTIONS: IF BREACHES OF S 8 ARE ESTABLISHED WHAT IS THE TRIBUNAL'S PREFERRED RECTIFICATION METHODOLGY; AND WHICH DEFECTS SHOULD BE THE SUBJECT OF UPDATED COSTING EVIDENCE?
EPS foam not sealed to underside on upper storey
EPS installed in lieu of cement sheeting to living room walls
The render finish on the east side of the building is inconsistent
Wall return on living room (external) out of plumb x 6 mm
Absence of flashing above windows [x2] pictured
Gaps around windows rubber and render - 1x photograph
Absence of metal boundary flashing and brickwork - (see 6.4.2 in Quick report)
Non-compliant flashing - east side - [over carport]
Control joints at garage contain non-compressible material
DPC not visible on masonry walls - 4x photographs
Render incomplete behind two downpipes - [at entry and brick column]
Mortar over spill has not been cleaned form slab edge
Tile size inconsistent and appears random and slippery when wet
Tiles poorly finished at each side of patio slab
Roof sheets on the north side are not turned down into the gutter
Downpipe on the north side of the building upper level not adequately
Downpipes from the upper roof are not fitted with spreaders and are
Redundant downpipe bracket has not been removed on the west side
Downpipe at east side (lower level) scratched and dirty
Mortar residue on fascia and gutter at north side
Termite treatment label not installed inside meter enclosure
Pipes connected to instant HW service not lagged
Insufficient separation of electrical cables and water pipes
Distance between glass splashback and periphery of gas cook top less than 200 mm
Gap between ceiling and range hood flu surround
Joinery shelf missing from cupboard adjacent dishwasher
Incorrect screw cap colour to laundry cavity sliding unit
Uneven gap between laundry sliding door and jamb
Ground floor bathroom door scratched on outer face
Door has not been properly prepared for painting - no photo
Tiles stepped at cornice in bathroom ground floor - 3x photographs
Fixtures in shower recess not sealed in ground floor bathroom
Uneven margin between architrave and wall in study
Uneven gap between robe sliding doors and jamb to one side
Gaps between joinery and wall in study robe not caulked
timber floor at base of stairs out of level by 14 mm
Garage brickwork contains mortar smears x3 m2 - 3x photographs
Pedestrian door from garage to rear yard not sealed on bottom side 1x photograph
Gap between door and jamb uneven - 1x photograph
Finish to handrail and balustrade poor and filler not colour matched
Crack in moulding between upper and lower levels
Green masking tap on stair baluster - 3x photographs
Non-matching caulking used between stairs and timber flooring
Scratches and marks on bedroom three door (hinge side) & adhesive on jamb
Non-matching caulking between tiles and timber flooring at first floor bathroom
Holes in grout in first floor bathroom - 3x photographs
Water proofing on window architrave in first floor bathroom
Fixtures in shower recess not sealed in first floor bathroom
Tiles stepped at cornice in first floor bathroom - 3x photographs
Cornice bowed down in first floor bathroom by 9 mm and ceiling by 8 mm
Architrave poorly installed over cistern (unfinished)
Door jamb not finished/painted to first floor toilet
Door jamb out of plumb with adjoining bedroom architrave
Hole to LHS of door handle inside first floor toilet
Holes surrounding door handle inside bedroom two
Gap between door and jamb uneven in bedroom two door
Gap between rode sliding door and jamb to LHS is uneven
Marks on door next to flush pull in bedroom two robe door
Skirting missing to LHS of entry to master at top of stairs
Gap between door and jamb uneven in master bedroom
Vanity stone top overhangs doors and gaps to doors uneven
Water proofing membrane material on door and architrave in master ensuite
Fixtures in shower recess not sealed in master ensuite
Tiles stepped in master ensuite - 1x photograph
Wall out of plumb by 6 mm in Master - north west corner
Top and bottom of doors not paints ('common issue') 2x photographs of bottoms and 2x photographs of tops - no locations
Glazing scratched throughout lower floor - 5x photographs
Gaps in corners of window jambs and mitres of architraves ('common issue') - 7x photographs
Paint and other materials not cleaned from windows internally ('common issue') - 3x photographs
Architraves not seals to walls - 4x photographs
Water proofing membrane material on door ('common issue') 4x photographs
Pans not sealed to walls ('common issue') - 4x photographs
Gaps in window gaskets ('common issue') -3 3x photographs
Doors fitted with lift off hinges contained insufficient clearance with jambs
External double GPO not sealed ('common issue') - 1x pictured
Rebate not exposed for termite inspection & blue Home Guard not visible
Kitchen window sill flashing folded at sides of frame (external)
Sub-stair access door from garage not finished with in-fill
Freeboard is less than 150 mm at north-west corner of the home
EPS foam cladding installation is not in accordance with manufacturer's
Garage boundary walls not sufficiently fire rated
Flashings are missing over the window and entry door
Cracks in the junctions of the skirting, architraves, mouldings and cornice
Gap between plasterboard and electrical switchboard near front entry
Windows in living/master and bedroom two do not open/close properly
Water closet not sealed to wall repeated from 426 above
Insufficient grade in gutter - ponding - 1x photograph
Downpipe mitres not riveted and sealed - 2x photographs
Fixings to downpipes brackets not fit for purpose and not holding - 2x photographs
Downpipes not offset around fascia - 1x photograph
Excess silicone installed underside gutter at pop
Downpipe discharges without spreader and into valley repeated from 114 above
Render repair to wall in two locations - 2x photographs
Apron flashing not dressed and not adhered to tiles - 4x photographs
Apron flashing at eastern boundary non-compliant repeated from 98 above
Parapet flashings insufficient grade and fixings
A/C condenser installation defects (supports/penetrations/roof flashing)
Condensate drains to discharge to the nearest downpipe
Flashing to the tiled roof on the western side of the roof has been siliconed to the tiles and a fixing has been installed through a tile
Sheets not turned down repeated from 17(f) above
Flashing not installed over ridge cap repeated from 20 above
External condenser supported by treated pine timbers and other matters
Reverse cycle drains x2 does not drain to gutter
Un-flashed gaps between the windows and the cladding repeated from 30 above
Gap between cladding and flashing on eastern side repeated from 30 above
Agreed except (g) - PVC pipe not supported (see Photo 57)
Stormwater drain inspection shaft not connected to stormwater drain
The pressure pump serving the stormwater recycling storage tank is
The concrete base for the stormwater recycling storage tank is moving
Shower mixer in upper-level bathroom leaks when the water pressure
[1] Common Tribunal Book ('CTB'), pages 717 to 756.
[3] Troise v Blue Key Properties Pty Ltd (Building and Property) (Costs) [2025] VCAT 976.
[7] Belgrove v Eldridge [1954] HCA 36; (1954) 90 CLR 613.
[8] Wang v Moutidis [2025] VCC 1156.
[10] DTR Nominees Pty Ltd v Mona Homes Pty Ltd [1978] HCA 12; (1978) 138 CLR 423.
[11] Allianz v Waterbrook [2009] NSWCA 224.
[12] Beamish v Rosvoll (Domestic Building) [2006] VCAT 440.
[13] Bonarrigo v DSF Pty Ltd trading as LaRosa Tiling Company (Domestic Building) [2012] VCAT 1404.
[14] Brown v S & B Weerasinghe Pty Ltd (Building and Property) [2019] VCAT 1329.
[18] DBCA, s 3(4) A contract for the sale of land on which a home is being constructed ... that provides ... that the construction of the home will be completed before the completion of the contract is not, and is not to be taken to form part of, a domestic building contract within the meaning of this Act if- (a) the home is being constructed under a separate contract that is a major domestic building contract;