The applicant did not call Paul Webb, the author of that report, to give evidence and the OC argued that I should apply the principles in Jones v Dunkel and infer that Mr Webb's evidence would not have supported the applicant's case.[1] I do not accept that such an inference should be drawn. Mr Webb was only one of many authors of reports provided to the parties. None of those authors was called. In any event, the OC's Points of Defence specifically pleaded and sought to rely on Mr Webb's report.
We cut an exploratory hole in the bedroom wall above the damp area and found the wall cavity dry. As the water is coming down the wall cavity we believe the balcony tiles are the cause of the wet carpets
There is no evidence of waterproofing to the back of the exposed tile to the western corner of the north wall
There is no evidence of a flashing behind the wall cladding at the junction of the patio floor.
(5) If the causing of, or the interference with, the flow (as the case requires) was given rise to by works constructed or any other act done or omitted to be done on any land at a time before the current occupier became the occupier of the land, the current occupier is liable to pay damages in respect of the injury, damage or loss if the current occupier has failed to take any steps reasonably available to prevent the causing of, or the interference with, the flow (as the case requires) being so given rise to.
... I consider that the words "steps reasonably available" includes a requirement that the current occupier has a sufficient and reasonable time in which to carry out those steps after being given notice or constutive (sic) notice of the unreasonable flow is imputed. Further, that their liability in the event of them not taking reasonable steps to cease the flow after such notice is limited to the time from which such steps should reasonably have been taken.
Therefore, I find that "reasonable steps" in the Act infers that the current occupier takes the necessary steps within a reasonable time.
As we have advised previously, the damage noted to these units is apparent elsewhere around the building - i.e. buckled tiling and cracked cladding.
We recommend that your Committee considered deciding to:
(i) repair all external cracked cladding (which leads to water entry such as in units 17 and 18)
Furthermore, Alldry could be engaged to simply caulk windows and cracked cladding joints outside units 17 and 18 as a temporary measure whilst the Committee discussed the need to address the general cladding issue. To simply patch cracked cladding will produce a visually poor result that will probably not last. Cladding should be removed and replaced - a major task! (Emphasis added)
The façade and windows to the entire building also have evidence of cracking and inadequate window flashings. (Emphasis added)
Cement sheet cladding relies on sound flexible jointing and regular membrane recoating to prevent cracking and moisture ingress. In this case the cracking of the cement sheet cladding appears to be due to failure of the sheet jointing and lack of building maintenance. (Emphasis added)
The OC's section 46 duty to repair and maintain
Owners Corporation to repair and maintain common property
(a) the common property; and
(b) the chattels, fixtures, fittings and services related to the common property or its enjoyment.
[2] [2008] VCAT 454 at paragraph 51
Guy
Owners Corporation 416326
(1959) 101 CLR 298