[2026] VSC 94
General information, not legal advice.
Supreme Court of Victoria
2026-03-06
Barrett AsJ
Original judgment source is linked above.
PRACTICE AND PROCEDURE - Legal professional privilege - Section 118(c) of the Evidence Act 2008 (Vic) - Plaintiffs engaged lawyers to provide legal services in relation to building dispute - Lawyers subsequently engaged experts - Whether dominant purpose of communications between lawyers and experts was for legal advice - Whether evidence from lawyer who did not author communications was sufficient evidence of dominant purpose - Inferences to be drawn from context - AWB v Cole (No 5) [2006] FCA 1234; (2006) 155 FCR 30 - Court's discretion to inspect documents over which privilege claimed pursuant to s 133 of the - considered -Whether plaintiffs' selective disclosure of privileged material in pleading constitutes waiver of privilege in undisclosed documents - Meaning of 'inconsistency' in - ; - Held: Documents privileged but privilege waived.
(a) whether the plaintiffs have established that the dominant purpose of the communications was for legal advice; and
(b) whether any privilege has been waived.
First retainer: Structural Assessment Engagement
(a) Document 1 (MPN.001.001.0495) which is a retainer letter from Allens to MPN dated 23 July 2019.[6]
(b) Document 10 (MPN.001.013.0220) that the plaintiffs have agreed to disclose.
(c) Document 16 (MPN.004.001.0001) which is a letter of instruction from Allens to MPN dated 18 November 2019.
Second retainer: Stage 7 Works Engagement
Retainer Letter-QIC-Pacific Werribee Shopping Centre
We act for QICP Pty Ltd (QIC) in relation to certain incidents at the Pacific Werribee Shopping Centre (Pacific Werribee).
1 Background
QIC engaged Probuild to refurbish and expand Pacific Werribee (the Agreement).
There have recently been certain incidents at Pacific Werribee involving the cracking and falling of concrete within the centre (Defects). Probuild has engaged Calibre Professional Services Pty Ltd (Calibre) to carry out rectification works in relation to those incidents.
Allens is providing advice to QIC (in its capacity as agent for the owners of Pacific Werribee) in relation to:
(a) potential claims that QIC may have against Pro Build and/or Calibre in relation to the Defects; and
(b) potential claims against QIC by third parties affected by the Defects.
2 Scope of your retainer
The scope of works the subject of this retainer is set out below.
You are instructed to:
(a) review the rectification works which Probuild and/or Calibre propose to undertake at Pacific Werribee, in order to bring Pacific Werribee into conformity with the Agreement. QIC expects that these works will include:
(i) a full site inspection of the centre, including the inspection of all expansion joints; and
(ii) the rectification of all Defects;
(b) carry out a review of all works carried out by Probuild and/or Calibre at Pacific Werribee, with a focus on the structural integrity of the concrete and the expansion joints;
(c) provide us a report setting out the findings of your review.
(a) identify the safety and health risks associated with the Defects;
(b) consider whether the identified risks are well known and whether there are well established and accepted control measures for the risks;
(c) if the identified risks are not well known or there are not well established and accepted control measures for the risks, conduct a formal risk assessment in respect of the risks;
(d) prepare a report addressing your opinion as to:
(i) whether the existing controls in respect of the risks to health and safety eliminate the risks so far as is reasonably practicable; or, if not, minimise those risks so far as is reasonably practicable;
(ii) any additional, reasonably practicable short, medium and long term control measures that should be implemented in respect of any residual risks to health and safety.
Retainer Letter-QIC-Pacific Werribee Shopping Centre
We act for QICP Pty Ltd (QIC) (in its capacity as agent for the owners of Pacific Werribee) in relation to certain incidents at the Pacific Werribee Shopping Centre (Pacific Werribee) associated with the works undertaken by Probuild Constructions (Aust) Pty Ltd (Probuild). This retainer supersedes your retainer dated 6 August 2019.
1 Background
QIC engaged Probuild On 21 March 2014 Probuild was engaged to refurbish and expand Pacific Werribee, pursuant to a design and construct contract (Contract Agreement). The works undertaken by Probuild are referred to as the "Stage 7 Works."
There have recently been certain incidents at Pacific Werribee whereby concrete within the centre has cracked and fallen. involving the cracking and falling of concrete within the centre (Defects). Pro build has engaged Calibre Professional Services Pty Ltd (Calibre) to carry out rectification works in relation to those incidents.
Allens is providing advice to QIC (in its capacity as agent for the owners of Pacific Werribee) in relation to:
(a) potential claims that QIC may have against Probuild (and/or Calibre other downstream contractors) in relation to the Defects Stage 7 Works; and
(b) potential claims against QIC by third parties affected by the incidents at the Defects Stage 7 Works.
2 Scope Basis of Your Retainer
You are retained to provide your independent expert opinion in relation to the defects with respect to the Stage 7 Works. This includes providing a written report setting out your expert opinion. If we instruct you to commence working on this matter and/or provide a written report, we will provide you with a brief, along with questions and relevant assumptions in the form of a letter of instruction at that time.
We may rely on your report as evidence in any proceedings against Probuild.
The scope of works the subject of this retainer is set out below.
You are instructed to:
(a) review the rectification works which Pro build and/or calibre propose to undertake at Pacific Werribee, in order to bring Pacific Werribee into conformity with the agreement. QIC expects that these works will include:
(i) a full site inspection of the centre, including the inspection of all expansion joints; and
(ii) the rectification of all Defects;
(b) carry out a review of all works carried out by Pro build and/or calibre at Pacific Werribee, with a focus on the structural integrity of the concrete and the expansion joints;
(c) provide us a report setting out the findings of your review.
(a) identify the safety and health risks associated with the Defects;
(b) consider whether the identified risks are well-known and whether there are well-established and accepted control measures for the risks;
(c) if the identified risks are not well-known or there are not well established and accepted control measures for the risks, conduct a formal risk assessment in respect of the risks;
(d) prepare a report addressing your opinion as to:
(i) whether the existing controls in respect of the risks to health and safety eliminate the risks insofar as is reasonably practicable; or, if not, minimise those risks so far as is reasonably practicable;
(ii) any additional, reasonably practicable short, medium and long-term control measures that should be implemented in respect of any residual risks to health and safety.
(a) refers to the expert witness code of conduct applicable in Victoria;
(b) states that the creator of the report may be required to give evidence;
(c) includes, as a term, that any report or other document created in consequence of the retainer is confidential and may be subject to a claim of legal professional privilege; and
(d) requests that any document created by MPN contain the header 'Confidential & Privileged: Prepared for the Dominant Purpose of Litigation.'
Allens is providing advice to QIC (in its capacity as agent for the owners of Pacific Werribee) in relation to potential action by WorkSafe Victoria in respect of the Defects.
2 Instructions
You are instructed to prepare a brief written report in the form of a letter which summarises the results of your inspections and review of relevant materials to date.
Please include in your report your opinion as to:
(a) the safety and health risks associated with the Defects;
(b) whether the existing controls in respect of the risks to health and safety eliminate the risks so far as is reasonably practicable; or, if not, minimise those risks so far as is reasonably practicable;
(c) any additional, reasonably practicable, short, medium and long term control measures that should be implemented in respect of any residual risks to health and safety.
We refer to:
- the Werribee Plaza Shopping Centre Design and Construction Contract dated 21 March 2014 (Contract); and
• your retainer signed by you on 22 November 2019 (Retainer);
- your letter of instruction dated 25 November 2019.[11]
This letter of instruction is issued pursuant to, and is subject to, the terms of your Retainer ...
1 Instructions
You are instructed to prepare a written report or reports (Expert Report) which:
(a) as to any seismic defects in Stage 7 of Pacific Werribee:
(i) details your view on whether Stage 7 complied with the requirements of:
[the Contract and various Building and Australian Standards] (together, the Compliance Standards);
(ii) provides your opinion as to an appropriate permanent rectification solution and design which could be implemented to bring the Stage 7 Works into conformity with the requirements of each of the Compliance Standards;
(iii) provides your opinion as to whether the proposed permanent rectification solution is reasonable and necessary to bring the Stage 7 works into conformity with the requirements of each of the Compliance Standards;
(iv) provides your opinion on any scope, cost, timing and disruption differential between the permanent rectification solutions identified at (a)(ii);
(b) as to any corbel joint defects in Stage 7 of Pacific Werribee:
(i) updates the Structural Assessment Report on Stage 7 Carpark and Retail Concrete Movement Joints dated 25 September 2019 in light of any information obtained since that date;
(ii) details your view on whether Stage 7 complied with the requirements of the Compliance Standards;
(iii) provides your opinion as to an appropriate permanent rectification solution and design which could be implemented to bring the Stage 7 Works into conformity with the requirements of the Compliance Standards;
(iv) provides your opinion as to whether the proposed permanent rectification solution is reasonable and necessary to bring the Stage 7 works into conformity with the requirements of each of the Compliance Standards;
(v) provides your opinion on any scope, cost, timing and disruption differential between the permanent rectification solutions identified at (b)(a)(ii);
(c) as to any other defects in Stage 7 of Pacific Werribee:
(i) details your view on whether Stage 7 complied with the requirements of the Compliance Standards;
(ii) provides your opinion as to an appropriate permanent rectification solution and design which could be implemented to bring the Stage 7 Works into conformity with the requirements of the Compliance Standards;
(iii) provides your opinion as to whether the proposed permanent rectification solution is reasonable and necessary to bring the Stage 7 works into conformity with the requirements of each of the Compliance Standards;
(iv) provides your opinion on any scope, cost, timing and disruption differential between the permanent rectification solutions identified at (c)(a)(ii).
(a) a report dated 25 September 2019 (MPN.001.004.0519) ('2019 Report');
(b) a report dated 7 September 2021 (MPN.001.001.9469) ('2021 Report'); and
(c) a report dated 7 February 2022 (MPN. 001.004.0001) ('2022 Report')[13]
References to the MPN Reports in the pleadings
(a) all retainer(s) and letter(s) of instruction for the reports of MPN Group Pty Ltd (MPN) dated 25 September 2019 (MPN.001.004.0519) (2019 Report); 7 September 2021 (CLB.001.004.9741) (2021 Report) and 7 February 2022 (MPN. 001.004.0001) (2022 Report), including the letter of instruction dated 25 November 2019 and retainer letter signed on 22 November 2019; > > (b) any further reports from MPN provided in relation to the Stage 7 Works that have not yet been disclosed and all retainer(s) and letter(s) of instruction relating to those further reports; > > (c) all file notes and other documents that record any instructions given to MPN in relation to the 2019, 2021 and 2022 Reports, and in relation to any other reports provided under subparagraph (b) above (Relevant Instructions).
Production of documents and claim for privilege
(a) pursuant to orders 51(a)-(c), disclosing 33 documents; and
(b) pursuant to orders 52 and 53, producing a schedule of 18 documents which were responsive to orders 51(a), (b) and (c) but were, in respect of 17, wholly privileged, and in respect of one, partially privileged and redacted.[15]
(a) there is no valid basis for any redactions based on relevance;
(b) the plaintiffs have not established a valid claim for privilege; and
(c) any privilege has been waived.
Evidence is not to be adduced if, on objection by a client, the court finds that adducing the evidence would result in disclosure of -
...
(c) the contents of a confidential document (whether delivered or not) prepared by the client, lawyer or another person -
for the dominant purpose of the lawyer, or one or more of the lawyers, providing legal advice to the client.
The evidence must reveal the relevant characteristics of each document in respect of which privilege is claimed, and must do so by admissible direct evidence, not hearsay.[21]
Where a lawyer has been retained for the purposes of providing legal advice in relation to a particular transaction or series of transactions, communications between the lawyer and the client relating to that transaction will be privileged, notwithstanding that they do not contain advice on matters of law; it is enough that they are directly related to the performance by the lawyer of his or her professional duty as legal adviser to the client. In Dalleagles, Anderson J said at 332-333 that professional discourse in a professional capacity between a solicitor and his client with reference to the transactions covered by his instructions should be regarded as prima facie for the purpose of giving and receiving advice. In his Honour's view, this would apply to any communication that is on its face a communication of a professional nature from the solicitor to the client or his agent touching the subject matter of the solicitor's engagement and any communication from the client to the solicitor in connection with that engagement. These propositions were referred to, with approval, by Allsop J in DSE at [51]-[52] and by Branson J in Wenkart v Commissioner of Australian Federal Police (unreported, Federal Court, Branson J, 11 November 1996).[22]
... this Division does not prevent the adducing of evidence if the client or party concerned has acted in a way that is inconsistent with the client or party objecting to the adducing of the evidence because it would result in a disclosure of a kind referred to in section 118, 119 or 120.
Fundamentally, I do not consider it appropriate to base a finding of a broad waiver on an argument that the Plaintiffs have disclosed a lot of documents, which the Defendant contends are privileged, and so therefore it is unfair to maintain privilege over the balance of the documents. It cannot be the case that this boils down to a numbers exercise.[30]
...the Defendant should have identified which privileged and undisclosed documents are required in order for a proper understanding of the disclosed documents to be achieved. Which documents is it inconsistent to maintain privilege over when other documents have been disclosed? The Defendant says, all of them. But this is simply too imprecise.[31]
All of the facts and circumstances deposed to herein are within my knowledge, save for those deposed to from information and belief. Where I depose to matters on information and belief, my means of knowledge and sources of information are set out in this affidavit and I believe those matters to be true to the best of my knowledge.
...
I have reviewed the documents over which the Co-owners claim privilege. I believe the facts set out below are correct based on my review of the specific documents referred to ... and my experience acting for the Co-Owners under the Stage 7 Works Engagement ... and in this proceeding.
My evidence at paragraphs 34, 37 and 38 of the Morcom 2025 Affidavit is based on my direct involvement in the Stage 7 Works Engagement. While I was not involved in the Stage 7 Works Engagement in July 2019, my subsequent involvement on the matter caused me (and required me) to understand:
(a) the scope of Allens' engagement with QICP and the Co-Owners; and
(b) the work undertaken on the Stage 7 Works Engagement prior to my involvement, including which Allens Partners and employees were involved in that work.
... the 13 documents (over which the Co-Owners claim privilege) were communications or related to work carried out under the Stage 7 Works Engagement, was based on my involvement in the Stage 7 Works Engagement.[32]
... the legal services provided by Allens in relation to the Stage 7 Works Engagement and the Structural Assessment Engagement were provided under separate engagements with separate matters numbers. The Structural Assessment Engagement was administered by Allens under the matter 'Portfolio Structural Review' and the Stage 7 Works Engagement was administered by Allens under the matter 'Pacific Werribee'. It is Allens' matter management practice and my experience at Allens on the Stage 7 Works Engagement and generally, that work products prepared, sent or received by Allens are saved to the matter to which they concern.[33]
(a) The MPN Retainers concerned structural engineering matters. Allens was merely a conduit, and any advice given by Allens was not legal advice.[35]
(b) Allens has failed to adduce the best available evidence such as: any letter of engagement between QICP and Allens; any evidence from anyone at QICP as to the terms of the engagement; or any evidence from Mr Pappalardo who had the conduct of the matter in Allens up until about September 2020.
(c) Based on the terms of the Structural Assessment Engagement document and the function called upon by MPN, the Court cannot be satisfied that the report commissioned by Allens is not a document that would have been produced regardless of any purpose of providing legal advice and, therefore, legal advice cannot be said to be its dominant purpose.
(a) Evidence from the maker of the communication will not be conclusive and 'in the usual run of cases, will not even be necessary.'[36] Further, hearsay evidence is admissible[37] and a deponent who lacks knowledge of the circumstances in which the communication is made will not necessarily be fatal.[38]
(b) Ms Morcom is well-placed to depose to relevant matters having regard to the fact that: she has carriage of the matter; is a partner of the law firm which provided legal advice to QICP and the plaintiffs at the relevant time; and has directly acted for the plaintiffs in relation to the Stage 7 Works Engagement since September 2020.
[The] level of detail required to support claims for privilege is very situation specific, and varies according to, among other things, the nature of the proceeding, the number of documents over which privilege is claimed, the number of and roles of the authors and recipients of the documents concerned, and whether the privilege claimed is advice privilege or litigation privilege.[39]
(a) Allens is a law firm. It is not a building and construction firm, nor is it a firm of engineers, nor an occupational health and safety advisory business. I conclude that, prima facie, the communications it had with MPN, in the circumstances, were for the purposes of providing legal advice in relation to building and construction issues, and their possible consequences, at the Werribee Centre.[40]
(b) Allens has been engaged since March 2019 to provide legal services in relation to the subject matter of this proceeding, which involves complex questions of defects in building and construction, and risks associated with them.
(c) Since Allens was engaged, it is likely that several lawyers have worked on the matter. It appears that up until September 2020, Mr Pappalardo, a partner at Allens, worked on the matter.
(d) Ms Morcom, as a partner with the day-to-day carriage of the proceeding since about September 2020, deposes that she has knowledge of the matters deposed to, save where expressed to be from information and belief. Ms Morcom says she has read the Privilege Documents. Ms Morcom also says that Allens has provided the plaintiffs legal advice in relation to a number of matters, including the matters identified by her in her 2025 affidavit.[41]
(a) Allens was engaged to provide legal advice to QICP and the plaintiffs;
(b) Allens, in that capacity, engaged MPN to prepare reports for the purpose of providing legal advice; and
(c) documents received by Allens from MPN were provided for the purposes of providing legal advice to Allens' clients.
The properties that QIC wishes to give priority to are the Pacific Werribee Shopping Centre in Werribee, Victoria (Pacific Werribee) and the [... REDACTED ...].
(a) First, the claim for privilege is based on what may, at best, be described as very weak evidence, given that it is from Ms Morcom who does not have relevant direct knowledge. I have addressed this broad objection to Ms Morcom's evidence above at paragraph 52.
(b) Second, Ms Morcom's evidence in paragraphs 53(a)-(e) of the 2025 Morcom Affidavit has no probative value because she did not sign the letter of instruction dated 25 November 2019 and has no direct knowledge of the retainer's purpose. It can therefore readily be inferred that the document was prepared for multiple purposes. I disagree with this submission. The purpose of a communication is to be determined from the content of the document understood in its full context.[54] For the same reasons, I reject the submission that Ms Morcom's statement that the choice of language between 'advice' and 'legal advice' is significant, or that it leads to any different conclusion.
(c) Third, the advice given in the covering letter of document 18 is concerned with 'health and safety risks' rather than legal advice. I do not agree. As discussed above, Allens is a law firm, and the ready inference to be drawn from the circumstances is that it engaged MPN for the purposes of providing legal advice. The fact that advice may have been given concerning health and safety issues does not mean that it does not constitute legal advice concerning those health and safety issues. Legal advice about building and construction issues does not become building and construction advice simply because that is the factual background giving rise to the need for the advice.
were attached to a communication between Allens and QICP as agent for the Co-Owners under the Stage 7 Works Engagement in which Allens provided legal advice.[59]
(a) Ms Morcom's evidence is 'mere assertion and conclusion' that falls short of the requisite standard;
(b) Ms Morcom's evidence is based only on her review of the documents and is therefore inadmissible opinion and of no probative value;
(c) the descriptions demonstrate that their purpose relates to 'assessment and mitigation of health and safety issues' and therefore the Court cannot be satisfied what the dominant purpose is; and
(d) any privilege has been waived.
An instruction from Allens to MPN for a revised report concerning the western retail area of the Pacific Werribee Shopping Centre ... in relation to the letter from MPN to Allens dated 22 July 2020, being MPN.001.001.0806 that was prepared under the stage 7 works Engagement.
WADREN PTY LTD (ACN 005 537 235) IN ITS CAPACITY AS TRUSTEE FOR THE HOPPERS CROSSING UNIT TRUST (ABN 83 405 769 465)
QIC WERRIBEE PTY LTD (ACN 624 121 204) AS TRUSTEE FOR THE QIC WERRIBEE TRUST (ABN 76 994 021 211)
PROBUILD CONSTRUCTIONS (AUST) PTY LTD (SUBJECT TO A DEED OF COMPANY ARRANGEMENT) (ACN 095 250 945)
PACIFIC SHOPPING CENTRES AUSTRALIA PTY LTD (ACN 005 537 244)
KPMG PROPERTY & ENVIRONMENTAL SERVICES PTY LTD (ACN 103 479 992)
[1] The most recently filed Statement of Claim was filed on 5 July 2024 although a Draft Second Further Amended Statement of Claim was served (but not filed) on 23 January 2026. The parties proceeded on the basis that the latter Statement of Claim was the relevant one to have regard to. The relevant paragraphs in the Further Amended Statement of Claim are paragraphs [344]-[356]. There is broad correspondence between paragraphs [344]-[349] of the 2026 FASOC and paragraphs [248]-[252] of the 2024 FASOC. Paragraphs [347], [350]-[355] of the 2026 FASOC are additions that do not appear in the 2024 FASOC.
[2] In this ruling, the term 'Privilege Documents' refers to the 20 documents identified in two different privilege schedules provided by Allens to the defendants. The first privilege schedule provided to the defendants on 10 September 2025 identified 18 documents over which the plaintiffs claimed privilege. Following this, on 9 December 2025, Allens provided the defendants with a revised privilege schedule which listed 13 documents over which the plaintiffs maintained a claim of privilege. Out of the 13 documents, two documents (documents 19 and 20) are additions to the first privilege schedule. The remaining 11 documents are documents over which the plaintiffs either maintain a privilege claim or maintain that the redacted portion of the document redacts irrelevant material. The documents omitted in the revised schedule are documents over which the plaintiffs no longer claim privilege. As explained below, these schedules were provided following orders made by Stynes J in August 2025. At the hearing of this application, the plaintiffs provided the Court with the full list (that is, the 20 documents in toto) of the Privileged Documents. In this ruling, 'Updated Privilege Schedule' refers to this list of 20 documents.
[3] Cargill Australia Ltd v Viterra Malt Pty Ltd (No 8) [2018] VSC 193, [43], [52] ('Cargill v Viterra').
[4] Esso Australia Resources Ltd v Federal Commissioner of Taxation [1999] HCA 67; (1999) 201 CLR 49, [52] (Gleeson CJ, Gaudron J and Gummow J) ('Esso').
[5] Affidavit of Corin Eileen Morcom affirmed on 9 December 2025, CEM-8: 73-77 ('2025 Morcom Affidavit').
[7] Ibid [35]-[36], CEM-8: 78-81, CEM-8: 82-91.
[14] See 2024 FASOC [248], [250], [251], [252]; 2026 FASOC [347], [350]-[355].
[15] Affidavit of Andrew Charles Brennan sworn on 28 October 2025, ACB-1: 1-3.
[16] Esso (n 4) [61] (Gleeson CJ, Gaudron and Gummow JJ); Energy Resources Limited v Cactus Wellhead Australia Pty Ltd [No 3] [2025] WASC 100, [89] ('Energy Resources v Cactus Wellhead').
[17] Esso (n 4) [172] (Callinan J), cited in Sydney Airports Corporation Ltd v Singapore Airlines Ltd [2005] NSWCA 47, [6] (Spiegelman CJ) (Sheller JA agreeing); Carter Holt Harvey Wood Products Australia Pty Ltd v Auspine Ltd [2008] VSCA 59, [2] (Maxwell P and Redlich JA) ('Carter Holt v Auspine'); IOOF Holdings v Maurice Blackburn [2016] VSC 311, [47(5)].
[18] Waugh v British Railways Board [1979] UKHL 2; [1980] AC 521, 543 (Edmund-Davies LJ); AWB Ltd v The Honourable Cole (2006) 152 FCR 382, [105].
[19] Barnes v Commissioner of Taxation [2007] FCAFC 88; (2007) 67 ATR 284, [8].
[20] Giurina v Director of Public Prosecutions [2020] VSC 1, [82]; Racing New South Wales v Racing Victoria Ltd (No 2) [2024] NSWSC 312, [14].
[21] Hancock v Rinehart [2016] NSWSC 12, [7] (citations omitted), cited in Berhero Pty Ltd v Senibina Sentral Sdn Bhd [2025] NSWSC 868, [46].
[22] AWB Ltd v Cole (No 5) [2006] FCA 1234; (2006) 155 FCR 30, [47] (citations omitted) ('AWB v Cole').
[23] Energy Resources v Cactus Wellhead (n 16) [93], citing Pratt Holdings Pty Ltd v Federal Commissioner of Taxation [2004] FCAFC 122; (2004) 136 FCR 357, [41] (Finn J), [52] (Merkel J), [105] (Stone J).
[24] Energy Resources v Cactus Wellhead (n 16) [94], citing Commissioner of Australian Federal Police v Propend Finance Pty Ltd (1997) 188 CLR 501, 507-509 (Brennan CJ), 544 (Gaudron J), 554 (McHugh J), 571-572 (Gummow J), 587, 590 (Kirby J) ('Propend Finance').
[25] New South Wales v Betfair (2009) 180 FCR 543, [54].
[26] Viterra Malt Pty Ltd v Cargill Australia Ltd [2018] VSCA 118; (2018) 58 VR 333, [74] ('Viterra v Cargill'). The Court cited the alternative tests as 'centrality', 'all relevant communications' and 'materially affecting or contributing to'. The trial judge in Viterra (see [28]) had proceeded on the basis that '[t]he confidential communication has to be sufficiently central to the issue that the content of the communication is necessarily opened up by the assertion of the issue.'
[28] GR Capital Group Pty Ltd v Xinfeng Australia International Investment Pty Ltd [2020] NSWCA 266, [57].
[29] Bradford v Devlot 17 Pty Ltd (No 3) [2021] VSC 368, [236], [240].
[32] Affidavit of Corin Eileen Morcom affirmed on 27 January, [23] ('2026 Morcom Affidavit').
[35] Each of the defendants clarified that they did not suggest Ms Morcom had engaged in any misconduct, rather it was a case of her failing to discharge the onus.
[36] Asahi Holdings (Australia) Pty Ltd v Pacific Equity Partners Pty Ltd [2013] FCA 998, [38] ('Asahi v Pacific Equity').
[37] Supreme Court (General Civil Procedure) Rules 2025 (Vic) r 43.03(2) ('Rules'); Evidence Act 2008 (Vic) s 75.
[38] Setka v Dalton (No 2) (Legal Professional Privilege) [2021] VSC 604, [74]-[75].
[41] 2025 Morcom Affidavit (n 5) [28]-[48].
[46] 2025 Morcom Affidavit (n 5) [51]-[52].
[49] Affidavit of Andrew Charles Brennan sworn on 24 December 2025, ACB-2: 143.
[50] 2025 Morcom Affidavit (n 5) CEM-8: 73-77.
[56] Those being the defects associated with the Stage 7 Works: see 2026 FASOC, [343].
[58] Document 3 (MPN.001.001.0825). Document 4 (MPN.001.001.0826). Document 5 (MPN.001.001.0827). Document 6 (MPN.001.001.0828).
[61] Cargill v Viterra (n 3) [32]-[36]; Kamasaee v Cth (No 2) (LPP Ruling) [2016] VSC 404, [43]-[47].
[62] Asahi v Pacific Equity (n 36) [38]. See also Cargill v Viterra (n 3).
[63] Correlates roughly to 2026 FASOC, [346(a)-(b)].
[65] Updated index document 29 (MPN.001.001.9361) 'Site Inspection 10 - dated 29 May 2020' is MPN's report to Otto of the 'propping to the Lower Ground and Ground Floors, and the exclusion areas to the Ground and Level 1 floors, on the 29th of May 2020'. Updated index document 53 (MPN.001.013.0373) is a letter from MPN to Mr Kay of Allens dated 13 August 2020 with the subject 'Recommended Reinspection of Frequency of Installed Temporary Props'.
Wadren
Probuild
(2006) 155 FCR 30
(2018) 58 VR 333
(1999) 201 CLR 49
(2006) 152 FCR 382
(2004) 136 FCR 357
(1997) 188 CLR 501
(2009) 180 FCR 543