[2025] VCAT 1049
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2025-11-21
Original judgment source is linked above.
(a) the owners corporation has failed to repair and maintain common property, in breach of s 46 of the Owners Corporation Act 2006 (Vic) ('OC Act'); and
(b) Mr Raynor has refused and failed to carry out repairs and maintenance to his lot to prevent the water leak from his lot causing damage to the applicant's lot in breach of s 48 of the OC Act and in breach of s 16 of the Water Act 1989 (Vic) ('Water Act').
(a) Mr Raynor to arrange for the undertaking of repairs to his lot;
(b) Mr Raynor to compensate the applicant for costs, loss and damage incurred as a consequence of the leak; and
(c) if Mr Raynor does not comply with such Orders, the owners corporation be directed to arrange for the repairs to be carried out in accordance with ss 48 to 51 of the OC Act_._[1]
(a) Loss of rent
(b) Cleaning
(c) Letting fees
(d) Painting and mould removal
(e) Plastering repair works
(f) Compensation to tenants
(a) the water leak was reported to the owners corporation and to Mr Raynor soon after it was detected by the applicant in January 2023;
(b) the applicant arranged for temporary repairs to the damaged ceiling in its lot on more than one occasion, including the installation of a drip tray, but this did not stop the water leak;
(c) on or about 1 November 2023, the owners corporation served a Notice to Repair on Mr Raynor, in accordance with s 48 of the OC Act.
(a) the common property; and
(b) the chattels, fixtures, fittings and services related to the common property or its enjoyment.
(1) If a lot owner has refused or failed to carry out repairs, maintenance or other works to the lot owner's lot that are required because -
(a) the outward appearance or outward state of repair of the lot is adversely affected; or
(b) the use and enjoyment of the lots or common property by other lot owners is adversely affected -
the owners corporation may serve a notice on the lot owner requiring the lot owner to carry out the necessary repairs, maintenance or other works.
(2) If a lot owner has been served with a notice under subsection (1), the lot owner must carry out the repairs, maintenance or other works required by the notice within 28 days of the service of the notice.
(3) If a lot owner has been served with a notice under subsection (1) and has not complied with the notice within the required time, the owners corporation may carry out the necessary repairs, maintenance or other works to the lot.
(4) An owners corporation may recover as a debt from a lot owner the cost of repairs, maintenance or other works carried out under subsection (3).
(a) there is a flow of water from the land of a person onto any other land; and
(b) that flow is not reasonable; and
(c) the water causes -
(i) injury to any other person; or
(ii) damage to the property (whether real or personal) of any other person; or
(iii) any other person to suffer economic loss -
the person who caused the flow is liable to pay damages to that other person in respect of that injury, damage or loss.
(subsections (2) and (3) are concerned with interference with a flow of water and are not relevant here)
(5) If the causing of or the interference with, the flow (as the case requires) was given rise to by works constructed or any other act done or omitted to be done on any land at a time before the current occupier became the occupier of the land, the current occupier is liable to pay damages in respect of the injury, damage or loss if the current occupier has failed to take any steps reasonably available to prevent the causing of, or the interference with, the flow (as the case requires) being so given rise to.
(6) The existence of a liability under subsection (5) extinguishes the liability under subsection (1) of the person who caused the flow or the liability under subsection (2) of the person who interfered with the flow (as the case requires).
(a) In relation to the Water Act claim:
(i) has there been an unreasonable flow of water that has caused damage to the applicant?
(ii) if there has been an unreasonable flow of water that caused damage to the applicant, who caused that unreasonable flow of water?
(b) In relation to the claims under the OC Act:
(i) has Mr Raynor failed to carry out his obligations to repair and maintain his lot as required by s 48 of the OC Act?
(ii) has the owners corporation failed to carry out its obligations to repair and maintain common property as required by s 46 of the OC Act?
(c) In each claim:
(i) what orders should be made to address the water leak affecting the applicant's lot?
(ii) what is the quantum of the applicant's loss and damage caused by the water leak?
OK looks like it could be the problem. I showed the photo to a builder friend of mine and he said when the apartments were built in 1992 they used jackhammers to make a hole for the piping.
Today of course they cement around the piping so it is sealed and add a puddle flange around the down pipe.
So unfortunately, the first plumber didn't even look at the shower drainage pipe, so I had a look and I noticed that the seal wasn't tight.
I'll show you two photos of before and after as I have now sealed a small gap between the draining pipe and the tiles.
So I hope we don't have any more issues with water. I hope this fixes the problem and I'm still not convinced because originally a few years ago when I was overseas, in winter, and no one was using the shower, the body corporate mentioned about water leaking.
Water has leaked from Lot 13 (being the lot number of unit 13) into Lot 9 (being the lot number of unit 9) over a substantial period of time. These leaks have caused damage to Lot 9, thereby adversely affecting the use and enjoyment of that lot.
You are required to repair the gaps, holes and other sources or causes of the leaks to prevent further leaking into or onto the common property and/or Lot 13 and provide the necessary certificates.
For further details please refer to the letter from 30 The Avenue Owners Corporation to Lot13/Unit13/
CORRESPONDENCE FROM THE SECOND RESPONDENT PRIOR TO THE SECOND DAY OF HEARING
(a) asserted that 'the ongoing issue involves a blind balcony adjacent to Unit 13, which is a common area, and also sits above Unit 9, which the applicant asserts 'has not been waterproofed, painted, or treated for 32 years' and 'should be taken into consideration as a possible water leak as well'.
(b) asserted that the plumbing report prepared by the applicant's plumber in 2023 was 'not conclusive' because the plumber did not enter the second respondent's lot to conduct any testing.
(c) he did not undertake repairs to his property when he received the Notice to Repair, asserting that 'there was no proof that the shower was the issue' and maintaining that the 'blind balcony' was the source of the leak because 'that has leaked before'.[8]
(d) denied liability to the applicant on the grounds that the water damage 'is caused by a common property fault' [paragraph 17(a)].
(e) the second respondent denied liability under the Water Act because 'the water damage is caused by a faulty waterproof membrane or no membrane at all. Again, this is common property'.[9]
(a) He did not see any indication before the inspection to suggest that the balcony was leaking or causing water to enter the building. He considered the entire balcony slab and formwork to be clean and free of water damage or corrosion, although the condition of the membrane is poor, and concluded that there was no evidence that leaking had occurred previously from the balcony.
(b) He expressed the opinion that there is 'no evidence' that would suggest the leaks are caused by factors other than a shower leak.
(c) He did not observe direct leaks from the plumbing pipes, but rather, evidence of leaks trailing from the shower base down the outside of the pipe, which he considered consistent with a leak to the shower base.
(d) He observed water damage directly beneath the shower floor waste of Mr Raynor's lot, including corrosion around the shower waste and mould to the ceiling below. He noted that there was active leaking through the shower base before any testing.[11] Further, he observed 'a redundant brick loose in the concrete' which he said 'indicates that the finishing of the concrete was initially poorly completed'. Mr Wood considered the damage to be 'consistent with excessive corrosion and microbial growth from long term moisture exposure'. He concluded that 'the shower is no longer fit for purpose, nor is it performing as intended according to the relevant performance requirements' which require the floor surface in a shower enclosure to be impervious to water.[12]
(e) Although the other experts carried out some testing of the window in the bathroom of Mr Raynor's lot on the day of joint inspection, in his opinion, that testing was not carried out in a controlled manner and, in his opinion, could not be relied upon.
(f) Despite the deficiencies in water testing the window, in his opinion, and although there was evident dry rot in the window, he saw no indications, such as damp or rotting due to water ingress to suggest that the windows were leaking.
(g) He estimated the repairs required to be: assessment of the condition of the concrete slab, demolition of the existing shower, preparation of the site and installation of a waterproof membrane, new floor and wall tiles, installation of fixtures and fittings, caulking of wet areas, a water test to confirm leaks have ceased, and rectification of the damage to the applicant's lot. He estimated the cost of the works at $91,502.98.
The owners corporation's expert: Benjamin Robson
(a) patches of black growth and water staining on the ceiling in Lot 9 were directly below the bathroom of Lot 13;
(b) there was rust on metal elements within the suspended ceiling space between the lots consistent with exposure to moisture and a prolonged humid environment;
(c) in the underside of the floor of Lot 13, in the area surrounding the waste pipe that services the shower in Lot 13, there was a visible water drip, and the surrounding area was visibly damp with changes consistent with a prolonged period of water ingress, and recent water ingress;
(d) the water testing of the shower conducted on the day resulted in water ingress into Lot 9 with water dripping from the area under the shower;
(e) the relevant Building Code required that the shower enclosure, including walls and floor, should be impervious to water;
(f) there was no water leaking into Lot 9 from the external window of the Lot 13 bathroom;
(g) there was no water leaking into Lot 9 from the balcony adjacent to Lot 13;
(h) the water ingress observed during the water testing first appeared at the edges of the metal formwork. Mr Robson expressed the opinion that a leak from the plumbing would typically present closer to the pipe work. He considered the pattern of leaking to be consistent with the source not being from the plumbing pipes, that is, the plumbing beneath the shower did not appear to be a source of the leak;
(i) the deteriorated condition of the wall tiling and the floor tiling in the shower enclosure of Lot 13, and the results of the water testing, were consistent with the source of the water leak into Lot 9 being the shower enclosure of Lot 13 and not any other source.
(a) Remove the shower screen, plumbing fixtures, existing tiles, wall substrate and floor screed;
(b) Install new plumbing pipework and floor substrate;
(c) Install new wall substrate;
(d) Supply and install new tiling;
(e) Re-install existing shower screen and plumbing fixtures;
(f) Install silicone caulking to internal junctions.
(a) Cut out and remove approximately 2m x 2m plastered ceiling;
(b) Replace with new plaster sheeting, trowel joins and prepare for painting;
(c) Apply new painting to entire ceiling;
(d) Supply and install new downlight;
(e) Steam clean carpet in bedroom.
(2) Where a boundary on a plan is defined by reference to a building or part of a building, the plan must specify whether the boundary is -
(a) the interior face of the walls, ceilings and floors of the relevant part of the building; or
(b) the exterior face of the relevant part of the building; or
(c) in some other location.
HAS THERE BEEN AN UNREASONABLE FLOW OF WATER CAUSING DAMAGE TO THE APPLICANT'S LOT?
DID MR RAYNOR 'CAUSE' THE UNREASONABLE FLOW OF WATER?
(1) A determination that negligence caused particular harm comprises the following elements -
(a) that the negligence was a necessary condition of the occurrence of the harm (factual causation); and
(b) that it is appropriate for the scope of the negligent person's liability to extend to the harm so caused (scope of liability).
(2) In determining in an appropriate case, in accordance with established principles, whether negligence that cannot be established as a necessary condition of the occurrence of harm should be taken to establish factual causation, the court is to consider (amongst other relevant things) whether or not and why responsibility for the harm should be imposed on the negligent party.
(3) If it is relevant to the determination of factual causation to determine what the person who suffered harm (the injured person) would have done if the negligent person had not been negligent, the matter is to be determined subjectively in the light of all relevant circumstances.
(4) For the purpose of determining the scope of liability, the court is to consider (amongst other relevant things) whether or not and why responsibility for the harm should be imposed on the negligent party.
WHAT ORDERS SHOULD BE MADE IN RESPECT OF THE REPAIRS REQUIRED?
(a) Mr Raynor and the owners corporation take all steps necessary so that water no longer flows from the shower in Mr Raynor's lot into the applicant's lot. The orders proposed by the applicant include proposed orders specifying the steps required;
(b) Mr Raynor meet the cost of the works required to stop the water leak from the shower in Mr Raynor's lot into the applicant's lot;
(c) If Mr Raynor should not meet the cost of the works, that the owners corporation pay for the works and recover the amount paid from Mr Raynor 'as a debt pursuant to s 49 of the Owners Corporations Act 2006 (Vic)';
(d) Mr Raynor pay the applicant damages of $12,170.82 for loss as a result of the lot being uninhabitable as a result of the water leak for the period from 26 January 2025 to the date of the hearing on 12 June 2025, together with interest on that amount from 17 June 2025 until the sum is paid, at the interest rate currently prescribed under the Penalty Interest Rate Act 1983 (Vic); and
(e) Mr Raynor pay the applicant damages at the rate of $85.71 per day for loss as a result of the lot being uninhabitable as a result of the water leak for the period until the water leak has stopped and rectification works are complete.
WHAT ORDERS SHOULD BE MADE IN RESPECT OF THE APPLICANT'S CLAIM FOR DAMAGES?
Pursuant to s 16 of the Water Act 1989 (Vic) the Tribunal Orders:
[1] Applicant's Points of Claim dated 21 March 2024.
[2] First Respondent's Points of Defence dated 3 July 2025 paragraph 18a.
[3] Affidavit of Barry Worthington dated 13 March 2025.
[4] Affidavit of Julie Ann Monacella dated 13 March 2025, paragraphs 14-16.
[5] Affidavit of Julie Ann Monacella dated 13 March 2025, at page 31 of the Exhibits.
[7] First Respondent's Points of Defence dated 3 July 2024 paragraph 16.
[8] Second Respondent's Amended Points of Defence dated 21 September 2024 paragraph 10.
[9] Second Respondent's Amended Points of Defence dated 21 September 2024, paragraph 17(b).
[10] 9 litres or less per minute - see waterrating.gov.au.
[11] Expert Witness Report of Benjamin Wood | version 1| Wednesday 14 May 2025 figure 13.
[12] Ibid, paragraph 4.7, referencing F.17 of the Building Code of Australia 1988.
[13] Report of Angela Perry of Guardian Building Inspections dated 16 April 2025 page 6.
[15] See Damjanovski v Owners Corporation 1 Plan No.PS503570D (Owners Corporations) [2025] VCAT 484; and Owners Corporation v PS508732B v Fisher [2014] VCAT 1358.
[16] Report of Benjamin Robson page 21, photograph 17.
[17] Report of Angela Perry of Guardian Building Inspections dated 16 April 2025, image at page 14.
[18] If the cost of works is not to be met on a lot liability basis.
[19] (Building and Property) [2022] VCAT 494.
[20] See paragraphs 49d, 51c, and 56 above.
[21] See Connors v Boden International Pty Ltd [2008] VCAT 454 at paragraph 51; Sidoti v Owners Corporation 633715B [2016] VCAT 1880, both cited with approval in Guy v Owners Corporation 416326 (Owners Corporations) [2018] VCAT 2027.
[22] Applicant's Points of Claim dated 21 March 2024, paragraphs 9-11.
[23] (Building and Property) [2019] VCAT 1724.
[24] Correspondence of Nelson Alexander Real Estate Agents dated 5 March 2025 page 46 of the Exhibits to the Affidavit of Julie Ann Monacella dated 13 March 2025.
[25] 298 days x $85.71 daily rental rate = $25,541.58.
M & J Monacella Pty
Owners Corporation PS 309930
Claim under Water Act 1989 (Vic) and under the Owners Corporations Act 2006 (Vic) for damages, for orders directing the second respondent to carry out repairs to his lot to put an end to water ingress from the second respondent's lot into the applicant's lot, and for orders directing and authorising the owners corporation to facilitate completion of the repairs. Hill v Owners Corporation PS525339U (Building and Property) [2022] VCAT 494 applied.