[2015] VCAT 1723
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2015-10-30
Original judgment source is linked above.
The application for review is against the Responsible Authority's failure to make a decision within the prescribed time. As such there is a presumption under Section 115CA that fees will be reimbursed. As outlined in paragraphs 78 to 82 I declined to direct that fees be reimbursed. In particular, I noted that a consultative approach to development applications is a strong and very positive feature of the Victorian planning system. Ongoing discussions and negotiations between a permit applicant and Council staff are common and a more complex application will usually involve more discussion and negotiation and hence longer timeframes. Although the delays can be lengthy, the final result can be a far more acceptable and positive development than the one first presented to Council.
Stonnington Planning Scheme; Application pursuant to Section 79 of the Planning and Environment Act 1987; General Residential Zone 7 (GZ7); Incremental Change Area; Three storey building; 25 dwellings; Basement parking; Setbacks; Visual bulk; Amenity impacts; Landscaping.
Burke Vue Pty Ltd v Stonnington CC (Includes Summary) (Red Dot) [2015] VCAT 1723
Issue TP15, Drawings DA1.01, DA1.02, DA2.01, DA2.02, DA2.03, DA2.04, DA2.05, DA3.01, DA3.02, DA3.03, DA4.1, DA4.2, DA4.3, DA.4.4, DA4.5, DA4.6, DA5.1, DA6.1, DA6.2, DA6.3 and DA6.4
Mr Stuart Morris QC, instructed by Minter Ellison Lawyers. He called evidence from the following witnesses:
Written evidence was also provided by Mr Russell Fairlie, Traffic Engineer of Ratio: Consultants Pty Ltd but in the absence of any traffic issues raised by parties or the Tribunal he was not required to attend the hearing.
Mr David Vorchheimer, Solicitor of HWL Ebsworth Lawyers. He called evidence from the following witness:
Construction of three storey building containing 25 dwellings over basement parking for 35 vehicles.
Application under Section 79 of the Planning and Environment Act 1987 to review the failure to grant a permit within the prescribed time.[1]
Cl. 32.08-4 (two or more dwellings on a lot in GRZ7).
Cl. 52.29 (alteration of access to a road in a Road Zone Category 1)
Clauses 9, 10, 11, 15, 16, 18, 21.03, 21.04, 21.05, 21.06, 21.07, 21.08, 22.05, 22.23, 52.06, 52.34, 55 and 65.
The review site is located on the western side of Burke Road approximately midway between Malvern Road to the north and High Street to the south. It has a frontage of 25.6 metres, a depth of 73.15 metres and an area of 1,784 square metres.
An unconstructed laneway abuts the western boundary and terminates as a splay at the south west corner of the site. A pedestrian gate provides access to the laneway.
The review site contains a large double storey, Edwardian era dwelling with a pitched tiled roof. Adjoining sites to the north and south are also developed for single dwellings.
I undertook an inspection of the review site, surrounding properties and the locality on the afternoon of the third day of the hearing.
Global Alpha Group Pty Ltd v Boroondara CC [2013] VCAT 1929.
A18 Pty Ltd v Stonnington CC [2014] VCAT 1015.
AMENDMENT C175 HAS BEEN GAZETTED SINCE THE HEARING
WHAT DOES THE PLANNING SCHEME SAY ABOUT ADDITIONAL HOUSING IN THIS LOCATION?
[11] ... Plan Melbourne contains an example of applying the GRZ in Greater Dandenong and explains that it is applied to incremental change areas where lower-scale, medium-density development of 2-3 storeys is preferred. Planning policy in this case says the site is in an incremental change area and GRZ7 provides for three storey development. Further, in an existing neighbourhood with generally 1-2 storey high buildings, a three storey building is an incremental change and a three storey apartment building can be described as moderate housing growth.
IS THE DESIGN RESPONSIVE TO THE SITE CONTEXT, TO CLAUSE 55 (RESCODE) AND IS IT ACCEPTABLE?
[39] Inadequate side and rear setbacks and unreasonable visual bulk to neighbouring properties were other matters raised in submissions opposing the development. It is often argued that compliance with the B17 side and rear setback envelope demonstrates that a building does not cause unreasonable visual bulk when viewed from neighbouring properties. Nothing could be further from the truth since simple use of the B17 setback envelope takes no account of the length of wall being measured. For example, the visual impact of a short 10 metre length of wall achieving the B17 envelope is likely to be entirely different to a 40 to 50 metre length of wall, particularly where that length of wall occupies a significant length of boundary with neighbouring properties. In this case, the review site abuts six neighbouring properties and therefore has the potential to have a significant visual impact on the rear yards of these properties. The rear yards of Nos 143 and 147 Cotham Road and 3 Ermington Place are most affected as the upper levels of the building are recessed away from Nos 5 and 7 Ermington Place and No 1 Hillcrest Avenue. During the hearing Mr Scally produced a number of plans that further recessed the building from the northern end of the site. Whilst these represent an improved built form for neighbours at the northern end of the site, the building still extends for a considerable length along the site.
(1) Subject to subsections (2) and (3), an applicant to the Tribunal under section 79 of the Planning and Environment Act 1987 is entitled to an order under section 115B that the responsible authority reimburse the applicant the whole of any fees paid by the applicant in the proceeding.
Section 79 of the Planning and Environment Act 1987 enables an applicant for a planning permit to apply to the Tribunal for review of a failure of the responsible authority to grant the permit within the prescribed time.
(2) If different fees are payable in a proceeding under section 79 of the Planning and Environment Act 1987 depending on an election made by the applicant, subsection (1) applies to entitle the applicant to an order for reimbursement of only the amount of the lowest of those fees.
If different fees are payable depending on the list of the Tribunal in which the applicant elects to have the proceeding entered, then if the applicant elects to have the proceeding entered in a list that attracts a higher fee, the applicant would only be entitled under subsection (1) to an order for reimbursement of the amount of the lowest of those fees.
(3) Subsection (1) does not apply if the responsible authority satisfies the Tribunal that there was reasonable justification for the responsible authority to fail to grant the permit before the application to the Tribunal, having regard to -
(a) the nature and complexity of the permit application; and
(b) the conduct of the applicant in relation to the permit application; and
(c) any other matter beyond the reasonable control of the responsible authority.
Construction of a multi-dwelling development in the General Residential Zone 7 (GRZ7) and alteration of access to a road in a Road Zone, Category 1 in accordance with endorsed plans.
When approved, the plan will be endorsed and will then form part of the permit. Waste collection from the development must be in accordance with the plan, to the satisfaction of the Responsible Authority.
All works must be undertaken in accordance with the endorsed Sustainability Management Plan to the satisfaction of the Responsible Authority. No alterations to the Sustainable Management Plan may occur without written consent of the Responsible Authority.
Without limiting the generality of the tree management plan it must have at least three sections as follows:
(a) Pre-construction - details to include a tree protection zone, height barrier around the tree protection zone, amount and type of mulch to be placed above the tree protection zone and method of cutting any roots or branches which extend beyond the tree protection zone.
(b) During-construction - details to include watering regime during construction and method of protection of exposed roots.
(c) Post-construction - details to include watering regime and time of final inspection when barrier can be removed and protection works and regime can cease.
Pre-construction works and any root cutting must be inspected and approved by the Parks Unit. Removal of protection works and cessation of the tree management plan must be authorised by the Parks Unit.
No vehicular or pedestrian access, trenching or soil excavation is to occur within the Tree Protection Zone without the written consent of the Responsible Authority. No storage or dumping of tools, equipment or waste is to occur within the Tree Protection Zone.
In accordance with Section 69 of the Planning and Environment Act 1987, an application may be submitted to the Responsible Authority for an extension of the periods referred to in this condition.
----End of Conditions---
[1] Section 4(2)(d) of the Victorian Civil and Administrative Tribunal Act 1998 states a failure to make a decision is deemed to be a decision to refuse to make the decision.
[2] I have considered the submissions of all the parties that appeared, all the written and oral evidence, all the exhibits tendered by the parties, and all the statements of grounds filed. I do not recite or refer to all of the contents of those documents in these reasons.
[5] In some locations further south, the GRZ10 is replaced by the NRZ to recognise minimal change areas.
[6] A18 Pty Ltd v Stonnington CC [2014] VCAT 1015.
[7] Global Alpha Group Pty Ltd v Boroondara CC [2013] VCAT 1929.
Burke Vue Pty Ltd
Stonnington CC