[2025] VCAT 995
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2025-11-07
Original judgment source is linked above.
Figure 1: Front elevation street perspective - Source: Decision Plans
Figure 2: Ground Level Plan - Source: Decision Plans TP10
Figure 3: Level 1 Plan - Source: Decision Plans TP11
Figure 4: Level 2 Plan - Source: Decision Plans TP12
Figure 6: Elevation Plan West & East - Source: Decision Plans TP30
Figure 7: Elevation Plan North & South Building 1 - Source: Decision Plans TP31
Figure 8: Elevation Plan North & South Building 3 - Source: Decision Plans TP32
Amendment VC283 to the Victoria Planning Provisions and all planning schemes is required to update the Planning Policy Framework to implement Plan for Victoria (Department of Transport and Planning, 2025). The amendment updates and introduces policy, removes references to Plan Melbourne 2017-2050: Metropolitan Planning Strategy and makes general drafting improvements and clarifications.
Does the proposal provide an acceptable planning response to its planning policy context?
Statement of Significance
What is significant?
The Reservoir Methodist Church at 34 George Street, Reservoir, constructed in 1934 to a design by Raymond G. Wilson, is significant. It is a modest inter-war Gothic Revival church set back from George Street by a lawn. The church has a gable roof clad in terracotta tiles. The walls of the church are red brick and the street facing elevation has a red brick porch projecting towards the street. The porch is entered from its sides, and it is flanked by pointed arched windows on the wall of the main part of the church. The wall of the porch facing the street has a four-centred arched stained glass window. On the wall of the church above the porch is a smaller four-centred arched window. The side walls of the church are divided into bays by piers/buttresses, with each bay having a pointed arched window. Later alterations and additions and other buildings on the site are not significant.
How is it significant?
The former Reservoir Methodist Church at 34 George Street, Reservoir is of local historic, architectural and social significance to Darebin City.
Why is it significant?
Historically, the former Reservoir Methodist Church is significant as a representative example of a simple interwar Gothic Revival church, which is associated with the first phase of suburban development in Reservoir during the inter-war period. The architectural and historic significance of the church is enhanced by its high level of intactness and its rarity value as the only surviving inter-war church in Reservoir. (AHC criteria A.4, B.2, D.2)
Socially, the former Reservoir Methodist Church is significant as a building that is known, used and valued by the local community over 70 years. It illustrates the continuing strength of the Methodist faith as an important denomination in Darebin in the twentieth century. (AHC criterion G.1).
Areas that are reasonably close to public transport and activity areas and relatively unconstrained so that a moderate level of housing change over time is encouraged. This may include a mixture of single and semi-detached dwellings as well as infill development including 2-3 storey town houses and villas, with scale and outcome dependent on local character and conditions. Medium density housing may be encouraged in selected locations. Within the incremental change areas, there are varying local conditions that necessitate a different scale and built form outcome.
Does the proposal provide an acceptable planning response to amenity and neighbourhood character?
Side and rear setbacks objective (Standard B17)
To ensure that the height and setback of a building from a boundary respects the existing or preferred neighbourhood character and limits the impact on the amenity of existing dwellings or small second dwellings.
Walls on boundaries objective (Standard B18)
To ensure that the location, length and height of a wall on a boundary respects the existing or preferred neighbourhood character and limits the impact on the amenity of existing dwellings or small second dwellings.
Does the proposal achieve an acceptable planning response to parking and traffic?
Figure 9: Public Transport Provision Table - Source: Traffic Impact Assessment, One Mile Grid, 20 December 2023.
Demolish or remove a building; construct a building or construct or carry out works.
Reduce (including reduce to zero) the number of car parking spaces required under Clause 52.06-5.
(a) Deletion of bedroom 1 at the upper level of dwelling TH05 to be replaced with an open balcony form with overlooking screening to the northern section of the balcony to meet Standard B22 requirements.
(b) Annotated dimensions of the car parking space for dwelling TH05 (the northernmost dwelling facing the street) to achieve compliance with the standards of Clause 52.06-9 and use of 'grasscrete' type or similar paving to the proposed vehicle access to integrate with landscaping proposed in the front setbacks of dwellings TH02-TH05.
(c) Annotated dimensions demonstrating all of the building (excluding any porch) for dwellings TH02 to TH05 being setback from the frontage (western boundary) by at least 6.03 metres.
(d) Annotated dimensions of the heights of the fences separating the Secluded Private Open Space of dwelling TH02 to TH05 to comply with Standard B29 at Clause 55.05-5 of the Darebin Planning Scheme.
(e) Annotated dimensions of the heights of the front fences to comply with Standard B32 at Clause 55.06-2 of the Darebin Planning Scheme.
(f) The provision of pedestrian visibility splays measuring 2.0 metres (width across the frontage) by 2.5 metres (depth into the site), to the northern and southern sides of the crossovers to George Street. Where within the site, the splays must be at least 50% clear of any visual obstructions (structures, vegetation and the like). The splays may include an adjacent entry or exit lane where more than one lane is provided, or adjacent landscaped areas, provided the landscaping in those areas is less than 900mm in height.
(g) Removal of the north-facing windows of dwelling TH05.
(h) Relocate the Hot Water Unit of dwelling TH16 to a location within the eastern side of the Secluded Private Open Space, or any other location to the satisfaction of the responsible authority.
(i) The front fence for the church building to be timber pickets or another material to the satisfaction of the responsible authority, with detailed dimensioned plans of the fence included.
(j) A cumulative provision of at least 5 cubic metres of storage in the First Floor porch, underneath each dwelling's First/Second Floor stairway and on the Second Floor Balcony of each dwelling TH17 to TH24.
(k) The portion of the southern crossover which serves vehicles finished in concrete.
(l) A comprehensive schedule of construction materials, external finishes and colours (including colour samples).
(m) Details of the fences on the northern, eastern and southern boundaries (except within 9 metres of the western boundary of the land) in accordance with Condition No. 12 of this Permit.
(n) The location of all plant and equipment (including air-conditioners, condenser units, rainwater tanks, solar panels, hot water units and the like). These are to be:
- co-located where possible;
- located or screened to be minimally visible from the public realm;
- air conditioners located as far as practicable from neighbouring bedroom windows or acoustically screened; and
- integrated into the design of the building.
(o) The location of water and electricity metres. Where metres would be visible from the public realm, these are to be:
- co-located where possible;
- positioned on a side boundary or adjacent to the accessway; and
- screened from view using either landscaping or durable screening that integrates with the development.
(p) The northern window of the northern First Floor bedroom of dwelling TH08 and the southern First and Second Floor windows of each dwellings TH17 to TH21 and the First Floor windows of dwelling TH22 with either:
- a sill with a minimum height of 1.7 metres above finished floor level;
- a fixed external screen with a maximum permeability of 25% to a minimum height of 1.7 metres above finished floor level; or
- fixed obscure glazing (not film) with a maximum transparency of 25% to a minimum height of 1.7 metres above finished floor level.
Where fixed screens are being utilised a section diagram must be included to demonstrate how the screens minimise overlooking of adjoining properties. Screens must be constructed of durable materials and be integrated with the design of the development.
(q) Any fencing visible from the street, other than fencing along common boundaries shared with an adjoining site, to be of a design, colour and quality of material (not timber palings) that matches the character of the development.
(r) Any modifications required as a result of the approved Landscape Plan required by Condition No. 4 of this Permit.
(s) Annotations detailing Tree Protection Zone(s), associated tree protection fencing and tree protection measures in accordance with the requirements of Condition No. 5 and 6 of this Permit.
(t) Any modifications required as a result of the approved Sustainable Management Plan (SMP) required by Condition No. 7 of this Permit, including:
- All East and West upper-level windows to be operable: two awning style windows or both casement style.
- External operable shading devices to all west and east facing windows and glazed doors to habitable rooms drawn and labelled with ASD (Adjustable Shading Device) on the floor plan and elevations. The first-floor window shading devices must be operable from within the dwelling. Include a product diagram or section of the proposed device (must not be roller shutters for any street facing glazing). Ensure windows that have external adjustable shading can open when using the blind.
- Horizontal, fixed, external shading devices to all north facing habitable room windows and glazed doors where not located directly under an eave or overhang. Draw and label all shading on the plans and elevations with FSD (Fixed Shading Device). Provide a dimensioned section diagram or photograph of the shading. The depth of the device must be equal to 25% of the distance from sill height to the base of the device. The device must also extend horizontally to both sides of the window or glazed door by a distance equal to the depth of the device.
- Double glazing 'DG' to all habitable room windows, glazed doors and skylights annotated on each individual glazing unit and specified on the material/colour schedule/window legend. New operable glazing doors to church-dwelling to be double-glazed and existing wall vents to be renovated.
- The location and size of all rainwater tanks, labelled, including a notation indicating that the rainwater tank will be collecting from specified roofed area (sqm) and servicing all toilets. The tanks must be accessible for maintenance, leak detection and repair.
- Label Water Efficient Gardens, annotate rainwater tank connection to garden, noting that no potable water is to be used for irrigation. Location of taps and floor waste on balconies / courtyards, clearly annotated. Size of Vegetated area labelled (sqm), as defined in BESS.
- Details of the permeable surfaces with a cross section - if permeable paving as per Darebin WSUD guidelines.
- Annotate 3kW minimum photovoltaic array solar panels per dwelling, facing North with tilt angle annotated. Panels must be located to avoid being overshadowed.
- Update the ESD table to show items that cannot be drawn e.g. NatHERS, ACH, building material certifications (PEFC timber, E0, Non-VOC etc), glazing properties (U-value, SGHC), appliance ratings and cooling/heating ratings; A minimum 4/4/5 WELS rated Shower/Toilet/Taps; a minimum 4 Star WELS Dishwasher.
- Draw and label: Ceiling fans to all bedrooms. The clothesline for each dwelling. Skylights and note as operable. Skylights to Church must have operable shading. Electrical power points to bike parking area for E-bikes.
- The roof specified with a Solar Absorptance value of less than or equal to 0.50 on the plans and in the Materials/Finishes schedule. The driveway specified as no darker than 'Medium' i.e. with a Light Reflectance Value of 40 or higher.
- Show 6 visitor bike parking or bike rails.
- Provision of a minimum 32A dedicated circuit from switchboard to carparks to allow for electric vehicle charging for each carparking space.
- All bathrooms to have humidity-controlled exhaust fans.
- Location of food and garden waste facilities.
- Amended Landscape, WSUD, Garden Plans.
(u) The provision of a Stormwater Management System Plan, including a Water Sensitive Urban Design Plan, in accordance with Standard W1 of Clause 53.18-4 of the Darebin Planning Scheme. (Refer to Condition No. 9 of this Permit.)
(v) The provision of a Site Management Plan in accordance with Standard W3 of Clause 53.18-6 of the Darebin Planning Scheme. (Refer to Condition No. 10 of this Permit.)
(w) Any modifications required as a result of the approved Waste Management Plan (WMP) required by Condition No. 11 of this Permit.
When approved, the plans will be endorsed and form part of this Permit.
(a) The specie of tree proposed in the south east corner of the subject land shown as a Eucalyptus Woodwardii (Lemon flowering gum - 12.0m x 3.0m).
(b) Tree protection measures in accordance with Condition No. 5 and 6 of this Permit.
(c) Any modifications relating to landscaping required as a result of the Sustainable Management Plan required by Condition No. 7 of this Permit)
(d) Any modifications relating to landscaping required as a result of the Water Sensitive Urban Design Plan/Report required by Condition No. 9 of this Permit).
(e) Details of all existing trees to be retained and all existing trees to be removed, including overhanging trees on adjoining properties and street trees within the nature strip. The genus, species, height and spread of all trees must be specified. All existing trees to be retained must be retained and protected in accordance with Australian Standards.
(f) A planting schedule of proposed vegetation detailing the botanical name, common name, size at maturity, pot size and quantities of all plants.
(g) A diversity of plant species and forms including at least:
- Eight (8) large sized canopy trees in the private open space of the proposed development, with a minimum mature height of 10m or more. At the time of planting these trees are to be from 50L size pots and at least 2m in height.
- Twelve (12) medium sized canopy trees in the private open space of the proposed development, with a minimum mature height of 8m. At the time of planting these trees are to be from 50L size pots and at least 2m in height.
- Twelve (12) small sized canopy trees in the private open space of the proposed development, with a minimum mature height of 4m. At the time of planting these trees are to be from 50L size pots and at least 2m in height.
(h) No trees are to be located in the church's front setback, i.e. both to the west of the church building and to the south of the main crossover.
(i) Annotated graphic construction details showing all landscape applications and structures including tree and shrub planting, retaining walls, raised planter bed and decking.
(j) Type and details of all surfaces including lawns, mulched garden beds and permeable and/or hard paving (such as pavers, brick, gravel, asphalt and concrete) demonstrating a minimum site permeability of 20%. Percentage cover of permeable surfaces must be stated on the plan. Where paving is specified, material types and construction methods (including cross sections where appropriate) must be provided.
(k) Hard paved surfaces at all entry points to dwellings.
(l) The location of all plant and equipment as shown (including air conditioners, letter boxes, garbage bins, lighting, clotheslines, tanks, storage, bike racks and the like).
(m) Type and details of edge treatment between all changes in surface (e.g. grass (lawn), gravel, paving and garden beds).
(n) An outline of the approved building/s including any basement, the location of entry doors, windows, gates and fences.
(o) The location of both existing and proposed overhead and underground services. Conflicts of such services with the existing and proposed planting must be avoided.
(p) Clear graphics identifying trees (deciduous and evergreen), shrubs, grasses/sedges, groundcovers and climbers.
(q) Scale, north point and appropriate legend.
(r) Landscape specification notes including general establishment and maintenance requirements.
The requirements of the endorsed Landscape Plan must be complied with and implemented to the satisfaction of the responsible authority.
The development must not be occupied, unless otherwise approved by the responsible authority in writing, until the landscaping works shown on the endorsed Landscape Plan are completed to the satisfaction of the responsible authority.
No later than seven (7) days after the completion of the landscaping, the permit holder must advise council, in writing, that the landscaping has been completed.
The landscaping shown on the endorsed Landscape Plan must be maintained to the satisfaction of the responsible authority, including by replacing any dead, diseased, dying or damaged plants to the satisfaction of the responsible authority.
All landscaped areas must be provided with an appropriate irrigation system to the satisfaction of the responsible authority.
Tree 3 - Chamaecyparis lawsoniana (Lawson's Cypress)
*As defined in Arboricultural Impact Assessment prepared by Treetec Professional Tree Services and dated 8 December 2023.
(a) Tree protection measures must be in accordance with Australian Standard AS4970 - 2009: Protection of trees on development sites or as otherwise approved in writing by the Responsible Authority.
(b) Tree protection fencing must be constructed of star pickets and chain mesh (or similar) to the satisfaction of the Responsible Authority. The tree protection fence must remain in place until construction is completed or unless otherwise agreed by the Responsible Authority in writing.
(c) The tree protection fencing must be maintained at all times and may only be moved the minimum amount necessary for approved buildings and works to occur within a Tree Protection Zone (TPZ). The movement of the fencing to allow such buildings and works shall only occur for the period that such buildings and works are undertaken, after which time the full extent of the fencing must be reinstated.
(d) Tree 1 will require an exploratory dig, to a depth of 300mm below existing grade, using a non-destructive method such as manual, pneumatic or hydro excavation is undertaken. The excavation must be undertaken under supervision of an AQF Level 5 arborist. The excavation should expose the area of encroachment within the SRZ of tree 1, to ensure that no large roots, greater than 40mm in diameter are within this footprint.
If roots of this size are discovered, they must remain in situ and an engineering solution, such as suspending the slab of the proposed extension, implemented to avoid the severance of these roots.
Roots smaller than 40mm in diameter within this SRZ encroached area may be severed to facilitate the footings of the proposed design.
Any severance or engineering solution must be undertaken/designed in co-ordination with a suitably qualified arborist.
TPZ fencing can only be reduced by the minimum amount necessary for construction of the approved crossover.
(e) All excavations for the construction of the proposed southern crossover are to be supervised by a suitably qualified and experienced arborist with all root pruning undertaken in accordance with section 9 of AS4373-2007 Pruning of Amenity Trees.
(f) The proposed building footprint within the SRZ and TPZ of tree 7 must be constructed using root sensitive footings. The proposed courtyard paving must be constructed at or above the existing soil level, with permeable materials, and with no trenching or major excavation inside the TPZ of tree 7. The new fence construction must use the existing fence post holes where possible and where new post holes are needed within the TPZ of tree 7, these must be dug by hand. If roots greater than 40mm are found, they must remain in situ and the post hole must be moved further away from the tree. If roots less than 40mm are found, these can be cut with a sharp clean tool by a suitably qualified arborist. These works will be closely supervised by the project arborist, to ensure there is no inadvertent impact to the roots of this tree.
(g) A qualified arborist must oversee all works in and around Tree Protection Zones (TPZ) for trees 1, 2, and 7.
(h) All services must be routed outside 'Tree Protection Zones'. If there is no alternative to passing through the protection zone, the local authority and the consulting arborist must be advised in writing on the need for directional boring beneath root zone; this must be maintained at a minimum depth of 45cm in soil depth when inside the TPZ of a retained tree.
(i) Except with the written consent of the responsible authority:
- The area within the TPZ and Tree Protection Fencing (TPF) must be irrigated during the summer months with 1 litre of clean water for every 1cm of trunk girth measured at the soil/trunk interface on a weekly basis.
- The area within the TPZ of Trees No. 1, 2, and 7 must be provided with 100mm layer of coarse mulch.
- No vehicular or pedestrian access, trenching or soil excavation is to occur within a TPZ, save for that allowed to complete the approved development.
- No storage or dumping of tools, equipment or waste is to occur within a TPZ.
(j) Any pruning works must be conducted in accordance with the Australian Standard AS4373 - 2007: Pruning of Amenity Trees and undertaken by a suitably qualified arborist.
(k) The construction of the crossover (and any other buildings and works within a TPZ) must be undertaken under the supervision and direction of a qualified arborist.
(l) Where applicable to a nature strip tree, a TPZ is confined to the width of the nature strip.
(m) Where applicable to a tree on a neighbouring lot, a TPZ only applies where within the site.
(n) Before any development (including demolition) starts, all existing vegetation shown on the endorsed plan(s) to be retained must be marked and that vegetation must not be removed, destroyed or lopped without the written consent of the Responsible Authority.
(a) Provide preliminary NatHERS ratings assessments for all thermally unique dwellings and achieve an average of at least 7 Stars; and Provide preliminary NatHERS ratings assessments for the retrofitted church.
- The NatHERS ratings must be updated to include all skylights.
- All skylights to be double-glazed and operable.
(b) Specify 4 Star WELS rated toilets.
(c) If claiming in BESS a Building Users Guide, provide a further description of what information is going to be included.
(d) Amend the BESS report (and any other corresponding documentation) to:
- Select 4 star WELS rated toilets in the BESS water category.
- Include the updated heating and cooling loads and overall star rating obtained from the preliminary energy ratings in the dwelling Energy Profiles.
(e) A STORM report and stormwater management response that maintains a minimum STORM score of 100% but is modified so that:
- There is consistency between the plans, SMP and STORM report.
- An equivalent minimum 2000L rainwater tank to each dwelling, plumbed to flush toilets, independent of any on site detention requirements.
- It must not use proprietary products, buffer strips, swales or large areas of hard surface draining to in-ground raingardens.
- If rainwater tanks are used: Their reliability a minimum of 80%.
- If raingardens are used: A minimum of 1 square metre in size, and 2% - 4% of the catchment area they are treating. The catchment area must be a minimum of 25 square metres and detailed to Darebin's preferred design.
(f) An amended WSUD (Water Sensitive Urban Design) catchment plan that is consistent with the STORM report, clearly showing:
- Location and size/s of rainwater tanks (labelled) including access to underground tank maintenance.
- Where all stormwater will drain, downpipes clearly marked and the direction of flow shown with arrows (including roof, balconies, driveway and raingarden).
- All permeable areas dimensioned;
- All stormwater catchment areas (impervious areas and roofs) clearly marked and dimensioned (in sqm) and connected to corresponding Water Sensitive Urban Design (WSUD) treatment measures.
Where alternative ESD initiatives are proposed to those specified in this condition, the responsible authority may vary the requirements of this condition at its discretion, subject to the development achieving equivalent (or greater) ESD outcomes in association with the development. When submitted and approved to the satisfaction of the responsible authority, the amended SMP and associated notated plans will be endorsed to form part of this permit. No alterations to the SMP may occur without the written consent of the responsible authority.
(a) Details of how the stormwater management system is designed to meet the current best practice performance objectives for stormwater quality contained in the Urban Stormwater - Best Practice Environmental Management Guidelines (Victorian Stormwater Committee, 1999), including;
- An assessment using an industry recognised stormwater tool;
- The type of water sensitive urban design (WSUD) stormwater treatment measures to be used and details of these treatment measures including cross sections, materials, plants and drainage directions;
- The location of stormwater treatment measures in relation to buildings, sealed surfaces, neighbouring properties and landscaped areas;
- A plan illustrating where all impervious surfaces will be treated and drained;
- A construction and maintenance schedule;
(b) Details of how the stormwater management system contributes to cooling, improving local habitat and providing attractive and enjoyable spaces;
(c) Consideration of how the WSUD stormwater treatment measures will integrate with on-site detention requirements;
The requirements of the endorsed Stormwater Management System Report must be implemented and complied with to the satisfaction of the responsible authority.
(a) Erosion and sediment.
(b) Stormwater.
(c) Litter, concrete and other construction wastes.
(d) Chemical contamination.
The requirements of the endorsed Site Management Plan must be implemented and complied with to the satisfaction of the Responsible Authority.
(a) Ensure all bin types, bin sizes, the size of the waste storage area/s and any other relevant detail/s specified in the Waste Management Plan are shown to scale on the endorsed plans.
(b) Explain how and where waste will be stored on the site.
(c) Detail the size and location of general, recyclable, [*FOGO and glass] waste bins.
(d) Include a plan that shows:
- The waste storage and collection area.
- The length and width of the footpath/ nature strip directly abutting the site boundary.
- The location of any available on-street carparking, loading zones and tram/bus stops.
- The location of all street furniture, light poles, electricity poles, driveways, street trees, bus shelters or similar obstructions.
- The location of the bins within the road reserve, with a minimum gap of 300mm between bins and other obstructions.
- If private waste collection is required, type and size of collection vehicles, frequency of collection, times of collection, location of collection point for vehicles and location of bins prior to collection.
The plan may require bin sharing or that collection be undertaken by a private contractor if it cannot be demonstrated to the satisfaction of the Responsible Authority that the kerb-side collection of individual bins will not cause car parking and/ or amenity issues.
Where waste is collected by a private contractor, bins must not be stored off site before and after collection.
The provisions, recommendations and requirements of the approved Waste Management Plan must be implemented and complied with to the satisfaction of the Responsible Authority.
Waste storage and collection must not affect the amenity of the surrounding area.
Waste storage and collection must not cause any interference with the circulation and parking of vehicles on abutting streets.
If the existing fences on the southern, northern and eastern with a height less than 1.8 metres is structurally sound, the fence height may be increased by the addition of a free-standing, self-supporting trellis adjacent to the fence to the required height. If used, such trellis must be a maximum of 25% visually permeable and be fixed, permanent, durable and of materials, finishes and colour that will blend in with the development.
The development must not be occupied until a report prepared by a licensed land surveyor to the satisfaction of the responsible authority is submitted to the responsible authority, confirming the floor level(s).
The external lighting must be designed, baffled and located to prevent any adverse effect on adjoining and nearby land to the satisfaction of the responsible authority.
(a) concealed in service ducts or otherwise hidden from view; or
(b) located and designed to integrate with the development,
All to the satisfaction of the responsible authority.
(a) constructed;
(b) properly formed to such levels that they can be used in accordance with the plans;
(c) surfaced with an all-weather sealcoat;
(d) drained;
(e) line-marked to indicate each car space and all access lanes; and
All to the satisfaction of the responsible authority.
(a) The development does not start within three (3) years from the date of this Permit; or
(b) The development is not completed within five (5) years of the date of this Permit.
As relevant, the responsible authority may extend the times referred to if a request is made in writing:
(a) Before this Permit expires;
(b) Within six (6) months after the expiry date; or
(c) Within twelve (12) months after the expiry date if the request relates to the completion of the development or a stage of the development.
[1] A planning permit is not triggered under the DCPO1.
[2] Council advised that the land immediately adjacent and along the rear boundary of the review site, includes a 'former carriageway easement' that is currently used as secluded private open space by the rear dwellings located at 35-37 and 39 Ashley Street ('the Henty Land'). I was also informed this land is currently progressing through 'vacant possession' procedures by the respective dwelling owners.
[3] The submissions and evidence of the parties, any supporting exhibits given at the hearing and the statements of grounds filed have all been considered in the determination of the proceeding. In accordance with the practice of the Tribunal, not all of this material will be cited or referred to in these reasons.
[4] As worded prior to gazettal of AmVC243.
[5] The HO264 does not require a permit for internal alterations to the former church building.
[6] AmVC267 inserted a transition provision in residential zones to provide that any application lodged before the commencement date can continue to be assessed under the provisions in force immediately before the commencement date.
[7] D'Andrea v Boroondara CC [2023] VCAT 1148, Costa v Banyule CC [2023] VCAT 1273 and Oechsle v Frankston CC [2023] VCAT 1356 referred to.
[8] Ling v Whitehorse CC (Red Dot) [2023] VCAT 307 referred to.
[9] Decision guidelines stated are those in place prior to the gazettal of AmVC243.
[10] Darebin Neighbourhood Character Precinct Guidelines (Planisphere, 2007).
[11] Council's heritage adviser also supported the contemporary design outcomes associated with the proposal in relation to the retention and setting of the former church building (advice dated 10/1/24).
[12] Alameddine v Darebin CC [2023] VCAT 839 and Mavrikis v Darebin CC [2024] VCAT 646 referred to.
Kropf
Darebin CC [2025] VCAT 995