© 2026 Zoe. All rights reserved.
Zoe is a legal information platform. Always consult the Federal Register of Legislation for authoritative text.
[2023] NSWSC 343
Supreme Court of NSW
2023-02-14
Stevenson J
Original judgment source is linked above.
omson Reuters) Category: Principal judgment Parties: Oxford (NSW) Pty Ltd (Plaintiff/First Cross Defendant) KR Properties Global Pty Ltd trading as AK Properties Group ABN 62 971 068 965 (First Defendant/First Cross Claimant) AS Coaching Pty Ltd atf Calm Properties Unit Trust ABN 19 756 796 114 trading as AK Properties Group ABN 62 971 068 965 (Second Defendant/Second Cross Claimant) Elankeeren Eswaran (Third Defendant/Third Cross Claimant) Ashay Sharma (Fourth Defendant/Fourth Cross Claimant) Pierre Kazzi (Second Cross Defendant) Representation: Counsel: T W Lynch SC with A Cameron (Plaintiff/Cross Defendants) J Horowitz (Defendants/Cross Claimants)
Solicitors: Fortis Law Pty Limited (Plaintiff/Cross Defendants) Domain Legal Pty Limited (Defendants/Cross Claimants) File Number(s): 2020/7703
Judgment
The Contract
Proper construction of the Contract
Mr Kazzi
The Builder's purported suspension of works and the Owners' termination of the Contract
The incomplete building work
The defective work - major defects
1 - Failure to build a shotcrete retaining wall along Noble Street boundary
2 - Boundary encroachments
3 - Change to basement perimeter load bearing walls
4 - Entry foyer below Noble Street level
5 - Failure to construct foyer, façade and roof in accordance with Development Approval and construction certificate drawings
6 - Failure to separate services passing through penetrations between separate fire compartments
7 - Use of plastic pipes through penetrations between separate fire compartments
8 - Defective wiring in basement
9 - Failure to install fire-rated door jambs on basement and unit fire doors
10 - Concrete strength of ground and first floor slabs below structural engineer's specifications
11 - Part of first floor concrete slab built to external brickwork
12 - Pergolas constructed using materials not fit for purpose
13 - Water and gas points installed too close to balcony balustrades, enabling children to climb and fall
14 - Leaking through double brick parapet wall
15 - Failure to design or construct wheelchair access to Unit C1
16 - Failure to comply with fire resistance requirements
The minor defects
Events leading to the purported suspension of works by the Builder on 20 March 2018 - the lift issue
The purported suspension of works by the Builder
Invoice 6880
Invoice 690
Invoice 691
Invoices 685 and 686
Resumption of work by the Builder
Conclusion concerning the Builder's purported suspension of the works
Events thereafter
Termination of the Contract
The claim against the Builder
Damage
The methodology adopted by the Owners
Principles
The Court proceedings
Claim for interest
The Owners' Claim against Mr Kazzi under the DBP Act
The Builder's claim for payment of its invoices
Invoice 685 - 1 July 2017 - $75,000
Invoice 686 - 1 July 2017 - $63,750
Invoice 6880 - 3 November 2017 - $17,784
Invoice 690 - 28 February 2018 - $82,210
Invoice 6916 - 19 March 2019 - $11,793.06
Invoices not pressed
Conclusion
Appendix A - Schedule of Incomplete Building Works (1806717, pdf) Appendix C (480312, pdf)
Endnotes
Oxford (NSW) Pty Ltd
KR Properties Global Pty Ltd trading as AK Properties Group ABN 62 971 068 965
[2003] VCAT 443
[2015] VCAT 1879
[2012] VSC 99
[1997] NSWSC 608
[2015] ACTSC 58
[2003] SASC 393
[2009] VCAT 760
(2019) 101 NSWLR 679
(1997) 44 NSWLR 46
(1989) 171 CLR 125
(1990) 24 NSWLR 499
(1991) 58 SASR 184
(2007) 234 CLR 330
[2000] HCA 64