Application under section 77 of the Planning and Environment Act 1987 (Vic) - to review the refusal to grant a permit.
Clause 45.06 Development Contributions Plan Overlay
The combined area of 32- 34 Railway Road Neerim South is 2206 square metres. The site is broadly rectangular in shape and has a 31.3 m frontage to Railway Parade and a 49.6 m frontage to Railway Road.
The topography of the land is flat, and the review site is currently vacant.
The site is located approximately 34.2m from the bank of Red Hill Creek.
WHY WAS THE MATTER REFERRED TO A PRACTICE DAY HEARING?
1. The proposal is not consistent with the objective of clause 13.01-1S 'Natural hazards and climate change' of the Planning Policy Framework (PPF) which seeks to 'minimise the impacts of natural hazards and adapt to the impacts of climate change through risk-based planning'.
2. The proposal is not consistent with the objective of clause 13.03-1S 'Floodplain management' of the PPF which seeks to 'assist the protection of: life, property and community infrastructure from flood hazard, including coastal inundation, riverine and overland flows; the natural flood carrying capacity of rivers, streams and floodways; the flood storage function of floodplains and waterways; floodplain areas of environmental significance or of importance to river, wetland or coastal health.' This includes the following strategies:
3. The proposal is not consistent with the principles and objectives from the Authority's Flood Guidelines: Guidelines for development in flood prone areas (2020)[6]. (Ground 3 - Flood Guidelines)
4. The proposal is not consistent with the decision guidelines in the Victorian Planning Provision (VPP) Planning Practice Note PPN11: Applying for a Planning Permit Under the Flood Provisions, in that:
b. It is likely to result in danger to the life, health and safety of the occupants due to flooding of the site.
c. It relies on low-level access to and from the site.
d. It is likely to increase the burden on emergency services and the risk to emergency personnel.
e. It is likely to increase the amount of flood damage to public or private assets.
f. It is likely to increase the number of buildings located in a floodway area. (Ground 4 - PPN1)
Figure 1 - Extract from page 6 Council officer's report
'As a result of the changes made, the impact on nearby properties is extremely minor.
...
[After pointing out that the CMA is not a referral authority] As such the West Gippsland Catchment Management Authority does not have a statutory role in the assessment of the application.
Changes Made to Address the CMA issues
In response to the issues raised by the CMA, the permit applicant has made significant changes to the design, which include:
The changes have been informed by the Flood Impact Assessment prepared by Raiin dated 15 January 2024.
...
Given the significant delays that have been incurred, it is requested that the application proceed to advertising as soon as possible.'
[30] It can be observed that the apparent scope of relevant considerations is extremely broad. This is typically the case with planning permit decisions. Yet if all apparently relevant factors need to be considered in a particular case, with reasons being articulated as to how the matter was taken into account, the making of planning permit decisions would be quite impossible. In the real world, most decisions revolve around just one or two key considerations.
[35] The National Trust principle has a valuable role to play in the administration of planning in Victoria. Indeed, current planning schemes, which are based on the Victoria Planning Provisions, are predicated upon the application of the National Trust principle. These schemes contain many provisions which require a permit to be obtained in specific circumstances, which are designed to regulate use or development in those specific circumstances. For example, there are specific controls in relation to the construction of buildings in wildfire areas, in areas prone to erosion, in areas susceptible to flooding and in areas susceptible to land salinity. Similarly, there are provisions in relation to the height of buildings, access on to main roads and the removal of native vegetation. Sometimes these specific controls are part of an overlay provision; sometimes they are the result of specific clauses of the scheme. If, upon an application for a permit under one of the specific provisions, the decision maker was required to consider the full panoply of planning considerations set out in sections 60 and 84B of the Planning and Environment Act and in clause 65 of each planning scheme, planning decision making would grind to a standstill.
The latter part of this argument meets immediately with difficulty. For the purpose of the grant of the discretion is to control the height of buildings in a particular area. Notwithstanding the general words of clause 5A the responsible authority is not entitled "to introduce into the considerations affecting the grant of a licence an element foreign to the duties" of the authority in that regard, or to engage "in a consideration of matters extraneous to the application for a licence", or matter which is "too remote" therefrom. (Victorian Railways Commissioners v McCartney and Nicholson (1934) 52 CLR at pp. 390, 395, 398). "The discretion must be used and the power exercised bona fide and with the view of achieving ends or objects not outside the purposes for which the discretion or power is conferred". (Shrimpton v the Commonwealth (1945) 69 CLR, at pp. 620, 627, 631 and 632). The discretion conferred by clause 24(4) is one conferred for the purpose of controlling the height of buildings. In that connection it is proper to have regard to what is prescribed by clause 5A. But to use that discretion for the purpose of endeavouring to ensure the conservation of an historic building and to regulate the orderly and proper planning of the area in which it is situated and the amenity of the neighbourhood, in other respects than with regard to the height of the building, is to endeavour to achieve ends outside the purpose for which the power is conferred and to intrude into the exercise of the discretion matters which are extraneous to it. The responsible authority could not properly refuse the permit under the Planning Scheme on such considerations and could not properly have regard to them in determining whether to grant a permit or not. [emphasis added]
[36] As presently advised, I consider that the tribunal, even when constituted by the President, is bound by decisions of the Supreme Court of Victoria. Hence, I regard myself as bound by the decision in Shalit, the ratio decidendi of which is directly in point, and hold that the National Trust principle applies to planning schemes based upon the Victoria Planning Provisions. (Incidentally, any other finding would create a severe problem for planning decision-making in Victoria and would require an immediate legislative amendment.) But I am also of the independent view that the National Trust principle is applicable to current Victorian planning schemes.
No discretion to be exercised means that no policies are engaged[13]
[68] The Tribunal must only consider the policies at state and local level that are relevant to the exercise of the discretion it has to determine. No permit is required for a provision of car parking over the specified rate in Clause 52.06 thus no question of the exercise of discretion arises in respect of provision of the quantum of car parking.
[69] The principles which should be applied can be summarised as follows:
[75] The Tribunal's task is to make a decision on the permit application taking into account all relevant considerations called up by the permit triggers set out in the Scheme. > > [76] The ambit of the discretion to be exercised is constrained by the purpose for which it is generated. Policy of itself is not a trigger for the exercise of discretion but provides the guidance and strategic context for decision-making once a decision has to be made under the planning scheme provisions. > > [77] The role of policy is not the same as the role of the provisions which trigger the need for a permit. Policy at this statutory point is the servant not the master.
One must remain mindful that policy cannot operate as a control. The zone and overlays and particular provisions are the controls. They are the provisions which trigger a permit requirement, that is, they are the provisions which call up an exercise of discretion. Polices assist in the exercise of discretion when a decision is to be made, that is where a permit.is required for a particular use or development.
In essence the relevant clause dealing with car parking in the planning scheme was held to 'cover the field' with respect to car parking requiring a permit. The fact that no permit was required under that provision was not a relevant consideration in assessing the permit that was before the Tribunal under the zone.
[133] Rather, given the Council's issue of the NOD for the proposal, the approval of the permission sought under the LSIO - as well as the permission sought under the BMO1 - can be said to have been 'established'. Accordingly, the only permission that is available for review by the applicants under section 82 of the Act is that sought under the GRZ. > > [134] What this means is that the only matters that are available for review by the Tribunal in this proceeding brought under section 82 of the Act are those that relate to the permission sought under the GRZ. > > [135] The flooding concerns raised by the applicants are properly addressed in the assessment of the permission sought under the LSIO. As stated, this permission is not before the Tribunal in this review proceeding. > > [136] The only way that the applicants' concerns regarding flooding could be taken into account is through the Tribunal's consideration of the permission that is before the Tribunal for review, being that under the GRZ. > > [137] I acknowledge that there is State and local planning policy in the Scheme that deals with floodplains: clause 13.03 'Floodplains' includes clause 13.03-1S 'Floodplain management' and clause 13.03-1L 'Floodplain management in Campaspe'. > > [138] I also acknowledge that clause 65.01 of the Scheme requires consideration 'as appropriate' of 'the degree of flood, erosion or fire hazard associated with the location of the land and the use, development or management of the land so as to minimise any such hazard'. > > [139] I acknowledge that section 60(1)(e) of the Act requires consideration of any significant effects which the responsible authority considers the development may have on the environment or which the environment may have on the development. > > [140] These provisions would be relevant to the assessment of the permission sought under the LSIO. However, as stated, the decision to issue the permission under the LISO is not reviewable in this proceeding. > > [141] These provisions will not be taken into account in assessing the permission sought under the GRZ. This is because, given the imposition of the LSIO over the Land, the LSIO 'covers the field' with respect to floodplain management of areas identified for inclusion in the LSIO. > > [142] Analogous with the situation in Clifftop as regards the presence of the BMO in that case, in the present case where the LSIO is in operation, floodplain management and flooding risk is assessed under the LSIO and not under the GRZ. > > [143] In summary:
...
[154] The purposes of the GRZ are to encourage residential development that respects neighbourhood character, and to do so in higher densities in parts of the GRZ that are well located in terms of access to services and transport. It is also to provide for appropriate non-residential development, such as medical centres and places of worship.
[155] It is not to identify land that is prone to flooding or to manage flood risk in association with land.
[156] If land is identified as being prone to flooding and requiring special management as a consequence, including in terms of whether it can be developed with dwellings and how many, that land should be included in one of the specific flood zones or overlays. The inclusion of land in such a zone or overlay will have implications in terms of the development potential of the land - as is expected. The inclusion of land in such a zone or overlay would occur following a planning scheme amendment, where affected persons are given the opportunity to comment on the land's potential rezoning.
[157] Here, the Land is included in such a flood overlay, with the consequence that those specific flood concerns are assessed when permission is required under the LSIO. That is the appropriate place to assess those matters.
[158] It cannot be the case that effectively the same issues with regards to flood risk and flood management can be taken into account in the assessment of permission sought under the GRZ, through the application of clause 13.03‑1S, 13.03-1L and clause 65 of the Scheme and section 60(1)(e) of the Act as are taken into account in assessing a permission sought under a specific flood overlay, such as the LSIO.
[159] If this were so, then this would result in a decision-maker taking into account specialised and potentially technical matters under a more generalised zone permission, where the decision guidelines in the zone are not directed at such assessment.
[160] As I said in Clifftop, this would also effectively provide third parties with a 'back door' to be involved in the assessment of these matters through, in this case, a development permission under the GRZ when those persons are not able to address those matters via the specific provision that deals with it, namely the LSIO, due to the exemption in the Scheme. This cannot be correct.
[161] For these reasons, I find that in the circumstances of this proceeding, the applicants cannot raise flooding concerns in relation to the decision that is before the Tribunal, namely, whether to grant permission under the GRZ for the development of 16 dwellings.
[84] As to flooding risk, following the same line of thinking, I am also not prepared to amend the grounds of review to include the second ground in the applicant's correspondence dated 13 June 2024 that deals with flooding risk and impact. > > [85] I acknowledge that the second purpose of the LDRZ directs consideration to whether lots, in the absence of reticulated sewerage, can treat and retain all wastewater generated on site. I accept that the referral under clause 66.02-5 of the Scheme supports the notion that impact to the catchment is an important consideration in an application under the LDRZ. However, neither of these things is akin to dealing with flooding risk; these are about potential impact to the catchment, not the impact of, or on, flooding as a consequence of the development. > > [86] In the absence of any purpose or decision guideline in the LDRZ that refers to flooding risk, there is no warrant to be assessing the flooding risk associated with the proposal through the permissions sought under the LDRZ. > > [87] Whilst there is a waterway (and dam on the waterway) on the Land, there is no zone or overlay control applied to the Land that addresses flooding risk. This being the case, notwithstanding what the applicant or other persons might contend about flooding risk posed by or to the Land, in the absence of such a control, the Scheme does not recognise that flooding is a matter that needs to be taken into account in assessing use and development on the Land. > > [88] Finally, notwithstanding the respondent's reference to clause 52.17 of the Scheme, I am also not persuaded that there is any link in the permission sought in that clause or in those permissions sought under the LDRZ to the potential impact on wildlife as a consequence of light spill from the proposal or increased vehicle movements from the proposal. > > [89] As such, I am also not prepared to amend the applicant's grounds to include the third ground in the applicant's correspondence dated 13 June 2024.
Which zones, overlay and particular provisions apply to the review site?
Before deciding on an application, in addition to the decision guidelines in Clause 65, the responsible authority must consider, as appropriate:
General
...
Dwellings, small second dwellings and residential buildings
Building height if the land is subject to inundation
If the land is in the Special Building Overlay, Land Subject to Inundation Overlay or is land liable to inundation the maximum building height specified in the zone or schedule to the zone is the vertical distance from the minimum floor level determined by the relevant drainage authority or floodplain management authority to the roof or parapet at any point[22].
Before deciding on an application or approval of a plan, the responsible authority must consider, as appropriate:
This clause does not apply to a VicSmart application.[23]
(1) Before deciding on an application, the responsible authority must consider -
(a) the relevant planning scheme; and
(b) the objectives of planning in Victoria; and
(c) all objections and other submissions which it has received and which have not been withdrawn; and
(d) any decision and comments of a referral authority which it has received; and
(e) any significant effects which the responsible authority considers the use or development may have on the environment or which the responsible authority considers the environment may have on the use or development; and
(f) any significant social effects and economic effects which the responsible authority considers the use or development may have.
(1A) Before deciding on an application, the responsible authority, if the circumstances appear to so require, may consider -
...
(g) any other strategic plan, policy statement, code or guideline which has been adopted by a Minister, government department, public authority or municipal council; ...
Strategies
Identify land affected by flooding, including land inundated by the 1 in 100-year flood event (1 per cent Annual Exceedance Probability) or as determined by the floodplain management authority in planning schemes.
Avoid intensifying the impact of flooding through inappropriately located use and development.
Plan for the cumulative impacts of use and development on flood behaviour.
Locate emergency and community facilities (including hospitals, ambulance stations, police stations, fire stations, residential aged care facilities, communication facilities, transport facilities, community shelters, child care centres and schools) outside the 1 in 100 year (1 per cent Annual Exceedance Probability) floodplain and, where possible, at levels above the height of the probable maximum flood.
Locate use and development that involve the storage or disposal of environmentally hazardous industrial and agricultural chemicals or wastes and other dangerous goods (including intensive animal industries and sewage treatment plants) outside floodplains unless site design and management is such that potential contact between such substances and floodwaters is prevented, without affecting the flood carrying and flood storage functions of the floodplain.
Ensure land use on floodplains minimises the risk of waterway contamination occurring during floods and floodplains are able to function as temporary storage to moderate peak flows and minimise downstream impacts.
Policy guidelines
Consider as relevant:
Which planning scheme provisions do not affect the review site?

To implement the Municipal Planning Strategy and the Planning Policy Framework.
To identify waterways, major floodpaths, drainage depressions and high hazard areas within urban areas which have the greatest risk and frequency of being affected by flooding.
To ensure that any development maintains the free passage and temporary storage of floodwater, minimises flood damage and is compatible with flood hazard, local drainage conditions and the minimisation of soil erosion, sedimentation and silting.
To reflect any declarations under Division 4 of Part 10 of the Water Act, 1989.
To protect water quality and waterways as natural resources by managing urban stormwater, protecting water supply catchment areas and managing saline discharges to minimise the risks to the environmental quality of water and groundwater.
To implement the Municipal Planning Strategy and the Planning Policy Framework.
To identify waterways, major floodpaths, drainage depressions and high hazard areas which have the greatest risk and frequency of being affected by flooding.
To ensure that any development maintains the free passage and temporary storage of floodwater, minimises flood damage and is compatible with flood hazard, local drainage conditions and the minimisation of soil erosion, sedimentation and silting.
To reflect any declarations under Division 4 of Part 10 of the Water Act, 1989 if a declaration has been made.
To protect water quality and waterways as natural resources by managing urban stormwater, protecting water supply catchment areas, and managing saline discharges to minimise the risks to the environmental quality of water and groundwater.
To ensure that development maintains or improves river and wetland health, waterway protection and flood plain health.
To implement the Municipal Planning Strategy and the Planning Policy Framework.
To identify flood prone land in a riverine or coastal area affected by the 1 in 100 (1 per cent Annual Exceedance Probability) year flood or any other area determined by the floodplain management authority.
To ensure that development maintains the free passage and temporary storage of floodwaters, minimises flood damage, responds to the flood hazard and local drainage conditions and will not cause any significant rise in flood level or flow velocity.
To minimise the potential flood risk to life, health and safety associated with development.
To reflect a declaration under Division 4 of Part 10 of the Water Act, 1989.
To protect water quality and waterways as natural resources by managing urban stormwater, protecting water supply catchment areas, and managing saline discharges to minimise the risks to the environmental quality of water and groundwater.
To ensure that development maintains or improves river, marine, coastal and wetland health, waterway protection and floodplain health.
To implement the Municipal Planning Strategy and the Planning Policy Framework.
To identify land in urban areas liable to inundation by overland flows from the urban drainage system as determined by, or in consultation with, the floodplain management authority.
To ensure that development maintains the free passage and temporary storage of floodwaters, minimises flood damage, is compatible with the flood hazard and local drainage conditions and will not cause any significant rise in flood level or flow velocity.
To protect water quality and waterways as natural resources by managing urban stormwater, protecting water supply catchment areas, and managing saline discharges to minimise the risks to the environmental quality of water and groundwater.
The decision-maker should ask 'what is the purpose of that permission and what decision guidelines are to be taken into account in assess that permission?[25]
The third purpose may allow further enquiries into the locations where a diversity of housing types and housing growth might be encouraged. Although, this will turn on the emphasis on locations offering good access to services and transport. Here, the use of particularly, if interpreted narrowly, could limit this to consideration of housing diversity and housing growth only in locations offering good access to services and transport. However, a better view, having regard to other aspects of the planning scheme and the operation of the GRZ and Clause 55, is that this is guided by any policy related to the location of housing and future urban growth (including infill development) in the Municipal Planning Strategy and the Planning Policy Framework.
It is further submitted, that the site has an obvious and known flood risk which has been identified and examined as part of the application process. Here, it ought to be open to the decision maker to consider the risk to life and property from flooding as is apparent from sections 4, 60 and 84B of the Act, and the relevant controls, policy and Clause 65 of the Scheme. It is submitted that the decision guidelines in Clause 64 and Section 60 of the Act are not too broad to incorporate. consideration of the policy/s under Clause 13.01 and 13.03-1S. In fact these policies enunciate the State dimension for incorporating natural hazards and climate change policy in Victorian planning schemes and decisions.
One must remain mindful that policy cannot operate as a control. The zones and overlays and particular provisions are the controls. They are the provisions which trigger a permit requirement, that is, they are the provisions which call up an exercise of discretion. Policies assist in the exercise of discretion when a decision is to be made, that is where a permit is required for a particular use or development.[27]
(a) Provided a copy of the CMA 2020 Flood Guidelines;
(b) Confirmed that the CMA is a public authority established under clause 11 of the Catchment of Land Protection Act 1994 ('Vic').
(c) Indicated the guidelines were adopted by the CMA Board at its Board meeting 268 in November 2019.
(d) Referred to a policy Use and Development within Floodplains Policy (Document 20/PL051) adopted on board meeting number 269 on 13 December 2019 which states:
Policy statement
For the purposes of clause 13.03-1S of the Planning Policy Framework this Policy has been adopted as a 'policy guideline' by the Board of the WGCMA in its role as the relevant floodplain management authority in the WGCMA Region and is to be used to guide decision-making on:
It applies to situations when WGCMA is a referral authority in respect of a planning application and also to situations when WGCMA makes a decision as to whether to object to a planning application.
This policy is also to be used to guide decision making for Flood Advice requests under Section 202 of the Water Act 1989 which may lead to future Planning Permit applications under the Planning and Environment Act 1987.
When making decisions regarding planning permit applications to which this policy applies, the WGCMA will seek to minimise the increase in flood risk, through the implementation of Floodplain
Management Best Practice. This includes applications for uses or developments in existing urban areas, in greenfield areas and in rural areas. The Authority also recognises the increased risk that Climate Change and potential sea level rise will pose on communities already exposed to flooding.
In accordance with the West Gippsland Regional Catchment Strategy and this policy, Floodplain Management Best Practice is to be implemented by applying the 'WGCMA Guidelines for development in flood prone areas'.
(e) Concluded:
Given the above, it is the WGCMA's view that the WGCMA Flood Guidelines - Guidelines for Development in Flood Prone Areas (2020) has status as a Policy Guideline under clause 13.03-1S Floodplain Management and has the status of a document to which section 60(1A)(g) of the Planning and Environment Act 1987 (Vic) applies.
(1A) Before deciding on an application, the responsible authority, if the circumstances appear to so require, may consider -
(g) any other strategic plan, policy statement, code or guideline which has been adopted by a Minister, government department, public authority or municipal council;
Preparing a flood risk report
If a local floodplain development plan has not been incorporated into the planning scheme, a flood risk report must be prepared by the applicant if the land is in the UFZ or the FO and lodged with the planning permit application.
[39] Section 60(1) of the Planning and Environment Act sets out matters which the responsible authority, before deciding on an application, must consider, and if the circumstances appear to require, may consider. As Hayne JA observed in Returned Service League of Australia (Victorian Branch) Inc, Glenroy Subbranch v Moreland City Council [1998] 2 VR 406, at 413: (1997) 19 AATR 07 @ 114:
Section 60 of the Planning and Environment Act is not easy to construe. At first sight the contrast drawn between matters which a responsible authority (and the tribunal on rehearing) "must consider" and those which it "may consider" "if the circumstances appear to so require" is stark and suggests a distinction between obligation and unfettered discretion. The nature and extent of the difference, however, may not be as obvious as that first sight might suggest. It is noted that subpara. (iii) of para.(b) refers to "any other relevant matter". It would be strange if a responsible authority had a completely unfettered discretion whether to consider a relevant matter before deciding on an application.
[40] In that case, the Court of Appeal held that the responsible authority is bound to have regard to the matters set out in subparagraphs (i), (ii), (ia) and (iii) of paragraph (b) of the subsection, if these matters bear upon any issue under consideration. ([1998] 2 VR 406, at 413 to 414.) In my opinion, the same logic applies to paragraph (a) of the subsection. The commandment that certain matters "must" be considered is, in my opinion, to be qualified by the proviso that the matter bear upon the issue under consideration. In other words, section 60(1)(a) of the Act is to be read as if it contained the words "if relevant to the application" or "if relevant" after the words "must consider". Thus the commandment that the responsible authority must consider all objections does not mean that an irrelevant objection (to take an extreme example, the applicant has red hair) must be considered.
WHAT WOULD HAVE HAPPENED IF AMENDMENT C144 HAD BEEN IMPLEMENTED?
There is a known flood hazard at the subject property. The site is subject to inundation from Red Hill Creek during a 1% Annual Exceedance Probability (AEP) flood event. This information was obtained from the Neerim South Flood Study (2020). Planning Scheme Amendment (PSA) C144bawb proposed to implement this information in the Baw Baw Planning Scheme through application of the LSIO and FO to the site. However, the PSA was abandoned
What the amendment does
The amendment proposes to update the Land Subject to Inundation Overlay (LSIO) and Floodway Overlay (FO) maps within the Baw Baw Planning Scheme based on strategic flood and drainage assessments completed by Melbourne Water, WGCMA and Council officers.
More specifically, the amendment proposes to:
The amendment applies the updated flood overlays to areas known to be affected by mainstream flooding during a 100-year Average Recurrence Interval (ARI) flood. The FO has been applied to areas that are likely to experience active flood flows and/or store floodwaters to hazardous depths, while the LSIO generally applies to areas that are subject to mainstream flooding but have a lower flood risk than areas in the FO. The LSIO may also apply to areas that are known to flood but where there is no information about flood depth, velocity and level of hazard.
The application of these updated overlays will assist Local Government, the Water Authorities and the community in carrying out more effective planning and management of land affected by flooding.
The FO and LSIO require that a planning permit be obtained from Baw Baw Shire Council prior to commencement of certain developments. Each planning permit application will be assessed on its merits, with the WGCMA or Melbourne Water acting as a Referral Authority to assist Council in the consideration of applications.
[1] The submissions and evidence of the parties, any supporting exhibits given at the hearing and the statements of grounds filed have all been considered in the determination of the proceeding. In accordance with the practice of the Tribunal, not all of this material will be cited or referred to in these reasons.
[2] It is also subject to Development Contributions Plan Overlay - schedule 1 which does not impose any requirements for the application.
[3] The parties agree that these issues may be considered in accordance with clauses 55 and clause 53.18 of the Scheme and that these clauses do not cover the flooding issues which the CMA seeks to have considered.
[4] The CMA's explanation for the late submission of its grounds is that it initially erroneously identified itself as a referral authority on the Statement of Grounds lodged with the Tribunal. Essentially, having initially lodged the grounds on a basis which would not attract a fee, once the error was identified and attended to it had missed the date for paying the fee. For this reason, the Tribunal is required to consider whether it should be joined as a party to the proceedings.
[5] The hearing of the matter was adjourned by consent for reasons not relevant to this decision. At the commencement of the first Practice Day Hearing the Council foreshadowed that it would consider asking the Tribunal to refer this matter or an unidentified issue raised by this matter to the Governor in Council under clause 60 of Schedule 1 to the Victorian Civil and Administrative Tribunal Act 1998 (Vic). Ultimately, prior to the reconvened Practice Day Hearing the Council informed the Tribunal that it did not intend to make that application or submission.
[6] The CMA stated that these guidelines could be considered under clause 13.03 but were not included in the Planning Scheme and did not assert that they could be considered independently of that clause.
[7] Which were provided in accordance with the Tribunal's orders. These submissions addressed the Tribunal's previous decisions in Crawford v Surf Coast SC [2013] VCAT 1660 (26 September 2013); Lindsay Holland Pty Ltd v South Gippsland SC [2018] VCAT 1408 (24 September 2018) Having considered each of the decisions raised by the CMA, I agree that it appears that the Tribunal has, on occasions, considered flood related issues in the absence of a flood related zones or overlays. Those decisions do not directly address the arguments put before me and I have not examined all of the planning scheme provisions which applied at the time each decision was made. I have considered each of these decisions but do not consider any of them to be of material assistance in analysing the matters I am required to decide in this matter particularly in view of the many more recent decisions of the Courts and Tribunal including Brunswick Investment Project Pty Ltd v Moreland CC [2021] VCAT 1191; Viva Energy Australia v Greater Geelong CC [2022] VCAT 326, Cinanni v Campaspe SC [2023] VCAT 797, Jordan v Baw Baw SC [2024] VCAT 444, Booth v Strathbogie SC [2023] VCAT 782 and Trickey v Mount Alexander SC [2024] VCAT 863.
[8] The permit applicant says that even though it did provide the Flood report it is entitled to argue that this was not necessary and that flooding related matters are not relevant considerations and to seek a ruling on this issue. I accept that proposition.
[9] In Strachan v LaTrobe CC [2024] VCAT 541 at footnote 9: Recent cases considering the correct approach to this issue referred to in that case were identified as: Clifftop at Hepburn Pty Ltd SC & Ors [2023] VCAT 201 (1 March 2023) ('Clifftop'); Booth v Strathbogie SC [2023] VCAT 782 (11 July 2023) ('Booth'); Viva Energy Australia Pty Ltd v City of Geater Geelong Council & Anor [2023] VSC 586 (10 October 2023) ('Viva Energy VSC'); at the time, the Notice of Appeal to the Supreme Court of Victoria from the decision of the Tribunal in Myers v Southern Grampians SC [2022] VCAT 695 ('Myers (Tribunal)') and then decision of the Supreme Court of Victoria in Myers v Southern Grampians SC [2023] VSC 658 ('Myers VSC)') was handed down on 16 November 2023. Also, the decision in Brunswick Investment Project Pty Ltd v Moreland CC [2021] VCAT 1191 ('Brunswick Investment') was raised.
[10] [2004] VCAT 20 at [46].
[11] For example, Shalit v Jackson Clement Burrows Architects Pty Ltd [2002] VSC 528 (2002) 12 VPR 329 Salmal Constructions Pty Ltd v Richards (1998) 99 LGERA 423, (1998) 22 AATR 339; Viva Energy Australia Pty Ltd v City of Greater Geelong Council (10 October 2023) [2023 VSC 586.
[12] Considered by Forbes J in Viva Energy Australia Pty Ltd v City of Greater Geelong Council (10 October 2023) [2023] VSC 586.
[15] Urban Floodway zone, Floodway Overlay, Land Subject to Inundation Overlay and Special Building Overlay
[16] Urban Floodway zone, Floodway Overlay, Land Subject to Inundation Overlay.
[17] See for example Jordan v Baw Baw SC [2024] 444 which concerned third party rights in a Farming zone, Booth v Strathbogie SC [2023] VCAT 782 which concerned bushfire planning.
[18] This clause requires compliance with certain design standards and provides discretions in relation to certain elements of application for two or more dwellings on a lot and residential buildings. This clause applies to this application but is not expressed to include considerations relevant to flooding. No submissions relied upon clause 55 in argument.
[19] This clause requires consideration of stormwater management in urban development and is relevant to this decision.
[20] I have not set out the text of all provisions of the Scheme or the PE Act but record that I have considered each of those referred to by the parties and in this decision.
[21] Excluding decision guidelines relating to subdivision and non-residential use and development.
[22] The Council and the applicant agreed that this provision related only to height and was not engaged here. The Council has not nominated the area as liable to flooding for the purposes of the Building Act 1993 (Vic.).
[23] Emphasis added to identify matters discussed in submissions.
[24] As set out in its prefiled submissions for the Practice Day Hearing at [15].
[25] By reference to Scoventure Pty Ltd v Yarra CC [2024] VCAT 1207 at [207]
[26] The Council cites Nasarella v Hobsons Bay CC [2024] VCAT 212 in support of this proposition.
[28] I was not provided with any submissions identifying how the West Gippsland Catchment Strategy 2021-2027 was to be considered in this matter.
[30] [2024] VCAT 992 at [20].
[32] For example, PPN11 and PPN12 were considered in AVC Operations Pty Lty v Maribyrnong City Council [2024] VSC 683 at [42] Harris J observed that the Tribunal has also accepted that the Department of Environment, Land Water and Planning (DEWLP) Guidelines for Development in Flood affected areas issues in were relevant in considering and amendment application. Applying for a Planning Permit under the Flood Provisions - Planning Practice Note 11 and Applying the flood provisions in planning schemes - Planning Practice Note 12 were considered to be relevant matters under section 60(1A)(g) of the PE Act at [150] and [154]; Glenelg Hopkins Catchment Management Authority v Moyne SC [2023] VCAT 1245 where the considerations before the Tribunal included land subject to both a Land Subject to Inundation Overlay and a Floodway Overlay.
Kiyagan
Baw Baw SC [2025] VCAT 206