Frankston Planning Scheme; Application pursuant to Section 82 of the Planning and Environment Act 1987; General Residential Zone Schedule 1 ('GRZ1'); Two double storey dwellings; Neighbourhood character; Clause 55; Amenity; Costs application.
Oechsle v Frankston CC [2023] VCAT 1356
Twelve sheets - Nos A01 to A012 - all dated 03.05.2023
Application under section 82 of the Planning and Environment Act 1987 - to review the decision to grant a permit.
Development Contributions Plan Overlay - Schedule 2 ('DCPO2').
Clause 32.08-6 (Construct two or more dwellings on a lot in GRZ1).
Clauses 02.03-2, 02.03-5, 02.03-6, 11, 15, 16, 32.08, 52.06, 55, 65 and 71.02.
The site is located on the northern side of the street. The site of 650.29 square metres is rectangular in shape with a frontage of 15.24 metres and a depth of 42.67 metres.
The site is currently occupied by a single storey dwelling and small outbuilding in the north west corner. A crossover and driveway are located in the south east corner and the site has a fall of 1.5 metres towards the rear.
An unaccompanied inspection of the locality and the yard of 11 Bayview Road was undertaken after the hearing on 16 November 2023.
Is an intensification of housing consistent with planning policy?
we recognise that our neighbourhood is earmarked for plenty of development in the coming years. We know that dual occupancy development will be a part of that and we appreciate the need for more well designed and affordable housing in our community.
Is the design an acceptable response to the physical site context and policies and decision guidelines designed to guide built form, along with the requirements of clause 55?
(a) whether a party has conducted the proceeding in a way that unnecessarily disadvantaged another party to the proceeding by conduct such as -
(i) failing to comply with an order or direction of the Tribunal without reasonable excuse;
(ii) failing to comply with this Act, the regulations, the rules or an enabling enactment;
(iii) asking for an adjournment as a result of (i) or (ii);
(iv) causing an adjournment;
(v) attempting to deceive another party or the Tribunal;
(vi) vexatiously conducting the proceeding;
(b) whether a party has been responsible for prolonging unreasonably the time taken to complete the proceeding;
(c) the relative strengths of the claims made by each of the parties, including whether a party has made a claim that has no tenable basis in fact or law;
(d) the nature and complexity of the proceeding;
(e) any other matter the Tribunal considers relevant.
Background as to what has transpired since December 2022
What are the reasons for and against costs being awarded?
At nearly all times of the day the current proposal will heavily shadow our home office and kitchen areas in particular. We would also like reassurance that the shadow diagrams supplied have been properly considered, as the 9am diagram doesn't seem to be accurate.
(a) The finished floor level to AHD to be shown on the ground and first floors of each dwelling.
(b) The internal dimension of the garage for Dwelling 1 to be 6 metres.
(c) All windows shown on plans to be shown correctly on elevations (example west facing ground level window of Dwelling 2).
(d) The streetscape elevation to be amended to properly reflect the lower height of dwelling 2 behind and to the side of Dwelling 1.
(e) All trees growing on the site and on the adjoining properties within 3m of the boundaries must be clearly illustrated on all relevant plans to demonstrate canopy width, trunk location and clearly labelled in accordance with the Tree Assessment Report prepared by Nick Collet dated 29th June 2021 and clearly state whether the tree is to be retained or removed to the satisfaction of the Responsible Authority.
(f) The Tree Protection Zone (TPZ), Structural Root Zone (SRZ) and the tree protection fence locations for all trees to be retained must be illustrated on all relevant plans to the satisfaction of the Responsible Authority.
(g) Tree protection conditions noted in accordance with Conditions 6-8.
(h) The access way to Dwelling 2 must be constructed above the existing soil grade and with permeable materials where it is located within the tree protection zone of any trees to be retained.
(i) Pedestrian visibility splays clearly notated on the plans in accordance with Design Standard 1 of Clause 52.06-9 of the Frankston Planning Scheme to the west side of the access way to Dwelling 1 and the east side of the access way to Dwelling 2.
(j) The proposed materials and colour schedule (including samples) to be provided and annotated on the elevation plan.
(k) Location of habitable and non-habitable room windows on adjoining properties to be shown on all relevant plans.
(l) Freestanding trellis to a height of 1.7 metres above the finished floor level of the dwellings must be erected on eastern boundary to avoid overlooking from the ground level of Dwelling 2 into adjoining habitable room windows and secluded private open space areas and framed and maintained to the satisfaction of the Responsible Authority.
(m) Site plan to show crossover location and width for Dwelling 2, nature strip and road.
(n) Water tanks for both dwellings.
(o) External storage to Dwelling 2 deleted.
(p) Garage length of Dwelling 1 to be consistent with measurements on plans.
(q) Mailbox to Dwelling 2 to be relocated to west side of access way.
(r) Access way width to Dwelling 1 to be consistent with measurements on plans.
(s) A garden bed within a minimum width of 500mm to be provided between the western boundary of the secluded private open space to Dwelling 2 and the access way.
(t) The garage walls where located on the site boundaries for both dwellings modified to comply with Standard B18 of Clause 55.04-2 of the Frankston Planning Scheme. The walls are to have an average height of no greater than 3.2 metres.
(u) Bollard lighting in accordance with Condition 19.
(v) Landscape Plan in accordance with Condition 3.
(a) A survey (including botanical names) of all existing vegetation on the site and those located within three (3) metres of the boundary of the site on adjoining properties, accurately illustrated to represent canopy width and labelled with botanical name, height and whether the tree is proposed to be retained and/or removed.
(b) The tree number, TPZ, SRZ and notations regarding protection methods during construction of retained trees.
(c) Buildings on neighbouring properties within three metres of the boundary.
(d) The delineation and details of surface finishes of all garden beds, grassed areas, pathways, driveways, retaining walls and other landscape works including areas of cut and fill throughout the development site.
(e) A planting schedule of all proposed trees, shrubs and ground covers, including botanical names, common names, pot sizes, size at maturity and quantities of each plant.
(f) A range of plant types from ground covers to large shrubs and trees.
(g) Landscaping and planting within all open areas of the site.
(h) Adequate planting densities (e.g.: plants with a mature width of 1 metre, planted at 1 metre intervals).
(i) The provision of screen planting (minimum mature height of 1.5m) within a landscape strip at the interface of the property boundary and driveway.
(j) Planting within corner splay/areas to have a maximum height of 900mm.
(k) A planting theme of a minimum 50% indigenous and 50% native within each plant group.
(l) All existing environmental weed species are to be removed from the site and environmental and noxious weeds found in the 'Frankston Invasive species guide (2019) are not to be planted.
(m) The provision of suitable canopy trees (minimum two metres tall when planted) in the areas specified below (trees are not to be sited over easements) with species chosen to be approved by the Responsible Authority:
- Two (2) canopy trees within the front setback of Dwelling 1 with a minimum mature height of 8m.
- Two (2) canopy trees within the private open space of both dwellings with a minimum mature height 6m.
(n) The provision of notes on the landscape plan regarding site preparation, including in-ground irrigation system to be provided to all landscaped areas, removal of all weeds, proposed mulch, soil types and thickness, subsoil preparation and any specific maintenance requirements.
(o) All tree stock used must be in accordance with AS2303-2015 Tree stock for Landscape Use.
The requirements below must be observed within this area -
(a) Coarse mulch laid to a depth of 50-100 mm (excluding street trees).
(b) No vehicular or pedestrian access.
(c) The existing soil level must not be altered either by fill or excavation.
(d) The soil must not be compacted or the soil's drainage changed.
(e) No fuels, oils, chemicals, poisons, rubbish or other materials harmful to trees are to be disposed of or stored.
(f) No storage of equipment, machinery or material is to occur.
(g) Open trenching to lay underground services e.g.: drainage, water, gas, etc. must not be used unless approved by the Responsible authority to tunnel beneath.
(h) Nothing whatsoever, including temporary services wires, nails, screws or any other fixing device, is to be attached to any tree.
(i) Tree roots must not be severed or injured.
(j) Machinery must not be used to remove any existing concrete, bricks or other materials.
The tree protection fence must remain in place for the duration of building and works to the satisfaction of the Responsible Authority
(a) On-site stormwater detention and rainwater tanks.
(b) Soil percolation.
(c) Stormwater harvesting and Re-use of stormwater for garden watering, toilet flushing, etc.
(d) On-site 'bio-treatment' to reduce dissolved contaminants and suspended solids.
(a) Constructed to the satisfaction of the Responsible Authority;
(b) Properly formed to such levels that they can be used in accordance with the plans;
(c) Surfaced with an all-weather sealcoat; and
(d) Drained and maintained to the satisfaction of the Responsible Authority.
Car spaces, access lanes and driveways must be kept available for these purposes at all times.
Precautions must include, appropriate signage to AS 1743 Road Works Signing Code of Practice, the provision of adequate barricading of works, including trenches of Service Authorities and any other road openings, sufficient to ensure public safety.
All relevant permits must be obtained from Council for works within the existing road reserves, in addition to the planning permit.
(a) The development has not started within two (2) years of the date of this permit; or
(b) The development is not completed within four (4) years of the date of this permit.
In accordance with Section 69 of the Planning and Environment Act 1987, an application may be submitted to the Responsible Authority for an extension of the periods referred to in this condition.
[1] The submissions, any supporting exhibits given at the hearing, and the statements of grounds filed, have all been considered in the determination of the proceeding. In accordance with the practice of the Tribunal, not all of this material will be cited or referred to in these reasons.
[2] Council's submission a paragraph 72 states the average setback as 8.2 metres but this does not reflect the setbacks of the adjoining dwellings shown on the design response plan (A02).
[3] Springer v Glenelg SC [2009] VCAT 1114; Moorabool Wind Farm Pty Ltd v Moorabool SC [2012] VCAT 1393; Crothers v Moira SC [2019] VCAT 1375.
Oechsle