[2025] NSWCATAP 93
General information, not legal advice.
NCAT Appeal Panel
2025-04-30
G Sarginson, Deputy PresidentJ Redfern, Senior Member
Original judgment source is linked above.
Aurora Australasia Pty Ltd v Hunt Prosperity Pty Ltd trading as trustee of the Aurora Australasia Investment Fund Unit Trust (No 2) [2024] NSWSC 1210
Australian Broadcasting Tribunal v Bond (1990) 170 CLR 321
BCA Constructions Pty Ltd v Arsovski [2024] NSWCATAP 31
Benjamin & Khoury Pty Ltd v Rahme (No 4) [2023] NSWSC 1162
Bostik Australia Pty Ltd v Liddiard (No 2) [2009] NSWCA 304
Brahm Bhatt v Osorio [2023] NSWCATAP 188
Brewarrina Shire Council v Beckhaus Civil Pty Ltd [2005] NSWCA 248
Collins v Urban [2014] NSWCATAP 17
Donohoe v Alburario [2025] NSWSC 9
Doppstadt Australia Pty Ltd v Lovick & Son Developments Pty Ltd (No 2) [2014] NSWCA 219
Edwards Madigan Torzillo Briggs Pty Ltd v Stack [2003] NSWCA 302
Ferella & Anor v Chief Commissioner of State Revenue [2014] NSWCA 378
Haritos v Federal Commissioner of Taxation (2015) 233 FCR 315; [2015] FCAFC 92
Harper v Harper (No 2) NSWSC 360
House v Defence Force Retirement and Death Benefits Authority [2011] FCAFC 72; (2011) 193 FCR 112
House v The King (1936) 55 CLR 499; [1936] HCA 40
HRX Pty Ltd v Scott [2013] NSWSC 451
In the matter of Cartwright Transport Pty Ltd (in liquidation) (No 2) NSWSC 1381
In the Matter of Sunnyside Bettoni Pty Ltd (No 2) [2020] NSWSC 1888
John Prendergast & Vanessa Prendergast v Western Murray Irrigation Ltd [2014] NSWCATAP 69
Knox v Bullen [2018] NSWCATAP 106
Kudrynski v Orange City Council [2024] NSWCA 33
Little v J & K Homes Pty Ltd [2017] NSWCATAP 84
Miwa Pty Ltd v Siantan Properties Pty Ltd (No 2) [2011] NSWCA 344
New Island Developments Pty Ltd v New Island Investments One Pty Ltd (No 2) [2024] NSWSC 454
One.Tel Ltd v Deputy Commissioner of Taxation [2000] FCA 270
Orr v Cobar Management Pty Limited (2020) 103 NSWLR 36; [2020] NSWCCA 220
Price v Price [2020] NSWCA 312
Re Minister for Immigration and Ethnic Affairs: Ex Parte Lai Qin [1997] HCA 6; (1997) 186 CLR 622
Ryan v BKB Motor Vehicle Repairs Pty Ltd [2017] NSWCATAP 39
Schwartz Family Co Pty Ltd v Capitol Carpets Pty Ltd [2017] NSWCA 223
Thomas and Naaz Pty Ltd v Chief Commissioner of State Revenue [2023] NSWCA 40
Unique Commercial Group v Cusumano [2024] NSWCATAP 204
(1) The works had not reached practical completion by the end of the building period and the owners were entitled to liquidated damages. The liquidated damages are quantified as $9,900.
(2) The builder had breached statutory warranties under s 18B of the HB Act in respect of the works performed. The owners relied upon an expert report of Doug Coombes & Associates dated 11 February 2022.
(3) The owners had paid the builder $305,468.80 for the works, and of this amount the owners had "overpaid" $100,368.80. The "overpayment" is pleaded as payments made for works not performed; or in the alternative payments made by reason of mistake.
"...
2. Orders the Respondent by 26 January 2023, pursuant to s 48O of the Home Building Act 1989 (NSW) to carry out the installation of a further 100 ties as per item 2 of the Joint Report signed and dated 23 November 2022.
3. Orders the Respondent by 30 June 2023, pursuant to s 48O of the Home Building Act 1989 (NSW) to return to site and carry out the balance of its obligations under the Home Building Contract between the parties dated 18 January 2021, specifically including performance of stages 4 and 5 set out in Schedule 2 of the Home Building Contract such that Practical Completion is achieved, and perform all items stipulated in the Tender for Fixed Price Contract between the parties dated 26 November 2020.
..."
(1) Although the proceedings had been finalised without a hearing and findings on the merits, principles in Re Minister for Immigration and Ethnic Affairs: Ex Parte Lai Qin [1997] HCA 6; (1997) 186 CLR 622 (Lai Qin) applied such that an order for costs could be made if (a) a party was almost certain to have succeeded if the matter had been fully tried; or (b) it is able to be concluded that one of the parties has acted so unreasonably that the other party should obtain a costs of the proceedings.
(2) The owners had served a "Calderbank" offer of 22 October 2022, which the builder had unreasonably rejected. That offer involved the builder paying the owners $23,000 within 14 days (para [1]); each party bear in their own costs (para [2]); and the builder performing certain works, including works that would achieve completion of the contract works (paras [4]-[8]). The offer expired at 4.00pm on 25 October 2022. At this juncture, it is important to note that the Tribunal's decision (and the submissions of both parties) referred to the offer having been made on "22 October 2022", but the date of the letter is 18 October 2022. Presumably, it was not in dispute that the offer was not served until 22 October 2022 as there is no other obvious explanation as to why both parties submission refer to the offer as being made on 22 October 2022.
(1) The owners had brought proceedings prematurely, because the contract remained on foot and had not been terminated. The only reason that the amount claimed or in dispute was over $30,000 in respect of the owners claim for "liquidated damages" and "restitution" damages was that the owners had commenced proceedings prematurely.
(2) The Tribunal should make a proportionate costs order that the owners pay the builders costs of the "liquidated damages" and "restitution" claims or damages, and otherwise there should be no order as to costs.
"All things considered, I am not satisfied that the builder's conduct was so unreasonable as claimed by the homeowners that this alone establishes an entitlement to costs.
In conclusion, in relation to both the work order and the damages order, my provisional view is that the Lai Quin (sic) principles which are well-established and regularly invoked in this jurisdiction, should apply, with the intent that there be no order as to costs."
"Ultimately, costs are in the discretion of the Tribunal. In my view, the most appropriate outcome is the builder pay the homeowners costs as agreed or as assessed. I come to that conclusion on the basis of the builder's submissions in which I see some substance that each of the liquidated damages claim and the restitution claim were premature because neither party has sought to terminate the contract."
The Tribunal's Second Costs Decision Dated 2 July 2024
"The starting point in my consideration of costs is that, as I stated in the First Costs Decision, I do find that the homeowners were successful, and that, consistent with Pt 38 of the NCAT Rules, the starting point in my costs determination is that they are entitled to their costs on the ordinary basis.
The starting point in my consideration of costs is that, as Pt 38 is the relevant costs rule, as I do find that the homeowners were successful, they are entitled to a costs order in their favour, unless there is this disentitling conduct, or some other established basis for departing from the usual principle: Oshlack v Richmond River Council [1999] HCA 11; (1993) 193 CLR 72."
"In conclusion, in relation to both the work order and the damages order, my provisional view was that the Lai Quin (sic) principles which are well-established and regularly invoked in this jurisdiction, should apply, with the intent that there be no order as to costs."
"Notwithstanding that I did not consider the overlooked submissions, I see no reason to change the provisional view I expressed in the First Costs Decision that the Lai Quin (sic) principles which are well-established and regularly invoked in this jurisdiction, should apply, with the intent that there be no order as to costs."
"I see nothing in the overlooked submissions to cause me to come to a different conclusion."
"Those questions of law should be, in our opinion, what are sometimes described as 'pure questions of law.' They should not draw the Court of Criminal Appeal into questions of fact. Moreover, they must be questions whose character as a question of law can be recognised on the face of the question, and not depend upon the answer given to the question. This does not include a question which may ultimately disclose an error of law depending on an analysis of the facts but where this cannot be known without scrutiny of the facts. The construction accords with the cases we have referred to at [48] and [70] above."
In Prendergast, the Appeal Panel identified the following questions of law, at [13], which are here summarised:
(1) Whether there has been a failure to provide proper reasons.
(2) Whether the Tribunal identified the wrong issue or asked the wrong question.
(3) Whether a wrong principle of law had been applied.
(4) Whether there was a failure to afford procedural fairness.
(5) Whether the Tribunal failed to take into account relevant considerations.
(6) Whether the Tribunal took into account an irrelevant consideration.
(7) Whether there was no evidence to support a finding of fact.
(8) Whether the decision is so unreasonable that no reasonable decision-maker would make it.
The formulations above are overly reductive. As the authorities above identify, it is necessary to state the question of law with precision.
To the above list might be added the following (some of which are nuanced aspects of the categories in Prendergast):
(1) Whether the Tribunal drew inferences that were not available from the facts as found (an extension of item 7). As noted by the Full Court in Minister for Immigration & Multicultural Affairs v Al‑Miahi [2001] FCA 744 at [34], the "question whether there is any evidence of a particular fact is a question of law. Likewise, the question whether a particular inference can be drawn from facts found or agreed is a question of law. That is because, before the inference is drawn, there is a preliminary question as to whether the evidence reasonably admits a different conclusion."
(2) Whether the construction of a statute or contract arrived at by the Tribunal at first instance was wrong in some identified way: Bianco Walling Pty Ltd v Construction, Forestry, Maritime, Mining and Energy Union (2020) 275 FCR 385; [2020] FCAFC 50 at [66].
(3) Whether the Tribunal's decision was vitiated by bias, or a reasonable apprehension of bias, relates to and intersects with the fair hearing rule, and may encompass or be related to the procedural fairness question: Mark Aronson, Matthew Groves and Greg Weeks_, Judicial Review of Administrative Action and Government Liability_ (Thomson Reuters, 6th ed, 2017) 643.
(4) Whether the Tribunal failed to respond to substantial, clearly articulated arguments based on established facts which may constitute a failure to accord natural justice, that is, procedural unfairness. Alternatively, it may also constitute a constructive failure to exercise jurisdiction: Dranichnikov v Minister for Immigration and Multicultural Affairs [2003] HCA 26; 77 ALJR 1088; Alexandria Landfill Pty Ltd v Transport for NSW (2020) 103 NSWLR 479; [2020] NSWCA 165 at [6], [20]-[22] (Basten JA).
(5) Whether the facts as found necessarily satisfied the statute or necessarily did not: Azzopardi v Tasman UEB Industries (1985) 4 NSWLR 139 at 156; Hope v Bathurst City Council [1980] HCA 16; (1980) 144 CLR 1 (Hope v Bathurst City Council) at pp 7 and 10; Australian Gas Light Co v Valuer‑General (1940) 40 SR (NSW) 126 at 138; Lombard Farms Pty Ltd v Chief Commissioner of State Revenue [2013] NSWADTAP 42 at [9]-[13], [23(5)]. Though care must be taken where the statute uses words according to their ordinary meaning, as questions raised about the ordinary meaning of words may not raise pure questions of law: Orr v Cobar at [56] citing Hope v Bathurst City Council at p 7; Thomas v Naaz [2023] NSWCA 40 at [54].
(6) As to the distinction between a question of law and a question of fact, the Federal Court in Collector of Customs v Pozzolanic Enterprises Pty Ltd [1993] FCA 356; (1993) 43 FCR 280 (_Pozzolani_c) at 287; [1993] FCA 456 identified five general propositions. These were extracted by the High Court in Collector of Customs v Agfa‑Gevaert [1996] HCA 36; (1996) 186 CLR 389 (Agfa‑Gevaert); [1996] HCA 36 at p 395:
"1. The question whether a word or phrase in a statute is to be given its ordinary meaning or some technical or other meaning is a question of law. [Jedko Game Co Pty Ltd v Collector or Customs (NSW) (1987) 12 ALD 491; Brutus v Cozens [1972] UKHL 6; [1973] AC 854].
2. The ordinary meaning of a word or its non‑legal technical meaning is a question of fact. [Life Insurance Co or Australia Ltd v Phillips [1925] HCA 18; (1925) 36 CLR 60 at 78; NSW Associated Blue‑Metal Quarries Ltd v Federal Commissioner or Taxation [1956] HCA 80; (1956) 94 CLR 509 at 512; Neal v Department or Transport (1980) 3 ALD 97 at 107‑108; Jedko (1987) 12 ALD 491].
3. The meaning of a technical legal term is a question of law. [Australian Gas Light Co v Valuer‑General (1940) 40 SR (NSW) 126 at 137‑138; Lombardo v Federal Commissioner or Taxation [1979] FCA 66; (1979) 40 FLR 208 at 215].
4. The effect or construction of a term whose meaning or interpretation is established is a question of law. [Life Insurance Co of Australia [1925] HCA 18; (1925) 36 CLR 60 at 79].
5. The question whether facts fully found fall within the provision of a statutory enactment properly construed is generally a question of law. [Hope v Bathurst City Council [1980] HCA 16; (1980) 144 CLR 1 at 7, per Mason J with whom Gibbs, Stephen, Murphy and Aickin JJ agreed; Australian National Railways Commission v Collector of Customs (SA) [1985] FCA 312; (1985) 8 FCR 264 at 277, per Sheppard and Burchett JJ.]
In Pozzolanic, the Full Court qualified the fifth proposition. The Court said that, when a statute uses words according to their ordinary meaning and it is reasonably open to hold that the facts of the case fall within those words, the question as to whether they do or do not is one of fact. [Pozzolanic [1993] FCA 356; (1993) 43 FCR 280 at 288, citing Hope [1980] HCA 16; (1980) 144 CLR 1 at 8]." (Footnotes inserted as text)
(7) In Sharp Corporation of Australia Pty Ltd v Collector of Customs (1995) 59 FCR 6; [1995] FCA 707, Hill J explained the fifth proposition of Pozzolanic at p 16:
"The rule that a question of fact is involved in determining whether facts fall within the meaning of a word once that meaning is ascertained, may cause confusion. The confusion comes about because there are actually two related rules, the distinction between which is not always readily apparent. The first of these rules is generally expressed as being that where the facts have been fully found or there is no dispute as to the facts and the question is whether those facts necessarily fall within the description of a word or phrase in a statute, that will be a question of law. This is the sixth proposition enunciated by Jordan CJ in the Australian Gas Light Co case. The rationale for this principle is clear enough. If only one meaning is open but a tribunal arrives at a different meaning, underlying the Tribunal's conclusion must be an error of principle, that is to say, an error of law.
The second related principle is that where the facts found are capable of falling within or without the description used in the statute, the decision which side of the line they fall on will be a decision of fact and not law. Such a decision will generally involve weight being given to one or other element of the facts and so involve matters of degree." (Emphasis added)
(8) Whether the Tribunal made a jurisdictional error will often raise a question of law. However, as jurisdictional error may stem from myriad reasons, care must be taken to ensure the particular basis is raising a question of law. The High Court in Hossain v Minister for Immigration [2018] HCA 34 at [24] described jurisdictional error as:
"an error in a statutory decision‑making process, correspondingly refers to a failure to comply with one or more statutory preconditions or conditions to an extent which results in a decision which has been made in fact lacking characteristics necessary for it to be given force and effect by the statute pursuant to which the decision‑maker purported to make it. To describe a decision as 'involving jurisdictional error' is to describe that decision as having been made outside jurisdiction." (Citations omitted)
Plainly, the categories are not closed.
In addition, because the list in Prendergast has been extensively referred to and cited, it is important to clarify the following:
(1) There is an important difference between wrongly applying the correct principles and applying the wrong principles. The former may not raise a pure question of law, but the latter does_: Bimson, Roads & Maritime_ at [40]-[45]. Applying the wrong principles evinces a misconstruction of the statute.
(2) As set out in Prendergast, to say that considerations are "relevant" in the appellate context signifies that those considerations are mandatory having regard to the text and context of a relevant provision. Similarly, to suggest that a consideration is "irrelevant" signifies that it is prohibited by the subject‑matter, scope and purpose of the statute. These are factors in the exercise of a discretion: Minister for Aboriginal Affairs v Peko‑Wallsend Limited (1986) 162 CLR 24 at pp 39-40; [1986] HCA 40.
(1) It is not appropriate for parties or legal representatives to use Prendergast as a checklist without clarification or modification to meet the particular circumstances of the appeal (at [35]-[36]).
(2) What constitutes a question of law is vexed and context dependent in the sense that the distinction between matters of fact and of law may turn on the circumstances in which the question arises (at [37]).
(3) Purported inadequate reasons may constitute an attack on the merits (which is not a pure question of law); or it may be a contention that the decision is unreasonable in the requisite sense to constitute a pure question of law; or that the Tribunal failed to exercise jurisdiction (which raises a pure question of law (at [38]).
(4) Discernment and care must be taken to ensure the grounds relied upon by the appellant, properly understood, raise questions of law and arise in the proceedings; or whether leave is required (at [39]).
"... there was a "significant possibility" or a "chance which was fairly open" that a different and more favourable result would have been achieved for the appellant had the relevant circumstance in para (a) or (b) not occurred or if the fresh evidence under para (c) had been before the Tribunal at first instance."
As both parties proceeded on the basis that r 38 of the NCAT Rules applies to the costs decision the subject of the appeal, it is unnecessary to consider the provisions of ss 60(1) and (2) of the NCAT Act.
The principles applicable when considering whether to make a costs order in favour of a party in circumstances where proceedings have not been heard and determined on the merits were set out by McHugh J in Re: Minister for Immigration & Ethnic Affairs; ex parte Lai Qin (1997) 186 CLR 622; [1997] HCA 6 (Lai Qin) at 624-625 as follows:
"In most jurisdictions today, the power to order costs is a discretionary power. Ordinarily, the power is exercised after a hearing on the merits and as a general rule the successful party is entitled to his or her costs. Success in the action or on particular issues is the fact that usually controls the exercise of the discretion. A successful party is prima facie entitled to a costs order. When there has been no hearing on the merits, however, a court is necessarily deprived of the factor that usually determines whether or how it will make a costs order.
In an appropriate case, a court will make an order for costs even when there has been no hearing on the merits and the moving party no longer wishes to proceed with the action. The court cannot try a hypothetical action between the parties. To do so would burden the parties with the costs of a litigated action which by settlement or extra-curial action they had avoided_._ In some cases, however, the court may be able to conclude that one of the parties has acted so unreasonably that the other party should obtain the costs of the action. In administrative law matters, for example, it may appear that the defendant has acted unreasonably in exercising or refusing to exercise a power and that the plaintiff had no reasonable alternative but to commence a litigation...
Moreover, in some cases a judge may feel confident that, although both parties have acted reasonably, one party was almost certain to have succeeded if the matter had been fully tried. ... But such cases are likely to be rare.
If it appears that both parties have acted reasonably in commencing and defending the proceedings and the conduct of the parties continued to be reasonable until the litigation was settled or its further prosecution became futile, the proper exercise of the cost discretion will usually mean that the court will make no order as to the cost of the proceedings. This approach has been adopted in a large number of cases. (footnotes and citations omitted)."
A party "capitulating" to the other party, in the sense of one party, after litigation has been on foot for some time, effectively "surrendering" to the other party and consenting substantially to the relief sought without any obvious compromise, or (if the applicant) withdrawing the proceedings, is a situation where it is open to conclude either (a) it is clear that one party would have been successful had the proceedings been heard and determined on the merits; and/or (b) a party has acted with sufficient unreasonableness in the proceedings that a costs order should be made (Muhibbah Engineering (M) BHD & Anor v Trust Company Ltd & Anor [2009] NSWCA 205 (Muhibbah Engineering) at [54]-[55]; Shellharbour City Council v Minister for Local Government [2017] NSWCA 256 at [6]- [14]; One.Tel Ltd v Commissioner of Taxation (2000) 101 FCR 548; [2000] FCA 270 at [6] - [8]; (One Tel); Kiama Council v Grant [2006] NSWLEC 96 at [80]; Hunter Development Corporation v Save Our Rail NSW Incorporated (No 2) [2016] NSWCA 375 at [78]-82]).
A "surrender" is to be distinguished from a situation where "some supervening event or settlement so removes or modifies the subject of the dispute that, although it could not be said that one side has simply won, no issue remains between the parties except that of costs" (One Tel at [6]; Knox v Bollen; Bollen v Knox [2018] NSWCATAP 106 at [47]).
In Nichols v NFS Agribusiness Pty Ltd [2018] NSWCA 84 (Nichols) the NSW Court of Appeal dealt with the principles in Lai Qin in the context of a matter where the parties had entered into consent orders finalising the dispute, but 'reserved' the issue of costs and sought separate determination of that issue.
Unhelpfully, neither party referred to Nichols in their submissions before the Tribunal, nor their submissions in the appeal. The Appeal Panel referred the parties to that decision during the course of oral submissions at the hearing of the appeal. Both parties have been legally represented at all relevant times.
Nichols is not an obscure authority. It has been referred to in many subsequent decisions, including decisions in the Supreme Court of NSW and the Appeal Panel of the Tribunal (e.g. The Owners-Strata Plan No 5319 v Price [2020] NSWCATAP 245 at [51]; Campara v Australian Islamic Society of Bosnia Herzegovinia Inc [2020] NSWSC 1739 at [75]- [77]; Wang v Cai (No 2) [2021] NSWSC 1268 at [63] Hoare v Taylormade Residential Pty Ltd [2022] NSWSC 1359 at [23]- [27]). Both parties had a reasonable opportunity to prepare and make submissions that dealt with the principles emerging from the decision in Nichols.
In Nichols, Basten JA stated at [2]-[3] and [8]-[10]:
"2 Where the parties resolve their differences, except as to the costs already incurred in litigation, they should usually expect that the court will not award costs. That is because the general rule applicable in civil litigation in superior courts is that costs will "follow the event." That rule is frequently paraphrased by reference to its purpose, namely that the successful party should generally recover its costs from the unsuccessful party. But where there has been no trial there is no "event" because, except in unusual cases, it is not possible to say that one party has been successful and the other unsuccessful. The orders made by consent may or may not demonstrate capitulation by the "unsuccessful" party.
3 In unusual cases, it may be possible to identify success which is manifest on the face of the record. However, to manufacture a dispute in order to resolve that question is to disregard the statutory obligation imposed on the parties, their legal representatives and the court to conduct civil proceedings so as to facilitate the just, quick and cheap resolution of the "real issues in the proceedings." As explained in Expense Reduction Analysts Group Pty Ltd v Armstrong Strategic Management and Marketing Pty Ltd:
"That purpose may require a more robust and proactive approach on the part of the courts. Unduly technical and costly disputes about non-essential issues are clearly to be avoided.
"It could hardly be suggested that the pursuit of satellite interlocutory proceedings of the kind here in question in any way fulfils the overriding purpose of the [Civil Procedure Act]. To the contrary, it is the very kind of conduct which should be avoided if those purposes are to be achieved."
...
8 Secondly, although it is possible to make an order for costs against one party if it can be shown that it has invited the litigation by its unreasonable behaviour, or has unreasonably pursued the litigation, such an order should only be made where that judgment is manifest by reference to known circumstances, not in dispute between the parties. If the question cannot be answered without reviewing large swathes of evidence and resolving, on a tentative basis, disputed questions of fact, the task should not be embarked upon.
9 Thirdly, if contrary to the views set out above, it was appropriate to investigate whether the applicants or the respondent had been unreasonable, either in their conduct prior to the proceedings, or in their conduct of the proceedings, the approach adopted was untenable. Thus, regard was had to the motives of the respondent in commencing proceedings, but no account was taken of the motives of the applicants in capitulating. Further, once it is clear that there is a real dispute as to a significant fact in issue in the proceedings, it is inappropriate to determine that matter, other than in making an interlocutory ruling, by accepting one party's case without permitting the other party an opportunity to challenge the opposing party's witnesses.
10 Once it becomes apparent that such a course is required, the hypothesis on which the examination was undertaken is negated and the inquiry should stop. (Footnotes omitted.)"
Meagher JA (with whom Payne JA agreed) stated at [30]-[33]:
30 If both parties to a proceeding which has been settled without a hearing on the merits have acted reasonably in commencing and defending the proceedings and the conduct of the parties continued to be reasonable until the litigation was settled or its further prosecution became futile, the proper exercise of the cost discretion will usually mean that the court will make no order as to the cost of the proceedings.
31 In the present case his Honour's judgment commenced by noting the applicants' submission that he should not embark upon a determination of what would have been the outcome had the matter proceeded to a hearing, as such an approach would be contrary to Lai Qin. The primary judge, whilst having regard to Lai Qin, proceeded to read the 200 plus pages of affidavit evidence on the costs question and observed:
"[6] I have read all of the affidavits contained in the court book and I observe that there are a number of disputed conversations and events. I do not think it is necessary to set out any of the detail, because it is clear that:
(1) Mr Nichols (and/or the other defendants) held documents which belonged to NFS, that he transferred those documents at the meeting of 8 May 2017 to NFS at NFS' request or demand, and which documents he agreed on 8 May could be deleted from his devices.
(2) Mr Nichols agreed to be permanently restrained from using 'in any way any of the plaintiff's confidential information as defined in the orders made on 28 April 2017'."
32 I have concluded that this approach is contrary to principle as explained in Lai Qin and adopted by this Court in many cases since, including Edwards Madigan Torzillo Briggs, Muhibbah Engineering and Shellharbour City Council.
33 Neither of the matters identified by the primary judge was capable of demonstrating that there had been a capitulation by the applicants or that, if the case had proceeded, the respondent would "almost certainly" have succeeded. Nor was either capable of demonstrating that there had been a marked difference in the reasonableness of the actions taken by the parties, so that one party should be rewarded for its reasonable actions and the other party should suffer a detriment in the form of a costs order against them.
At [37]- [39] Meagher JA stated that the reference by Sackville AJA in Muhibbah Engineering at [54]-[55] to the consideration of affidavit evidence was made in the specific context of whether a party had "effectively surrendered" in the proceedings, it was not an invitation to consider large swathes of disputed factual evidence in the context of determining whether a party has succeeded in obtaining a material aspect of the relief sought when the parties have settled other than on the issue of costs.
"It is not sufficient that the Tribunal is almost certain that a work order of some type would have been made. If that were the applicable test, then any consent order for any work in proceedings where the amount claimed or in dispute exceeded $30,000 would result in an order for costs in favour of the owners, irrespective that, had the proceedings been heard to finality, the owners were likely (or even certain) to have failed on substantial issues which may have resulted in the owners not being awarded costs.
Rather, the appropriate enquiry is that "even if both parties have acted reasonably, one party was almost certain to have succeeded if the matter had been fully tried so that the party should obtain the costs of the action" (emphasis added) (Kiama Council v Grant [ 2006] NSWLEC 96 at [80])."
It is convenient to refer first to Ms Price's second ground of challenge to the primary judge's costs order, namely, that his Honour misapplied r 42.1's directive that costs are to follow the event unless it appears that some other order is appropriate.
As to this contention, it must first be concluded that there was no "event" for this purpose. Whether in particular cases the event is taken as a reference to the outcome of proceedings as a whole or the result of determination of particular issues, for there to be an "event" there must have been a contest in which the applicant for costs has succeeded. As McHugh J pointed out in Re Minister for Immigration and Ethnic Affairs; ex parte Lai Qin [1997] HCA 6; (1997) 186 CLR 622 at 624; [1997] HCA 6, if there is no hearing on the merits, the rule that costs follow the event is inapplicable. To similar effect, Basten JA said in Nichols at [2] that "where there has been no trial there is no 'event'" (see also at [30] per Payne JA, Meagher JA agreeing). There was no contest or hearing as to the merits here because the orders (other than as to costs) were made by consent. That is not to say that a litigant who obtains consent orders will not ever be entitled to costs. He or she may well be, depending upon an assessment of the conduct of each party (see Minister v Lai Qin referred to at [43] below). Where there is consent, that litigant will not however have the benefit of the presumption created by r 42.1.
Grounds 1 and 3 of the Appeal-Legal Principles When Proceedings Settle
(a) The application filed by the owners on 12 March 2022 seeking a work order, or alternatively compensation of up to $100,368.50 and damages.
(b) The consent orders made on 24 November 2022 requiring the builder to perform certain works; and
(c) The consent orders made on 20 October 2023 requiring the builder to pay damages of $20,000 to the owners on or before 14 November 2023.
"However if the Court is satisfied that one party has had a "substantial victory" and the other a "substantial loss" even where there has been no determination on the merits, an award of costs may be made in favour of the successful party: Edwards Madigan Torzillo Briggs Pty Ltd v Stack [2003] NSWCA 302 at [4]- [5] per Davies AJA (with whom Mason P and Meagher JA agreed). In One.Tel Ltd v Commissioner of Taxation [2000] FCA 270; (2000) 101 FCR 548 Burchett J said at 553:
In my opinion, it is important to draw a distinction between cases in which one party, after litigating for some time, effectively surrenders to the other, and cases where some supervening event or settlement so removes or modifies the subject of the dispute that, although it could not be said that one side has simply won, no issue remains between the parties except that of costs. In the former type of case, there will commonly be lacking any basis for an exercise of the Court's discretion otherwise than by an award of costs to the successful party. It is the latter type of case which more often creates problems, since there may be difficulty in discerning a clear reason why one party, rather than the other, should bear the costs.
...
If it appears that both parties have acted reasonably in commencing and defending the proceedings and the conduct of the parties continued to be reasonable until the litigation was settled or its further prosecution became futile, the proper exercise of the cost discretion will usually mean that the court will make no order as to the costs of the proceedings: Re Minister for Immigration and Ethnic Affairs (Cth); Ex parte Lai Qin [1997] HCA 6; (1997) 186 CLR 622 at 625 per McHugh J."
"Where a matter does not proceed to determination after trial, the ordinary "benchmark" for the award of costs following "the event" is absent. However if the Court is satisfied that one party has had a "substantial victory" and the other a "substantial loss" even where there has been no determination on the merits, an award of costs may be made in favour of the successful party: Edwards Madigan Torzillo Briggs Pty Ltd v Stack [2003] NSWCA 302 at [4]- [5] per Davies AJA (with whom Mason P and Meagher JA agreed). In One.Tel Ltd v Commissioner of Taxation [2000] FCA 270; (2000) 101 FCR 548 Burchett J said at 553:
In my opinion, it is important to draw a distinction between cases in which one party, after litigating for some time, effectively surrenders to the other, and cases where some supervening event or settlement so removes or modifies the subject of the dispute that, although it could not be said that one side has simply won, no issue remains between the parties except that of costs. In the former type of case, there will commonly be lacking any basis for an exercise of the Court's discretion otherwise than by an award of costs to the successful party. It is the latter type of case which more often creates problems, since there may be difficulty in discerning a clear reason why one party, rather than the other, should bear the costs.
...
If it appears that both parties have acted reasonably in commencing and defending the proceedings and the conduct of the parties continued to be reasonable until the litigation was settled or its further prosecution became futile, the proper exercise of the cost discretion will usually mean that the court will make no order as to the costs of the proceedings: Re Minister for Immigration and Ethnic Affairs (Cth); Ex parte Lai Qin [1997] HCA 6; (1997) 186 CLR 622 at 625 per McHugh J.
"However, if the matter does not proceed to a determination after trial, the ordinary benchmark upon which costs are awarded, success or failure, is absent. McHugh J pointed this out in Re The Minister for Immigration and Ethnic Affairs Ex Parte Lai Qin [1997] HCA 6; (1997) 186 CLR 622 at 624:-
"In most jurisdictions today, the power to order costs is a discretionary power. Ordinarily, the power is exercised after a hearing on the merits and as a general rule the successful party is entitled to his or her costs Latoudis v Casey [1990] HCA 59; (1990) 170 CLR 534. Success in the action or on particular issues is the fact that usually controls the exercise of the discretion. A successful party is prima facie entitled to a costs order Latoudis (1990) CLR 534, 566-568. When there has been no merits, however, a court is necessarily deprived of the factor that usually determines whether or how it will make a costs order."
When proceedings are brought to an end without a determination after a trial, the judge may find it difficult, even impossible, to make an award of costs. If the judge does make an award, it will generally be because the judge is satisfied that one party has had a substantial victory and the other a substantial loss, or that there has been a marked difference in the reasonableness of the actions taken by the parties, so that one party should be rewarded for its reasonable actions and the other party should suffer a detriment in costs. In One Tel Ltd v Commissioner of Taxation [2000] FCA 270; (2000) 101 FCR 548 at 552-3, Burchett J expressed the point in this way:-
..."
"[i]t is not enough that the judges composing the appellate court consider that, if they had been in the position of the primary judge, they would have taken a different course. It must appear that some error has been made in exercising the discretion. If the judge acts upon a wrong principle, if he allows extraneous or irrelevant matters to guide or affect him, if he mistakes the facts, if he does not take into account some material consideration, then his determination should be reviewed ... It may not appear how the primary judge has reached the result embodied in his order, but, if upon the facts it is unreasonable or plainly unjust, the appellate court may infer that in some way there has been a failure properly to exercise the discretion which the law reposes in the court of first instance."
(1) Even if an error of law was established, it was not "material" to the decision in the sense that it "might" or "may" have made a difference to the outcome (citing Australian Broadcasting Tribunal v Bond (1990) 170 CLR 321 at 353 per Mason CJ and 384 per Toohey and Gaudron JJ; and House v Defence Force Retirement and Death Benefits Authority [2011] FCAFC 72; (2011) 193 FCR 112 at 121).
(2) No House v The King error has been established.
(1) An error on a question of law is established, as the Tribunal applied an incorrect legal principle.
(2) The error was material to the decision under appeal.
(3) The error was a type that falls within House v The King principles, because the Tribunal acted on the wrong legal principle.
Ground 2-Failure to Make a 'Proportionate' Costs Order
(1) The owners were never entitled to damages for rectification of existing defective works or completion of incomplete works because the contract had not been terminated (Brewarrina Shire Council v Beckhaus Civil Pty Ltd [2005] NSWCA 248 at [53] and [66]-[68]; Little v J & K Homes Pty Ltd [2017] NSWCATAP 84 at [20]- [23]).
(2) The claim for liquidated damages for delay under cl. 32.1 of the contract was "premature" because the contract remained on foot; and in any event the builder was entitled to various extensions of time under cl. 19.1 of the contract.
(3) The "restitution claim" had "weak prospects of success and in any event the owners would have failed to prove that damages or restitution should be paid while the contract remained on foot.
(4) The builder had returned to site (after suspending the works under the contract) prior to Tribunal proceedings being commenced, and was always ready, willing and able to complete the works under the terms of the contract, so no work order would have been made under s 48O of the HB Act.
(1) The amount paid by the builder to settle the proceedings ($20,000) with the amount in the offer ($23,000).
(2) The amount in the offer compared to the amount of "liquidated damages" that had potentially accrued at the date of the offer was made (on the builder's calculation, approximately $14,550); and
(3) The other conditions with the offer of settlement.
"The failure by a party to accept an offer of compromise which is a Calderbank offer where that party does not achieve a judgment more favourable than the offer is one of the circumstances in which the court may exercise its discretion under r 42.1 of the UCPR to make some order other than costs following the event on the ordinary basis. However, merely because the party to whom the offer was made does not ultimately obtain a more favourable judgment does not automatically lead to a favourable costs order, or raise a presumption that such an order should be made: E Group Security at [57].
The onus is on the party making a Calderbank offer to satisfy the court that it should exercise the costs discretion in its favour, in particular that (a) the Calderbank offer embodies a genuine compromise and (b) it was unreasonable for the other party not to accept it, which is an evaluative judgment to be made by reference to the terms of the offer and all the relevant surrounding circumstances at the time that it was made, and not with the benefit of hindsight: Miwa Pty Ltd v Siantan Properties Pte Ltd (No 2) [2011] NSWCA 344 at [8], [11], [16]; Wheatley v Lakshmanan (No 2) [2022] NSWSC 851 at [97]; E Group Security at [57]-[58].
Relevant factors in determining whether the rejection of an offer was unreasonable include (a) the stage of the proceeding at which the offer was received; (b) the time allowed to the offeree to consider the offer; (c) the extent of the compromise offered; (d) the offeree's prospects of success, assessed at the date of the offer; (e) the clarity with which the terms of the offer were expressed; and (f) whether the offer foreshadowed an application for indemnity costs in the event of the offeree rejecting it: Hazeldene's Chicken Farm Pty Ltd v Victorian Workcover Authority (No 2) (2005) 13 VR 435; [2005] VSCA 298 at [25]; Miwa at [12]; Wheatley at [98]; E Group Security at [59]. A finding of unreasonableness should not be made other than on clear grounds: E Group Security at [58].
In relation to (d), what is required is an objective assessment of the offeree's prospects of success as at the date of the offer: Hazeldene's Chicken Farm at [30].
The practice of treating Calderbank offers in this way is informed by the public policy objective of providing an incentive to the parties to end their litigation as soon as possible and discouraging wasteful and unreasonable behaviour by litigants: Commonwealth Bank of Australia v Gretton [2008] NSWCA 117 at [41]. However, the mere fact that the offer is a reasonable one does not make it unreasonable for the offeree to have rejected it: Gretton at [74] and [120]."
(1) A clear injustice, going beyond what is merely arguable, has been established; and
(2) The builder may have suffered a substantial miscarriage of justice because the decision is not fair and equitable.
Disposition of the Appeal and Determination of Costs at First Instance
Would Either Party Almost Certainly Succeeded Such That A Costs Order Would Have Been Made In Its Favour if the Proceedings Had Been Tried and Determined?
67 Accordingly, as at the judgment date, the Council rightly denied that practical completion had been achieved. But, it continued - at that stage - to hold Beckhaus to its contractual obligations to perform the work. Thus, on the Council's contention, at the date of judgment, the work remained in Beckhaus' possession; the Council, in effect, having refused to accept possession.
68 While, on this assumption (the Contract still being on foot), the Council may have been entitled to claim damages for delay arising out of Beckhaus' failure to achieve practical completion by the date for practical completion, it could not sue Beckhaus for defective or incomplete work. As long as the Council maintained that the Contract was alive and had not been terminated, and held Beckhaus to its obligation to complete the work in accordance with the specification, on its contention the work remained lawfully in Beckhaus' possession. In other words, it was an inevitable incident of the Council's argument that the work had not been delivered to and accepted by the Council (Beckhaus - on the Council's argument - being in possession of and obliged to complete the work). While the work was in Beckhaus' possession, the Council suffered no loss by reason of defective or incomplete work; the work, not being in the Council's possession, did not at that stage form part of its patrimony.
69 This situation would have changed when the Contract was terminated. When that occurred, the work (in its defective and incomplete state) was handed over to the Council. At that stage, the Council suffered loss by being in possession of defective and incomplete work."
"The principle for which the decision of the Court of Appeal stands can have no application to a claim seeking orders that a building contractor perform work required to be undertaken by the terms of a building contract ("specific performance"), or, in relation to work governed by the HBA, to a claim pursuant to s 48O(1)(c) of the HBA for orders that the builder carry out work. A claim for "specific performance" of a building contract can only be brought while the contract remains on foot. Neither the statement of principle set out in [65] to [69] of Brewarrina Shire Council v Beckhaus Civil nor the logic underlying that principle precludes the Tribunal from determining a claim for work orders pursuant to s 48O(1)(c) of the HBA while the contract remains on foot.
...
If a builder wrongfully refuses to complete building work governed by the HBA, the Tribunal has jurisdiction pursuant to s 48O(1)(c)(i) to direct the builder to complete that work. The work required to be undertaken by the respondent was work to which the HBA applied. By dismissing the appellants' claim, including the claim for work orders pursuant to s 48O(1)(c), on the basis that the contract remained on foot, the Senior Member was in error."
Did Either Party Act So Unreasonably in the Proceedings That a Costs Order Should Be Made In Their Favour?
(1) The monetary offer was for an amount more than the owners ultimately accepted to settle the damages component of their claim.
(2) The offer was only open for a short period of time. Both parties have made submissions on the basis that the offer was made on 22 October 2022. The offer expired at 4.00 pm on If that is correct, the builder had 3 days to obtain advice about, and consider, the offer. Even if the offer was received on 18 October 2022, the 7 day period for acceptance of the offer included a weekend. Considering the nature of the issues in dispute and the extensive terms of the obligations on the builder that the offer referred to, we do not regard that period as a reasonable period of time for the builder to properly consider and respond to the offer.
(3) The offer contained (at para [3]) a "notation" that the parties had "entered into a settlement agreement and will perform the settlement agreement, Building Contract dated 18 January 2021 and Tender for Fixed price Contract dated 26 November 2020". However, at paras [4]-[7] the offer refers to various specific obligations of the builder. It is unclear whether these obligations were to be consent orders of the Tribunal under s 48O of the HB Act; or notations of an agreement. That ambiguity is important, because if they were consent work orders, the owners would have a right to renew the proceedings under cl. 8 of Sch 4 of the NCAT Act, but otherwise would only be able to bring future proceedings for breach of agreement.
(4) Pars [5]-[7] contain obligations and time stipulations that do not clearly accord with the terms of the contract. Para [5] obliged the builder to provide, within 28 days of the date of acceptance of the offer "a report and/or certificate issued by the relevant Certifying Authority in connection with the structural framework stage of the Building Works..." Par [6] obliged the builder to perform, within 28 days of acceptance of the offer building works that involved attaching veneer ties and metal bracings to framework, as well as other work. Para [7] obliged the builder "within 21 days of completion of item 6 above" to provide various reports and certificates to the owners "required for an occupancy certificate, including "any other relevant inspection report for the Building Works completed".
(5) The works identified in pars [5]-[7] of the offer are in excess of the works that were contained in the consent orders dated 24 November 2022. The works identified in that consent order were limited to the builder carrying out the installation of a "further 100 ties" and the builder completing the works under the contract to achieve practical completion.
(6) The works identified in paras [5]-[7] are in excess of the works identified as defective in the report of the builder's expert Mr Sim. At the stage of the offer, there was no Joint Expert Report by Mr Coombes and Mr Sim. It was reasonable for the builder to adopt the position that the works identified paras [5]-[7] of the offer may not be works ordered by the Tribunal after a contested hearing, or works that the builder was obliged to perform under the terms of the contract within the time periods stipulated in the offer.
(1) It is not clear from the documents and submission of the parties as to precisely when the offer was received, but it is dated 21 November 2022. It expired at 4.00pm on 22 November 2022. Even taking into account the state of the parties evidence and the proximity to the Tribunal hearing date, we do no regard the short time period as reasonable for the builder to properly consider the offer.
(2) The terms of the offer are not clear in respect of the precise works to be performed by the builder. The offer is responsive to the builder's offer of 11 November 2022. The offer was for the builder to pay the owners $20,000; each party bear its own costs; the proceedings be withdrawn; and that there be a "notation" about agreed works. The offer includes reference to the parties having leave to "renew" the application on 5 days' notice. This is not an order that could have been made by the Tribunal, as proceedings that have been dismissed because they have been withdrawn under s 55(1)(a) of the NCAT Act cannot be "renewed". The notations regarding work in para [8] of the offer are unclear. There is a table that refers to "Schedules 1 and 2" of the builder's offer, and then sets out whether those items are agreed; not agreed; or agreed only on certain conditions. This lack of clarity and uncertainty would potentially lead to further disputes between the parties.
(2) Costs decisions and orders of the Tribunal dated 16 May 2024 and 2 July 2024 are set aside.
(3) In Tribunal proceedings 2022/00444141 (formerly HB 22/12518) there is no order as to costs, with each party to bear its own costs.
(4) If there is a costs application in the Appeal Panel proceedings, it is to be made as follows:
(a) The party seeking costs (costs applicant) is to file with the Appeal Panel and serve on the other party (costs respondent) submissions not exceeding 5 pages, and any evidence in support, within 14 days of the date of this decision.
(b) The costs respondent is to file with the Appeal Panel and serve on the costs applicant submissions in response, not exceeding 5 pages, and any evidence, within 28 days of the date of this decision.
(c) The costs applicant is to file with the Appeal Panel and serve on the costs respondent any submissions in reply, not exceeding three pages, within 35 days of the date of this decision.
(d) Submissions filed pursuant to this order must indicate whether the filing party consents to the costs decision being determined without a further oral hearing and if not, why not.
(e) Either party may apply to the Appeal Panel in writing to vary the procedural timetable for the filing and serving of costs submissions and evidence. Such application must be made no later than the applicable date for compliance with the timetable.
I hereby certify that this is a true and accurate record of the reasons for decision of the New South Wales Civil and Administrative Tribunal.
I hereby certify that this is a true and accurate record of the reasons for decision of the Civil and Administrative Tribunal of New South Wales.
Prestige Homez Pty Ltd
Ghag [2025] NSWCATAP 93
(1990) 170 CLR 321
(2015) 233 FCR 315
(2011) 193 FCR 112
(1936) 55 CLR 499
(2020) 103 NSWLR 36
(1997) 186 CLR 622
(1993) 193 CLR 72
(1997) 186 CLR 624
(2020) 275 FCR 385
(2020) 103 NSWLR 479
(1985) 4 NSWLR 139
(1980) 144 CLR 1
(1993) 43 FCR 280
(1996) 186 CLR 389
(1925) 36 CLR 60
(1956) 94 CLR 509
(1979) 40 FLR 208
(1985) 8 FCR 264
(1995) 59 FCR 6
(1986) 162 CLR 24
(2017) 95 NSWLR 597
(2000) 101 FCR 548
(1990) 170 CLR 534
(2005) 13 VR 435