[2018] VCAT 1630
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2018-10-22
Original judgment source is linked above.
(b) Mr Paul, a tradesman who had carried out work on the Applicant's Unit;
(d) Ms Pizzorno from the Owners' Corporation manager, who was called to produce emails passing between the Owners' Corporation and the Respondent; and
(e) Mr Riali, the Manager of a building company that provided a quotation for the rectification of the damage to the Applicant's Unit.
"16. Liability arising out of flow of water etc
(b) that flow is not reasonable; and
(c) the water causes -
(iii) any other person to suffer economic loss -
.......................................................................................
(5) If the causing of ...... the flow ........ was given rise to by works constructed or any other act done or omitted to be done on any land at a time before the current occupier became the occupier of the land, the current occupier is liable to pay damages in respect of the injury, damage or loss if the current occupier has failed to take any steps reasonably available to prevent the causing of, or the interference with, the flow (as the case requires) being so given rise to."
(1) The Tribunal has jurisdiction in relation to all causes of action (other than any claim for damages for personal injury) arising under sections 15(1), 16, 17(1) and 157(1) of this Act ...........................
(3) In exercising jurisdiction conferred by subsection (1), the Tribunal -
(a) may by order, whether interim or final, grant an injunction (including one to prevent an act that has not yet taken place) if it is just and convenient to do so; or
(ab) may make an order for payment of a sum of money awarding damages in the nature of interest; or
(3A) Nothing in subsection (3) takes away from or affects the Tribunal's powers under section 123 or 124 of the Victorian Civil and Administrative Tribunal Act 1998.
(4) In awarding damages in the nature of interest, the Tribunal may base the amount awarded on the interest rate fixed from time to time under section 2 of the Penalty Interest Rates Act 1983 or on any lesser rate that it considers appropriate.
(5) The Tribunal may in respect of any works that give rise to a cause of action of a kind referred to in subsection (1) make any order with respect to -
(b) the continuation, removal or modification of works; or
(c) payment of the costs of the removal or modification of works -
......................................................................................."
Am more concern about the leak and crack of our bathroom ceiling, please let me know how you go." (sic.)
"Please see the below email. Can you please advise if I may pass on your details to this agent so they may contact you and fix issue?"
Three photographs are attached with a number of emails from the Applicant's agent.
The unit was inspected and there are water stains on the ceiling of the bathroom and lounge/kitchen area.
We looked inside the ceiling space from the manhole in the bathroom.
There is a calcium build-up in a number of places above the bathroom.
It was raining during our inspection and water could be seen dripping from a number of these spots.
We accessed unit 306 above and there is a large tiled balcony above the water entry points.
The tiles are in poor condition and there are signs the water is tracking under the tiles.
Luke in unit 306 was aware there is a problem and has been in discussions with the Builder about this issue.
Access to unit 107 and a three storey ladder would be required to seal the window frames."
"This is the first time that I had any contact from anyone on behalf of the Applicants and the first time that I had been advised that the water had leaked into unit 207 from the balcony of unit 306 other than being told by the plumber."
(b) he had raised the issue of drummy tiles that water could get under with the Builder when he moved into the Respondent's Unit;
(c) it was most likely "a bigger issue which is a crack in the membrane";
(d) the rectification cost could be from $25,000.00 to $40,000.00;
(e) the issue affected both the Respondent's Unit and the Applicant's Unit;
(f) he intended to have his solicitor write to the Builder;
(g) the last time he had to deal with the Builder over a leak it took over two years to resolve.
"As a result, water has since been leaking from underneath the tiles into apartment 207 located directly below the premises causing significant damage. On 14 November 2016, the plumbing company, Kilburn, engaged by the Owners' of apartment 207, reported that the tiles on the terrace of the premises are in poor condition and that there are signs that water is tracking under the tiles, which is causing an issue with the tiling membrane on the premises."
"As discussed at time of quote that we cannot provide a warranty for this job" (sic).
(b) water damage over the bath. He said that the plaster above the bath was relatively dry, although he noted that Mr Ryan had found it to be wet a month earlier;
(c) moist calcium carbonate stalactites in the ceiling void along shrinkage cracks;
(d) further calcium carbonate stalactites above the linen cupboard in the hallway between the bathroom and the living area;
(e) some mildew on the plaster ceiling in front of the cupboard;
(f) that the plaster ceiling in front of the linen cupboard was moist. He said that the moist area corresponded with the drain from the balcony above:
(g) water damage to the bulkhead ceiling in the living room, although he found that the plaster ceiling above it was dry;
(h) on the balcony he found that the calcium carbonate leaking through the balcony soffit was damp and moisture was evident on the tiles of the balcony floor.
(1) A boundary may be shown on a plan by reference to a building.
(2) Any building or part of a building that defines a boundary must be identifiable from the plan.
(3) If a boundary on a plan is defined by reference to a building or part of a building, the plan must specify whether the boundary is one or more of the following -
(4) Unless otherwise specified on the plan, the location of any building boundary defined as -
(a) Interior Face lies along the interior face of any wall, floor (upper surface of elevated floor if any), ceiling (underside of suspended ceiling if any), window, door or balustrade of the relevant part of the building. Any internal coverings, waterproof membranes and fixtures attached to walls, floors, and ceilings are included within the relevant parcel;"
"I am of the view that the interior face of the building means, the interior face of the structure of the building rather than the top surface of whatever is fixed to the structure of the building. So that the where balconies are constructed of concrete and then tiled over, interior face means the upper face of the concrete structure not the tile. I am supported in my view by Section 132 of the Owners' Corporations Act 2006 and the 2011 Subdivision (Registrar's requirements) Regulations."
"Right to decorate interior walls, floors and ceilings
(1) If a boundary of a lot is shown on a plan of subdivision as being the interior face of the building, the lot owner has the right to decorate or attach fixtures or chattels to that face.
(b) For plaster removal and replacement, Mr Ryan assessed a base figure of $2,520.00 whereas Mr Martin has a base figure of $1,623.68.
(c) For painting, Mr Ryan has assessed a figure of $2,880.00 whereas Mr Martin's figures for painting total of $1,207.00.
(d) For an electrician to disconnect and then re-connect the electricity Mr Ryan has allowed $760.00 whereas Mr Martin has allowed $360.00. Considering the time that it is likely to take to disconnect and reconnect the electricity, I prefer Martin's figure and will allow $360.00.
(e) For cleaning and containment, Mr Ryan has allowed only $995.00 and I presume that the work of any additional cleaning and containment is included in his other costings. Mr Martin has allowed $1,740.00.
(b) the evidence establishes that the bulk of the water entering the apartment came from the balcony, not through the windows. The water from the balcony was collected in buckets whereas the entry around the window frames appears to have been comparatively minor;
(c) when mould was found in the curtains during the tenancy it was dealt with by simply cleaning the curtains, following which the unit was occupied.
The time taken to carry out the rectification work
(b) the method of repair suggested by Mr Ryan, although expensive, is a permanent repair and so it is warranted;
(c) the Respondent has the means to pay for the scope of works suggested by Mr Ryan;
(d) the Respondent intends to issue proceedings against the Builder for breach of warranty under sections 8 and 9 of the Domestic Building Contracts Act 1995 to recover damages and will be seeking to recover from the Builder the cost of having the balcony properly repaired. The Respondent then might obtain a windfall if he is successful against the Builder in that action, given that he has only expended a much lesser sum on the temporary solution that he has paid for;
(e) Mr Ryan's scope of works is consistent with s.129 of the Owners' Corporations Act 2006, which provides:
(a) properly maintain in a state of good and serviceable repair any part of the lot that affects the outward appearance of the lot or the use or enjoyment of other lots or the common property; and
(b) maintain any service that serves that lot exclusively."
(f) the Applicant does not want to relitigate the matter in 6 to 12 months' time when the waterproofing product supplied by the Respondent fails.
"8 This being a quia timet application, the Applicant has the burden of proving such a possibility of danger as amounts to a "moral certainty" that the Respondent threatens and intends to do something that will cause imminent and substantial damage to the Applicant: Royal Insurance Co Ltd v Midland Insurance Co Ltd (1908) 26 RPC 95 at 100; Bendigo and Country Districts Trustees and Executors Co Ltd v Sandhurst and Northern District Trustees, Executors and Agency Co Ltd [1909] HCA 63; (1909) 9 CLR 474; Byrne v Castrique [1965] VicRp 23; [1965] VR 171."
That case concerned an application to restrain the calling up of a bank guarantee given under a building contract. It did not concern a mandatory injunction.
"108. Turning now to the proceeding under the Water Act. The principal relief sought by Mr Reynolds was a quia timet injunction (that is an injunction to restrain future action which it is feared will damage Mr Reynolds' property) to restrain the construction of the proposed development without the offsite works advocated by his expert Mr Berry. All parties were agreed that the proper test to apply to determine whether a quia timet injunction should be granted is the one to be found in the joint judgment of Starke, Murphy and Brooking JJ as Judges of the Full Court of the Supreme Court in Grasso v Love [1980] 163, 167 where their Honours said at line 25 and following:
'What we are disposed to think is the true position is that, to obtain a quia timet injunction, the plaintiffs must prove that there is a real probability that activities of the defendants are imminent and if performed will cause substantial damage to the plaintiffs.'"
"The rent for this property is $2,824 pcm however, there is a leak coming from the balcony upstairs that is to be remedied by the body corp. and the Builders of the building.
We are told that as of 17/01/2017 these works should be completed in the next 6-12 weeks.
The landlord agrees that until these works are finalised and completed that the rent for the property will be set at $600 per week ($2,607 pcm)."
"Unfortunately I cannot put up with the situation any longer. The now continuous dripping, rising floor and smell meant I had to cancel having friends over for a long planned dinner. I have not been told the content of the fluid leaking from the roof. There must be a concern for health implications.
Having returned from overseas on 26/12/17 I have collected approximately 5 litres of fluid. I am concerned that there must be a considerable amount under the floor also."
$50 a week from 30 January 2017 until 29 January 2018 (364 days)
650 a week from 30 January 2018 until 28 September 2018 (241 days)
Leung
Harris
(1909) 9 CLR 474