WILL THERE BE ANY UNREASONABLE OFF-SITE AMENITY IMPACTS?
IS AN APPROPRIATE LEVEL OF INTERNAL AMENITY PROVIDED?
DOES THE PROPOSAL APPROPRIATELY PROVIDE FOR CAR PARKING AND TRAFFIC MOVEMENTS?
(a) The entire building achieving full compliance with Standard B17, as found at Clause 55.04-1 of the Boroondara Planning Scheme.
(b) The provision of a minimum of two skylights to the rear section of the living area of Apartment 2.02, in order to improve the daylight to this area, and the subsequent relocation of any rooftop plant and equipment to facilitate the provision of these skylights. Any relocated rooftop plant and equipment must be sited in a centralised location and away from property boundaries.
(c) Relocation of the water and gas meters further away from tree 5, and sited along the northern side of the basement access ramp, generally in accordance with the manner depicted in the sketch plan contained at Attachment 5 to Mr Loughnan's submissions in the VCAT hearing, marked G2 Urban Planning and dated 15 September 2023.
(d) The provision of a minimum 9.05 metre front setback to apartments G.05, 1.06 and 2.04.
(e) The provision of screening to restrict overlooking from the east facing first and second floor bedroom windows at Apartments 1.06 and 2.04, as well as the eastern edge of the balcony to Apartment 1.06.
(f) The provision of screening to restrict overlooking consistent with that depicted in plans prepared by Rothelowman and dated 11 May 2023, but with the following changes:
- Replacement of the obscure batten screen to balconies with an obscure glazed screen;
- Confirmation that the obscure glazed screen to balconies, is to be installed to the outer edge of the respective planter boxes;
- Confirmation that the 2.4 metre high fence to be erected along the southern boundary of the review site, will for the extent of the common boundary with 11 Butler Street, be installed inside the existing retaining wall and cyclone wire fence, allowing these existing elements to remain.
(g) The location of site services and retaining walls must be located in accordance with the ,marked up plan' prepared by G2 Urban Planning and dated 15 September 2023.
(h) Replace the soldier brick coursework above the top window of the central 3 storey façade with a dark grey metal finish and aligned with the recessed glazing.
(i) The fire booster unit at the eastern end of the street frontage to be metal battens (MC03).
(j) The dark brick finish of the front fence to continue to cover the driveway sideways, the eastern boundary wall and any visible basement walls.
(k) Details of all service enclosures to be shown on the plans.
(l) Physical samples of all finishes and colours to be submitted to Council for verification and approval.
(m) The top of the basement ramp showing 150mm above the base of the kerb in front of the crossover.
(n) Electric vehicle charging infrastructure to all car parking spaces.
(o) The raingarden relocated so it is no longer on-site boundary adjacent to neighbouring properties.
(p) The Tree Protection Zone and Structural Root Zone of Tree Nos. 1, 2, 3, 4, 5, 10, 12, 14, 15, 16, 17, 18, 19, 20, 21, 25 and 29 (as identified in the Arborist Report submitted with the application prepared by Tree Radar Australia (dated 16/06/2022) shall be shown in the Tree Management Plan and drawn on all site and floor plans.
(q) Notation on all site and floor plans that Tree Nos. 1, 2, 3, 4, 5, 10, 12, 14, 15, 16, 17, 18, 19, 20, 21, 25 and 29 are to be retained and protected in accordance with the endorsed Tree Management Plan required by this Permit.
(r) Any modifications to the location or layout of buildings and/or works recommended in the endorsed Tree Management Plan required by this Permit.
(s) The siting of any necessary stormwater detention pit, underground services and pits, and/or rainwater harvesting tank to be located outside any area set aside for deep-soil planting and outside the Tree Protection Zone of any trees to be retained/protected.
(t) Deletion of paving within the Structural Root Zone of Tree 10.
(u) Notation on all site and floor plans that the existing levels within the Tree Protection Zone of Tree 10 must be maintained (excluding building footprint).
(v) Notation on all site and floor plans that the existing concrete driveway and permeable concrete structure must be retained within the Tree Protection Zone of Tree 10 until commencement of the landscape stage.
(w) Notation on all site and floor plans that no services are to be located within the Tree Protection Zones of Tree Nos. 5, 10, 14, 15, 16, 17 and 18.
(x) Notation on all site and floor plans that all excavations within the Tree Protection Zone of Trees 5 and 10 must be undertaken with hand tools or hydro-vacuum and that all excavation works must be supervised, documented and certified by the AQF level 5 qualified Project Arborist (excluding building footprint).
(y) Notation on all site and floor plans that existing levels must be maintained within the Tree Protection Zones of Tree Nos. 5, 14, 15, 16, 17, 18, 19, 20, 21 and 29. between the Eastern boundary and paved areas.
(z) Notation on all site and floor plans that existing levels must be maintained within the Tree Protection Zones of Tree Nos. 25 between the boundary and building footprint.
(aa) Permanent fencing within the Tree Protection Zone of Trees 5, 10, 14, 15, 16, 17, 18, 19, 20, 21, and 25 constructed on pier foundations with any required plinths constructed above existing grade.
(bb) Changes to private open space areas in the southeast and southwest corners of the property to facilitate replacement tree planting as required in the Landscape Plan conditions of this permit.
(cc) Any changes as required by the Landscape Plan in accordance with this permit.
(dd) Any changes as required by the Waste Management Plan in accordance with this permit.
(ee) Any changes as required by the Tree Management Plan in accordance with this permit.
(ff) Any changes as required by the Sustainability Management Plan in accordance with this permit.
(a) All landscaping proposed at first floor and second floor levels;
(b) A survey (including botanical names) of all existing trees to be retained and of those to be removed. The intended status of the trees shown on the landscape plan must be consistent with that depicted on the development layout plan;
(c) All hard surfaces proposed within the Tree Protection Zone of Tree Nos. 1,2,3,4,10, 17, 18, and 25 (as identified in the Arborist Report submitted with the application Tree Radar Australia (dated 16/06/2022) must be constructed of permeable materials; be constructed above current grade; and be constructed on foundations that maintain appropriate permeability for each tree, to the satisfaction of the Responsible Authority;
(d) Detailed construction specifications for all permeable surfaces that include cross-section diagrams (including first and second floor areas);
(e) All trees must comply with Australian Standard AS2303:2015 - Tree Stock for Landscape Use;
(f) All canopy trees must be planted by an AQF Level 3 Qualified Arborist, Landscape Gardener or Horticulturist; and,
(g) The proposed irrigation system.
(a) A Tree Protection Plan drawn to scale that shows:
- Tree 5 accurately located;
- Tree Protection Zones and Structural Root Zones of all trees to be retained;
- All tree protection fenced off areas and areas where ground protection systems will be used;
- The type of foundations (illustration or notation) within each Tree Protection Zone;
- Any services to be located within the Tree Protection Zone and a notation to state that all services will either be located outside of the Tree Protection Zone, bored under the tree protection zone, or installed using hydro excavation under the supervision of the project arborist; and
- A notation to refer to the Tree Management Plan for specific detail on what actions are required within the Tree Protection Zone.
(b) Details of how the root system of any tree to be retained will be managed. This must detail any initial non-destructive trenching and pruning of any roots required to be undertaken by the project arborist; and details of how any permeable surfaces within the Tree Protection Zone of retained trees will be constructed;
(c) Supervision timetable and certification of tree management activities required by the Project Arborist to the satisfaction of the Responsible Authority;
(d) All remedial pruning works that are required to be performed on trees during demolition and development of the site. The pruning comments must reference Australian Standards 4373:2007 Pruning of Amenity Trees and provide a detailed photographic diagram specifying what pruning will occur.
(e) The recommendations contained in the approved Tree Management Plan must be implemented to the satisfaction of the Responsible Authority and any changes to the endorsed Tree Management Plan will require written authorisation from the Responsible Authority.
(a) A site plan showing the location of proposed stormwater treatment measures and the location and area (square metres) of impermeable surfaces that drain to each treatment measure.
(b) A written statement outlining how the application achieves current best practice performance objectives for stormwater quality as contained in the Urban Stormwater - Best Practice Environmental Management Guidelines (1999). Please note that for the modelling requirement you can use the following free program to demonstrate best practice, which is equivalent to a score of 100% or more: http://storm.melbournewater.com.au/
(c) If any water tank is proposed, the plans must indicate the tank's capacity in litres and what the tank is connected to (e.g. toilets).
(a) Preliminary energy rating for apartment 2.03 demonstration compliance with clause 55.07 cooling load limits
Where alternative ESD initiatives are proposed to those specified in conditions above (including condition 1), the Responsible Authority may vary the requirements of this condition at its discretion, subject to the development achieving equivalent (or greater) ESD outcomes in association with the development.
(a) Properly paved and drained to a legal point of discharge;
(b) Screened from view with a suitably designed enclosure;
(c) Supplied with adequate hot and cold water; and
(d) Maintained in a clean and tidy condition free from offensive odours
(a) the type/s and number of waste bins;
(b) screening of bins;
(c) type/size of trucks;
(d) frequency of waste collection;
(e) delivery of bins to waste collection points and retrieval of bins once collected;
(f) Include that all town houses be provided with kitchen caddies and compostable liners for the storage of FOGO.
(g) Waste Collection, Arrangement and Vehicle access -note that each waste stream is to be collected in separate trucks and taken to the respective waste processors and not to be placed in one truck.
(a) Hours for construction activity in accordance with any other condition of this permit;
(b) Measures to control noise, dust, water and sediment laden runoff;
(c) Measures relating to removal of hazardous or dangerous material from the site, where applicable;
(d) A plan showing the location of parking areas for construction and sub-contractors' vehicles on and surrounding the site, to ensure that vehicles associated with construction activity cause minimum disruption to surrounding premises. Any basement car park on the land must be made available for use by sub constructors/tradespersons upon completion of such areas, without delay;
(e) A Traffic Management Plan showing truck routes to and from the site;
(f) Swept path analysis demonstrating the ability for trucks to enter and exit the site in a safe manner for the largest anticipated truck associated with the construction;
(g) A plan showing the location and design of a vehicle wash-down bay for construction vehicles on the site;
(h) Measures to ensure that sub-contractors/tradespersons operating on the site are aware of the contents of the construction management plan;
(i) Contact details of key construction site staff;
(j) A site plan showing the location of any site sheds, on-site amenities, building waste storage and the like, noting that Council does not support site sheds on Council road reserves; and
(k) Any other relevant matters, including the requirements of VicRoads and Yarra Trams.
(a) The development is not started within two (2) years of the issue date of this permit.
(b) The development is not completed within four (4) years of the issue date of this permit.
In accordance with section 69 of the Planning and Environment Act 1987, an application may be submitted to the responsible authority for an extension of the periods referred to in this condition.
(a) Formed to such levels and drained so that they can be used in accordance with the endorsed plans.
(b) Treated with an all-weather seal or some other durable surface.
[1] The submissions and evidence of the parties, any supporting exhibits given at the hearing and the statements of grounds filed have all been considered in the determination of the proceeding. In accordance with the practice of the Tribunal, not all of this material will be cited or referred to in these reasons.
[2] As recorded in the Tribunal order dated 20 July 2023.
[3] Clause 11.03-1S of the Boroondara Planning Scheme.
[7] As found at Clause 55.04-1 of the Boroondara Planning Scheme.
[8] The walls that did not comply with Standard B17, are: to Apartment 201, has a wall height of 10.91m which requires a setback of 6.01m, and a setback of 5.8m is proposed; to Apartment 204, has a wall height of 10.19m which requires a setback of 5.29m, and a setback of 5.25m is proposed.
[9] Survey dated 20 January 2022 by Terrence Hamilton of 2Map Pty Ltd.
[10] The buildings at 576 Riversdale Road and 578-580 Riversdale Road are much wider, as is the rear (southern) elevation of the building at 564 Riversdale Road.
[11] Particularly the words at paragraph 86 of that decision.
[12] Quoted from paragraph 169 of Ms Harrison's written submission.
[13] As found at Clause 55.07-4 of the Boroondara Planning Scheme.
[14] As found at Clause 55.07-13 of the Boroondara Planning Scheme.
D'Andrea
Boroondara CC [2023] VCAT 1148