[2011] VCAT 692
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2011-04-18
Original judgment source is linked above.
Real Property List; Water Act 1989, Sections 16, 18, 19 and 20; Whether quia timet injunction should go restraining construction of grain terminal unless offsite works to enhance neighbouring drainage infrastructure are completed; Whether declaration should be made that issue of permit for terminal with particular drainage arrangements does not 'authorise' flows of water; Discretionary consideration as to grant of injunction; Consideration of probability of substantial damage.
Planning and Environment List; Application for review of Responsible Authority's determination to grant permit for grain terminal; Section 82 Planning and Environment Act 1987; Whether permit should be directed not to issue based on threatened increase in duration and frequency of inundation of objector's land by reason of drainage discharges from permit site; Permit directed to issue subject to amendment to condition.
RESPONDENT IN W6/2011 & 1****ST JOINED PARTY IN P2009/2010
Corner of Werneth and Colac-Ballarat Roads, Werneth
Reynolds v Southern Quality Produce Co Operative [2011] VCAT 692
Direct that a permit issue in accordance with Responsible Authority's Notice of determination subject to amendment of Condition 16 to read:
Applications for injunctive or declaratory relief dismissed.
Dr R.J. Sadler of Counsel, instructed by Coulter Roache
Mr Andrew Walker of Counsel, instructed by Heinz and Partners
Once the drain [that is the western table drain on Colac-Ballarat Road] reaches the corner of the Cressy-Pitfield Road it has to drain through a culvert under the road to the south. Drainage through this culvert is insufficient for existing flows. Mr Reynolds reports that his land in this area is frequently inundated due to the poor drainage in this area.
None of the parties disagreed with this observation. In this general area are located two of Mr Reynolds' paddocks known respectively as 'Humphreys' and 'Maccas'. We will have more to say about these paddocks later. It is to be noted that at this stage however Humphreys' Paddock is traversed from west to east by two spoon drains which were dug by Mr Reynolds to assist in the drainage of this paddock. As with the spoon drain traversing Mr Hirth's land between the Reynolds' holdings and the subject site, Mr Reynolds and Mr Berry said that in significant rainfall events these spoon drains are overtopped by southerly overland flows of rainfall. In ordinary conditions and of course to some degree even in major rainfall events they convey water from Humphreys' Paddock to the western table drain. It follows therefore that Mr Reynolds' land by this means makes a contribution to the drainage problems encountered in the vicinity of Cressy-Pitfield Road.
Our assessment of the survey data collected suggests that the existing culverts on the alignment of the western - Colac Road table drain and more particularly at the intersection of Colac-Ballarat Road and the Pitfield-Cressy Road have insufficient capacity to cater for the existing catchments.
- Maximum stormwater discharge rate for a one in 10 year ARI based on the existing 83% catchment.
- On-site stormwater detention volume provided for a one in one hundred year ARI.
- Site considered as totally pervious pre-development; co-efficient of runoff C = 0.17 - site co-efficient of runoff post-development C = 0.35.
When any storm less than the one in 10 year ARI event occurs (and assuming the secondary storage dam is at capacity) all runoff from the site will be through the low flow box culvert and there will be no storage of stormwater.
When storm events occur greater than the one in 10 year ARI event the low flow box culvert will be unable to cater for the runoff; subsequently the stormwater will 'back up' within the site and be stored in the south-east corner through the construction of an earth bank.
Relates to the protection of agricultural land and seeks to protect productive farmland which is of strategic significance in the local or regional context.
Compatibility between the proposed or likely development and the existing uses of the surrounding land.
It is considered that the Southern Quality Produce proposal, which relies on investment from local growers and aims to significantly cut transportation costs, is consistent with this approach.
It is considered that the proposal addresses each of the relevant requirements of Clause 65. Importantly Clause 65 requires the Responsible Authority to consider the degree of flood, erosion or fire hazard associated with the location of the land and the use, development for management of the land so as to minimise any such hazard.
These conditions are consistent with drainage conditions applied to major residential subdivisions and large industrial developments where there is a much greater risk of damage to property and persons.
Council acknowledges that the existing table drain network which borders the subject land could be improved to better accommodate increased stormwater flows during significant rainfall events. Furthermore Council would be prepared to invest in drainage infrastructure upgrade works on the Pitfield-Cressy Road if it is proven that there is an unacceptable risk of flooding to the road surface at the juncture (sic) of Pitfield-Cressy Road and the Colac-Ballarat Road.
Consistent (in terms of construction standard and general condition) with rural roadside drainage infrastructure located throughout the shire.
Confirmed the table drains were flooded but the water did not cover the road and flows to the swollen Woady Yaloak River were not obstructed.
There is a table drain along the east side of Colac-Ballarat Road. This crosses to the west side of Colac-Ballarat Road via a 900mm pipe culvert just north of Woady Yaloak River. There is also a 375mm pipe culvert crossing under the Colac-Ballarat Road, just south of Pitfield-Cressy Road.
Advice from VicRoads' maintenance staff is that drainage of Colac-Ballarat Road at this location is satisfactory in that the road surface is not inundated during heavy rain. Whilst water pools within the road reserve, water does not spread onto or inundate the traffic lanes.
Where scarring of roadsides or ponding of water is affecting safety aspects for road users or causing identifiable deterioration of the road formation.
From the photographs in the TGM report, water was well above the top of the table drain and so the table drain capacity may well have been greater than 0.080m3/s.
The proposed drainage system would result in lower discharge rates post-development than pre-development in the equivalent storm event. Nevertheless, the discharge would be well above the 0.080m3/s calculated capacity of the table drain even for a one year storm event.
Given this information, VicRoads would need to obtain its own expert advice prior to giving approval to construction of a drainage discharge onto the road reserve. It would need to be satisfied that the discharge from the subject site does not adversely affect the operation of the road or the integrity of the road pavement.
If expert advice suggests that the discharge from the culvert would adversely affect the Colac-Ballarat Road, it may be necessary to reduce the size of the stormwater culvert discharging onto the road and increase the retention volume on site.
To minimise the impact of salinity and rising water tables on land uses, buildings and infrastructure in rural and urban areas and areas of environmental significance and reduce salt loads in rivers.
Wise use of natural resources including energy, water, land, stone and minerals to support both environmental quality and sustainable development.
To protect productive farm land which is of strategic significance in the local or regional context.
That the State's agricultural base is protected from the unplanned loss of productive agricultural land due to permanent changes of land use.
... in assessing rural development proposals, planning and responsible authorities must balance the potential off-site affects of rural land use proposals (such as degradation of soil or water quality and land salinisation) which might affect productive agricultural land against the benefits of the proposals.
Between the adverse effects of off-site impacts that is impacts in the Reynolds' land by flooding and salinisation, and conversely the benefits of the proposal.
Assist the protection and, where possible, restoration of catchments, waterways, water bodies, groundwater, and the built environment
Undertake measures to minimise the quantity and retard the flow of stormwater runoff from developed areas.
The proposed levees will alter the natural flood flow (from south into paddocks to the table drain and thence into Mr Reynolds' land and the LSIO area), thus altering and concentrating the flood flow into a flood prone area and 'key floodplain'.
The effect of the development on redirecting or obstructing floodwater, stormwater or drainage water and the effect of the development on reducing flood storage and increasing flood levels and flow velocities.
Whether the proposed development is designed to maintain or improve the quality of stormwater within and exiting the site.
The degree of flooding associated with the location of the land and the use, development or management of [the land].
The effect of the development on re-directing or obstructing floodwater, stormwater or drainage water and the effect of the development on reducing flood storage and increasing flood levels and flow velocities.
Whether the proposed development is designed to maintain or improve the quality of stormwater within and exiting the site.
Mr Reynolds seeks an injunction to restrain the respondent discharging water from the development site into the table drain in a more concentrated form than the volume and rate of the natural flow.
If the Tribunal grants the permit in its current form Mr Reynolds will be potentially deprived of the legal capacity to stop the development, and deprived of any entitlement to compensation when his land is flooded.
Do not preserve a Section 16(1) claim. It has long been established that if a claim is available under the Water Act, the common law claims are abrogated (s.17(1) and Coles Myer at [50] - [54]). This raises the problem of a s.16 claim being the only available cause of action, but the very permit itself, by authorising the flow, arguably worked to prevent Mr Reynolds being able to demonstrate an essential element of the cause of action that is that the flow is 'not reasonable'.
Mr Reynolds consents to the respondent doing that work. It also involves ultimate discharge of drainage into a local creek that may require a 'works on waterway' licence from the local catchment management authority. Again the permit could be conditional on procuring that licence.
The subject land is in a strategic location. It has convenient access to the Hamilton Highway, and therefore farms to the east and to the west (and to the ports of Geelong and Portland). It also has convenient north-south access via Colac-Ballarat Road.
If the Water Act claim is dismissed, then it follows that Condition 14 of the NOD should be upheld, and the planning appeal [should] also [be] dismissed.
The Cressy-Pitfield Road culvert is at the intersection of the Colac-Ballarat Road roadside drain and the Cressy-Pitfield Road drain. The Cressy-Pitfield Road drain also serves a large catchment, and contributes to the flooding of the Cressy-Pitfield Road culvert.
An analysis of the photographs and drain patterns [shows] that a significant amount of water does drain from the subject land into the Colac-Ballarat Road roadside drain.
The key question for Tribunal particularly in the Water Act proceedings, is whether, in the context of land which already floods, the proposed development will make this situation significantly worse.
Whilst the proposed development will collect, and will potentially discharge, a greater volume of water than currently, the discharge will be at a significantly lower rate than current rates. This will give the Colac-Ballarat Road roadside drain a better opportunity to cope with water flows.
Therefore, he said the discharge from the proposed development would be reasonable.
The Shire's ready access to metropolitan and regional markets, export facilities and suppliers, is its competitive advantage. It is essential to maintain the efficiency of transport linkages to these markets, facilities and suppliers in order to build on this advantage.
In any case, the proposed development will not increase the salinity of the Humphrey's paddock or any other land owned by the Reynolds.
Is transferred to the drain on the east side of Colac-Ballarat Road via a culvert [the transfer culvert]. The transfer culvert is located about 500m south of the intersection of Werneth Road and Colac-Ballarat Road.
This is because the east side is serving a much larger catchment.
Any water in the Colac-Ballarat Road roadside drain, in between the transfer culvert and the two Reynolds' drains, comes either from the subject land or the small catchment served by the Werneth Road drains.
83% of the existing water flow from the subject land would drain to the Colac-Ballarat Road roadside drain, during a significant rainfall event'.
Is only achieved for a brief period in a one in 100 ARI storm event, that is, when the low flow box culvert is overtopped by 300mm, so that the head pressure is sufficient to push the water through at this maximum flow rate.
Any increase in the length of time that the Humphrey's paddock is inundated was so insignificant that it should be disregarded.
There is no credible evidence to assert that this additional volume will cause Mr Reynolds' loss, for example by tipping a crop on already flood prone land from a viable crop to an unviable crop.
Misconceived in that Mr Reynolds should have brought the claim against VicRoads rather than [the Co-operative] or at least VicRoads as a party.
In any case the fact that, through no fault of [the Co-operative], the Reynolds' land is susceptible to flooding, and both Mr Reynolds, and a third party, VicRoads, is to at least some extent responsible for this situation, are at least relevant factors in determining whether the proposed discharge is reasonable.
The Tribunal is entitled to consider the overwhelming strategic support for the proposed development overrides the concerns Mr Reynolds has raised about the proposed discharge.
If the Tribunal determined that the planning appeals should succeed [scil that the Co-operative's case should succeed] then in effect, the proposed discharge would be authorised. This is a factor that the Tribunal must have regard to pursuant to Section 20(1)(a) [of the Water Act 1989] and would support a conclusion that the Water Act claim should also be dismissed.
So even if Mr Berry is right, and water flows southward from the subject land to the Humphrey's paddock, then there is nothing Mr Reynolds can force [the present owner of the subject land] to do to abate the situation.
While the proposed development will collect and store water through the use of a hardstand area and storage dam, this is an unavoidable consequence of constructing a grain storage facility.
Further, Mr Reynolds can claim damages in the event that the flow is unreasonable, and he does suffer loss.
Whether Mr Cuming has ... been advised of the extent of the existing flooding, and whether a small increase in the time land is flooded is likely to 'tip a crop over the edge' so that it turns from a successful crop to a crop which fails.
What we are disposed to think is the true position is that, to obtain a quia timet injunction, the plaintiffs must prove that there is a real probability that activities of the defendants are imminent and if performed will cause substantial damage to the plaintiffs.
Accordingly, the greater the injury or distress that would be caused by the apprehended injury, if it occurred, the more readily will the court intervene despite uncertainties and deficiencies of proof.
The court may in its discretion decline to grant an injunction if to do so would result in such substantial hardship to the defendant that, account being taken of any detriment that the plaintiff will suffer on his being confined to damages, disproportionate prejudice would be caused by its intervention. Here it must be remembered that the plaintiff whose rights are threatened to be breached has prima facie and equitable right to have the breach restrained and that he will be denied specific relief only in exceptional cases.
(1) In determining whether a flow of water is reasonable or not reasonable, account must be taken of all the circumstances including the following matters -
(a) whether or not the flow, or the act or works that caused the flow, was or were authorised;
(b) the extent to which any conditions or requirements imposed under this Act in relation to an authorisation were complied with;
(c) whether or not the flow conforms with any guidelines or principles published by the Minister with respect to the drainage of the area;
(d) whether or not account was taken at the relevant time of the likely impact of the flow on drainage in the area having regard to the information then reasonably available about the cumulative effects on drainage of works and activities in the area;
(e) the uses to which the lands concerned and any other lands in the vicinity are put;
(ii) collected, stored or concentrated on that land; or
and if so, for what purpose and with what degree of care this was done;
(h) whether or not the flow was affected by any works restricting the flow of water along a waterway;
(i) whether or not the flow is likely to damage any waterway, wetland or aquifer.
(2) In taking account of the matters specified in subsection (1), greater weight must be attached to the matters specified in paragraphs (a), (b), (c) and (d) than to the other specified matters.
(3) An Authority that has a waterway management function in the area to which a proceeding before the Tribunal relates may make a submission to the Tribunal on the matters specified in paragraphs (c), (d) and (i) of subsection (1)
authorised, in relation to any act, means authorised (whether generally or specifically) by this or any other Act or by a licence, permit or other authority granted under this or any other Act and, in determining whether or not the construction of a dam is authorised, no account is to be taken of any direction given under section 80(1) or (2) or of the fact that any such direction has been complied with;
A declaration that the NOD or any planning permission given in accordance therewith does not authorise the respondent and each or either of them to create a flow of water from the development onto the applicant's land which causes the applicant to suffer loss or damage.
Reynolds
Southern Quality Produce Co Operative [2011] VCAT 692
(1991) 171 CLR 506