[2016] VCAT 1863
mixed. The respondent was ordered to pay the applicants $13,799. Each party had liberty to apply for interest or costs, with any required hearing fee payable by the party making the application.
The owners corporations needed access to Carroll's balcony to repair concrete spalling on the building's common-property facade. VCAT found that their 31 January 2014 notice triggered a valid access obligation under special rule 26.3, and that Carroll's refusal breached that obligation. The owners corporations' later special resolution cured the lack of authorisation when the case began. Their settlement did not release the claim before Carroll provided the access he had promised, and his refusal to do so on the agreed terms amounted to repudiation. However, the applicants did not prove the extra Vertitech cost sufficiently. They recovered $13,799 for other reasonable expenses that were adequately evidenced.
AI-generated legal information, not legal advice. Zoe can make mistakes. Check the cited source, and for advice about your situation consult a qualified Australian lawyer.
3 cited instruments linked from this judgment.
2,381 words · generated 30/09/2026
Owners Corporation No. 1, No. 2 and No. 3 for plan PS434030V brought a claim against Peter Carroll, the owner of apartment 1802 at The Arkley, a high-rise building in Docklands. The dispute concerned access to the balcony of his apartment so contractors could repair concrete spalling on the building's southern facade. The facade was common property, and the owners corporations had a responsibility to repair and maintain common property.
The proposed method was to install a swing-stage frame on the balconies of apartments 1801 and 1802. A swing stage supports a suspended cradle from which workers can carry out facade work. The owners corporations' evidence was that the large balconies at those two apartments were the only places suitable for the frame. Access through apartment 1802 was also needed to carry equipment to the balcony.
The applicants first attempted to notify the residents in November 2013. The Tribunal found that they had not proved effective delivery of that notice to Carroll. The occupier of apartment 1802 nevertheless communicated that the equipment could be set up, and Vertitech installed the swing stage in early December. Carroll said he had not received notice and objected when he discovered the equipment and disruption inside the apartment. The equipment was removed on 13 December 2013.
On 31 January 2014, the applicants gave Carroll a further written notice stating that access was required from 10 February for facade maintenance. The notice referred to special rule 26.3, which required access to a balcony after 24 hours' prior written notice for maintenance of the common-property external walls and facade. Carroll did not accept the proposed arrangements, and the applicants began the VCAT proceeding on 13 March 2014.
The parties later signed settlement terms on 28 August 2014. Carroll agreed to allow access during specified periods, including February 2015 if required. The applicants were to pay $500 for inconvenience to his tenant and to meet other stated conditions. The work was not carried out in the first period. When the applicants sought access in February, Carroll rejected an open-ended period and proposed additional requirements, including a 12-day limit, supervised access, and other conditions. The proceeding was reinstated. A VCAT access order was made in September 2015, and the works were completed in September and October 2015.
The damages claim was substantially larger than the eventual award. The applicants claimed $96,254.20, including Vertitech's 2015 work and expenses for other contractors and consultants. Senior Member Vassie awarded $13,799. The order also gave each party liberty to apply for interest or costs.
The first question was whether the statute itself gave the owners corporations a right to enter. The Tribunal considered Owners Corporations Act 2006 ss 47–51. It accepted that the provisions could support an application to VCAT for an order requiring access, but found that they did not themselves compel a lot owner or occupier to allow entry. Section 50 authorised a person to enter to carry out works in the circumstances covered by the preceding provisions, but did not, in its terms, force an owner to permit entry. The Tribunal therefore distinguished statutory authority to arrange work from a presently enforceable right to enter despite refusal.
The decisive access issue was special rule 26.3. The rule required a proprietor or occupier to allow balcony access, on 24 hours' prior written notice, for maintenance of common-property external walls and facade. Carroll argued that the work was repair rather than maintenance, so the rule did not apply. The Tribunal accepted that repair and maintenance are not always synonyms. It then considered the words in context: the owners corporations had to keep the facade safe and sound, the work addressed concrete spalling and exposed reinforcement, and the rule was designed to facilitate work on that facade. It held that “maintenance” in this setting included work involving repair. A narrower reading would, in the Tribunal's view, make the rule less effective for its intended purpose.
The Tribunal found the 31 January notice was proved and met the rule. It therefore concluded that Carroll was obliged to allow access to the balcony and that refusing access breached the rule and the Act. The decision did not treat the earlier November notice as the basis of the right, because its delivery to Carroll had not been proved.
The applicants also relied on an implied easement under s 12(2) of the Subdivision Act 1988. The Tribunal considered the two statutory conditions described in Body Corporate No 413424R v Sheppard: the easement must be necessary for reasonable use and enjoyment of the benefited property, and it must be consistent with reasonable use and enjoyment of the affected property and other lots. The Tribunal considered balcony access consistent with reasonable use, but not necessary. Scaffolding was a possible alternative, and the evidence did not establish that it was infeasible or prohibitively expensive. It therefore rejected the easement argument. This was an alternative ground, because the rule-based access right had already been found.
There was also a procedural objection. Section 18 required a special resolution for the proceeding because it sought damages as well as enforcement of the rules. No special resolution existed when the case began. Before the hearing, however, the owners corporations obtained a resolution authorising them to continue the proceeding to pursue damages. The Tribunal construed “continue” in context as a ratification of the proceeding from its commencement. It treated the initial defect as a curable procedural irregularity and found no evidence that the timing of the later resolution prejudiced Carroll.
The settlement defence turned on the objective meaning of the signed terms. The Tribunal considered the text and the circumstances known to the parties, including that access had been disputed and was the central purpose of the settlement. It concluded that the applicants were not giving up their claims simply in exchange for Carroll's promise. The intended settlement depended on him actually allowing access. The Tribunal also found that both sides had to co-operate to agree dates within the February period. Carroll did not do so and instead sought to impose new restrictions. Objectively, his position was inconsistent with performing the settlement as written. The applicants accepted that repudiation by applying to reinstate the case.
The decision applied the existing statutory and contractual framework rather than announcing a new general statutory right of entry. Before the decision, the relevant Act provisions addressed owners corporation powers and procedures for undertaking or requiring works. The Tribunal's reading was that those provisions did not, by themselves, force an owner or occupier to allow entry. Where access was refused, the owners corporation could seek a Tribunal order.
The practical significance of rule 26.3 was that the registered rule supplied a separate access obligation when its conditions were met. In this dispute, that meant prior written notice and access to a balcony for facade maintenance. The Tribunal read “maintenance” in its context rather than treating it as a narrow technical category that excluded work described as repair. It did not say that every repair project will necessarily constitute maintenance under every owners corporation rule. Its reasoning depended on the wording, purpose and physical circumstances of this rule and this facade work.
The implied easement analysis applied s 12(2) of the Subdivision Act and the approach in Sheppard. The Tribunal treated “necessary” as requiring more than convenience or a cheaper method. An alternative could be inconvenient or more expensive without necessarily making an easement essential. The evidence here did not establish that scaffolding was not reasonably available. The decision therefore illustrates the importance of evidence about alternatives, safety, cost and physical constraints when an implied easement is asserted.
On authorisation, the decision applied the principle that a later special resolution can cure an initial procedural irregularity where it ratifies commencement. It rejected an argument that the resolution's use of the word “continue” was insufficient. The Tribunal's conclusion rested on the proposed resolution and explanatory material as understood by a reasonable member, together with the absence of evidence of prejudice from the timing.
On settlement, the decision used objective construction and treated actual performance as central to whether the claim had been released. It also applied the idea that parties must co-operate where agreed performance requires both to settle a matter such as dates. The judgment does not establish that every settlement is conditional on performance: the conclusion depended on the particular wording and surrounding circumstances.
Finally, the damages reasoning emphasised proof. A finding of breach did not make the entire claimed cost recoverable. The applicants needed evidence linking the claimed amounts to the breach and establishing a sound calculation of loss. In particular, the unexplained Vertitech allowance prevented recovery of that large item.
The Tribunal said ss 47–51 “might provide a basis” for an application for an access order, but “do not themselves confer any right of access or entry.” In plain English, the Act provisions identified by the applicants did not automatically let them enter when Carroll objected. They could seek an order requiring access.
The Tribunal rejected a narrow reading of “maintenance” in rule 26.3. It said that excluding work involving repair would construe the rule “narrowly and pedantically.” In plain English, the label attached to the concrete work did not decide the question. The Tribunal considered what the work was doing and the rule's purpose, which was to facilitate keeping the common-property facade safe and sound.
On the easement, the Tribunal concluded that access was not “necessary” because an alternative method remained available on the evidence. In plain English, the swing-stage approach may have been more economical, but that did not prove that an easement was essential. The evidence did not establish that scaffolding was impossible or not reasonably available.
On settlement construction, the Tribunal said the parties' meaning had to be determined “objectively.” In plain English, it did not decide the effect of the agreement by accepting one party's later account of what they privately intended. It examined the wording, known circumstances and purpose of the terms.
On damages, the Tribunal found a “large gap” in the proof because nobody explained how the $15,731.30 credit against Vertitech's original contract was calculated. In plain English, the Tribunal could not reliably calculate the additional cost caused by the delay. It refused to guess at the missing amount and instead awarded the separately evidenced expenses it accepted.
The access reasoning is most relevant where an owners corporation relies on a registered rule requiring access to a lot or balcony after notice, and the owner disputes whether the proposed work falls within the rule's stated purpose. The judgment makes the wording of the particular rule important. Here, the rule expressly covered balcony access for maintenance of external walls and the facade, and the work was needed to address dangerous concrete spalling on those common-property structures.
The decision is also relevant where statutory provisions authorise an owners corporation to arrange or require work, but an owner refuses entry. Its distinction between authority to arrange works and an obligation to permit entry indicates that the precise source of access should be identified. The decision does not establish a general right of forcible entry.
For an implied easement claim, the reasoning is relevant where access through private property is asserted to be essential for work on common property. Evidence about viable alternatives matters. Relevant issues identified in the judgment include physical feasibility, safety and cost. A preferred or economical method alone may not establish that an easement is necessary.
For settlement disputes, the case is relevant where an agreement makes future access dependent on dates or conditions that still require co-operation. The Tribunal assessed whether a party's refusal or attempted renegotiation was inconsistent with the agreement's central obligation. The specific settlement wording remains critical.
For damages claims, the decision is relevant where the claimant can show breach but the claimed amount depends on a calculation, credit or comparison that is not explained by evidence. The Tribunal separated the inadequately proved Vertitech item from the other expenses that it accepted as reasonable, properly incurred and consequential.
The supplied judgment contains no information about later judicial consideration of this decision. It therefore does not establish whether a later court or tribunal has followed, distinguished, limited or otherwise treated Owners Corporation No. 1 - PS434030V v Carroll.
The judgment itself refers to earlier authorities, including Sheppard on implied easements, Avranik on construction of owners corporation rules, and authorities on settlement construction, co-operation, repudiation and damages. Those citations show the legal sources Senior Member Vassie considered, but they are not evidence of how later courts treated this particular VCAT decision. No subsequent cases should be inferred from the supplied text.
The judgment does not decide the scope of access required under every owners corporation rule. Its interpretation depends on rule 26.3's own wording, the external-facade purpose it served, and the concrete-spalling work at issue. Different rule language or a different kind of work could raise a different construction question.
The decision also leaves open what evidence would have been sufficient to establish the implied easement in this setting. The Tribunal suggested that evidence of a probability of damage to the building from scaffolding, or evidence that scaffolding was prohibitively expensive and infeasible, might have affected its analysis. It did not decide what precise degree of risk or cost would satisfy the statutory test.
The settlement analysis does not resolve how a differently worded release would operate, or when a settlement expressly states that claims are released upon signature regardless of later performance. The Tribunal decided only the objective meaning of the terms before it.
Finally, the judgment does not provide a general method for quantifying delay-related construction costs. It shows that the particular Vertitech claim failed for lack of satisfactory evidence about the contract credit and resulting additional cost. It does not specify what expert evidence or accounting material would necessarily have been sufficient in another case.
This is general legal information, not legal advice. Zoe can make mistakes. Before acting on this, relying on it, or using any draft, have a qualified Australian lawyer check it.
Special resolution - no special resolution before commencement of proceeding - ratification by later special resolution - Owners Corporations Act 2006 s18.
Easement - whether an implied easement over the lot or the balcony on the lot - Subdivision Act 1988 s12(2).
Terms of settlement - claim for damages following refusal of access - settlement conditional upon respondent allowing access in performance of the terms.
Owners Corporation No. 1 - PS434030V v Carroll (Owners Corporations) [2016] VCAT 1863
1. The respondent must pay the applicants $13,799.00.
26.3 A proprietor or occupier of a lot must grant to the Body Corporate its servants and agents upon the member being given twenty-four (24) hours prior written notice, the right of access to any balcony forming part of the Lot for the purpose of maintenance of the external walls of the Common Property and the cleaning of the outside of the windows and the external façade of the Common Property.
What was called a Body Corporate in 2001, when the rules were registered, is now called an owners corporation.[3]
(a) the owners corporations did not have any right of access unless and until they gave proper notice as required by rule 26.3;
(b) such notice was not ever given to him or to his tenant;
(c) there is no implied easement over lot 1802 for the benefit of the owners corporations;
(d) the dispute was settled by terms of settlement dated 28 August 2014;
(e) in accordance with and in performance of the terms of settlement he gave access to the owners corporations so that their contractors could do all necessary work;
(f) by reason of (d) and (e) the owners corporations are barred from pursuing the claim for damages;
(g) the amount claimed is excessive and no amount of damages has been properly proved.
(i) Louie Panagakos, the building manager for "The Arkley", who also resided in an apartment on the 18th storey;
(ii) Christopher Liew, who at all material times until July 2014 was employed by the owners corporations' manager, Melbourne Inner City Management Pty Ltd ("MICM") and had the conduct of their management;
(iii) Casimir Lukauskas, who at all material times since July 2014 has been employed by MICM and has had the conduct of the owners corporations' management;
(iv) Petrus Siemonsma, the general manager of Vertitech Australia Pty Ltd ("Vertitech"), the company which performed the repair work on the building's facades; and
(v) Andrew Parlour, who is a member of the owners corporations' committee and also a partner in the firm Russell Kennedy, solicitors.
We write as the Owners Corporation managers of this development and seek your co-operation in providing access into your apartment and balcony to facilitate the Concrete Spalling Works by the appointed contractor, Vertitech Australia Pty Ltd.
They will require access for 10 to 15 working days, weather permitting, to complete this task on your side of the façade. Safety checks will usually take 5 to 10 minutes each and is done at the start of the working day from
7am and further checks throughout the day, as required, depending on the tasks at hand. Please note that equipment set-up will require more time initially.
Your co-operation in this matter is very much appreciated to ensure these works are completed without undue delays. The Owners Corporation will be subject to additional costs, per the terms of the contract, if delays are caused by the lack of access to the building. Unfortunately, this will undoubtedly result in more costs passed to all owners that the Owners Corporation wants to mitigate.
The notice concluded with an invitation to make any enquiries to him (Mr Liew) or to Mr Panagakos, and with an apology for any inconvenience that the access might cause.
To put this matter into perspective, Vertitech has identified at least 92 areas of concrete spalling/cancer affecting balcony slab edges on this façade alone. The balcony slab edges of Lots 1801 and 1802 are also affected by concrete spalling. If this work is not done now, these slab edges will only deteriorate further with pieces of loose concrete coming away, exposing the steel reinforcement which in turn will corrode if left untreated. The end result will be structural damage and more costs to all owners to repair in the future. This affect [sic] is already occurring. We invite you to visit The Arkley to see for yourselves the concrete spalling before and after repairs.
The uncomfortable fact is that the only safe means of getting access to these slab edges is by way of a swing stage and the safest place to set this equipment up is from the balconies of Lots 1801 and 1802. The swing stage gives workmen a firm footing from which to jack hammer/break out affected concrete areas for proper repair and sealing. This they have already done on the façade facing Caravel Lane and others.
Aurecon and Vertitech have investigated access to "your" façade by other means including that from the common roof to perform these works via rope access. Unfortunately this method is simply not safe enough as workmen have minimal support, as you may appreciate, when they are dangling from ropes while working with tools etc. They cannot use swing stages from the roof either.
The Owners Corporation does require access to your Lots 1801 and 1802 in order that these concrete spalling repair works can be done, not only for your lots but many others below yours.
Aurecon Australia ("Aurecon") were the engineers and project managers for the works.
Please confirm what you mean by "serious compensation". The agreement contains an offer of $100 per week to your tenant for the duration of the works for the small inconvenience of having equipment located on your balcony. The current proposal is based on your balcony being accessed from Lynne's to avoid any need to access your apartment.
I do not see why there should be "something in it for you". You have not suffered any loss. The inconvenience of having to deal with issues like this is part of owning and residing in an apartment complex. It is unfortunate that you feel as though you should profit at the expense of other owners.
THE OWNERS CORPORATION HEREBY GIVES NOTICE TO YOU, LYNNE AND YOUR TENANT that it requires access to Lots 1801 and 1802 for the period commencing Monday 10 February 2014 for the purpose of the Owners Corporation maintaining the external walls and façade of common property. Access is required each day until the maintenance works have been completed and all equipment has been removed. This notice is given under Rule 26.3 of the Rules of the Owners Corporation which requires a proprietor or occupier of a lot to grant access to any balcony forming part of a Lot on 24 hours prior notice.
THE OWNERS CORPORATION HEREBY GIVES NOTICE TO YOU, LYNNE AND YOUR TENANT to comply, at your own cost with the requirements of the Owners Corporations Act 2016 (Act), including but not limited to section 130 (Care of Common Property) and section 137 (Duties of occupiers of lots). This notice is given under rule 26.1 of the Rules of the Owners Corporation and for the purposes of the Act.
Your attention is also drawn to sections 48 to 51 of the Act.
Failing receipt of written confirmation/agreement from you, Lynne, your tenant and ACT Apartments (Recipients) BY THE CLOSE OF BUSINESS TUESDAY 4 FEBRUARY that access will be granted as currently proposed, the Owners Corporation will have no alternative but to apply to VCAT under Part 11 of the Act for an Order that each Recipient complies with the Rules of the Owners Corporation and the Act. The Owners Corporation reserves all of its rights in respect of such an application, including its right to apply for an order that the Recipients pay a sum of money by way of damages and/or restitution in respect of additional costs incurred as a consequence of the Recipients refusing to grant access to Lots 1801 and 1802 as proposed. A failure to give access to Lots 1801 and 1802 as proposed will cause the Owners Corporation to incur significant expense that is likely to run into the tens of thousands of dollars. THE OWNERS CORPORATION RESERVES ITS RIGHT TO SEEK REIMBURSEMENT OF SUCH COSTS FROM EACH RECIPIENT BY WAY OF DAMAGES AND/OR RESTITUTION.
This email is being sent by me in my capacity as a committee member of the Owners Corporation 434030V and has been authorised by the Committee of that Owners Corporation. This email and any other related correspondence is not being sent for or on behalf of the law firm known as Russell Kennedy.
(b) Notice under Rule 26.3
26.3 A proprietor or occupier of a lot must grant to the Body Corporate its servants and agents upon the member being given twenty-four (24) hours prior written notice, the right of access to any balcony forming part of the Lot for the purpose of maintenance of the external walls of the Common property and the cleaning of the outside of the windows and the external façade of the Common Property.
to construe the word "proprietor" in the rule as meaning "owner". Rules of an owners corporation should be read fairly and their import derived from a reasonable interpretation of the language they employ.[6] Read in that way, "proprietor...of a lot" and "member" in rule 26.3 both mean "lot owner" and apply to Mr Carroll with respect to apartment 1802. Mr Agardy did not contend otherwise.
plan", the plan must set out (among other things) "the present condition or state of repair" of major capital items "anticipated to require repair and replacement within the next 10 years". The word "maintain" may take colour from the work of maintenance and be used in reference to acts done or requisite to be done in the course of maintenance.[10]
the building was, on one view, a mixture of repair and maintenance or, on another and better view, "maintenance" within the meaning of that expression in rule 26.3. It is a better view because it is the result of a construction that allows the expression to take colour from the work that was required, and gives business efficacy to a rule designed to assist the owners corporations to do what might have to be done to keep the facades safe and sound. To construe the expression to mean that if what had to be done was or included "repair" it could not be "maintenance" would be to construe the rule narrowly and pedantically, in my opinion.
if the easement or right is necessary for the reasonable use and enjoyment of the lot or the common property and is consistent with the reasonable use and enjoyment of the other lots and the common property.
(a) The only economical way of repairing the balconies between levels 5 and 18 on the southern side of the building was the swing stage method. Had there been a more economical way he would have recommended it.
(b) The only places upon which the swing stage frame could be erected were the large balconies of apartments 1801 and 1802. All other balconies were only 1.5 metres deep: too small for the purpose.
(c) To set up the swing stage the equipment had to be carried through one of the apartments and onto the balconies.
(d) The use of scaffolding was a possible alternative to the use of a swing stage, but he doubted whether it was a safe method because he doubted whether the levels below level 18 could have withstood the weight of scaffolding.
condition" and to the condition that the easement or right be consistent with the reasonable use of the other lots and the common property as "the second condition". There was no dispute that in the first condition "the lot" meant the property or properties to be benefited by the implied easement. Her Honour held that "the other lots" included the lot which was to be subject to the implied easement.
In my opinion, the word "necessary" bears its ordinary meaning of "essential". It is not, however, to be construed in isolation, but in the context of the composite phrase, in which it is qualified by the broad concept of reasonable use and enjoyment of the benefited property. Further, it is the easement, rather than the function it secures, which must be "necessary". The reasonable use and enjoyment of the property not only clearly exceeds mere use, but also admits consideration of the effect on the reasonable use and enjoyment of property if the function to be achieved by the easement is unavailable and of the costs or detriments of securing the function by means other than the easement.
His Honour, in my view, correctly concluded that "necessary" meant that the easement was essential to achieving the specified function, in the sense that no alternative means of achieving the relevant function was feasible or reasonably available. It determining whether an alternative to the easement was reasonably available, all relevant circumstances, including physical factors, legal restrictions, safety considerations and cost should be considered.
While the mere possibility of an alternative to the easement would not preclude the satisfaction of the first condition, his Honour did not hold the contrary, but rather, correctly concluded that if the alternative were reasonable, although involving some inconvenience or additional cost, an implied easement would not be necessary in the relevant sense.
(a) A resolution to "continue" a proceeding is not a resolution that ratifies a decision to commence it, he submitted. I disagree. After a proceeding had been commenced the only way in which members can sensibly express approval of it is to resolve to "continue" it. It is wrong to treat the construction of a resolution of members as strictly as one would treat the construction of a statute.[20] A reasonable person in the shoes of a member of the owners corporations, having read the proposed resolution and the explanatory letter, would know that the members were voting on a proposed resolution to approve, from the beginning, for the present and for the future, the bringing of a proceeding to recover damages from Mr Carroll.
(b) The explanatory letter was misleading, he submitted. It was not. There was nothing in the letter which was inconsistent with the facts as I have found them above or with the facts I will be finding below.
(c) The special resolution was made so late, he submitted, that in the exercise of my discretion I should find that it had not cured the procedural irregularity. It is true that the resolution was made very late, a few days before the hearing of the proceeding began. It is also true that in one reported case that Mr Agardy cited the court, in holding that a special resolution had ratified a decision to begin a proceeding, stated that the procedural irregularity had been cured promptly.[21] But the case is not authority for the proposition that the irregularity cannot be cured by a ratifying special resolution made late in the proceeding. Moreover there was no evidence that Mr Carroll was prejudiced in any way by the late making of the special resolution.
Despite the wording of paragraph 10, the evidence as I understood it was that no work had been undertaken between 4 and 13 December 2013; all that had happened was that the swing stage had been set up then removed.
I have met with the contractors who were to carry out the remaining concrete repairs and they have advised that they can't guarantee that the works can be completed in the narrow window of access as proposed. Accordingly, we will need to reschedule the work to be done after the Christmas/holiday season and ask that you are happy to provide access from say 1 February 2015.
The work should take about a month but with weather being an uncontrollable factor, we can't be sure of the exact time for the works.
I have corresponded with the new owners to be of Lynne's apartment and they have agreed to provide access for the duration of the works.
I look forward to hearing from you so that we can continue our planning for the works.
No, I am not happy with a month's work being carried out. I am intending to put my property on the market in the new year, and a bloody big crane in the middle of the balcony won't help the marketing campaign one bit.
We were talking a week to 10 days being all that was required. And that's all I am interested in allowing. Get them to put more people on the job and get it done rather than drag it out after Christmas. I am happy to accommodate delays caused by adverse weather. But nothing more.
I am not sure if you are aware of it, but the Arkley Building Managers have breached the agreement that we made at the VCAT mediation a couple of months ago. The deal was that Lynne would terminate her lease three weeks early, the Owners Corp would rent her unit for three weeks prior to her settlement, I would give them access to my balcony and the concrete works would be carried out over that period.
Lynne terminated her lease as agreed, (from a few days ago) but no one has made arrangements for the works to be carried out, no one has paid her the $2,700.00 that she is now out of pocket, and the Managers are now talking about getting the work done in February, over a period of about a month. I don't know what view you take of this behaviour, but as far as I am concerned it shows a serious lack of good faith.
I don't know what planet these people are on, or why they think they can ignore the deal we reached and just carry on like they owned both of our apartments. But if they are half way interested in getting the repairs done then they had better get off their arses and get it started straight away. If they are wanting my balcony for a moth [sic] over February then we might as well go straight back to VCAT and beyond. They won't be getting access to my property at all if they don't do it now as we agreed. As you know, this is exactly the same problem we had with them about this time last year. I thought we had resolved things to everyone's satisfaction. Apparently it wasn't to their satisfaction.
The Owners Corporation are currently finalising arrangements for completion of the concrete remediation works. I have suggested that arrangements not be finalised until the Owners Corporation has agreed with you specific arrangements for access to your balcony. I understand that the new owners of apartment 1801 have agreed to their apartment being accessed for the purpose of setting up and dismantling the swing stages and for the purpose of performing daily safety checks. Access to your balcony is required for the purpose of ensuring that the works are performed in a safe manner. MICM has been instructed to do all that it can to ensure that the works are completed as soon as possible and that inconvenience to your tenant is minimised. Unfortunately the contractors are unable to commit to a fixed period to complete the works. From what I recall you were satisfied with the information that was provided in connection with the VCAT terms. Please let me know if this not the case and whether you have any particular preference for when works can commence. If suitable arrangements cannot be made then unfortunately the Owners Corporation will have little alternative other than to apply for reinstatement of the dispute before VCAT.
Andrew, I am away in New Zealand for a few days. A family funeral I have to attend. I will be back early next week.
You might want to try to revive the VCAT proceedings, because I am not in any circumstances going to accept an open ended deal. Nor will VCAT force me to accept one.
meteorology expert that says it was too dangerous to work, or no deal. You are asking my tenant to give up the enjoyment of the balcony during about the only time they ever get to enjoy it, and its not going to continue for a second longer than it needs to.
I am pretty pissed off that the Owners Corporation thought it was fine to hammer out a deal at the mediation, and then not honour their side of the deal. That's not how these things work. Its not how I work, and I don't want to deal with people who think that agreements are only binding on other people.
I think I may safely say, as a general rule, that where in a written contract it appears that both parties have agreed that something shall be done, which cannot effectually be done unless both concur in doing it, the construction of the contract is that each agrees to do all that is necessary to be done on his part for the carrying out of that thing, though there may be no express words to that effect. What is the part of each must depend on circumstances.[24]
Mr Carroll did not fulfil that duty to co-operate. At first he made no effort to agree on dates in February 2015 for the undertaking of the works and said that he would not give access to his balcony except during the first time frame. Then in his email of 2 February 2015 he attempted to renegotiate the terms of settlement by demanding that access be limited to twelve days, that the access be by "named personnel" and that the access be "supervised".
The order defined "the works" as meaning the work of repairing concrete spalling on common property in the vicinity of apartment 1802. The Deputy President reserved his decision on the application for summary dismissal of the proceeding otherwise.
Cost of making safe loose concrete spalls pending access
Repairs to concrete spalling following grant of access pursuant to VCAT orders dated 1 September 2015
Allowance for uncompleted works against original contract price for works to be performed on Arkley tower in its entirety. Amount determined by consultant AURECON
Project Management in respect of works performed pursuant to VCAT orders dated 1 September 2015
(a) Skyhooks was a firm which, before the remedial works were begun in September 2015, inspected the southern façade of the building to determine whether there had been more concrete spalling than had been evident in late 2013.
(b) Vertitech Australia Pty Ltd, as previously mentioned, was the company which had been engaged to do the remedial work on the southern façade in 2013, although it did not then do the work because of Mr Carroll's refusal of access to apartment 1802 or to its balcony, and was the company which eventually did that work in September and October 2015.
(c) Varney McLean Pty Ltd was the company engaged by the owners corporations as project manager for the works done in 2015.
(d) Aurecon Australia had been the firm engaged as consulting engineer and project manager for works done on the northern façade in 2013 and for works that were intended to have been done on the southern façade in 2013.
(e) Van Grieken and Associates Pty Ltd was a company whose director was Albert Van Grieken. He had been an employee of Aurecon Australia in 2013. The owners corporations engaged his company as a consulting engineer for the works done in 2015 because of his previous experience in that role at Aurecon Australia.
(f) Dearness Property Services Pty Ltd was engaged to dispose of drums of paint that had been intended for use on the building in 2013 but had exceeded the use by date before September 2015.
had been done in 2013. Mr Siemonsma told me access to the balconies of apartments 1801 and 1802 had not been needed for that work. The Vertitech tender was the lowest of three tenders that Varney McLean Pty Ltd had received, Mr Lukauskas told me.
[1] The admission is made in paragraph 18 of Mr Carroll's "Response to Amended Points of Claim" dated 4 August 2016.
[2] S46 of the Act. From page 44 of the plan of subdivision it would appear that the third applicant alone might have had the obligation to repair and maintain the southern façade of the building, but no objection was ever taken to the standing of the first and second applicants. Moreover, Mr Carroll has admitted that all three applicants had the obligation: see footnote 1.
[3] Schedule 2 of the Act, clause 3, is a transitional provision to that effect. Clause 5, another transitional provision, states that any rules of a body corporate in force immediately before the commencement of the Act continue in force and are deemed to be rules of the owners corporation.
[4] The email is not in the Tribunal book but is Exhibit B.
[6] Avranik Pty Ltd v Lloyd [2012] VSC 306, per Garde, J, President of VCAT. The decision was upheld on appeal: Avranik Pty Ltd v Lloyd [201] VSCA244.
[7] Halsbury's Laws of Australia, volume 16, para [245-3240].
[8] Shorter Oxford Dictionary, 3rd edition; The Macquarie Dictionary, 2nd revised edition.
[9] John Fairfax & Sons Ltd v Australia Telecommunications Commission [1977] 2 NSWLR 400 at 413.
[10] Galashiels Gas Co Ltd v O'Donnell [1949] UKHL 2; [1949] AC 275 at 286.
[11] Avranik v Lloyd: see footnote 6.
[12] Mr Siemonsma of Vertitech gave evidence to that effect.
[14] [2008] VSCA 118; (2008) 20 VR 362 at 374.
[16] The proceeding against Ms Khoury was numbered OC669/2014. This proceeding against Mr Carroll is numbered OC671/2014.
[17] Burbank Australia Pty Ltd v Owners Corporation PS 447493 [2015] VSC 160.
[18] The ballot paper form, the explanatory letter and the notice of the result of the ballot are all in the Tribunal book.
[20] Kenros Nominees Pty Ltd v Tipperary Group Pty Ltd [2009] 524 at [63], approving Myer Queenstown Garden Plaza Pty Ltd v Corporation of the City of Adelaide (1975) 11 SASR 504 at 520.
[21] 2 Elizabeth Bay Road Pty Ltd v The Owners - Strata Plan No 73943 [2014] NSWCA 409 especially at [107] - [108].
[22] Mr Beck-Godoy cited McDermott v Black [1940] HCA 4; (1940) 63 CLR 161 at 183-4 where Dixon J explained the distinction between accord and satisfaction and an accord executory.
[23] Pacific Carriers Limited v BNB Paribas [2004] HCA 35; (2004) 218 CLR 451 at 461-2; Toll (FGCR) Pty Ltd v Alphapharm Pty Ltd (2004) 219 CLR 165 at 179.
[24] Mackay v Dick (1881) 6 App Cas 251 at 253, per Lord Blackburn; cited with approval by Mason J in Secured Income Real Estate (Aust) Ltd v St Martins Investments Pty Ltd (1979) 144 CLR 597 at 607, which whose judgment the other members of the High Court agreed.
[25] Laurinda Pty ltd v Capabala Park Shopping Centre Pty Ltd [1989] HCA 23; (1989) 166 CLR 623 at 647, per Brennan J; Sopov v Kane Constructions Pty Ltd (2008) 20 VR 127.
[26] Poort v Development Underwriting (Victoria) Pty Ltd (No. 2) [1977] VicRp 52; [1977] VR 454.
[27] Freedom Homes Pty Ltd v Boros [2002] Qd R377.
[28] By the Tribunal's order made on 14 July 2016.
[29] J.L.W. (Vic) Pty Ltd v Tsiloglou [1994] VicRp 16; [1994] 1 VR 237 at 241.
Owners Corporation No. 1 - PS434030V
Carroll
(1940) 63 CLR 161
(2004) 218 CLR 451
(2008) 20 VR 362
(1975) 11 SASR 504
(2004) 219 CLR 165
(1989) 166 CLR 623
(1979) 144 CLR 597
(2008) 20 VR 127
The respondent was ordered to pay the applicants $13,799. Each party had liberty to apply for interest or costs, with any required hearing fee payable by the party making the application.